SHEET 1 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date: 243332.0002
J. Hotstream 11/9/2016 T. Martin 11/22/2016
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐002.DOCX 12/15/16
INSPECTION REPORT
Landfill Annual Inspection Report
Purpose:
This inspection checklist has been developed to meet the requirements for inspections by a
qualified professional engineer for a coal combustion residual (CCR) landfill. This checklist
exceeds the requirements for 40 Code of Federal Regulations 257.84(b). This inspection of the
Alma Off‐Site Disposal Facility Phase IV Landfill was performed by TRC Environmental
Corporation on behalf of Dairyland Power Cooperative (DPC).
The goal of the inspection is to ensure that the design, construction, operation, and maintenance
is consistent with recognized good engineering practices. In addition, the inspection looked for
conditions of structural weakness or conditions that may affect the safe operation of the CCR
unit.
The following were performed for the inspection of the CCR unit.
Review of Available Information:
The following documents were reviewed in preparation of the site visit.
Health and Safety Plan
Fugitive Dust Control Plan (10/14/2015)
Plan of Operation (October 2000)
Annual Landfill Inspection Report (12/21/15)
Post‐Closure Plan (10/2016)
Closure Plan (10/2016)
Run‐on and Run‐off Control System Plan (10/2016)
Corrective Measures Report for Storm Water Runoff Event of Aug 8, 2015
Weekly inspections performed by qualified personnel (11/23/2015 through 11/2/2016)
Comments on the Operating Record: Electronic system, well organized, accessible in office
Summary of the Site Conditions (based on document review):
DPC operates a CCR landfill (Alma Off‐Site Disposal Facility Phase IV Landfill) located in the
NE 1/4 of the NE 1/4 of Section 19 and portions of Sections 18 and 20, T21N, R12W, Town of
Belvidere, Buffalo County, Wisconsin (see Figure 1). The location of the Phase IV landfill is in a
valley along with three phases of non‐contiguous closed landfills. This inspection addresses
SHEET 2 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date: 243332.0002
J. Hotstream 11/9/2016 T. Martin 11/22/2016
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐002.DOCX 12/15/16
INSPECTION REPORT
only the Phase IV landfill, because the Phase 1, II, and III landfills were closed prior to the
promulgation of the federal CCR rule (40 Code of Federal Regulations 257.50 through 107).
The Phase IV landfill is permitted through the state of Wisconsin. To date the liner system
Cells 1, 2A, 2B, 3A and 3B have been constructed with final cover installed over a portion of
Cells 1, 2A, and 2B. Cell 3B of the Phase IV landfill was constructed during 2015. The landfill
construction included a composite liner system, composite cover system, leachate collection
system, leachate storage tank, and storm water controls (diversion berms, sedimentation basin,
ditching, and downslope flumes). During summer of 2016, 2.8 acres of final cover were
installed over the remaining portion of Cell 1 and portions of Cells 2A and 2B.
Changes to the unit since the previous report:
Since the inspection in 2015, CCR placement has begun in Cell 3B and final cover was installed
over a portion of Cells 1 and 2.
Approximate volume of CCR in the unit at the time of the inspection: Approximately
975,300 cubic yards (based on November 2, 2016 topographic survey)
Visual Inspection:
A site visit and visual inspection were performed by Jonathan Hotstream (TRC Environmental
Corporation) on November 9, 2016.
Time arrived on site: 10:20 AM ______________________________
Time departed from site: 12:15 PM ___________________________
DPC Personnel Present: Leif Tolokken, Rick Loppnow _________
Weather Conditions: Sunny, ~ low to mid 50s ˚F, slight wind ____
Summary of Items Visually Inspected: Electronic operating record, weekly inspection forms, _
final cover areas including diversion berms, flumes, vegetation; perimeter run‐on controls ____
including culverts, ditches, rock checks, riprap; working area conditions; access roads; ________
sedimentation basin; leachate pipe cleanouts; and surface conditions at the leachate collection _
tank. _______________________________________________________________________________
Site Operations during Inspection: Trucks hauling CCR from JPM plant and placement of CCR
in landfill. Contractor on‐site repairing storm water controls downstream of SB‐1. Watering __
ash on working face. _________________________________________________________________
___________________________________________________________________________________
SHEET 3 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date: 243332.0002
J. Hotstream 11/9/2016 T. Martin 11/22/2016
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐002.DOCX 12/15/16
INSPECTION REPORT
Appearance of structural conditions:
Final Cover Conditions (Cell 1 and 2A/2B areas):
Vegetation Condition: Very Good _____________________
Evidence of Erosion: Yes: None: X
Evidence of slumping, sloughing, or slope distress: Yes: None: X
Evidence of seepage: Yes: None: X
Comments: Vegetation emerging in areas of new final cover construction, continued good ___
growth on areas of existing final cover (state approved tall grass prairie vegetation) __________
Perimeter Berm:
Vegetation Condition: Good __________________________________________________________
Evidence of Erosion: Yes: None: X
Cracking along crest: Access road along crest Yes: None: X
Evidence of slumping, sloughing, or slope distress: Yes: None: X
Evidence of seepage: Yes: None: X
Phase Delineation Berms: Good, separation of CCR from exposed geomembrane ____________
Comments: Minor rutting and sedimentation in perimeter ditch. Sediment to be removed ___
during cooler weather when area is accessible. __________________________________________
Storm Water Controls:
Run‐on Controls: Well controlled via perimeter berms and final cover slopes. _______________
Perimeter Drainage Ditches: Good condition, well maintained, minor sediment ______
deposition ____________________________________________________________________
_____________________________________________________________________________
Comments: This sediment will be removed when areas dry/freeze sufficiently for _____
equipment access. _____________________________________________________________
_____________________________________________________________________________
SHEET 4 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date: 243332.0002
J. Hotstream 11/9/2016 T. Martin 11/22/2016
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐002.DOCX 12/15/16
INSPECTION REPORT
Run‐off Controls: Final Cover
Diversion Berms: Well‐maintained, clear of obstructions, and no ponding observed. __
Downslope Flumes: Well maintained and clear. __________________________________
Ditching: Some minor accumulated sediment that will be removed once drying/freezing
allows equipment access. _______________________________________________________
Comments: Storm water controls are well maintained at the site. Areas with _________
accumulated sediment will be cleared as they become accessible. Storm water ________
successfully managed to prevent run‐on into the active area of the landfill.____________
Sedimentation Basin No. 1:
Outlets Operational: Yes, maintenance cleaning being performed during inspection. ___
Culverts Operational: Yes, clear and operational __________________________________
Comments: Some minor sediment accumulated in the basin. This cleanup is scheduled
during the winter. _____________________________________________________________
Operating Conditions:
Changes in Operation since the previous annual inspection: Began placing CCR in Cell 3B. ___
Access Road Conditions: Very good access road conditions, good aggregate cover, no rutting _
observed. ___________________________________________________________________________
Landfill Operations:
Temporary Storm Water Controls: Well maintained controls of sufficient capacity. Buffer ____
between CCR placement and delineation berms _________________________________________
___________________________________________________________________________________
Working Face Conditions: Well maintained, watered as needed with water truck, trucking in _
CCR and spreading. __________________________________________________________________
Access roads: Well maintained, tracking pad installed to remove CCR from trucks exiting ____
landfill. _____________________________________________________________________________
___________________________________________________________________________________
SHEET 5 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date: 243332.0002
J. Hotstream 11/9/2016 T. Martin 11/22/2016
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐002.DOCX 12/15/16
INSPECTION REPORT
Fugitive Dust Observed: Yes: No: X
Comments: Watering working face with water truck ______________________________
_____________________________________________________________________________
Leachate Management: System operational, minor ponding will be addressed with on‐site ___
operations. _________________________________________________________________________
Ash Tracked Out on Access Road? Yes: None: X
Leachate Collection System: Pipes buried, not visible _____________________________________
___________________________________________________________________________________
Pipe Cleanouts: Clean & accessible ______________________________________________
Tank: No concern _____________________________________________________________
Loadout Area: Accessible ______________________________________________________
Comments: Well maintained ___________________________________________________
_____________________________________________________________________________
Conditions that may potentially impact safety: None ___________________________________
___________________________________________________________________________________
___________________________________________________________________________________
Observed Deficiencies and Proposed Corrective Actions: _________________________________
Sediment to be removed from perimeter ditches as they become accessible by equipment. _____
Sediment to be removed from Sedimentation Basin 1 as it dries out. ________________________
DPC has scheduled these activities to occur when the areas become accessible. ______________
___________________________________________________________________________________
___________________________________________________________________________________
Future Action:
Update Item 9 – Site Operations on the Weekly Inspection Form to reflect current conditions. __
Continued monitoring and maintenance of storm water controls ___________________________
Continued implementation of dust control practices. _____________________________________
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐001.DOCX 1
Photographic Log
Client Name: Site Location: Project No.:
Dairyland Power Cooperative Phase IV Off‐Site Disposal 243332.0002
Photo No. Date
1 11/9/2016
Description
Perimeter access road with final
cover on left side of frame.
Photo No. Date
2 11/9/2016
Description
Final cover installed during
2016. Vegetation emerging.
Diversion berms covered.
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐001.DOCX 2
Photographic Log
Client Name: Site Location: Project No.:
Dairyland Power Cooperative Phase IV Off‐Site Disposal 243332.0002
Photo No. Date
3 11/9/2016
Description
Active area of the landfill
(Cells 2 and 3). Exposed
geomembrane phase delineation
berm on right side of frame.
Photo No. Date
4 11/9/2016
Description
Perimeter access road and
perimeter ditch.
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0002\Z2433320002‐001.DOCX 3
Photographic Log
Client Name: Site Location: Project No.:
Dairyland Power Cooperative Phase IV Off‐Site Disposal 243332.0002
Photo No. Date
5 11/9/2016
Description
View of access road into active
area of landfill. Tracking pad is
located prior to exiting landfill
to remove CCR from vehicle
tires.