Reliable power when and where you need it. Clean and simple. The Giant company’s Ramon Station is located between Roswell and Vaughn, New Mexico, at 5,300 foot elevation. Capstone’s distributor, Pumps and Service, was responsible for the installation of 15 65kW stand-alone microturbines that are providing the primary power for a booster station on an oil pipeline. The oil that is pumped is being fed to Western Refineries’ Bloomfield refinery. The microturbines, fueled by propane and controlled by Capstone’s Advanced Power Server, are providing the primary power for three 200 horsepower pumps capable of pumping 55,500 barrels of oil per day. With the high financial impact of equipment not being able to run on this location, “power reliability” was non-negotiable. According to our distributor, Capstone turbines were the only choice. Ramon Station New Mexico Oil & Gas 21211 Nordhoff Street | Chatsworth, CA 91311 | 866.422.7786 818.734.5300 ©2016 Capstone Turbine Corporation. P0811 Case Study CAP313 Fifteen 65kW microturbines provide the primary power for this oil pipeline booster station in New Mexico. www.capstoneturbine.com

Oil & Gas Ramon Station New Mexico

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Reliable power when and where you need it. Clean and simple. Reliable power when and where you need it. Clean and simple.

The Giant company’s Ramon Station is located between Roswell and Vaughn, New Mexico, at 5,300 foot elevation. Capstone’s distributor, Pumps and Service, was responsible for the installation of 15 65kW stand-alone microturbines that are providing the primary power for a booster station on an oil pipeline. The oil that is pumped is being fed to Western Refineries’ Bloomfield refinery. The microturbines, fueled by propane and controlled by Capstone’s Advanced Power Server, are providing the primary power for three 200 horsepower pumps capable of pumping 55,500 barrels of oil per day. With the high financial impact of equipment not being able to run on this location, “power reliability” was non-negotiable. According to our distributor, Capstone turbines were the only choice.

Ramon StationNew Mexico

Oil & Gas

21211 Nordhoff Street | Chatsworth, CA 91311 | 866.422.7786 818.734.5300 ©2016 Capstone Turbine Corporation. P0811 Case Study CAP313

Fifteen 65kW microturbines provide the primary power for this oil pipeline booster station in New Mexico.