10
OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

  • View
    217

  • Download
    2

Embed Size (px)

Citation preview

Page 1: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS

U.Schneekloth/R.Beck

PRC closed session6.05.2009

Page 2: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 2

OLYMPUS Approval

Recommended by PRC in Oct. 2008, provided funding

Approved by DESY directorate in Dec. 2008 subject to

schedule for installation and running and necessary funding

Page 3: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 3

Schedule

Remove ARGUS experiment in Summer 2009 Disassemble and pack BLAST detector Jan.-March 2010 Ship and assemble BLAST/OLYMPUS detector and OLYMPUS target

in spring-fall 2010 Modify DORIS beam-line and install OLYMPUS target in DORIS in

winter 2010/11 shutdown. OLYMPUS commissioning in parking position winter-summer 2011 Install complete OLYMPUS experiment in summer 2011 Commission in fall 2011

Parasitic mode and some dedicated shits during service weeks Take data in 2012

Schedule discussed/agreed with DESY M, FS and FH directors

Page 4: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 4

Schedule Milestones

Page 5: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 5

Schedule

Page 6: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 6

Schedule

Background studies

Parasitic studies + some days (~5)

full operation

Page 7: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 7

Cost Estimate – Operation

OLYMPUS

Page 8: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 8

Cost Estimate – Investments

Page 9: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 9

Cost Estimate – Investments

Page 10: OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009

OLYMPUS U. Schneekloth/R.Beck 10

Cost Estimate – Investments Possible in-kind contributions of institutes

Cooling system (design, ordering, setup,…) Cabling from power supply to toroid Polarity switches (assembly in workshop) Modification of vacuum system Send technicians (ARGUS removal, modification of IR,…)

Presently about 500 – 600k€

Could save about 100k€ in power costs in case of early modification of quads