1)(;r ('llml cpf - GAIL (India} Limited (A Govr nment of India Undertaking-A Maharatna Company) Acceptance/343839/20181 10<1 Cf To, The Secretary Petroleum and Natural Gas Regulatory Board ] 51 Floor, World Trade Centre Babar Road, New Delhi-110001 i)c;J 'll<A", GAIL BHAWAN. 16 BHIKAIJI CAMA PLACE NEW DELHl- 110066, INDIA i:p'r;,j PHONE : +9111 26182955 + 911126185941 [email protected] 27.03. 20 18 A 4( Af,' 1 t I ">'% £! l{ !tt - v Sub: Final Terms & Conditions for Acceptance of Ce ntral Government Authorization for laying, ry\ \..\ building, operating or expanding the Jagdishpur -Haldia Natural Gas Pipeline with an extension from Bokaro to Dhamra u/r 17(1) of PNGRB (Authorizing Entities to Lay, Build, Operate or . I'll\'\ Expand Natural Gas Pipelines) Regulations, 2008, and in pursuance of the Policy Directive issued to PNGRB by the Ministry of Petroleum & Natural Gas under Section 42 of the PNGRB Act, 2006 / Respected Madam, This has reference to the PNGRB letter no. lnfra/NGPL/124/GAIL/JHBDPL/01/18 dated 29.01.20 18 conveying the Final Terms & Conditions (T&C) in respect of the subject Natural Gas Pipeline. 2. In terms of Clause No. 12 of the said T & C, enclosed please find GATL 's confirmation of its acceptance of the Final Terms & Conditions for PNGRB 's Acceptance of Central Government Authorization for laying, building, operating or expanding the subject Natural Gas Pipeline. 3. ln respect of Clause No. 11 of the said T & C so li citing GAIL to submit the Performance Bond of Rs. 20 Crore, it is submitted that GAIL, vide letter GAIL/RA/JHBDPL Acceptance/343839/2018/1914 dated 12.01.20 18, has already submitted the Performance Bank Guarantee (PBG) No. 0007BGRO 182618 dated 12.01.2018 by ICICI Bank for an amount of Rs 20 crore (Rupees Twenty Crore) in terms of the PNGRB's provisional T & C .issued by PNGRB vide letter dated 29. 12.2017. Submitted please. Encl: ala Copy for kind information to: Shri Ashish Chatterjee tAs, Joint Secretary (GP), MoP&NG Yours sincerely, (M n) Executive Director (Gas Mk g.) E-mail: mano jj [email protected]. in L40200DL1984G01018976 www.gailonline.com

O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

Embed Size (px)

Citation preview

Page 1: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

1)(;r (~~~I) ~~e\S ('llml ~ cpf ~ - ~ ~)

GAIL (India} Limited (A Govr nment of India Undertaking-A Maharatna Company)

O~~~~~~ft/RA/JHBDPL Acceptance/343839/20181 10<1 Cf

To, The Secretary Petroleum and Natural Gas Regulatory Board ]

51 Floor, World Trade Centre Babar Road, New Delhi-110001

i)c;J 'll<A",

16~<Wll~ ~ ~-110066, ~

GAIL BHAWAN. 16 BHIKAIJI CAMA PLACE NEW DELHl-110066, INDIA

i:p'r;,j PHONE : +9111 26182955 ~/FAX: +911126185941

{-~/E-mail: [email protected]

27.03.20 18 A 4( Af,' 1 t ~ I ">'%

£! l{ !tt - v

~~ ~

Sub: Final Terms & Conditions for Acceptance of Central Government Authorization for laying, ry\ \..\ building, operating or expanding the Jagdishpur-Haldia Natural Gas Pipeline with an extension from Bokaro to Dhamra u/r 17(1) of PNGRB (Authorizing Entities to Lay, Build, Operate or . I'll\'\ Expand Natural Gas Pipelines) Regulations, 2008, and in pursuance of the Policy Directive issued ~ytrY to PNGRB by the Ministry of Petroleum & Natural Gas under Section 42 of the PNGRB Act, 2006 /

Respected Madam,

This has reference to the PNGRB letter no. lnfra/NGPL/124/GAIL/JHBDPL/01/18 dated 29.01.20 18

conveying the Final Terms & Conditions (T &C) in respect of the subject Natural Gas Pipeline.

2. In terms of Clause No. 12 of the said T & C, enclosed please find GATL's confirmation of its acceptance of the Final Terms & Conditions for PNGRB's Acceptance of Central Government Authorization for laying, building, operating or expanding the subject Natural Gas Pipeline.

3. ln respect of Clause No. 11 of the said T & C soliciting GAIL to submit the Performance Bond of Rs.

20 Crore, it is submitted that GAIL, vide letter GAIL/RA/JHBDPL Acceptance/343839/2018/ 1914 dated

12.0 1.2018, has already submitted the Performance Bank Guarantee (PBG) No. 0007BGRO 182618 dated 12.01.2018 by ICICI Bank for an amount of Rs 20 crore (Rupees Twenty Crore) in terms of the PNGRB's provisional T & C .issued by PNGRB vide letter dated 29. 12.2017.

Submitted please.

Encl: ala

Copy for kind information to:

Shri Ashish Chatterjee tAs, Joint Secretary (GP), MoP&NG

Yours sincerely,

(M ~ n) Executive Director (Gas Mk g.)

E-mail: mano [email protected]

~~/CIN L40200DL1984G01018976

www.gailonline.com

Page 2: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

'•

4~)~ljJi QCf S41Cf'IF.!Cfl ~ fa~lilJiCfl ~ c.

Petroleum and Natural Gas Regulatory Board

~-c=t<>r, qc;g ~~. iITTR Us, ~ ~: 110001. htHdhall ' llld~~- ,,\ "1lllt•1 •-11~i1

1" Floor, World Trade Centre, BabaJ" Road, New Delhi - 110001.

~a:f./Pbone No01123457700 / ~a:f./Fax No.01123709JS1

Infra/NGPL /124/GAIL/JHBDPL/Ol/18 Dated: Januaiy 29, 2018

To Chairman & Managing Director GAIL (India) Limited 16, Bhikaji Gama Place, R. K. Puram, New Delhi- 110066

Subject: Final Terms and Conditions for Acceptance of Central Government Authorization for laying, building, operating or expanding Jagdishpur-Haldia Natural Gas Pipeline with an extension from Bokaro to Dhamra of GAIL as common carrier pipeline network under regulation 17 (1) of the PNGRB (Authorizing entities to lay, build, operate or expand Natural Gas pipelines) Regulations, 2008 and in pursuance of the Policy Directives issued to PNGRB by the Ministry of Petroleum & Natural Gas under Section 42 of PNGRB Act, 2006

Reference: (i) MoP&NG's Letter No. L-14014/44/'06-GP dated 06.07.2007 (ii) MoP&NG's Letter No. L-14014/44/2006-GP-I (Pt. II), dated

15 .03.2017 (iii) GAIL' s Letter GAIL/RA/JHBDPL/320435/20 17/1685, dated

29.03.2017 and subsequent communications dated 20.04.2017 on the above issue.

Sir,

This is in response to your application referred above for consideration of the Board for acceptance of Central Government Authorization for laying, building, operating or expanding Jagdishpur-Haldia-Bokaro-Dhamra natural gas pipeline network (JHBDPL).

2. To substantiate your claim for authorization from the Central Government for the said pipeline prqject, you bad furnished documents like MoP&NG's authorization letter and Policy Directives issued to PNGRB. Considering your submissions, the Petroleum and Natural Gas Regulatory Board accepts the

~~ Pagelof6

~r;;.rf~;._- •-p~1~ ARVI N D K UMAR

3JlH '!'rc.~rn;<f, N 'r A dditional A dviser . s;'\"~~·1 :iri~11q.ff!t<i, -l)~r t-:il'lm••·" ,

- e troleum & Natural Gas Regulator, ; J:J~Pf <l<'r,<R'\J ~,; <)·..:~

1st F loor. W orl d T rade Ct:n to<; 'I I'<-(~ ... ,: f<: <'<'fi - 110001

Babar Road, New Oelhi-110001

Page 3: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

information submitted by you under Regulation 17(1) of the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas pipelines) Regulations, 2008. Further on the basis of the submissions made, the following terms and conditions have been finalised by the Petroleum and Natural gas Regulatory Board which shall be applicable during the construction as well as operative phase of the said pipeline systems:

3. Natural Gas Pipeline System:

Part-( A):

Jagdishpur-Haldia-Bokaro-Dbamra Natural Gas Pipeline (JBBDPL) (including spur lines)

The capacity of Jagdishpur-Haldia-Bokaro-Dhanua (including spur lines) natural gas pipeline system of length approx. 2619 km, diameter ranging from 4 inches to 36 inches (details enclosed as Annexe-I) is equal to 16 MMSCMD* ( at a pressure of 92 kg/cm2) as indicated by GAIL. The Board has decided to declare the Jagdishpur-Haldia-Bokaro-Dhamra natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*.

Note: (*- This capacity is accepted as provisional and the final capacity shall be determined as per the Petroleum and Natural Gas Regulatory Board (Determining capacity of Petroleum, Petroleum products and Natural Gas Pipeline) Regulations, 201 O].

Part-(B):

The route of Jagdishpur-Haldia-Bokaro-Dhamra Natural Gas Pipeline shall be through Phulpur near Allahabad to Haldia - Bokaro - Dhamra and spurlines to various customers enroute this pipeline viz. Gorakhpur, Varanasi, Patna, Barauni, Bokaro, Ranchi, Sindri, Rourkela, Sambalpur, Jharsuguda, Angul, Cuttak, Bhubaneshwar, Paradip, Jamshedpur, Durgapur, Kolkata and Haldia.

4. Your attention is also drawn to the provisions contained in the PNGRB (Guiding Principles for Declaring or Authorizing Natural Gas Pipeline as Common CruTier or Contract Carrier) Regulations, 2009 to create common carrier capacity as and when required.

S. The entity shall complete the activities of laying, building, or expansion activities of natural gas pipeline and commission the natural gas pipeline project by December 2020. Any failure on the part of entity to comply with the targets

3R~~ ARVIND KUMAR

31\R~~ Additionol Adviser

. ~<'flflT 31'1.i mp~~ 1:JPWP1<!' .,) .. etroleum & Natural Gas Regulatory Bv.•

ll"-f'f <l<'I.~ ~..,; ~) ·~· 1st Floor. World Trnde Centre "fl .. 'C ~. ~ R...:..fl-110001

Babar R ond. New Oelhi-11 0001

Page 2 of 6

Page 4: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

prescribed in the time schedule shall lead to consequence as per relevant provisions of the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Regulations 2008.

6. The authorized entity shall be required to take prior approval from the Board for creation of any lien or charge or hypothecation on the assets of the pipeline to secure finances for the project and furnish details of utilization of funds.

7. The entity shall publish on its website the approved tariffs and other details as required under various regulations for the natural gas pipeline.

8. In case the authorization of the entity is terminated, the Board may assign the rights and obligations to any agency or another entity on such terms and conditions, as it may deem fit. Fwther, the entity may be required, as per the directions of the Board, to continue the operations of the natural gas pipeline at the same level till another agency or entity appointed by the Board takes over the full control of the natural gas pipeline.

9. The entity shall comply with the provisions under-

a. the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand natural gas pipelines) Regulations, 2008;

b. the Petroleum and Natural Gas Regulatory Board (Determination of natural gas pipeline Tariff) Regulations, 2008;

c. the Petrolewn and Natural Gas Regulatory Board (Guiding Principles for Declaring or Authorizing Natural Gas Pipeline as Common Carrier or Contract Carrier)Regulations, 2009

d. the Petroleum and Natural Gas Regulatory Board(Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines), Regulations, 2009;

e. the Petroleum and Natural Gas Regulatory Board (Access code for common carrier or contract carrier natural gas pipelines) Regulations, 2008;

f. the Petroleum and Natural Gas Regulatory Board (Affiliate code of conduct for entities engaged in marketing of natural gas and laying, building, operating or expanding natural gas pipeline) Regulations, 2008;

3R~~ ARVIND KUMAR

3T<1"f ~I-< Additional Adviser

~i;'l~lf'l 3'1< Tif"Tl<r<fi 'lt-<r r.ir.wr•T<fi <iV c lfoleum & Natural Gas Regulatory BOtl '.

:R~ <l<il.~ ~.;; ~)~'{ 1st Floor. World T rade Centre <rrOR'l!'r.i;. "'i>l' f~;;:-.ft- 110001 ~abar Road, N ew Oelhi-110001

Page 3 of 6

Page 5: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

..

g. the Petroleum and Natural Gas Regulatory Board (Determining capacity of Petroleum, Petroleum products and Natural Gas Pipeline) Regulations, 2010

h. the PNGRB Act and any other regulations notified by the Board from time to time , as may be applicable.

I 0. The entity shall comply with any other term or condition which may be notified by the Board in public interest, from time to time.

11 . You are requested to submit the Performance Bond of Rs.20 crores as per

the provision of the Regulation 8 of the Petroleum and Natural Gas Regulatory

Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas

Pipelines) Regulations, 2008. The Performance Bond is required to be

submitted within 15 days of this Letter of the Provisional Terms and

Conditions.

12. You are requested to confirm your acceptance in the space provided below

and return the same in original.

Dated: 29.01.2018

Copy to: Joint Secretaiy (GP) Ministry of Petroleum & Natural Gas

Shastri Bhavan, NewDelhi-110001

Page 4 of 6

Yours Faithfully, --~\,\?o\ ~ (Arvind Kumar)

Additional Adviser PNGRB

Official Seal

3l ef<'t-~ g.~ ARVIND KUMAR

3T'T't ~"<fifle . Addit iona l A d v iser l~)l°t'r<i>1;in~1'.11~,fi'rq; •'lu f<lPl•iPl <fi >i) •euoleum & Natural Gas Regu•atory s 0 ,.

Jl1!.P'r <1<'1.~ ~..: ~);c~ 1 s t F loor. World T rade C e n tre <rl<R ~. ~ ~<'•.fi- 11000 1

Aabar Road. New Delhi-110001

Page 6: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

·.

Acceptance of Terms and Conditions

I I We hereby agree to the terms and conditions issued by the Board vide letter ref. < '2ri,.f~jNG.PLLl'1.lt /<:AIL. j-s HfJDfL/ 01/18' > dated < .21· '11 • 2olf'> and agree to comply whh the same subject to which I I We have been issued acceptance letter for laying, building, operating or expanding natural gas pipeline along the route from the originating station <PAu..Lfu."(' "7'coA. A l/ ,.,J..c.bc..t:f > in the State or the Union Territory of < Vito.'° frr...Juh.. > to the terminating station < Ho..lcl..'t)... > in the State or the Union Territory of < 1;J«Ht- B~r:qcd.. >. t:V\tt < f:li-\o,_'MY'A.-7 ;11 1~ s+cJ~ ri~ (_ o~sJ...a_(

Date: :l. "7- • 0 ~ • 2.c/ I?

Place: N~ v ~lh.~ Signature of the Entity or Authorized Signatory

Name and Off!~· al ,.Seal

Lt~ NOJJAIN ~~ ~~aM~ ,· ..... «-r;~) ~~· ,, .. ,,'

~ ri"tr<li tfl<f-'l'I- • <l>l"q""~) f~thl-~,. . ~ (-q;( ~'fwll)/\f. , .·11 .. . • (~~ q;T'IT ~~; 10. op ;~~:a~(Je.,.-11Jlt' 16. m"''"';{ ~-110 oss /R. K. u ~. ·-f. ~"{11.

~-

~~ ARVIND KUMAR ~~R

Additional Adviser , al'R Slr=£:>-q; it"~l f<lf.'l<ll'H• '· .~)R:fWT •·i·"' · i ator i etroleum a. Natural Gas Reg~) '

ll'l.f>l CT<'l .'ll~ ~~ ~ -<.-1 1st Floor, World Trade Centi . 4fl>R ~-~~;,fl-~ 1000 ~­

"labar R oad. New Oelh1-1100 ..

Page 5 of 6

Page 7: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

·,

Annexure -I

Detail about Jagdishpur-Haldia-Bokaro-Dhamra pipeline

A. Phase-I: Phulpur to Dobhi pipeline section :

• Mainline: Phulpur to Dobhi - 30" x 341 .46 Kms

• Spmline : Gorak11pur TOP to FCI Gorakhpur - 18" x 163 .2 Kms

• Spurline : Varanasi ToP to CGS Varanasi - 8" x 15 Kms

• Spurline: Dobhi to Patna ToP- 24" x 83.4 Kms

• Spurline : Patna ToP to HFC Barauni - 24" X 78.749 kms

• Spurline: to Petrochemical plant Bara.uni - 12" x 8 kms

• Spurline: Patna Top to CGS Patna- 12" x 65.089 Kms

8 . Phase-Il: Dobhi to Haldia I Bokaro to Dhamra pipeline section:

• Trunkline : Dobhi -Sindri -Ranchi ToP - 30"x 292.8 km • Trunkline : Sindri to Haldia section - 30"/ 24"x390.3 km

• Trunkline: Ranchi to Angul pipeline section-30" x 446 Krus

• Trunk.line: Angul to Dhamra section - 36" x 210 Kms

• Spurline to: Bokaro -12" x 6.70 Kms

Sindri - 12" x6. 710 Kms Kolkata - 18" x47.620 Kms

IOCL Haldia - l8''x15.558 Kms Jamshedpur -1 2"x 112.715 Km HFC/SAIL/DPL Durgapur-24"x5.922 Kms/1 2''x5 Kms/18"x6 Kms

Sambalpur/Jharsuguda - 12" /4"x 38.5 Kms

Cuttack/Bhubaneshwar- 12" x 109 Kms

Rourkela - 4" x 24 Kms Jindal Ranchi - 6" x 25 Kms Para.dip - 12" x 80 Kms

~~AlN . -ltil) I be<:Ulive Director (l.lar'l.e~ng:Gasl

~ ~~ ~;pre;s I GAIL (India) L1m1ted ~ ~) ~)/(AGovt.ofhod_i_aundertaking~ (m«t ~ C6l ~=;· 15 Bhika •i: Cama Plac;

3lx~ Wl-flX ARVI ND K UMAR 3~~R

Additional Adviser ri:'rf<;r<i'f ;ill;r ~ ihT f.lf.'lm1J<1> .. ~ .. 'etroleum & Na:ural Gas RegulatOI)' a_._.

J:r<U'<l tl<'T.~ ~.,; ~l"i:!'-1 1st Floor, World Trade Centre 'l'l''R 'IC~. -ort ~-0- 1 10001

'3abar Road. New De Jh;-11 0001

~ ct>T1'l ...,, ~ . - ., . . 'IY. 16. ~ ~-llO 066/R K. Purair •;cl" · '' • ;m. -~. 'J.l'I.

Page 6 of 6

Page 8: O~~~~~~ft/RA/JHBDPL … natural gas pipeline system as common carrier with common carrier capacity of 4.0 MMSCMD*. Note: (*-This capacity is accepted as provisional and the final capacity

JHBDPL Project (State Wise Plpoline Length)

Uttar Pradesh - 343Km

Bihar 441 Km

Jharkhand 624Km

Odis ha 762Km

West Bengal 550Km

Total 2620 Km