LANDSCAPE BLOW-UP PLAN AND SECTIONS
DK 10 / 15 EL DL
NTS
A FIRST ISSUE 07/13
Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery – Design and Construction
11.6.3
B REVISED ISSUE 11/14C REVISED ISSUE 10/15
C
Site formation platform to be handover to relevant department
Proposed internal road within Sandy Ridge
OM3
OM2
OM4
B
B
BLOW-UP PLAN BN.T.S.
Section B-BN.T.S.
OM4
OM2
OM3
BLOW-UP PLAN AN.T.S.
Section A-AN.T.S.
OM4OM2
A
A
Shuttle Bus drop-off area
OM4
OM3