21
Office Design for LED Enterprises By Laverne E. Denyer ©Microsoft Office Suite

Office Design for LED Enterprises By Laverne E. Denyer ©Microsoft Office Suite

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Office Design for LED Enterprises

By Laverne E. Denyer

©Microsoft Office Suite

LED Enterprises Drafting and Design Business

The business began in San Jose in 1973 and transferred to Yuba City in 1977. It is a sole-proprietor business. Formerly called Denyer’s Drafting &

Design Or 3D Drafting

©Microsoft Office Suite

LED Enterprises Drafting and Design Business

A primary business service is architectural designs for residential and commercial use.

LED Enterprises the Business, cont’d

Target Clientele Business and Residential owners

All ages and economic bases Contractors

Additional space beyond office: None

©Microsoft Office Suite

Needs Assessment

The primary needs for this business include: Computer space with adjacent work

space Enough for two people

Drafting board and equipment Enough for 2 people

©Microsoft Office Suite

Needs Assessment, cont’d

WhiteprinterCopierDisplay AreaGeneral Work AreaAccessibility

Needs Assessment, cont’d

Drawing storageSupply and equipment storageConference areaFile storage

Proposed Use

Two person officeClient conferencesDesigning, drawing and producing plansDesign displaysBusiness management

Business Marketing Strategy

Low key – Primarily ReferralsLocal phone bookChamber of CommerceOther……

Design Elements

Contemporary Style Interior and Exterior alike

Excellent lighting and ventilationComputer safe (weather, static, power, etc.)ComfortWorkabilityAesthetics

Client Conference Notes

Concerned about Space

Minimum 1,000 square feet Budget

$150,000 for furniture and equipment Facility development funds negotiable –

approximately $275,000 Aesthetics

Considerations

Sites and materials used for the development of this planCodes to be metOther…..

Materials List

Furniture:Equipment:Facility:Other Resources:

Cost Analysis

Equipment & Furniture $100,000.00

Facility Cost $ 80,000.00

Design Fees $ 2,000.00

Total Cost $182,000.00

Comparative Research

Plan “A”Square Feet……Cost……..Aesthetics……Workability……Desirability…..

Plan “B”Square Feet……Cost……..Aesthetics……Workability……Desirability…..

Recommendation: Select Plan “A”

Selected Plan: “A”

©LE Denyer 2000

©LE Denyer 2000

Elevation

©LE Denyer 2000

Location

©LE Denyer 2000

Feasibility Report

Plan “A” is very feasible because: Budget Design elements Workable Etc………..

Resources

Works Cited Research Graphics Sounds

Permissions

Design Report

Design theories incorporated in this designConstruction considerationsSelection RationaleStructural Feasibility for Local AreaOther……….

©Microsoft Office Suite