  • CAPABILITY STATEMENT Consultancy Services within Offshore Wind Energy

    WWW.RAMBOLL.COM/WIND

  • 1

    CONTENTS

    1. Introduction 2 2. The Ramboll Group 2 3. Ramboll Offshore Wind 2 4. Consultancy Services 3 4.1 Project Development 3 4.2 Permitting, Approval and Project Certification 4 4.3 Site Investigations and Site Assessments 4 4.4 Wind Turbine Technology 5 4.5 Structural Design Services 6 4.5.1 Wind Turbine Foundations 6 4.5.2 Transformer Platforms 9 4.5.3 Design of Electrical Infrastructure 10 4.5.4 Design for Decommissioning 10 4.6 Design Risk Assessments 11 4.7 Project Enquiry and Contracting 11 4.8 Fabrication Supervision 11 4.9 Construction Management and Supervision 11

  • 2

    1. INTRODUCTION

    To design, construct, operate and maintain an offshore wind farm located in a harsh environment, and often far from shore, requires a multitude of skills and experiences, and represents management of many interfaces and risks, to be identified, considered and managed years before they become concrete. By investing in the necessary investigations, and engineering and design exercises at the "right" point in time for the actual project, many resources and much money can be saved throughout the lifetime of a project providing an overall minimum lifetime cost. Ramboll Offshore Wind strives to engage in - and to perform such services.

    2. THE RAMBOLL GROUP

    The Ramboll Group is amongst the leading consultancy groups on a European level. From the establishment in 1945 we are now close to 10,000 employees in 190 permanent offices in 24 countries. The Ramboll Group is an independent and multidisciplinary consulting group offering primarily engineering and design services, but is also engaged in architecture, management consultancy, socioeconomics and other related services. We emphasise local experience combined with a global knowledge-base. We constantly strive to achieve inspiring and exacting solutions that make a genuine difference to our clients, the end-users and society as a whole. Ramboll operates within the areas of: Buildings, Transport, Energy, Environment, Oil & Gas, and Management Consulting. The Ramboll Group is owned by a foundation and is independent of external interests.

    3. RAMBOLL OFFSHORE WIND

    Ramboll Offshore Wind (ROW) has been engaged in onshore wind projects designing turbine towers and foundations since 1986, and has been involved in offshore wind projects since 1989 participating in the design of the first Danish test project at Vindeby. Today ROW operates as a division within Ramboll Energy and has existing offices in Copenhagen, Aarhus and Esbjerg in Denmark, in London in the UK, and in Hamburg in Germany and employs approx. 160 full time staff dedicated to offshore wind projects. Besides these staff we draw on a pool of competencies from the rest of the Ramboll Group, such as geotechnical, geophysical, hydrodynamics, CFD modelling, and environmental science so that of today approximately 175 full time equivalent staff is employed on offshore wind projects. Our capabilities originally stem from our 30 years of experience within the offshore oil & gas industry, but have, within the last 15 years, also been developed to include offshore wind energy, and the many issues applicable to design of offshore wind turbine foundations and offshore transformer platforms. In 2012 Ramboll acquired IMS Ingenieurgesellschaft GmbH in Hamburg, Germany, and LAC Engineering in Aarhus, Denmark adding their respective capabilities and experiences within structural design, turbine technology and turbine load calculations to the total pool of knowledge. In addition to our own permanent staff ROW draws on the competencies, resources and staff of our many offices, and thereby, ensures that we also consider best local practice and local legislation.

  • 3

    4. CONSULTANCY SERVICES

    As a multidisciplinary consulting firm and with more than 25 years of experience within planning of energy projects and design of offshore oil & gas structures, and with 65 years of experiences with design of large infrastructure projects we are in a very good position to offer a huge variety of consulting services within offshore wind, as follows.

    4.1 Project Development Energy Planning As part of the Energy Unit in Ramboll we perform overall planning of energy supply of local - and of regional areas, and work with optimising the mix of energy sources to provide the best possible solutions with respect to efficiency, local resources, cost of energy and to the environment. As part of these studies we work with, amongst others, storage of surplus energy produced by wind farms, and with energy carriers other than the traditional consumption. Trade and Transmission of Electricity As an extension of the work with energy planning we perform studies concerning trade and transmission of electricity to enable our clients to decide market strategies for the trading of the produced electricity. These studies look into available market opportunities and price forecasts for the respective markets. Technical and Financial Risk Analysis and Management To assist our clients in identifying and to manage and mitigate technical and financial risks associated with offshore wind projects we perform technical and financial risk assessments, with respect to costs, income and time. In such a risk assessment we define, in close cooperation with the client, the various risk elements we estimate the probability of the occurrences and estimate the consequences. All this information is then inserted into a Monte Carlo simulation giving e.g. project costs or net present value of the entire project as a function of the probability. Delays of the time schedule for the project can either be modelled directly, or a more simple approach capitalizing delays can be applied by estimating the loss of revenue. Navigational Risk Analysis For input to the permitting phase and to the service life phase of the projects we estimate the risk of vessels entering into the project area and colliding with wind turbines or transformer platforms. The potential consequences of a vessel entering into the project area are several: collisions with installation vessels, spillage of e.g. oil, damages to the hull of the vessel, loss of wind turbines because of structural collapse or damages to or collapse of the transformer platform. The consequences of the various collisions are varying from everything to small damages to vessels or structures and up to temporary shutdown of the electricity production for a year or two because of loss of the transformer platform. In the latter case we use the navigational risk analysis to estimate the probability of a collision for various ship sizes, and thereby the structural loads to be considered in the design of the transformer platform. Scheduling and Planning Development, permitting and implementing an offshore wind project may easily take 5 to 8 years and needs proper planning and scheduling to ensure that information is available when required, and that physical elements, e.g. long lead items, have been designed and ordered in due time. Therefore, it is important that a proper time schedule is established at an early stage and maintained throughout the various project stages. Such a time schedule should contain all dependencies to be able to assess impacts from variations to the planning. As a multi disciplinary firm we are capable of establishing such time schedules including all elements of the projects, and we are, further, capable of applying the results from the technical and financial risk assessment into these schedules. Wind Studies We are currently capable of performing wind studies and production estimates for wind farms applying more simplified software sufficient for early feasibility studies estimating potential income and expenses for the new projects. We are further capable of assessing wind measurements with respect to statistical validity compared to long term measurements from

  • 4

    other stations. For performance of more detailed wind studies and micro siting, where it is a requirement to be considered bankable, we would usually contract a sub consultant, but still act as a single point of contact. Feasibility Studies, Due Diligence and Project Budgets We perform feasibility studies and due diligence for assessment of projects from early stages of the projects and up to where projects may be traded after implementation and start of service. The degree of detailing will depend on the amount of information available, or whether we are able to locate information ourselves. In connection with these studies we usually breakdown the projects into smaller cost and income elements to better be capable of estimating the variability/uncertainty of each element. If more factual information is available we can also model the feasibility of a project by the technical and financial risk assessment. Turbine Foundation Budgets Based on our vast experience within turbine foundation design and on the large number of designs we have performed we have developed an in-house Foundation Budget Tool to be used for cost estimation and investigation of cost variability in feasibility studies. In the budget tool we are capable of varying: wind turbine size and type, foundation concept, ground conditions, water depth, wave size, ice/no ice, weather down time during installation, and to consider variations in water depth over an entire project. The output from the budget tool is material quantities and costs broken down into design, investigations, fabrication, installation, risk, insurance and profit. When tested against competitive pricing from real projects we have usually been within an uncertainty of +/- 10% to 15%.

    4.2 Permitting, Approval and Project Certification Environmental Impact Studies and Assessments Most countries require performance of an environmental impact assessment, EIA, and delivery of an environmental impact statement, EIS, in which the various impacts on the environment are investigated, estimated and reported. The EIS includes a number of investigations of the flora and fauna on the project site, and considers the impacts on the flora, the fauna, and on the human population as well. As a multi disciplinary consultant we are capable of performing all the investigations and to assess the impacts from the project both during the implementation as well as during the service life and finally the decommissioning, as we do have in-depth knowledge of all the designs and the processes. We further perform the follow-up monitoring of impacts to document fulfilment of the requirements. BSH Approval In Germany the authority BSH is involved in the permitting process in addition to the environmental authorities and to the certifying bodies performing the project specific certification. Via our performance of German projects and our dealings with the BSH we are well suited and experienced in communicating with - and obtaining approvals from the BSH. Project Certification Most projects require a project certification in order to have them approved by the financial community, the insurers or if they are to be sold off at a later stage. As of March 2011 we have performed detailed foundation design and obtained certification of 21 offshore wind projects, which constitutes more than half the existing projects Worldwide, and are, therefore, very experienced in dealing with the independent certifying bodies, such as DNV, Germanische Lloyd and SGS.

    4.3 Site Investigations and Site Assessments Geophysical Investigations Geophysical investigations are used for a relatively fast mapping of the seabed contours, bathymetry, and of the foundation soil layers usually involved in the support of the foundation structures for the wind turbines and the transformer platforms. The geophysical investigations are also applied in connection with the mapping for the environmental impact assessment, EIA, and for studies of seabed sediment movements as travelling sand dunes. We are in a position to

  • 5

    offer these services performed by our own staff, or to specify, contract and supervise the work on behalf of the client. From being multi disciplinary we are capable of considering all aspects to be investigated in defining the scope for these investigations: environmental investigations as well as early investigations for determination of the foundation structures, and thereby, achieve an optimized survey program. Geotechnical Investigations In order to properly assess the strength of the foundation soil for the design of the structures for the wind turbines and the transformer platforms, and to properly estimate excavation works for the cables, and finally to evaluate issues concerning the installation works geotechnical investigations are performed using drilling of boreholes and measurements such as cone penetration tests, CPT tests. From many years of experience within offshore soil mechanics we are well positioned to specify, contract, supervise and interpret such investigations and laboratory tests. Metocean Studies and Reports Metocean data in the form of long-term information concerning wind and waves, and their respective correlation with the wind, is of importance to the structural design, and when assessing access and constructional conditions with respect to sea states. This metocean data can be made available by numerical modelling or measurements by a buoy, or in a combination thereof. For conceptual - and for FEED design foundation studies a numerical model will suffice in every respect. For detailed foundation designs for construction, it is best to apply verified long-term data to calibrate the numerical model, to achieve the best possible accuracy and for not to be too conservative in the design. In case verified data is readily available, this data can be used to calibrate the model without further measurements. In case this data is not available, measurements will have to be made to support the numerical model. We operate our own numerical models, the MIKE suite of programs, to be capable of developing basis for design and for evaluation of sea states for constructional and access purposes. Local and Global Scour and Erosion Installation of structures and cables in the seabed changes the flow regime for the sea water and may course local erosion around the structures and the cables by removal of seabed material, depending on the type of seabed sediments. As the seabed forms the support of the structures and the cables, it is important to either prevent this erosion by deploying stones or to estimate the extent of the erosion, so that it can be considered in the design. We usually design for both situations to be able to make a cost benefit analysis to investigate which of the two options is the most cost optimal. This investigation will also consider probable future cost of inspecting and maintaining the erosion protection. In detailed foundation designs we will usually perform such an investigation for each individual wind turbine foundation and structure, to achieve an overall optimisation of the cost.

    4.4 Wind Turbine Technology Functional and Technical Specifications The choice of wind turbine is not trivial, as it is impacted by many different factors such as: "proven technology", performance under certain conditions such as average wind, cut-in/cut-out wind speeds, early production for lower wind speeds, requirements to operation and maintenance and organisation to perform the O&M, interaction with the public grid etc. ROW has established such functional and technical requirements for several projects, and incorporated these into project enquiries and into contracts. O&M Requirements and Monitoring As part of the definition of the functional and technical requirements we define the requirements to the operation and maintenance of the wind turbines. We also deliver requirements into to the O&M procedures for the structures, erosion protection and cabling. Following the implementation of an offshore wind project we can either perform inspections ourselves, or we can monitor the performance by others.

  • 6

    Test and Commissioning When involved on the developer side of the projects we act on behalf of the developer during the test and commissioning, and the handing over of the projects, to ensure that the project fulfils the contractual requirements, and that this is properly documented. Cold Climate Conditions Cold climate conditions for the wind turbines are often associated with onshore wind farms locate in cold climate areas, and not with offshore projects. However, the increasing interest in developing offshore wind farms in the north eastern Baltic area, and in the Great Lakes in USA and Canada, means that there is now a requirement for considering these climatic conditions when defining the technical and the functional requirements. From our previous experiences in the northern Nordic regions we have experiences in establishing such requirements and in reviewing the proposed solutions concerning the wind turbines. Turbine Loads, Control and Monitoring Via the acquisition of LAC Engineering Ramboll Offshore Wind is capable of assessing turbine and site specific turbine loads for design calculations for the foundations, and also capable of performing integrated load simulations. The integrated design load calculation approach employed puts emphasis on the generation of a fully integrated offshore wind turbine model for aero elastic analyses. It comprises of three sequential steps ensuring a proper representation of all relevant subsystems and loads in the design load generation process. This allows combining the benefits from a sophisticated foundation and hydrodynamic load representation in our in-house design software ROSA with the state-of-the-art modelling approach of the rotor-nacelle-assembly, tower, aerodynamic loads and controller in LACflex.

    4.5 Structural Design Services From being a multidisciplinary consultant and design firm we are capable of designing most objects and to consider many different impacts on the structures to be designed. We are further capable of designing for a multitude of materials and according to many different codes and standards, such as e.g. Euro Code, API, ABS, ASTM, DIN and ISO.

    4.5.1 Wind Turbine Foundations Ramboll is currently one of the leading consultants within design of foundations for offshore wind turbines, and have a profound experience within design of monopiles, jackets and other foundation types, where we apply in-house state-of-the-art software for the designs. Our load calculation group is, furthermore, capable of providing early site specific turbine load calculations for the use in conceptual and FEED designs. Further, we have very extensive experience in performing load iterations with all major turbine vendors, including for jacket structures. We have currently performed load iterations for turbine sizes up to 8MW. Our references include Detailed Design of foundations for megawatt type turbines for offshore projects in:

    Denmark Sweden UK Germany The Netherlands Belgium USA

    We have performed conceptual and tender designs for developers, utility companies, turbine manufacturers and foundation contractors. The foundation concepts have included gravity base structures of both steel and concrete, monopiles, tripod - and jacket foundations, and suction buckets. Conceptual and tender designs have, in addition to the above countries, been performed for projects in Russia, Finland, China, France, Spain, Ireland, Estonia, and Latvia.

  • 7

    We have completed detailed design of monopile and jacket foundations and for gravity concrete cones for more than 30 Offshore Wind Farms, all approved by a third party certification agency, which provides Ramboll with a market share of over 50% of the so far installed offshore wind foundations worldwide. A list of the designs we have - or are currently performing is shown below.

    Location

    Status

    Loc.

    Park Size

    Turbine

    Water Depth

    Client

    Developer

    [MW] [m LAT]

    Klasarden On Hold SE 44 NM92 4-8 PNB Entr. NEG Micon Burbo Bank Completed UK 90 SWT-3.6-

    107 2-8 MTH DONG

    Lynn & I. Dowsing

    Completed UK 194 SWT-3.6-107

    8-12 MTH Centrica

    Kentish Flats Completed UK 90 Vestas V90 5-8 MTH Vattenfall Robin Rigg Completed UK 180 Vestas V90 13 MTH Eon C&R Rhyl Flats Completed UK 90 SWT-3.6-

    107 4-12 MTH RWE

    Greater Gabbard

    Completed UK 504 SWT-3.6-107

    22-31 Fluor SSE & RWE

    Thanet Completed UK 300 Vestas V90 20-30 Vattenfall Vattenfall Bligh Bank (Belwind)

    Completed BE 165 Vestas V90 16-31 Van Oord Belwind

    Sheringham Shoal

    Completed UK 317 SWT-3.6-107

    15-22 MTH Statoil

    Walney Completed UK 184 SWT-3.6-107

    20-22 DONG DONG

    Walney II Completed UK 184 SWT-3.6-120

    22-30 DONG DONG

    Lincs Completed UK 284 SWT-3.6-120

    8-16 MTH Centrica

    Gwynt Y Mr Completed UK 576 SWT-3.6-107

    13-30 RWE RWE

    Anholt Completed DK 400 SWT-3.6-120

    14-18 DONG DONG

    Teesside Completed UK 90 SWT-2.3-101

    8-15 EDF EDF

    Nordergrnde On Hold DE 90 REpower 5M 15 Energiekontor

    Energiekontor

    Amrumbank West

    On-going DE 288 SWT-3.6-120

    19-24 E.On E.On

    Baltic 2 On-going DE 288 SWT-3.6-120

    23-44 Hochtief EnBW

    Humber Gateway

    On-going UK 219 Vestas V112 11-17 E.On E.On

    Confidential Completed BE 6 Confidential 34 Confiden-tial

    Confidential

    Fife Energy Park

    Completed UK 7 Samsung 5 Samsung Samsung

    Luchter-duinen (Q10)

    On-going NL 129 Vestas V112 18-22 Van Oord ENECO

    Gemini On-going BE 600 SWP-4.0-130

    29-37 Typhoon Offshore

    Typhoon Offshore

    Cape Wind On-going USA 468 SWP-3.6-107

    2-17 Cape Wind Asc.

    Cape Wind Associates

    BARD Offshore I

    Completed DE 400 BARD 5.0 39-41 BARD BARD

  • 8

    Location

    Status

    Loc.

    Park Size

    Turbine

    Water Depth

    Client

    Developer

    [MW] [m LAT]

    BARD Hooksiel

    Completed DE 5 BARD 5.0 2-6 BARD BARD

    London Array Completed UK 630 SWT-3.6-122

    0-25 ABJV LAL

    Riffgat Completed DE 108 SWT-3.6-122

    18-23 EWE Enova

    GodeWind II On-Going DE 252 Vestas V112-3.0

    29-34 PNE PNE

    DanTysk Completed DE 288 SWT-3.6-122

    21-32 ABJV DTOW

    Wikinger On-Going DE 350 Areva 29-42 IBERDROLA Renovab-les

    IBERDROLA Renovables

    For all of the above projects we have been the designers of both primary and secondary steel, performed the load iterations between the turbine vendor and the structural designer, and liaised with the WTG manufacturer and Certification Agencies as necessary.

    The number of jacket and monopile projects that Ramboll has carried out, has provided us with extensive expertise and experience with the requirements of the certifying agencies, installation contractors and marine warranty surveyors. Ramboll is the only company in the world that has carried out Detailed Design of numerous offshore wind farms for 8 different WTGs, including Vestas V90, Vestas V112, Siemens SWT-36-107, Siemens SWT-36-120, Siemens 4.0, Repower 5MW, Alstom HALIADE 6MW and Samsung 7MW. Hence we offer unprecedented experience in the design process together with different manufactures, which can enable more effective cooperation due to known interfaces.

    JACKET DESIGN FACTS Extensive experience As part of the above mentioned detailed designs, we have performed detailed design for two wind turbine prototypes, size 6MW and 7MW, with jacket structures. Further, we are, together with a partner, currently progressing the design of the jackets for the Wikinger project in Germany.

    In addition, we have done and are currently developing several conceptual and FEED designs for other projects with jacket structures.

  • 9

    Example of an offshore wind jacket designed by Ramboll

    Ramboll render the full suite of multidisciplinary engineering consultancy services within offshore wind energy projects. On this background we are pleased to offer our foundation design services, where we are able to take into account the many different design drivers impacting on the foundation design, and the subsequent cost of the foundations.

    4.5.2 Transformer Platforms Our expertise in this field is based on 30 years of experience in the hostile North Sea, where we have carried out 39 jacket Detailed Designs from 1981 to 2010 and has a track record that covers the design of at least 75% of all jackets installed in the Danish part of the North Sea. Ramboll has its primary jacket experience from the Danish part of the North Sea, but has over the years also carried out a number of projects for clients in Norway, Qatar, Abu Dhabi, UK and Germany. Besides structures for offshore wind turbines and oil and gas platforms, Ramboll has also completed several detailed designs of transformer platforms. The services have included general layout, design of both foundation structure and top sides, as well as M&E. In addition, Ramboll has conducted several FEED and conceptual studies for different projects, mainly for the UK market.

  • 10

    Visualization of the transformer platform at the Anholt Offshore Wind Farm designed by Ramboll

    Client Project Completion. year

    Size MW

    Van Oord Luchterduinen (NL) 2015 129

    DONG Energy Burbo Bank Extension (UK) (2013) 240

    DONG Energy Westernmost Rough (UK) 2012 210

    Energinet.dk Anholt Wind farm (DK) 2010 400

    MT Hjgrd/ E.On Robin Rigg (UK) 2007 180

    MTH/StatoilHydro Sheringham Shoal (UK) 2007 316

    Van Oord Belwind I (165 MW) 2007 165

    DONG Energy/E.On London Array (630 MW) (UK) 2007 630

    BARD OSS Bard I (DE) 2012 400

    DOTI OSS Alpha Ventus (DE) 2009 60

    4.5.3 Design of Electrical Infrastructure We design the electrical infrastructure within the wind farm, including collection system, transformers and export cable, up to and including conceptual design level, where the results can be used for budgeting of the infrastructure, and as input to the environmental impact assessment. In case of performance of detailed designs we contract sub-consultants and still acts as one-point contact towards the client. Based on our large experience with design and laying of offshore pipelines and cables we perform design and consultancy concerning installation and protection of cables, and are also capable of performing supervision and inspection of these project elements.

    4.5.4 Design for Decommissioning The permits granted by the authorities contain, for most projects, a requirement for decommissioning of the entire project upon the end of the service life. The cost of decommissioning of a project is in most cases equal to, at least, the installation costs, so this

  • 11

    requires careful consideration in the design phase in order to minimize the costs. From our close cooperation with fabricators and installation contractors, we have good experience in designing the structures for both construction and for decommissioning, and have a good knowledge of impacts from the choice of various materials.

    4.6 Design Risk Assessments Considering the harsh environment the wind turbines are installed and located in, where weather, sea state and access conditions is often a challenge a safe working environment is important for the staff. Some countries have their own set of rules for Health & Safety, but the basic rules are, in most cases, all based on the rules from the oil and gas industry, amongst others the UK CDM Regulations. From our long experience with design of both oil and gas structures and offshore wind structures awe have developed our own best practice, and included this in our in-house tool for performance of design risks, Soter. We further perform the design risk assessments using our full 3D models of the access facilities, platforms and other places accessed by people.

    4.7 Project Enquiry and Contracting Based on our many different experiences in offshore wind projects we have drafted full enquiry documents and performed pre-qualification of tenderers and tender evaluations. The tenders have concerned anything from geophysical and geotechnical investigations, to turbine supply contracts and full turnkey contracts for complete offshore wind farms. We are capable of handling both the general conditions of contract as well as the special conditions and technical requirements.

    4.8 Fabrication Supervision We perform supervision of fabrication of elements for the projects. The supervision can be constituted of review of method statements for fabrication, review of quality control plans and standards, check and monitoring of fabrication and quality audits of the manufacturers. Our supervision is not a substitute for any certifying agencies monitoring of the fabrication, but can assist the client in the everyday management of the project.

    4.9 Construction Management and Supervision We are capable of contributing with engineering and design services to all phases of the construction work: Design of sea fastening and lifting arrangements Inspection of structural elements upon transportation Supervision and monitoring of installation of structures and cables Design changes during installation works Elaboration of as-built documentation Contact: Sren Juel Petersen Director Business Development [email protected] +45 5161 8760

  • 1-1

    SUPPLEMENT 1 SELECTED PROJECT REFERENCES

  • Ramboll Wind Selected References

    Proj

    ect N

    ame

    / D

    escr

    ipti

    on

    Coun

    try

    A. E

    nerg

    y Pl

    anni

    ng,

    Trad

    e an

    d Tr

    ansp

    orta

    tion

    B. P

    roje

    ct D

    evel

    opm

    ent

    C. F

    easi

    bilit

    y St

    udy

    Ene

    rgy

    and

    Prod

    ucti

    on E

    stim

    ate

    D. P

    roje

    ct F

    inan

    ces

    and

    Fina

    ncia

    l Ris

    k As

    sess

    men

    t

    Met

    -Oce

    an s

    tudi

    es a

    nd

    Win

    d st

    udie

    sEn

    viro

    nmen

    t Im

    pact

    Ass

    .

    Live

    Cyc

    le A

    naly

    sis

    Geo

    phys

    ical

    and

    Geo

    tech

    nica

    l Inv

    estig

    atio

    n.

    Nav

    igat

    iona

    l Ris

    k An

    alys

    is

    Elec

    tric

    al R

    isk

    Anal

    ysis

    Foun

    dati

    on C

    osts

    Bud

    get

    Tool

    Foun

    dati

    on D

    esig

    n.

    Conc

    eptu

    al a

    nd F

    EED

    Foun

    dati

    on D

    esig

    n.

    Det

    aile

    d D

    esig

    n an

    d

    Cert

    ifica

    tion

    Off

    shor

    e Su

    bsta

    tion

    Des

    ign

    Ele

    ctri

    cal D

    esig

    nTu

    rbin

    e To

    wer

    Des

    ign

    Cons

    ulta

    ncy

    for

    Cabl

    e

    Layi

    ngCo

    nsul

    tanc

    y fo

    r

    Cons

    truc

    tion

    Pha

    se

    Cont

    ract

    ing

    and

    Cons

    tr.

    Man

    agem

    ent.

    &

    Supe

    rvis

    ion

    Win

    d Fa

    rm

    Dec

    omm

    issi

    onin

    g

    Anholt Wind Farm (offshore) DenmarkPaludan's Flak (offshore) DenmarkHorns Rev 1 (offshore) DenmarkNysted (Rdsand) (offshore) DenmarkOm (offshore) DenmarkMiddelgrunden (offshore) DenmarkVindeby (offshore) DenmarkNoise Measurements (Offshore) DenmarkHorns Rev B (offshore) DenmarkOffshore Foundation w. Suction Buckets DenmarkHarbour of Bnnerup(onshore) DenmarkUtgrunden (offshore) SwedenUtgrunden II (offshore) SwedenKrehamn SwedenLillgrunden SwedenKlasrden (offshore) SwedenSeven Sites (offshore) SwedenEleven Sites (offshore) SwedenEIA for Four Wind Farms SwedenHarbaksfjellet (onshore) NorwayValsneset/Bessakerfj (onshore) NorwayHyWind (full-scale floating wind turbine) NorwayArklow Bank (offshore) IrelandQ8 (offshore) HollandNorth Sea (offshore) HollandKatwijk Offshore (offshore) HollandDen Helder (offshore) HollandLong Island (offshore) USACape Cod (offshore) USALake Erie (offshore) USAWind turbines on existing oil/gas jackets USADelaware (offshore) USACape Wind (offshore) USA

  • Proj

    ect

    Nam

    e /

    Des

    crip

    tion

    Coun

    try

    A. E

    nerg

    y Pl

    anni

    ng,

    Trad

    e an

    d Tr

    ansp

    orta

    tion

    B. P

    roje

    ct D

    evel

    opm

    ent

    C. F

    easi

    bilit

    y St

    udy

    Ene

    rgy

    and

    Prod

    ucti

    on E

    stim

    ate

    D. P

    roje

    ct F

    inan

    ces

    and

    Fina

    ncia

    l Ris

    k As

    sess

    men

    t

    Met

    -Oce

    an s

    tudi

    es a

    nd

    Win

    d st

    udie

    sEn

    viro

    nmen

    t Im

    pact

    Ass

    .

    Live

    Cyc

    le A

    naly

    sis

    Geo

    phys

    ical

    and

    Geo

    tech

    nica

    l Inv

    estig

    atio

    n.

    Nav

    igat

    iona

    l Ris

    k An

    alys

    is

    Elec

    tric

    al R

    isk

    Anal

    ysis

    Foun

    datio

    n Co

    sts

    Budg

    et

    Tool

    Foun

    datio

    n D

    esig

    n.

    Conc

    eptu

    al a

    nd F

    EED

    Foun

    datio

    n D

    esig

    n.

    Det

    aile

    d D

    esig

    n an

    d

    Cert

    ifica

    tion

    Off

    shor

    e Su

    bsta

    tion

    Des

    ign

    Ele

    ctri

    cal D

    esig

    nTu

    rbin

    e To

    wer

    Des

    ign

    Cons

    ulta

    ncy

    for

    Cabl

    e

    Layi

    ngCo

    nsul

    tanc

    y fo

    r

    Cons

    truc

    tion

    Pha

    se

    Cont

    ract

    ing

    and

    Cons

    tr.

    Man

    agem

    ent.

    &

    Supe

    rvis

    ion

    Win

    d Fa

    rm

    Dec

    omm

    issi

    onin

    g

    Sheringham Shoal (offshore) UKRhyl Flats (offshore) UKKentish Flats (offshore) UKRobin Rigg/ Solway Firth (offshore) UKBarrow (offshore) UKGunfleets Sands (offshore) UKOffshore Wind Farm (offshore) UKGreater Gabbard (offshore) UKLynn & Inner Dowsing (offshore) UKBurbo Bank (offshore) UKScarweather Sands (offshore) UKWalney (offshore) UKGwynt y Mr (offshore) UKThanet (offshore) UKLondon Array (offshore) UKLincs (offshore) UKTeeside (offshore) UKDogger Bank (offshore) UKUK Round 3 (offshore) UKHumber Gateway (offshore) UKEast Anglia (offshore) UKWestermost Rough (offshore) UKFife (offshore) ScotlandWind Farm (offshore) FranceLa Banc (offshore) FranceSt. Brieuc (offshore) France

  • Proj

    ect N

    ame

    / D

    escr

    ipti

    on

    Coun

    try

    A. E

    nerg

    y Pl

    anni

    ng, T

    rade

    and

    Tran

    spor

    tatio

    n

    B. P

    roje

    ct D

    evel

    opm

    ent

    C. F

    easi

    bilit

    y St

    udy

    Ene

    rgy

    and

    Prod

    ucti

    on E

    stim

    ate

    D. P

    roje

    ct F

    inan

    ces

    and

    Fina

    ncia

    l Ris

    k As

    sess

    men

    t

    Met

    -Oce

    an s

    tudi

    es a

    nd

    Win

    d st

    udie

    sEn

    viro

    nmen

    t Im

    pact

    Ass

    .

    Live

    Cyc

    le A

    naly

    sis

    Geo

    phys

    ical

    and

    Geo

    tech

    nica

    l Inv

    estig

    atio

    n.

    Nav

    igat

    iona

    l Ris

    k An

    alys

    is

    Elec

    tric

    al R

    isk

    Anal

    ysis

    Foun

    dati

    on C

    osts

    Bud

    get

    Tool

    Foun

    dati

    on D

    esig

    n.

    Conc

    eptu

    al a

    nd F

    EED

    Foun

    dati

    on D

    esig

    n.

    Det

    aile

    d D

    esig

    n an

    d

    Cert

    ifica

    tion

    Off

    shor

    e Su

    bsta

    tion

    Des

    ign

    Ele

    ctri

    cal D

    esig

    nTu

    rbin

    e To

    wer

    Des

    ign

    Cons

    ulta

    ncy

    for

    Cabl

    e

    Layi

    ngCo

    nsul

    tanc

    y fo

    r

    Cons

    truc

    tion

    Pha

    se

    Cont

    ract

    ing

    and

    Cons

    tr.

    Man

    agem

    ent.

    &

    Supe

    rvis

    ion

    Win

    d Fa

    rm

    Dec

    omm

    issi

    onin

    g

    Sky 2000 (offshore) GermanyButendiek (offshore) GermanyMeerwind (offshore) GermanyAmrumbank West GermanySandbank 24 GermanyNordergrunde (offshore) GermanyNordzee Ost (offshore) GermanyKrieger's Flak (offshore) GermanyGode Wind (offshore) GermanyBaltic 2 (offshore) GermanyLuchterduinen (Q10) NetherlandsThornton Bank (offshore) BelgiumGemini (offshore) BelgiumBligh Bank/Belwind 1 (offshore) BelgiumConfidential (offshore) SpainBelwind 2 (offshore) SpainKaliningrad (offshore) RussiaCastelfranco (onshore) ItalySardinia (onshore) ItalyCeara Wind Project (onshore) BrazilGujarat (onshore) IndiaWind farm Test Project(onshore) IndiaHokkaido(onshore) JapanNaikun (offshore) CanadaDarling (onshore) S. AfricaWido (offshore) S. KoreaManjil(onshore) IranSamsung Jacket Foundation Design South Korea