11
OHSMS for Geotechnical Risk Mine Fill Presentation by: Alex Atkins FAusIMM(CP) Principal Mining Consultant, Optiro

Ohsms geotech risk_acg_fillseminar_june2013_alexatkins

Embed Size (px)

Citation preview

OHSMS for Geotechnical Risk Mine Fill

Presentation by: Alex Atkins FAusIMM(CP)Principal Mining Consultant, Optiro

Vulnerable Rule followers Robust Enlightened Resilient

In denialMessengers ‘shot’Whistleblowers dismissed or discreditedProtection of the powerfulInformation hoardedResponsibility shirkedFailure punished or covered upNew ideas crushed

Deal ‘by the book’Conform to rulesTarget = ‘zero’ReactiveRepair not reformInformation neglectedResponsibility compartmentalisedNew ideas = ‘problems’

Develop risk management capacityEnhance systemsImprove suite of performance measuresDevelop action plansMonitor and review progressClarify/refine objectives

Active leadershipSafety management plan widely knownCompetent people with experienceAccountabilities understoodAdvanced performance measuresRegular reviewsRange of emergency responses catered for

Strive for resilience of systemsReform rather than repairResponsibility sharedActively seek new ideasMessengers rewardedProactive as well as reactiveFailures prompt far-reaching inquiriesFlexibility of operationConsistent mindset = ‘wariness’

‘in disarray’pathological

‘organised’reactive

‘credible’calculative

‘trusting’proactive

‘disciplined’generative

Sanction Direct Encourage Partner Champion

Safety Culture Spectrum Continuous improvement

Model WHS Act

Nationally harmonised OHS Laws - status by state:

• WA & Vic – not introduced yet• Qld, NT, NSW, ACT, Cmwlth – from 1 Jan 2012• Tas, SA – from 1 Jan 2013

http://www.safeworkaustralia.gov.au/sites/swa/model-whs-laws/pages/jurisdictional-progress-whs-laws

SSEs – Mandatory risk management training (G-MIRM)

Work Health & Safety Management Systems(WHSMS)

PHMP:Principal hazard

management plan (intrinsic site hazards)

• OHSMS

PCP:Principal control plan

(barriers & controls)

• RISK MANAGEMENT FRAMEWORK

DUE

DILIGENCE

Transfer control measures into procedures, designs, processes, etc

Geotechs

OHSMS – consider the following:

Codes of Practice (SWA)

MSIA/MSIR Model WHS Act

OHSMS StandardsOHSAS18001:2007AS/NZS 4801:2001AS/NZS 4804:2001

Risk Management Standards

AS/NZS ISO 31000:2009

Incident Investigation – Capture LearningsSubject specific AS &

Industry Best Practice

DMP Guidelines, Safety Bulletins &

SIRs

DMP HIF Audits (e.g. OC & UG

Geotech; UG Mine Fill)

Goal: OHSMS Compliance Certification for technical risk

DMP Technical Specific HIF AuditsE.g. Mine Fill HIF Audit

(hydraulic/paste fill)

OHSMS Audit AS/NZS4801:2000 or OHSAS18001:2007

Technical/ Project Specific

Third Party Compliance Certification

http://www.dmp.wa.gov.au/documents/Audit_guidelines_and_templates/MSH_AuditG_UGMineFillHighImpactFunctionAudit2011.pdf

Hydraulic/ Paste Fill – reasons for failures

Refer to page 371 of Strategy2011 paper:

• Highly technical project in a KISS operating environment• Uncontrollable variables or unknowns• Multi-disciplinary team with limited time & resources,

conflicting interests, contradictory technical terms, etc

Need to perform OHSMS audits & risk assessments: systems, procedures, documentation, organisation, training

Hydraulic/Paste Fill Audit

Refer to page 372 of Strategy2011 paper:

• Fill system design should be holistic• Technical specification & QA

(competent person, clearly defined):– Barricades– Hydraulic/ paste fill specification– Reticulation system

• UG monitoring & documentation

Mine Management Systems - Fill(based on ISOAS 18001:2007 OHSMS audit)

Refer to page 372 of Strategy2011 paper:

Ensure these are in place:• Risk Register• Sufficient resources• Documented systems of work• Incident investigations and documentation• Emergency preparedness• Documented Trigger Action Plans (TAPs)

WHSMS

• Due Diligence & evidence of Duty of Care

• Audits & risk assessments (multi-disciplinary team) gap analysis continuous improvement Learning Organisation