OD HV Upgrade
Hans BernsJeff WilkesU. of Washington10/14/01
New OD HV Paddle Cards:
VME 9U height (14.4") Standard VME C-type front panel and
ejector latches for robust and precise mounting
High voltage relay instead of jumper for each PMT channel.
Front panel DIP switches for manual enable/disable of each channel.
LEDs for HV status of each PMT channel on front panel (relay on/off display).
Header jack on front panel for relay remote control input.– Remote control system is under
development LEMO jack on front panel for each PMT
signal– Scope signal available without disconnecting
the coax ribbon cable to the QTC.
New OD HV Paddle Cards
Channel circuit changes
Old paddle cards
New paddle cards
Installation
Test installation (Hut 1): 11/21/00 Full installation began: 4/27/01 Completed: 5/2/01
Shift workers’ notes
Switches and indicators: – enable/disable channel with DIP switch– LED on = enabled
Ribbon cable = HV relay power/control
Lemos for scope ports
HV in from LeCroy supplies
Same cables to QTCs
Procedure for disabling OD channels
Procedure for disabling or enabling an OD channel: – DISABLE the selected HV channel
using the LeCroy HV controller in the appropriate hut.
– Change the setting of the dip switch for desired channel on its paddle card
» red LED next to the LEMO jack of each channel shows whether the relay is on or off.Note: The LEDs monitor relay status only, NOT HV status!
– RE-ENABLE the selected HV channel.