Offshore Cable Installation
November 2010John Davies
Global Marine Systems Limited
Services and Markets - Overview
Turnkey submarine cable systems
Network planning and design
Subsea route planning and survey
Permitting & Offshore Liaison
Cable joint development
Charting
Subsea technology training
and engineering
Decommissioning support and assets to
for the Subsea removal of seabed
infrastructure.
Trenching Services and Plough assets for
both installation and reburial.
Submarine telecommunications cable
installation & maintenance
Subsea power cable installation &
maintenance
Cable storage and logistics
ROV and plough services,
Equipment leasing
Undersea research equipment
installation & maintenance
Oil and Gas Support – Services to
complement IRM and Installation / Repair /
Removal of SURF components.
Both directly and through our Partnerships & Joint Ventures, we offer a wide range of services in several markets
Mission Statement
To be the first choice provider of global offshore marine
engineering services, recognised by our customers for our
commitment to quality in everything we deliver.
4Cable tank in C.S. Great Eastern
Source: Smithsonian Institution Libraries
Together lets learn from experience
We have been installing power cable in offshore wind since UK Round 1
Offshore wind may be relatively new, but we have been installing cable under the sea for well over 160 years
Many of the processes and project management issues are similar in both Telecommunications & Offshore Power
C.S. Great Eastern:1866
Energy - Overview
5
We are the market leader for the cabling element of offshore wind farms, comprising the inter-turbine connection cables & export cables to shore.
Major new entry into growing Offshore Wind Farm market.
One of the only contractors in the world with significant experience in this market.
Wind Farms are seen as crucial to meeting the power needs of the UK & Europe.
Building latest generation of marine engineering, jobs and power infrastructure here in UK.
Our area of expertise is in the project design, installation, burial and eventual maintenance of array cables, export cables and inter-connectors.
An Explanation
6
Interconnectors are those systems
that join countries.
Eg. Britned – Britain to Netherlands.
Array Cable
Export Cable
Image source: BWEA
7
In short, we bury cable: our vessels & equipment are somewhat different than what you normally see in offshore wind photos
Global Marine Systems: Subsea Power Cable Installation Specialists
8
Our area of expertise is in project design, installation, burial and maintenance of inter-field cables, export cables and inter-connectors.
At the forefront of the alternative energy market for several years, specifically offshore wind
Experience at many of the world’s largest offshore projects
Alpha Ventus
Kentish Flats
Horns Rev
Horns Rev 2
Sheringham Shoal
Beatrice
Gunfleet Sands
BritNed
Nord Eon 1
StatoilHydro Gjoa
Barrow
London Array
Q7
OWEZ
Energy – Projects complete
9
Horns RevInstallation and burial of 80 in-field cables on one of the largest offshore wind farms.
Kentish Flats
One of the first major offshore wind farms operating in the UK, providing power from the Thames Estuary to the coast in Kent. Global Marine Systems installed and buried 3 export cables and 27 inter-array cables.
Beatrice Wind Farm
The installation and burial of the cables connecting the world’s first two offshore 5MW turbines and the Beatrice Alpha production platform.
EstLink
A HVDC inter-connector link between Estonia and Finland comprising of some 77 kilometres of bundled power cable, installed and buried by the CS Sovereign.
Barrow Wind Farm
Remedial work carried out on the inter-array cables using the CS Sovereign and the Atlas 1 trencher ROV.
OWEZ Wind Farm
Reburial of the export cables and the inter-array cables using the CS Sovereign and the Atlas 1 trencher ROV.
Horns Rev 2
Successfully completed the installation and burial of all the 91 inter-array cables using two cable lay barges namely the Pontra Maris and the Stemat 82.
Energy – Projects under construction
10
NordE. ON1The installation and burial of the 110kms HVCD wind farm export cable in Germany using the Team Oman to install the cable and the Excalibur trenching system for post lay burial. Completion is due in Art 2010.
BritNedThe power inter-connector cable between the UK and The Netherlands is currently being installed by Global Marine Systems Energy. Utilising the Team Oman and the North Ocean 102 to install the bundled HVDC system. The cable is being buried by the Excalibur trenching system. Completion is due early Q3 2010.
StatoilHydro GjøaA HVAC system form the Norwegian mainland to the Gjoa floating production platform. The North Ocean 102 has completed an extensive mobilisation programme and will lay the cable in Q1/Q2 2010.
London ArraySigned 4th Feb 2010. Global Marine has been chosen to install the 175 inter-array cables of the world’s largest and most prestigious offshore wind farm project to date. Due to the range of water depths we shall be utilising cable installation barges and DP2 installation vessels for this work . The work is due to start in July 2011 and will be completed by July 2012
We run a ROV Training School, operate a state of the art cable depot and operate our subsea equipment from our Portland, Dorset, UK base.
Portland UK Marine Base
Cable Tank House
Portland Subsea Training School
13
Port Facilities – Horns Rev 2
14
Port Facilities – Horns Rev 2 Cable Storage
85 Turbines, london Array 175 and West of Isle of Wight similar amount
2 Campaigns storing 40 at a time on shore – 30T ea @ 650 metres
15
Port Facilities – Horns Rev 2
Additional items – J tube extension pieces, mattresses, equipment / Ploughs / Trenchers
16
Port Facilities – Operations HR2
2 Barges plus 2 AHT ea Oil Express CS Sovereign 1 x Windcats 1 x crew transfer cutter 200 people at any one time
17
Inter Array Installation
18
Port Facilities – Supply Chain
Complete Logistics Support on Site – offices, freight forwarding, stevedore, canteen, craneage, tugs, transportation, storage, bunkering, berths,agents, field control office.
Wider Business Cluster –welding, hydraulics, machining, fabrication, electricians, consumables, chandlers, personnel, training, transport (cars, buses, train)
19
20
Thank You