Okanagan Regional Correctional Centre FOI request

Embed Size (px)

Citation preview

  • 7/28/2019 Okanagan Regional Correctional Centre FOI request

    1/5

    Pages 1 through 339 redacted for the following reasons:- - - - - - - - - - - - - - - - - - - - - - - - - - - -S. 12S. 12 , 15

    1JAG-2013-00258

  • 7/28/2019 Okanagan Regional Correctional Centre FOI request

    2/5

    ConsiderationsCOST

    C.1 ProximitytoCourtstobeservedbyOCC(exclusiveofCarbonFootprint)

    C.2 LikelihoodtoAchieve360cellswithinCurrentEstimate

    C.3 CostofLandPurchase/Lease

    C.4 CostofBuilding(exclusiveofsitedevelopmentcosts)

    C.5 ImpactonAnnualOperatingCosts(excludingcostofland)

    C.6 SiteDevelopmentCostsandRestraints(needforspecialfoundations,construction,drainage,

    relocations,anddemolitions)

    C.7

    Off

    Site

    Development

    Costs

    (eg.

    road

    expansions,

    bridges,

    walkways,

    service

    line

    extensions)

    ENVIRONMENTAL

    E.1 NotinALR

    E.2 EnvironmentalImplications(MinimalNegativeImpactonair,land,waterconditions,including

    noiseandlightpollution)

    E.3 NotWithinEnvironmentallySensitiveArea

    E.4 GreenBuildingOpportunitiesandAbilitytoAchieveLEEDGold

    E.5 CarbonFootprint(TrafficImpact,TravelDistancesforStaff,Services)

    SCHEDULE

    S.1 ScheduleImpact(ExclusiveofTimetoZoneandPurchase;e.g.Siteremediation,demolition,

    permits,andlegalchallenges)

    S.2

    Timelinessof

    Zoning

    S.3 TimelinessofPurchase/Lease

    2JAG-2013-00258

  • 7/28/2019 Okanagan Regional Correctional Centre FOI request

    3/5

    PROVINCIALIMPLICATIONS

    P.1 ProbablepositiveoutcomeofFirstNationsStrengthofClaimAnalysis

    P.2 ConsistentwithCapitalAssetManagementPlan

    MUNICIPALIMPLICATIONS

    M.1 LikelihoodofAppropriateZoningincludingconsiderationforpublicacceptance

    M.2 CommunityImpact ProximitytoSchools/EducationFacilities,DaycareCentres&Residential

    Areas

    M.3 ConsistentwithCommunityPlan(Municipalbenefit)

    M.4 FinancialBenefittoMunicipality(grants/grantsinlieu)

    M.5 CompatibilitywithNeighbours(Architectural,Functional)

    TECHNICAL

    T.1 MinimumSize (Buildingfootprint,publicandstaffparking)

    T.2 SiteConfiguration(includingbuildablearea,abilitytoexpand,allowsflexibledesign)

    T.3 Geotechnical(includingfloodplains,soilbearing,drainage,terrain/slopeconditions)

    T.4 ServicestoSite(power,water,septic,vehicularaccess,telephone/radioreception)

    T.5 AbilitytoAchieveFacilityDesignCriteria

    OPERATIONAL

    O.1 AvailabilityofSecondaryAccess(highwayclosure,naturaldisaster,etc)

    O.2 AbilitytoAchieveThreatPerimeterBuffer

    O.3 AccesstoMajorArterial(AccessforStaffandServices)

    O.4 ProximitytoEmergencyServices

    O.5 AvailabilityofProfessionalStaff(Psych,Dental,Doctor,Nurse)

    3JAG-2013-00258

  • 7/28/2019 Okanagan Regional Correctional Centre FOI request

    4/5

    4JAG-2013-00258

  • 7/28/2019 Okanagan Regional Correctional Centre FOI request

    5/5

    5JAG-2013-00258