1 October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite Production Strategy Data Product (SS#) PGEs Data Dates PR Status (Unless noted, Statuses apply to all PRs in row) *** Baseline1-QC PRs Standing NPP 780-14 NPP 1056-14 NPP 1059-14 NPP 1062-14 NPP 1065-14 SCCRs 911, 1041, 863, 756, 867 NPP Baseline1- QC BDS, IES, ES8 1.0P2 1.1P8 1.2P1 1.4P1 2.2P1 Standing Request 11/1/2014 12/31/2018 Active Priority 2 AM 1028-14 AM 1057-14 AM 1060-14 AM 1063-14 SCCRs 1041, 863, 756, 867 Terra Baseline1- QC BDS, IES, ES8 1.1P8 1.2P1 1.4P1 2.2P1 Standing Request 11/1/2014 12/31/2018 Active Priority 2 PM 1054-14 PM 1055-14 PM 1058-14 PM 1061-14 PM 1064-14 SCCRs 1041, 863, 756, 867 Aqua (FM3, FM4) Baseline1- QC BDS, IES, ES8 1.1P8 1.2P1 1.4P1 2.2P1 Standing Request 11/1/2014 12/31/2018 Active Priority 2 NPP 1573-15 NPP 1574-15 NPP 1575-15 NPP 1576-15 NPP 1577-15 SCCRs 1074, 1052, 863, 1082, 867 NPP Baseline1- QC Eph, Att BDS, IES PRES8 BDSI ES8 1.0P3 1.1P8 1.2P1 1.4P1 2.2P1 Standing Request 10/1/2015 12/31/2018 Ready Final Review Complete Ready Final Review Complete Priority 2

October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

1

October 7, 2015 - System Issues and Status

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

*** Baseline1-QC PRs – Standing

NPP 780-14

NPP 1056-14

NPP 1059-14

NPP 1062-14

NPP 1065-14

SCCRs 911,

1041, 863,

756, 867

NPP Baseline1-

QC

BDS, IES,

ES8

1.0P2

1.1P8

1.2P1

1.4P1

2.2P1

Standing Request

11/1/2014 –

12/31/2018

Active

Priority 2

AM 1028-14

AM 1057-14

AM 1060-14

AM 1063-14

SCCRs 1041,

863, 756, 867

Terra

Baseline1-

QC

BDS, IES,

ES8

1.1P8

1.2P1

1.4P1

2.2P1

Standing Request

11/1/2014 –

12/31/2018

Active

Priority 2

PM 1054-14

PM 1055-14

PM 1058-14

PM 1061-14

PM 1064-14

SCCRs 1041,

863, 756, 867

Aqua

(FM3,

FM4)

Baseline1-

QC

BDS, IES,

ES8

1.1P8

1.2P1

1.4P1

2.2P1

Standing Request

11/1/2014 –

12/31/2018

Active

Priority 2

NPP 1573-15

NPP 1574-15

NPP 1575-15

NPP 1576-15

NPP 1577-15

SCCRs 1074,

1052, 863,

1082, 867

NPP Baseline1-

QC

Eph, Att

BDS, IES

PRES8

BDSI

ES8

1.0P3

1.1P8

1.2P1

1.4P1

2.2P1

Standing Request

10/1/2015 –

12/31/2018

Ready Final

Review Complete

Ready Final

Review Complete

Priority 2

Page 2: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

2

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

AM 1591-15

AM 1594-15

AM 1596-15

AM 1598-15

SCCRs 1052,

863,1082,867

Terra

Baseline1-

QC

BDS, IES

PRES8

BDSI

ES8

1.1P8

1.2P1

1.4P1

2.2P1

Standing Request

10/1/2015 –

12/31/2018

Ready Final

Review Complete

Ready Final

Review Complete

Priority 2

PM 1592-15

PM 1593-15

PM 1595-15

PM 1597-15

PM 1599-15

SCCRs 1052,

863,1082,867

Aqua

(FM3,

FM4)

Baseline1-

QC

BDS, IES

PRES8

BDSI

ES8

1.1P8

1.2P1

1.4P1

2.2P1

Standing Request

10/1/2015 –

12/31/2018

Ready Final

Review Complete

Ready Final

Review Complete

Priority 2

*** Edition1-CV PRs – Standing

NPP 781-14

NPP 1069-14

NPP 1073-14

NPP 1077-14

NPP 1083-14

SCCRs 911,

1041, 863,

756

NPP Edition1-

CV

BDS, IES 1.0P2

1.1P8

1.2P1

1.4P1

1.4P2

Standing Request

6/30/2014 –

12/31/2018

Active

Priority 2

NPP 1087-14

NPP 1091-14

NPP 1095-14

NPP 1099-14

SCCR 867

NPP Edition1-

CV

ERBE-like 2.2P1

2.3P1

2.3P2

3.1P1

Standing Request

6/30/2014 –

12/31/2018

Active

Priority 2

AM 1066-14

AM 1070-14

AM 1074-14

AM 1080-14

SCCRs 1041,

863, 756, 770

Terra

Edition1-

CV

BDS 1.1P8

1.2P1

1.4P1

1.4P2

Standing request

9/30/2014 –

12/31/2018

Active

Priority 2

Page 3: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

3

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

AM 1084-14

AM 1088-14

AM 1092-14

AM 1096-14

SCCR 867

Terra

Edition1-

CV

ERBElike

2.2P1

2.3P1

2.3P2

3.1P1

Standing request

9/30/2014 –

12/31/2018

Active

Priority 2

PM 1067-14

PM 1071-14

PM 1075-14

PM 1081-14

SCCRs 1041,

863, 756, 770

Aqua

FM3

Edition1-

CV

BDS 1.1P8

1.2P1

1.4P1

1.4P2

Standing request

9/30/2014 –

12/31/2018

Active, Priority 2

PM 1085-14

PM 1089-14

PM 1093-14

PM 1097-14

SCCR 867

Aqua

FM3

Edition1-

CV

ERBElike

2.2P1

2.3P1

2.3P2

3.1P1

Standing request

9/30/2014 –

12/31/2018

Active, Priority 2

PM 1072-14

PM 1068-14

PM 1076-14

PM 1082-14

SCCRs 1041,

863, 756, 770

Aqua

FM4

Ed1-CV-

NoSW

BDS 1.1P8

1.2P1

1.4P1

1.4P2

Standing request

9/30/2014 –

12/31/2018

Active, Priority 2

PM 1086-14

PM 1090-14

PM 1094-14

PM 1098-14

SCCR 867

Aqua

FM4

Ed1-CV-

NoSW

ERBElike

2.2P1

2.3P1

2.3P2

3.1P1

Standing request

9/30/2014 –

12/31/2018

Active, Priority 2

AM 1294-15

PM 1295-15

AM 1282-15

PM 1283-15

AM 1280-15

PM 1281-15

AM 1286-15

PM 1287-15

SCCR 919

Terra

Aqua

Edition1-

CV

SSFi

Clouds

4.1-4.1P4/5

4.1-4.2P2

4.1-4.2P3

4.1-4.3P2

Standing Request

11/29/14 - 12/31/18

12/2014 – 12/2018

Active

Priority 2

Page 4: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

4

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

AM 1271/74/

77-15, PM

1272/73/75/

76/78/79-15

SCCR 913

FM1,

FM2,

FM3,

FM4

Edition1-CV SSF 4.5-6.1P2/3

4.5-6.2P2

4.5-6.4P1

Standing Request

11/29/14 - 12/31/18

12/2014 – 12/2018

Active

Priority 2

NPP 1578-15

NPP 1579-15

NPP 1580-15

NPP 1581-15

NPP 1582-15

SCCRs 1074,

1052, 863,

1082, 770

NPP Edition1-

CV

Eph, Att

BDS, IES

PRES8

BDSI

GAIN

1.0P3

1.1P8

1.2P1

1.4P1

1.4P2

Standing Request

8/31/2015 –

12/31/2018

Ready Final

Review Complete

Ready Final

Priority 2

NPP 1583-15

NPP 1584-15

NPP 1585-15

NPP 1586-15

SCCR 867

NPP Edition1-

CV

ERBE-like 2.2P1

2.3P1

2.3P2

3.1P1

Standing Request

8/31/2015 –

12/31/2018

9/2015 – 11/2018

Review Complete

Priority 2

AM 1600-15

AM 1603-15

AM 1606-15

AM 1609-15

SCCRs 1052,

863,1082,770

Terra

Edition1-

CV

BDS, IES

PRES8

BDSI

GAIN

1.1P8

1.2P1

1.4P1

1.4P2

Standing request

8/31/2015 –

12/31/2018

Ready Final

Review Complete

Ready Final

Priority 2

AM 1612-15

AM 1615-15

AM 1618-15

AM 1621-15

SCCR 867

Terra

Edition1-

CV

ERBE-like

2.2P1

2.3P1

2.3P2

3.1P1

Standing request

8/31/2015 –

12/31/2018

9/2015 – 11/2018

Review Complete

Priority 2

PM 1601-15

PM 1604-15

PM 1607-15

PM 1610-15

SCCRs 1052,

863,1082,770

Aqua

FM3

Edition1-

CV

BDS, IES

PRES8

BDSI

GAIN

1.1P8

1.2P1

1.4P1

1.4P2

Standing request

8/31/2015 –

12/31/2018

Ready Final

Review Complete

Ready Final

Priority 2

Page 5: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

5

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

PM 1613-15

PM 1616-15

PM 1619-15

PM 1622-15

SCCR 867

Aqua

FM3

Edition1-

CV

ERBE-like

2.2P1

2.3P1

2.3P2

3.1P1

Standing request

8/31/2015 –

12/31/2018

9/2015 – 11/2018

Review Complete

Priority 2

PM 1602-15

PM 1605-15

PM 1608-15

PM 1611-15

SCCRs 1052,

863,1082,770

Aqua

FM4

Ed1-CV-

NoSW

BDS, IES

PRES8

BDSI

GAIN

1.1P8

1.2P1

1.4P1

1.4P2

Standing request

8/31/2015 –

12/31/2018

Ready Final

Review Complete

Ready Final

Priority 2

PM 1614-15

PM 1617-15

PM 1620-15

PM 1623-15

SCCR 867

Aqua

FM4

Ed1-CV-

NoSW

ERBE-like

2.2P1

2.3P1

2.3P2

3.1P1

Standing request

8/31/2015 –

12/31/2018

9/2015 – 11/2018

Review Complete

Priority 2

AM 1675-15

PM 1676-15

SCCR 919

Terra

Aqua

Edition1-

CV

SSFi

Clouds

4.1-4.1P4/5 Standing Request

8/31/15 - 12/31/18

Ready Final

Priority 2

*** Snow and Ice Products PRs – Standing

M 841-14

SCCR 918

NSIDC-

CLASS

EICE

ESNOW

4.1-4.0P2 Standing Request

5/1/14 – 12/31/15

Active

M 847-14

SCCR 943

NSIDC-

AFWA-

Mesh16th

ESNOW

EICE

4.1-4.0P3 Standing Request

5/1/14 – 12/31/15

Active

M 794-14

SCCR 867

NSIDC SNOW 2.1P1 Standing Request

1/2015 – 2/2019

Active

*** MOA/PMOA Products PRs – Standing

M 1146-14

SCCR 920

CERES DAO-G5-

CERES

MOA 12.1P1 Standing request

1/2/15 – 1/1/17

Active

Priority 2

M 1147-14

SCCR 914

CERES DAO-G5-

CERES

PMOA 9.1P1 Standing request

1/1/15 – 12/31/16

Active

Priority 2

M 1348-15

SCCR 749

CERES GMAO-

G541-Ed4

MOA 12.1P2 Standing request

4/2/15 thru 5/1/17

Ready Final (active

on 6/26), Priority 2

Page 6: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

6

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

M 1101-14

SCCR 1018

CERES GMAO-

G541-Ed4

PMOA 9.1P2 Standing Request

8/1/2014 –

12/31/2016

Active

Priority 2

The PRs that follow are the Non-Standing PRs that can be processed

*** Edition 3 Instrument & ERBElike PRs

*** Edition 4 Instrument & ERBElike PRs

*** Edition 1 NPP Instrument and ERBE-like PRs

*** Edition 3 SSF & SSF1deg-Hour (SSF, SFC & SAH)

1029-14

1030-14

1031-14

SCCRs 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

1/1/07 – 2/28/07 Ready Final

Priority 3

1032-14

1033-14

1034-14

SCCRs 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

6/1/07 – 7/31/07 Ready Final

Priority 3

1035-14

1036-14

1037-14

SCCRs 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

6/08 Ready Final

Priority 3

Page 7: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

7

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

1038-14

1039-14

1040-14

SCCRs 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

12/08 Ready Final

Priority 3

1041-14

1042-14

1043-14

SCCRs 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

7/09 Ready Final

Priority 3

1044-14

1045-14

1046-14

SCCRs 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

12/09 Ready Final

Priority 3

1047-14

1048-14

1049-14

SCCRs 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

6/11 Ready Final

Priority 3

1050-14

1051-14

1052-14

SCCR 984,

939

FM2 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

4.5-6.4P1

11/1/12 – 12/31/12 Ready Final

Priority 3

*** Edition 3 TSI --> SYNI --> SYN1deg

*** Edition 3 SSF1deg

1677-15

SCCR 1086

Terra Edition3A SSF1deg-

Month

10.0P4 3/2000 – 4/2006 Ready Final

Priority 2

Page 8: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

8

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

1678-15

SCCR 1086

Aqua Edition3A SSF1deg-

Month

10.0P4 7/2002 – 4/2006 Ready Final

Priority 2

1680-15

SCCR 1086

Terra Edition3A SSF1deg-

Month

10.0P4 5/2006 – 11/2007 Pending SS Review

Priority 2

1682-15

SCCR 1086

Aqua Edition3A SSF1deg-

Month

10.0P4 5/2006 – 11/2007 Pending SS Review

Priority 2

1681-15

SCCR 1086

Terra Edition3A SSF1deg-

Month

10.0P4 12/2007 – 6/2010 Pending SS Review

Priority 2

1683-15

SCCR 1086

Aqua Edition3A SSF1deg-

Month

10.0P4 12/2007 – 6/2010 Pending SS Review

Priority 2

1497-15

SCCR 1086

Terra Edition3A SSF1deg-

Month

10.0P4 7/2010 – 11/2014 Pending SS Review

Priority 1

1500-15

SCCR 1086

Aqua Edition3A SSF1deg-

Month

10.0P4 7/2010 – 11/2014 Pending SS Review

Priority 1

1665-15

SCCR 1086

Terra Edition3A SSF1deg-

Month

10.0P4 12/2014 – 4/2015 Pending SIT Review

Priority 2

1666-15

SCCR 1086

Aqua Edition3A SSF1deg-

Month

10.0P4 12/2014 – 4/2015 Pending SIT Review

Priority 2

**** Beta2-Ed4 SSFi --> SSF, Edition4 SSF

1254-15,

1257-15,

1259-15,

1261-15

SCCR 947

FM1,

FM2

Beta2-Ed4 SSFi 4.1-4.1P6

4.1-4.2P5

4.1-4.2P4

4.1-4.3P3

9/11/09 – 12/31/13

1/2010 – 12/2013

Active

Priority 2

1262-15,

1265-15,

1268-15

SCCR 814

FM1,

FM2

Beta2-Ed4 SSF 4.5-6.1P4

4.5-6.2P3

4.5-6.4P2

1/2010 – 12/2013 Active

Priority 2

1255-15,

1256-15,

1258-15,

1260-15

SCCR 947

FM3,

FM4

Beta2-Ed4 SSFi 4.1-4.1P6

4.1-4.2P5

4.1-4.2P4

4.1-4.3P3

9/11/09 – 12/31/13

1/2010 – 12/2013

Active

Priority 2

1263-15,

1266-15,

1269-15

SCCR 814

FM3 Beta2-Ed4 SSF 4.5-6.1P5

4.5-6.2P3

4.5-6.4P2

1/2010 – 12/2013 Active

Priority 2

Page 9: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

9

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

1264-15,

1267-15,

1270-15

SCCR 814

FM4 Beta2-Ed4-

NoSW

SSF 4.5-6.1P5

4.5-6.2P3

4.5-6.4P2

1/2010 – 12/2013 Active

Priority 2

1296-15

1298-15

1300-15

SCCR 1010

Terra-

MODIS

Edition4A SSF-1deg 9.2P3

9.3P3

9.4P3

3/01/00 – 12/01/09

3/2000 – 11/2009

Complete

Ready Final

Priority 2

1297-15

1299-15

1301-15

SCCR 1010

Aqua-

MODIS

Edition4A SSF-1deg 9.2P3

9.3P3

9.4P3

7/03/02 – 12/01/09

7/2002 – 11/2009

Ready Final

Active, Priority 2

1302-15

SCCR 1075

Terra

Edition4A SSF1deg-

month

10.0P5 3/2000 – 11/2009 Ready Final Priority 2

1303-15

SCCR 1075

Aqua Edition4A SSF1deg-

month

10.0P5 7/2002 – 11/2009 Ready Final Priority 2

1357-15

SCCR 1001

Terra Edition4 sibi 4.5-6.0P6 1/2010 – 12/2013 Active

Priority 2

1358-15

SCCR 1001

Aqua Edition4 sibi 4.5-6.0P6 1/2010 – 12/2013 Active

Priority 2

1359-15

1361-15

1363-15

SCCRs 973,

814

FM1

FM2

Edition4A SSF 4.5-6.1P6

4.5-6.2P3

4.5-6.4P2

1/1/2010-

12/31/2013

Active

Priority 2

1360-15

1362-15

1364-15

SCCRs 973,

814

FM3 Edition4A SSF 4.5-6.1P6

4.5-6.2P3

4.5-6.4P2

1/1/2010-

12/31/2013

Active

Priority 2

1365-15

SCCR 1028

FM1

FM2

Edition4A SAH 5.0P3 1/2010 – 12/2013 Ready Final

Priority 2

1366-15

SCCR 1028

FM3 Edition4A SAH 5.0P3 1/2010 – 12/2013 Ready Final

Priority 2

Page 10: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

10

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

1507-15

1509-15

1511-15

SCCR 1010

Terra-

MODIS

Edition4A SSF-1deg 9.2P3

9.3P3

9.4P3

12/2/09 – 12/1/13

12/2009 – 11/2013

Pending SIT Review

Priority 2

1508-15

1510-15

1512-15

SCCR 1010

Aqua-

MODIS

Edition4A SSF-1deg 9.2P3

9.3P3

9.4P3

12/2/09 – 12/1/13

12/2009 – 11/2013

Pending SIT Review

Priority 2

*** Edition 4A PMOA, TSI --> SYNI --> SYN1deg 1466-15

SCCR 1024

Aqua Edition4A TSI 7.3.1P2 1/2005 – 12/2010 Active

Priority 2

1467-15

SCCR 1024

Terra

+Aqua

Edition4A TSI 7.3.1P3 1/2005 – 12/2010 Active

Priority 2

1468-15

SCCR 1024

Terra

+Aqua

Edition4A TSI 7.3.1P4 1/2005 – 12/2010 Ready Final

Priority 2

1489-15

SCCR 1017

Terra+

Aqua

Edition4A SYNI 7.2.1P2 1/2008 – 12/2010 Ready Final

Priority 2

1490-15

SCCR 1025

Terra+

Aqua

Edition4A SYN1deg 8.1P2 1/2005 – 12/2010 Ready Final

Priority 2

*** Edition 1 NPP Clouds and Inversion PRs

1395-15,

1444-15 to

1450-15

SCCR 1047

FM5 Edition1A SSFi 4.1-4.1P7

4.1-4.2P6

4.1-4.2P7

4.1-4.3P4

1/19/12 – 12/31/12

1/1/12 – 12/31/12

1/1/13 – 3/31/14

Active

Ready Final

(updated from P6 to

P7), Priority 2

1396-15

SCCR 1047

FM5 Edition1A SSFi 4.1-4.1P7

1/1/13 – 3/31/14 P6 PR Rejected by SS,

replaced w/ 1448-15

1371-15 to

1374-15

SCCRs 1001,

1064, 814

FM5 Edition1A SSF 4.5-6.0P6

4.5-6.1P7

4.5-6.2P3

4.5-6.4P2

1/1/12 – 3/31/14

1/27/12 – 3/31/14

1/27/12 – 3/31/14

1/1/12 – 3/31/14

Ready Final

Priority 2

Page 11: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

11

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

*** ISCCP-D2like Stream (all the ISCCP-D2like products)

**** ValRx PRs for newly delivered PGEs

1002-14

SCCR 1028

FM1,

FM2

ValR1028 SAH 5.0P3 7/2004 ValRx Review Priority 2

1003-14

SCCR 1028

FM3,

FM4

ValR1028 SAH 5.0P3 7/2004 ValRx Review

Priority 2

1004-14

SCCR 1041

FM1

FM2

ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1005-14

SCCR 1041

FM3 ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1006-14

SCCR 1041

FM4 ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1007-14

SCCR 1041

FM5 ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1008-14

SCCR 1041

FM1

FM2

ValR1041-

X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1009-14

SCCR 1041

FM3 ValR1041-

X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1010-14

SCCR 1041

FM4 ValR1041-

X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1011-14

SCCR 1041

FM5 ValR1041-

X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review

Priority 2

1150-15

1152-15

1154-15

1156-15

SCCR 919

Terra ValR1-P6 SSFi 4.1-4.1P4

4.1-4.2P2

4.1-4.2P3

4.1-4.3P2

4/13 On Hold -

Preproduction -

ValRx Review

Priority Level 2

1151-15

1153-15

1155-15

1157-15

SCCR 919

Aqua ValR1-P6 SSFi 4.1-4.1P5

4.1-4.2P2

4.1-4.2P3

4.1-4.3P2

4/13 On Hold -

Preproduction -

ValRx Review

Priority Level 2

Page 12: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

12

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

290-13 thru

292-13

SCCR 913

Terra ValR1-P6 SSF 4.5-6.1P2

4.5-6.2P2

4.5-6.4P1

4/13 On Hold - Preprod -

ValRx Review

Priority Level 2

293-13 thru

295-13

SCCR 913

Aqua ValR1-P6 SSF 4.5-6.1P3

4.5-6.2P2

4.5-6.4P1

4/13 On Hold - Preprod -

ValRx Review

Priority Level 2

296-13

297-13

298-13

SCCR 913

Terra ValR1-X86 SSF 4.5-6.1P2

4.5-6.2P2

4.5-6.4P1

4/13 On Hold - Preprod -

ValRx Review

Priority Level 2

299-13 thru

301-13

SCCR 913

Aqua ValR1-X86 SSF 4.5-6.1P3

4.5-6.2P2

4.5-6.4P1

4/13 On Hold - Preprod -

ValRx Review

Priority Level 2

1473-15

SCCR 1038

NPP Baseline1-

QC

Eph, Att 1.0P3 6/10/15 - 6/15/15 Ready Final

Priority 2

1480-15

1481-15

SCCR 1064

FM5 ValR-NPP

ValR-NPP-

X86

SSF 4.5-6.1P7

7/1/13 – 7/31/13

Ready Final

Priority 2

1563-15

SCCR 1074

NPP Baseline1-

QC

Eph, Att 1.0P3 7/16/15 - 9/1/15 Ready Final

Priority 2

1671-15

SCCR 1086

Terra ValR1-P6 SSF1deg-

month

10.0P4 3/2001 Active,

Priority 2

1672-15

SCCR 1086

Terra ValR1-X86 SSF1deg-

month

10.0P4 3/2001 Active,

Priority 2

1673-15

SCCR 1086

Aqua ValR1-P6 SSF1deg-

month

10.0P4 3/2005 Active,

Priority 2

1674-15

SCCR 1086

Aqua ValR1-X86 SSF1deg-

month

10.0P4 3/2005 Active,

Priority 2

**** The PRs are for PGEs that have not completed pre-op testing and been promoted to the production environment

**** The PRs that follow are for PGEs that are pending delivery or other future event.

Page 13: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

13

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

1679-15

SCCR 1089

Terra+

Aqua

ValR1-X86 SYNI 7.2.1P2 1/2008 Pending SS Review

Priority 2

**** The PRs that follow have completed processing

546-14

549-14

551-14

SCCR 867

FM1

FM2

Edition3 ES8 2.2P1

2.3P1

2.3P2

7/1/2013 –

10/31/2013

Pending Op Review

710-14

711-14

SCCR 979

FM5 ValR979-Ed1 BDS, IES 1.4P3 02/2012,

12/2013

Review Complete

Should be Complete

116-13

117-13

SCCR 814

FM3+

FM4

ValR2-

Beta2Ed4

SSF 4.5-6.1P5 7/1/06 – 7/31/06

1/1/07 – 1/31/07

Ready Final

Need to be closed

1023-14

SCCR 867

FM1 Edition4 CXDR 2.3P2 2/1/11 – 10/31/13 Review Complete

Priority 2

Needs to be closed

995-14

996-14

SCCR 814

FM3,

FM4

Edition4A SSF 4.5-6.2P3

4.5-6.4P2

6/30/02 – 3/30/05

7/2002 – 3/2005

Ready Final

Active (4/7/15), should

be Complete

744-14

SCCR 1016

Terra ValR1016 SSF1deg-

month

10.0P4 12/2013 Review Complete

Should be Complete

745-14

SCCR 1016

Aqua ValR1016 SSF1deg-

month

10.0P4 12/2013 Review Complete

Should be Complete

746-14

747-14

SCCR 1016

Terra+

Aqua

ValR1016 TSI 10.0P3

7.3.1P1

12/2013 Ready Final

Review Complete

Should be Complete

750-14

SCCR 801

Terra+

Aqua

ValR1016 SYN1deg 8.1P1 12/2013 Review Complete

Should be Complete

985-14

SCCR 984

FM1 ValR1040-

Ed3

SSF 4.5-6.5P4 01/31/2012 Ready Final – should

be complete

Page 14: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

14

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

986-14

SCCR 984

FM3 ValR1040-

Ed3

SSF 4.5-6.5P5 12/31/2012 Ready Final – should

be complete

987-14

SCCR 947

Terra ValR1040-

Ed4

SSFi 4.1-4.1P6 7/1/2007 Pending SS Review

Should be complete

988-14

SCCR 947

Aqua ValR1040-

Ed4

SSFi 4.1-4.1P6 7/1/2007 Pending SS Review

Should be complete

852-14

853-14

854-14

855-14

SCCRs 1001,

974, 814

FM5 ValR-NPP-

P6

SSF 4.5-6.0P6

4.5-6.1P7

4.5-6.2P3

4.5-6.4P2

1/1/13 – 1/31/13 Complete

Ready Final

Should be Complete

858-14

859-14

860-14

861-14

SCCRs 1001,

974, 814

FM5 ValR-NPP-P6 SSF 4.5-6.0P6

4.5-6.1P7

4.5-6.2P3

4.5-6.4P2

4/1/13 – 4/30/13 Complete

Ready Final

Should be Complete

868-14

869-14

870-14

871-14

SCCRs 1001,

974, 814

FM5 ValR-NPP-P6 SSF 4.5-6.0P6

4.5-6.1P7

4.5-6.2P3

4.5-6.4P2

7/1/13 – 7/31/13 Complete

Ready Final

Should be Complete

856-14

857-14

SCCRs 1001,

974

FM5 ValR-NPP-

X86

SSF 4.5-6.0P6

4.5-6.1P7

1/1/13 – 1/31/13 Complete

Ready Final

Should be Complete

Page 15: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

15

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

862-14

863-14

SCCRs 1001,

974

FM5 ValR-NPP-

X86

SSF 4.5-6.0P6

4.5-6.1P7

4/1/13 – 4/30/13 Active

Ready Final

Should be Complete

872-14

873-14

SCCRs 1001,

974

FM5 ValR-NPP-

X86

SSF 4.5-6.0P6

4.5-6.1P7

7/1/13 – 7/31/13 Complete

Ready Final

Should be Complete

886-14

887-14

888-14

SCCR 1010

NPP ValR1-P6 SSF1deg 9.2P3

9.3P3

9.4P3

3/31/13 – 5/1/13

04/2013

04/2013

Ready Final

Should be Complete

Priority 2

895-14

896-14

897-14

SCCR 1010

NPP ValR1-X86 SSF1deg 9.2P3

9.3P3

9.4P3

3/31/13 – 5/1/13

04/2013

04/2013

Ready Final

Should be Complete

Priority 2

638-14 thru

641-14

SCCR 947

FM1,

FM2

Beta2-Ed4 SSFi 4.1-4.1P6

4.1-4.2P4

4.1-4.2P5

4.1-4.3P3

6/2005 – 12/2009 all Active, should be

complete

Priority 2

618-14 thru

620-14

SCCR 814

FM1,

FM2

Beta2-Ed4 SSF 4.5-6.1P4

4.5-6.2P3

4.5-6.4P2

6/2005 – 12/2009 all Active, should be

complete

Priority 2

617-14

628-14 thru

630-14

SCCR 947

FM3,

FM4

Beta2-Ed4 SSFi 4.1-4.1P6

4.1-4.2P4

4.1-4.2P5

4.1-4.3P3

4/2005 – 12/2009 all Active, should be

complete

Priority 2

621-14

623-14

625-14

SCCR 814

FM3 Beta2-Ed4 SSF 4.5-6.1P5

4.5-6.2P3

4.5-6.4P2

4/2005 – 12/2009 all Active, should be

complete

Priority 2

624-14,

627-14,

626-14

SCCR 814

FM4 Beta2-Ed4-

NoSW SSF 4.5-6.1P5

4.5-6.2P3

4.5-6.4P2

4/2005 – 12/2009 all Active, should be

complete

Priority 2

Page 16: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

16

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

1246-15

1248-15

1250-15

SCCRs 973,

814

FM1

FM2

Edition4A SSF 4.5-6.1P6

4.5-6.2P3

4.5-6.4P2

6/1/2005-

12/31/2009

Active

Ready Final

Active (completed)

Priority 2

1247-15

1249-15

1251-15

SCCRs 973,

814

FM3 Edition4A SSF 4.5-6.1P6

4.5-6.2P3

4.5-6.4P2

3/31/2005-

12/31/2009

Active

Ready Final

all should be complete

Priority 2

1368-15

1370-15

SCCR 1010

Terra ValR1-X86 SSF1deg 9.2P3

9.3P3

9/30/01 – 11/01/01

10/2001

Ready Final (should

be complete), Active

Priority 2

1501-15

1502-15

SCCR 1010

Terra ValR1-X86 SSF1deg 9.2P3

9.3P3

10/31/2001

10/2001

Pending SIT Review

Priority 2

should be complete

1527-15

SCCR 867

FM3 Edition3 SCCD

SCCN

2.4P1 1/15/15 – 3/15/15 Active

Completed July 1

1532-15

SCCR 867

FM1 Edition3 CXDR 2.3P1 1/2015 – 3/2015 Review Complete

Completed July 2

1535-15

SCCR 867

FM3 Edition3 CXDR 2.3P2 11/2014 – 1/2015 Review Complete

Completed July 2

1482-15

1483-15

1484-15

1485-15

1486-15

1487-15

1488-15

SCCR 1058

NPP

Terra

FM3

FM4

Terra

FM3

FM4

ValR-Ed1

ValR-Ed3

ValR-Ed4

BDS, IES 1.4P3 4/1/12 – 4/7/12

12/01/14 –

12/07/12

Review Complete

Completed 6/24/15

Priority 2

1491-15

SCCR 1074

NPP ValR1-X86 Eph, Att 1.0P3 5/13/15 - 5/18/15 Ready Final, Priority

2, Completed 7/20/15

1568-15

SCCR 1025

Terra+

Aqua

ValR1-X86 SYN1deg 8.1P2 10/2002 Pending SIT Review

Priority 2, ran 7/13/15

1571-15

1572-15

SCCRs 1001

FM5 ValR-NPP-P6

ValR-NPP-

X86

SSF 4.5-6.0P6 07/2013 Ready Final

Priority 2, ran 7/31/15

Page 17: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

17

Table 1: PR Status for 10/07/15

(Status as of 10/02/15)

Production

Request (PR) Satellite

Production

Strategy

Data

Product

(SS#)

PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all

PRs in row)

1587-15

1588-15

1589-15

1590-15

SCCR 1052

Terra

FM3

FM4

FM5

ValR1052 BDS, IES 1.1P8

6/12/2015 Review Complete Run & validated on

9/17/15

Priority 2

1397/1431-15

SCCRs

984/939

FM1 Edition3A SSF 4.5-6.5P4

4.5-6.2P4

12/1/14 – 12/1/14 Complete

Active (run 5/21/15)

Priority 2

1398/1432-15

SCCRs

984/939

FM3 Edition3A SSF 4.5-6.5P5

4.5-6.2P4

12/1/14 – 12/1/14 Complete

Active (run 5/21/15)

Priority 2

1668-15

SCCR 938

Terra+

Aqua

Edition3A SYNI 7.2.1P1 3/15 – 4/15 Pending SIT Review

Completed 9/1/15

1669-15

SCCR 801

Terra+

Aqua

Edition3A SYN1deg 8.1P1 3/15 – 4/15 Active

Completed 9/1/15

Page 18: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

18

Table 2. October 07, 2015 - System Issues and Status

Activity Lead Status

SEC Miller No updates. (Miller - [email protected])

CM/Docu-

mentation

Ayers

(Saunders)

See Table 3 for SCCR activity since the last DMT meeting. SCCRs

that need to be reviewed follow Table 3. (Ayers -

[email protected])

SCCR 1087 – Installed this delta delivery on AMI-P and performed

minimal testing before releasing it to the SIT team. (Keyes -

[email protected])

SCCR 1065 – Formatted the updated CATALYST Test Plan, posted it

on the Web, notified the SIT team of its availability, and archived the

file in the document repository on AMI. (Saunders -

[email protected])

SCCR 1065 – Installed and tested an update to CATALYST v2.0 in

the CM testing environment to address JIRA ticket CER-51, and then

provided it to the SIT team. (Ayers)

SCCR 1089 - Formatted the updated Synoptic SARB Test Plan, posted

it on the Web, notified the SIT team of its availability, and archived

the file in the document repository on AMI. (Saunders)

SCCR 1089 – Installed, compiled, and tested PGE CER7.2.1P2 on

AMI-P-x86, and released the delivery to the SIT team. (Ayers)

SCCR 1088 – Installed and executed the logging database update

script in the CM testing environment. Submitted some test PRs to

ensure that the updated database is aware of the existence of data files

in the DPO for dates from July 2013 to May 2015 before releasing the

delivery to the SIT team. (Ayers)

AMI Job

Submission

Scripts

(AJSS)

Ayers

(Hillyer)

Providing scripting support as requested. (Grepiotis -

[email protected])

Page 19: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

19

Table 3. SCCR Activity September 21 at 5:30 p.m. – October 6 at 1:00 p.m.

SCCR S U A C D SS Page

No. Comments

1052 X X Instrument

1086 X X TISA

Averaging

1087 X X Clouds

1088 X X X X CATALYST

1089 X X Synoptic

SARB

S=Submitted; U=Updated; A=Approved; C=Closed; D=Disapproved; SS=Subsystem

Page 20: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

20

CERES Software Configuration Change Request Submittal

=====================================================

Subsystem: CATALYST SCCR Date: 09/29/2015 SCCR Number: 1088

Parameter Change: ( ) YES (X) NO

Description of Change (Science):

N/A

Reason for Change (Science):

N/A

Description of Change (non-Science):

Updating CATALYST log database to allow processing dates beyond June 2013.

Reason for Change (non-Science):

In order to process July 2013 onward, the CATALYST log database must be updated to include

records for input products from that point in time to present.

Parameter(s) and Product(s) Being Changed (Use Name(s) from Data Products Catalog) and

Description of Parameter Change:

N/A

Reason for Parameter Change:

N/A

Affected PGEs in this Subsystem:

N/A

Estimated Time to Complete Change : 2 days

Planned Delivery Date : 10/1/2015

List Affected Subsystems and PGE Names: N/A

Date: 09/30/2015 Status: Approved

Originator: HILLYER, THOMAS N. (SSAI)

====================================

ADDITIONAL CHANGES TO SCCR NO. 1088:

====================================

Parameter Change: ( ) YES (X) NO

Description of Change (Science):

N/A

Page 21: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

21

Reason for Change (Science):

N/A

Description of Change (non-Science):

Update will provide coverage from July 2013 to May 2015.

Reason for Change (non-Science):

N/A

Parameter(s) and Product(s) Being Changed (Use Name(s) from Data Products Catalog) and

Description of Parameter Change:

N/A

Reason for Parameter Change:

N/A

Affected PGEs in this Subsystem:

N/A

Estimated Time to Complete Change : completed

Planned Delivery Date : 10/2/2015

List Affected Subsystems and PGE Names: N/A

Date & Time: 2015-10-02 11:35:30

Originator: HILLYER, THOMAS N. (SSAI)

Page 22: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

22

CERES Software Configuration Change Request Submittal

=====================================================

Subsystem: SynSARB SCCR Date & TIME: 2015-09-29 10:45:06 SCCR No.: 1089

Parameter Change: ( ) YES (X) NO

Description of Change (Science):

Req# 7.2-1.40

A correction to the reporting of flux profile levels at and near the surface. The correction slightly

increases the tolerance for level match between SSF and MOA levels to +/-5hPa. It also checks for

lower levels if a match is not found.

Reason for Change (Science):

Req# 7.2-1.40

There was an issue with the reporting of flux profile levels near the floating surface levels. For

surface levels below 850 hPa, the 850 hPa fixed level would sometimes be omitted and replaced the

the 500 hPa data. This error would typically affect a few percent of the global grid boxes.

Description of Change (non-Science):

N/A

Reason for Change (non-Science):

N/A

Parameter(s) and Product(s) Being Changed (Use Name(s) from Data Products Catalog) and

Description of Parameter Change:

N/A

Reason for Parameter Change:

N/A

Affected PGEs in this Subsystem:

CER7.2.1P2

Estimated Time to Complete Change : 1 day

Planned Delivery Date : September 30, 2015

List Affected Subsystems and PGE Names: PGE CER7.2.1P2 Synoptic SARB

Originator: CALDWELL, THOMAS E. (SSAI)

Page 23: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

23

Table 4. October 7, 2015 - Subsystem Issues and Status

SS

No.

SS

Lead Status Problems

Toolkit

Issues

Hillyer

(Wilkins) Nothing to report. (Hillyer -

[email protected])

CERES-

lib

Hillyer

(Wilkins) Collecting IBM Flex testing results from CERES

subsystems. (Hillyer)

Perl_Lib Hillyer

(Wilkins) Nothing to report. (Hillyer)

CERES

Proc.

System

Hillyer

(Wilkins) Provided support for CATALYST to the ASDC.

(Hillyer, Wilkins - [email protected])

Investigating issue with unsent email notices for

emails sent by CERES wrapper on zb27.cluster.net.

(Hillyer)

SCCRs 1065, 1066, 1067 – Working with SIT to

provide clarifications to issues found in PPE testing.

(Hillyer, Wilkins)

SCCR 1065 – Delivered updates to correct issue in

responding to error prompt in CERES wrapper

epilogue script on 9/28. (Hillyer)

SCCR 1088 – Delivered updates to CATALYST

Log Database to allow processing between July 2013

and May 2015 on 10/1. (Hillyer)

1.0 Cooper

(Grepiotis) SCCR 1052 – The software should be promoted to

begin Baseline1-QC processing for October 1, 2015.

(Cooper – [email protected], Grepiotis -

[email protected])

Continue work on updating PGE CER1.4P1 software

to bring it up to current Instrument standards using

the new instrument libraries. This work has been

moved to a lower priority to allow Mark to support

updates to the FM6 simulator. (Grepiotis, Timcoe –

[email protected])

The next telecom for the EDOS SNPP Level-0

support will be held on Nov. 4th

at 1 PM. At this

time, we are receiving Level-0 data from EDOS. A

couple of small issues have been reported and

resolved. (Cooper, Grepiotis, Timcoe)

Continue work to combine the software that creates

the Instrument available data Web pages so that we

only have to maintain one set of software for this

effort, instead of 3 individual sets of software.

(Grepiotis)

Page 24: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

24

Table 4. October 7, 2015 - Subsystem Issues and Status

SS

No.

SS

Lead Status Problems

Continue testing of the J01-FM6 updates to create

new PGE CER1.1P9. This new PGE will be used to

run J01-FM6 only until any and all issues with FM6

have been resolved after launch. After all issues are

resolved, these updates will be combined back into

PGE CER1.1P8. (Grepiotis)

2.0 Walikainen

(Lande) SCCR 1088: verified Beta2-Ed4/Ed4 PRs still have

at least 6 months of processing to do in prod. (Lande

- [email protected])

SCCR 1089: created ValR, sent notification w/

issues (1/16 mesh snow/ice, CC#), discussed w/

Tom, waiting for answer from Tonya (no SIT testing

yet). (Lande)

SCCR 1086: ValRs run in PPE and approved, initial

Ed3A PRs approved by SS/SIT to Ready Final (no

prod activity yet). Created/updated remaining (5/06-

11/14) Ed3A PRs from 1069 to 1086. (Lande)

SCCR 1052: monitored approval of the new set of

related Instr/ERBE-like/Clouds SPRs: all either

Ready Final or Review Complete. (Lande)

Looked at using a PR 'Generation by Stream' feature

to create standardized PR 'batches' (i.e. Ed3) to speed

up current 'clone 1 PR at a time' approach: provided

clarifications to Clara's proposal to Lisa. (Lande)

Continued reviewing/updating Status_Proc&PR_

(tables) document, sent to Lisa. (Lande)

Created and sent weekly progress reports on the 11

prod data streams, including the reprocessing of the

Edition1A stream. (Lande)

Provided Instrument Team with off-line 2015

Edition 4 FM2 ES8s. (Walikainen -

[email protected])

Completed analysis of proposed Terra and Aqua

Edition4 gains/SRFs for June 2015. (Walikainen)

3.0 Walikainen

(Lande) Combined with above.

4.1 Sun-Mack

(Brown) Continued testing NPP code on x86 machine.

(Smith - [email protected])

Delivered Delta SCCR 1087 with a PCF generator

bug fix. (Smith)

Continued learning python and creating a CERES

Page 25: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

25

Table 4. October 7, 2015 - Subsystem Issues and Status

SS

No.

SS

Lead Status Problems

Post processing GUI. (Smith)

Began learning HDF file structure and coding.

(Smith)

Reformatted input data for CERES clouds QC

Property Viewing Tool. (Smith)

Processed ClearSky results for Aqua and Terra

Beta2-Ed4 from 2011 - 201304. Results were posted

on the Web. (Brown - [email protected])

Update Default Value and added two new

parameters(CWGsurfaceskintemperature and

Surfaceskintemperature) to SSF post processing

code. (Brown)

SSF global images and statistics were processed for

Aqua Beta2-Ed4 from 201107 through 201305, Terra

Beta2-Ed4 from 201112 through 201305, NPP

Edition1A from 201201 through 201208, and for

Aqua and Terra Edition 2 from 201504 through

201507. Results were posted on the Web. (Brown)

Post processed x86test and pp6test runs. (Brown)

Worked on testing out scripts on new Web server.

Access on dev-ceres-clouds still not the same as on

wbs. (Brown)

Working on code for CERESVis Histogram tool's

redesign. (Heckert - [email protected])

CERES PR Tool 2.1.0 released to production

(Heckert)

Produced global maps of skintemp from SSF

MODIS Ed4 (Terra 200003 - 201304, Aqua 200207-

201305).

Time Series for skintemp were produced and posted

on the website. (Chen - [email protected])

Wrote an idl code to create the histogram plots for

modis ref and btemp study. (Chen)

Started looking into creating Time Series for more

parameters from Ed4 Beta2. (Chen)

Practicing Python programming and wrote a code to

handle ascii histogram data from monthly to yearly.

(Chen)

Completed work on GOESW 2011 Jan-Jun. (Gibson

- [email protected])

Page 26: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

26

Table 4. October 7, 2015 - Subsystem Issues and Status

SS

No.

SS

Lead Status Problems

Evaluated V1.93 results and compared to earlier

version. (Gibson)

Attended geoclean team meeting. (Gibson)

Worked with members in the Clouds group on

various tasks. (Sun-Mack - Szedung.Sun-Mack-

[email protected])

Worked on Neural Network paper with Pat Minnis

and Gang Hong. (Sun-Mack)

Working on offline validations with UND group.

Completed SGP cloud parameters averaging. (Sun-

Mack)

Worked on Enhanced Algorithm with C3M. (Sun-

Mack)

4.2 Sun-Mack Combined with above.

4.3 Sun-Mack Combined with above.

4.4 Miller

(Antropov) Worked on Terra and Aqua Edition4A Data Quality

Summary. (Miller - [email protected])

Generated three months of Intermediate SSF using

NPP size PSF with Aqua and MODIS data. (Miller)

Audited MODIS Col 005 data between archive and

DPO by checking PCFs. (Miller)

Updated Data Description and Abstract for SSF,

SFC, SSF1deg-Hour, SSF1deg-Day/Month,

SYN1deg. (Miller)

Monitored Terra and Aqua Beta2-Ed4 and Edition4A

SSF production. (Miller)

Maintained Confluence pages in support of

production. (Miller)

Created masks and cleaned August 2010 through

March 2011 GOES E images. (Antropov -

[email protected])

4.5 Sothcott

(Caldwell) Continued to support the SOFA working groups

efforts to improve the SW model B algorithms.

(Sothcott - [email protected])

Processed several months of Aqua data using NPP

PSFs for the ADM working group. (Sothcott)

Continued looking at the Terra/Aqua Edition4 and

NPP Edition1 code with an eye toward reducing the

memory footprint. (Sothcott)

4.6 Sothcott Combined with above.

Page 27: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

27

Table 4. October 7, 2015 - Subsystem Issues and Status

SS

No.

SS

Lead Status Problems

(Caldwell)

5.0 Caldwell

(Sothcott) No new updates. (Caldwell -

[email protected])

7.2 Caldwell

(Sothcott) SCCR 1089 - PGE 7.2.1P2 for Synoptic SARB was

re-delivered to correct a problem involving the

omission of near-surface profile data when SSF and

MOA levels failed to align with tolerances. The

fixes were validated at SCF and delivered for testing.

(Caldwell)

12.0 Caldwell

(Sothcott) No new updates. (Caldwell)

7.1 Nguyen

(Keyes) GGEO cleaning:

Edition4 October 2010 MTSAT (MTS01, MTS02)

Edition4 November 2010 MTSAT (MTS01, MTS02)

Edition4 December 2010 MTSAT (MTS02)

Edition4 All of 2009-2011 MET7 water vapor

channel recurring problems.

Edition3 June 2015 GOESE and GOESW.

([email protected])

Validating the re-written TSI code. (Nguyen -

[email protected])

8.0 Nguyen

(Keyes) Ran CER8.1P2 to support validation of changes to

CER7.2.1P2 SYNI code. (Keyes)

Corrected error in CER8.1P2 SYN1deg code in

preparation for potential future delivery. (Keyes)

10.0 Nguyen

(Keyes) Validating Edition4 SSF1deg Lite. Changing the

way of computing clear-sky SW fluxes. (Nguyen)

Working with Wenying Su in verifying the causes of

the differences of SW fluxes in SSF1degB and SSF

daily subset. (Nguyen)

Updating the HDF code part of Edition4 SSF1deg

code. (Nguyen)

9.0 Raju

(F. Wrenn) SCCR 1050 - As per Moguo request, looking in to

two regions’ hourly data that showed differences

between SYN1deg and CldTypHist merge

comparisons. (R Raju -

[email protected])

SCCR 1050 - Work continued on documentation and

output evaluation procedures. (R Raju)

Page 28: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

28

Table 4. October 7, 2015 - Subsystem Issues and Status

SS

No.

SS

Lead Status Problems

11.0 Raju

(F. Wrenn) Received science approval and provided 12/2008 –

12/2009 Edition4 GGEO products to ASDC. (Raju)

Completed moving year 2008 GRAN files ( GGEO

main processor outputs) into dropbox area for

product archival purposes. (Raju)

Processed year 2010 GEO data and created HDF

files for science validations. Looking into 04/2010

GOE12/13 satellites’ transition where hours showed

data gaps. (Raju)

Page 29: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

29

Table 5. October 7, 2015 – DM Tasks

Activity Status

Production

Processing

Database/

Automation

(Coleman)

SCCR 1073 - Prepared test cases for Web Component version

2.2. (Heckert - [email protected])

SCCR 1073 - Released to PPE the Web Component version 2.2

associated with CATALYST Version 2 delivery (CER-247).

(Heckert)

Began design process for generating PRs by Stream. (Grune -

[email protected], Lande, Heckert, Coleman –

[email protected])

CERES

Websites

(Kizer)

Updated the CERES website data availability pages to

standardize browse, hdf, and legacy product return links .

(Kizer – [email protected])

Modified CERES reference lookups to use the

Publications database. (Kizer)

CERES WebRA migration: (Kizer)

- CERES Clouds Website – http://dev-ceres-

clouds.larc.nasa.gov, JIRA ticket "WEB-14". The site has been

successfully to the production server. A mount was created

from WBS128 to the WebRA ( this is a temporary solution).

- CERES CM Website – http://dev-ceres-cm.larc.nasa.gov, JIRA

ticket "WEB-13". There is a database version issue that ASDC

needs to resolve before this task can start.

- CERES ERBE-like Website – http://dev-ceres-

erbelike.larc.nasa.gov, JIRA ticket "WEB-15" is currently

paused, waiting for the AMI mount issue to be resolved.

CERES

Ordering Tool

(Chu/

Mitrescu)

Assisted the development of plotting histograms based on

multiple bounding boxes. (Chu - [email protected])

Working on EQCMG. The thumbnail page is completed. The

thumbnail images are also verified with a user. The development

of plotting time series is under process. (Chu)

Participate in one meeting regarding ODISEES to discuss the

interfaces how ODISEES places orders and CERES-OT informs

ODISEES the completion of orders. (Chu)

Continue work on integrating future products into the test

environment. (Mitrescu - [email protected])

Test GeoTif image production on ptest. (Mitrescu)

Participate in two meetings regarding ODISEES. (Mitrescu)

Test receiving/sending messages between CERES OVT and

ODISEES. (Mitrescu)

Page 30: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

PGElist_CERES_20151007.xls 10/7/20151:04 AM

Status of Misc.

Item(s)

Subsystem ID PGE ID SCCR

(exe) P6P6 TK Ver

P7P7 TK Ver

X86X86 TK Ver

CATALYST Integration Status (Y / N / Devel /

SSI&T / n/a)

Terra Aqua NPP FM6 T, A Ed3

T, A Ed4

NPP Ed1

B1-QC

Ed1-CV Other

Instrument CER1.0P2 911 Y 16 N N/A Y 16 N Y Y Y1 CER1.0P3 1074 Y 18 N N/A Y 18 N Y Y

CER1.1P8 1052 Y/S 18 N N/A Y/S 18 N Y Y Y Y YCER1.1P9 Devel 18 N N/A Devel 18 N Y YCER1.2P1 863 Y 16 N N/A Y 16 N Y Y Y Y Y Y Y YCER1.4P1 756 Y 16 N N/A Y 16 N Y YCER1.4P2 770 Y 16 N N/A Y 16 N YCER1.4P3 1058 N N/A N N/A Y 18 N Y Y Y Y Y Y

ERBE-like CER2.1P1 867 Y 16 N N/A Y 16 N Y2 CER2.2P1 867 Y 16 N N/A Y 16 N Y Y Y Y Y Y Y Y

CER2.3P1 867 Y 16 N N/A Y 16 N Y Y Y Y Y Y YCER2.3P2 867 Y 16 N N/A Y 16 N Y Y Y Y Y Y YCER2.4P1 867 Y 16 N N/A N N/A N Y Y Y Y Y Y

ERBE-like CER3.1P1 867 Y 16 N N/A Y 16 N Y Y Y Y Y Y 3 CER3.2P1 867 Y 16 N N/A Y 16 N Y Y Y Y

Clouds CER4.1-4.0P2 918 Y 18 N N/A N N/A N Y 4.1-4 CER4.1-4.0P3 943 Y 18 N N/A N N/A N Y

CER4.1-4.1P4 919 Y 18 N N/A N N/A N Y YCER4.1-4.1P5 919 Y 18 N N/A N N/A N Y YCER4.1-4.1P6 947 Y 18 N N/A N N/A Y Y Y YCER4.1-4.1P7 1047 N 18 Y 18 N N/A N Y YCER4.1-4.2P2 919 Y 18 N N/A N N/A N Y Y YCER4.1-4.2P3 919 Y 18 N N/A N N/A N Y Y YCER4.1-4.2P4 947 Y 18 N N/A N N/A Y Y Y YCER4.1-4.2P5 947 Y 18 N N/A N N/A Y Y Y YCER4.1-4.2P6 1047 N 18 Y 18 N N/A N Y YCER4.1-4.2P7 1047 N 18 Y 18 N N/A N Y YCER4.1-4.3P2 919 Y 18 N N/A N N/A N Y Y YCER4.1-4.3P3 947 Y 18 N N/A N N/A Y Y Y YCER4.1-4.3P4 1047 N 18 Y 18 N N/A N Y Y

Table 1: PGE Current Status Table

Status of PGEs on Each Platform and TK Version used for Compilation1,2

Applicable EditionsApplicable Satellites

Page 31: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

PGElist_CERES_20151007.xls 10/7/20151:04 AM

Status of Misc.

Item(s)

Subsystem ID PGE ID SCCR

(exe) P6P6 TK Ver

P7P7 TK Ver

X86X86 TK Ver

CATALYST Integration Status (Y / N / Devel /

SSI&T / n/a)

Terra Aqua NPP FM6 T, A Ed3

T, A Ed4

NPP Ed1

B1-QC

Ed1-CV Other

Table 1: PGE Current Status Table

Status of PGEs on Each Platform and TK Version used for Compilation1,2

Applicable EditionsApplicable Satellites

Inversion CER4.5-6.0P6 1001 Y 18 N N/A Y 18 Devel Y Y Y Y Y4.5-6 CER4.5-6.1P2 913 Y 18 Devel 18 Y 18 N Y Y

CER4.5-6.1P3 913 Y 18 Devel 18 Y 18 N Y YCER4.5-6.1P4 814 Y 16 N N/A N N/A Y Y YCER4.5-6.1P5 814 Y 16 N N/A N N/A Y Y YCER4.5-6.1P6 973 Y 18 Devel 18 Y 18 Devel Y Y YCER4.5-6.1P7 1064 Y 18 Y 18 Y 18 N Y YCER4.5-6.2P2 913 Y 18 N N/A N N/A N Y Y YCER4.5-6.2P3 814 Y 16 Devel 18 N N/A Y Y Y Y Y Y

CER4.5-6.2P4 939 Y 18 N N/A Y 18 N Y Y YCER4.5-6.4P1 913 Y 18 Devel 18 Y 18 N Y Y YCER4.5-6.4P2 814 Y 16 N N/A N N/A Y Y Y Y Y YCER4.5-6.5P4 984 Y 18 N N/A Y 18 N Y YCER4.5-6.5P5 984 Y 18 N N/A Y 18 N Y Y

SARB CER5.0P2 917 Y 18 N N/A Y 18 N Y Y Y5 CER5.0P3 1028 Y 18 N N/A N N/A N Y Y Y

CER5.1P2 Devel 18 N N/A Devel 18 n/a Y YCER5.1P3 1029 Devel 18 N N/A Devel 18 N Y Y Y

TISA Avg CER7.3.1P1 1016 Y 16 N N/A N N/A N Y Y Y7.1 CER7.3.1P2 1024 N N/A N N/A Y 18 Devel Y Y Y

CER7.3.1P3 1024 N N/A N N/A Y 18 Devel Y Y YCER7.3.1P4 1024 N N/A N N/A Y 18 Devel Y Y Y

SARB CER7.2.1P1 938 N N/A N N/A Y 16 N Y Y Y7.2 CER7.2.1P2 1089 N N/A N N/A SSIT 18 Devel Y Y Y

Page 32: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

PGElist_CERES_20151007.xls 10/7/20151:04 AM

Status of Misc.

Item(s)

Subsystem ID PGE ID SCCR

(exe) P6P6 TK Ver

P7P7 TK Ver

X86X86 TK Ver

CATALYST Integration Status (Y / N / Devel /

SSI&T / n/a)

Terra Aqua NPP FM6 T, A Ed3

T, A Ed4

NPP Ed1

B1-QC

Ed1-CV Other

Table 1: PGE Current Status Table

Status of PGEs on Each Platform and TK Version used for Compilation1,2

Applicable EditionsApplicable Satellites

TISA CER8.1P1 801 Y 16 N N/A N N/A N Y Y Y8 CER8.1P2 1025 Y 18 N N/A N N/A Devel Y Y Y

TISA Grid CER9.0P1 915 Y 18 N N/A Y 18 N Y Y Y9 CER9.0P2 961 Y 16 N N/A Y 18 N Y Y Y

CER9.0P3 961 Y 16 N N/A Y 18 N Y Y YCER9.0P4 940 Devel 18 N N/A N N/A NCER9.0P5 940 Devel 18 N N/A N N/A NCER9.0P6 1050 Devel 18 N N/A N N/A N Y Y YCER9.0P7 1050 Devel 18 N N/A N N/A N Y Y YCER9.1P1 914 Y 18 N N/A N N/A N YCER9.1P2 1018 N N/A N N/A Y 18 N YCER9.2P2 914 Y 18 N N/A N N/A N Y Y YCER9.2P3 1010 Y 18 N N/A Y 18 Devel Y Y Y Y YCER9.3P2 914 Y 18 N N/A N N/A N Y Y YCER9.3P3 1010 Y 18 N N/A Y 18 Devel Y Y Y Y YCER9.4P2 914 Y 18 N N/A N N/A N Y Y YCER9.4P3 1010 Y 18 N N/A Y 18 Devel Y Y Y Y Y

TISA Avg CER10.0P3 1013 Y 18 N N/A N N/A N10 CER10.0P4 1086 SSI&T 18 N N/A SSI&T 18 N Y Y Y

CER10.0P5 1075 Y 18 N N/A Y 18 Devel Y Y Y Y YGGEO CER11.7P1 916 Y 18 N N/A Y 18 N Y

11 CER11.7P2 1049 Devel 18 N N/A N N/A N YRegrid CER12.1P1 920 Y 16 N N/A Y 16 N Y

12 CER12.1P2 749 Y 16 N N/A Y 16 N Y

Page 33: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

PGElist_CERES_20151007.xls 10/7/20151:04 AM

Y Currently able to run in production

ia Executable exists on platform but PGE is inactive

N Not able to run in production

Y/D Current version in production operational, New version in development

Y/S Current version in production operational, New version in SSI&T

Y/V Current version in production operational, New version in ValRx

Devel PGE in development, still to be delivered for the first time to the platform.

SSIT PGE delivered and in SSI&T (CM or SIT) testing prior to operational processingValRx PGE undergoing ValRx testing and approving phase

P6 AMI - IBM P6P7 AMI - IBM P7X86 AMI - IBM X86 Y Scripts in production

n/a Not needed for this PGEN Development not yet begun

SSIT or SSIT Delivered and in SSI&T (CM or SIT) testing prior to operational processing

Devel Development in progress for inclusion in next delivery

7"New" Wrapper Scripts for AMI Status

Table 1 Key:1Status

2Prod. Platform

Page 34: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

PGElist_CERES_20151007.xls 10/7/20151:04 AM

Date Affected Section or PGE/Product ID Revision Made11.7P1, 9.0P1 Changed P6 and New Wrapper Status from "Devel" to "SSI&T", Changed

X86 status from "N" to "SSI&T"4.1-4.0P2 Changed P6 and New Wrapper Status from "SSI&T" to "ValRx"4.1-4.0P3 New PGE added to list1.4P3 Changed P6, X86, and New Wrapper Status from "Devel" to "SSI&T" 4.1-4.0P2 Changed P6 and New Wrapper Status from "ValRx" to "Y"9.2P2,3,4 Changed P6 and New Wrapper Status from "ValRx" to "Y"1,4P3, 4.5-6.1P2,3, 4.5-6.2P2 Changed P6, X86 and New Wrapper Status from "SSI&T" to "ValRx" 4.1-4.0P3 Changed P6 and New Wrapper Status from "SSI&T" to "ValRx" 4.1-4.0P3 Changed P6 and New Wrapper Status from "ValRx" to "Y"1.4P3, 4.5-6.1P2,3, 4.5-6.2P2 Changed P6, X86, and New Wrapper Status from "ValRx" to "Y"

3/6/2013 None No changes4.1-4.1P7, 2P6, 2P7, 3P4 4.5-6.1P6

New PGEs added to list

9.0P1, 11.7P1 Changed P6 and New Wrapper Status from "SSI&T" to "Y"10.0P4 Changed New Wrapper Status from "N" to "Devel"1.4P3 Changed P6 and X86 status from "Y" to "Y/Devel" to indicate an updated

version to replace current functioning version is in development 4.-14.1P6, 2P4, 2P5, 3P3 Changed TK version from 16 to 1810.0P4 Changed P6, X86, and New Wrapper Status from "Devel" to "SSI&T" 1.4P3 Changed P6 and X86 status from "Y/Devel" to to "Y/SSIT" to indicate an

updated version to replace current functioning version is in testing 4.-14.1P6, 2P4, 2P5, 3P3 Changed P6 status to "ValRx"All Removed column for SGI information

5/1/2013 No updates4.-14.1P6, 2P4, 2P5, 3P3 Changed P6 status to "Y"9.0P2,3 Changed X86 status from "N" to "Y" and X86 tk version fron "N/A" to "18"

5/29/2013 No updates6/12/2013 4.1-4.1P4,5, 2P2, 2P3, 3P2 Changed P6 and New Wrapper status from "Devel" to "SSIT"

1.4P3 Removed "SSIT" from P6 and X86 status, added comment about ValRx 4.5-6,1P2,3, 2P2, 4P1 Changed P6, X86, and New Wrapper Status from "Y" to "ValRx"

7/10/2013 No updates

4/15/2013

4/1/2013

1/9/2013

6/24/2013

5/15/2013

Revisions:

1/23/2013

2/6/2013

2/20/2013

3/18/2013

Page 35: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

PGElist_CERES_20151007.xls 10/7/20151:04 AM

Date Affected Section or PGE/Product ID Revision MadeRevisions:

5.1P2 Changed P6, X86, and New Wrapper Status from "N" to "Devel", and TK Version to 18

5.1P3 Changed TK Version from "16" to "18"4.5-6.1P7 New PGE added to list4.5-6.1P6 Changed comment to indicate this PGE is now an Ed4 PGE and not an NPP

PGE8/7/2013 10.0P4 Changed P6 and New Wrapper Status from "SSI&T" to "Y"

8/21/2013 No updates9/4/2013 No updates

9/18/2013 4.5-6.5P4,5 Changed P6 and X86 status from "Y" to "Devel" to indicate an updated version to replace current version is in development

10/2/2013 1.4P3 Changed TK version from "16" to "18"10/16/2013 No updates10/30/2013 No updates11/13/2013 No updates11/27/2013 9.0P4,5 Changed P6 and New Wrapper status from "Devel" to "SSIT"12/11/2013 9.0P5 Changed P6 and New Wrapper status from "SSIT" back to "Devel"

1/8/2014 9.0P4 Changed P6 and New Wrapper status from "SSIT" back to "Devel"1/22/2014 No updates

Table 1 Key Added new Statuses Y/D, Y/S, and Y/V1.1P8, 1.2P1, 1.4P1, 1.4P2, 1.4P3 Changed P6 and X86 status from "Y" to "Y/S"

2/19/2014 4.5-6.0P6 New PGE added to list3/5/2014 No updates

3/19/2014 No updates1.4P3 Changed P6 status from "Y/S" to "N"1.1P8, 1.2P1, 1.4P1, 1.4P2 Changed P6 and X86 statuses from "Y/S" to "Y"4.5-6.0P6, 4.5-6.1P6 Changed P6 and X86 statuses from "Devel" to "SSIT"4.1-4.1P7, 2P6, 2P7, 3P4 Changed P6 statuses from "Devel" to "SSIT"

4/16/2014 No updates4/30/2014 No updates5/14/2014 4.5-6.1P6 Changed P6 and X86 statuses from "SSIT" to "ValRx"5/28/2014 7.2.1P2 Added new PGE6/11/2014 9.2P3, 9.3P3, 9.4P3 Added new PGEs

10.0P4 Changed X86 Status from "Y" to "N"7.3.1P2, 7.3.1P3, 7.3.1P4, 8.1P2, 9.1P2, 10.0P5 Added new PGEs

7/24/2013

6/25/2014

2/5/2014

4/2/2014

Page 36: October 7, 2015 - System Issues and Status€¦ · October 7, 2015 - System Issues and Status Table 1: PR Status for 10/07/15 (Status as of 10/02/15) Production Request (PR) Satellite

PGElist_CERES_20151007.xls 10/7/20151:04 AM

Date Affected Section or PGE/Product ID Revision MadeRevisions:

7/11/2014 7.3.1P1, 8.1P1, 10.0P3, 10.0P4 Changed P6 status from "Y" to "SSIT"4.5-6.0P6, 4.5-6.1P6 Changed P6 and X86 and New Wrapper Status from "SSI&T" to "Y"4.5-6.1P7 Changed P6 and X86 and New Wrapper Status from "Devel" to "SSI&T"9.1P2 Changed X86 and New Wrapper status "Devel"' to "SSIT"9.2P3, 9.3P3, 9.4P3 Changed P6 and New Wrapper status "Devel"' to "SSIT"9.2P3, 9.3P3, 9.4P3 Changed X86 status from "N"' to "SSIT"10.0P3, 4 Changed P6 status from "Devel" to "Y"1.3P3 Removed from table

9/3/2014 5.0P3 Changed P6 status to "SSIT" from "N"All Added new status - "ia"All Added column for active SCCR IDAll Removed "New Wrapper" columnAll Replaced Comment Column with Sat and Version columns2.NPx, 3.NPx, 4.5-6.5P4,5, 5.0Px, 5.1P1,2, 5.4Px, 6.NPx, 7.3.1P1, 7.2.1P1, 9.0P1, 9.1P1, 9.NP2, 10.0P3, 11.NPx, 12.1P1

Changed P4 status from "Y" to "ia"

9/17/2014

8/20/2014

8/6/2014

7/23/2014