141
Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme Volume-II (Annexures) Office of the Conservator of Forests, Bilaspur Himachal Pradesh Forest Department (Shimla) Submitted By: M/s N.H. Consulting Pvt. Ltd., New Delhi, India January’ 2012

Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and

RIM Plantation Scheme

Volume-II

(Annexures)

Office of the Conservator of Forests, Bilaspur Himachal Pradesh Forest Department (Shimla)

Submitted By:

M/s N.H. Consulting Pvt. Ltd., New Delhi, India

January’ 2012

Page 2: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

N.H. Consulting Pvt. Ltd (ISO 9001: 2008 and ISO 14001: 2004 Certified Company) F-131/1 First Floor

Pragati Bhawan, Mohammadpur Near Bhikaji Cama Place New Delhi -66 India Tel. 011-26174580 / 41718184

Website: www.consultingnhc.com E-mail : [email protected] : [email protected]

January’ 2012

Page 3: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft
Page 4: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. i

Annexure - I

Data Sheet for Recording of GPS Location of Plantations

Division – Bilaspur Range - Bilaspur

Sl. No. Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

1. Afforestation 2005-06

DPF Chamyon Chamyon Sadar Bilaspur 5-Ha. N31023.243’ E076

0 51.259’ 2336 Ft. Center

Point

2. Afforestation 2005-06

DPF Chamyon Chamyon Sadar Bilaspur 15 Ha. N31023.155’ E076

0 51.279’ 2344 Ft. Center

Point

3. Afforestation 2006-07

DPF Chamyon –II Chamyon Sadar Bilaspur 21-Ha. N310 23.424’ E076

0 51.918’ 2424 Ft. Entry

Point

4. Afforestation 2006-07

DPF Karsi Chamyon Sadar Bilaspur 20-Ha. N310 51.411’ E076

0 51.249’ 2562 Ft. Entry

Point

5. Afforestation 2006-07

DPF Chamyon Jamthal Sadar Bilaspur 19-Ha. N310 23.425’ E076

0 51.426’ 2420 Ft. Entry

Point

6. Afforestation 2006-07

DPF JamThal Chamyon Sadar Bilaspur 11 Ha. N310 20.560’ E76

0 52.289’ 3325 Ft. Center

Point

7. Rim Plantation 2006-07

DPF Chamyon Jamthal Sadar Bilaspur 20-Ha. N310 23.444’ E076

0 51.423’ 2443 Ft. Entry

Point

8. Down Stream Treatment. 2006-07

DPF First Part Jamthal

Jamthal Sadar Bilaspur 15-Ha. N31024.450’ E076

0 52.555’ 1876 Ft. Entry

Point

9. Down Stream Treatment 2006-07

DPF Jamthal Jamthal Sadar Bilaspur 20-Ha. N310 24.360’ E076

0 51.585’ 1934 Ft. Entry

Point

10.

Afforestation 2007-08

DPF Chamyon - III Chamyon Sadar Bilaspur 13-Ha. N31022.166’ E076

0 51.210’ 2897 Ft. Center

Point

11. Afforestation 2007-08

DPF Chamyon –IV Chamyon Sadar Bilaspur 13-Ha. N31021.292’ E076

0 51.284’ 2446 Ft. Center

Point

12. Afforestation 2007-08

DPF Chamyon Jamthal Sadar Bilaspur 13-Ha. N31023’17.4” E076

0 51’47.5” 2331 Ft. Entry

Point

Page 5: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. ii

Sl. No. Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

13. Afforestation 2007-08

DPF Chamyon Chamyon Sadar Bilaspur 13-Ha. N31022’49.2” E076

0 51’30.7” 2391Ft. Center

Point

14. Down Stream Treatment 2007-08

DPF Jamthal Part 1 Jamthal Sadar Bilaspur 15 Ha. N31024’35.3’’ E076

0 52’30.0’ 1949 Ft. Center

Point

15. Dawn Stream Treatment 2007-08

DPF Jamthal I Jamthal Sadar Bilaspur 15-Ha. N310 24’59.9” E076

0 52’54.5” 1800 Ft. Entry

Point

16. Down Stream Treatment 2007-08

DPF First Part Jamthal

Jamthal Sadar Bilaspur 15-Ha. N31024’38.0” E076

0 52’30.7” 1838 Ft. Entry

Point

17. Afforestation 2008-09

DPF First Part Jamthal

Jamthal Sadar Bilaspur 13-Ha. N310 23.253’ E076

0 51.654’ 2359 Ft. Entry

Point

18. Rim Plantation 2009-10

UF Kasol Chamyon Sadar Bilaspur 4 Ha. N310 22.235’ E076

0 51.584’ 2570 Ft. Center

Point

Page 6: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. iii

Division - Karsog

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

1.

2. Afforestation 2004-05

D-72 Reshtadhar C-III Kanda Pangna Karsog 10 Ha. N31010.912’ E077

004.459’ 6105 Ft.. Center Point

3. Afforestation 2004-05

D-171 Dopha Dopha Karsog Karsog 5 Ha. N31025.389’ E077

012.721’ 6840 Ft.. Center Point

4. Afforestation 2004-05

D-201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31019.901’ E077

014.914’ 4356 Ft.. Center Point

5. Afforestation 2004-05

D -242 Buna Taben Seri Karsog 5 Ha. N31021.210’ E077

021.066’ 3760 Ft.. Center Point

6. Afforestation 2004-05

D -241 Kandloo Taben Seri Karsog 5 Ha. N31022.466’ E077

019.40.8’ 4745 Ft.. Center Point

7. Afforestation 2004-05

O D -Makra Sarahan Seri Karsog 13 Ha. N31023.333’ E077

021.307’ 5027 Ft.. Center Point

8. Afforestation 2004-05

D -228 Bhandashish C (v)

Chauridhar

Seri Karsog 5 Ha. N31022.196’ E077

019.175’ 4123 Ft.. Center Point

9. Afforestation 2004-05

D- 183 MKB Mahadev ki Banouni

Mamail Karsog Karsog 7 Ha. N31022.360’ E077

013.245’ 4192 Ft.. Center Point

10. Afforestation 2004-05

D 2497 Sarahan- CI Sarahan Seri Karsog 5 Ha. N31022.290’ E077

022.270’ 4668 Ft.. Center Point

11. Afforestation 2004-05

D- Ganu C-II Nari Seri Karsog 10 Ha. N31020.413’ E077

020.126’ 4185 Ft.. Center Point

12. Afforestation 2004-05

D- Ganu C-II Nari Seri Karsog 5 Ha. N31019.501’ E077

018.986’ 5450 Ft.. Entry Point

13. Afforestation 2004-05

D-175 Pehran Ghalaych Karsog Karsog 8 Ha. N31024.667’ E077

014.271’ 7553 Ft.. Center Point

14. Afforestation 2004-05

D- 222 Pog Nari Seri Karsog 5 Ha. N31019.984’ E077

019.794’ 3620 Ft.. Center Point

15. Afforestation 2004-05

D- 213 Nehrinal Nehrinal Seri Karsog 6 Ha. N31018.414’ E077

017.944’ 5758 Ft.. Center Point

16. Afforestation 2004-05

D- 193 Katach Bhanera Karsog Karsog 7 Ha. N31021’36.6” E077

015’29.0” 4784 Ft. Center Point

17. Afforestation D-199 Dhamiyara Khashoul Karsog Karsog 8 Ha. N31020.496’ E077

014.354’ 3879 Ft.. Entry Point

Page 7: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. iv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2004-05

18. Afforestation 2004-05

D-72 Resthadhar –III Kanda Pangna Karsog 10 Ha. N31019.354’ E077

004.718’ 5834 Ft. Center Point

19. Afforestation 2004-05

D-74 Parvain Blindi Pangna Karsog 10 Ha. N31017’96.2’’ E077

003’39.8’’ 2416 Ft. Center Point

20. Afforestation 2004-05

D-101 Nandoo Tattapani Pangna Karsog 10 Ha. N31015’03.6’’ E077

008’81.3’’ 3040 Ft. Center Point

21. Afforestation 2004-05

D- 101 Nandoo Tattapani Pangna Karsog 10 Ha. N31015’13.3’’ E077

008’82.1’’ 3168 Ft. Center Point

22. Afforestation 2004-05

D-103 Talehan Talehan Pangna Karsog 10 Ha. N31016.595’ E077

009.408’ 4643 Ft. Center Point

23. Afforestation 2004-05

OD 236 Pathraivi Pathraivi Seri Karsog 8 Ha. N31029’18.4” E 077

0 21’07.6" 7200 Ft.. Entry Point

24. Afforestation 2004-05

D 242 Buna Taben Seri Karsog 5 Ha. N31021.210’ E077’21.066’ 3760 Ft.. Entry Point

25. Afforestation 2004-05

OD Makra Sarahan Seri Karsog 13 Ha. N31023.038’ E077’21.307’ 5024 Ft.. Entry Point

26. Afforestation 2004-05

D 247 Sarahan C-I Sarahan Seri Karsog 5 Ha. N31022.290’ E077’22.290’ 4668 Ft. Entry Point

27. Afforestation 2004-05

D 213 Nehrinal Nehrinal Seri Karsog 6 Ha. N31018.414’ E077’17.944’ 5758 Ft. Center Point

28. Afforestation 2004-05

D 222 Pog Nanj Seri Karsog 5 Ha. N31019.894’ E077’19.794’ 3620 Ft. Center Point

29. Afforestation 2004-05

D 233 Richni Richhni Seri Karsog 7 Ha. N31024.337” E077

0 15.218” 6841 Ft. Entry Point

30. Afforestation 2004-05

D 219 Ganu C Ii Dhamoon Seri Karsog 6 Ha. N31019.29.2” E077

018.58.2” 3238 Ft. Entry Point

31. Afforestation 2004-05

D 228 Bhundashil C-V Chauridhar

Seri Karsog 5 Ha. N31022.196’ E077’19.175’ 4123 Ft. Center Point

32. Afforestation 2004-05

D Ganu C -II Nanj Seri Karsog 5 Ha. N31019.501’ E077’18.986’ 5450 Ft. Center Point

33. Afforestation 2004-05

D 104 Besta Talehan Pangna Karsog 10 Ha. N31016.499’ E077

0 10.340’ 4192 Ft. Entry Point

34. Afforestation D 100 Ghangar Tattapani Pangna Karsog 10 Ha. N31015.040’ E077

0 08.824’ 2339 Ft.. Entry Point

Page 8: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. v

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2004-05

35. Afforestation 2004-05

ND 131 Parnot Perlig Karsog Karsog 10 Ha. N31016003’ E077

0 1339.3’ 3225 Ft.. Entry Point

36. Afforestation 2004-05

D 86 Lochar Alsindi Pangna Karsog 8 Ha. N31017.127’ E077

0 06.433’ 3763 Ft.. Entry Point

37. Afforestation 2004-05

ND 283 Raidhar Chora Magroo Karsog 4 Ha. N31027.599' E077

013.288’ 7350 Ft. Entry Point

38. Afforestation 2004-05

ND 289 Ghanidhar Seri Mangarh

Magroo Karsog 4 Ha. N3108 2.846' E077

0 18.322” 6909 Ft. Entry Point

39. Afforestation 2004-05

OD 255 Sagarh Malrog Magroo Karsog 3 Ha. N31024.561' E077

0 20.427' 7169 Ft. Entry Point

40. Afforestation 2004-05

OD 265 khotu Shaggage Magroo Karsog 4 Ha. N31027.409’ E077

0 17.775’ 5363 Ft.. Entry Point

41. Afforestation 2004-05

OD 294 Danount Seri Mangarh

Magroo Karsog 6 Ha. N31030.386’ E077

0 17.441’ 8880 Ft.. Entry Point

42. Afforestation 2004-05

OD 297 Surhi Seri Mangarh

Magroo Karsog 4 Ha. N31030.982’ E077

0 17.941’ 8752 Ft.. Entry Point

43. Afforestation 2004-05

OD 278 Nadaun Lassi Magroo Karsog 3 Ha. N31029.798’ E077

0 16.741’ 7692 Ft.. Entry Point

44. Afforestation 2004-05

OD 256 Jagol Mahog Magroo Karsog 3 Ha. N31025.084’ E077

0 20.641’ 6198 Ft.. Entry Point

45. Afforestation 2004-05

N D 259 Lotala Katanda Magroo Karsog 3 Ha. N31025.440’ E077

0 18.055’ 7222 Ft.. Entry Point

46. Afforestation 2005-06

O D 255 Sgach Mahog Magroo Karsog 13 Ha. N31026.276’ E077

0 20.045’ 5334 Ft.. Center Point

47. Afforestation 2005-06

OD 278 Nadaun Lassi Magroo Karsog 9 Ha. N31029.374’ E077

0 17.130’ 7545 Ft.. Center Point

48. Afforestation 2005-06

OD 297 Surhi Seri Mangarh

Magroo Karsog 10 Ha. N31030.477’ E077

0 17.615’ 8828 Ft.. Center Point

49. Afforestation 2005-06

OD 264 khotu Shaggagi Magroo Karsog 6 Ha. N31027.384’ E077

0 17.889’ 5459 Ft.. Entry Point

50. Afforestation 2005-06

OD 279 Nadaun Lassi Magroo Karsog 3 Ha. N31028.036’ E077

0 17.641’ 6252 Ft.. Entry Point

51. Afforestation D 278 Nadoon Lassi Magroo Karsog 10 Ha. N31030’04.1” E077

0 16’30.6” 8006 Ft. Entry Point

Page 9: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. vi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2005-06

52. Afforestation 2005-06

D 259 Latta C IV Katanda Magroo Karsog 13 Ha. N31025.223' E077

0 18.033’ 7460 Ft. Entry Point

53. Afforestation 2005-06

D 278 Nadaun Lassi Magroo Karsog 10 Ha. N31030.173' E077

0 16.366” 8750 Ft. Entry Point

54. Afforestation 2005-06

ND 283 Raidhar Chora Magroo Karsog 3 Ha. N31027.351' E077 13.278' 6393 Ft. Entry Point

55. Afforestation 2005-06

D-199 Dhamiyara Kashoul Karsog Karsog 5 Ha. N31020.102' E077

0 14.498' 4720 Ft.. Entry Point

56. Afforestation 2005-06

OD 167 Baju Sanarli Karsog Karsog 10 Ha. N31024.396’ E077

0 11.009’ 6988 Ft.. Entry Point

57. Afforestation 2005-06

OD 124 Kalontha Mahaunag

Karsog Karsog 10 Ha. N31017.449' E077

0 12.353' 6419 Ft.. Entry Point

58. Afforestation 2005-06

ND 201 Aglidhar Mehendi Karsog Karsog 5 Ha. N31019.502’ E077

0 15.156’ 4332 Ft.. Entry Point

59. Afforestation 2005-06

D 207 Gandhoi Mehendi Karsog Karsog 10 Ha N31019.016’ E077

015.038’ 4528 Ft.. Entry Point

60. Afforestation 2005-06

D 101 Nandoo Tattapani Pangna Karsog 10 Ha. N31015.040’ E077

0 08.824’ 3152 Ft.. Entry Point

61. Afforestation 2005-06

D 100 Ghangar Tattapani Pangna Karsog 7 Ha. N31014.223’ E077

0 07.746’ 2371 Ft.. Entry Point

62. Afforestation 2005-06

D 63 Panyaroo Balar Pangna Karosg 4 Ha. N31021.022’ E077

0 06.445’ 6266 Ft. Entry Point

63. Afforestation 2005-06

D 72, Restadhar Kanda Pangna Karsog 4 Ha. N31019’54.8” E077

0 04’27.3” 6596 Ft. Entry Point

64. Afforestation 2005-06

D 74 Parvain Bilindi Pangna Karsog 8 Ha. N31017.833” E077

0 03.642” 2540 Ft.. Entry Point

65. Pasture Dev. 2005-06

Nehrinal Nehrinal Seri Karsog 7 Ha. N31018’11.4” E077

0 18’18.4” 5830 Ft.. Entry Point

66. Afforestation 2005-06

D 61 Sorsan Balar Pangna Karosg 5 Ha. N31020’0.11" E077

0 08’09.0" 6121 Ft. Entry Point

67. Afforestation 2005-06

OD 247 Sarahan Sarahan Seri Karsog 5 Ha. N31021’13.0” E077

0 21’46.0” 4608 Ft.. Entry Point

68. Afforestation D 101 Nandoo Tattapani Pangna Karsog 7 Ha. N31015.119” E077

0 08.857” 3379 Ft.. Entry Point

Page 10: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. vii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2005-06

69. Afforestation 2005-06

D 219 Ganu C -II Dhamoon Seri Karsog 6 Ha. N31019.41.3’ E077’18.82.4’ 5420 Ft. Center Point

70. Afforestation 2005-06

D 214 Jhunjhun Nehrinal Seri Karsog 5 Ha. N31018.38.2’ E077’18.67.0’ 5445 Ft. Center Point

71. Afforestation 2005-06

D 214 Jhunjhun Nehrinal Seri Karsog 12 Ha. N31019.44.3’ E077’19.57.8’ 5645 Ft. Center Point

72. Afforestation 2005-06

D 222 Pog Nanj Seri Karsog 2 Ha. N31020.48.6’ E077’19.49.0’ 5480 Ft. Center Point

73. Afforestation 2005-06

D 222 Pog Nanj Seri Karsog 5 Ha. N31019.71.5’ E077’19.94.8’ 3533 Ft. Center Point

74. Afforestation 2005-06

D 222 Pog Nanj Seri Karsog 5 Ha. N31020.03.6’ E077’19.17.4’ 4255 Ft. Center Point

75. Afforestation 2005-06

D 250 Bagridhar Sarahan Seri Karsog 3 Ha. N31023.77.7’ E077’22.28.4’ 4277 Ft. Entry Point

76. Afforestation 2005-06

D 245 Firnoo Taben Seri Karsog 5 Ha. N31025.31.4’ E077’21.54.2’ 2627 Ft.. Entry Point

77. Afforestation 2005-06

D 241 Kandloo C-II (B) Taben Seri Karsog 12 Ha. N31022.36.7’ E077’19.38.6’ 4204 Ft.. Entry Point

78. Afforestation 2005-06

OD 237 Kathanda Pathraeivi Seri Karsog 13 Ha N310 2518.5" E077

0 1707.6' 7180 Ft.. Entry Point

79. Afforestation 2005-06

ND 245 Firno Taben Seri Karsog 5 Ha. N310 2132.6' E077

0 2155.8' 2519 Ft.. Entry Point

80. Afforestation 2005-06

D-103 Talehan Talehan Pangna Karsog 4 Ha. N31016’423’ E077

008’893’ 4379 Ft. Center Point

81. Afforestation 2005-06

D-105 Khadain Talehan Pangna Karsog 15 Ha. N31016’435’ E077

010’775’ 4170 Ft. Center Point

82. Afforestation 2005-06

D-105 Khadain Talehan Pangna Karsog 10 Ha. N31016’470’ E077

010’402’ 4438 Ft. Center Point

83. Afforestation 2005-06

D 208 Bhundashill Chauridhar

Seri Karsog 5 Ha. N3102142.8” E077

0 1759.0” 5840 Ft.. Entry Point

84. Afforestation 2005-06

D222 Pog Nanj Seri Karsog 2 Ha. N3102009.9” E077

0 1924.3” 3952 Ft.. Entry Point

85. Afforestation OD 233 Richhni (B) Richhni Seri Karsog 10 Ha. N31023.54.2’ E077’14.48.2’ 6192 Ft.. Entry Point

Page 11: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. viii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2005-06

86. Afforestation 2005-06

D- 98 Kidia Tattapani Pangna Karsog 5 Ha. N31015’35.0’’ E077

005’87.4’’ 2502 Ft. Center Point

87. Afforestation 2005-06

D-76 Kapdyals Alsindi Pangna Karsog 10 Ha. N31016.635’ E077

004.967’ 3361 Ft. Center Point

88. Afforestation 2005-06

D-79 Moharoo Blindi Pangna Karsog 5 Ha. N31018’37.2’’ E077

006’50.8’’ 5536 Ft. Center Point

89. Afforestation 2005-06

D-74 Parvain-I Blindi Pangna Karsog 10 Ha. N31017’76.0’’ E077

004’61.2’’ 3152 Ft. Center Point

90. Afforestation 2005-06

D-74 Parvain – II Blindi Pangna Karsog 10 Ha. N31017’96.5’’ E077

003’54.9’’ 2358 Ft. Center Point

91. Afforestation 2005-06

D-73 Gharlal –C-II Kanda Pangna Karsog 10 Ha. N31020.296’ E077

003.494’ 5081 Ft. Center Point

92. Afforestation 2005-06

D-73 Gharlal –C-II Kanda Pangna Karsog 13 Ha. N31020.325’ E077

003.548’ 4932 Ft. Center Point

93. Afforestation 2005-06

D-73 Gharlal –C-II Kanda Pangna Karsog 10 Ha. N31020.507’ E077

003.678’ 5165 Ft. Center Point

94. Afforestation 2005-06

D-72 Resthadhar–II Kanda Pangna Karsog 10 Ha. N31019.257’ E077

005.035’ 5887 Ft. Center Point

95. Pasture Development 2005-06

D-73 Gharlal Kanda Pangna Karsog 10 Ha. N31020’27.2’’ E077

003’94.0’’ 5632 Ft. Center Point

96. Afforestation 2005-06

D-62 Kunas Balar Pangna Karsog 5 Ha. N31021’80.2’’ E077

006’71.6’’ 4320 Ft. Center Point

97. Afforestation 2005-06

D-61 Shorshan Shorshan Pangna Karsog 5 Ha. N31019’99.5’’ E077

008’14.2’’ 5718 Ft. Center Point

98. Afforestation 2005-06

D-175 Pehran Ghalaych Karsog Karsog 7 Ha. N31024’637’ E077

014’592’ 7321 Ft.. Center Point

99. Afforestation 2005-06

D- 214 Jhunjhun Nehrinal Seri Karsog 5 Ha. N31018.382’ E077

018’67.7’ 5445 Ft.. Center Point

100. Afforestation 2005-06

D- 214 Jhunjhun Nehrinal Seri Karsog 12 Ha. N31019.443’ E077

019.578’ 5645 Ft.. Entry point

101. Afforestation 2005-06

D- 222 Pog Nari Seri Karsog 5 Ha. N31020.036’ E077

019.174’ 4255 Ft.. Center Point

Page 12: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. ix

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

102. Afforestation 2005-06

D- 222 Pog Nari Seri Karsog 5 Ha. N31019.715’ E077

019.948’ 3533 Ft.. Center Point

103. Afforestation 2005-06

D- 222 Pog Nari Seri Karsog 15 Ha. N31020.316’ E077

020.040’ 4269 Ft.. Center Point

104. Afforestation 2005-06

D- 222 Pog Nari Seri Karsog 2 Ha. N31020.486’ E077

019.490’ 5480 Ft.. Entry Point

105. Afforestation 2005-06

D 250 Bagridhar Sarahan Seri Karsog 5 Ha. N31023.277’ E077

022.284’ 4277 Ft.. Center Point

106. Afforestation 2005-06

D -241 Kandloo Taben Seri Karsog 10 Ha. N31022.181’ E077

020.087’ 4204 Ft. Center Point

107. Afforestation 2005-06

O.D 233 Richhni CI (b) Richhni Seri Karsog 10 Ha. N31023.542’ E077

014.482’ 6192 Ft. Center Point

108. Afforestation 2005-06

D -245 Firnoo Taben Seri Karsog 5 Ha. N31021.324’ E077

021.542’ 2627 Ft. Center Point

109. Afforestation 2005-06

O D 137 Nagaltha Mahonag Karsog Karsog 20 Ha. N31019’24.7’’ E077

014’06.3’’ 3475 Ft. Center Point

110. Afforestation 2005-06

D 136 Parlog Part-I Parlog Karsog Karsog 17 Ha. N31016.722’ E077

016.419’ 3244 Ft.. Center Point

111. Afforestation 2005-06

N D 136 Parlog Part-II Parlog Karsog Karsog 10 Ha. N31016.181’ E077

016.866’ 2747 Ft.. Center Point

112. Afforestation 2006-07

N D 136 Parlog Parlog Karsog Karsog 25 Ha. N31016.539’ E077

016.414’ 3265 Ft. Center Point

113. Afforestation 2006-07

D- 12 Bhayana Surahi Pangna Karsog 10 Ha. N31023.230’ E077

005.975’ 6404 Ft. Center Point

114. Afforestation 2006-07

O D 137 Nagaltha Mahonag Karsog Karsog 5 Ha. N31019’20.2’’ E077

013’16.0’’ 4512 Ft. Center Point

115. Afforestation 2006-07

O D 124 Kalountha Mahonag Karsog Karsog 15 Ha. N31018’12.2’’ E077

013’34.8’’ 6214 Ft. Center Point

116. Afforestation 2006-07

D -241 kandloo Taben Seri Karsog 10 Ha. N31022.181’’ E077

020.087’' 4393 Ft. Center Point

117. Afforestation 2006-07

D -242 Buna Taben Seri Karsog 10 Ha. N31021.187’’ E077

020’55.6’’ 3648 Ft. Center Point

118. Afforestation 2006-07

D -245 Firnoo Taben Seri Karsog 5 Ha. N31021.314’ E077

021’51.7’ 2659 Ft. Center Point

Page 13: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. x

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

119. Afforestation 2006-07

D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.060’ E077

018.013’ 7097 Ft. Center Point

120. Afforestation 2006-07

D-234 Sundroo Katkosh Seri Karsog 10 Ha. N31024.205’ E077

017.007’ 6307 Ft. Center Point

121. Afforestation 2006-07

D 249 Makra Sarahan Seri Karsog 5 Ha. N31022.467’ E077

021’20.2’’ 5282 Ft. Center Point

122. Afforestation 2006-07

D 251 Kaveri Sarahan Seri Karsog 10 Ha. N31023.110’ E077

022’65.8’ 3934 Ft.. Center Point

123. Afforestation 2006-07

D- 213 Nihrinal Naharnal Seri Karsog 10 Ha. N31018.662’ E077

017’841’ 5408 Ft.. Entry Point

124. Afforestation 2006-07

D-207 Majod Mehendi Karsog Karsog 11 Ha. N31018’657’ E077

016’256’ 5708 Ft.. Center Point

125. Afforestation 2006-07

D-201 Aglidhar Mehandi Karsog Karsog 7 Ha. N31019’862’ E077

014’912’ 4368 Ft.. Center Point

126. Afforestation 2006-07

D-137 Dopha CII (b) Dopha Karsog Karsog 21 Ha. N31025’44.7’’ E077

014’13.3’’ 6764 Ft. Center Point

127. Afforestation 2006-07

D-80 Kanda Blindi Pangna Karsog 20 Ha. N31019’166’ E077

007’058’ 5545Ft. Center Point

128. Afforestation 2006-07

D-73 Gharlal – CII Kanda Pangna Karsog 20 Ha. N31019’689’ E077

003’986’ 5710 Ft. Center Point

129. Afforestation 2006-07

D-93 Thogi Tattapani Pangna Karsog 10 Ha. N31015’33.2’’ E077

004’83.9’’ 2828 Ft. Center Point

130. Afforestation 2006-07

D- 101 Nandoo Tattapani Pangna Karsog 15 Ha. N31015’06.4’’ E077

008’79.8’’ 3008 Ft. Center Point

131. Afforestation 2006-07

D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017.182’ E077

006.425’ 395 Ft. Center Point

132. Afforestation 2006-07

D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017.030’ E077

005.773’ 3752 Ft. Center Point

133. Afforestation 2006-07

D 234 Sundroo Katkosh Seri Karsog 10 Ha. N31024.205’ E077’17.074’ 6307 Ft.. Entry Point

134. Afforestation 2006-07

D 208 Bhundashill Chauridhar

Seri Karsog 10 Ha. N310 21.404’ E 077

0 18.061’ 5980 Ft.. Entry Point

135. Afforestation 2006-07

OD 233 Richchni Richhni Seri Karsog 10 Ha. N310 24.337’ E 077

0 15.231’ 7616 Ft.. Entry Point

Page 14: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

136. Afforestation 2006-07

D-103 Talehan Talehan Pangna Karsog 20 Ha. N31016.206’ E077

008.805’ 4690 Ft. Center Point

137. Afforestation 2006-07

D-176 Kapdyal Alsindi Pangna Karsog 20 Ha. N31016.235’ E077

004.135’ 3230 Ft. Center Point

138. Afforestation 2006-07

D-104 Besta Talehan Pangna Karsog 20 Ha. N31016.834’ E077

009.758’ 4737 Ft. Center Point

139. Afforestation 2006-07

D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.060’ E077’18.013’ 7097 Ft.. Entry Point

140. Afforestation 2006-07

D 237 Katanda Taben Seri Karsog 5 Ha. N31022.466’ E077’19.408’ 4745 Ft.. Entry Point

141. Afforestation 2006-07

D 249 Makra Sarahan Seri Karsog 5 Ha. N31022.590’ E077’21.384’ 4652 Ft.. Entry Point

142. Afforestation 2006-07

D 242 Buna Taben Seri Karsog 10 Ha. N31021.187’ E077’20.556’ 3648 Ft.. Entry Point

143. Afforestation 2006-07

D 245 Firnoo Taben Seri Karsog 5 Ha. N31021.314’ E077’21.517’ 2659 Ft.. Entry Point

144. Afforestation 2006-07

D 222 Pog Nanj Seri Karsog 10 Ha. N31020.413’ E077’20.126’ 4185 Ft. Center Point

145. Afforestation 2006-07

D 249 Makra Sarahan Seri Karsog 5 Ha. N31022.467’ E077’21.202’ 5283 Ft.. Entry Point

146. Afforestation 2006-07

D 251 Kaveri Sarahan Seri Karsog 10 Ha. N31023.110’ E077’27.658’ 3934 Ft. Entry Point

147. Afforestation 2006-07

D 213 Nehrinal Nehrinal Seri Karsog 10 Ha. N31018.662’ E077’17.841’ 5405 Ft. Center Point

148. Afforestation 2006-07

D 167 Baju (III) Sanarli Karsog Karsog 7 Ha. N31024.379’ E077

0 10.422’ 7171 Ft.. Entry Point

149. Afforestation 2006-07

ND 264 Khatu Shagagi Magroo Karsog 5 Ha. N31027.883” E077

0 10.057’ 5680 Ft. Entry Point

150. Afforestation 2006-07

D 170 Tikar Karsog C II b

Sanarli Karsog Karsog 7 Ha N31024.471’ E077

0 11.194’ 6256 Ft.. Entry Point

151. Afforestation 2006-07

D 279 Nadaun Lassi Magroo Karsog 10 Ha. N31028.521' E077

0 17.233' 7730 Ft. Entry Point

152. Afforestation 2006-07

D 74 Parvain Bilindi Pangna Karsog 30 Ha. N31017.705’ E077

0 03.809’ 2790 Ft.. Entry Point

Page 15: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

153. Afforestation 2006-07

D 105 Khadni Talehan Pangna Karsog 10 Ha. N31016.402’ E077

0 10.809’ 4000 Ft.. Entry Point

154. Afforestation 2006-07

D 106 Bhoura Takhan Pangna Karsog 10 Ha. N31016.504’ E077

0 12.305’ 4192 Ft.. Entry Point

155. Afforestation 2006-07

D 95 Jeori Tattapani Pangna Karsog 10 Ha. N31015.010’ E077

0 05.481’ 2348 Ft.. Entry Point

156. Afforestation 2006-07

D 259 Lotla Katanda Magroo Karsog 10 Ha. N31025.319' E077

0 18.129’ 1743 Ft. Entry Point

157. Afforestation 2006-07

OD 283 Raidhar Chaura Magroo Karsog 10 Ha. N31027.093’ E077

0 19.132’ 5251 Ft.. Entry Point

158. Afforestation 2006-07

OD 283 Raidhar Chaura Magroo Karsog 15 Ha. N31027.739’ E077

0 19.557’ 4902 Ft.. Entry Point

159. Afforestation 2006-07

OD 294 Danount Seri Mangarh

Magroo Karsog 10 Ha. N31030.348’ E077

0 17.338’ 9040 Ft.. Entry Point

160. Afforestation 2006-07

OD 278 Nadaun Lassi Magroo Karsog 15 Ha. N31029.658’ E077

0 17.297’ 8531 Ft.. Entry Point

161. Afforestation 2006-07

N D 257 Jagol Mahog Magroo Karsog 5 Ha. N31025.089’ E077

0 20.112’ 7286 Ft.. Entry Point

162. Afforestation 2006-07

O D 253 Sagach Mahog Magroo Karsog 10 Ha. N31024.986’ E077

0 19.944’ 7526 Ft.. EntryPoint

163. Afforestation 2006-07

D 259 Lotla Katanda Magroo Karsog 10 Ha. N31025.460’ E077

0 18.165’ 7062 Ft.. Entry Point

164. Afforestation 2006-07

OD 297 Danount Seri Mangarh

Magroo Karsog 15 Ha. N31031.529’ E077

0 18.426’ 9260 Ft.. Entry Point

165. Afforestation 2006-07

OD 289 Ghami Dhar Seri Mangarh

Magroo Karsog 10 Ha. N 31028.914’ E077

0 18.233’ 7312 Ft.. Entry Point

166. Afforestation (2007-08)

D 16 Suket Begli Pangna Karsog 10 Ha. N31023.826’ E077’07.107’ 5570 Ft. Center Point

167. Afforestation 2007-08

D 203 Thach C II Mehendi Karsog Karsog 15 Ha. N31022.056’ E 077

0 17.462’ 6064 Ft.. Entry Point

168. Afforestation 2007-08

135 Fafan Parlog Karsog Karsog 5 Ha. N31016.007” E 077

0 14.592’ 4227 Ft.. Entry Point

169. Afforestation 2007-07

D 222 Pog Nanj Seri Karsog 40 Ha. N31020.226’ E077’11.906’ 4125 Ft. Center Point

Page 16: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xiii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

170. Afforestation 2007-08

D 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N31018.507’ E077’17.661’ 5996 Ft. Center Point

171. Afforestation 2007-08

D 213 Nehrinal Nehrinal Seri Karsog 20 Ha. N31018.314’ E077’17.552’ 6082 Ft. Center Point

172. Afforestation 2007-08

D 249 Makra Sarahan Seri Karsog 10 Ha. N31023.096’ E077’21.291’ 5177 Ft.. Entry Point

173. Afforestation 2007-08

D 222 Pog Nanj Seri Karsog 15 Ha. N31020.316’ E077’20.040’ 4269 Ft. Center Point

174. Afforestation (2007-08)

D 230 Chabar Chauridhar

Seri Karsog 10 Ha. N31022.792’ E077’18.395’ 4639 Ft. Center Point

175. Afforestation (2007-08)

D 241 Kandloo Taben Seri Karsog 10 Ha. N31022.181’ E077’20.087’ 4393 Ft.. Entry Point

176. Afforestation (2007-08)

D 241 Kandloo Pokhi Seri Karsog 20 Ha. N31022.106 ‘ E077’19.533’ 3728 Ft.. Entry Point

177. Afforestation 2007-08

D 249 Makra Sarahan Seri Karsog 2 Ha. N31022.481’ E077

0 21.271’ 5536 Ft.. Entry Point

178. Afforestation 2007-08

D-103 Talehan Talehan Pangna Karsog 20 Ha. N31016.599’ E077

009.162’ 4015 Ft. Entry Point

179. Afforestation 2007-08

D 234 Sundro Katash Seri Karsog 5 Ha. N31023'31.2” E077

0 17' 09.0" 6089 Ft.. Entry Point

180. Afforestation 2007-08

D-104 Besta Talehan Pangna Karsog 20 Ha. N31016.831’ E077

009.976’ 5130 Ft. Center Point

181. Afforestation 2007-08

D-107 Gumma Talehan Pangna Karsog 10 Ha. N31015.828’ E077

011.593’ 4185 Ft. Center Point

182. Afforestation 2007-08

D 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N310 18’25.3” E077

0 17’56.6” 5740 Ft.. Entry Point

183. Afforestation 2007-08

D 213 Nehrinal Nehrinal Seri Karsog 11 Ha. N310 18’21.2” E77

0 16’48.5” 5612 Ft.. Entry Point

184. Afforestation 2007-08

D- 101 Nandoo Tattapani Pangna Karsog 15 Ha. N31015’16.5’’ E077

008’66.2’’ 2851 Ft. Center Point

185. Afforestation 2007-08

D-74 Jeouri Tattapani Pangna Karsog 10 Ha. N31015’34.9’’ E077

005’16.3’’ 3222 Ft. Center Point

186. Afforestation 2007-08

D-94 Tattapani Tattapani Pangna Karsog 10 Ha. N31015’31.8’’ E077

005’41.0’’ 3059 Ft. Center Point

Page 17: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xiv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

187. Afforestation 2007-08

D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017’19.5’ E077

006’02.0’ 3799 Ft. Center Point

188. Afforestation 2007-08

D-77 Gujrodhar Alsindi Pangna Karsog 10 Ha. N31016’89.8’ E077

004’79.6’ 3205 Ft. Center Point

189. Afforestation 2007-08

D-73 Gharlal C-II Kanda Pangna Karsog 15 Ha. N31019.431’ E077

004.214’ 5356 Ft. Center Point

190. Afforestation 2007-08

D-79 Parvain Blindi Pangna Karsog 15 Ha. N31017’93.3’’ E077

004’80.7’’ 3574 Ft. Center Point

191. Afforestation 2007-08

N D 167 Bajhu C III Sanarli Karsog Karsog 10 Ha. N31024.149’ E077

010.513’ 6484 Ft.. Center Point

192. Afforestation 2007-08

D-208 Majod Mehendi Karsog Karsog 20 Ha. N31018.175’ E077

017.129’ 5845 Ft.. Center Point

193. Afforestation 2007-08

D-198 Dhamiyara Khashoul Karsog Karsog 12 Ha. N31020.143’ E077

014.533’ 3990 Ft.. Center Point

194. Afforestation 2007-08

D-207 Gandhoi Mehendi Karsog Karsog 18 Ha. N31019.119’ E077

015.084’ 4795 Ft.. Center Point

195. Afforestation 2007-08

D-207 Gandhoi Mehendi Karsog Karsog 25 Ha. N31018.772’ E077

015.866’ 5364 Ft.. Center Point

196. Pasture Development 2007-08

D-207 Gandhoi –CII Mehendi Karsog Karsog 10 Ha. N31018.892’ E077

015.602’ 5290 Ft.. Center Point

197. Afforestation 2007-08

D- 211 Sainjh Nehrinal Seri Karsog 10 Ha. N31018.923’ E077

017.735’ 5902 Ft.. Center Point

198. Afforestation 2007-08

D 236 Pathreavi Pathreavi Seri Karsog 10 Ha. N31024.160’ E077

016.112’ 6633 Ft. Center Point

199. Afforestation 2007-08

D -245 Firnoo Taben Seri Karsog 10 Ha. N31021.441’ E077

021’24.7’ 4035 Ft. Center Point

200. Afforestation 2007-08

D- 214 Jhunjhun Nehrinal Seri Karsog 30 Ha. N31019.507’ E077

019.252’ 5074 Ft.. Entry point

201. Afforestation 2007-08

D -252 Naganal Gowalpur Seri Karsog 10 Ha. N31024.023’ E077

0’21.388’ 5657 Ft. Center Point

202. Afforestation 2007-08

D 128 Kashoul Parlog Karsog Karsog 15 Ha. N31016.252’ E077

013.103’ 5002 Ft. Center Point

203. Afforestation N D 135 Fafan Parlog Karsog Karsog 10 Ha. N31016.233’ E077

015.484’ 3956 Ft. Center Point

Page 18: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2007-08

204. Afforestation 2007-08

N D 136 Parlog Parlog Karsog Karsog 8 Ha. N31016.990’ E077

016.385’ 2784 Ft. Center Point

205. Afforestation 2007-08

D- 127 Kashoul Parlog Karsog Karsog 25 Ha. N31016.211’ E077

013.833’ 3414 Ft. Center Point

206. Afforestation 2007-08

D- 16 Chattri-Suket Begli Pangna Karsog 10 Ha. N31023.826’ E077

007.107’ 5570 Ft. Center Point

207. Afforestation 2007-08

D-72 Reshtadhar CII Kanda Pangna Karsog 10 Ha. N31020.114’ E077

005.558’ 5334 Ft. Center Point

208. Pasture Development 2007-08

D 241 Kandloo Taben Seri Karsog 5 Ha. N31022.389’ E077°19.385’ 4128 Ft.. Entry Point

209. Afforestation 2007-08

ND 242 Boona Tabben Seri Karsog 5 Ha. N31025’08.1” E077

0 17’97.7” 3212 Ft.. Entry Point

210. Afforestation 2007-08

D 76 Kapdyal Tattapani Pangna Karsog 15 Ha. N31016.514” E077

0 04.386’ 2614 Ft.. Entry Point

211. Afforestation 2007-08

D 100 Ghanger Tattapani Pangna Karsog 5 Ha. N31014.271” E077

0 07.859’ 2345 Ft.. Entry Point

212. Afforestation 2007-08

D 96 Shoj Tattapani Pangna Karsog 10 Ha. N31015.648’ E077

0 04.958’ 3971 Ft.. Entry Point

213. Afforestation 2007-08

D 17 Chattri Suket Pangna Pangna Karsog 10 Ha. N31023.786’ E077

0 07.005’ 5568 Ft. Entry Point

214. Afforestation 2007-08

D 80 Kanda Bilindi Pangna Karsog 20 Ha. N31019.090’ E077

0 07.004’ 5600 Ft. Entry Point

215. Afforestation 2007-08

D 198 Dhamiyara Kashoul Karsog Karsog 17 Ha. N31019.908’ E077

0 10.277’ 4326 Ft. Entry Point

216. Afforestation 2007-08

D 133 Parnot Parlog Karsog Karsog 12 Ha N31016.156’ E077

0 13.180’ 4105 Ft. Entry Point

217. Pasture Dev. 2007-08

135 Fafan Mahaunag

Karsog Karsog 10 Ha N31018.111’ E077

0 12.573’ 4793 Ft. Entry Point

218. Afforestation 2007-08

D 173 Dopha Dopha Karsog Karsog 11 Ha. N31025.547' E077

0 14.077' 6550 Ft.. Entry Point

219. Afforestation 2007-08

D 124 Kolontha Mahaunag

Karsog Karsog 5 Ha. N31017.473' E077

0 12.406' 6518 Ft.. Entry Point

Page 19: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xvi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

220. Afforestation 2008-09

D 170 Tikar Karsog Sanarli Karsog Karsog 10 Ha. N31025.598’ E077

0 14.063’ 5702 Ft.. Entry Point

221. Afforestation 2008-09

D 87 Sarahan Alsindi Pangna Karsog 5 Ha. N31016.489’ E077

0 05.880’ 3401 Ft.. Entry Point

222. Afforestation 2008-09

D 20 Humginalla Pangna Pangna Karsog 6 Ha. N31024.645’ E077

0 07.465’ 5792 Ft.. Entry Point

223. Afforestation 2008-09

D 247 Sarahan Sarahan Seri Karsog 5 Ha. N31023.492’ E077°22.345’ 4595 Ft. Entry Point

224. Afforestation 2008-09

D 249 Makra Sarahan Seri Karsog 3 Ha. N31023.577’ E077°20.573’ 6137 Ft.. Entry Point

225. Afforestation 2008-09

D 249 Makra Sarahan Seri Karsog 6 Ha. N31022.412’ E077°21.007’ 6051 Ft.. Entry Point

226. Afforestation 2008-09

D 252 Naganal Gowalpur Seri Karsog 7 Ha. N31024.170’ E077°21.433’ 5382 Ft.. Entry Point

227. Afforestation 2008-09

D 252 Naganal Gowalpur Seri Karsog 3 Ha. N31024.189’ E077°21.464’ 5401 Ft.. Entry Point

228. Afforestation 2008-09

D 245 Firnoo Taben Seri Karsog 13 Ha. N31021.571’ E077°21.58.0’ 3984 Ft.. Entry Point

229. Afforestation 2008-09

D 231 Shiladhar Seri Seri Karsog 5 Ha. N31022.332’ E077°17.276’ 5855 Ft. Center Point

230. Afforestation 2008-09

D-105 Khadain Talehan Pangna Karsog 15 Ha. N31016.276’ E077

011.233’ 4739 Ft. Center Point

231. Afforestation 2008-09

D-175 Chatkar Alsindi Pangna Karsog 10 Ha. N31016.270’ E077

004.630’ 3272 Ft. Entry Point

232. Afforestation 2008-09

D-107 Gumma Talehan Pangna Karsog 10 Ha. N31015.713’ E077

011.769’ 4160 Ft. Entry Point

233. Afforestation 2008-09

D-106 Gumma Talehan Pangna Karsog 20 Ha. N31015.585’ E077

011.909’ 4087 Ft. Center Point

234. Afforestation 2008-09

D-106 Bhaura Talehan Pangna Karsog 10 Ha. N 31015.235’ E077

012.314’ 3228 Ft. Center Point

235. Afforestation 2008-09

D 249 Makra Sarahan Seri Karsog 4 Ha. N31023.359’ E077

021.210’ 6531 Ft.. Entry Point

236. Afforestation 2008-09

D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.086’ E077°17.484’ 6787 Ft.. Entry Point

Page 20: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xvii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

237. Afforestation 2008-09

D 237 Katanda Pathreavi Seri Karsog 5 Ha. N31025.040’ E077°17.598’ 7033 Ft.. Entry Point

238. Afforestation 2008-09

D 236 Pathreavi Pathreavi Seri Karsog 2 Ha. N31024.523’ E077°15.44.0’ 7081 Ft.. Entry Point

239. Afforestation2008-09

D 238 Gadpara Pokhi Seri Karsog 7 Ha. N31024.355’ E077°18.45.3’ 5993 Ft.. Entry Point

240. Afforestation 2008-09

D 239 Drawal Pokhi Seri Karsog 5 Ha. N31023.199’ E077°18.351’ 5760 Ft.. Entry Point

241. Afforestation 2008-09

D 240 Behal Pokhi Seri Karsog 7 Ha. N31025.300’ E077°17.101’ 6080 Ft.. Entry Point

242. Afforestation 2008-09

D 235 Dhurmu Katkosh Seri Karsog 5 Ha. N31023.305’ E077°17.074’ 4252 Ft.. Entry Point

243. Afforestation 2008-09

D—72 Reshtadhar CII Kanda Pangna Karsog 6 Ha. N31020’11.8’’ E077

005’129’’ 5324 Ft. Center Point

244. Afforestation 2008-09

D-72 Reshtadhar CII Karadal Pangna Karsog 10 Ha. N31020’33.7’’ E077

004’75.2’’ 4899 Ft. Center Point

245. Afforestation 2008-09

D-72 Gharlal CI Kanda Pangna Karsog 16 Ha. N31020’19.0’’ E077

004’15.1’’ 5696 Ft. Center Point

246. Afforestation 2008-09

D-73 Gharlal CII Kanda Pangna Karsog 18 Ha. N31020’28.4’’ E077

003’90.0’’ 5744 Ft. Center Point

247. Afforestation 2008-09

D-73 Gharlal Kanda Pangna Karsog 26 Ha. N31020’46.5’’ E077

004’19.7’’ 4912 Ft. Center Point

248. Afforestation 2008-09

U-2 Belend I&II Balar Pangna Karsog 30 Ha. N31021’27.0’’ E077

006’71.8’’ 4560 Ft. Center Point

249. Afforestation 2008-09

D-61 Shorshan (CII) Shorshan Pangna Karsog 10 Ha. N31021’05.1’’ E077

007’73.6’’ 4550 Ft. Center Point

250. Afforestation 2008-09

D- 39 Tikkar Begli Pangna Karsog 5 Ha. N31024.213’ E077

008.905’ 6064 Ft. Entry Point

251. Afforestation 2008-09

D- 39 Shill Ghoshal Pangna Karsog 5 Ha. N31024.428’ E077

010.395’ 7041 Ft. Center Point

252. Afforestation 2008-09

D-1 Mahag Surahi Pangna Karsog 5 Ha. N31023.303’ E077

005.661’ 6727 Ft. Center Point

253. Afforestation 2008-09

D-22 Chadanident Katachi Pangna Karsog 4 Ha. N31025’91.9’’ E077

007’45.2’’ 6483 Ft. Center Point

Page 21: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xviii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

254. Afforestation 2008-09

D- 40 Baju Ghoshal Pangna Karsog 5 Ha. N31024.024’ E077

010.003’ 6622 Ft. Center Point

255. Afforestation 2008-09

D 134 Mangam Parlog Karsog Karsog 5 Ha. N31015.410’ E077

014.559’ 2752 Ft. Center Point

256. Afforestation 2008-09

D- 131 Parnot Parlog Karsog Karsog 5 Ha. N31015.889’ E077

013.975’ 3285 Ft. Center Point

257. Afforestation 2008-09

D 137 Nagaltha Mahonag Karsog Karsog 30 Ha. N31019.301’ E077

013.563’ 3731 Ft. Center Point

258. Afforestation 2008-09

D-161 Dumahal Kakahan Karsog Karsog 10 Ha. N31021.420’ E077

010.339’ 6208 Ft. Center Point

259. Afforestation 2008-09

D -241 Kandloo Taben Seri Karsog 9 Ha. N31022.521’ E077

019.533’ 4934 Ft. Center Point

260. Afforestation 2008-09

D -241 Kandloo Taben Seri Karsog 3 Ha. N31022.205’ E077

019.43.3’ 4105 Ft. Center Point

261. Afforestation 2008-09

D -241 Kandloo Taben Seri Karsog 4 Ha. N31022.530’ E077

020.056’ 4937 Ft. Center Point

262. Afforestation 2008-09

D -241 Kandloo Taben Seri Karsog 5 Ha. N31022.514’ E077

019.552’ 4947 Ft. Center `Point

263. Afforestation 2008-09

D -241 Kandloo Taben Seri Karsog 3 Ha. N31022.317’ E077

019.451’ 4054 Ft. Center Point

264. Afforestation 2008-09

D 249 Makra Sarahan Seri Karsog 4 Ha. N31023.462’ E077

021.023’ 6617 Ft. Center Point

265. Afforestation 2008-09

D -230 Chabar Chauridhar

Seri Karsog 10 Ha. N31022.646’ E077

018.074’ 5002 Ft.. Center Point

266. Afforestation 2008-09

D -23 Chabar Chauridhar

Seri Karsog 10 Ha. N31022.792’ E077

018.395’ 4639 Ft.. Center Point

267. Afforestation 2008-09

D- 222 Pog Nari Seri Karsog 10 Ha. N31020.371’ E077

019.565’ 4944 Ft.. Entry Point

268. Afforestation D- 229 Ganu C-II Chamoon Seri Karsog 6 Ha. N31019.418’ E077

018.824’ 5420 Ft.. Center Point

269. Afforestation 2008-09

D- 222 Pog Nari Seri Karsog 8 Ha. N31020.215’ E077

020.045’ 4093 Ft.. Center Point

270. Afforestation 2008-09

D -227 Charog Khanda Seri Karsog 7 Ha. N31020.705’ E077

017.777’ 5875 Ft.. Entry Point

271. Afforestation D- 211 Sainjh Nehrinal Seri Karsog 18 Ha. N31018.629’ E077

017.449’ 5978 Ft.. Center Point

Page 22: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xix

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2008-09

272. Afforestation 2008-09

D- 211 Sainjh Nehrinal Seri Karsog 2 Ha. N31018.523’ E077

017.230’ 5833 Ft.. Center Point

273. Afforestation 2008-09

D- 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N31018.331’ E077

018.437’ 5590 Ft.. Entry Point

274. Afforestation 2008-09

D-176 Gahalaych Ghalaych Karsog Karsog 10 Ha. N31024.758’ E077

014.260’ 6646 Ft.. Center Point

275. Afforestation 2008-09

D-188 Kandi Kashal Karsog Karsog 5 Ha. N31020.796’ E077

016.053’ 6570 Ft.. Center Point

276. Afforestation 2008-09

D-172 Dopha C(v) Dopha Karsog Karsog 10 Ha. N31025.725’ E077

012.250’ 6484 Ft.. Center Point

277. Afforestation 2008-09

D-208 Majod Mehendi Karsog Karsog 10 Ha. N31018.118’ E077

017.035’ 5954 Ft.. Center Point

278. Afforestation 2008-09

D-199 Dhamiyara Kashoul Karsog Karsog 5 Ha. N31020’10.5” E077

014’47.6” 4873 Ft. Center Point

279. Afforestation 2008-09

D-204 Sanahro Mehendi Karsog Karsog 10 Ha. N31019.690’ E077

016.151’ 4961 Ft.. Center Point

280. Afforestation 2008-09

D-202 Paraladarthu Mehendi Karsog Karsog 10 Ha. N31019’52.4’’ E077

015’10.6’’ 4710 Ft. Center Point

281. Afforestation 2008-09

D-5.5 Janol Karadal Pangna Karsog 10 Ha. N31021’22.7’’ E077

007’78.8’’ 4886 Ft. Center Point

282. Afforestation 2008-09

D-74 Parvain –I Blindi Pangna Karsog 15 Ha. N31017’79.5’’ E077

005’16.4’’ 4208 Ft. Center Point

283. Afforestation 2008-09

D-74 Parvain –II Blindi Pangna Karsog 20 Ha. N31017’73.6’’ E077

005’15.9’’ 4272 Ft. Center Point

284. Afforestation 2008-09

D-74 Parvain –III Blindi Pangna Karsog 10 Ha. N31017’63.0’’ E077

005’08.1’’ 4198 Ft. Center Point

285. Afforestation 2008-09

D-74 Parvain Blindi Pangna Karsog 20 Ha. N31017’79.7’’ E077

004’42.7’’ 2976 Ft. Center Point

286. Afforestation 2008-09

D-74 Parvain Blindi Pangna Karsog 5 Ha. N31018’41.9’’ E077

003’16.1’’ 2633 Ft. Center Point

287. Afforestation 2008-09

D-79 Moharoo Blindi Pangna Karsog 5 Ha. N31018’36.3’’ E077

006’50.1’’ 5564 Ft. Center Point

288. Afforestation D-80 Kanda Blindi Pangna Karsog 30 Ha. N31018.341’ E077

006.458’ 5584 Ft. Center Point

Page 23: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xx

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2008-09

289. Afforestation 2008-09

D- 101 Nandoo -II Tattapani Pangna Karsog 10 Ha. N31015’16.3’’ E077

008’60.0’’ 2691 Ft. Center Point

290. Afforestation 2008-09

D- 101 Nandoo Tattapani Pangna Karsog 30 Ha. N31014’63.2’’ E077

008’74.4’’ 3014 Ft. Center Point

291. Afforestation 2008-09

D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31017.205’ E077

006.530’ 4050 Ft. Entry Point

292. Afforestation 2008-09

D-86 Lochar Alsindi Pangna Karsog 5 Ha. N31017.050’ E077

005.875’ 3875 Ft. Entry Point

293. Afforestation 2008-09

D-86 Lochar Alsindi Pangna Karsog 25 Ha. N31016.815’ E077

005.844’ 3664 Ft. Entry Point

294. Afforestation 2008-09

D-75 Chatkar Alsindi Pangna Karsog 10 Ha. N31016.624’ E077

005.041’ 3299 Ft. Center Point

295. Afforestation 2008-09

D-86 Lochar Alsindi Pangna Karsog 10 Ha. N31016.659’ E077

004.575’ 3180 Ft. Entry Point

296. Afforestation 2008-09

D-76 Kapdyal Alsindi Pangna Karsog 5 Ha. N31016.651’ E077

004.445’ 3270 Ft. Center Point

297. Afforestation 2008-09

D-76 Kapdyal Alsindi Pangna Karsog 5 Ha. N31016.866’ E077

004.829’ 3310 Ft. Center Point

298. Afforestation 2008-09

D-76 Kapdyal Alsindi Pangna Karsog 10 Ha. N31016.232’ E077

005.102’ 3210 Ft. Center Point

299. Afforestation 2008-09

D-104 Basta Talehan Pangna Karsog 15 Ha. N31016.964’ E077

010.307’ 4831 Ft. Center Point

300. Afforestation 2008-09

D-104 Besta Talehan Pangna Karsog 25 Ha. N31017.144’ E077

010.545’ 5386 Ft. Entry Point

301. Afforestation 2008-09

D 245 Firnoo Tabben Seri Karsog 9 Ha. N 310 21.326’ E077

0 21.558’ 3936 Ft.. Entry Point

302. Afforestation 2008-09

D 213 Nehrinal Nehrinal Seri Karsog 15 Ha. N31018.331’ E077°17.437’ 5590 Ft. Center Point

303. Afforestation 2008-09

D 227 Charog Khadra Seri Karsog 7 Ha. N31020.705’ E077°17.777’ 5875 Ft. Center Point

304. Afforestation 2008-09

D 222 Pog Nanj Seri Karsog 10 Ha. N31020.371’ E077’19.565’ 4944 Ft. Center Point

305. Afforestation D 211 Sainjh Nehrinal Seri Karsog 18 Ha. N31018.629’ E077’17.441’ 5978 Ft. Center Point

Page 24: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2008-09

306. Afforestation 2008-09

D 211 Sainjh Nehrinal Seri Karsog 2 Ha. N31018.523’ E077’17.230’ 5833 Ft. Center Point

307. Afforestation 2008-09

D 211 Sainjh Nehrinal Seri Karsog 10 Ha. N31018.923’ E077’17.735’ 5902 Ft. Center Point

308. Afforestation 2008-09

D 40 Baju Ghushal Pangna Karsog 5 Ha. N31024.008’ E077

0 10.204’ 6051 Ft.. Entry Point

309. Afforestation 2008-09

D 39 Shill Ghoshal Pangna Karsog 6 Ha. N310 24.609’ E077

0 10.405’ 6336 Ft.. Entry Point

310. Afforestation 2008-09

D 19 Shalog Shalog Pangna Karsog 4 Ha. N310 24.008’ E077

0 10.204’ 6016 Ft.. Entry Point

311. Afforestation 2008-09

D 101 Nandoo Tattapani Pangna Karsog 20 Ha. N310 15.146’ E077

0 08.696’ 2960 Ft.. Entry Point

312. Afforestation 2008-09

D 249 Makra Sarahan Seri Karsog 4 Ha. N3102335.9’ E077

0 21.210’ 4531 Ft.. Entry Point

313. Afforestation 2008-09

D 72 Reshtadhar Kanda Pangna Karosg 10 Ha. N 31021.057’ E077

0 06.160’ 4384 Ft.. Entry Point

314. Afforestation 2008-09

D 72, Reshtadhar 2 Kanda Pangna Karsog 6 Ha. N31020.047’ E077

0 05.096’ 5747 Ft. Entry Point

315. Afforestation 2008-09

D 109 Ghawla Talehan Pangna Karsog 10 Ha. N31017.309’ E077

0 11.44’ 4521 Ft.. Entry Point

316. Afforestation 2008-09

D99 Braker Tattapani Pangna Karsog 15 Ha. N31015.146’ E077

0 07.982’ 3433 Ft.. Entry Point

317. Afforestation 2008-09

D 161 Dumehi Kamand Karsog Karsog 10 Ha. N31021.390’ E077

0 10.387’ 6073 Ft.. Entry Point

318. Afforestation 2008-09

D 176 Galaych Galaych Karsog Karsog 10 Ha. N31024.593’ E077

0 14.066’ 5046 Ft.. Entry Point

319. Afforestation 2008-09

D 40 Baju Ghoshal Pangna Karsog 5 Ha. N31024.024’ E077°10.003’ 6622 Ft. Center Point

320. Afforestation 2008-09

D 39 Tikkar Begli Pangna Karsog 5 Ha. N31024.213’ E077°08.905’ 6064 Ft. Center Point

321. Afforestation 2008-09

D 39 Shill Ghoshal Pangna Karsog 6 Ha. N31024.428’ E077°10.395’ 7041 Ft. Center Point

322. Afforestation D 39 Shill Ghoshal Pangna Karsog 5 Ha. N31024.402’ E077°10.545’ 7160 Ft. Center Point

Page 25: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2009-10

323. Afforestation 2009-10

D 40 Baju Ghoshal Pangna Karsog 5 Ha. N31023.949’ E077°10.261’ 6398 FT. Center Point

324. Afforestation 2009-10

D 24 Barnog Katachi Pangna Karsog 6 Ha. N31025.708’ E077

0 07.879’ 6736 Ft.. Entry Point

325. Afforestation 2009-10

D 19 Shalog Shalog Pangna Karsog 5 Ha. N31025.154’ E977

0 07.003’ 6220 Ft.. Entry Point

326. Afforestation 2009-10

D 80 Kanda Bilindi Pangna Karsog 5 Ha. N31018.341' E077

006.367’ 5670 Ft.. Entry Point

327. Afforestation 2009-10

D 105 Khandain Talehan Pangna Karsog 30 Ha. N31016.406’ E077

0 10.890’ 4464 Ft.. Entry Point

328. Afforestation 2009-10

D 8 Panyaroo Surahi Pangna Karsog 5 Ha. N31022.105’ E077

0 06.809’ 4960 Ft.. Entry Point

329. Afforestation 2009-10

D 64 Salana Degoh Balar Pangna Karosg 5 Ha. N31021.095’ E077

066.023’ 5307 Ft. Entry Point

330. Afforestation 2009-10

D 247 Sarahan Sarahan Seri Karsog 5 Ha. N31022.130’ E077

0 22.160’ 4553 Ft.. Entry Point

331. Afforestation 2009-10

OD 247 Sarahan Sarhan Seri Karsog 5 Ha. N31022.070’ E077

0 22.386’ 4518 Ft.. Entry Point

332. Afforestation 2009-10

D 222 Pog Nahi Seri Karsog 5 Ha. N31020.101’ E077

0 19.229’ 3916 Ft.. Entry Point

333. Afforestation 2009-10

D 222 Pog Nanj Seri Karsog 5 Ha. N31020.215’ E077’20.095’ 4093 Ft. Center Point

334. Afforestation 2009-10

D-105 Bhouri Talehan Pangna Karsog 20 Ha. N 31016.273’ E077

011.665’ 5331 Ft. Center Point

335. Afforestation 2009-10

D-107 Gumma Talehan Pangna Karsog 20 Ha. N31016.143’ E077

011.508’ 5371 Ft. Top Entry

Point

336. Afforestation 2009-10

D-99 Braker Tattapani Pangna Karsog 5 Ha. N31015’32.1’’ E077

007’83.3’’ 3507 Ft. Center Point

337. Afforestation 2009-10

D-86 Lochar Alsindi Pangna Karsog 7 Ha. N31016.587’ E077

006.305’ 3952 Ft. Center Point

338. Afforestation 2009-10

D-64 Salana Degoh Balar Pangna Karsog 5 Ha. N31021’24.5’’ E077

006’01.6’’ 5008 Ft. Center Point

339. Afforestation D-72 Resthadhan Kanda Pangna Karsog 5 Ha. N31018.935’ E077

005.295’ 5915 Ft. Center Point

Page 26: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxiii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2009-10

340. Afforestation 2009-10

D-72 Resthadhan –A Kanda Pangna Karsog 15 Ha. N31019.426’ E077

004.506’ 5560 Ft. Center Point

341. Afforestation 2009-10

D-73 Gharlal –C-II Kanda Pangna Karsog 5 Ha. N31019.968’ E077

003.858’ 5389 Ft. Center Point

342. Afforestation 2009-10

D-74 Parvain Blindi Pangna Karsog 5 Ha. N31018’33.9’’ E077

003’10.5’’ 2448 Ft. Center Point

343. Afforestation 2009-10

D-39 Shill Ghoshal Pangna Karsog 5 Ha. N31024.402’ E077

010.545’ 7160 Ft. Center Point

344. Afforestation 2009-10

D-40 Baju Ghoshal Pangna Karsog 5 Ha. N31023.949’ E077

010.261’ 6398 Ft. Center Point

345. Afforestation 2009-010

D- 40 Humginala Pangna Pangna Karsog 6 Ha. N31024.470’ E077

007.110’ 5750 Ft. Center Point

346. Afforestation 2009-10

D-27 Mahasu Machroot Pangna Karsog 6 Ha. N31025’27.0’’ E077

008’71.5’’ 5955 Ft. Center Point

347. Afforestation 2009-10

D-30 Begalimandi Machroot Pangna Karsog 5 Ha. N31025’05.5’’ E077

008’56.7’’ 5542 Ft. Center Point

348. Afforestation 2009-10

D-198 Dhamiyara Khashoul Karsog Karsog 10 Ha. N31020’25.7” E077

015’07.8” 5046 Ft. Center Point

349. Afforestation 2009-10

D-202 Paraladarthu Mehendi Karsog Karsog 12 Ha. N31019’54.4’’ E077

015’21.6’’ 4774 Ft. Center Point

350. Afforestation 2009-10

D-207 Gandhoi Mehendi Karsog Karsog 11 Ha. N31019.125’ E077

015.083’ 4818 Ft.. Center Point

351. Afforestation 2009-10

D-172 Dopha Dopha Karsog Karsog 10 Ha. N31025’22.4’’ E077

013’40.7’’ 6256 Ft. Center Point

352. Afforestation 2009-10

D-175 Pehran Ghalaych Karsog Karsog 5 Ha. N31025.017’ E077

014.651’ 4425 Ft.. Center Point

353. Afforestation 2009-10

D- 183 MKB Mahadev ki Banouri

Mamail Karsog Karsog 15 Ha. N31022.081’ E077

014.069’ 4460 Ft. Center Point

354. Afforestation 2009-10

D- 187 Kelodhar Sarahanda

Bhenera Karsog Karsog 10 Ha. N31021’51.5” E077

015’12.6” 4652 Ft. Center Point

355. Afforestation 2009-10

D-176 Ghalaych Ghalaych Karsog Karsog 3 Ha. N31024.413’ E077

014.263’ 6803 Ft.. Entry Point

356. Afforestation D-171 Dopha Dopha Karsog Karsog 10 Ha. N31025.073’ E077

012.985’ 6863 Ft.. Center Point

Page 27: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxiv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2009-10

357. Afforestation 2009-10

D-162 Kajhol Kakahan Karsog Karsog 5-Ha. N31022’11.8’’ E077

010’47.4’’ 6048 Ft. Center Point

358. Afforestation 2009-10

D-155 Batauli Kamand Karsog Karsog 5 Ha. N31020’18.3’’ E077

012’37.8’’ 4864 Ft. Center Point

359. Afforestation 2009-10

D-170 Tikkar Karsog Sanarli Karsog Karsog 5 Ha. N31024.649’ E077

011.135’ 6841 Ft.. Center Point

360. Afforestation 2009-10

D-138 Bagbokhari Mahaunag

Karsog Karsog 40Ha. N31090’01.3’’ E077

014’05.5’’ 4934 Ft. Center Point

361. Afforestation 2009-10

D 137 Nagaltha Mahaunag

Karsog Karsog 20 Ha. N31019’24.4’’ E077

014’06.0’’ 3507 Ft. Center Point

362. Afforestation 2009-10

D 119 Mehram Mahaunag

Karsog Karsog 5 Ha. N31019’32.3’’ E077

010’30.7’’ 5820 Ft. Center Point

363. Afforestation 2009-10

D 144 Kashmir Sapnot Karsog Karsog 5 Ha. N31019’39.4’’ E077

010’35.5’’ 5680 Ft. Center Point

364. Afforestation 2009-10

D 111 Bagshar Bagshar Karsog Karsog 5 Ha. N31019’17.3’’ E077

008’41.1’’ 6019 Ft. Center Point

365. Afforestation 2009-10

D- 133 Hiru Parlog Karsog Karsog 10 Ha. N31016.654’ E077

013.666’ 3804 Ft. Center Point

366. Afforestation 2009-10

D- 134 Mangam Parlog Karsog Karsog 5 Ha. N31016.007’ E077

015.261’ 3205 Ft. Center Point

367. Afforestation 2009-10

D-106 Bhaura Talehan Pangna Karsog 5 Ha. N31015.266’ E077

012.523’ 2881 Ft. Center Point

368. Afforestation 2009-10

D- 134 Mangam Parlog Karsog Karsog 10 Ha. N31015.957’ E077

015.222’ 3290 Ft. Center Point

369. Afforestation 2009-10

OD 247 Sarahan Sarahan Seri Karsog 5 Ha. N31022’40.0” N 31

0 21’22.5” 4515 Ft. Entry Point

370. Afforestation 2009-10

D 124 Kolontha Mahaunag

Karsog Karsog 5 Ha. N31017.435' E077

0 12.209’ 5920 Ft. Entry Point

371. Afforestation 2009-10

138 Bag Bhokhari Mahaunag

Karsog Karsog 10 Ha N31019.082' E077

0 13.290' 4812 Ft. Entry Point

372. Afforestation 2010-11

B 207 Ghandoi Mehendi Karsog Karsog 9 Ha. N31019’07.3’’ E077

0 15’04.1” 4630 Ft. Entry Point

373. Afforestation D- 133 Hiru Parlog Karsog Karsog 13 Ha. N31017.246’ E077

013.178’ 6568 Ft. Center Point

Page 28: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2010-11

374. Afforestation 2010-11

D- 128 Kashoul Parlog Karsog Karsog 20 Ha. N31016.453’ E077

012.907’ 4846 Ft. Center Point

375. Afforestation 2010-11

D- 134 Mangan Parlog Karsog Karsog 15 Ha. N31015.786’ E077

014.145’ 3152 Ft. Center Point

376. Afforestation 2010-11

D -226 Khadra Khadra Seri Karsog 8 Ha. N31020.136’ E077

017.771’ 6112 Ft. Center Point

377. Afforestation 2010-11

D-222 Pog Nari Seri Karsog 3- Ha. N31020.489’ E077

019.370’ 5445 Ft. Top Entry

Point

378. Afforestation 2010-11

D- 214 Jhunjhun Nehrinal Seri Karsog 10 Ha. N31019.313’ E077

019.435’ 4935 Ft.. Center Point

379. Afforestation 2010-11

D- 214 Jhunjhun Nehrinal Seri Karsog 20 Ha. N31017.971’ E077

017.267’ 6290 Ft.. Center Point

380. Afforestation 2010-11

D- 214 Jhunjhun Nehrinal Seri Karsog 2 Ha. N31019.635’ E077

019.735’ 5243 Ft. Center Point

381. Afforestation 2010-11

D-208 Majod Mehendi Karsog Karsog 20 Ha. N31018.535’ E077

017.412’ 5821 Ft. Center Point

382. Afforestation 2010-11

D 236 Pathraeivi Pathraeivi Seri Karsog 5 Ha N31024’52.0" E 077

0 15’56.3" 7088 Ft. Entry Point

383. Afforestation 2010-11

D 249 Makra Sarahan Seri Karsog 2 Ha. N31022.451’ E077°21.243’ 5280 Ft. Entry Point

384. Afforestation 2010-11

D 226 Khadra Khadra Seri Karsog 8 Ha. N31020.936’ E077°17.771’ 6112 Ft. Center Point

385. Afforestation 2010-11

D 222 Pog Khadra Seri Karsog 3 Ha. N31020.48.9’ E077°19.37.0’ 5445 Ft. Center Point

386. Afforestation 2010-11

D 214 Jhunjhun Nehrinal Seri Karsog 20 Ha. N31017.97.1’ E077°17.26.7’ 6290 Ft. Center Point

387. Afforestation 2010-11

D 214 Jhunjhun Nehrinal Seri Karsog 10 Ha. N31019.31.3’ E077°19.43.5’ 4935 Ft. Center Point

388. Afforestation 2010-11

D 222 Pog Nahj Seri Karsog 1 Ha. N31020’29.4” E077

0 19’17.9” 5142 Ft. Entry Point

389. Afforestation 2010-11

D 73 Gharlal Kanda Pangna Karsog 12 Ha. N31020’10.9” E077

004’57.5” 5002 Ft. Entry Point

390. Afforestation D 90 Mahita 2 Alsnidi Pangna Karsog 5 Ha. N31016.267’ E077

0 05.437’ 3216 Ft. Entry Point

Page 29: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxvi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2010-11

391. Afforestation 2010-11

D 1 Mahog Surahi Pangna Karsog 5 Ha. N31023.710’ E077

0 05.454’ 6048 Ft. Entry Point

392. Afforestation 2010-11

D72 Reshtadhar Kanda Pangna Karsog 5 Ha. N31021.794’ E077

0 0.6.753’ 4428 Ft. Entry Point

393. Afforestation 2010-11

D 62 Kunash Balar Pangna Karsog 5 Ha. N31019.058’ E077

0 05.370’ 5552 Ft. Entry Point

394. Afforestation 2010-11

Alyash Alsindi Pangna Karsog 10 Ha. N31017.075’ E077

0 07.004’ 5568 Ft. Entry Point

Page 30: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxvii

Rim Plantation

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

395. Rim Pltn 2004-05

D 170 Tikkar Karsog

Sanarli Karsog Karsog 5 Ha. N 310 25’10.6" E 077

011’04.7” 6320 Ft. Entry Point

396. Rim Plantation 20005-06

D-92 Sorour Tattapani Pangna Karsog 5 N 31015’14.9’’ E077

003’84.3’’ 2089 Ft. Center Point

397. Rim Plantation 2005-06

D- 101 Nandoo Tattapani Pangna Karsog 10 N 31015’94.0’’ E077

007’94.1’’ 4000 Ft. Center Point

398. Rim Plantation 2005-06

D- 101 Nandoo Tattapani Pangna Karsog 43 N 31015’74.1’’ E077

008’94.7’’ 4089 Ft. Center Point

399. Rim Plantation 2005-06

D- 101 Ghangar Tattapani Pangna Karsog 7 N 31014’19.0’’ E077

007’51.3’’ 1952 Ft. Center Point

400. Rim Plantation 2005-06

U. F. Thinu Balh Tattapani Pangna Karsog 8 N 31013’93.0’’ E077

008’33.2’’ 2137 Ft. Center Point

401. Rim Plantation 2005-06

D -99 Braker Tattapani Pangna Karsog 5 N 31014’74.7’’ E077

008’26.4’’ 2265 Ft. Center Point

402. Rim Plantation 2005-06

U. F. Thalli Tattapani Pangna Karsog 5 N 31014’27.7’’ E077

007’87.8’’ 2096 Ft. Center Point

403. Rim Plantation 2005-06

D – 98 Kidia Tattapani Pangna Karsog 5 N 31015’22.4’’ E077

005’92.1’’ 2441 Ft. Center Point

404. Rim Plantation 2005-06

D- 98 kidia Tattapani Pangna Karsog 30 N 31015’19.8’’ E077

005’94.7’’ 2499 Ft. Center Point

Page 31: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxviii

Pasture Development

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

405. Pasture Dev. 2004-05

OD 137 Nagaltha Mahaunag Karsog Karsog 5 Ha. N310 17.264' E 077

0 14.280’ 6352 Ft. Entry Point

406. Pasture Development 2005-06

OD 255 -IV Sagach Mahog Magroo Karsog 5 Ha. N 310 25.598’ E077

020.047’ 6563 Ft. Entry Point

407. Pasture Development 2005-06

OD 283 Raidhar khotu

Chaura Magroo Karsog 10 Ha. N 310 27.211’ E077

0 18.826’ 5321 Ft. Entry Point

408. Pasture Development 2005-06

OD 278 Nadun Lassi Magroo Karsog 10 Ha. N 310 30.314’ E077

0 17.218’ 8928

Ft.. Entry Point

409. Pasture Development 2005-06

OD 278 Nadun Lassi Magroo Karsog 10 Ha. N 310 30.166’ E077

0 17.173’ 8780 Ft. Top Entry

point

410. Pasture Development 2005-06

D 241 kandloo Taben Seri Karsog 5 Ha. N31022.400’ E077’19.440’ 4492 Ft. Entry Point

411. Pasture Development 2005-06

D-106 Bhaura Talehan Pangna Karsog 10 Ha. N 31014.950’ E077

012.387’ 3202 Ft. Center Point

412. Pasture Development 2005-06

D-106 Bhaura Talehan Pangna Karsog 20 Ha. N 31015.004’ E077

011.609’ 2320 Ft. Center Point

413. Pasture Development 2005-06

D-76 Kapdyals Alsindi Pangna Karsog 10 Ha. N 31016.396’ E077

004.662’ 3070 Ft. Entry Point

414. Pasture Development 2005-06

D-74 Parvain Blindi Pangna Karsog 10 Ha. N 31017’70.8’’ E077

003’78.4’’ 2601 Ft. Center Point

415. Pasture Development 2005-06

D-198 Dhamiyara Kashoul Karsog Karsog 10 Ha. N 31020.946’ E077

014.646’ 4250 Ft. Center Point

416. Pasture D 249 Makra Sarahan Seri Karsog 5 Ha. N 31022.590’ E077

021.384’ 4652 Ft. Center Point

Page 32: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxix

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

Development 2005-06

417. Pasture Development 2005-06

D 233 Richhni Richhni Seri Karsog 8 Ha. N 31024.359’ E077

014.497’ 7174 Ft. Center Point

418. Pasture Development 2005-06

D 233 Richhni Richhni Seri Karsog 13 Ha. N 31024.013’ E077

016.129’ 6000 Ft. Center Point

419. Pasture Development 2005-06

N D- 131 Parnot Parlog Karsog Karsog 10 Ha. N 31016.111’ E077

013.854’ 3096 Ft. Center Point

420. Pasture Development 2005-06

D -241 Kandloo Taben Seri Karsog 5 Ha. N 31022.400’ E077

019.440’ 4492 Ft. Center Point

421. Pasture Development 2006-07

N D 255 Sagach Mahog Magroo Karsog 15 Ha. N 310 25.669’ E077

0 19.961’ 6400 Ft. Entry Point

422. Pasture Dev. 2007-08

ND 283 Raidhor Chaura Magroo Karsog 5 Ha. N 310 27.111’ E077

0 18.530’ 5450 Ft. Center Point

423. Pasture Development 2007-08

OD 283 Raidhar Chaura Magroo Karsog 5 Ha. N 310 27.229’ E077

0 18.893’ 5424 Ft. Center Point

424. Pasture Development 2007-08

OD 278 Nadur Lassi Magroo Karsog 20 Ha. N 310 29.603’ E077

0 17.494’ 8457 Ft. Entry Point

425. Pasture Dev. 2007-08

ND 283 Raidhor Chawra Magroo Karsog 5 Ha. N 310 27.142 E 077

0 18.880’ 5496 Ft. Entry Point

426. Pasture Dev. 2007-08

D 133 Hiru Parlog Karsog Karsog 9 Ha. N 310 17’32.4” E 077

0

13’52.7” 6470 Ft. Entry Point

427. Pasture Dev. 2007-08

NB 247 Sarahan Sarahan Seri Karsog 5 Ha. N 310 22’22.5” E 077

0

22’14.0” 4620 Ft. Entry Point

428. Pasture Development 2007-08

D 247 Sarahan CII Sarahan Seri Karsog 5 Ha. N 31022.375’ E077

022.755’ 4519 Ft. Center Point

Page 33: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxx

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

429. Pasture Development 2007-08

D 247 Sarahan C -VI

Sarahan Seri Karsog 10 Ha. N 31022.591’ E077

022.862’ 4455 Ft. Center Point

430. Pasture Development 2007-08

D 250 Bagridhar Sarahan Seri Karsog 10 Ha. N 31023.259’ E077

022.141’ 4421 Ft. Center Point

431. Pasture Development 2007-08

D -241 Kandloo Taben Seri Karsog 5 Ha. N 31022.379’ E077

019.385’ 1290 Ft. Center Point

432. Pasture Development 2007-08

D-138 Bagbokhari Mahonag Karsog Karsog 20 Ha. N 31019’07.5’’ E077

014’05.5’’ 4483 Ft. Center Point

433. Pasture Development 2007-08

D-137 Nagaltha Mahonag Karsog Karsog 30 Ha. N 31019’27.2’’ E077

014’13.0’’ 3817 Ft. Center Point

434. Pasture Development 2007-08

O D- 136 Parlog Parlog Karsog Karsog 15 Ha. N 31016.438’ E077

016.884’ 2652 Ft. Center Point

435. Pasture Development 2007-08

N D- 134 Magam Parlog Karsog Karsog 20 Ha. N 31016.072’ E077

014.845’ 4553 Ft. Center Point

436. Pasture Development 2007-08

D 252 Naganal Gowalpur Seri Karsog 10 Ha. N31024.023’ E077°21.388’ 5657 Ft. Entry Point

437. Pasture Development 2007-08

D 247 Sarahan C-II Sarahan Seri Karsog 5 Ha. N31022.375’ E077°22.750’ 4519 Ft. Entry Point

438. Pasture Development 2007-08

D 247 Sarahan C-IV

Sarahan Seri Karsog 10 Ha. N31022.59.1’ E077°22.86.2’ 4455 Ft. Entry Point

439. Pasture Development 2007-08

D 250 Bagridhar Sarahan Seri Karsog 10 Ha. N31023.259’ E077°22.145’ 4421 Ft. Entry Point

440. Pasture Dev. 135 Fafan Porlog Karsog Karsog 0 5 Ha. N 310 16.007’ E 077

0 14.592’ 4227 Ft. Entry Point

Page 34: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2007-08

441. Pasture Development 2008-09

D-104 Besta Talehan Pangna Karsog 25 Ha. N 31016.630’ E077

010.224’ 4756 Ft. Center Point

442. Pasture Development 2008-09

D-105 Kadain Talehan Pangna Karsog 5 Ha. N 31016.237’ E077

010.593’ 3772 Ft. Center Point

443. Pasture Development 2008-09

D-73 Gharlol Kanda Pangna Karsog 10 Ha. N 31020’27.5’’ E077

003’96.0’’ 5728 Ft. Center Point

444. Pasture Development 2008-09

D-27 Mahasu Machroot Pangna Karsog 10 Ha. N 31025’74.0’’ E077

009’11.3’’ 6476 Ft. Center Point

445. Pasture Development 2008-09

D- 131 Parnot Parlog Karsog Karsog 15 Ha. N 31018.074’ E077

013.867’ 3485 Ft. Center Point

446. Pasture Development 2008-09

D- 133 Hiru Parlog Karsog Karsog 20 Ha. N 31016.779’ E077

013.550’ 4143 Ft. Center Point

447. Pasture Development 2008-09

D-38 Bakaran Begli Pangna Karsog 5 Ha. N 31025’63.5’’ E077

009’09.0’’ 6400 Ft. Center Point

448. Pasture Development 2008-09

D-74 Parvain Blindi Pangna Karsog 35 Ha. N 31017’74.6’’ E077

004’14.3’’ 2806 Ft. Center Point

449. Pasture Development 2008-09

D- 101 Nandoo Tattapani Pangna Karsog 10 Ha. N 31014’58.3’’ E077

008’55.0’’ 2851 Ft. Center Point

450. Pasture Development 2008-09

D-86 Kapdyals Alsindi Pangna Karsog 10 Ha. N 31016.625’ E077

005.533’ 3008 Ft. Center Point

451. Pasture Dev. 2008-09

D 134 Magan Porlog Karsog Karsog 5 Ha. N 310 15.320’ E 077

0 14.469’ 3075 Ft. Entry Point

452. Pasture D-106 Besta Talehan Pangna Karsog 15 Ha. N 31016.439’ E077

009.320’

4123 Ft. Center Point

Page 35: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

Development 2008-09

453. Pasture Dev. 2009-10

D 214 Jhunjhun Nehrinal Seri Karsog 20 Ha. N 310 17.593’ E 077

0 18.340’ 5676 Ft. Entry Point

454. Pasture Development 2009-10

D- 12 Bhayana Surahi Pangna Karsog 5 Ha. N 31023.676’ E077

005.854’ 6096 Ft. Entry Point

455. Pasture Development 2009-10

D- 183 MKB Mahadev ki Banouni

Mamail Karsog Karsog 8- Ha. N 31022’38.3” E077

013’35.5” 4313 Ft. Center Point

456. Pasture Development 2010-11

D-137 Nagaltha Mahonag Karsog Karsog 10 Ha. N 31019’25.9’’ E077

013’59.7’’ 3590 Ft. Center Point

457. Pasture Dev. 2010-11

D 133 Hiru Parlog Karsog Karsog 5 Ha. N 310 16’10.7” E 077

0

14’48.0” 4819 Ft. Entry Point

458. Pasture Dev. 2010-11

D - 175 Pehran Galaych Karsog Karsog 10 Ha. U 310 25’01.1" E 077

014’23.6” 6048 Ft. Entry Point

459. Pasture Development 2010-11

D -245 Firnoo Taben Seri Karsog 2 Ha. N 31021.274’ E077

021.113’ 3900 Ft. Center Point

460. Pasture Development 2010-11

D -252 Naganal Taben Seri Karsog 4 Ha. N 31022.140’ E077

020.049’ 4003 Ft. Center Point

461. Pasture Development 2010-11

D 249 Makra Sarahan Seri Karsog 2 Ha. N 31022.455’ E077

021.243’ 5280 Ft. Center Point

462. Pasture Development 2010-11

D -254 Sushan Gowalpur Seri Karsog 2 Ha. N 31024.021’ E077

021.288’ 6201 Ft. Center Point

463. Pasture Development 2010-11

D- 185 MKB Mahadev ki Banouni

Mamail Karsog Karsog 6 Ha. N 31022’24.9” E077

014’14.5” 4774 Ft. Center Point

464. Pasture Development

D-175 Pehran Ghalaych Karsog Karsog 10 Ha. N 31025.031’ E077

013.651’ 4417

Ft.. Center Point

Page 36: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxiii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft..)

Point of Location Reading

2010-11

465. Pasture Development 2010-11

D-207 Gandoli Mehendi Karsog Karsog 10 Ha. N 31019.132’ E077

015.507’ 4693

Ft.. Center Point

466. Pasture Development 2010-11

D-138 Bagbokhari Mahonag Karsog Karsog 20 Ha. N 31018’52.4’’ E077

014’11.5’’ 5126 Ft. Center Point

467. Pasture Development 2010-11

D- 136 Parlog Parlog Karsog Karsog 10 Ha. N 31016.098’ E077

014.295’ 4970 Ft. Center Point

468. Pasture Development 2010-11

D- 128 Kashout Parlog Karsog Karsog 12 Ha. N 31016.214’ E077

012.981’ 5203 Ft. Center Point

469. Pasture Development 2010-11

D-208 Majod Mehendi Karsog Karsog 10 Ha. N 31018.235’ E077

017.212’ 5724 Ft. Center Point

470. Pasture Development 2010-11

D 233 Richhni Katkosh Seri Karsog 8 Ha. N31024.359’ E077°14.497’ 7174 Ft. Entry Point

471. Pasture Development 2010-11

D 245 Firnoo Taben Seri Karsog 2 Ha. N31021.274’ E077°21.113’ 3900 Ft. Entry Point

472. Pasture Development 2010-11

D 241 kandloo Taben Seri Karsog 4 Ha. N31022.145’ E077°20.049’ 4003 Ft. Entry Point

473. Pasture Development 2010-11

D 254 Sushan Gowalpur Seri Karsog 2 Ha. N31024.021’ E077°21.288’ 6201 Ft. Entry Point

474. Pasture Development

D 233 Richhni Katkosh Seri Karsog 13 Ha. N31024.013’ E077°16.129’ 6000 Ft. Entry Point

Page 37: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxiv

Division – Kunihar

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

475. Afforestation 2004-05

D 8 Trot Labrath Darlaghat Kunihar 7 Ha. N31019.344’ E076

057.292’ 3285 Ft. Center

Point

476. Afforestation 2006-07

D-3 Bajrail Kandhar Darlaghat Kunihar 5 Ha. N31021.156’ E076

054.537’ 3412 Ft. Center

Point

477. Afforestation 2006-07

D 8 Trot Labrath Darlaghat Kunihar 10 Ha. N31021.226’ E076

057.764’ 3006 Ft. Center

Point

478. Afforestation 2006-07

D 10 Banola Labrath Darlaghat Kunihar 5 Ha. N31021.098’ E076

055.885’ 5924 Ft. Center

Point

479. Afforestation 2006-07

U 17 Matrech Labrath Darlaghat Kunihar 10 Ha. N31018.490’ E076

055.526’ 4900 Ft. Center

Point

480. Afforestation 2007-08

U 14 Sehnali Kandhar Darlaghat Kunihar 8 Ha. N31021.426’ E076

054.579’ 4350 Ft. Center

Point

481. Afforestation 2007-08

D 3 Bajrail Kandhar Darlaghat Kunihar 10 Ha. N31021.545’ E076

054.538‘ 2105 Ft. Center

Point

482. Afforestation 2007-08

U 9 Suin Kandhar Darlaghat Kunihar 15 Ha. N31020.991’ E076

054.661’ 3150 Ft. Center

Point

483. Afforestation 2007-08

D 5 Kathpol Labrath Darlaghat Kunihar 10 Ha. N31021.526’ E076

055.495’ 4880 Ft. Center

Point

484. Afforestation 2007-08

U 20 Ghour Labrath Darlaghat Kunihar 10 Ha. N31019.633’ E076

056.792’ 2317 Ft. Center

Point

485. Afforestation 2007-08

D 5 Kathpol Labrath Darlaghat Kunihar 10 Ha. N31019.255’ E076

055.315’ 5284 Ft. Center

Point

486. Afforestation 2007-08

U 9-Skor Labrath Darlaghat Kunihar 7 Ha. N310 18.668’ E076

056.581’ 4551 Ft. Center

Point

487. Afforestation 2008-09

U 18 Labrath Labrath Darlaghat Kunihar 20 Ha. N31018.320’ E076

056.519’ 5949 Ft. Center

Point

488. Afforestation 2008-09

D 9 Skor Labrath Darlaghat Kunihar 25 Ha. N 31018.690’ E076

057.002’ 3977 Ft. Center

Point

489. Afforestation 2008-09

U 13 Kandhar Kandhar Darlaghat Kunihar 15 Ha. N31020.122’ E076

054.534’ 3618 Ft. Center

Point

490. Afforestation 2008-09

U 9 Suin Kandhar Darlaghat Kunihar 15 Ha. N31028.470’ E076

054.627’ 3375 Ft. Center

Point

Page 38: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

491. Afforestation 2008-09

D3 Bajrail Kandhar Darlaghat Kunihar 25 Ha. N31021.583’ E076

054.962’ 2420 Ft. Center

Point

492. Afforestation 2008-09

D 4 Suin Marora Kandhar Darlaghat Kunihar 20 Ha. N31021’328’ E076

055.912’ 2709 Ft. Center

Point

493. Afforestation 2009-10

U F- Manru Mangoo Darlaghat Kunihar 5 Ha. N31013.987’ E077

059.984’ 4313 Ft. Center

Point

494. Afforestation 2009-10

Sergharakru Danoghat Darlaghat Kunihar 5 Ha. N310 20.460’ E076

054.738’ 4227 Ft. Center

Point

495. Afforestation 2009-10

U 17 Matreach Labrath Darlaghat Kunihar 5 Ha. N31018.475’ E076

055.625’ 4816 Ft. Center

Point

496. Afforestation 2009-10

U 13 Kandhar Kandhar Darlaghat Kunihar 20 Ha. N31021.017’ E076

055.540’ 3075 Ft. Center

Point

497. Afforestation 2009-10

D -10 Banola Labrath Darlaghat Kunihar 10 Ha. N31021.133’ E076

057.664’ 5962 Ft. Center

Point

498. Afforestation 2009-10

D 52 bajrial Mangoo Darlaghat Kunihar 5 Ha. N31013.473’ E076

059.834’ 3858 Ft. Center

Point

499. Afforestation 2009-10

U 43 Pakati Chandi Darlaghat Kunihar 5 Ha. N31015.107’ E076

000.173’ 5625 Ft. Center

Point

500. Afforestation 2009-10

D 51 Sergharakru Danoghat Darlaghat Kunihar 10 Ha. N 31012.705’ E076

0 58.471’ 4948 Ft. Center

Point

501. Afforestation 2009-10

U 19 Skor Labrath Darlaghat Kunihar 5 Ha. N31018.847’ E076

055.554’ 4468 Ft. Center

Point

502. Rim Plantation 2009-10

D -3 Bajrail Kandhar Darlaghat Kunihar 10 Ha. N31021.520’ E076

054.547’ 2025 Ft. Center

Point

503. Rim Plantation 2009-10

U-8 Boi Kandhar Darlaghat Kunihar 10 Ha. N31021.559’ E076

055.350’ 1980 Ft. Center

Point

504. Rim Plantation 2009-10

D-3 Bajrail Kandhar Darlaghat Kunihar 10 Ha. N31021.520’ E076

054.547’ 6480 Ft. Center

Point

505. Afforestation 2010-11

D 51 Sergharakru Danoghat Darlaghat Kunihar 7 Ha. N31012.554’ E076

059.199’ 4395 Ft. Center

Point

506. Afforestation 2010-11

D 49 Gharakru Danoghat Darlaghat Kunihar 7 Ha. N31011.785’ E076

059.096’ 4510 Ft. Center

Point

507. Afforestation 2010-11

D 50 C2 Daran Danoghat Darlaghat Kunihar 5 Ha. N31012.389’ E076

059.877’ 3861 Ft. Center

Point

Page 39: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxvi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

508. Afforestation 2010-11

U- 7 Kauli Kandhar Darlaghat Kunihar 7 Ha. N31021.214’ E076

054.467’ 2430 Ft. Center

Point

509. Afforestation 2010-11

U-F Sehnali Kandhar Darlaghat Kunihar 7 Ha. N31021.025’ E076

054.370’ 3250 Ft. Center

Point

510. Afforestation 2010-11

D -3 Bajrail Kandhar Darlaghat Kunihar 5 Ha. N31021.567’ E076

054.765’ 2018 Ft. Center

Point

511. Afforestation 2010-11

U 19 Skor Labrath Darlaghat Kunihar 5 Ha. N31019.001’ E076

056.903’ 3635 Ft. Center

Point

512. Afforestation 2010-11

D 5 Kathpol Labrath Darlaghat Kunihar 15 Ha. N31019.488’ E076

055.187’ 5455 Ft. Center

Point

513. Afforestation 2010-11

D-5 - Kathpol Labrath Darlaghat Kunihar 15 Ha. N31019.310’ E076

0 55.318’ 5344 Ft. Center

Point

514. Afforestation 2010-11

DPF- Baryal Mangoo Darlaghat Kunihar 10 Ha. N31013.326’ E077

0 59.545’ 3373 Ft. Center

Point

515. Rim Plantation 2010-11

U 19 Skor Labrath Darlaghat Kunihar 10 Ha. N31018.991’ E076

056.781’ 3898 Ft. Center

Point

516. Rim Plantation 2010-11

U 9 Suin Kandhar Darlaghat Kunihar 10 Ha. N31021.598’ E076

056.562’ 3255 Ft. Center

Point

517. Rim Plantation 2010-11

UF Parlakyar Labrath Darlaghat Kunihar 3 Ha. N31019.723’ E076

057.047’ 2479 Ft. Center

Point

518. Rim Pltn. 2009-10 UF Padyar Kandhar Darlaghat Kunihar 10 Ha. N31021.423’ E076

053.909’ 4225 Ft. Center

Point

519. Rim Plantation 2010-11

J -21 Jandoi Labrath Darlaghat Kunihar 5 Ha. N31018.661’ E076

057.275’ 3403 Ft. Center

Point

Page 40: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxvii

Division – Nachan

1. Afforestation 2004-05

Salotli Baila Seraj Nachan 5 Ha. N310 30.258’ E077

0 14.746’ 8220 Ft. Entry Point

2. Afforestation 2004-05

Salotli Liuri Baila Seraj Nachan 10 Ha. N310 30.002’ E077

0 14.551’ 7638 Ft. Center Point

3. Afforestation 2005-06

Magrugalla Baila Seraj Nachan 10 Ha. N310 28.929’ E077

0 15.571’ 7860 Ft. Center Point

4. Afforestation 2005-06

Chainidhar Baila Seraj Nachan 12 Ha. N310 29.511’ E077

0 15.332’ 8236 Ft. Entry Point

5. Afforestation 2005-06

Lambidhar Baila Seraj Nachan 10 Ha. N310 29.273’ E077

0 15.458’ 8358 Ft. Entry Point

6. Afforestation 2005-06

Grijnoo -1 Baila Seraj Nachan 10 Ha. N310 29.246’ E077

0 15.664’ 8550 Ft. Entry Point

7. Afforestation 2005-06

Grijnoo -2 Baila Seraj Nachan 10 Ha. N310 29.183’ E077

0 15.697’ 8608 Ft. Entry Point

8. Afforestation 2005-06

Magrugalla Baila Seraj Nachan 10 Ha. N310 28.928’ E077

0 15.567’ 8726 Ft. Entry Point

9. Afforestation 2005-06

Lambidhar Baila Seraj Nachan 10 Ha. N310 28.978’ E077

0 14.796’ 9004 Ft. Center Point

10. Afforestation 2005-06

Lambidhar Baila Seraj Nachan 10 Ha. N310 28.909’ E077

0 14.817’ 8953 Ft. Center Point

11. Afforestation 2005-06

Deoridhar Baila Seraj Nachan 10 Ha. N310 28.712’ E077

0 14.815’ 8886 Ft. Entry Point

12. Afforestation 2005-06

Chaitridhar Baila Seraj Nachan 8 Ha. N310 28.598’ E077

0 14.138’ 8668 Ft. Entry Point

13. Afforestation 2005-06

GariJhoo Baila Seraj Nachan 10 Ha. N310 30.253’ E077

0 14.749’ 8204 Ft. Entry Point

14. Afforestation 2005-06

Manshanidhar Baila Seraj Nachan 12 Ha N310 30.401’ E077

0 14.716’ 8089 Ft. Center Point

15. Afforestationv 2005-06

Labni Nalla Baila Seraj Nachan 5 Ha. N31029.807’ E077

018.290’ 9310 Ft. Center Point

16. Afforestation 2005-06

Pokhridhar Baila Seraj Nachan 9 Ha. N310 28.901’ E077

0 15.190’ 9230 Ft. Center Point

17. Afforestation 2005-06

Bijnadhar Baila Seraj Nachan 10 Ha. N310 29.512’ E077

0 15.432’ 8531 Ft. Center Point

Page 41: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxviii

18. Pasture Development 2006-07

Garijnoo Baila Seraj Nachan 14 Ha. N310 29.445’ E077

0 14.144’ 7436 Ft. Entry Point

19. Afforestation 2007-08

Jhalru Baila Seraj Nachan 5 Ha. N310 29.575’ E 77

0 14.958’ 7294 Ft. Center Point

20. Pasture Development 2007-08

Malsigarh Baila Seraj Nachan 10 Ha. N310 29.512’ E077

0 15.432’ 8531 Ft. Centr Point

21. Afforestation 2008-09

Garijnoo Bail Seraj Nachan 15 Ha. N310 29.575’ E077

0 14.958’ 7924 Ft. Center Point

22. Afforestation 2007-08

Snohalidhar Baila Seraj Nachan 5 Ha. N310 30.167’ E077

0 14.135’ 8057 Ft. Centr Point

Page 42: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xxxix

Division – Shimla

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

520. Afforestation 2004-05

DPF Kheel Sanog Dhami Shimla 5 Ha. N31008.467’ E077

006.259’ 5491 Ft. Entry

Point

521. Afforestation 2004-05

Tallgiri Tall Tara Devi Shimla 4 Ha. N31006.891' E077

008.019' 6552 Ft. Entry Point

522. Afforestation 2004-05

GCL Nalhayal Tutu Tara Devi Shimla 4 Ha. N31007.588' E077

007.844' 6221 Ft. Entry Point

523. Afforestation 2004-05

GCL Nalhayal Tall Tara Devi Shimla 3 Ha. N31007.391’ E077

007.862’ 6600 Ft. Entry Point

524. Afforestation 2004-05

GLC - Marhon Kamyana Tara Devi Shimla 7 Ha. N31008.461' E077

0 10.045' 6416 Ft. Entry Point

525. Afforestation 2004-05

DPF Badfaranlog

Bharari Mashobra Shimla 15 Ha. N31007.139’ E077

012.033’ 6639 Ft. Entry Point

526. Afforestation 2004-05

UF Janlog Bharari Mashobra Shimla 5 Ha. N31008.506’ E077

010.743’ 5661 Ft. Entry Point

527. Afforestation 2004-05

DPF Janlog Bharari Mashobra Shimla 5 Ha. N31008.541‘ E077

010.977 ‘ 5399 Ft. Entry Point

528. Afforestation 2004-05

Kanda/ Dhar Dharti Mashobra Shimla 10 Ha. N31007.701‘ E077

016.202’ 6395 Ft. Entry Point

529. Afforestation 2004-05

Himala/Kanda Mashobra Mashobra Shimla 10 Ha. N31008.916‘ E077

014.156’ 5825 Ft. Entry Point

530. Afforestation 2004-05

D 73 Mashobra Seepur Mashobra Shimla 10 Ha. N31008.919‘ E077

012.977’ 2497 Ft. Entry Point

531. Afforestation 2004-05

D 67 Paniyali C 2

Paniyali Mashobra Shimla 5 Ha. N31009.713‘ E077

013.107’ 6357 Ft. Entry Point

532. Afforestation 2004-05

UF Jug Paniyali Mashobra Shimla 5 Ha. N31010.443’ E077

012.579’ 6290 Ft. Entry Point

533. Afforestation 2004-05

DF Seon Naldehra Mashobra Shimla 15 Ha. N31010.914‘ E077

010.273’ 5940 Ft. Entry Point

534. Pasture Development 2004-05

UF Ghatti Naldehra Mashobra Shimla 5 Ha. N31009.651‘ E077

012.053’ 4990 Ft. Entry Point

535. Afforestation D 73 Mashobra Seepur Mashobra Shimla 5 Ha. N31009.443‘ E077

012.799’ 7174 Ft. Entry Point

Page 43: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xl

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2004-05 C1

536. Afforestation 2004-05

UF Charain Naldehra Mashobra Shimla 5 Ha. N31011.414’ E077

012.169’ 4313 Ft. Entry Point

537. Afforestation 2004-05

D 73 Mashobra C III

Dhalli Mashobra Shimla 5 Ha. N31007.296' E077

013.539' 6950 Ft. Entry Point

538. Afforestation 2004-05

D 26 Biru Khatnol Bhajji Shimla 18 Ha. N 31016.527’ E077

012.239' 6720 Ft. Entry Point

539. Pasture Dev. 2004-05

UF Deothi Seepur Mashobra Shimla 3 Ha. N31008.071' E077

014.730' 7279 Ft. Entry Point

540. Afforestation 2004-05

Tallgiri Tall Tara Devi Shimla 4 Ha. N31007.297' E077

007.865' 6400 Ft. Entry Point

541. Pasture Development 2004-05

DPF Janlog Bharari Mashobra Shimla 10 Ha. N31008.463’ E077

010’678’ 5375 Ft. Entry Point

542. Afforestation 2005-06

GLC Marhon Kamyana Tara Devi Shimla 7 Ha. N 31008.502' E077

010.195’ 6382 Ft. Entry Point

543. Afforestation 2005-06

Bohli Halog Dhami Shimla 4 Ha. N31010.688' E077

013.344' 4932 Ft. Entry Point

544. Afforestation 2005-06

UF Sharog Ganeog Dhami Shimla 5 Ha. N 31009.116' E077

005.514' 4862 Ft. Entry Point

545. Afforestation 2005-06

Mahapuna Halog Dhami Shimla 4 Ha. N31011.154’ E077

003.094’ 5449Ft. Entry Point

546. Afforestation 2005-06

Hir Ki Beshak Halog Dhami Shimla 6 Ha. N31010.159' E077

002.232' 5142 Ft. Entry Point

547. Afforestation 2005-06

Bohli Dhalaya Dhami Shimla 4 Ha. N31010.688' E077

003.753' 4932 Ft. Entry Point

548. Afforestation 2005-06

DPF Baddu Badoo Dhami Shimla 8 Ha. N310

09.207' E077004.456' 5457 Ft. Entry Point

549. Afforestation 2005-06

UF Pahal Bathol Bhajji Shimla 10 Ha. N31010.220’ E077

010.200' 4000 Ft. Entry Point

550. Afforestation 2005-06

D 70 Naldehra C III

Naldehra Mashobra Shimla 10 Ha. N31011.218' E077

011.089' 6507 Ft. Entry Point

551. Afforestation 2005-06

DF 208 Gadoug Gadaug Tara Devi Shimla 2 Ha. N31006.437' E77

007.711' 5979 Ft. Entry Point

Page 44: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xli

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

552. Afforestation 2005-06

GLC Dhart Kamyana Tara Devi Shimla 10 Ha. N310 08.908' E077

008.946' 5379 Ft. Entry Point

553. Afforestation 2005-06

D 214 Jhajia Banoti Tara Devi Shimla 6 Ha. N310 07.894' E077

0 06.478' 5676 Ft. Entry Point

554. Afforestation 2005-06

GCL Kalawat Tall Tara Devi Shimla 3 Ha. N310 07.776' E077

0 07.772' 5750 Ft. Entry Point

555. Afforestation 2005-06

GCL Karound Tall Tara Devi Shimla 10 Ha. N310 08.065' E077

0 08.732' 5375 Ft. Entry Point

556. Afforestation 2005-06

D 208 Gadaug Gadaug Tara Devi Shimla 10 Ha. N310 06.579’ E077

0 07.547' 6339 Ft. Entry Point

557. Afforestation 2005-06

GCL Nalhayal Tall Tara Devi Shimla 4 Ha. N31007.294’ E077

007.715’ 6040 Ft. Entry Point

558. Afforestation 2005-06

UPF Bathmana Dhalaya Dhami Shimla 3 Ha. N31010.903’ E077

003.101’ 5152 Ft. Entry Point

Afforestation 2005-06

U-6 Dhagogra Sandoa Bhajji Shimla 5 Ha. N31015.160’ E077

019.596’ 6102 Ft. Entry Point

559. Afforestation 2005-06

U-48 Beru Khatnol Bhajji Shimla 5 Ha. N31011’02.1” E077

015’07.8” 5635 Ft. Entry Point

560. Afforestation 2005-06

UPF Bohli Dhalaya Dhami Shimla 4 Ha. N310 10.705’ E077

0 03.571’ 5103 Ft. Entry Point

561. Afforestation 2005-06

Bainsh Bakhrail Okharoo Dhami Shimla 4 Ha. N 310 12.712’ E077

0 01.407’ 3668 Ft. Entry Point

562. Afforestation 2005-06

Panjaily Nerty Okharoo Dhami Shimla 5-Ha. N310 12.731’ E077

0 01.330’ 3612 Ft. Entry Point

563. Afforestation 2005-06

U P F Okhroo Madeya

Okharoo Dhami Shimla 3 Ha. N310 12.349’ E077

0 00.589’ 3508 Ft. Entry Point

564. Afforestation 2005-06

U P F Dargot Salaun Dhami Shimla 7 Ha. N310 10.995’ E077

0 04.825’ 5245 Ft. Center

Point

565. Afforestation 2005-06

U F Sharog Bhajol Bhajji Shimla 10 Ha. N31012.586’ E077

006.959’ 3616 Ft. Entry point

566. Afforestation 2005-06

UPF Ganeog Ganeog Dhami Shimla 5 Ha. N31010.367' E77

0 05.284' 5813 Ft. Entry Point

567. Afforestation 2005-06

U-25 Kadharghat

Kandharghat Bhajji Shimla 15 Ha. N31013’07.1” E077

011’44.5” 4866 Ft. Entry point

Page 45: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xlii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

568. Afforestation 2005-06

DPF Hiri Ki Beshak

Halog Dhami Shimla 6 Ha. N310 10.157’ E077

0 02.238’ 5043 Ft. Entry Point

569. Afforestation 2005-06

DPF Bara Pandish

Sanog Dhami Shimla 4 Ha. N310 09.585’ E077

0 06.416’ 5435 Ft. Center

Point

570. Afforestation 2005-06

UPF Deola Sanog Dhami Shimla 4 Ha. N310 09.636’ E077

0 06.203’ 4962 Ft. Entry

Point

571. Afforestation 2005-06

UPF Saden Badoo Dhami Shimla 4 Ha. N310 09.464’ E077

0 02.564’ 5305 Ft. Entry

Point

572. Afforestation 2005-06

UPF Badoo Badoo Dhami Shimla 5 Ha. N310 08.918’ E077

0 04.125’ 6319 Ft. Entry Point

573. Afforestation 2005-06

DPF Bledi Ganeog Dhami Shimla 3 Ha. N310 10.569’ E077

0 05.279’ 5539 Ft. Entry Point

574. Afforestation 2005-06

GCL Neri Tall Tara Devi Shimla 5 Ha. N310 08.447’ E077

0 08.496’ 5063 Ft. Entry Point

575. Afforestation 2005-06

U-19 Grovnjaishi

Karyali Bhajji Shimla 10 Ha. N31014.485’ E077

013.344’ 4318 Ft. Entry Point

576. Afforestation 2005-06

DPF Bag Ka Nal Ghanahatti Dhami Shimla 8 Ha. N310 08.408’ E077

0 05.457’ 5672 Ft. Entry Point

577. Afforestation 2005-06

DPF Brelli Ghanahatti Dhami Shimla 8 Ha. N310 09.088’ E077

0 05.759’ 5696 Ft. Center

Point

578. Afforestation 2005-06

GCL Janol Banoti Tara Devi Shimla 5 Ha. N310 08.511’ E 077

0 07290 5854 Ft. Entry Point

579. Afforestation 2005-06

U 42 Nin Badmain Bhajji Shimla 5 Ha. N310 08.738' E077

0 15.791 5472 Ft. Entry Point

580. Pasture development(2005-06)

DPF Kaulpur Sunni Bhajji Shimla 5 Ha. N31014’47.8” E077

006’89.3” 2636 Ft. Entry point

581. Pasture Development 2005-06

R 27 Gadaug Gadaug Tara Devi Shimla 2 Ha. N310 06.327' E077

0 07.605’ 6318 Ft. Entry Point

582. Pasture Dev. 2005-06

UPF Cherain Naldehra Mashobra Shimla 5 Ha. N310 11.198 ‘ E077

0 12.016’ 5115 Ft. Entry Point

583. Pasture Development

R-27 Gadaug Gadaug Tara Devi Shimla 5 Ha. N310 06.357’ E077

0 07.725' 6217 Ft. Entry Point

Page 46: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xliii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2005-06

584. Afforestation 2006-07

DPF Sangech Ganeog Dhami Shimla 7 Ha. N310 09.295’ E077

0 05.098’ 5721 Ft. Entry Point

585. Afforestation 2006-07

GCL - Jhollo Kamyana Tara Devi Shimla 10 Ha. N310 09.259' E077

0 09.561' 5882 Ft. Entry Point

586. Afforestation 2006-07

UF Janlog Bharari Mashobra Shimla 10 Ha. N31003.553 ‘ E077

010.810’ 5525 Ft. Entry Point

587. Afforestation 2006-07

UF 155 Jagyalroo

Mashobra Mashobra Shimla 10 Ha. N31011.365’ E077

012.840 ‘ 4345 Ft. Entry Point

588. Afforestation 2006-07

UF Anu Bharari Mashobra Shimla 5 Ha. N31008.124 ‘ E077

010.893 ‘ 5906 Ft. Entry Point

589. Afforestation 2006-07

U-17 Himri Himri Bhajji Shimla 20 Ha. N31013.388’ E077

016.802’ 6563 Ft. Entry Point

590. Afforestation 2006-7

D-9 Drabla Karyali Bhajji Shimla 10 Ha. N31014.783’ E077

015.032’ 3808 Ft. Entry Point

591. Afforestation 2006-07

U- 15 Drabla Karyali Bhajji Shimla 10 Ha. N31014.699’ E077

014.039’ 4044 Ft. Entry Point

592. Afforestation 2006-07

Kainth Ki Ghati Dhalaya Dhami Shimla 3 Ha. N 310 10.891' E77

0 03.918' 4785 Ft. Entry Point

593. Afforestation 2006-07

U-12 Gadhau Himri Bhajji Shimla 10 Ha. N31011.508’ E077

016.137’ 4859 Ft. Entry Point

594. Afforestation 2006-07

U-32 Bhargan Madhorghat Bhajji Shimla 10 Ha. N31014.182’ E077

004.386’ 3873 Ft. Entry point

595. Afforestation 2006-07

U-1 Anukayalu Pandoa Bhajji Shimla 15 Ha. N31015.307’ E077

020.475’ 4744 Ft. Entry Point

596. Afforestation 2006-07

D-15 Malawan Pandoa Bhajji Shimla 15 Ha. N31014.951’ E077

020.165’ 5283 Ft. Entry Point

597. Afforestation(2006-07

U-53 Ramahan Khatnol Bhajji Shimla 10 Ha. N31010’95.2” E077

014’43.5” 4736 Ft. Entry point

598. Afforestation(2006-07

D-26 Berk Khatnol Bhajji Shimla 20 Ha. N31011’35.5” E077

015’02.0” 5858 Ft. Entry point

599. Afforestation 2006-07

U-59 Dandibag Khatnol Bhajji Shimla 15 Ha. N31010’26.3” E077

017’03.9” 6452 Ft. Entry point

600. Afforestation U-47Jajehar Kadharghat Bhajji Shimla 25 Ha. N31011.78.7” E077

013.034” 3927 Ft. Center

Page 47: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xliv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2006-07 Point

601. Afforestation 2006-07

U 22 Palag Kadharghat Bhajji Shimla 10 Ha. N31013’33.9” E077

012.49.0” 4437 Ft. Entry point

602. Afforestation 2006-07

D28 Bag Sunni Bhajji Shimla 10 Ha. N31012’59.0” E077

007’02.2” 4600 Ft. Entry point

603. Afforestation 2006-07

U-36 Mandhorghat

Basantpur Bhajji Shimla 10 Ha. N31011’49.8” E077

011’20.3” 3505 Ft. Entry point

604. Afforestation(2006-07)

U-26 Basantpur Basantpur Bhajji Shimla 10 Ha. N31013’02.6” E077

009’43.5” 3680 Ft. Entry point

605. Afforestation 2006-07

DPF 210 Girb III Gadaug Tara Devi Shimla 5 Ha. N310 07.244’ E077

0 07.047’ 6337 Ft. Entry Point

606. Afforestation 2006-07

GCL Chewla Banoti Tara Devi Shimla 6 Ha. N310 09.615’ E077

0 07.527’ 6465 Ft. Entry Point

607. Afforestation 2006-07

DPF Bhukhoo Ganeog Dhami Shimla 5 Ha. N 310 10.399’ E077

0 05.963’ 4552 Ft. Center

Point

608. Afforestation 2006-07

DPF Bara Pandish

Sanog Dhami Shimla 5 Ha. N310 09.827’ E077

0 06.606’ 5546 Ft. Center

Point

609. Afforestation 2006-07

UPF Nerog Sanog Dhami Shimla 5 Ha. N310 08.870’ E077

0 06.139’ 5199 Ft. Entry Point

610. Afforestation 2006-07

DPF Lahog Ki Ghar

Halog Dhami Shimla 3 Ha. N310 10.035’ E077

0 02.370’ 4911 Ft. Center

Point

611. Afforestation 2006-07

D-25 Kandharghat

Kandharghat Bhajji Shimla 15 Ha. N31013.309’ E077

012.006’ 4737 Ft. Entry point

612. Afforestation 2006-07

D-23 Chowki Kandharghat Bhajji Shimla 20 Ha. N31013.463’ E077

011.978’ 4806 Ft. Entry point

613. Afforestation 2006-07

Kushah Ganeog Dhami Shimla 2 Ha. N31010.409' E077

0 05.518' 5499 Ft. Entry Point

614. Afforestation 2006-07

Baledi Ganeog Dhami Shimla 3 Ha. N31010.212' E077

0 05.201' 4321 Ft. Entry Point

615. Afforestation 2006-07

Kainth Ki Ghatti Dhalaya Dhami Shimla 3 Ha. N310 10.878’ E077

0 03.913’ 4756 Ft. Entry

Point

616. Afforestation 2006-07

DPF Jhalpari Dhalaya Dhami Shimla 3 Ha. N310 11.002’ E077

0 03.865’ 4942 Ft. Center

Point

617. Afforestation UPF Kangti Dhalaya Dhami Shimla 8 Ha. N310 11.020’ E077

0 03.608’ 5394 Ft. Entry

Page 48: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xlv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2006-07 Bhima Rngi Point

618. Afforestation 2006-07

D P F Shahal Salaun Dhami Shimla 6 Ha. N310 10.925’ E077

0 04.827’ 5294 Ft. Entry

Point

619. Afforestation 2006-07

U P F Narihana Salaun Dhami Shimla 4 Ha. N310 10.154’ E077

0 03.214’ 4640 Ft. Center

Point

620. Afforestation 2006-07

U P F Ghulan Halog Dhami Shimla 2 Ha. N310 11.531’ E077

0 03.126’ 5423 Ft. Entry

Point

621. Afforestation 2006-07

U P F Baikiar Okharoo Dhami Shimla 4 Ha. N310 11.541’ E077

0 00.491’ 3769 Ft. Entry

Point

622. Afforestation 2006-07

Bag Ka Nalla Ghanahatti Dhami Shimla 1 Ha. N31008.500' E077

0 05.443' 5708 Ft. Entry Point

623. Afforestation 2006-07

Okharoo Madhya

Okharoo Dhami Shimla 11 Ha. N310 12.261' E077

0 02.019’

3933Ft. Entry Point

624. Afforestation 2006-07

U 143 Kayar Thiala Bhajji Shimla 10 Ha. N310 08.725' E077

0 15.946' 5129 Ft. Entry Point

625. Afforestation 2006-07

U 15 Drawal Karyali Bhajji Shimla 10 Ha. N310 14.698’ E077

0 14.041’ 4041 Ft. Entry Point

626. Afforestation 2006-07

D 260 Malag Bajhol Bhajji Shimla 5 Ha. N310 12.062’ E077

0 06.868’ 4843 Ft. Entry Point

627. Afforestation 2006-07

D -9 Drabla Karyali Bhajji Shimla 10 Ha. N31014.619' E077

015.145' 4036 Ft. Entry Point

628. Pasture Development 2006-07

UPF Narihana Salaun Dhami Shimla 4 Ha. N310 10.147' E077

0 3.208' 4575 Ft. Entry Point

629. Pasture Dev. 2006-07

U 594 Kotla Bajhol Bhajji Shimla 10 Ha. N310 12.104' E077

0 05.458' 3350 Ft. Entry Point

630. Pasture Development 2006-07

D-9 Drabla Karyali Bhajji Shimla 10 Ha. N31014.625’ E077

015.139’ 3940 Ft. Entry Point

631. Pasture Dev. 2006-07

U 20 Domehar Kariyali Bhajji Shimla 20 Ha. N310 13.598' E077

0 13.217' 4353 Ft. Entry Point

632.

Afforestation 2007-08

U 22 Palag Kadharghat Bhajji Shimla 12 Ha. N 31013’32.9” E077

012’476” 4430 Ft. Entry point

633. Afforestation200 U 23 Chowki Thiala Bhajji Shimla 25 Ha. N31013’38.7” E077

012’51.5” 4262 Ft. Entry point

Page 49: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xlvi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

7-08

634. Afforestation 2007-08

U 29 Reog Sunni Bhajji Shimla 10 Ha. N31013’57.0” E077

005’40.2” 3452 Ft. Entry point

635. Afforestation 2007-08

U-26 Basantpur Basantpur Bhajji Shimla 10 Ha. N31012’30.9” E077

010’45.0” 3256 Ft. Entry point

636. Afforestation 2007-08

U-50 Shalli Khatnol Bhajji Shimla 20 Ha. N31011’21.2” E077

016’47.4” 7540 Ft. Entry

point

637. Afforestation 2007-08

U-10 Malgi Sandoa Bhajji Shimla 10 Ha. N31015.456’ E077

017.280’ 3734 Ft. Entry Point

638. Afforestation 2007-08

U-6 Dharogra Sandoa Bhajji Shimla 5 Ha. N31014.284’ E077

019.570’ 5384 Ft. Entry Point

639. Afforestation 2007-08

U-8 Glah Sandoa Bhajji Shimla 10 Ha. N31013.757’ E077

018.039’ 5850 Ft. Entry Point

640. Afforestation 2007-08

U-35 Golan Madhorghat Bhajji Shimla 10 Ha. N31015.379’ E077

002.506’ 4203 Ft. Entry point

641. Afforestation 2007-08

DPF Bashadi Chalawag Bhajji Shimla 10 Ha. N31014.070’ E077

002.972’ 2800 Ft. Entry point

642. Afforestation 2007-08

U-13 Oglisuma Himri Bhajji Shimla 20 Ha. N31015.924’ E077

016.063’ 2625 Ft. Entry Point

643. Afforestation 2007-08

U-11 Bari-Bamuna

Himri Bhajji Shimla 10 Ha. N31014.660’ E077

016.528’ 3927 Ft. Entry Point

644. Afforestation 2007-08

U-14 Bharara-Drabla

Karyali Bhajji Shimla 15 Ha. N31014.713’ E077

014.039’ 4002 Ft. Entry Point

645. Afforestation 2007-08

DPF Brelli Ghanahatti Dhami Shimla 2 Ha. N310 08.397' E077

0 05.441' 5636 Ft. Entry Point

646. Afforestation 2007-08

U - 20 Domehal Karyali Bhajji Shimla 7 Ha. N31013.782' E077

0 14.113' 5913 Ft. Entry Point

647. Afforestation 2007-08

U - 27 Sunni Shakrodi

Sunni Bhajji Shimla 5 Ha. N31013.733' E077

0 07.794' 2647 Ft. Entry Point

648. Afforestation 2007-08

U - 40 Dadhoeg Sunni Bhajji Shimla 5 Ha. N31013.527' E077

0 05.299' 3945 Ft. Entry Point

649. Afforestation 2007-08

U 143 Kayar Thaiala Bhajji Shimla 10 Ha. N310 08.726' E077

0 15.956' 5100 Ft. Entry Point

650. Afforestation UF Taloh Khatnol Bhajji Shimla 10 Ha. N310 10.221' E077

0 16.546' 6800 Ft. Entry Point

Page 50: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xlvii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2007-08

651. Afforestation 2007-08

D 70 Anu Bharari Mashobra Shimla 5 Ha. N310 08.138' E077

0 10.926' 5771 Ft. Entry Point

652. Afforestation 2007-08

U 167 Jayali Dhalli Mashobra Shimla 5 Ha. E310 08.516’ E077

0 12.206’ 6169 Ft. Entry Point

653. Afforestation 2007-08

D 62 Kufri Dharti Mashobra Shimla 10 Ha. N31007.036‘ E077

014.853’ 7626 Ft. Entry Point

654. Afforestation 2007-08

D 69 Sawakar Naldehra Mashobra Shimla 5 Ha. N31011.619‘ E077

012.317’ 4353 Ft. Entry Point

655. Afforestation 2007-08

U 180 Anu Bharari Mashobra Shimla 5 Ha. N310 07.989' E077

0 10.658’ 6503 Ft. Entry Point

656. Afforestation 2007-08

R-17 Marhon Kamyana Tara Devi Shimla 10 Ha. N310 08.217’ E077

0 10.263' 6676 Ft. Entry Point

657. Afforestation 2006-07

D 214 Jhajia Banoti Tara Devi Shimla 6 Ha. N310 07.765' E077

0 05.860' 6219 Ft. Entry Point

658. Afforestation 2007-08

GCL Kajail Banoti Tara Devi Shimla 5 Ha. N310 09.107’ E077

0 07.606 4902 Ft. Entry Point

659. Afforestation 2007-08

DPF Bag Ka Nal Ghanahatti Dhami Shimla 3 Ha. N310 08.909’ E077

0 05.606’ 5107 Ft. Center

Point

660. Afforestation 2007-08

DPF Bledi Ganeog Dhami Shimla 10 Ha. N310 10.538’ E077

0 05.371’ 5489 Ft. Center

Point

661. Afforestation 2007-08

UPF Kiuroo Ganeog Dhami Shimla 2 Ha. N310 09.773’ E077

0 05.950’ 4748 Ft. Entry

Point

662. Afforestation 2007-08

DPF Sanog Sanog Dhami Shimla 5 Ha. N310 08.702’ E077

0 06.073’ 5329 Ft. Entry

Point

663. Afforestation 2007-08

DPF Brelli Ghanahatti Dhami Shimla 2 Ha. N310 08.435’ E077

0 05.426’ 5628 Ft. Center

Point

664. Afforestation 2007-08

DPF Lahog Ki Ghar

Halog Dhami Shimla 3 Ha. N310 10.042’ E077

0 02.426’ 4897 Ft. Entry

Point

665. Afforestation 2007-08

UPF Bohli Dhalaya Dhami Shimla 3 Ha. N310 10.625’ E077

0 03.697’ 4954 Ft. Entry

Point

666. Afforestation 2007-08

D P F Salaun Salaun Dhami Shimla 8 Ha. N310 10.028’ E077

0 03.673’ 5094 Ft. Entry

Point

667. Afforestation(200 R-1 Mohranal Basantpur Bhajji Shimla 10 Ha. N31013’10.5” E077

009’51.6” 3669 Ft. Entry point

Page 51: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xlviii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

7-08)

668. Afforestation 2007-08

U 14 Bhara-Drabla

Karyali Bhajji Shimla 10 Ha. N31014.572’ E077

0 14.598’ 3963 Ft. Entry Point

669. Afforestation 2007-08

D P F Halog Halog Dhami Shimla 2 Ha. N310 11.249’ E077

0 02.656’ 5177 Ft. Entry

Point

670. Pasture Development 2007-08

DPF Brelli Ghanahatti Dhami Shimla 2 Ha. N310 08.749’ E077

0 05.001’ 5139 Ft. Center

Point

671. Pasture Dev. 2007-08

U 51 Dalana Khatnol Bhajji Shimla 10 Ha. N310 10.625' E077

016.139' 6527 Ft. Entry Point

672. Pasture Development 2007-08

Bharwar Ka Dhank

Ghanahatti Dhami Shimla 5 Ha. N310 08.691' E077

0 05.160' 5027 Ft. Entry Point

673. Pasture Development 2007-08

U-14 Bhara-Drabla

Karyali Bhajji Shimla 20 Ha. N31014.705’ E077

014.023’ 4043 Ft. Entry Point

674. Pasture Development 2007-08

U-47 Jajehar Kandharghat Bhajji Shimla 15 Ha. N31012.113’ E077

012.742’ 4232 Ft. Entry point

675. Pasture Development 2007-08

U-25 Kandharghat

Kandharghat Bhajji Shimla 15 Ha. N31013.460’ E077

011.946’ 4756 Ft. Entry point

676. Pasture development 2007-08

D-7 Jander Badmain Bhajji Shimla 5 Ha. N31011’56.5” E077

009’41.9” 5693 Ft. Centre

Point

677. Pasture development(2007-08)

U-51 Dalana Khatnol Bhajji Shimla 10 Ha. N31011’00.3” E077

016’24.5” 7117 Ft. Center

Point

678. Afforestation2008-09

D-25 Kadharghat

Khatnol Bhajji Shimla 10 Ha. N31°13’15.5” E077

012’33.1

” 4504 Ft. Center

Point

679. Afforestation(2008-09)

U 29 Reog Sunni Bhajji Shimla 6 Ha. N31013’47.8” E077

005’31.1” 3513 Ft. Entry point

680. Afforestation(2008-09)

U-26 Basantpur

Basantpur Bhajji Shimla 10 Ha. N31013’13.7” E077

010’20.2” 2963 Ft. Entry point

Page 52: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. xlix

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

681. Afforestation(2008-09

R-1 Mohranal

Basantpur Bhajji Shimla 5 Ha. N31013’02-8” E077

009.43.0” 3170 Ft. Entry point

682. Afforestation 2008-09

D-26 Beru Khatnol Bhajji Shimla 25 Ha. N31011’37.8” E077

015’01.9” 5760 Ft. Entry point

683. Afforestation 2008-09

U-48 Berti Khatnol Bhajji Shimla 10 Ha. N31010.46.5” E077

013’35.8” 3500 Ft. Entry point

684. Afforestation 2008-09

U-10 Malgi Sandoa Bhajji Shimla 5 Ha. N31015.500’ E077

017.493’ 3605 Ft. Entry Point

685. Afforestation 2008-09

D-11 Mandal Pandoa Bhajji Shimla 5 Ha. N31015.563’ E077

017.992’ 3635 Ft. Entry Point

686. Afforestation 2008-09

U-25 Kadharghat

Kandharghat Bhajji Shimla 20 Ha. N31012.586’ E077

011.955’ 4347 Ft. Entry point

687. Afforestation 2008-09

U-34 Ratia Madhorghat Bhajji Shimla 10 Ha. N31015.690’ E077

002.802’ 3270 Ft. Entry point

688. Afforestation 2008-09

U-47 Jagehar Kandharghat Bhajji Shimla 20 Ha. N31012.312’ E077

012.385’ 4258 Ft. Entry point

689. Afforestation 2008-09

U F Bashat Bajhol Bhajji Shimla 2 Ha. N31011.456’ E077

006.447’ 4292 Ft. Entry point

690. Afforestation 2008-09

U F Pahal Bajhol Bhajji Shimla 5 Ha. N31012.225’ E077

006.867’ 5086 Ft. Entry point

691. Afforestation 2008-09

D- 577 Jaini Nalla

Chalawag Bhajji Shimla 5 Ha. N31014.943’ E077

001.949’ 3440 Ft. Entry point

692. Afforestation 2008-09

U-21 Khaira Pandain

Karyali Bhajji Shimla 10 Ha. N31014.650’ E077

013.155’ 4460 Ft. Entry Point

693. Afforestation 2008-09

UPF Kheel Sanog Dhami Shimla 5 Ha. N31009.765’ E77

002.899’ 5426 Ft. Entry Point

694. Afforestation 2008-09

Bag Ka Nalla Ghanahatti Dhami Shimla 3 Ha. N310

08.886' E770 05.622' 5163 Ft. Entry Point

695. Afforestation 2008-08

Dadeheog Okharoo Dhami Shimla 5 Ha. N310 12.231' E77

0 01.965' 3853 Ft. Entry Point

696. Afforestation 2008-09

D-20 Lambidhar Sandoa Bhajji Shimla 5 Ha. N 310 15.200’ E077

0 16.457’ 4640 Ft. Entry Point

697. Afforestation 2008-09

U - 41 Chatyar Badmain Bhajji Shimla 7 Ha. N310 11.797' E077

0 08.5.8' 4640 Ft. Entry Point

Page 53: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. l

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

698. Afforestation 2008-09

D 25 Kandhar ghat

Kandharghat Bhajji Shimla 10 Ha. N310 13.413’ E077

0 17.063’ 4564 Ft. Entry Point

699. Afforestation 2008-09

U 57 Bag Khatnol Bhajji Shimla 5 Ha. N3310 10.327’ E077

0 16.555’ 7000 Ft. Entry Point

700. Afforestation 2008-09

UPF 180 Anu Dharti Mashobra Shimla 3 Ha. N31°07.781' E077010.587' 6673 Ft. Entry Point

701. Afforestation 2008-09

U 31 Gharyana Sunni Bhajji Shimla 3 Ha. N31014.688' E077

0 05.959' 2165 Ft. Entry Point

702. Afforestation 2008-09

U 15 Malawan Pandoa Bhajji Shimla 10 Ha. N31015.297’ E077

0 10.457' 4781 Ft. Entry Point

703. Afforestation 2008-09

D 66 Seepur C 2 Seepur Mashobra Shimla 5 Ha. N31007.286’ E077

014.500’ 7683 Ft. Entry Point

704. Afforestation 2008-09

U 141 Koni Dharti Mashobra Shimla 10 Ha. N31006.903‘ E077

016.293’ 7298 Ft. Entry Point

705. Afforestation 2008-09

R 18 Poabo Kamyana Tara Devi Shimla 5 Ha. N310 08.589’ E077

0 09.700' 6586 Ft. Entry Point

706. Afforestation 2008-09

UPF Dadeheog Okharoo Dhami Shimla 3 Ha. N310 12.325’ E077

0 02.113’ 3621 Ft. Entry

Point

707. Afforestation 2008-09

Bainsh Okharoo Dhami Shimla 5 Ha. N310 12.601’ E077

0 01.886’ 3537 Ft. Entry

Point

708. Afforestation 2008-09

U P F Dhalla Okharoo Dhami Shimla 4 Ha. N310 12.159’ E077

0 03.570’ 4104 Ft. Entry Point

709. Afforestation 2008-09

U P F Khan ki Dhank

Halog Dhami Shimla 2 Ha. N310 11.463’ E077

0 03.387’ 5410 Ft. Entry

Point

710. Afforestation 2008-09

UPF Kiari Okharoo Dhami Shimla 3 Ha. N310 12.374’ E077

0 02.575’ 3847 Ft. Entry

Point

711. Afforestation 2008-09

U-13 Oglisuma Himri Bhajji Shimla 10 Ha. N31015.688’ E077

016.278’ 3163 Ft. Entry Point

712. Afforestation 2008-09

U-11 Bari-Bamuna

Himri Bhajji Shimla 10 Ha. N31014.856’ E077

016.612’ 3664 Ft. Entry Point

713. Pasture development 2008-09

U-45 Jandor Basantpur

Badmain Bhajji Shimla 5 Ha. N31011’52.1” E077

010’09.1” 5401 Ft. Centre

Point

714. Pasture U-24 Lunsung Kandharghat Bhajji Shimla 15 Ha. N31013.517’ E077

011.898’ 4817 Ft. Entry point

Page 54: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. li

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

Development 2008-09

715. Pasture Dev. 2008-09

U 145 Mool Bhajji

Thiala Bhajji Shimla 3 Ha. N310 08.721' E70

0 15.947' 5343 Ft. Entry Point

716. Afforestation 2009-10

U-41 Chatyar

Badmain Bhajji Shimla 5 Ha. N31011’45.3” E077

008’45.0” 4530 Ft. Entry point

717. Afforestation 2009-10

U-45 Jandar Badmain Bhajji Shimla 5 Ha. N31011’56.6” E077

009’39.1” 5665 Ft. Entry Point

718. Afforestation 2009-10

U-59 Dandibag Khatnol Bhajji Shimla 5 Ha. N31°10’22.8” E077017’07.9” 6357 Ft. Entry point

719. Afforestation 2009-10

U-49 Saroh Khatnol Bhajji Shimla 5 Ha. N31011’00.4” E077

015’15.8” 5650 Ft. Entry Point

720. Afforestation 2009-10

D-26 Beru Khatnol Bhajji Shimla 5 Ha. N31011’24.6” E077

014’51.7” 5668 Ft. Entry point

721. Afforestation 2009-10

U-53 Ramahan Sarar

Khatnol Bhajji Shimla 5 Ha. N31010’36.9” E077

013’50.8” 3612 Ft. Entry point

722. Afforestation 2009-10

D-11 Mandal Pandoa Bhajji Shimla 5 Ha. N31015.635’ E77

018.353’ 3627 Ft. Entry Point

723. Afforestation 2009-10

U-2 Aisha Pandoa Bhajji Shimla 5 Ha. N31015.134’ E077

019.605’ 6166 Ft. Entry Point

724. Afforestation 2009-10

D-21 Fulagalni Sandoa Bhajji Shimla 5 Ha. N31013.904’ E077

018.808’ 5648 Ft. Entry Point

725. Afforestation 2009-10

U-8 Glah Sandoa Bhajji Shimla 5 Ha. N31013.772’ E077

018.832’ 5802 Ft. Entry Point

726. Afforestation 2009-10

U-47 Jajehar Kandharghat Bhajji Shimla 5 Ha. N31012.511’ E077

012.129’ 4355 Ft. Entry point

727. Afforestation 2009-10

U-36 Madhorghat

Madhorghat Bhajji Shimla 5 Ha. N31014.770’ E077

003.407’ 3773 Ft. Entry point

728. Afforestation 2009-10

U 577 Jaini Nalla

Chalawag Bhajji Shimla 5 Ha. N31014.641’ E077

001.949’ 3000 Ft. Entry point

729. Afforestation 2009-10

U-583 Sohal Chalawag Bhajji Shimla 5 Ha. N31013.809’ E077

002.425’ 2997 Ft. Entry point

730. Afforestation 2009-10

U-17 Himri Himri Bhajji Shimla 5 Ha. N31013.882’ E077

016.587’ 5502 Ft. Entry Point

Page 55: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

731. Afforestation 2009-10

U-11 Bagri Banuna

Himri Bhajji Shimla 5 Ha. N31013.682’ E077

016.489’ 5462 Ft. Entry Point

732. Afforestation 2009-10

U-14 Bhara-Drabla

Karyali Bhajji Shimla 5 Ha. N31014.956’ E077

099.035’ 3835 Ft. Entry Point

733. Afforestation 2009-10

U-21 Kaira Pandain

Karyali Bhajji Shimla 5 Ha. N31014.561’ E077

013.161’ 4475 Ft. Entry Point

734. Afforestation2009-10

DPF Bijo Ka Dhalla

Ganeog Dhami Shimla 3 Ha. N310

09.791'

E770 05.234' 5716 Ft. Entry Point

735. Afforestation 2009-10

Bathmana Dhalaya Dhami Shimla 3 Ha. N310 10.485' E077

0 03.587' 5382 Ft. Entry Point

736. Afforestation 2009-10

DPF Salaun Salaun Dhami Shimla 5 Ha. N310 09.877' E077

0 03.276' 5556 Ft. Entry Point

737. Afforestation 2009-10

Pani Rana Okharoo Dhami Shimla 10 Ha. N310 12.531’ E077

002.600’ 3545 Ft. Entry Point

738. Afforestation 2009-10

U - 20 Domehal Karyali Bhajji Shimla 5 Ha. N31013.382' E077

0 13.915' 6656Ft. Entry Point

739. Afforestation 2009-10

U - 27 Sunni Shakrodi

Sunni Bhajji Shimla 4 Ha. N31013.624' E077

0 08.067' 2350 Ft. Entry Point

740. Afforestation 2009-10

U 144 Deothi Thiala Bhajji Shimla 5 Ha. N310 085.685' E077

0 15.909' 4279 Ft. Entry Point

741. Afforestation 2009-10

U 10 Malgi Pandoa Bhajji Shimla 5 Ha. N310 15.114' E077

0 17.998’ 3514 Ft. Entry Point

742. Afforestation 2009-10

O 14 Anukyalu Pandoa Bhajji Shimla 5 Ha. N310 15.297' E077

0 20.457' 4781 Ft. Entry Point

743. Afforestation 2009-10

R 17 Marhon Kamyana Tara Devi Shimla 10 Ha. N310 08.335' E077

0 09.975' 6597 Ft. Entry Point

744. Afforestation 2009-10

UPF Gharog Ghanahatti Dhami Shimla 3 Ha. N310 09.387’ E077

0 04.855’ 6177 Ft. Entry Point

745. Afforestation 2009-10

UPF Bledi Ganeog Dhami Shimla 3 Ha. N310 10.595’ E077

0 05.475’ 5516 Ft. Entry

Point

746. Afforestation 2009-10

DPF Sanog Sanog Dhami Shimla 4 Ha. N310 08.714’ E077

0 05.989’ 5047 Ft. Entry

Point

747. Afforestation 2009-10

UPF Raukichauri

Sanog Dhami Shimla 5 Ha. N310 08.553’ E077

0 06.257’ 5543 Ft. Entry

Point

Page 56: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. liii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

(Prot)

748. Afforestation 2009-10

DPF Lahog Ki Ghar

Halog Dhami Shimla 3 Ha. N310 10.226’ E077

0 02.578’ 4849 Ft. Entry

Point

749. Afforestation 2009-10

UPF Bathmana Dhalaya Dhami Shimla 3 Ha. N310 10.993’ E077

0 03.277’ 5143 Ft. Entry

Point

750. Afforestation 2009-10

UPF Toon Okharoo Dhami Shimla 5 Ha. N310 12.021’ E077

0 02.451’ 3871 Ft. Entry

Point

751. Afforestation 2009-10

UPF Binu Okharoo Dhami Shimla 3 Ha. N310 12.006’ E077

0 01.826’ 4103 Ft. Entry

Point

752. Afforestation 2009-10

DPF Salaun Salaun Dhami Shimla 5 Ha. N310 09.831’ E077

0 03.393’ 5684 Ft. Entry

Point

753. Pasture Development 2009-10

Binu Okharoo Dhami Shimla 3 Ha. N310 12.007' E77

0 01.826' 4092 Ft. Entry Point

754. Afforestation 2010-11

U-28 Bag Sunni Bhajji Shimla 4 Ha. N31012’55.1” E077

006’55.1” 4205 Ft. Entry point

755. Afforestation(2010-11

U 29 Reog Sunni Bhajji Shimla 4 Ha. N31013’54.3” E077

005’18.8” 3580 Ft. Entry point

756. Afforestation 2010-11

D-7 Jander Badmain Bhajji Shimla 5 Ha. N31011’56.6” E077

009’41.9” 5696 Ft. Entry Point

757. Afforestation 2010-11

U 47- Jajehar Badmain Bhajji Shimla 10 Ha. N31011’068” E077

013’966” 4211 Ft. Entry point

758. Afforestation 2010-11

U-52 Banijalag Khatnol Bhajji Shimla 5 Ha. N31010’29.9” E077

015’52.3” 6325 Ft. Entry Point

759. Afforestation 2010-11

U-10 Malgi Himri Bhajji Shimla 3 Ha. N31015.583’ E077

016.677’ 4920 Ft. Entry Point

760. Afforestation 2010-11

U-10 Malgi Sandoa Bhajji Shimla 5 Ha. N31015.120’ E077

017.971’ 3491 Ft. Entry Point

761. Afforestation 2010-11

U-6 Dhagogra Sandoa Bhajji Shimla 4 Ha. N31015.382’ E077

018.069’ 3595 Ft. Entry Point

762. Afforestation 2010-11

U-3 Bag-Sainj Pandoa Bhajji Shimla 5 Ha. N31016.320’ E077

019.980’ 3369 Ft. Entry Point

763. Afforestation 2010-11

U-3 Bag-Sainj Pandoa Bhajji Shimla 15 Ha. N31016.309’ E077

020.092’ 3506 Ft. Entry Point

Page 57: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. liv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

764. Afforestation 2010-11

U-35 Golan Madhorghat Bhajji Shimla 5 Ha. N31015.086’ E077

003.171’ 4093 Ft. Entry point

765. Afforestation 2010-11

U-35 Madhorghat

Madhorghat Bhajji Shimla 5 Ha. N31014.794’ E077

003.171’ 3698 Ft. Entry point

766. Afforestation 2010-11

U F Bajhal Bajhol Bhajji Shimla 4 Ha. N31011.631’ E077

006.141’ 3927 Ft. Entry point

767. Afforestation 2010-11

U-258 Basharu Chalawag Bhajji Shimla 5 Ha. N31014.195’ E077

002.541’ 3901 Ft. Entry point

768. Afforestation 2010-11

U-11 Bari Bamuna

Himri Bhajji Shimla 10 Ha. N31011.411’ E077

016.437’ 4754 Ft. Entry Point

769. Afforestation 2010-11

U-14 Bharara Drabla

Karyali Bhajji Shimla 10 Ha. N31014.641’ E077

014.446’ 3955Ft. Entry Point

770. Afforestation 2010-11

Makri Okhru Dhami Shimla 2 Ha. N310 11.748' E077

001.472' 4446 Ft. Entry Point

771. Afforestation 2010-11

U – 3 Bag Sainj Pandoa Bhajji Shimla 15 Ha. N31016.365' E077

0 20.116' 3318 Ft. Entry Point

772. Afforestation 2010-11

U - 14 Bhara Drabla

Karyali Bhajji Shimla 10 Ha. N31014.655' E077

0 014.985’ 3959 Ft. Entry Point

773. Afforestation 2010-11

D P F Daban Salaun Dhami Shimla 5 Ha. N310 10.468’ E077

0 04.753’ 4647 Ft. Entry

Point

774. Afforestation (2010-11)

D-4Bag

Sunni Bhajji Shimla 4 Ha. N31013’02.9” E077

007’01.3” 4595 Ft. Entry point

Page 58: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lv

Division – Suket Range - Kangoo

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

775. Afforestation 2004-05

Patta Batwara Kangoo Suket 5 Ha. N 31022.908’ E076

055.327’ 3261 Ft Bottom

Entry Point

776. Afforestation 2004-05

OD 272 Kanagol Behli Kangoo Suket 6-Ha. N 310 16.790’ E077

002.699’ 4571 Ft Top Entry

Point

777. Afforestation 2004-05

O D 300 Chouri Badoo Kangoo Suket 6 Ha. N 310 22.194’ E076

058.231’ 6616 Ft Top Entry

Point

778. Afforestation 2004-05

N D 276 Bragta Hara Boi Kangoo Suket 6 Ha. N 310 17.855’ E077

001.245’ 3646 Ft Top Entry

Point

779. Afforestation 2005-06

Patta Batwara Kangoo Suket 15 Ha. N 31022.937’ E076

055.565’ 4205 Ft Top Entry

Point

780. Afforestation 2005-06

Pajrana Harpoi Kangoo Suket 10 -Ha. N 310 21.535’ E076

0 59.365’ 5786 Ft Top Entry

Point

781. Afforestation 2005-06

N D 275 Behli Behli Kangoo Suket 10-Ha. N 310 17.533’ E077

0 02.345’ 4692 Ft Top Entry

Point

782. Afforestation 2005-06

Chouri Badhu Kangoo Suket 10- Ha. N 310 22.166’ E076

0 58.210’ 6610 Ft Top Entry

Point

783. Afforestation 2005-06

N D 276 Bragta Har Boi Kangoo Suket 10 Ha. N 310 17.721’ E077

001.854’ 4511 Ft Center Point

784. Afforestation 2005-06

N D 280 Tahli Har Boi Kangoo Suket 10 Ha. N 31018.084’ E077

000.423’ 3609 Ft Top Entry

Point

785. Afforestation 2005-06

N D 287 Hara Har Boi Kangoo Suket 15 Ha. N 31018.544’ E077

022.862’ 3875 Ft Center Point

786. Afforestation (2005-06)

Manjheli Gehru Kangoo Suket 10 Ha. N31022.758’ E076°56.931’ 4219 Ft Side entry

point

787. Afforestation (2005-06)

Jarandhar Gehru Kangoo Suket 25 Ha. N31022.744’ E076°57.145’ 4444 Ft Side entry

point

788. Afforestation (2005-06)

Prali Gehru Kangoo Suket 10 Ha. N31023.476’ E076°57.186’ 6799 Ft Middle side

entry point

789. Afforestation 2005-06

Kayan Dhawal Kangoo Suket 10 Ha. N 31022.668’ E076

052.402’ 2715 Ft Top entry

Point

Page 59: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lvi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

790. Afforestation 2005-06

Ahen Sunali II Dhawal Kangoo Suket 10 Ha. N 31022.059’ E076

052.751’ 2986 Ft Top Entry

Point

791. Afforestation 2005-06

Dhawal Dhawal Kangoo Suket 15 Ha. N 310 24.679’ E 76

0 52.788’ 1847 Ft Center Point

792. Pasture Development 2005-06

Ahen Sunali Dhawal Kangoo Suket 5 Ha. N 31022.272’ E076

052.639’ 3008 Ft Top Entry

Point

793. Pasture Development 2005-06

N D 278 Sojha Behli Kangoo Suket 12-Ha. N 310 17.620’ E077

002.543’ 4318 Ft Top Entry

Point

794. Pasture Development 2005-06

Ratta-II Batwara Kangoo Suket 10 Ha. N 31023.047’ E076

055.132’ 4228 Ft Bottom

Entry Point

795. Afforestation 2006-07

ND 274 Kator Behli Kangoo Suket 8-Ha. N 31017.087’ E077

002.769’ 4831 Ft Center Point

796. Afforestation 2006-07

N D 298 Neri Ropra

Badoo Kangoo Suket 10 Ha. N 31020.990’ E076

057.108’ 4216 Ft Top Entry

Point

797. Afforestation 2006-07

Panjolth Batwara Kangoo Suket 8 Ha. N 31023.041’ E076

054.630’ 3540 Ft Top Entry

Point

798. Afforestation (2006-07)

Kathla Gehru Kangoo Suket 16 Ha. N31022.77.2’ E076°57.13.3’ 4452 Ft Side entry

point

799. Afforestation (2006-07)

Devidhar Gehru Kangoo Suket 10 Ha. N31023.573’ E076°56.483’ 7125 Ft Side entry

point

800. Afforestation 2006-07

O D 300 Chouri Badoo Kangoo Suket 6 Ha. N 310 22.141’ E076

058.224’ 6569 Ft Top Entry

Point

801. Afforestation 2006-07

Ahen Sunali II Dhawal Kangoo Suket 10 Ha. N 31021.863’ E076

052.832’ 3121 Ft Below entry

Point

802. Afforestation 2006-07

273 Bhallam Behli Kangoo Suket 8-Ha. N 310 17.060’ E077

0 03.738’ 2907 Ft Entry Point

803. Afforestation 2006-07

N D 286 Hara (P) Har Boi Kangoo Suket 5 Ha. N 310 18.769’ E077

0 55.518’ 4074 Ft Entry Point

804. Afforestation (2007-08)

Gohloo Gehru Kangoo Suket 10 Ha. N31022.642’ E076’52.782’ 3870 Ft Bottom side

Entry point

805. Afforestation Gehroodhar Gehru Kangoo Suket 8 Ha. N31023.534’ E076’56.877’ 6790 Ft Bottom

Page 60: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lvii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

(2007-08) entry point

806. Afforestation 200708

Ahen Sunali Dhawal Kangoo Suket 15 Ha. N 31021.602’ E076

032.840’ 2969 Ft Top Entry

Point

807. Afforestation 2007-08

Ghawol Dhawal Kangoo Suket 10 Ha. N 31021.775’ E076

052.793’ 366 Ft Top Entry

Point

808. Afforestation 2007-08

N D 273 Bhallan Behli Kangoo Suket 2-Ha. N 31017.501’ E077

0 03.496’ 2945 Ft Entry Point

809. Afforestation 2007-08

O D 272 Karagal Behli Kangoo Suket 18-Ha. N 31016.348’ E077

0 03.023’ 2726 Ft Entry Point

810. Afforestation 2007-08

N D 285 Jallah Hara Boi Kangoo Suket 5- Ha. N 31019.083’ E076

0 58.327’ 2321 Ft Top Entry

Point

811. Afforestation 2007-08

N D 283 Bartha Hara Boi Kangoo Suket 5 Ha. N 31019.780’ E076

0 57.786’ 2666 Ft B. Entry

Point

812. Afforestation 2007-08

N D Chouri Hara Boi Kangoo Suket 5- Ha. N 310 18.856’ E077

0 14.237’ 4649 Ft Top Entry

Point

813. Afforestation 2007-08

N D 288 Chouri Har Boi Kangoo Suket 3 -Ha. N 310 18.728’ E077

0 13.418’ 4510 Ft Top Entry

Point

814. Afforestation 2007-08

N D 280 Tahli Har Boi Kangoo Suket 5 Ha. N 310 18.227’ E077

0 00.683’ 3737 Ft Center Point

815. Afforestation 2007-08

N D 296 Cholun Badoo Kangoo Suket 10 Ha. N 310 20.936’ E076

0 57.108’ 4185 Ft Entry Point

816. Afforestation 2007-08

N D 298 Neri Ropra

Badoo Kangoo Suket 10 Ha. N 310 20.819’ E076

0 57.033’ 3734 Ft Center Point

817. Afforestation 2007-08

N D 290 Deauli Badoo Kangoo Suket 8 Ha. N 310 21.828’ E076

0 59.630’ 5557 Ft Entry Point

818. Afforestation 2007-08

N D 291 Deauli Badoo Kangoo Suket 10 Ha. N 310 21.662’ E076

0 59.546’ 6111 Ft Top Entry

Point

819. Afforestation 2007-08

O D 300 Chouri Badoo Kangoo Suket 8 Ha. N 310 21.899’ E076

0 59.527’ 5321 Ft Entry Point

820. Afforestation 2007-08

O D 300 Chouri Badoo Kangoo Suket 10 Ha. N 310 22.168’ E076

0 58.128’ 6569 Ft Center point

821. Afforestation 2007-08

O D 300 Chouri Badoo Kangoo Suket 10 Ha. N 310 22.168’ E076

0 58.128’ 6586 Ft Center point

822. Afforestation Dorhnadhar Batwara Kangoo Suket 10 Ha. N 31023.183’ E076

054.981’ 4276 Ft Center Point

Page 61: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lviii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2007-08

823. Afforestation 2007-08

Rakiunraa Gehra Batwara Kangoo Suket 12 Ha. N 31023.209’ E076

055.165’ 4805 Ft Center Point

824. Afforestation 2007-08

Salog Batwara Kangoo Suket 10 Ha. N 31022.807’ E076

054.062’ 4002 Ft Top Entry

Point

825. Afforestation 2007-08

Jartu Batwara Kangoo Suket 10 Ha. N 31022.696’ E076

053.872’ 4669 Ft Top Entry

Point

826. Afforestation 2007-08

Kehloo Batwara Kangoo Suket 5 Ha. N 31023.061’ E076

055.583’ 4575 Ft Center Point

827. Afforestation 2007-08

Devidhar Gairu Kangoo Suket 10 Ha. N 310 23.511’ E 76

0 56.809’ 6872 Ft Center Point

828. Pasture Development (2007-08)

Kathla Gehru Kangoo Suket 10 Ha. N31022.886’ E076’57.048’ 4571 Ft Bottom

entry point

829. Pasture Development(2007-08)

Salogdhar Gehru Kangoo Suket 5 Ha. N31023.180’ E076’57.668’ 6617 Ft Top entry

point

830. Pasture Development 2007-08

N D 274 Kator Dalol

Behli Kangoo Suket 7.5-Ha. N 310 17.139’ E077

0 02.775’ 4764 Ft Top Entry

Point

831. Pasture Development 2007-08

Sufri Ka tat Dhawal Kangoo Suket 15 Ha. N 31022.108’ E076

053.031’ 3462 Ft Below Entry

Point

832. Down Steam Teatment 2007-08

Padhana Dhawal Kangoo Suket 7 Ha. N 31023.759’ E076

053.022’ 1948 Ft Top Entry

Point

833. Down Steam Teatment 2007-08

Padhana Dhawal Kangoo Suket 13 Ha. N 31024.517’ E076

052.895’ 2200 Ft Center point

834. Afforestation 2008-09

N D 281 Khalind Har Boi Kangoo Suket 20 Ha. N 310 18.867’ E077

0 00.353’ 4724 Ft Top Entry

Point

835. Afforestation 2008-09

Jartu Batwara Kangoo Suket 9 Ha. N 31022.464’ E076

054.341’ 2976 Ft Top Entry

Point

836. Afforestation N D 282 Thung Hara Boi Kangoo Suket 20 Ha. N 310 19.356’ E076

0 59.256’ 3013 Ft B. Entry

Page 62: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lix

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2008-09 Dhar Point

837. Afforestation 2008-09

N D 277 Morid Har Boi Kangoo Suket 25 Ha. N 310 17.160’ E077

001.713’ 3623 Ft Top Entry

Point

838. Afforestation 2008-09

O D 272 Karagal Behli Kangoo Suket 16-Ha. N 310 16.121’ E077

003.401’ 2553 Ft Entry Point

839. Afforestation 2008-09

O D 300 Chouri Badoo Kangoo Suket 10 Ha. N 310 22.295’ E076

057.849’ 6265 Ft Entry point

840. Afforestation 2008-09

N D 291 Deauli Badoo Kangoo Suket 10 Ha. N 310 21.194’ E076

059.654’ 6652 Ft Top Entry

Point

841. Afforestation 2008-09

N D 296 Cholun Badoo Kangoo Suket 15 Ha. N 310 21.117’ E076

057.904’ 4677 Ft Entry Point

842. Afforestation 2008-09

N D 280 Tahli Har Boi Kangoo Suket 10 Ha. N 310 18.437’ E077

000.013’ 3808 Ft Entry Point

843. Afforestation 2008-09`

Patta Batwara Kangoo Suket 25 Ha. N 31022.818’ E076

055.558’ 3918 Ft Center Point

844. Afforestation 2008-09

Ahen Sunali Dhawal Kangoo Suket 22 Ha. N 31021.697’ E076

052.873’ 3076 Ft Center Point

845. Afforestation 2008-09

Ahen Sunali Dhawal Kangoo Suket 10 Ha. N 31022.343’ E076

052.554’ 2975 Ft Center Point

846. Afforestation (2008-09)

Prali - II* Gehru Kangoo Suket 5 Ha. N31

033.19.3’ E076’57.42.6’ 6094 Ft Side entry

point

847. Afforestation 2008-09

Ahen Sunali Dhwal Kangoo Suket 15 Ha. N 310 22.341’ E 76

0 53.214’ 3575 Ft Center Point

848. Afforestation 2008-09

Jartu (16) Batwara Kangoo Suket 16 Ha. N 310 22.309’ E 76

0 54.429’ 3163 Ft Center Point

849. Pasture Development 2008-09

Pralidhar Gelrou Kangoo Suket 5 Ha. N 31023.402’ E076

057.289’ 6518 Ft Bottom

Entry Point

850. Pasture Development 2008-09

O D 300 Chouri Badoo Kangoo Suket 15 Ha. N 31021.999’ E076

0 58.559’ 5887 Ft Entry point

851. Pasture Cront Batwara Kangoo Suket 5 Ha. N 31023.014’ E076

055.100’ 4000 Ft Top Entry

* Prali-II not in list but is in CAT Plan

Page 63: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lx

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

Development 2008-09

Point

852. Afforestation 2009-10

N D 298 Neri Ropra

Badoo Kangoo Suket 10 Ha. N 31020.521’ E076

057.102’ 3113 Ft Center Point

853. Afforestation 2009-10

N D 275 Bindllo Behli Kangoo Suket 9-Ha. N 31016.879’ E077

001.905’ 3159 Ft Top Entry

Point

854. Afforestation 2009-10

Jartu Batwara Kangoo Suket 9 Ha. N 31022.464’ E076

054.341’ 2976 Ft Top Entry

Point

855. Afforestation 2009-10

Ahon Sunali Dhal Dhawal Kangoo Suket 15 Ha. N 31022.108’ E076

053.031’ 3462 Ft Below Entry

Point

856. Afforestation 2009-10

Jartu 25 Batwara Kangoo Suket 25 Ha. N 31022.797’ E 76

054 167’ 3331 Ft Center Point

857. Pasture Development 2009-10

Chouri Badhu Kangu Suket 17.5 Ha. N 310 26’26.4” E 77

0 04’26.3” 6849 Ft Center Point

858. Pasture Development 2009-10

Jartu Batwara Kangoo Suket 10 Ha. N 310 23.023’ E 76

0 53.969’ 3998 Ft Center Point

859. Afforestation 2010-11

Jartu Batwara Kangoo Suket 12 Ha. N 31022.144’ E 76

054.592’ 2897 Ft Center Point

860. Afforestation 2010-11

N D 294 Chauri Badoo Kangoo Suket 17.5 Ha.

N 31021.569’ E076

059.581’ 4068 Ft Entry Point

861. Afforestation 2004-05

Kathiuni Kathiuni Jhungi Suket 10- Ha. N 31026’01.5” E077

03’47.7” 6745 Ft Center Point

862. Afforestation 2004-05

Manjhaki Jaral Jhungi Suket 5- Ha. N 31026’59.0” E077

004’01.7” 8591 Ft Top Entry

point

863. Afforestation 2004-05

Trechdi Kinder Jhungi Suket 10 Ha. N 310 18’10.5” E 077

0 07’57.3” 4534 Ft Center Point

864. Pasture Development 2004-05

Heg Dhawar Jhungi Suket 7 Ha. N 31026’38.9” E077

006’47.1” 8795 Ft Center Point

865. Pasture Development 2004-05

Heg Dhawar Jhungi Suket 10- Ha. N 31026’35.2” E077

006’42.3” 8570 Ft Botom Entry

Point

Page 64: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

866. Pasture Development(2004-05)

Galtoo Barmig Jhungi Suket 10 Ha. N31027.459’ E077’05.536’ 9003 Ft Center point

867. Afforestation(2005-06)

Kharyana Nehri Jhungi Suket 7 Ha. N31023.339’ E077’02.595’ 5270 Ft Top entry

point

868. Afforestation 2005-06

Chehar Plantation Site

Nihri Jhungi Suket 5 Ha. N 310 23.498” E 077

0 02.047’ 6217 Ft Center Point

869. Afforestation 2005-06

Ranghol –II Dhawar Jhungi Suket 5 Ha. N 31026’90.2” E077

006’30.4” 7693 Ft Top entry

point

870. Afforestation(2005-06)

Haluoo Marhara Jhungi Suket 5 Ha. N31022.386’ E077’02.408’ 5960 Ft Center point

871. Afforestation(2005-06)

Marhara Marhara Jhungi Suket 5 Ha. N31022.507’ E077’01.318’ 6482 Ft Center point

872. Afforestation 2005-06

N.D. 264. Chand

Jaral Jhungi Suket 5- Ha. N 31022’24.3” E077

002’34.7” 4860 Ft Botom Entry

point

873. Afforestation(2005-06)

OD–251 Shivshankar

Jhungi Jhungi Suket 10 Ha. N31025.277’ E077’05.425’ 6262 Ft Center point

874. Afforestation(2005-06)

Khoba Jhungi Jhungi Suket 5 Ha. N31024.582’ E077’06.096’ 6379 Ft Center point

875. Afforestation 2005-06

Kathiuni Kathiuni Jhungi Suket 7- Ha. N 31025’20.4” E077

03’40.4” 6428 Ft Center Point

876. Afforestation(2005-06)

Kathala Balag Jhungi Suket 8 Ha. N31022.24.6’ E076°59.20.3’ 6595 Ft Entry point

877. Afforestation 2005-06

Daint–C-2-b Galankhar Jhungi Suket 5- Ha. N 31025’47.3” E077

005’03.2” 7302 Ft Center Point

878. Afforestation 2005-06

Daint–C-1-b Galankhar Jhungi Suket 5- Ha. N 31025’49.9” E077

005’00.5” 7251 Ft Top Entry

Point

879. Afforestation 2005-06

Manjhaki –C-1-B Jaral Jhungi Suket 5- Ha. N 31027’00.7” E077

004’01.5” 8647 Ft Botom Entry

point

880. Afforestation(2005-06)

Kamrah Nehri Jhungi Suket 3 Ha. N31024.30.3’ E077°02.043’ 7400 Ft Center point

881. Afforestation(2005-06)

Kanon Kanon Jhungi Suket 10 Ha. N31024.35.0’ E077°01.403’ 7780 Ft Top entry

point

Page 65: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

882. Afforestation(2005-06)

Dogri Bandli Jhungi Suket 5 Ha. N31021.036’ E077°01.263’ 6503 Ft Top entry

point

883. Afforestation(2005-06)

Dogri Bandli Jhungi Suket 7 Ha. N31020.592’ E077°01.245’ 6336 Ft Center point

884. Afforestation(2005-06)

Dogri* Bandli Jhungi Suket 6 Ha. N31

020.588’ E077°01.232’ 6240 Ft Entry point

885. Afforestation(2005-06)

Narehli Kinder Jhungi Suket 10 Ha. N31018.386’ E077°02.497’ 3448 Ft Center Point

886. Afforestation(2005-06)

Narehli Kinder Jhungi Suket 5 Ha. N31018.415’ E077°02.564’ 3562 Ft Center Point

887. Afforestation(2005-06)

Supadhar Trechh Jhungi Suket 10 Ha. N31021.484’ E077°02.544’ 4305 Ft Top entry

point

888. Afforestation(2005-06)

Kathala Balag Jhungi Suket 5 Ha. N31022.309’ E076°59.237’ 7015 Ft Top entry

point

889. Pasture Development(2005-06)

Plundli Trechh Jhungi Suket 5 Ha. N31022.387’ E077°00.138’ 7734 Ft Center Point

890. Pasture Development 2005-06

Heg Dhawar Jhungi Suket 10- Ha. N 31026’43.1” E077

006’51.4” 8970 Ft Center Point

891. Afforestation 2006-07

Kathla Balag Jungi Suket 10 Ha. N 31022’40.7’’ E 076

0 59’42.7” 7430 Ft Center Point

892. Afforestation 2006-07

Trechdi Kinder Jhungi Suket 10 Ha. N 310 18’52.5” E 77

0 01’41.5” 5146 Ft Center Point

893. Afforestation 2006-07

Chanadbahan Chanadbahan

Jhungi Suket 5- Ha. N 31023’53.2” E077

005’08.6” 6728 Ft Top Entry

Point

894. Afforestation(2006-07)

Dogri Bandli Jhungi Suket 20 Ha. N31020.596’ E077’01.081’ 6041 Ft Entry point

895. Afforestation 2006-07

Ranghol Dhawar Jhungi Suket 5 Ha. N 31026’13.0” E077

006’24.4” 7255 Ft From Center

896. Afforestation 2006-07

Ranghol Dhawar Jhungi Suket 5 Ha. N 31026’26.7” E077

006’39.4” 8337 Ft Top entry

point

* Dogri (2005-06) 6 ha. was not in list but is in CAT Plan.

Page 66: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxiii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

897. Afforestation 2006-07

Kathiuni Kathiuni Jhungi Suket 5- Ha. N 31025’35.7” E077

003’39.0” 6642. Ft Top Entry

Point

898. Afforestation(2006-07)

Kamrah Nehri Jhungi Suket 10 Ha. N31024’49.4” E077°02’57.3” 7380 Ft Center point

899. Afforestation(2006-07)

Narehli Kinder Jhungi Suket 10 Ha. N31018’46.7” E077°02’57.5” 3325 Ft Center Point

900. Afforestation(2006-07)

Narehli Kinder Jhungi Suket 10 Ha. N31018.512’ E077°03.030’ 3102 Ft Center Point

901. Afforestation(2006-07)

Narehli Kinder Jhungi Suket 10 Ha. N31019.016’ E077°02.545’ 3150 Ft Bottom

entry point

902. Afforestation 2006-07

Manjhaki Jaral Jhungi Suket 10- Ha. N 31026’343” E077

004’088” 7575 Ft Top Entry

point

903. Afforestation(2006-07)

Trechh Trechh Jhungi Suket 5 Ha. N31021.484’ E077’01.207’ 7001 Ft Top entry

point

904. Afforestation 2006-07

Shi Vshankar Junghi Jungi Suket 5 Ha. N 31024’35.4’’ E 076°52’32.4” 1820 Ft Center Point

905. Afforestation(2007-08)

Balag Balag Jhungi Suket 5 Ha. N31022.261’ E076°59.203’ 6763 Ft Top entry

point

906. Afforestation(2007-08)

Tandidhar Trechh Jhungi Suket 5 Ha. N31021.132’ E077°02.389’ 4831 Ft Top entry

point

907. Afforestation(2007-08)

Marhara Marhara Jhungi Suket 10 Ha. N31023.173’ E077°01.587’ 6690 Ft Top entry

point

908. Afforestation(2007-08)

Kinder Kinder Jhungi Suket 10 Ha. N31019.052’ E077°02.316’ 4301 Ft Center Point

909. Afforestation(2007-08)

Kinder Kinder Jhungi Suket 7 Ha. N31019.074’ E077°02.307’ 4739 Ft Center Point

910. Afforestation 2007-08

Kathiuni Kathiuni Jhungi Suket 5- Ha. N 31025’29.5” E077

003’33.4” 6619 Ft Center Point

911. Afforestation(2007-08)

Bah Nehri Jhungi Suket 10 Ha. N31024.186’ E077°02.573’ 6920 Ft Center point

912. Afforestation 2007-08

Galankhar Galankhar Jhungi Suket 10- Ha. N 31024’49.7” E077

004’23.0” 6320 Ft Center Point

913. Afforestation 2007-08

Manjhaki Jaral Jhungi Suket 10- Ha. N 31026’34.8” E077

004’09.2” 7589 Ft Top Entry

point

Page 67: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxiv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

914. Pasture Development 2007-08

Manjhaki Jaral Jhungi Suket 15- Ha. N 31026’55.5” E077

004’02.7” 8421 Ft Top Entry

point

915. Pasture Development 2007-08

Heg Dhawar Jhungi Suket 10- Ha. N 31026’45.4” E077

006’48.6” 9140 Ft Center Point

916. Pasture Development 2007-08

Manjhaki Jaral Jhungi Suket 5- Ha. N 31027’01.6” E077

004’02.1” 8691 Ft Top Entry

point

917. Afforestation(2008-09)

Kamrah Nehri Jhungi Suket 10 Ha. N31024.588’ E077°02.458’ 7848 Ft Top entry

point

918. Afforestation(2008-09)

Gadachh Bandli Jhungi Suket 15 Ha. N31021.176’ E077°01.148’ 6462 Ft Bottom

entry point

919. Afforestation 2008-09

Ranghol Dhawar Jhungi Suket 5 Ha. N 31026’30.3” E077

006’34.0” 8321 Ft Top entry

point

920. Afforestation 2008-09

Ranghol -II Dhawar Jhungi Suket 5 Ha. N 31026’28.9” E077

006’39.9” 8401Ft Top entry

point

921. Afforestation 2008-09

Ranghol -I Dhawar Jhungi Suket 5 Ha. N 31026’12.2” E077

006’39.0” 8000 Ft Top entry

point

922. Afforestation 2008-09

Gahghka Chhol Dhawar Jhungi Suket 5 Ha. N 31025’42.6” E077

006’21.2” 7120.Ft Center

Point

923. Afforestation 2008-09

Khundhar Salani Jhungi Suket 10- Ha. N 31022’04.8” E077

004’12.4” 6236 Ft Center point

924. Afforestation 2008-09

Simoo-1 Salani Jhungi Suket 10- Ha. N 31021’49.1” E077

003’21.0” 5033 Ft Top Entry

Point

925. Afforestation 2008-09

Simoo-2 Salani Jhungi Suket 5- Ha. N 31022’03.5” E077

003’05.5” 5037 Ft Top Entry

Point

926. Afforestation 2008-09

Simoo-3 Salani Jhungi Suket 5- Ha. N 31022’02.3” E077

003’04.2” 4983 Ft Top Entry

Point

927. Afforestation 2008-09

Khunedher Salani Jhungi Suket 5- Ha. N 31022’40.5” E077

004’00.5” 5745 Ft Top Entry

Point

928. Afforestation 2008-09

Simoo Salani Jhungi Suket 5- Ha. N 31022’16.6” E077

003’33.7” 5005 Ft Top Entry

Point

929. Afforestation Simoo Salani Jhungi Suket 5- Ha. N 31022’25.4” E077

003’35.9” 4961 Ft Top Entry

Page 68: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2008-09 Point

930. Afforestation 2008-09

Salani-1 Salani Jhungi Suket 5- Ha. N 31022’27.5” E077

003’40.8” 5279 Ft Top Entry

Point

931. Afforestation(2008-09)

Bart Marhara Jhungi Suket 10 Ha. N31022.55.3’ E077°02.46.6’ 5690 Ft Bottom

entry point

932. Afforestation(2008-09)

Haluoo Marhara Jhungi Suket 10 Ha. N31028.032’ E077°03.012’ 5123 Ft Center point

933. Afforestation(2008-09)

Marhara Marhara Jhungi Suket 10 Ha. N31023.080’ E077°01.206’ 7313 Ft Center point

934. Afforestation(2008-09)

Kumarhoo Bandli Jhungi Suket 15 Ha. N31020.12.4’ E077°00.422’ 6716 Ft Top entry

point

935. Afforestation(2008-09)

Charog Kinder Jhungi Suket 10 Ha. N31019.31.0’ E077°01.215’ 6451 Ft From center

936. Afforestation(2008-09)

Trehli Kinder Jhungi Suket 20 Ha. N31018.292’ E077°02.321’ 4888 Ft Top entry

point

937. Afforestation(2008-09)

Narehli Kinder Jhungi Suket 10 Ha. N31019.011’ E077°02.521’ 3284 Ft Bottom

entry point

938. Afforestation(2008-09)

Tandidhar Trechh Jhungi Suket 10 Ha. N31021.115’ E077°02.385’ 4820 Ft Entry point

939. Afforestation(2008-09)

Kathala Balag Jhungi Suket 15 Ha. N31022.335’ E076°59.475’ 7532 Ft Top entry

point

940. Afforestation 2008-09

Kumaru Bandli Jhungi Suket 35 Ha. N 310 20.242’ E 76

059.518’ 6784 Ft Center Point

941. Pasture Development (2008-09)

Kathala Balag Jhungi Suket 10 Ha. N31022.292’ E076°59.593’ 7740 Ft Top entry

point

942. Pasture Development 2008-09

Heg Dhawar Jhungi Suket 6- Ha. N 31026’48.0” E077

006’49.5” 9130 Ft Center

point

943. Pasture Development 2008-09

Daint Galankhar Jhungi Suket 10- Ha. N 31025’31.0” E077

004’51.0” 6766 Ft Center Point

944. Pasture Development

Kathla Kathla Jhungi Suket 10 Ha. N 310 22’29.2” E 76

0 59.59.3” 7740 Ft Center Point

Page 69: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxvi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2008-09

945. Afforestation(2009-10

Maj Pragan) Bandli Jhungi Suket 10 Ha. N31020.293’ E077°02.223’ 4759 Ft Center Point

946. Afforestation(2009-10)

Trehli–1 Kinder Jhungi Suket 6 Ha. N31092.208’ E077°02.392’ 4229 Ft Top entry

point

947. Afforestation(2009-10)

Trehli–II Kinder Jhungi Suket 6 Ha. N31018.161’ E077°02.391’ 3999 Ft From top

entry point

948. Afforestation 2009-10

Fegal Salani Jhungi Suket 5 Ha. N 31021’34.6” E077

004’19.2” 5358 Ft Center Point

949. Afforestation 2009-10

Fegal –II Salani Jhungi Suket 5- Ha. N 31021’23.5” E077

004’15.2” 5035 Ft Top Entry

Point

950. Afforestation 2009-10

Ukri –1 Salani Jhungi Suket 5- Ha. N 31021’20.5” E077

003’56.5” 5182. Ft Top Entry

Point

951. Afforestation 2009-10

Ukri -2 Salani Jhungi Suket 6- Ha. N 31021’28.1” E077

003’45.1” 5257. Ft Top Entry

Point

952. Afforestation 2009-10

O.D. Manjhaki –I Jhungi Jhungi Suket 5- Ha. N 31026’19.3” E077

004’31.9” 7549 Ft Top Entry

Point

953. Afforestation 2009-10

O.D. Manjhaki II Jhungi Jhungi Suket 5- Ha. N 31026’10.1” E077

004’31.1” 7125 Ft Center Point

954. Afforestation(2009-10)

Salani Salani Jhungi Suket 5 Ha. N31023.46.6’ E077°04.20.7’ 6032 Ft Center point

955. Afforestation(2009-10)

Chebaz Nehri Jhungi Suket 3 Ha. N31023.436’ E077°02.065’ 6105 Ft Bottom

entry point

956. Afforestation(2009-10)

Kathala Balag Jhungi Suket 4 Ha. N31

022.229’ E076°59.095’ 6261 Ft Center Point

957. Afforestation 2009-10

Trechdi Trechh Jungi Suket 5 Ha. N 31021.481’ E 77

0 01.212’ 6860 Ft Center Point

958. Pasture Development 2009-10

Manjhaki Jaral Jhungi Suket 13- Ha. N 31026’26.4” E077

004’26.3” 6849 Ft Botom Entry

point

959. Afforestation(2010-11)

Mallraher* Marhara Jhungi Suket 5 Ha. N31

023.041’ E077°03.041’ 5035 Ft Center point

* Mallraher is a afforestation site which us out given in list but is in CAT Plan

Page 70: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxvii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

960. Afforestation(2010-11)

Salani Salani Jhungi Suket 6 Ha. N31023.496’ E077°04.324’ 6458 Ft Bottom

entry point

961. Afforestation 2010-11

Trechdi Kinder Jhungi Suket 10 Ha. N 31018.252’ E 77

0 20.389’ 4110 Ft Center Point

962. Afforestation 2010-11

Narehli Kinder Jhungi Suket 10 Ha. N 310 19.345’ E 77

0 02.066’ 5480 Ft Center Point

Page 71: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxviii

Division – Theog Range –Theog

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

963. Afforestation 2004-05

Khalashi –I Khalashi Theog Theog 10 Ha. N31006’37.6” E077

018’09.2” 7024 Ft. Center Point

964. Afforestation 2004-05

Khalashi –II Khalashi Theog Theog 10 Ha. N31006’36.2” E077

018’38.0” 7680 Ft. Center Point

965. Afforestation 2004-05

Narainty-I Matiana Theog Theog 10 Ha. N31013’13.4” E077

022’47.4” 8252 Ft. Center point

966. Afforestation 2004-05

Narainty-II Matiana Theog Theog 10 Ha. N31013’02.7” E077

022’38.2” 8186 Ft. Entry Point

967. Afforestation 2004-05

Rohru Shalli Theog Theog 10 Ha. N31007’03.7” E077

022’21.1” 7603 Ft. Entry Point

968. Afforestation 2004-05

Makhrol Kufri Theog Theog 5 Ha. N31005’43,1” E077

017’10.6” 7952 Ft. Center Point

969. Afforestation 2004-05

Gawai- Kufta Chadara Theog Theog 10 Ha. N31010’59.9” E077

020’05.2” 6894 Ft. Center Point

970. Afforestation 2004-05

Rohru Shali Theog Theog 10 Ha. N310 07.155’ E077

022.517’ 7687 Ft. Entry Point

971. Afforestation 2004-05

Makhrol Kufri Theog Theog 5 Ha. N310 05.503’ E077

0 17.263’ 7951 Ft. Entry Point

972. Afforestation 2004-05

Bagna Kufri Theog Theog 5 Ha. N310 05.275’ E077

0 17.813’ 7876 Ft. Entry Point

973. Afforestation 2004-05

Sholvi Chadara Theog Theog 5 Ha. N310 13.364’ E077

0 20.145’ 8888 Ft. Entry Point

974. Afforestation 2004-05

Shalli-I Dharam pur

Theog Theog 10 Ha. N31012.119’ E077

019.123’ 7835 Ft. Center Point

975. Afforestation 2004-05

Shalli-II Dharam pur

Theog Theog 10 Ha. N31012.149’ E077

019.190’ 7724 Ft. Center Point

976. Afforestation 2004-05

Balech Gowai Theog Theog 5 Ha. N31007.640’ E077

023.420’ 7430 Ft. Center Point

977. Afforestation 2005-06

Lanoo 2 Dearati Theog Theog 5 Ha. N310 10.058’ E077

0 20.560’ 6561 Ft. Entry Point

Page 72: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxix

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

978. Afforestation 2005-06

Majhar Dearati Theog Theog 5 Ha. N310 07.131’ E077

0 18.215’ 6260 Ft. Entry Point

979. Afforestation 2005-06

Khanoor Nalla Kufri Theog Theog 20 Ha. N310 06.280’ E077

0 16.685’ 7594 Ft. Entry Point

980. Afforestation 2005-06

Kuinal Chadara Theog Theog 4 Ha. N310 13.018’ E077

0 21.995’ 8101 Ft. Entry Point

981. Afforestation 200506

Kandharghat Sarog Theog Theog 10 Ha. N310 08.777’ E077

0 19.967’ 6576 Ft. Entry Point

982. Afforestation 2005-06

Chalawag -1 Shalli Theog Theog 10 Ha. N310 08.466’ E077

0 20.944’ 6875 Ft. Entry Point

983. Afforestation 2005-06

Pralighashi Dharampur

Theog Theog 6 Ha. N310 11.508’ E077

0 18.685’ 6635 Ft. Entry Point

984. Afforestation 2005-06

Rainall Chadara Theog Theog 10 Ha. N31010’26.6” E077

020’04.1” 5561 Ft. Entry point

985. Afforestation 2005-06

Bagana Cheog Theog Theog 10 Ha. N31005’19.2” E077

017’44.0” 7910 Ft. Entry point

986. Afforestation 2005-06

Gatlu Matiana Theog Theog 10 Ha. N31013’03.9” E077

022’49.6” 8354 Ft. Center Point

987. Afforestation 2005-06

Matiana Matiana Theog Theog 10 Ha. N31012’12.4” E077

022’46.4” 8353 Ft. Entry Point

988. Afforestation 2005-06

Majhrana Dharam pur

Theog Theog 20 Ha. N31011.989’ E077

019.148’ 7895 Ft. Center Point

989. Afforestation 2005-06

Chikhar-1 Gowai Theog Theog 10 Ha. N31009.123’ E077

021.836’ 6625 Ft. Center Point

990. Afforestation 2005-06

Chikhar-3 Gowai Theog Theog 10 Ha. N31009.122’ E077

021.947’ 6840 Ft. Center Point

991. Afforestation 2005-06

Nal Dharam pur

Theog Theog 10 Ha. N31009.923’ E077

017.899’ 5808 Ft. Center Point

992. Afforestation 2005-06

Charaghat Dharmpur Theog Theog 5 Ha. N31009.639’ E077

018.573’ 7215 Ft. Center Point

993. Afforestation 2005-06

Shalli Tir Dharam pur

Theog Theog 15 Ha. N31009.832’ E077

017.793’ 5840 Ft. Center Point

994. Afforestation 2005-06

Karyal Kiari Theog Theog 10 Ha. N31009’14.7” E077

017’22.2” 5315 Ft. Center Point

Page 73: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxx

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

995. Afforestation 2005-06

Bagoti -2 Kiari Theog Theog 10 Ha. N31008’31.6” E077

017’45.0” 6307 Ft. Center Point

996. Afforestation 2005-06

U-127 Sarog Kiari Theog Theog 10 Ha. N31007’52.3” E077

018’39.7” 6864 Ft. Center Point

997. Afforestation 2005-06

Majhar Khalashi Theog Theog 10 Ha. N31007’05.0” E077

018’15.8” 6201 Ft. Center Point

998. Afforestation 2005-06

Kufta Jugo Theog Theog 10 Ha. N31009’01.3” E077

019’32.9” 5417 Ft. Center Point

999. Afforestation 2005-06

Cheeng Jugo Theog Theog 10 Ha. N31008’50.2” E077

020’09.2” 5961 Ft. Center Point

1000. Afforestation 2005-06

Kheel – II Jugo Theog Theog 10 Ha. N31008’44.1” E077

020’24.4” 6172 Ft. Center Point

1001. Pasture Dev. 2005-06

Siholvi Pasture Matiana Theog Theog 20 Ha. N310 12.948’ 077

0 22.870’ 8101 Ft. Entry Point

1002. Afforestation 2006-07

Sainj Khufta 2 Jugo Theog Theog 10 Ha. N310 08.688’ E077

0 20.301’ 6217 Ft. Entry Point

1003. Afforestation 2006-07

Gagan Ghatir Dharam pur

Theog Theog 15 Ha. N310 12.202’ E077

0 19.346’ 7751 Ft. Entry Point

1004. Afforestation 2006-07

Sainj Kufta 1 Jugo Theog Theog 10 Ha. N310 08.857’ E077

0 20.151’ 6061 Ft. Entry Point

1005. Afforestation 2006-07

Kandharghat Sarog Theog Theog 10 Ha. N310 08.555’ E077

0 17.767’ 6176 Ft. Entry Point

1006. Afforestation 2006-07

U-63- Tikkar Dharati Theog Theog 10 Ha. N31011’45.5” E077

021’28.9” 6140 Ft. Center Point

1007. Afforestation 2006-07

Kandharghat Sarog Theog Theog 10 Ha N310 08.555’ E077

0 17.767’ 6176 Ft. Entry Point

1008. Afforestation 2006-07

Ghorajubbar Sandhu Theog Theog 5 Ha. N310 09.053’ E077

0 23.034’ 6176 Ft. Entry Point

1009. Afforestation 2006-07

Mahog Jugo Theog Theog 10 Ha. N31008’52.0” E077

019’59.4” 5955 Ft. Center Point

1010. Afforestation 2006-07

Talal Jugo Theog Theog 10Ha. N31008’48.4” E077

019’55.2” 5843 Ft. Center Point

1011. Afforestation 2006-07

Chichar – I Khalashi Theog Theog 10 Ha. N31006’25.5” E077

018’22.6” 6396 Ft. Center Point

Page 74: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxxi

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

1012. Afforestation 2006-07

Chichar – II Khalashi Theog Theog 10 Ha. N31006’33.7” E077

018’14.5” 6291 Ft. Center Point

1013. Afforestation 2006-07

Budhil – I Khalashi Theog Theog 10 Ha. N31006’35.8” E077

018’14.6” 6329 Ft. Center Point

1014. Afforestation 2006-07

Goltimbi – I Khalashi Theog Theog 10 Ha. N31007’30.4” E077

019’23.8” 7619 Ft. Center Point

1015. Afforestation 2006-07

Goltimbi – II Khalashi Theog Theog 5 Ha. N31007’18.9” E077

019’28.9” 7526 Ft. Center Point

1016. Afforestation 2006-07

Manal Kiari Theog Theog 10 Ha. N31008’39.6” E077

018’08.4” 7180 Ft. Center Point

1017. Afforestation 2006-07

U-129 Ghaini Kiari Theog Theog 5 Ha. N31008’10.0” E077

017’48.6” 6364 Ft. Center Point

1018. Afforestation 2006-07

Manal Gasog Kiari Theog Theog 5 Ha. N31008’36.6” E077

018’02.4” 7068 Ft. Center Point

1019. Afforestation 2006-07

Kandharghat Kairi Theog Theog 10 Ha. N31008’33.1” E077

017’46.3” 6176 Ft. Center Point

1020. Afforestation 2006-07

Shikari Kiari Theog Theog 5 Ha. N31008’32.2” E077

017’47.0” 6345 Ft. Center Point

1021. Afforestation 2006-07

Balech Gowai Theog Theog 10 Ha. N31007.557’ E077

023.386’ 7680 Ft. Center Point

1022. Afforestation 2006-07

Kathal Gowai Theog Theog 10 Ha. N31009.607’ E077

022.617’ 8182 Ft. Center Point

1023. Afforestation 2006-07

Ramkali Gowai Theog Theog 10 Ha. N31009.275’ E077

022.160’ 7123 Ft. Center Point

1024. Afforestation 2006-07

D-49 Pap-1 Gowai Theog Theog 10 Ha. N31008.293’ E077

023.061’ 7675 Ft. Center Point

1025. Afforestation 2006-07

Kotdhar Gowai Theog Theog 5 Ha. N31008.493’ E077

023.230’ 7520 Ft. Center Point

1026. Afforestation 2006-07

Deothinal Dharam pur

Theog Theog 20 Ha. N31011.972’ E077

019.127’ 7505 Ft. Center Point

1027. Afforestation 2006-07

Kufta Dharam pur

Theog Theog 10 Ha. N31012.162’ E077

019.400’ 7415 Ft. Center Point

1028. Afforestation 2006-07

Shali ki tir Dharam pur

Theog Theog 20 Ha. N31009.531’ E077

017.313’ 7235 Ft. Center Point

Page 75: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxxii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

1029. Afforestation 2006-07

Karyal Matiana Theog Theog 18 Ha. N31013’03.4” E077

025’04.5” 8250 Ft. Entry Point

1030. Afforestation 2006-07

Rohru Shalli Theog Theog 20 Ha. N31007’04.9” E077

021’56.6” 7574 Ft. Entry Point

1031. Afforestation 2006-07

Bharyana Shalli Theog Theog 10 Ha. N31007’50.2” E077

021’05.8” 7274 Ft. Entry Point

1032. Afforestation 2006-07

Chalawag Shalli Theog Theog 10 Ha. N31007’41.0” E077

021’11.2” 7182 Ft. Entry Point

1033. Afforestation 2006-07

Chalawag Shalli Theog Theog 10 Ha. N31007’48.4” E077

021’28.1” 6988 Ft. Entry Point

1034. Afforestation 2006-07

Chalawag Shalli Theog Theog 10 Ha. N31007’50.1” E077

022’24.1” 7735 Ft. Entry Point

1035. Afforestation 2006-07

Naur Shalli Theog Theog 4 Ha. N31007’02.6” E077

022’24.1” 7735 Ft. Entry Point

1036. Afforestation 2006-07

Khanoor Kufri Theog Theog 20 Ha. N31006’16.8” E077

016’41.2” 7718 Ft. Entry Point

1037. Afforestation 2006-07

Jahoo Kufri Theog Theog 20 Ha. N31007’48.2” E077

018’11.7” 8253 Ft. Center Point

1038. Afforestation 2006-07

Sholvi Chadara Theog Theog 15 Ha. N31013’13.3” E077

020’15.8” 8515 Ft. Entry Point

1039. Afforestation 2006-07

Kufta Chadara Theog Theog 10 Ha. N31011’31.9” E077

020’59.5” 7444 Ft. Entry point

1040. Afforestation 2006-07

Solvi Chadara Theog Theog 5 Ha. N31011’03.0” E077

020’19.4” 6775 Ft. Entry Point

1041. Afforestation 2006-07

Fargula Dearati Theog Theog 10 Ha. N31009’28.4” E077

019’13.5” 5295 Ft. Entry point

1042. Afforestation 2006-07

Lanoo Dharati Theog Theog 5 Ha. N31010’24.4” E077

019’40.6” 5707 Ft. Center Point

1043. Afforestation 2006-07

U-100- Khanu Dearati Theog Theog 5 Ha. N31010’25.1” E077

020’09.0” 6140 Ft. Center Point

1044. Afforestation 2006-07

U-Koti Dearati Theog Theog 10 Ha. N31009’41.5” E077

020’26.4” 6870 Ft. Center Point

1045. Afforestation 2006-07

Khanro Dearati Theog Theog 7 Ha. N31011’26.9” E077

021’10.1” 6260 Ft. Entry Point

Page 76: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxxiii

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

1046. Afforestation 2006-07

Badima Dharampur

Theog Theog 10 Ha. N310 10.981’ E077

0 18.817’ 6814 Ft. Entry Point

1047. Afforestation 2006-07

Majhoan Dharati Theog Theog 7 Ha. N310 10.058’ E 077

0 20.860’ 6564 Ft. Entry Point

1048. Afforestation 2006-07

Shali ki Tir Dharam pur

Theog Theog 10 Ha. N310 11.951’ E077

0 19.139’ 7570 Ft. Entry Point

1049. Afforestation 2007-08

Kheel –I Jugo Theog Theog 10 a. N31008’45.3” E077

020’17.6” 5856 Ft. Center Point

1050. Afforestation 2007-08

Kufta Matiana Theog Theog 10 Ha. N31011’32.7” E077

022’45.9” 7888 Ft. Entry Point

1051. Afforestation 2007-08

Sholvi Chadara Theog Theog 5 Ha. N31013’15.6” E077

020’16.8” 8553 Ft. Entry point

1052. Afforestation 2007-08

Kamalthi Chadara Theog Theog 10 Ha. N31010’50.0” E077

019’39.0” 5581 Ft. Center Point

1053. Afforestation 2007-08

Kathal 2 Gowai Theog Theog 10 Ha. N310 10.437’ E077

0 21.913’ 7410 Ft. Entry Point

1054. Afforestation 2007-08

Kathal 1 Gowai Theog Theog 10 Ha. N310 09.607’ E077

0 22.613’ 8013 Ft. Entry Point

1055. Afforestation 2007-08

Bhalech Gowai Theog Theog 5 Ha. N310 07.521’ E077

0 22.927’ 7621 Ft. Entry Point

1056. Afforestation 2007-08

Narainty Matiana Theog Theog 10 Ha. N310 11.956’ E077

0 19.137’ 7768 Ft. Entry Point

1057. Afforestation 2007-08

Budlhi 2 Dharam pur

Theog Theog 10 Ha. N310 06.680’ E077

0 18.161’ 6120 Ft. Entry Point

1058. Pasture Development 2007-08

U-40 Narainty Matiana Theog Theog 5 Ha. N31011’37.7” E077

023’04.3” 7929 Ft. Entry Point

1059. Afforestation 2007-08

Karyal Matiana Theog Theog 20 Ha. N31013’03.1” E077

023’03.3” 8147 Ft. Entry Point

1060. Pasture Development 2007-08

Sherti Matiana Theog Theog 15 Ha. N31013’01.2” E077

022’04.9” 8718 Ft. Center Point

1061. Pasture Development

D 52 Rohru Shalli Theog Theog 10 Ha N31007’03.6” E077

021’58.8” 7565 Ft. Center Point

Page 77: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

NH Consulting Pvt. Ltd. lxxiv

Sl. No.

Components Name of Site Beat Range Division Are of Pltn. (Ha.)

Latitude

Longitude Altitude (Ft.)

Point of Location Reading

2007-08

1062. Pastucher Development 2006-07

Rohru Shalli Theog Theog 10 Ha. N31007’02.6” E077

022’21.1” 7608 Ft. Center Point

1063. Pasture Development 2007-08

U-138- Jahoo Kufri Theog Theog 10 Ha. N31009’47.3” E077

019’12.9” 8362 Ft. Entry Point

Page 78: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxv

Annexure - II

Data Sheet for Enumeration of Plantation

1.0 Location Data 1.1 Division: ……………………………………………………….. 1.2 Range: …………………………………………………………… 1.3 Block: ……………………………………………………………. 1.4 Beat: ………………………………………………………………. 1.5 Name of the area: ……………………………………………. 1.6 Year of plantation: …………………………………………… 1.7. Total area planted (Hac): ………………………………… 1.8. Aspect: ……………………………………………………………

Longitude Latitude Altitude

1.9. Distance of site from Road ……………………………………………………………………… 1.10. Distance of site from Habitation ………………………………………………………….. 1.11 eological Formations of the Site

……………………………………………………………………………….....................................

……………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………

1.12. No. of Plants Planted & Species

S.No Name of species Number

1

2

Page 79: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxvi

3

4

5

6

1.13. Source of Saplings: …………………………………………………………………………………………………. 1.14. Distance of the nursery from the plantation site (Km.): …………………………………………… 1.15 Size of sapling (nursery):

S No. Species Size of sapling

1.

2.

3.

4.

2.0 Land Use Pattern

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………

3.0 Slope of Land (%) …………………………………………………………………………………………………………

- Other Intervention Components ………………………………………………………………………………….

- Terrain Description (write about soil, rock, water source, surroundings etc.)

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………..……………………………………………………………………………

…………………………………………………………………………………………………………………………………………………

Page 80: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxvii

………………………………………………………………………………………………………………………………………..………

…………………………………………………………………………………………………………………………………………………

- Scheme of Plantation (a) Afforestation

(b) Rim Plantation

(c) Pasture Development

- Downstream Treatment (d) Fringe plantation (e) Grass slip planting (f) Others

- Type of Participation by Villagers

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………..……………………………………………………………………………

- Fencing status & type

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………

4.0 Cost of fencing

…………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………

5.0 Biotic Pressure Status

5.1 Incidence of Grazing ………………………………………………………………………

5.2 Incidence of fodder collection ……………………………………………………………

5.3 Incidence of fire ………………………………………………………………………………..

5.4 Other biotic pressure …………………………………………………………….……………

Page 81: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxviii

6.0 Enumeration Sheet

Sl

No.

Sample

Plot No

Size of plot

(30mx33m)

Species No. of

Surviving

Plants

Mortality

No.

Sl

No.

Sample

Plot No

Size of plot

(30mx33m)

Species No. of

Surviving

Plants

Mortality

No.

I. 26

II. 27

III. 28

IV. 29

V. 30

VI. 31

VII. 32

VIII. 33

IX. 34

X. 35

XI. 36

XII. 37

XIII. 38

XIV. 39

XV. 40

XVI. 41

XVII. 42

XVIII. 43

XIX. 44

XX. 45

XXI. 46

XXII. 47

XXIII. 48

XXIV. 49

XXV. 50

Page 82: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxix

7.0 Growth parameters

Growth Parameters

Sl. No. Species Plants

No.

Height Girth

(B/C)

B C Crown

condition

(E/UE)

1.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

Page 83: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxx

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

44.

45.

46.

47.

48.

Name of Investigator ……………………………………..

Name& designation of Officer interacted…………………………………………………………………………….

Signature of Investigator ………………………..…... Signature of Officer Interacted …………………..….

Date of Enumeration ………………………………………..

Page 84: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxxi

Annexure - III

Check Dam Monitoring Data Sheet

1.0 Location Data 1.1 Division: …………………………………………………… 1.2 Range: …………………………………………………………. 1.3 Block: ……………………………………………………………… 1.4 Beat: …………………………………………………………………. 1.5 Name of drainage line (Nalla): ………………………………. 1.6 Year of construction: …………………………………………….. 1.7 Catchment area of the nalla: ………………………………… 2.0 Total length of drainage line ………………………………………………………………………………………. 3.0 Slope of drainage line (%)……………………………………………………………………………………………. 4.0 No. of check dams constructed on this drainage line…………………………….………………………

5.0 Siltation data

S No. Check dam Percentage of Siltation Year (1st, 2nd etc)

Page 85: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. lxxxii

Page 86: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. 83

6.0 Monitoring data recording of individual check dam Division………………………………………………..Range…………………………..……………Block………………………….………….

Beat………………………….Name of Nalla……………………………………………….. Total Catchment (Ha.)……………………………………………………

Check

dam

no.

Location Cross section of nalla (Mtr) Foundation

material soil/

Geological

formation

Type of

check

dam

Dimension of check dam Quantity of

silt

( volume)

U M L Bottom

width

Top

width

Dept

h

Botto

m

width

Top

width

Length Height

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

Note: Sample weight of silt deposited will be determined on a sample basis (in Kg)

Page 87: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consuling Pvt. Ltd. 84

7.0 Cost of construction………………………………………………………………………………………………………….

8.0 Present condition of check dams……………………………………………………………………………………………… Name of Investigator ……………………………Name and designation of official Interviewed………….…………… Signature of Investigator ……………………..………………... Signature of Officer Interacted …………………..…. Date of Enumeration ………………………………………..

Page 88: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

lxxxv

Annexure - IV

Component wise Tasks Completed

Bilaspur Circle

Range : Sadar Division : Bilaspur Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. DPF Chamyon Chamyon 2005-06 13

2. DPF Chamyon Chamyon 2006-07 21

3. DPF Chamyon Chamyon 2007-08 13

Range : Sadar Division : Bilaspur Component : Downstream Treatment

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. DPF Jamthal Jamthal 2006-07 15

2. DPF Jamthal Jamthal 2007-08 15

Range : Sadar Division : Bilaspur Component : Rim Plantation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. DPF Sangan Chamyon 2005-06 11

2. UPF Kasol Chamyon 2005-06 4

Range : Sadar Division : Bilaspur Component : Check Dams

Sl No. Site Name Year No. of dams

1. UPF Kasol 2006-07 8

2. UPF Kasol 2005-06 12

3. UPF Kasol 2005-06 2

4. Sooth ka paani nalla 2006-07 2

5. Tol nalla 2006-07 39

Page 89: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

lxxxvi

Range : Dalraghat Division : Kunihar Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. D 8 Trot Labrath 2005-06 10

2. U 17 Matnech Labrath 2006-07 10

3. UF C -6 Lanogha 2009-10 5

4. D 8 Trot Labrath 2004-05 7.5

5. D 52 Barial Mangroo 2010-11 10

6. D 5 Kattpol Labrath 2010-11 15

7. D 3 Bajrial Kandhar 2006-07 5

8. D 9 Skor Labrath 2008-09 25

9. D 51 Sergharakur Danogha 2009-10 10

10. D 9 Skor Labrath 2007-08 7

11. UF Manru Mangroo 2009-10 5

12. U17 Matrechl Labrath 2009-10 5

Range : Dalraghat Division : Kunihar Component : Rim Plantation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. J 21 Jandoi Labrath 2010-11 5

2. U 2 Padyar U2 Kandhar 2009-10 10

Range : Dalraghat Division : Kunihar Component : Check Dams Sl No. Site Name Type Year No. of Dams

1. Skor DPF nalla B – 0 M – 0 S – 25

2004-05 25

2. Siharli nalla S – 20 2005-06 20

3. Matrech nalla M – 10 2006-07 10

4. Jandoi UF nalla S – 50 2006-07 50

5. Matrech nalla M – 25 2007-08 28

6. Siharli nalla S – 100 2007-08 100

7. Kun nalla M – 5 S - 10

2008-09 15

8. Dangoil nalla M - 20 2010-11 20

Range : Arki Division : Kunihar Component : Check Dams

Sl No. Site Name Type Year No. of Dams

1 Palaniya Nalla M – 20 S – 20

2010 - 11 40

Page 90: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

lxxxvii

Mandi Circle Range : Karsog Division : Karsog Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. OD 170 Tikan Karsog Samarli 2004-05 5

2. MD 201 Aglidhar Machaudi 2005-06 5

3. OD 187 Bajhu C III (a) Samarli 2006-07 7

4. OD 124 Kolontha Mahunmag 2007-08 5

5. D-170 tikri Karsog Samarli 2008-09 10

6. OD 193 Katach bhanhera Kashoul 2004-05 7

7. ND 183 Maha Dey ki Banouri Munal 2004-05 7

8. ND 131 Parnaj Parlog 2004-05 10

9. ND 199 Dhamyara Kashoul 2005-06 5

10. OD 124 Koloultha Mahumnag 2009-10 05

11. MD 203 Thach C-II Mehandi 2007-08 15

12. D-188 Kandi Kaushol 2008-09 5

13. OD 173 Dopha Dopha 2007-08 11

14. ND 207 Gandhoi Mehandi 2005-06 10

15. D 170 Tikar Karsog (II ) Samarli 2006-07 7

16. MD 131 Parhot Parlog 2007-08 15

17. D 161 Kath domail Kamand 2008-09 10

18. OD 137 Nagalth Mahunmag 2004-05 5

19. OD 167 Bajnu Sanosli 2005-06 10

20. OD 198 Dhamiyana Kashoul 2007-08 17

21. D 176 Galyach Galyach 2008-09 10

22. D 135 Bagbokali Mohunmag 2009-10 10

23. D 207 ghandhoi Mehandi 20010-11 9

Range : Karsog Division : Karsog Component : Pasture Development Sl No. Site Name Beat Year of

Plantation Size of Plantation

(Ha.)

1. OD 124 Kolratha Bagshon 2005-06 10

2. D 175 Pehram Gholyach 2010-11 10

3. OD 138 Bag Bokhali Mahunmag 2005-06 10

4. MD 135 fofam Parlog 2007-08 15

5. ND 133 Hiru Parlog 2007-08 9

6. D 133 Hiru Parlog 2010-11 5

7. D 134 Mangum Parlog 2008-09 5

8. ND 183 Maha Dey ki Banouri Mamail 2010-11 6

Page 91: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

lxxxviii

Range : Karsog Division : Karsog Component : Check Dam

Sl No. Site Name Type Year No. Dams

1. Harmola nalla L -1 M - 2 S - 3

2005-06 6

2. Nagatiha nalla M - 4 S – 2

2005-06 6

3. Bhanera nalla L -2 M - 3 S - 7

2006-07 12

4. Mehram nalla L -2 M - 4 S – 6

2007-08 12

5. Dumehal nalla L -5 M - 4 S – 2

2009-10 11

6. Tharmi nalla L -1 M - 1 S - 12

2008-09 14

7. Khadoma nalla S – 12 M – 1 L – 1

2008-09 14

8. Judli nalla S – 12 M – 1 L – 1

2008-09 14

9. Puni nalla S – 13 M – 1 L – 2

2008-09 16

10. Tatmu nalla S – 13 M – 2 L – 2

2008-09 17

11. Jingal nalla S – 13 M – 1 L – 2

2008-09 16

12. Shayongi nalla S – 13 M – 1 L – 2

2008-09 16

13. Sursi nalla S – 10 M – 1 L – 1

2009-10 12

14. Ghalyach nalla S – 10 M – 2 L – 1

2009-10 13

15. Bahj nalla S 2009-10 25

16. Sarkol nalla S 2009-10 20

17. Bhanera nalla S – 2 M – 3 L - 1

2005-06 6

18. Mehram nalla - 2009-10 20

19. Ghalsa nalla - 2009-10 17

Page 92: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

lxxxix

Range : Magroo Division : Karsog Component : Afforestation

Sl No.

Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. ND 289 Ghanidhar Mangarh 2004-05 4

2. ND 278 Nadaan Cassi 2005-06 10

3. OD 255 sapach Mahog 2004-05 3

4. D 279 Nadaam Cassi 2006-07 10

5. ND 283 Raidhar Serimangarh 2005-06 3

6. D 259 Latta Katanda 2006-07 10

7. DD 259 Latta (IV) Katanda 2005-06 13

8. ND 283 Raidhar Chora 2004-05 4

9. ND 264 Khatu Sagagi 2006-07 5

Range : Magroo Division : Karsog Component : Pasture Development

Sl No.

Site Name Beat Year of Plantation Size of Plantation (Ha.)

1 N D – 283 Raidhar Chora 2007 – 08 5

2 N D 283 Raidhar ll Chora 2005 – 06 5

3 N D 278 Nadaan Cassi 2005 – 06 10

Range : Magroo Division : Karsog Component : Check Dams

Sl No. Site Name Type Year of Plantation

No. of Dams

1 Jangla Nalla Mid – 2 Small - 2

2004 – 05 4

2 Bashala Dam S – 10 M – 8 L – 2

2008 – 09 20

3 Nagan nalla S – 10 M – 8 L – 2

2008 – 09 20

4 Khanak Nalla S – 10 M – 10

L – 4

2008 – 09 24

5 Kathan shor S – 15 M – 10

L – 0

2009 – 10 25

6 Katachl S – 3 M – 0 L – 3

2007 – 08 6

7 Katandhar S – 10 M – 0 L – 8

2007 – 08 18

Page 93: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xc

8 Keshri Nalla S – 15

M – 12 L – 4

2008 – 09 31

9 Haridhar Nalla S – 6 M – 8 L – 2

2008 – 09 16

Range : Seri Division : Karsog Component : Afforestation

Sl No. Site Name Beat Year of Plantation

No. of Dams

1 OD237 katanda Pathreui 2005-06 13

2 OD228 Bhonda Shill Chohridhar 2005-06 5

3 N&242 Boona Tebhan 2007-08 5

4 D-249 Makri Rolohi 2008-09 4

5 OD219 Ganoo c II Dhamun 2004-05 6

6 OD236 Pathravi Pathravi 2004-05 8

7 N-D 245 Firnoo Taban 2005-06 5

8 D-233 Richhani Richani 2006-07 10

9 OD247 saran Saeakni 2009-10 5

10 D-222 pog Nanj 2009-10 5

11 OD-233 Richami CI (b) Richami 2004-05 7

12 M.D 222 pog Nanj 2005-06 2

13 OD228 Bhondashill Chauisha 2006-07 10

14 OD234 surdru Katkash 2007-08 5

15 D 247 Saran Saeackni 2007-08 5

16 D245 Firnoo Louoastru 2008-09 9

17 D-241 kandloo Tebban 2008-09 3

18 D-247 saran Susahan 2005-06 5

19 D-213 Nehain Nal Nachai 2007-08 15

20 D213 Nachain Nal Nachai alol 2008-09 11

21 D222 pog Nanj 2010-11 1

22 D-236 pathreavi Pathreavi 2010-11 5

23 ND247 saran Sasahan 2009-10 5

Range : Seri Division : Karsog Component : Pasture Development

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. D 247 Saran Goradpur 2007-08 5

2. D 214 Jhunjhan Niharinal 2009-10 20

3. D 213 Niharinal Niharinal 2005-06 7

4. D 249 Makra Sorahan 2007 – 08 2

Page 94: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xci

Range : Seri Division : Karsog Component : Check Dams

Sl No. Site Name Type Year No. of Dams

1 Naresh Nalla L=1 M=4 S=4

2005-06 9

2 Bogh Nalla L=0 M=1 S=1

2005-06 2

3 Pathrevi Nalla L=1 M=4 S=4

2005-06 9

4 Kandal Nalla L=2 M=2 S=10

2007-08 14

5 Jai Nala L=2 M=4 S=10

2007-08 16

6 Kandlu Nalla L=2 M=0 S=18

2007-08 20

7 Tharmi Nalla L=1 M=2 S=5

2007-08 8

8 Niharinal nalla L=0 M=2 S=6

2007-08 8

9 Pandoo Nalla L=2 S=4 M=4

2008-09 10

10 Makri Kot Nalla L=3 S=5 M=5

2008-09 13

11 Badoham Nalla L=3 M=4 S=5

2008-09 12

12 Trimbli Nalla L=1 M=4 S=10

2009-10 15

13 Godam Nalla L=1 M=5 S=10

2009-10 16

14 Jai Nalla L=1 M=2 S=2

2009-10 15

15 Sayanj Nalla L=0 M=3 S=0

2004-05 3

16 Mambli Nalla L=0 M=3 S=0

2004-05 3

17 Kathanda Nalla L=0 M=4 S=0

2004-05 4

Page 95: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xcii

Range : Pangana Division : Karsog Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. D101 Naudoo Pattapavi 2005-06 7

2. D74 Parvain Balnidi 2005-06 8

3. D105 khadain Talehan 2006-07 10

4. D96 shoj Tattapui 2007-08 10

5. D87 saran Alsuidi 2008-09 5

6. D 39 shill Lurhal 2008-09 6

7. D76 Gharlal cII c/k 2010-11 12

8. D90 Mahota T/A 2010-11 5

9. D104 Bestu Talchan 2004-05 10

10. D100 Ghangar Talta pani 2005-06 7

11. D74 parvain Balnidi 2006-07 30

12. D95 Jeouri Tattapavi 2006-07 10

13. D101 Nandoo Tattapani 2008-09 20

14. D109 Ghawala Talechan 2008-09 20

15. D72 Reshtedharar cIV c/k 2010-11 5

16. D86 lochar Tattapavi 2004-05 8

17. D62 Kunash Chindi 2010-11 5

18. D63 panyonoo Chindi 2005-06 4

19. D-16 chittri suket Sioishi 2007-08 10

20. D20 Huimgi nalla Pangna 2008-09 6

21. D76 kapdyas Alsuidi 2004-05 10

22. D101 Nandoo Tattapani 2005-06 10

23. D72 Ristadhave Kanda 2005-06 4

24. D106 Bhoura Talechan 2006-07 10

25. D 100 Ghargan Tattapani 2007-08 5

26. D72 Restadher C II Kanda 2008-09 10

27. D 99 Brakar Tahenam 2008-09 15

28. D 19 shalog Kanda 2008-09 4

29. D24 Barnug Katwachi 2009-10 6

30. D80 kanda Balindi 2007-08 20

31. D76 kapdyal Alsuidi 2007-08 15

32. D84 Alyash T/A 2010-11 10

33. D19 Shalog Shalog 2009-10 5

34. D1 Mahog P/surhi 2010-11 5

35. D8 panyanoo Shorshan 2009-10 5

36. D105 khadain Talchan 2009-10 30

37. D80 kanda Balnidi 2009-10 5

38. D 40 Ghoshal Ghoshal 2008-09 5

Page 96: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xciii

Range : Pangana Division : Karsog Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1 D 94 Tattapani Tattapani 2007 – 2008 10

Range : Pangana Division : Karsog Component : Check Dams

Sl No. Site Name Type Year No. of Dams

1. Panyroo khablage Nalla S=4 M=7 L=0

2004-05 11

2. Bithori Bourl Nalla S=10 M=4 L=0

2004-05 14

3. Chitchad durkanoo majhoat nalla S=0 M=0 L=4

2005-06 14

4. Patti, jhorandi nalla S=15 M=0 L=3

2005-06 18

5. Talehan Nalla S=5 M=5 L=2

2005-06 17

6. Bithori, Bouri Nalla S=10 M=5 S=1

2005-06 13

7. Salong, Dagsh panyora nalla S=10 M=5 S=1

2005-06 16

8. Udhun k hady belar nalla S=0 M=8 L=4

2005-06 12

9. Baryon kuudi maloonala S=0 M=7 S=4

2005-06 12

10. Shakrainidi nalla L=1 M=1 S=12

2008-09 14

11. Chutkor nalla L=2 M=1 S=13

2008-09 16

12. Kunash nalla L=1 M=1 S=12

2008-09 14

13. Sandrehal nalla L=1 M=1 S=12

2008-09 14

14. Chukhu nalla L=1 2009-10 17

Page 97: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xciv

M=1 S=15

15. Gujnodhar nalla L=1 M=4 S=12

2009-10 12

16. Chatkar, Durkunoo S=16 M=0 L=0

2009-10 16

Range : Seraj Division : Nachan Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. Saloti/ Liuri Baila 2004-05 10

2. Labni Nala Baila 2005-06 8

3. Magrugala Baila 2005-06 10

4. Jhalru Baila 2007-08 5

5. Bijnadhar Baila 2005-06 10

6. Pokhridhar Baila 2005-06 9

7. Grijnoo / Halsigad Baila 2008-09 15

Range : Seraj Division : Nachan Component : Silvi-Pasture

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. Halsigad Baila 2007-08 10

Range : Seraj Division : Nachan Component : Check Dams

Sl No. Site Name Type Year No. Dams

1. Grijnu nalla Big 2007-08 2

2. Shradhinal nalla Medium 2007-08 2

3. Srijnoo nalla Small 2007-08 30

4. Jogni nalla Small 2008-09 9

Range : Jhungi Division : Suket Component : Afforestation

Sl No. Site Name Beat Year of Plantation Size of Plantation (Ha.)

1. Trehadi Kindar 2004-05 10

2. Salani Salani 2005-06 5

3. Kathiuni kathauni 2005-06 7

4. Manjjhki Jaral 2005-06 5

5. Chehar Nihri 2005-06 5

Page 98: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xcv

6. Trechh Trech 2009-10 5

7. Shivshankar Jhungi 2006-07 5

8. Salani Salni 2006-07 5

9. Trehli Trehli 2006-07 10

10. Kathla Balag 2006-07 10

11. Kumahru Bandli 2008-09 35

12. Narehi Kindar 2009-10 6

13. Kathla Balag 2009-10 4

14. Manghel Marhara 2009-10 2

15. Supadhar Trechh 2010-11 11

16. Malohi – I Trechh 2010-11 5

17. Khoondar Salani 2010-11 10

18. Salani Salani 2010-11 10

19. Narehi Kinder 2010-11 10

20. Tarehi Kinder 2010-11 10

Range : Jhungi Division : Suket Component : Pasture Development

Sl No. Site Name Beat Year of Plantation Size of Plantation (Ha.)

1. Kathla Balag 2009-10 9

Range : Jhungi Division : Suket Component : Check Dams

Sl No. Site Name Type Year No. of Check Dams

1. Timbroo nalla S 2000-05 2

2. Marogra nalla S 20005-06 2

3. Mehra nalla S 20005-06 3

4. Chanad nalla L 2005-06 2

5. Kandi nalla M 2005-06 3

6. Brokhri nalla L 2005-06 6

7. Timbroo nalla S – 2 M – 3

2005-06 5

8. Nihri nalla S – 5 M – 3

2005-06 8

9. Kkriya nalla L 2005-06 3

10. Trechh nalla S – 8 M – 4

2005-06 12

11. Chakki nalla S – 4 M – 2

2005-06 6

12. Roproo nalla L 2005-06 7

13. Chiral nalla M 2006-07 1

14. Chhotagadon Not available 2009-10 10

15. Shivshankar Not available 2009-10 10

16. Brough nalla Not available 2009-10 13

17. Jadhnu nalla Not available 2009-10 9

Page 99: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xcvi

18. Trechh nalla Not available 2009-10 2

19. Kamrah nalla Not available 2009-10 13

20. Kathna nalla Not available 2009-10 30

21. Balag nalla Not available 2009-10 20

22. Bah Not available 2010-11 18

23. Nirhi – I Not available 2010-11 2

24. Trechh Not available 2010-11 18

25. Kathuini nalla Not available 2004-05 9

Range : Kangoo Division : Suket Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. Galma Geiru 2004-05 5

2. Ahen sunali Dhawal 2005-06 20

3. Dhawal Dhawal 2005-06 15

4. Sojha Behli 2005-06 10

5. Krangal Behli 2005-06 10

6. Devidhar Batwara 2007-08 10

7. Karla Arawai 2007-08 3

8. Hara Arawai 2007-08 5

9. Neri Ropru Badhu 2005-06 5

10. Bindlu Behli 2008-09 9

11. Ahen Sunali Dhawal 2008-09 15

12. Jartu Barwara 2008-09 16

13. Jartu Barwara 2009-10 25

14. Behli Behli 2010-11 10

15. Baragta Maraboi 2009-10 4

16. Chaloun Badhu 2009-10 14

17. Jartu Batwara 2010-11 12

18. Mared Behli 2010-11 10

19. OD 300 Chouri Badhu 2010-11 20

20. Neri Ropru Badhu 2009-10 10

Range : Kangoo Division : Suket Component : Pasture Development

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. Ahen Sunali Dhawal 2005-06 5

2. Thungdhar Harabol 2005-06 10

3. Thungdhar Harabol 2008-09 7

4. Jartu Batwara 2009-10 10

Range : Kangoo Division : Suket

Page 100: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xcvii

Component : Rim Plantation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1 DPF Karangal Not Available 2010 – 2011 80

2 Karla DPF Not Available 2010 – 2011 10

3 Tahli Not Available 2010 - 2011 80

Range : Kangoo Division : Suket Component : Check Dams

Sl No. Site Name Type Year No. of Dams

1. Fafna Nalla S 2004 – 05 16

2. Garla Bragata S 2004 – 05 11

3. Sunali Nalla S – 25 M – 4 L – 2

2005 – 2006 31

4. Manjheli Nalla S – 11 M – 5 L – 2

2005 – 2006 18

5. Narla Nalla M – 2 L – 2

2005 – 2006 14

6. Smoul Nalla M 2005 – 2006 5

7. Garla Nalla S 2005 – 2006 10

8. Jadium Nalla L 2005 – 2006 1

9. Dohru Nalla M 2006 – 2007 2

10. Gehroo Nalla S 2006 – 2007 2

11. Snoha M 2009 – 2010 6

12. Jindri S 2010 – 2011 20

13. Chehru L 2010 – 2011 12

14. Doghri L – 4 M – 5 S - 3

2010 – 2011 12

15. sojha L – 5 M – 6 S - 4

2010 – 2011 15

16. Gadehra Nalla Not Available 2009 – 2010 20

17. Kayan nalla Not Available 2009 – 2010 12

18. Salog Nalla Not Available 2009 – 2010 20

19. Mandyana Nalla Not Available 2009 – 2010 10

20. Baballa Nalla Not Available 2009 – 2010 18

21. Smoul Nalla Not Available 2009 – 2010 15

22. Kathla Nalla Not Available 2009 – 2010 20

Page 101: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xcviii

Shimla Circle Range : Mashobra Division : Shimla Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. U 167 Jayali Dhalli 2007-08 5

2. U 180Aun Bharari 2007 - 08 5

3. D 73 Mashobra C III Dhalli 2004-05 5

4. D 70 Aun Bharari 2007-08 5

5. D 70 Naldhera C III Naldehra 2005-06 10

6. Annu Bharari 2008-09 3

7. UF Taloh Khotnol 2007-08 10

Range : Mashobra Division : Shimla Component : Pasture Development

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. U.F. Deothi Seepur 2004-05 3

2. UF Charain Naldehra 2005-06 5

Range : Mashobra Division : Shimla Component : Check Dams

Sl No. Site Name Type Year No. Dams

1. Seepur Nalla Not Available 2005 – 06 21

2. Kumhali nalla Not Available 2005 – 06 10

3. Surila / Burila Not Available 2006 – 07 20

4. Manjhari Nalla Not Available 2006 – 07 4

5. Seepur phase ll Not Available 2006 – 07 18

6. Ajidhar Nalla Not Available 2007 – 08 14

7. Kuni Nalla Branch Not Available 2007 – 08 13

8. Paniartu Not Available 2008 – 09 16

9. Janlog Not Available 2008-09 20

10. Chanawat nalla Not Available 2008-09 21

Range : Tara Devi Division : Shimla Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. GCL Neri Tall 2005-06 5

2. GCL Dhart Kamyana 2005-06 10

3. D 214 Jhajia Banoti 2006-07 6

4. R 17 Marhon Kamyana 2007-08 10

5. R 18 Poabo Kamyana 2008-09 5

6. D 207 Tallgiri Tall 2004-05 4

Page 102: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

xcix

7. GCL Marhon Kamyana 2005-06 7

8. D 207 Tallgiri Tall 2004-05 4

9. D 210 Girab Gadaug 2006-07 5

10. GCL Chiwla Banoti 2006-07 46

11. GCL Jhollo Kamyana 2006-07 10

12. GCL Marhon Kamyana 2004-05 7

13. D 208 Gadoug Gadoug 2005-06 2

14. D 214 Jhajia Banoti 2006-07 6

15. GCL Nalhayal Tall 2004-05 4

16. GCL Nalhayal Tall 2005-06 4

17. GCL Karound Tall 2005-06 10

18. GCL Nalhayal Tall 2004-05 3

19. GCL Kalawat Tall 2005-06 3

20. GCL Janol Banoti 2005-06 5

21. D 208 Gadoug Gadoug 2005-06 10

22. GCL Kajail Banoti 2007-08 5

23. R 17 Marhon Kamyana 2009-10 10

Range : Tara Devi Division : Shimla Component : Pasture Development

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. R 27 Gadoug Gadoug 2005-06 2

2. R 27 Gadoug Gadoug 2005-06 5

Range : Tara Devi Division : Shimla Component : Check Dams

Sl No. Site Name Type Year No. Dams

1. Dhander nalla Not available 2004-05 4

2. Bharoi nalla Not available 2005-06 25

3. Kiar nalla Not available 2006-07 24

4. Manla nalla Not available 2007-08 15

5. Bhong nalla Not available 2008-09 26

6. Haron nalla Not available 2009-10 18

7. Sanog nalla Not available 2008-09 7

8. Klar nalla Not available 2010-11 6

Range : Dhami Division : Shimla Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. DPF Badoo Badoo 2005-06 8

2. DFP Brelli G/Hatti 2007-08 2

3. UPF Kushah G/Hatti 2008-09 2

Page 103: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

c

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

4. UPF Bathmana Dhalaya 2009-10 3

5. UPF Makri Okhroo 2010-11 2

6. UPF Okhroo Madeya Okhroo 2006-07 11

7. DPF Kheel Sanog 2008-09 5

8. DPF Salaun Salaun 2009-10 5

9. UPF Mahapuna Halog 2005-06 3

10. UPF Kainth Ki ghati Dhalaya 2006-07 3

11. UPF Ganeog Ganeog 2005-06 5

12. DPF Bag ka nall G/Hatti 2006-07 1

13. DPF Panihana Okhroo 2009-10 10

14. UPF Bohli Dhalaya 2005-06 4

15. UPF Sharog Ganeog 2005-06 5

16. UPF Dhaheog Okhroo 2007-08 5

17. UPF Bag ka nalla Ganeog 2008-09 3

18. DPF Biza Ka Dhalla Ganeog 2009-10 3

19. DPF Bledi Ganeog 2006-07 3

Range : Dhami Division : Shimla Component : Pasture Development

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. DPF Bhawar ki dhak G/Hatti 2007-08 5

2. UPF Narihana Salaun 2006-07 4

3. DPF Binu Pkhroo 2009-10 3

Range : Dhami Division : Shimla Component : Check Dams

Sl No. Site Name Type Year No. of Dams

1. Hiri Ki Beshak Nalla Not Available 2004-05 15

2. Jabri Nalla Not Available 2004-05 16

3. Ghaneog nalla Not Available 2004-05 17

4. Panti nalla Not Available 2005-06 20

5. Barika nalla Not Available 2004-05 17

6. Chand Ki nallai Not Available 2005-06 7

7. Rattanpur Main Khad Not Available 2005-06 8

8. Banaun nalla Not Available 2005-06 7

9. Kushah nalla Not Available 2006-07 17

10. Moolbari nalla Not Available 2006-07 10

11. Dhalya nalla Not Available 2006-07 6

12. Sari nalla Not Available 2007-08 60

13. Dhagech Not Available 2008-09 11

14. Dhogoh/Gainchari nalla Not Available 2008-09 7

15. Mataini nalla and branches Not Available 2008-09 7

Page 104: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

ci

16. Dido Ghatti nalla Not Available 2008-09 51

17. Dhadeyog nalla Not Available 2008-09 13

18. Bledi nalla and branches Not Available 2009-10 10

19. Madeyana nalla Not Available 2009-10 7

Range : Bhajji Division : Shimla Component : Afforestation

Sl No.

Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1 U-42 Nin Chalabag 2005-06 5

2 U-18 chapprani karyali 2005-06 5

3 D-26 Biru khatnaol 2005-06 18

4 U-60 Farinda khatnol 2005-06 10

5 U.F Pahal bajhol 2005-06 10

6 U.F.chanawag Chalabag 2006-07 10

7 DPF Nalag bhajhol 2006-07 5

8 U-15 Drawal karyali 2006-07 10

9 U-9 Drabla karyali 2006-07 10

10 U-13 Ogli Suma himri 2006-07 20

11 U-53 Ramahan khatnaol 2006-07 10

12 U-143 Kayar Thaeila 2006-07 10

13 U-27 Suni,Shakrodi Sunni 2007-08 5

14 U-40 Dadhoeg Sunni 2007-08 5

15 UF Dishti Madhorghat 2007-08 5

16 U-14 Bharara Drabla karyali 2007-08 10

17 U-19 Groan Jasshi karyali 2007-08 25

18 U-20 Dommehar karyali 2007-08 7

19 U-143 Kayar Thaeila 2007-08 10

20 U-56 Taloti khatnaol 2007-08 10

21 U.F. Jaini Nalla I Chalabag 2008-09 5

22 U.F 41. Chatyarh Chalabag 2008-09 7

23 U.31 Gharayana Sunni 2008-09 3

24 D-15 Malaawan Pandoa 2008-09 15

25 D-23 Chapprani Karyali 2008-09 15

26 D-20 Lambidhar Sandoa 2008-09 5

27 D.25 Kadharghat Kandarghat 2008-09 10

28 U-57 Bag Khatnol 2008-09 5

29 U-20 Domehar Karyali 2009-10 5

30 D-10 Malgi Sandoa 2009-10 5

31 D-14 Anu kailu Pandoa 2009-10 5

32 U-144 Deothi Thaeila 2009-10 5

33 U-27 Suni Shakrodi Sunni 2009-10 4

34 U-14 Bharara Drabla Karyali 2010-11 10

35 U-3 Bag-Saini Pandoai 2010-11 15

36 U F Jaminal Chalawa 2009-10 5

Page 105: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cii

Range : Bhajji Division : Shimla Component : Pasture Development

Sl No. Site Name Beat Year of Plantation

Size of plantation (Ha.)

1 U-35 Golan Mandhor ghat 2005-06 5

2 U-12 Gadhau Himri 2005-06 8

3 U.F 594.Kotla Bajhol 2006-07 10

5 U-60 Farinda Thaeila 2005-06 10

6 U-51 Dalana Katnol 2007-08 10

7 U-145 Mool Bhajji Thaeila 2008-09 3

Range : Bhajji Division : Shimla Component : Check Dams

Sl No. Site Name Type Year No. of Dams

1 Sandoa Nalla S 2005-06 2

2 Malthi S=20 M=7

2005-06 27

3 Katli Nalla S=8 M=4

2005-06 12

4 Kangti Nalla S=22 M=25

2005-06 47

5 Hudu Nalla S=3 M=7

2005-06 10

6 Chamba Nalla S=10 M=10

2006-07 20

8 Dyangal S=11 M=12

2006-07 13

9 Chamba Nalla S=2 M=8 L=2

2007-08 12

10 Drabla Nalla S=2 M=11

L=5

2007-08 18

11 Broom Nalla S=10 M=8 L=2

2008-09 20

12 Khanawag S=4 M=11

L=3

2008-09 18

13 Sohal S=5 M=6 L=2

2008-09 13

14 Mandari S=1 M=2

2009-10 3

15 Shamloh S 2009-10 1

16 Khirpidi S=3 2009-10 5

Page 106: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

ciii

M=2

17 Judloo / Mucharna S=5 M=3 L=2

2009-10 10

18 Chakyana S=3 M=9 L=3

2009-10 15

Range : Theog Division : Theog Component : Afforestation

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1. Bagana Cheog 2004-05 5

2. Rohro Theog 2004-05 10

3. Majhar Khanashi 2005-06 5

4. Sainjkhuta I Jugo 2006-07 10

5. Kathaal 1 Gowai 200708 10

6. Bardima D/pur 2006-07 10

7. Shovil Chandara 2009-10 5

8. Khanor Nala Kufri 2005-06 20

9. Kuinial Chandara 2005-06 4

10. Kandaghat Kiari 2005-06 10

11. Sainj Kufta 2 Sugo 2006-07 10

12. Budhil 2nd D/pur 2007-08 10

13. Kathaal 2 Gowai 2007-08 10

14. Bhalech Gowai 2007-08 5

15. Chalawag 1 Shilli 2005-06 10

16. Lanoo 2nd Dharti 2005-06 5

17. Gihorajubbar Sandhu 2006-07 5

18. Gagan Ghari D/pur 2006-07 15

19. Narainty Matinana 2007-08 10

20. Makhrol Kufri 2004-05 5

21. Pralighasni Matiana 2005-06 6

22. Kandaghat Sarog 2006-07 10

23. Shalli Ki Teer D/pur 2006-07 10

Range : Theog Division : Theog Component : Pasture Development

Sl No. Site Name Beat Year of Plantation

Size of Plantation (Ha.)

1) Sholvi Chandara 2005-06 20

2) Chichar Matiana 2006-07 11

3) U 93 Kathog Matiana 2007-08 5

Page 107: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

civ

Range : Theog Division : Theog Component : Check Dams

Sl No. Site Name Type Year No. of Dams

1) D 144 Kundly nalla Big 2004-05 5

2) Narainty nalla Medium 2004-05 15

3) Rohru nalla Small 2004-05 20

4) Rahighat nalla Big 2005-06 15

5) Jugoo nalla Medium 2005-06 20

6) Rahighat nalla Small 2005-06 19

7) Rohroo nalla Big 2006-07 5

8) Sholvi nalla Medium 2006-07 10

9) Narainty nalla Small 2006-07 10

10) Chechar nalla Small 2006-07 10

11) Khanor nalla 2007-08 2008-09

50

12) Jhamu 2006-07 10

Page 108: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cv

Annexure - V

Attendance Sheet of Himachal Pradesh Forest Officials

Page 109: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cvi

Page 110: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cvii

Page 111: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cviii

Page 112: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cix

Annexure - VI

Survival Percentage Based on Distance from Habitation and Road – Afforestation (%)

Bilaspur Division (%)

Sl

No.

Species Distance from Road Distance From Habitation

≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km

1. Khair 58 - - 59 57 -

2. Tuna 61 - - 61 79 -

3. Teak 58 46 - 59 57 -

4. Drek 61 - - 61 46 -

5. Chil - 80 - - 80 -

6. Bamboo 59 - - 62 57 -

7. Shisham 57 68 - 59 60 -

Karsog Division

Sl

No.

Species Distance from Road Distance From Habitation

≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km

1. Chil 64 58 60 60 58 -

2. Deodar 59 60 55 68 61 -

3. Daroo 60 58 63 61 59 -

4. Leucaena 58 69 62 59 59 -

5. Robinia 48 60 65 49 60 -

6. Shisham 66 60 60 64 60 -

7. Ban 59 52 57 52 56 -

Kunihar Division

Sl

No.

Species Distance from Road Distance From Habitation

≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km

1. Chil - 57 44 51 - -

2. Deodar - 54 - 54 - -

3. Kachnar 72 51 64 58 - -

4. Leucaena - 63 57 59 - -

5. Khair 52 63 61 61 - -

6. Chirindi 72 59 59 60 - -

7. Daroo 76 56 - 60 - -

Nachan Division

Sl

No.

Species Distance from Road Distance From Habitation

≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km

1. Deodar 73 58 70 63 - 60

Page 113: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cx

2. Khanor 71 65 - 66 - 58

3. Robinia 66 59 - 61 - 60

4. Khair - 63 - 63 - -

5. Chuli - 62 - - 63 62

Shimla Division

Sl

No.

Species Distance from Road Distance From Habitation

≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km

1. Deodar 56 62 68 58 59 -

2. Ban 46 57 58 55 46 35

3. Daroo 63 64 82 59 66 37

4. Karal 53 68 - 52 61 -

5. Khair 64 40 - 56 45 -

6. Leucaena 66 57 72 57 65 -

7. Ritha 59 44 - 38 46 -

Suket Division

Sl

No.

Species Distance from Road Distance From Habitation

≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km

1. Amla 64 58 60 - 60 -

2. Ban 65 57 58 68 59 56

3. Deodar 57 59 57 60 58 55

4. Shisham 60 58 53 57 58 -

5. Amaltas 64 66 56 73 60 -

6. Khair 59 61 59 68 58 -

7. Leucaena 62 62 53 68 59 -

Theog Division

Sl

No.

Species Distance from Road Distance From Habitation

≤ 0.5 Km 0.6-5Km >5 Km ≤ 0.5 Km 0.6-5Km >5 Km

1. Ban 59 59 - 59 - -

2. Chil 56 58 - - 58 -

3. Daroo 57 57 - - 57 -

4. Deodar 55 56 - 59 54 -

5. Robinia 56 64 - - 57 -

Page 114: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxi

Annexure - VII

Survival of plantations made under different components

Sl.no Division Range Beat Name of Site Year of Plantation

Area of Plantation (Ha.)

Components Average Survival (%)

1 Bilaspur Sadar Panjgain Chamyoun 2005-06 10 Afforestation 57

2 Bilaspur Sadar Jamthal DPF Jamthal Part 1 2007-08 15 Afforestation 59

3 Bilaspur Sadar Chamyoun DPF 2006-07 11 Afforestation 67

4 Bilaspur Sadar Chamyoun DPF 2006-07 21 Afforestation 62

5 Bilaspur Sadar Chamyoun Chanyon 2007-08 13 Afforestation 74

6 Bilaspur Sadar Chamyan UPF Kasol 2005-06 4 Rimplantation 60

7 Karsog Seri Richhni OD 233 RichChni 2006-07 10 Afforestation 67

8 Karsog Seri Katash D 234 sundro 2007-08 5 Afforestation 66

9 Karsog Seri Pathraivi OD 236 Pathraivi 2004-05 8 Afforestation 61

10 Karsog Seri Pathrairi D 236 Pattraivi 2010-11 5 Afforestation 67

11 Karsog Seri Pathrairi Pathrivi OD 237 Kathanda 2005-06 13 Afforestation 65

12 Karsog Seri Tabber ND 245 Firno 2005-06 5 Afforestation 58

13 Karsog Magroo Chora ND 283 Raidhar 2004-05 4 Afforestation 73

14 Karsog Magroo Lassi D 278 Nadoon 2005-06 10 Afforestation 61

15 Karsog Pangana Bilindi D 80 Kanda 2009-10 5 Afforestation 55

16 Karsog Karsog Galaych D - 175 Pehran 2010-11 10 Pasture Development 65

17 Karsog Karsog Snorli D 170 Tikkar Karsog

2004-05 5 Afforestation 55

18 Karsog Karsog Dopha D 173 Dopha 2007-08 11 Afforestation 55

19 Karsog Karsog Mahaunag D 124 Kolontha 2007-08 5 Afforestation 55

Page 115: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxii

20 Karsog Karsog Mahaunag D 124 Kolontha 2009-10 5 Afforestation 60

21 Karsog Karsog Mahaunag 138 Bag bhokhari 2009-10 10 Afforestation 71

22 Karsog Karsog Mahunag OD 124 Kalontha 2005-06 10 Afforestation 62

23 Karsog Karsog Snarli D 170 Tikar Karsog 2006-07 7 Rimplantation 55

24 Karsog Karsog Snarli Baju (OD 167) 2005-06 10 Afforestation 45

25 Karsog Karsog Mahunaag OD 137 Nagaltha 2004-05 5 Pasture Development 63

26 Karsog Karsog Kashol D-199 Dhanyara 2005-06 5 Afforestation 30

27 Karsog Karsog Manail ND 183 Maha Dev ki Banouri

2004-05 7 Afforestation 71

28 Karsog Magroo Serimangarh ND 289 Ghanidhar 2004-05 4 Afforestation 62

29 Karsog Magroo Lassi D 279 Nadoon 2006-07 10 Afforestation 59

30 Karsog Magroo Katande D 259 Latta 2006-07 10 Afforestation 77

31 Karsog Magroo Katande D 259 Latta C IV 2005-06 13 Afforestation 61

32 Karsog Magroo Lassi D 278 Nadoon 2005-06 10 Afforestation 59

33 Karsog Magroo Chora ND 283 Raidhar 2005-06 3 Afforestation 67

34 Karsog Magroo Malrog OD 255 Sagarh 2004-05 3 Afforestation 58

35 Karsog Pangana Tattapani D 95 Jeori 2006-07 10 Afforestation 58

36 Karsog Pangana Shalog D 19 Shlog 2008-09 4 Afforestation 51

37 Karsog Pangana Tattapani D 101 Nandoo 2008-09 20 Afforestation 56

38 Karsog Pangana Talehan D 105 Khadix 2006-07 10 Afforestation 70

39 Karsog Karsog Kashol D 198 Dhanyara 2007-08 17 Afforestation 79

40 Karsog Pangana surhii D 1 Mahog 2010-11 5 Afforestation 64

41 Karsog Pangana Surri D 8 Panyanoo 2009-10 5 Afforestation 62

42 Karsog Pangana Kanda D72 Reshtedheer 2010-11 5 Afforestation 62

43 Karsog Pangana Kutach D 24 Barnug 2009-10 6 Afforestation 58

44 Karsog Pangana Shalog D 19 Shlog 2009-10 5 Afforestation 59

45 Karsog Pangana Talehan D 109 Ghawla 2008-09 10 Afforestation 61

Page 116: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxiii

46 Karsog Pangana Balar D 62 Kunash 2010-11 5 Afforestation 59

47 Karsog Pangana Alsindi Alyash 2010-11 10 Afforestation 59

48 Karsog Pangana Takhan D 106 Bhoura 2006-07 10 Afforestation 58

49 Karsog Pangana Ghushal D 40 Bajhu 2008-09 5 Afforestation 58

50 Karsog Pangana Pangana D 17 Chittri Suket 2007-08 10 Afforestation 55

51 Karsog Pangana Gushal D 39 Shill 2008-09 6 Afforestation 57

52 Karsog Pangana Bilindi D 74 Pavain 2005-06 8 Afforestation 59

53 Karsog Pangana Bilindi D 80 Kanda 2007-08 20 Afforestation 53

54 Karsog Karsog Snarli D 167 Baju (111) 2006-07 7 Afforestation 53

55 Karsog Karsog Mahu Naag 138 Bag bhokhari 2005-06 10 Pasture Development 59

56 Karsog Karsog Manohi OD 193 Katach 2004-05 7 Afforestation 66

57 Karsog Karsog Kashoul D 188 Kandi 2008-09 5 Afforestation 40

58 Karsog Karsog sonarli D 170 Tikar Karsog 2008-09 10 Afforestation 59

59 Karsog Karsog Mamail D 18Maha Dev ki Banouri

2010-11 6 Pasture Development 68

60 Karsog Pangana Bilinali D 74 Parvavr 2006-07 30 Afforestation 57

61 Karsog Pangana Alsindi D 87 Saran 2008-09 5 Afforestation 61

62 Karsog Seri Saran D 249 Hakra 2008-09 4 Afforestation 55

63 Karsog Karsog Parlog D 133 Hiru 2010-11 5 Pasture Development 67

64 Karsog Karsog Parlog D 133 Parnot 2007-08 12 Afforestation 69

65 Karsog Karsog Mehndi ND 201 Aglidhar 2005-06 5 Afforestation 55

66 Karsog Karsog Perlig ND 131 Parnol 2004-05 10 Afforestation 61

67 Karsog Karsog Mendi B 207 Ghandoi 2010-11 9 Afforestation 71

68 Karsog Karsog Mendi D 207 Gandhoi 2005-06 10 Afforestation 75

69 Karsog Pangana Tattapani D 101 Nabdoo 2005-06 7 Afforestation 63

70 Karsog Pangana Talehan D 105 Khandain 2009-10 30 Afforestation 68

71 Karsog Seri Nehri Naal D 213 Nehari Naal 2007-08 15 Afforestation 62

Page 117: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxiv

72 Karsog Seri Nehri Naal D 213 Nehari Naal 2008-09 11 Afforestation 63

73 Karsog Seri Chauridhar D 208 Bhondshill 2006-07 10 Afforestation 43

74 Karsog Seri Chauridhar D 208 Bhondshill 2005-06 5 Afforestation 54

75 Karsog Seri Nanj D222 Pog 2005-06 2 Afforestation 52

76 Karsog Seri Saran NB 247 Saran 2007-08 5 Pasture Development 59

77 Karsog Seri Tabben D 245 Firrio 2008-09 9 Afforestation 58

78 Karsog Seri Tabben ND 242 Boona 2007-08 5 Afforestation 46

79 Karsog Seri Richhni D 233 Richni 2004-05 7 Afforestation 57

80 Karsog Seri Dhamoon D 219 Ganoo C ii 2004-05 6 Afforestation 54

81 Karsog Seri Nahj D 222 Pog 2010-11 1 Afforestation 47

82 Karsog Magroo Chawra ND 283 Raidhor 2007-08 5 Pasture Development 67

83 Karsog Magroo Chawra ND 283 Raidhor 2005-06 5 Pasture Development 69

84 Karsog Karsog Parlog D 133 Hiru 2007-08 9 Pasture Development 65

85 Karsog Karsog Mehndi D 203 Thach 2007-08 15 Afforestation 54

86 Karsog Karsog Parlog 135 fagog 2007-08 5 Afforestation 59

87 Karsog Pangana Balar D 61 Sorsan Plantation Site

2005-06 5 Afforestation 57

88 Karsog Pangana Balar D 64 Salana Degoh 2009-10 5 Afforestation 68

89 Karsog Pangana Kanda D 72 Rishtedhar 2008-09 10 Afforestation 67

90 Karsog Pangana Balar D 63 Panyroo 2005-06 4 Afforestation 60

91 Karsog Pangana Kanda D 72, RestaDhar 2005-06 4 Afforestation 62

92 Karsog Pangana Kanda D 72, RestaDhar 2 2008-09 6 Afforestation 71

93 Karsog Pangana Kanda D 73 Gharlal 2010-11 12 Afforestation 72

94 Karsog Seri Nahi D 222 Pog 2009-10 5 Afforestation 60

95 Karsog Seri Saran D 249 Makra 2007-08 2 Afforestation 58

96 Karsog Seri Saran D 247 saran 2009-10 5 Afforestation 61

97 Karsog Seri Drehari Nal D 214 Jhunjhun 2009-10 20 Pasture Development 76

98 Karsog Seri Tabben 241 Kandloo 2008-09 3 Afforestation 60

Page 118: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxv

99 Karsog Seri Nehri Nal Nehri Nal 2005-06 7 Pasture Development 69

100 Karsog Seri Sarhan OD 247 Saran 2009-10 5 Afforestation 54

101 Karsog Seri Sarhan OD 247 Saran 2004-05 5 Afforestation 46

102 Karsog Seri Sarhan OD 247 Saran 2005-06 5 Afforestation 68

103 Karsog Pangana Tattapani D99 Brahar 2008-09 15 Afforestation 56

104 Karsog Pangana Tattapani D 100 Ghangar 2004-05 10 Afforestation 61

105 Karsog Pangana Tattapani D 76 Kapdyal 2007-08 15 Afforestation 59

106 Karsog Pangana Alsnidi D 90 Mahita 2 2010-11 5 Afforestation 68

107 Karsog Pangana Tattapani D 100 ghanger 2007-08 5 Afforestation 57

108 Karsog Pangana Tattapani D 96 Shoj 2007-08 10 Afforestation 54

109 Karsog Pangana Talehan D 104 Besta 2004-05 10 Afforestation 58

110 Karsog Magroo Segagi ND 264 Khatu 2006-07 5 Afforestation 73

111 Karsog Karsog Porlog D 134 magan 2008-09 5 Pasture Development 61

112 Karsog Karsog Kakashan D 161 Damail 2008-09 10 Afforestation 59

113 Karsog Karsog Galaych D 176 Galyech 2008-09 10 Afforestation 51

114 Karsog Seri Saran D 249 Makra 2008-09 4 Afforestation 37

115 Karsog Pangana Pangana D 20 Humginalla 2008-09 6 Afforestation 55

116 Karsog Karsog Porlog 135 Fafan 2007-08 5 Pasture Development 78

117 Karsog Pangana Alsindi D 86 lochar 2004-05 8 Afforestation 78

118 Karsog Pangana tatta Pani D 101 Nandoo 2005-06 10 Afforestation 64

119 Karsog Pangana tatta Pani D 100 Ghangar 2005-06 7 Afforestation 64

120 Karsog Pangana Alsuidi D-76, Kapadyas 2004-05 10 Afforestation 78

121 Kunihar Darlaghat Labrath DS - Katpol 2010-11 15 Afforestation 57

122 Kunihar Darlaghat Mangoo Manru - UF 2009-10 5 Afforestation 57

123 Kunihar Darlaghat Kandhar UF Padyar 2009-10 10 Rimplantation 63

124 Kunihar Darlaghat Labrath D 8 Trat 2004-05 7.5 Afforestation 58

125 Kunihar Darlaghat Danoghat Serghara Kau UFC 6 C 6

2010-11 5 Afforestation 59

Page 119: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxvi

126 Kunihar Darlaghat Labrath U 17 Matreach 2009-10 5 Afforestation 62

127 Kunihar Darlaghat Mangoo Baryal DPF 2010-11 10 Afforestation 60

128 Kunihar Darlaghat Kandhar 23 Bajrail 2006-07 5 Afforestation 57

129 Kunihar Darlaghat Labrath U 17 Matreach 2006-07 10 Afforestation 58

130 Kunihar Darlaghat Kandhar Labrath 2005-06 10 Afforestation 55

131 Kunihar Darlaghat Ladhar J 21 2010-11 5 Rimplantation 54

132 Kunihar Darlaghat Danoghat D 51 sergharakur E 2

2009-10 10 Afforestation 63

133 Kunihar Darlaghat Labrath 09-Skor 2007-08 7 Afforestation 40

134 Kunihar Darlaghat Labrath D 9 Skor 2008-09 25 Afforestation 65

135 Nachan Seraj Bail Grytroof 2008-09 15 Afforestation 72

136 Nachan Seraj Bail Bijnadhar 2005-06 10 Afforestation 65

137 Nachan Seraj Bail Jhalrue 2007-08 5 Afforestation 69

138 Nachan Seraj Bail Santotili 2004-05 10 Afforestation 59

139 Nachan Seraj Bail Magarugala 2005-06 10 Afforestation 52

140 Nachan Seraj Bail Pohhridhar 2005-06 9 Afforestation 53

141 Nachan Seraj Baila Kasigad 2007-08 10 Afforestation 67

142 Nachan Seraj Bail Labni Nalla 2005-06 5 Afforestation 65

143 Shimla Dhami Shngo UPF Kheel 2008-09 5 Afforestation 60

144 Shimla Dhami Ganeog Kushah 2008-09 2 Afforestation 56

145 Shimla Dhami Ganeog Baledi 2006-07 3 Afforestation 53

146 Shimla Dhami Ganeog UPF Ganeog 2005-06 5 Afforestation 59

147 Shimla Dhami Ganeog DPF Bijo Ka Dhalle 2009-10 3 Afforestation 61

148 Shimla Dhami Ganeog UF Sharog 2005-06 5 Afforestation 41

149 Shimla Dhami halog Mahapuna 2005-06 4 Afforestation 55

150 Shimla Dhami Dhalaya Kainth ki Ghati 2006-07 3 Afforestation 75

151 Shimla Dhami Dhalaya Bathmana 2009-10 3 Afforestation 75

Page 120: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxvii

152 Shimla Dhami Salaun DPF Salaun 2009-10 5 Afforestation 68

153 Shimla Dhami Salaun UPF Narihana 2005-06 4 Pasture Development 54

154 Shimla Dhami Ghanhatti Bag Ka Nalla 2008-09 3 Afforestation 53

155 Shimla Dhami Ghanhatti Bharwar Ka Dhank 2007-08 5 Pasture Development 67

156 Shimla Dhami Okhru Binu 2009-10 3 Afforestation 59

157 Shimla Dhami Okhru Makri 2010-11 2 Afforestation 56

158 Shimla Dhami Okhru Pani Lane 2009-10 10 Afforestation 57

159 Shimla Dhami Ghanhatti Bag Ka 2006-07 1 Afforestation 55

160 Shimla Dhami Ghanhatti BDF Brelli 2007-08 2 Afforestation 61

161 Shimla Dhami Okhru Dhaheog 2007-08 5 Afforestation 78

162 Shimla Dhami Okhru Dokhru Madhya 2006-07 11 Afforestation 69

163 Shimla Dhami Holog Hin Ki Beshak 2005-06 6 Afforestation 63

164 Shimla Dhami Dhalaya Bohli 2005-06 4 Afforestation 52

165 Shimla Bhajji Himri U - 13 Oglisuma 2006-07 20 Afforestation 76

166 Shimla Bhajji Karyali U - 20 Domehal 2009-10 5 Afforestation 59

167 Shimla Bhajji Karyali U - 20 Domehal 2007-08 7 Afforestation 60

168 Shimla Bhajji Sunni U - 27 Sunni Shakrodi

2007-08 5 Afforestation 44

169 Shimla Bhajji Sunni U - 27 Sunni Shakrodi

2009-10 4 Afforestation 55

170 Shimla Bhajji Sunni U - 40 Dadhoeg 2007-08 5 Afforestation 61

171 Shimla Bhajji Madhorghat UF Dishti 2007-08 5 Afforestation 61

172 Shimla Bhajji Madhorghat U - 35 Golan 2005-06 5 Pasture Development 59

173 Shimla Bhajji Chalnwag Chalnwag 2006-07 10 Afforestation 27

174 Shimla Bhajji Chalnwag UF Jaminala 2009-10 5 Afforestation 44

175 Shimla Bhajji Khotnol D 26 Biru 2004-05 18 Afforestation 50

176 Shimla Bhajji Khotnol U 51 Dalana 2007-08 10 Pasture Development 63

Page 121: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxviii

177 Shimla Bhajji Khotnol U 53 Ramhar 2006-07 10 Afforestation 61

178 Shimla Bhajji Thaila U 143 kayar 2006-07 10 Afforestation 67

179 Shimla Bhajji Thaila U 143 kayar 2006-07 10 Afforestation 47

180 Shimla Bhajji Sandoa D-20 Lambi Dhar 2008-09 5 Afforestation 65

181 Shimla Bhajji Badhain U - 41 Chatyar 2008-09 7 Afforestation 59

182 Shimla Bhajji Pandoa U - 3 Bag - Sainj 2010-11 15 Afforestation 69

183 Shimla Bhajji Karyali U - 14 Bhara Drabla

2010-11 10 Afforestation 57

184 Shimla Bhajji Thaila U - 60 Farinda 2005-06 10 Afforestation 69

185 Shimla Bhajji Karyali D- 23 Chaprni 2008-09 15 Afforestation 75

186 Shimla Bhajji Thaila U - 60 Forinda 2006-07 10 Pasture Development 56

187 Shimla Bhajji Himri U 12 Gadhau 2005-06 8 Pasture Development 58

188 Shimla Bhajji Kariyali U 18 ChaPrani 2005-06 5 Afforestation 62

189 Shimla Bhajji Thaila U 145 Mool Bhajji 2008-09 3 Pasture Development 54

190 Shimla Bhajji Thaila U 144 Deothi 2009-10 5 Afforestation 43

191 Shimla Bhajji Kariyali U 20 Domehar 2006-07 20 Pasture Development 65

192 Shimla Bhajji Khatnol U 57 Bag 2008-09 5 Afforestation 67

193 Shimla Bhajji Panooa U 10 Malgi 2009-10 5 Afforestation 55

194 Shimla Bhajji Karyali U 15 Drawal 2006-07 10 Afforestation 43

195 Shimla Bhajji Bathol UF Pahal 2005-06 10 Afforestation 37

196 Shimla Bhajji KadharGhat D 25 Kdhar Ghat 2008-09 10 Afforestation 65

197 Shimla Bhajji Karyali U 14 Bhara-Drable 2007-08 10 Afforestation 57

198 Shimla Bhajji Khatnol U 57 Bag 2008-09 5 Afforestation 71

199 Shimla Bhajji Bajhol D 260 Malalag 2006-07 5 Afforestation 66

200 Shimla Bhajji Pandoha O 14 anuKajhr 2009-10 5 Afforestation 71

201 Shimla Bhajji Bajhol U 594 kotla 2006-07 10 Pasture Development 53

202 Shimla Bhajji Badmain U 42 Neen 2005-06 5 Afforestation 51

Page 122: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxix

203 Shimla Dhami Badoo DPF Badoo 2005-06 8 Afforestation 65

204 Shimla Bhajji Sunjni U 31 Gharyana 2008-09 3 Afforestation 65

205 Shimla Bhajji Karyali D -9 Drabla 2006-07 10 Afforestation 59

206 Shimla Bhajji Pandoa U 15 Malawan 2008-09 10 Afforestation 60

207 Shimla Mashobra Dhalli D 73 Mashobra Cttt

2004-05 5 Afforestation 53

208 Shimla Taradevi Gadeug RF 27 Gadaug (PD) 2005-06 5 Pasture Development 61

209 Shimla Taradevi Ghamyana GLC Marhon 2005-06 7 Afforestation 56

210 Shimla Mashobra Bharari U 180 anu 2007-08 5 Afforestation 68

211 Shimla Mashobra Bharari D 70 Anu 2007-08 5 Afforestation 69

212 Shimla Mashobra Nalderhra D 70 Naldehra C III 2005-06 10 Afforestation 63

213 Shimla Taradevi Khamyana GLC - Marhon 2004-05 7 Afforestation 70

214 Shimla Taradevi Kamyana R 17 Marhav 2009-10 10 Afforestation 53

215 Shimla Taradevi Kamyana GCL - Jhollo 2006-07 10 Afforestation 54

216 Shimla Taradevi Ghamyana R- 17 Morhon 2007-08 10 Afforestation 67

217 Shimla Taradevi Taal Taalgiri 2004-05 4 Afforestation 55

218 Shimla Taradevi Gamyana R 18 Poabo 2008-09 5 Afforestation 55

219 Shimla Taradevi Khamyana GLC Dhart 2005-06 10 Afforestation 60

220 Shimla Taradevi Bauoti D 214 Jhagio 2005-06 6 Afforestation 70

221 Shimla Taradevi Tall GCL Kalawat 2005-06 3 Afforestation 43

222 Shimla Taradevi Tall GCL Nalayal 2004-05 3 Afforestation 76

223 Shimla Taradevi Tall GCL Karomed 2005-06 10 Afforestation 56

224 Shimla Mashobra Bharti UPF 180 Anu 2008-09 3 Afforestation 52

225 Shimla Mashobra Seepur UF Deothi (Pastune)

2004-05 3 Pasture Development 53

226 Shimla Taradevi Gadaug R 27 Gadaug 2005-06 2 Pasture Development 52

227 Shimla Taradevi Gadaug D 208 Gadang 2005-06 10 Afforestation 60

Page 123: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxx

228 Shimla Taradevi Tutu GCL Nalhayal 2004-05 4 Afforestation 55

229 Shimla Taradevi Boondi D 214 Jhajra 2006-07 6 Afforestation 60

230 Shimla Taradevi Taal Taalgiri 2004-05 4 Afforestation 48

231 Shimla Mashobra Naldera UPF Cherain 2005-06 5 Pasture Development 71

232 Shimla Taradevi Gadaug DPF 210 Garib III 2006-07 5 Afforestation 59

233 Shimla Bhajji Karyali U 19 Graon Jassi 2007-08 25 Afforestation 74

234 Shimla Taradevi Tall GCL Nalhayal 2005-06 4 Afforestation 61

235 Shimla Taradevi Banooti GCL Kajail 2007-08 5 Afforestation 63

236 Shimla Taradevi Banooti GCL Janol 2005-06 5 Afforestation 57

237 Shimla Mashobra Dhalli U 167 Sayali 2007-08 5 Afforestation 56

238 Shimla Taradevi Boonati GCL Chewla 2006-07 6 Afforestation 55

239 Shimla Taradevi Taal GCL Neri 2005-06 5 Afforestation 57

240 Shimla Bhajji Bathol UF Pahal 2005-06 10 Afforestation 37

241 Shimla Taradevi Guduya DF 208 badoug 2005-06 2 Afforestation 77

242 Suket Kangu Badhoo UD 300 Chauri 2010-11 70 Afforestation 63

243 Suket Kangu Behli mared 2010-11 10 Afforestation 60

244 Suket Kangu Behli Behli 2010-11 10 Afforestation 59

245 Suket Kangu Batwara Ahemsunali 2005-06 20 Afforestation 58

246 Suket Kangu Batwara Jartu 2009-10 10 Pasture Development 57

247 Suket Kangu Dhawal Dhawal 2005-06 15 Afforestation 60

248 Suket Kangu Batwara Jartu (16) 2009-10 16 Afforestation 52

249 Suket Kangu Gairu Devidhar 2007-08 10 Afforestation 52

250 Suket Kangu Haraboi Bargata 2009-10 4 Afforestation 59

251 Suket Kangu Haraboi Tahli 2010-11 80 Afforestation 52

252 Suket Jhungi Junghi Shi Vshankar 2006-07 5 Afforestation 63

253 Suket Jhungi Trechh Supadhar 2010-11 11 Afforestation 67

254 Suket Jhungi Balag Trechh 2009-10 4 Afforestation 59

255 Suket Jhungi Trechh Trechh 2009-10 5 Afforestation 53

Page 124: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxi

256 Suket Jhungi Balag Kathla 2006-07 10 Afforestation 59

257 Suket Jhungi Kinder Trechh 2004-05 10 Afforestation 60

258 Suket Jhungi Kathuni Kathuni 2005-06 7 Afforestation 60

259 Suket Kangu Batwara Jartu 2010-11 12 Afforestation 63

260 Suket Kangu Haraboi Karla 2007-08 3 Afforestation 56

261 Suket Kangu Badhoo DPF Chaloun 2010-11 14 Afforestation 53

262 Suket Kangu Haraboi Karla 2010-11 10 Rimplantation 56

263 Suket Kangu Badhu New ropree 2005-06 5 Afforestation 53

264 Suket Jhungi Trechh Ropa 2010-11 5 Afforestation 77

265 Suket Kangu Haraboi Thungdar III 2009-10 20 Pasture Development 58

266 Suket Kangu Behli Karangal 2009-10 80 Rimplantation 82

267 Suket Jhungi Salani Salani 2005-06 5 Afforestation 63

268 Suket Jhungi Jarel Hanjki 2005-06 5 Afforestation 51

269 Suket Kangu Harboi Thungfar 2 2008-09 7 Pasture Development 59

270 Suket Kangu Dhwal Ahen sunali 2008-09 15 Afforestation 56

271 Suket Kangu Gairu Galma 2004-05 5 Afforestation 61

272 Suket Kangu Haraboi Thungdar 1 2005-06 10 Pasture Development 60

273 Suket Kangu Behli Bindloo 2008-09 9 Afforestation 53

274 Suket Kangu Behli Karngal 2005-06 10 Afforestation 58

275 Suket Kangu Harabai Hara 2007-08 5 Afforestation 62

276 Suket Jhungi Kinder Narehli 2009-10 6 Afforestation 63

277 Suket Jhungi Kinder Kinder 2010-11 10 Afforestation 73

278 Suket Jhungi Bandli Malohi 2010-11 5 Afforestation 63

279 Suket Jhungi Kinder Narehli 2010-11 10 Afforestation 73

280 Suket Jhungi Nihri Chehar Plantation site

2005-06 5 Afforestation 63

281 Suket Kangu Behali Sojha 2005-06 10 Afforestation 54

282 Suket Kangu Dhwal Ahen Sunali 2005-06 5 Pasture Development 57

Page 125: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxii

283 Suket Jhungi Salani Khoondar 2010- 11 10 Afforestation 83

284 Suket Jhungi Kinder Trechdi 2006-07 10 Afforestation 56

285 Suket Kangu Badoo Near Ropru 2009-10 10 Afforestation 71

286 Suket Jhungi Bandli Kumaru 2008-09 35 Afforestation 54

287 Suket Jhungi Marhara manghel 2009-10 15 Afforestation 61

288 Suket Jhungi Saloni Saloni 2010-11 5 Afforestation 55

289 Suket Jhungi Saloni Saloni 2006-07 5 Afforestation 52

290 Suket Kangu Batwara Jartu 2009-10 25 Afforestation 58

291 Theog Theog Matiana Sholui Pasture 2005-06 20 Pasture Development 60

292 Theog Theog Shali Rohroo 2004-05 10 Afforestation 59

293 Theog Theog Shali Chalawog -1 2005-06 10 Afforestation 55

294 Theog Theog Dharampur Prlighashi 2005-06 6 Afforestation 56

295 Theog Theog Ghowai Kathal 2 2007-08 10 Afforestation 57

296 Theog Theog Ghowai Kathal 1 2007-08 10 Afforestation 55

297 Theog Theog Dharampur Basdima 2006-07 10 Afforestation 61

298 Theog Theog Ghowai Bhalech 2007-08 5 Afforestation 54

299 Theog Theog Koofri Makrol 2004-05 5 Afforestation 59

300 Theog Theog Koofri Bagna 2004-05 5 Afforestation 59

301 Theog Theog Koofri Kanor Nalla 2005-06 20 Afforestation 58

302 Theog Theog Chidara Kuinal 2005-06 4 Afforestation 59

303 Theog Theog Sarog Khadhaghat 2005-06 10 Afforestation 55

304 Theog Theog Matyana Narainty 2007-08 10 Afforestation 55

305 Theog Theog Deoth Magaen Gaen 2006-07 7 Afforestation 60

306 Theog Theog Dharti Maghar 2005-06 5 Afforestation 67

307 Theog Theog Dharmpur Shalu hi tear 2006-07 10 Afforestation 45

308 Theog Theog Dharmpur Budlhi 2 2007-08 10 Afforestation 63

309 Theog Theog Sandu Ghorajubbar 2006-07 5 Afforestation 41

310 Theog Theog Chadara Sholvi 2004-05 5 Afforestation 67

Page 126: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxiii

311 Theog Theog Jugo Sainj Khafta 2 2006-07 10 Afforestation 23

312 Theog Theog Dharmpur Gagan Ghatir 2006-07 15 Afforestation 64

313 Theog Theog Jugo Sainj Kupla 1 2006-07 10 Afforestation 56

314 Theog Theog Sarog Kandaghat 2006-07 10 Afforestation 61

315 Theog Theog Deoth Lanoo 2 2005-06 5 Afforestation 56

Page 127: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxiv

Results of Chek Dam Monitoring Sl.No Division Name of the Drainage Line Year of

Treatment Range Beat Average Depth

of silt / Ha. (m) Average Weight of Silt(ton/Ha)

1 Bilaspur D 80 Kanda 2009-10 2005-06 Sadar UPF Kasol Nala 0.6 1.7

2 new Kayari 2006-07 Sadar Chamyaun 1.1 3.1

3 Suit ka Pani Nalla 2006-07 Sadar Jmthal 0.8 2.4

4 Tal nalla 2006-07 Sadar Chamyan 1.3 3.7

5 UPF Nalla 2005-06 Sadar Chamyan 0.7 2.0

6 Karsog Badoham 2008-09 Seri Dhamoesh 1.5 4.3

7 Bahj 2009-10 Karsog Kashol 0.9 2.5

8 Bahj nalla 2009-10 Karsog Kashol 0.8 2.5

9 Banera 2005-06 Karsog Banera 1.6 4.7

10 Banera 2006-07 Karsog Banera 1.5 4.5

11 Baryon Kuudi 2005-06 Pangana Kanda 1.4 4.1

12 Bashala Nalla 2008-09 Magroo Serinangarh 0.1 0.2

13 Bhogu 2005-06 Seri Chauridhar 2.0 5.9

14 Bithari bouri nalla 2004-05 Pangana Katach 1.7 5.0

15 Bithouri Bouri nalla 2005-06 Pangana Pangna 1.6 4.8

16 Boghu 2005-06 Seri Chauridhar 2.5 7.3

17 Chatkar 2009-10 Pangana Kanda 0.7 2.0

18 Chitchad nall 2005-06 Pangana Katamda 0.6 1.6

19 Chukku nalla 2009-10 Pangana Karadal 2.4 6.9

20 Danoil 2009-10 Karsog Kakahen 0.4 1.0

21 Domail 2009-10 Karsog Kakahon 0.4 1.3

22 Galyach 2009-10 Karsog Galyach 1.6 4.8

23 Ghalash Nalla 2009-10 Pangana Alsindi 2.3 6.7

24 Godarn Nalla 2009-10 Seri Puchi 1.4 4.2

Page 128: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxv

25 Gujroodhar nalla 2009-10 Pangana Alsuindi 2.0 5.8

26 Haridhar Nalla 2008-09 Magroo SreMangrih 1.4 4.2

27 Harmolla 2005-06 Karsog Galyach 1.7 4.9

28 hatkar nallas 2008-09 Pangana Alsuindi 2.0 6.0

29 Jai Nalla 2007-08 Seri Saran 1.0 3.0

30 Jai Nalla 2009-10 Seri Saran 0.7 2.0

31 Jhingal 2009-10 Karsog Darmour 1.9 5.6

32 Kandlu 2007-08 Seri Tabben 1.6 4.7

33 Kandlu 2007-08 NA Tabber 1.7 4.9

34 Karashi nalla 2008-09 Magroo Chora 1.1 3.3

35 Kataclu Nalla 2007-08 Magroo Katamda 1.7 5.0

36 Kathende 2004-05 Seri Pathrari 1.5 4.4

37 Khanek Nalla 2008-09 Magroo Sereangish 1.3 3.9

38 Khodona 2008-09 Karsog Banero 1.5 4.5

39 Kondal 2007-08 Seri Richhni 1.2 3.6

40 Kus Nalla 2008-09 Pangana Belar 0.7 1.9

41 Makrikat nalla 2008-09 Seri Pathaivi 1.4 4.1

42 Makrikot Nalla 2008-09 Seri Patnrairi 1.3 3.9

43 Mehram Nall 2009-10 Karsog Darmour 1.8 5.3

44 Mehran 2007-08 Karsog Dharmour 1.8 5.4

45 Nagaltha 2005-06 Karsog Mahunaag 2.0 5.8

46 Naguam nalla 2008-09 Magroo mahog 0.2 0.5

47 Naresh 2005-06 Seri Chavridhar 1.6 4.8

48 Narosh 2005-06 Seri Churidhar 2.0 5.9

49 Nehari Nal 2007-08 Seri Nehari Nal 1.4 4.2

50 Nehaxi nalla 2007-08 Seri Nehari Nalla 1.6 4.8

51 Padoo 2008-09 Seri Seri 1.5 4.3

52 Palhrairi Nalla 2005-06 Seri Palhrairi 2.1 6.0

Page 129: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxvi

53 Pandao 2008-09 Seri Seri 1.5 4.4

54 Panyroo khablaye 2005-06 Pangana Belar 1.6 4.7

55 Path Jhurandi nalla 2005-06 Pangana Karadal 1.8 5.3

56 Path Jhurandi nalla 2005-06 NA Karadal 1.6 4.7

57 pathreivi nalla 2005-06 Seri Pathreivi 2.1 6.0

58 Puni 2008-09 Karsog Dopha 0.7 2.0

59 Puni nalla 2008-09 Karsog Dopha 0.6 1.7

60 Saganj 2004-05 Seri Nahi 1.5 4.4

61 Sakrahan nalla 2008-09 Pangana Blindi 1.9 5.7

62 Salaundagah 2005-06 Pangana Belar 0.8 2.5

63 Sarkol 2009-10 Karsog Snarli 0.9 2.5

64 Sayani 2004-05 Seri Nahi 1.5 4.4

65 Shandrelal nalla 2008-09 Pangana Pangna 0.8 2.4

66 Shayongi 2008-09 Karsog Bakshae 2.1 6.3

67 Shayongi 2008-09 NA Bhakshaal 2.1 6.3

68 Sursi 2009-10 Karsog Manail 1.5 4.5

69 Tatapani Nalla 2005-06 Pangana Tatapani 1.9 5.5

70 Tatmu 2008-09 Karsog Mahunaag 1.8 5.2

71 Thambli 2004-05 Seri Nahi 1.6 4.6

72 Thangi nall 2009-10 Magroo Chara 0.1 0.4

73 Thermi 2008-09 Karsog Mamail 0.7 2.1

74 Thermi nalla 2007-08 Seri Gowalpur 0.0 0.0

75 Thermlli 2009-10 Seri Nahi 1.5 4.3

76 Tudli 2008-09 Karsog Dopha 1.5 4.5

77 Udhun k nalla 2005-06 Pangana Belar 0.2 0.5

78 Kunihar Dangaril 2010-11 Darlaghat Bagga 0.3 1.0

79 Jandhoi U F nalla 2006-07 Darlaghat LABRATH 0.9 2.7

80 Kun nalla 2008-09 Darlaghat mangoo 0.5 1.5

Page 130: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxvii

81 matraich nalla 2006-07 Darlaghat LABRATH 0.9 2.5

82 matraich nalla 2007-08 Darlaghat LABRATH 1.0 2.9

83 Pladnia nalla 2010-11 Arki Sanalaghat 1.2 3.4

84 Shiharli nalla 2007-08 Darlaghat LABRATH 1.1 3.1

85 SHIRIJ 2005-06 Darlaghat LABRATH 1.0 2.9

86 Skor DPF 2004-05 Darlaghat Karrath 1.3 3.8

87 Nachan Jogni Girjinoo nalla (running)

2009-10 Seraj Baila 1.6 4.7

88 Lrojnce 2008-09 Seraj Baila 1.3 3.8

89 Shimla Ajdhar nalla (working nalla) 2007-08 Mashobra Dhalli 1.2 3.4

90 Banaun Nalla 2005-06 Dhami Salaun 1.1 3.2

91 Bharoia nalla 2005-06 Taradevi Banauti 1.1 3.1

92 Bhong batal nalla 2008-09 Taradevi taal 0.0 0.0

93 Bledi nalla 2009-10 Dhami Ganeog 1.8 5.2

94 Bron 2008-09 Bhajji Himri 1.7 5.1

95 Chakvana 2009-10 Bhajji Thila 1.1 3.4

96 Chamba nalla 2006-07 Bhajji Karyali 1.5 4.5

97 Chand ki Nalla 2005-06 Dhami Dhalaya 1.6 4.7

98 Chand ki Wall 2005-06 Dhami Dhalaya 1.6 4.7

99 Chanmba 2007-08 Bhajji Karyali 1.9 5.5

100 Chhanawat 2008-09 Mashobra Dhalli 0.7 2.1

101 Dayangal 2006-07 Bhajji Thail 1.4 4.0

102 Dhadyag nala 2009-10 Dhami okru 0.6 1.9

103 Dhagech Nalla 2008-09 Dhami Dhalaya 1.6 4.6

104 Dhagech Nalla 2008-09 NA Dhalaye 1.6 4.6

105 Dhagoh yainchari 2008-09 Dhami Holog 1.3 3.8

106 Dhalaya nalla 2006-07 Dhami Dhalaya 1.5 4.4

107 Dhandar nalla 2004-05 Taradevi Banauti 2.0 5.8

Page 131: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxviii

108 Dholaya Nalla 2006-07 Dhami Dhalaya 1.5 4.4

109 Didighatti nalla 2008-09 Dhami Sarog 1.6 4.7

110 Drabla nalla 2007-08 Bhajji Karjali 1.2 3.7

111 Ghanog nalla 2005-06 Dhami Ganeog 1.3 3.9

112 Haroon nallah 2009-10 Taradevi Banauti 0.0 0.0

113 Hiri ki beshak 2005-06 Dhami halog 1.2 3.5

114 Hudu Nalla 2005-06 Bhajji Chanaurag 1.4 4.0

115 Jabri Nalla 2004-05 Dhami Dhalaya 1.4 4.2

116 Janglog 2008-09 Mashobra Bharari 1.3 3.7

117 Judlu Nalla 2009-10 Bhajji Chanaway 1.3 3.7

118 Kair nalla 2010-11 Taradevi Tall 0.0 0.0

119 Kangti nalla 2005-06 Bhajji Bajhol 1.6 4.8

120 Katali Nalla 2005-06 Bhajji Maldhor 1.1 3.2

121 Khanawag 2008-09 Bhajji Khotnul 1.0 2.9

122 Khirpadi 2009-10 Bhajji Himri 0.4 1.1

123 Kiar nalla 2006-07 Taradevi Gadaug 1.6 4.7

124 Kumalli nalla 2005-06 Mashobra Dhalli 0.0 0.0

125 Kunni nalla and branches 2007-08 Mashobra Dharti 1.5 4.4

126 Kushaha nalla 2006-07 Dhami Ganeog 1.6 4.7

127 Madyana nalla 2009-10 Dhami Okhroo 0.6 1.9

128 Majheri nalla 2006-07 Mashobra Dharti 1.6 4.6

129 Malthi nalla 2005-06 Bhajji Thaila 1.5 4.3

130 Mandri Nalla 2009-10 Bhajji Maldhorghat 1.8 5.4

131 Manla nalla & branches 2007-08 Taradevi Tutu 0.6 1.6

132 mataini nalla 2008-09 Dhami Ghanhatti 0.3 0.8

133 Moolbari Nalla 2006-07 Dhami Shanog 1.5 4.3

134 Moolbari Nalla 2006-07 NA Shawog 1.6 4.8

135 Paniartu nalla 2008-09 Mashobra Paniyali 0.6 1.7

Page 132: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxix

136 Panti nala 2005-06 Dhami Shanog 1.0 2.9

137 Panti nala 2005-06 NA Shanog 0.6 1.8

138 Rari ka nalla 2004-05 Dhami Ganeog 1.5 4.5

139 Rattan pur nala 2005-06 Dhami Salaun 0.7 2.1

140 Sandua 2005-06 Bhajji Sandua 1.3 3.7

141 Sanog nalla 2009-10 Taradevi Tall 2.1 6.2

142 Sari nall 2007-08 Dhami Dhalay 0.4 1.3

143 Seepur nalla 2005-06 Mashobra Seepur 1.9 5.7

144 Seepur nalla Phase II 2006-07 Mashobra Seepur 0.0 0.0

145 Shimaoh Nalla 2009-10 Bhajji Sunni 1.1 3.2

146 Sohal 2008-09 Bhajji Chananrag 0.9 2.6

147 Surilla/burrilla nalla (running)

2006-07 Mashobra Dhalli 1.0 2.9

148 Suket Babailla nalla 2009-10 Kangoo Haraboi 0.4 1.1

149 Bah Nalla 2010-11 Jhungi Nihri 1.4 4.2

150 Balagh nalla 2008-09 Jhungi Balagh 1.5 4.5

151 Baragta nalla 2004-05 Kangoo Haraboi 1.5 4.4

152 Brdkhari nalla 2005-06 Jhungi Jarek 1.0 2.9

153 Brough Ball 2009-10 Jhungi Salani 0.8 2.3

154 Chakki nalla 2005-06 Jhungi Bandli 1.3 3.7

155 Chanad nall 2009-10 Jhungi Kinder 1.0 3.0

156 Chehru nalla 2010-11 Kangoo Batwara 0.2 0.5

157 Chhutagadam 2009-10 Jhungi Chahagadan 1.1 3.3

158 Chiral Nalla 2006-07 Jhungi Nirihi 2.2 6.4

159 Dagri nalla 2010-11 Kangoo Haraboi 0.3 1.0

160 fafna nalla 2004-05 Kangoo Badhu 2.3 6.7

161 Gadhyana nalla 2009-10 Kangoo Batwara 0.6 1.7

162 garla nallaGarla nalla 2005-06 Kangoo Haraboi 1.4 4.2

Page 133: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxx

163 Gehroo Nalla 2006-07 Kangoo Gairu 1.7 4.9

164 Jariun nalla 2005-06 Kangoo Behali 1.6 4.7

165 Jindri nalla 2010-11 Kangoo Gairu 0.5 1.4

166 Jodhnoo nalla 2009-10 Jhungi Kinder 1.3 3.9

167 Kamrah Nalla 2009-10 Jhungi Nihri 1.5 4.3

168 Kathla Nalla 2008-09 Jhungi Balag 1.1 3.1

169 Kathla Nalla 2009-10 Jhungi Balag 1.2 3.6

170 Kathla Nalla 2009-10 Kangoo Gairu 0.5 1.6

171 Kathuri nalla 2004-05 Jhungi Kathuri 0.7 2.1

172 Khyan nalla 2009-10 Kangoo Dhawal 0.6 1.9

173 Kriya nalla 2005-06 Jhungi Bandli 1.9 5.7

174 Madaiyana 2009-10 Kangoo Haraboi 0.2 0.7

175 Manjheli Nalla 2005-06 Kangoo Gairu 1.8 5.1

176 Marogra nalla 2005-06 Jhungi Bandli 1.1 3.2

177 Mehron nalla 2005-06 Jhungi Badli 0.0 0.0

178 Naraity nalla 2005-06 Kangoo Badhu 1.6 4.7

179 Narehli check 2009-10 Jhungi Kinder 0.4 1.2

180 Narella Nalla 2005-06 Jhungi Kinhu 1.3 3.8

181 Nhri-1 2010-11 Jhungi Nihri 3.1 9.1

182 Nihri nalla 2005-06 Jhungi Nihri 1.5 4.4

183 Roproo Nalla 2005-06 Jhungi Kinder 1.0 3.0

184 salog nalla 2009-10 Kangoo Gairu 0.6 1.7

185 Sanoha nalla 2009-10 Kangoo Dhawal 1.4 4.1

186 Shibhanpar 2009-10 Jhungi jungi 1.1 3.2

187 Smoul nalla 2005-06 Kangoo Badhu 1.5 4.3

188 Smoul nalla 2009-10 Kangoo Badhu 0.4 1.3

189 Sojha nalla 2010-11 Kangoo Behali 0.5 1.5

190 Sunali nalla 2005-06 Kangoo Dhawal 0.9 2.6

Page 134: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxi

191 Timbroo Nalla 2005-06 Jhungi Nihri 1.6 4.6

192 Timbroo Nalla 2005-06 NA Nirihi 1.1 3.3

193 Trechh nalla 2005-06 Jhungi Trechh 0.8 2.5

194 Trechh nalla 2009-10 Jhungi Trechh 0.8 2.4

195 Trechh nalla 2010-11 Jhungi Trech 1.4 4.1

196 Theog Jhamu nalla 2006-07 Theog Chadara 1.1 3.1

197 Jugoo Nalla 2005-06 Theog Jugo 0.9 2.8

198 Kundley nalla 2004-05 Theog Shalli 1.2 3.5

199 Narainty nalla 2004-05 Theog Pathreivi 1.1 3.3

200 Narainty nalla 2006-07 Theog Pathreivi 1.1 3.1

201 Rahighat 2005-06 Theog Shalli 0.0 0.0

202 Rahi-Ghat 2005-06 Theog Shali 0.0 0.0

203 Rohroo nalla 2004-05 Theog Shalli 1.3 3.7

204 Rohru nalla 2006-07 Theog Shalli 1.8 5.4

205 Solvi nalla 2006-07 Theog Chandara 1.0 2.8

Average 1.1 3.3

Page 135: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxii

Annexure - VIII

Overall Survival % - Afforestation

Bilaspur Karsog Kunihar Nachan Shimla Suket Theog

Species Survival %

Species Survival %

Species Survival %

Species Survival %

Species Survival %

Species Survival %

Species Survival %

Amla 61 Kharor 60 Amla 60 Ban 60 Ailanthus 62 Amaltas 66 Ban 59

Amaltas 63 Siris 65 Ban 55 Willow 47 Amaltash 36 Amla 60 Chil 58

Arjun 56 Amaltas 59 Chil 51 Chil 54 Amla 38 Ban 58 Daroo 57

Bamboo 59 Amla 62 Daroo 59 Chuli 63 Bhida 48 Bahera 75 Deodar 55

Bheda 56 Ban 55 Deodar 54 Daroo 53 Ban 54 Chil 60 Robinia 62

Chil 80 Bahera 61 Karaunda 60 Deodar 66 Bahera 58 Chuli 53

Drek 57 Bihul 67 Kachnar 63 Khanor 62 Beul 63 Daroo 68

Jatropha 66 Binya 65 Khair 61 Robinia 63 Chill 60 Deodar 58

Kachnar 56 Beuns 69 Leucaina 57 Chuli 54 Drek 60

Khair 58 Chil 58 Ritha 64 Daroo 66 Jatropha 62

Leucaina 58 Chuli 58 Slock 62 Deodar 66 Kachnar 58

Pangomia 60 Daru 62 Toon 60 Darek 59 Khair 60

Shisham 60 Darle 60 Jamun 83 Leucaina 62

Ticktonia 62 Deodar 60 Jatropha 53 Ritha 60

Teak 58 Dharke 59 Jhadinu 61 Saghwan 61

Tuna 70 Drek 61 Kachnar 60 Shisham 58

Page 136: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxiii

Jamun 52 Karal 62 Tuna 59

Jatropha 59 Khair 49

Kachnar 54 Kinnu 52

Khair 63 Leuciana 62

Leucaina 58 Mahru 39

Ritha 55 Mulberry 47

Robinia 63 Poplar 49

Shisham 62 Ritha 52

Walnut 61 Robinia 54

Saroo 65

Shisham 65

Siris 59

Page 137: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxiv

Annexure - IX

Drainage Line Wise Sedimentation Data in Tonnage

Name of Nalla Avg weight of Silt (Tonnes / Ha)

Bilaspur

D 80 Kanda 2009-10 1.7

new Kayari 3.1

Suit ka Pani Nalla 2.4

Tal nalla 3.7

UPF Nalla 2.0

Karsog

Badoham 4.2

Bahj 2.5

Bahj nalla 2.5

Banera 4.6

Baryon Kuudi 4.1

Bashala Nalla 0.2

Bhogu 5.9

Bithari bouri nalla 5.0

Bithouri Bouri nalla 4.8

Boghu 7.3

Chatkar 2.0

Chitchad nall 1.6

Chukku nalla 6.9

Danoil 1.0

Domail 1.3

Galyach 4.8

Ghalash Nalla 6.7

Godarn Nalla 4.2

Gujroodhar nalla 5.8

Haridhar Nalla 4.2

Harmolla 4.9

hatkar nallas 6.0

Jai Nalla 2.5

Jhingal 5.6

Kandlu 4.8

Karashi nalla 3.3

Kataclu Nalla 5.0

Kathende 4.4

Page 138: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxv

Khanek Nalla 3.9

Khodona 4.5

Kondal 3.6

Kus Nalla 1.9

Makrikat nalla 4.1

Makrikot Nalla 3.9

Mehram Nall 5.3

Mehran 5.4

Nagaltha 5.8

Naguam nalla 0.5

Naresh 4.8

Narosh 5.9

Nehari Nal 4.2

Nehaxi nalla 4.8

Padoo 4.3

Palhrairi Nalla 6.0

Pandao 4.4

Panyroo khablaye 4.7

Path Jhurandi nalla 4.7

pathreivi nalla 6.0

Puni 2.0

Puni nalla 1.7

Saganj 4.4

Sakrahan nalla 5.7

Salaundagah 2.5

Sarkol 2.5

Sayani 4.4

Shandrelal nalla 2.4

Shayongi 6.3

Sursi 4.5

Tatapani Nalla 5.5

Tatmu 5.2

Thambli 4.6

Thangi nall 0.4

Thermi 2.1

Thermi nalla 0.0

Thermlli 4.3

Tudli 4.5

Udhun k nalla 0.5

Kunihar

Dangaril 1.0

Jandhoi U F nalla 2.7

Kun nalla 1.5

matraich nalla 2.8

Page 139: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxvi

Pladnia nalla 3.4

Shiharli nalla 3.1

SHIRIJ 2.9

Skor DPF 3.8

Nachan

Jogni Girjinoo nalla (running) 4.7

Lrojnce 3.8

Shimla

Ajdhar nalla (working nalla) 3.4

Banaun Nalla 3.2

Bharoia nalla 3.1

Bhong batal nalla 0.0

Bledi nalla 5.2

Bron 5.1

Chakvana 3.4

Chamba nalla 4.5

Chand ki Nalla 4.7

Chand ki Wall 4.7

Chanmba 5.5

Chhanawat 2.1

Dayangal 4.0

Dhadyag nala 1.9

Dhagech Nalla 4.6

Dhagoh yainchari 3.8

Dhalaya nalla 4.4

Dhandar nalla 5.8

Dholaya Nalla 4.4

Didighatti nalla 4.7

Drabla nalla 3.7

Ghanog nalla 3.9

Haroon nallah 0.0

Hiri ki beshak 3.5

Hudu Nalla 4.0

Jabri Nalla 4.2

Janglog 3.7

Judlu Nalla 3.7

Kair nalla 0.0

Kangti nalla 4.8

Katali Nalla 3.2

Khanawag 2.9

Khirpadi 1.1

Kiar nalla 4.7

Kumalli nalla 0.0

Kunni nalla and branches 4.4

Page 140: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxvii

Kushaha nalla 4.7

Madyana nalla 1.9

Majheri nalla 4.6

Malthi nalla 4.3

Mandri Nalla 5.4

Manla nalla & branches 1.6

mataini nalla 0.8

Moolbari Nalla 4.6

Paniartu nalla 1.7

Panti nala 2.6

Rari ka nalla 4.5

Rattan pur nala 2.1

Sandua 3.7

Sanog nalla 6.2

Sari nall 1.3

Seepur nalla 5.7

Seepur nalla Phase II 0.0

Shimaoh Nalla 3.2

Sohal 2.6

Surilla/burrilla nalla (running) 2.9

Suket

Babailla nalla 1.1

Bah Nalla 4.2

Balagh nalla 4.5

Baragta nalla 4.4

Brdkhari nalla 2.9

Brough Ball 2.3

Chakki nalla 3.7

Chanad nall 3.0

Chehru nalla 0.5

Chhutagadam 3.3

Chiral Nalla 6.4

Dagri nalla 1.0

fafna nalla 6.7

Gadhyana nalla 1.7

garla nallaGarla nalla 4.2

Gehroo Nalla 4.9

Jariun nalla 4.7

Jindri nalla 1.4

Jodhnoo nalla 3.9

Kamrah Nalla 4.3

Kathla Nalla 2.9

Kathuri nalla 2.1

Khyan nalla 1.9

Page 141: Office of the Conservator of Forests, Bilaspuragisac.gov.in/hpcampa/PDF Documents/Monitoring and...D -201 Aglidhar Mehandi Karsog Karsog 8 Ha. N31 019.901’ E077014.914’ 4356 Ft

Draft Final Report on Third Party Monitoring of the Works Undertaken as per Action Plans of Ongoing KoI Dam CAT Plan and RIM Plantation Scheme

N H Consulting Pvt. Ltd.

cxxxviii

Kriya nalla 5.7

Madaiyana 0.7

Manjheli Nalla 5.1

Marogra nalla 3.2

Mehron nalla 0.0

Naraity nalla 4.7

Narehli check 1.2

Narella Nalla 3.8

Nhri-1 9.1

Nihri nalla 4.4

Roproo Nalla 3.0

salog nalla 1.7

Sanoha nalla 4.1

Shibhanpar 3.2

Smoul nalla 2.1

Sojha nalla 1.5

Sunali nalla 2.6

Timbroo Nalla 4.2

Trechh nalla 3.4

Theog

Jhamu nalla 3.1

Jugoo Nalla 2.8

Kundley nalla 3.5

Narainty nalla 3.2

Rahighat 0.0

Rahi-Ghat 0.0

Rohroo nalla 3.7

Rohru nalla 5.4

Solvi nalla 2.8

Average 3.3