Urban Modular Construction Building the Davenport Grand Hotel Presented By: Blake Johnson, P.E. Sales Engineer Rob Holland, P.E. Engineering Manager

Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Embed Size (px)

Citation preview

Page 1: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Urban Modular ConstructionBuilding the Davenport Grand Hotel

Presented By:Blake Johnson, P.E.

Sales Engineer

Rob Holland, P.E.Engineering Manager

Page 2: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Introduction:

• Oldcastle Precast – Spokane

• In operation for 50+ years in the Inland NW

• Products:

– Building systems

– Bridge systems

– Utility vaults

• Oldcastle:

– North America’s largest manufacturer of building products and materials.

Page 3: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Oldcastle Precast Spokane:• 60+ Employees

• In-house engineering and drafting teams

• Supports architects, engineers & owners

• On-site batch plant to produce

• 20 casting beds available

• 12 acres of laydown-storage

• On-site quality control

Page 4: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Oldcastle Precast Spokane:

Page 5: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

The Grand Hotel:

• Latest project in Davenport collection

– 716 Rooms

– 900 Car parking garage

– 62,500 sq. ft of meeting and exhibit space

– 4,500+ pieces of precast concrete

– 1.5 Million tons of concrete used

– Completed in 2 years

Page 6: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

History With Owner

• Ecova building

• Rock Pointe

• RiverView

– 5 Week install

• Davenport Series:

– Hall of Doges

– Tower

– Grand

Page 7: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Owner’s Goals• Large open area spaces

• High efficiency:

– Sound reduction between rooms

– Thermal envelope

• Reduced project schedule

• Reduced overall project cost

Page 8: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Accelerated Building Construction• Trusted partner with local support

• Repeatable prefabricated components

• Schedule driven project

• Weather/Temperature controlled environment

• Quality control

• Just in time shipping

Page 9: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Who Else Uses This Approach?

• Bridge builders

• Ship builders

• Airplane manufacturers

Page 10: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Project Approach:• Cast in place:

– Footings

– Shear walls

– Topping slabs

• Modular precast construction:

– Custom column and girder design for base floors

– Elevator and stair towers

– Hollow core decking

– Solid panel demising walls

– Insulated CarbonCast® wall panels

Page 11: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Click Here for External 3D Animation Video

Page 12: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Cast in Place Footings• Transfer structural loads to the earth

• Anchored to rock for increased capacity

Page 13: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Cast in Place Shear Walls

• Transfer building lateral loads to footings

• Size dictates cast in place vs. precast

Page 14: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Columns

• Structural columns to transfer loads from main floor to footings

• All columns cast and installed as single piece multistory members

• No splices required between pieces

Page 15: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Floor Beams and Hollowcore Decking

• Prestressed flooring

• Large open spans

• Reduced weight/ft2

vs solid slabs

Page 16: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Wall & Spandrel

• Rebar reinforced

• Prestressed wall panel

Page 17: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Double-T Beams

• High capacity design – support HVAC and backup generator

• Allowed for open areas in ballroom (>100ft clear span) and kitchen (>60ft clear span)

Page 18: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast 3rd Floor Transfer Beams

• Transfer building vertical loads from hotel floors above to columns allowing large open areas in lower 2 floors.

• Utilized standard forms normally used for highway bridges.

Page 19: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

3rd Floor Hollowcore and Topping

• Precast & prestressed deck

• Cast in place topping provides “composite” strength.

• Served as diaphragm to transfer lateral loads to shear walls for building stability.

Page 20: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

3rd Floor Hollowcore and Topping

Page 21: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Insulated Stair Tower Panels• Fire resistant, thermally

efficient stair well.

• Also used to provide lateral resistance for the structure.

Page 22: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Insulated Stair Wall Panels

• High thermal efficiency

• Carbon cast provides high strength composite design

Page 23: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Demising Walls• Provided high level of sound dampening

between rooms and structural support of room levels

• Accommodated HVAC ductwork

• Doweled together for floor to floor continuity

Page 24: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Demising Walls

Page 25: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Exterior Wall Panels

• Pre-glazed

• Pre-painted

Page 26: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Exterior Wall Panels

Page 27: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Floor Slabs• (3) panels required to cover (2) rooms +

hallway

• Sized to reduce vibrations from walking (tested in the plant)

• Included shower pans and plumbing holes

• Welded to demising walls to provide instant diaphragm reducing bracing and increasing installation safety

Page 28: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Precast Floor Slabs

Page 29: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

What to Watch For:

• Standardize panels to maximum extent

• Ensure detailed engineering is complete prior to production

• Solid communication between erector and production

• Plan for MEP upfront to allow for plant installed block outs and sleeves

Page 30: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Questions?

Page 31: Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel

Let us know how we may support you.

Blake Johnson, P.E

(509) 536-3319

[email protected]

Rob Holland, P.E.

(509) 536-3349

[email protected]

Oldcastle Precast

922 N. Carnahan Rd.

Spokane Valley, WA 99212