PRESENTATION OF OFFSHORE ACTIVITIES

Stockholm - SweedenSeptember 2009

INDEX

1. PRESENTATION OF APIA XXI GROUP

2.RENEWABLE ENERGY RELATED ACTIVITIES

3. OFFSHORE FLOATING STRUCTURES

4. NEXT STEPS

INDEX

1. PRESENTATION OF APIA XXI GROUP

2. RENEWABLE ENERGY RELATED ACTIVITIES

3. OFFSHORE FLOATING STRUCTURES

4. NEXT STEPS

1. PRESENTATION OF APIA XXI GROUP

KEY FIGURES

• Founded in Spain in 1987

• 500 employeesp y

• Present in 3 world regions

BUSINESS AREASBUSINESS AREAS

1. PRESENTATION OF APIA XXI GROUP

CONSULTING AND ENGINEERING

Global and integrated solutions in following engineering and architectural fields: infrastructures,hydraulic works, town and city planning, environment, construction, industry and energy,

t d t h l imanagement and new technologies.

The group offers comprehensive consulting services, ranging from the planning prior to projectsto the final control and construction phases, including all the general management and advisoryprocesses.

1. PRESENTATION OF APIA XXI GROUP

CONSTRUCTION

Activity areas:

• civil works• building• industry and energy

Execution & Refurbishment Exploitation & PromotionRefurbishment 

of WorksEPC Exploitation &

MaintenancePromotion

Services:

• construction and restoration• comprehensive EPC

• infrastructure operation and maintenance

• promotionp

1. PRESENTATION OF APIA XXI GROUP

EQUITY INVESTMENTS

APIA XXI Group is present in public and private investment projects, contributing its consultingexperience and backing its active participation, as an investor, during all the project phases, includingthe construction and operationthe construction and operation.

Energy (renewable) Environment and Territory• wind farm development

• solar PV plant development

• development of offshore substructures

• Agroenergy cropping• Solar PV greenhouses

Infrastructures

• Mendicouague underground car parkIndustry

• Structures manufacturing plant inMataporquera

1. PRESENTATION OF APIA XXI GROUP

APIA XXI Group carries out projects through its wide network of branches established in fouri hi l h ld S i C l E L i A i d h USAstrategic geographical areas across the world: Spain, Central Europe, Latin America and the USA.

INDEX

1. PRESENTATION OF APIA XXI GROUP

2. RENEWABLE ENERGY RELATED ACTIVITIES

3. OFFSHORE FLOATING STRUCTURES

4. NEXT STEPS

2. RENEWABLE ENERGY RELATED ACTIVITIES

PROJECT DEVELOPMENT

• wind resource assessment

• wind farm / PV plant design

• permitting and administrative procedures with authorities and grid operator

• Environmental Impact Assessment (EIA)

• civil engineering (access roads, platforms, foundations, etc.)

CONSTRUCTION

• civil works

• erectionserections

• supervision and management

OPERATION ANDMAINTENANCEOPERATION ANDMAINTENANCE

• O&M of PV plants

• monitoring and data management

2. RENEWABLE ENERGY RELATED ACTIVITIES

PRODUCT DESIGN AND DEVELOPMENT

• Solar tracker

• Solar PV greenhouse

• Offshore floating met mast

• Offshore floating substructures for WT (in progress)

• Monitoring systems

INDEX

1. PRESENTATION OF APIA XXI GROUP

2. RENEWABLE ENERGY RELATED ACTIVITIES

3. OFFSHORE FLOATING STRUCTURES

4. NEXT STEPS

3. OFFSHORE FLOATING STRUCTURES

LOCATION

3. OFFSHORE FLOATING STRUCTURES

LOCATION X

X

3. OFFSHORE FLOATING STRUCTURES

PROJECT OVERALL GOAL

1. Develop, build and install research floating platforms to assess wind, wave and otherenvironmental conditions.

2. Develop floating substructures to support current multimegawatt offshore wind turbinesfor 50‐200 m sea depths at a competitive cost

3. OFFSHORE FLOATING STRUCTURES

PROJECT ORGANIZATIONPHASE 1:

Theoretical and functional validation. COMBSHORE project funded by CDTI (Finished)

PHASE 2:

Design, construction and installation of experimental floating platforms.

POM project funded by CDTI(Feb. 2009‐ Feb. 2011)

• Scale tests in water tankScale tests in water tank.

• Installation and instrumentation of 2 floating met masts.

• Installation and instrumentation of a 300kWWT on floating platform.

• Constructive, logistic and O&M development for floating offshore WTs.

PHASE 3:

Installation of grid connected multimegawatt floating WT

Consortium: Apia XXI, Instituto Hidráulico de Cantabria (IH), Transportes Lasarte, Erzia, Ecol

3. OFFSHORE FLOATING STRUCTURES

•Development of numerical analysis procedure for floating structures based on commercial FEM and

MAJOR ACHIEVEMENTS 

Development of numerical analysis procedure for floating structures based on commercial FEM andMBS codes + in‐house developed routines (hydrodynamics)

• In‐house design and construction of experimental water tank for scale models with wave and windloadingg

•Performance of wave loading tests for different floating substructure design alternatives using scalemodelsmodels

•Design, construction and installation of a 100m long floating met‐mast nearby Santander

• Development and installation of a monitoring and communication system

•Design and construction of a 130m long floating met‐mast (current assembly on dock in Santander)

3. OFFSHORE FLOATING STRUCTURES

STRUCTURE OF FIRST FLOATING MET MAST

Total height: 100m (above sea level: 60 m )Total height: 100m. (above sea-level: 60 m.)

3. OFFSHORE FLOATING STRUCTURES

DOCK OVERVIEWDOCK OVERVIEW

3. OFFSHORE FLOATING STRUCTURES

FLOATER TANK

3. OFFSHORE FLOATING STRUCTURES

ASSEMBLY OF BALLAST AND FLOATER TANKS WITH CENTRAL TUBE 

3. OFFSHORE FLOATING STRUCTURES

TRANSPORTATION

3. OFFSHORE FLOATING STRUCTURES

INSTRUMENTATION

3. OFFSHORE FLOATING STRUCTURES

INSTALLED PLATFORM

INDEX

1. PRESENTATION OF APIA XXI GROUP

2.RENEWABLE ENERGY RELATED ACTIVITIES

3. OFFSHORE FLOATING STRUCTURES

4. NEXT STEPS

4. NEXT STEPS

SHORT TERM

•Assemble and install second floating met mast

• Analyse field data

MEDIUM TERM

• Expand current numerical analysis procedure to account for coupled dynamic analysis ofmooring, substructure and WTmooring, substructure and WT

• Adapt current water tank test protocols to account for wind thrust on WT

• Design, scale test and build platform for small WT

• Install floating substructure with small WT (summer 2010)

LONG TERM

• Design, scale test and build platform for multimegawatt WT