  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Feb 21-22, 2014 Noida, India

    10th International Conference of the

    TOC Practitioners Alliance - TOCPAwww.tocpractice.com

    Advanced Issues of CCPM

    Oded Cohen TOC Strategic Solutions, Israel22, February 2014

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Oded Cohen

    Oded has over 35 years of experience in developing,teaching and implementing TOC methodology,solutions and implementation processes workingdirectly with Dr. Goldratt all over the world. Among thecountries to which Oded brings his expertise are theUSA, Canada, Japan, India, China, the UK, Poland,Russia, Ukraine, Colombia, Chile, Peru, Turkey andmany others.

    Oded has authored multiple TOC articles andcontributed to numerous TOC books.

    Oded in the is the author of Ever Improve A Guide toManaging Production the TOC Way, published in June2010. Oded co-authored the book Deming & Goldratt:The Theory of Constraints and the System ofProfound Knowledge The Decalogue.

    Together with Jelena Fedurko Oded has co-authoredthe book Theory of Constraints Fundamentals.

    Oded is International Director of TOC StrategicSolutions Ltd and Founder and Co-President ofTOCPA.

    [email protected]

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Introduction the U Shape and CCPM

    Direction of the solution - Managing Flow the TOC Way

    Time Buffers

    The General Structure for the CCPM Solution

    Advanced topics in Planning

    Advanced topics in Execution

    3

    Contents

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Introduction

    Practitioners raise practical issues along the lines of:

    How to deal with specific situations?

    Issues that deal with technicalities as well as managerial and human

    interaction

    Where do we find the answers?

    The beauty of the TOC methodology is that every issue associated with

    the solution has its own logical place :

    either in the What the knowledge that is captured by the

    U-Shape

    or in the How - which is captured in the procedures and the

    implementation plans.

    Advances issues of CCPM

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    TODAYTHE PAST THE FUTURE

    TIME

    P

    E

    R

    F

    O

    R

    M

    A

    N

    C

    E

    CURRENT LEVEL

    TARGET LEVEL

    The Managerial ChallengeImprove the performance of the system

    There is a strong belief that the system can perform better up to the Target Level

    TARGET LEVEL

    The GAP

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Improvement Solution

    Low Performance

    Measurements

    Low Performance

    Measurements

    What to Change?

    Which parts of the

    system have to

    go!

    C

    u

    r

    r

    e

    n

    t

    R

    e

    a

    l

    i

    t

    y

    High Performance

    Measurements

    High Performance

    Measurements

    What to Change

    to?Which new parts must

    be introduced

    F

    u

    t

    u

    r

    e

    R

    e

    a

    l

    i

    t

    y

    Current SystemStopped/Replaced

    Current System

    Stay

    ProposedSolution

    New

    Improved performance

    Understanding the problem Developing the solutionPIVOT

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Understanding the ProblemCurrent Reality

    Core Problem

    A conflict diagram - Core Cloud

    Core Problem

    A conflict diagram - Core Cloud

    DD

    DDCC

    BB

    AA

    D

    Take

    corrective actions

    that compromise

    project budget

    commitments A

    Run projects

    successfully

    B

    Ensure the project

    is on-time

    and in full

    (according to specs)

    C

    Protect budget

    commitments

    D

    Do not take

    corrective actions

    that compromise

    project budget

    commitments

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    The Direction of the Solution:Use the TOC Pivot to Better

    Manage the Flow

    Focus-Flow

    PIVOT

    TOC

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    The TOC Pivot

    Managing the TOC Way:

    The Basic Assumptions The Flows within the system The Constraint Types of Constraints Managing through the Constraint The Five steps of Focusing

    PIVOT

    TOC

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    The Flows of a

    Commercial Business

    Process flow $Goal units

    Management / Workforce

    The Goal: To make money now and in the future

    InformationFlow

    DecisionsFlow

    Blocking factor

    PIVOT

    TOC

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    TODAYTHE PAST THE FUTURE

    CONSTRAINTS factors or elements that determine

    how much the system can accomplish

    The GAP

    Block

    Lift

    What prevents us from

    achieving the goal?

    PIVOT

    TOC

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    The TOC Pivot Managing Constraints

    PIVOT

    TOC

    TODAYTHE PAST THE FUTURE

    The

    GAP

    Block

    Lift

    What is the constraint of the project management?When does the system create value for the goal of making more money?

    The shorter is the time to complete the project the better!At the completion of the project Throughput is generated and money invested is starting to be returned!Conclusion: Projects have the TIME constraint.

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Flow is characterized as dependent activities (tasks) coupled with statistical fluctuations

    The TOC Way for managing Flow is by using Buffers for Planning and Buffer Management for controlling and monitoring the Execution of the plans.

    A TOC Buffer A mechanism to absorb statistical fluctuations as well as to provide management with early signals that the process is in danger of going out of control (and hence are under threat of not achieving the goal/purpose of the system).

    Please note contingency is not a TOC Buffer!13

    Managing Production Flow

    the TOC Way

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Buffer Management a mechanism that informs management about the true status of the flow though the continued update of the buffer situation as compared with the plan.Buffers are used during the execution are used for:1. Setting up the priorities for assigning resources to perform

    jobs 2. Prompting recovery actions to ensure enough buffers for the

    rest of the flow3. Proper sizing of the buffers through Dynamic Buffer

    Management or managing PLT Production Lead Time4. Identifying reoccurring problems in the flow and eliminate

    themBuffer management is always oriented to the future.

    14

    Buffer Management

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    F

    u

    t

    u

    r

    e

    R

    e

    a

    l

    i

    t

    y

    TOC Direction of Solution

    CCPM Critical Chain Project Management:

    The TIME constraint of the project is

    presented through the Critical

    Chain the longest chain of

    dependent activities. Managing

    the project through the CC is

    geared to finish the project in a

    safe and quick way

    CCPM Critical Chain Project Management:

    The TIME constraint of the project is

    presented through the Critical

    Chain the longest chain of

    dependent activities. Managing

    the project through the CC is

    geared to finish the project in a

    safe and quick way

    TOC direction of solution

    TOC direction of solution

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Process flow Goal units

    Management / Workforce

    InformationFlow

    DecisionsFlow

    1

    % Chain Complete Production/Operation Buffer

    FGBuffers

    InformationFlow

    Project Buffer

    Managing the FLOW

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    A Buffer that it measuring units of timeThe time buffer is added at the end of a chain of tasks.Project Buffer at the end of the Critical ChainFeeding Buffer at the end of a chain that integrated into the critical chain

    Time Buffer For CCPM

    Feeding Buffer - FBProject Buffer - PB

    W16

    B10 M16 C20G10

    M16

    Over 100%

    Buffer Consumption

    Full Buffer Full Buffer

    Buffer Consumption

    Project Buffer FB

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    The general structure of a TOC Solutions for Managing Projects

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    The General Structure of

    TOC CCPM Solution

    Project Planning

    Injections 2-4

    Mindset:Customer orders

    are the Prime Driver the Drum

    Injection 1

    Tactics: Project Organization is on CCPM

    Project Execution Control

    Injections 5-9

    Strategy:

    The Project is On Time, In Full & Within Budget

    PlanningSetting up the System Execution Control

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    DE

    Inj

    Injection Flower

    IPImplementation

    Plan

    The Solution Design

    What

    HowProcedures &

    Implementation Plan

    Inj -Injection (essence)

    UDE Undesirable Effect

    DE Desired EffectNBR

    Negative Branch

    Reservation

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    TOC InjectionsTOC Injections

    Low PerformanceLow Performance

    UDE

    CCPMCCPMPIVOTTOC

    C

    u

    r

    r

    e

    n

    t

    R

    e

    a

    l

    i

    t

    y

    F

    u

    t

    u

    r

    e

    R

    e

    a

    l

    i

    t

    y

    Existing Feature

    UDE

    Existing Procedure

    Understanding the Injection

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Overview of the TOC Solution for Project Management

    CCPM

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Tactics:The Project organization implements Critical Chain project management

    Mindset:

    Customer orders

    are the

    Prime Driver

    the Drum

    Planning

    Injections 2-4Execution Control

    Injections 5-9

    TOC Solution for

    Single Project Management

    CCPM-Injection 1 Achievement of the delivery commitments is

    established as a Prime Measurement for

    managing project environment

    PlanningSetting Up Execution Control

    Commitment & Measurements

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Tactics:The Project organization implements Critical Chain project management

    Planning

    Injections 2-4Execution

    Control

    Injections 5-9

    CCPM -Injection 4

    Buffers are inserted

    in strategic points

    CCPM- Injection 2

    Project Planning Diagrams are in place

    with tasks resourced and estimated for

    duration (while estimates of durations

    are challenging but achievable)

    CCPM-Injection 3

    Critical Chain is

    determined through

    resolving resource

    contention

    Mindset:

    Customer orders

    are the

    Prime Driver

    the Drum

    Injection 1

    TOC Solution for

    Single Project Management

    Project Plan BuffersCritical Chain

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Managing the Project Planning

    The TOC way

    What does it mean?

    Managing Projects through CCPM means that project managers handle the planning phase of the project in a different way (to what they have done until now)

    There are three parts to the planning procedure containing:

    Parts that stay untouched Parts that are removed (*) New parts that are introduced

    (*) Procedures -the formal and the informal ways that are used during planning

    Current

    SystemStopped/

    Replaced

    Current

    System

    Stay

    ProposedSolution

    New

    Improved

    performance

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Managing the Project Planning

    The TOC way

    Parts that have to be removed

    Project Management is about managing the flow of the project and bringing it to the successful completion (time, money and specifications)

    Current

    SystemStopped

    /Replace

    d

    Current

    System

    Stay

    ProposedSolution

    New

    Improved

    performance

    The specs are the responsibility of the task performers and their organization (under the resource manager or subcontractor)

    The money aspect is subject to the internal processes and procedures of the company (SOP).

    The TOC way suggest that the project manager should focus on the time aspect of the project.

    Hence the project plan should be devoted only to managing the time!

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Project Planning the TOC way

    Parts that have to be removed/stopped

    The project plan is not for: Planning resource load Budgeting Controlling the pay to subcontractorsIt is just for managing TIME!

    Current

    SystemStopped

    /Replace

    d

    Current

    System

    Stay

    ProposedSolution

    New

    Improved

    performance

    Therefore: Task duration is the estimation elapsed time from start to

    completion. Task duration not less than 1 day and not more than 5% of

    the project length. Project plan is not To Do List every task is for concrete

    deliverable. Number of tasks in the project should be less than 300. No fractional resource, no team, no specific resource just

    skills, enough capacity for the majority of resources Few CCR if at all!

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Criteria for a Good Project Plan

    1. Providing financial benefit by the successful completion of the project on time, within budget and according to the promised specification the project generates Throughput for the contractor of the project.

    2. Realistic the plan does not contain conditions that are known to be unrealistic (such as resource loading over 100% of available capacity).

    3. Immunized against disruptions (Murphy and uncertainty).

    Injection 1

    Injections 2-3

    Injection 4

    Managing the Project Planning

    The TOC way

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    The quality of the Project Plan:

    The quality of the project plan is critical for the implementation of the planning phase.

    In reality any mistake in the planning is caught at the execution phase. However, correcting the mistake are expensive.

    The plan must reflect the views of the key stakeholders of the project.

    Technically the project should go through rigorous check to ensure the structure is sound and is ready for identifying Critical Chain and applying the Buffers.

    Managing the Project

    Planning the TOC way

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    CC Pulse project evaluation

    Before planning phase CC Pulse evaluates the

    project network.

    Problems highlighted in red text must be fixed

    before next step.

    Problems highlighted in bold text are

    recommended to be fixed.

    Project Planning

    Example

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Injection 2 Project DiagramsNew specifications Existing project plans are subject to rigorous logical checking and ambitious time estimations.

    Injection 3 Critical Chain New conceptReplacing critical path of the traditional project management with Critical Chain removing resource contention.

    Injection 4 Buffers New conceptConscious and open provision for additional time to protect from uncertainty.

    Planning Injections 2-4

    TOC Injections

    TOC Injections

    Low Performance

    Low Performance

    UDE

    TOC Direction of solution

    TOC Direction of solution

    PIVOT

    TOC

    Existing Feature

    UDE

    Existing Procedure

    Planning Injections are NEW features of project management

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Execution ControlInjections 5-9

    Tactics: The Project organization implements Critical Chain project management

    CCPM-Injection 8

    Buffer penetration reasons are

    reviewed periodically for POOGI

    CCPM-Injection 5 Tasks are performed

    according to the status of their

    corresponding buffers through using Buffer

    Management

    CCPM-Injection 6Resource

    availability is monitored in

    anticipation of a new planned

    task

    CCPM-Injection 7

    BM for recovery

    actions is in place

    CCPM-Injection 9Resources

    are monitored

    as potential Critical

    Resources

    TOC Solution for Single Project Management

    Look ahead CCRsPOOGIRecoveryReport & priority

    PlanningInjections 2-4

    Mindset:Customer orders

    are the Prime Driver the Drum

    Injection 1

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Criteria for a Good Execution Control

    1. Priority the process of assigning resources should be linked to the overall importance of the project and its own progress.

    2. Recovery the execution processes direct management in taking actions that bring projects to be back on course for on-time completion.

    3. POOGI - the system provides statistics to enable management to continually learn and improve planning and execution control.

    Injections 5-6

    Injection 7

    Injections 8-9

    Managing the Project Execution

    The TOC way

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    Injection 5 Resource assignment based on buffer penetration New concept

    Priority is given according to the predicted completion of the project as compared to the status of the other projects.Injection 6 Monitoring resource availability New ConceptProject managers get early warning about the coming tasks to ensure that the tasks can start without delays.

    Execution Control Injections 5-9

    Execution Control Injections are NEW features of project management

    Injection 7 Recovery actions early enough New concept

    Managers in the project get assessments of the project completion and prompt to take special

    unplanned actions (affordable and not expensive) to reduce the risk of the project not

    completing on time.

    Injection 8 Statistics for continuous improvement New concept

    A formal method to facilitate systemic learning through the use of statistics on blockages to

    point management to areas that can improve future projects.

    Injection 9 Critical resources New approach

    Once certain resources are identified to be obstructing the flow of projects,

    a special attention is given to properly utilizing and managing them.

    TOC Injections

    TOC Injections

    Low Performance

    Low Performance

    UDE

    TOC Direction of solution

    TOC Direction of solution

    PIVOT

    TOC

    Existing

    Feature

    UDE

    Existing Procedure

  • 10th International Conference of the TOC Practitioners Alliance - TOCPA

    DD DD

    CCBB

    AA

    TOC InjectionsTOC Injections

    Criteria for good solutions:- Improve performance

    measurements of the function- Improve performance of other

    functions - Improve the company bottom-line

    TOC Detailed Solution Design

    Low Performance Measurements

    Low Performance Measurements

    UDE

    UDE

    UDE

    UDEUDE

    UDE

    High Performance Measurements

    High Performance Measurements

    DE

    DE

    DE

    DEDE

    DE

    TOC direction of solution

    TOC direction of solution

    NBRs

    PIVOTTOC

    C

    u

    r

    r

    e

    n

    t

    R

    e

    a

    l

    i

    t

    y

    F

    u

    t

    u

    r

    e

    R

    e

    a

    l

    i

    t

    y