OmegaPS UGM 2010

Accepting Data into DND from Vendors

Mike Petik

Pennant Canada

[email protected]

Page 2: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

OmegaPS UGM 2010

•Introduction

•Data Flow Process

•Communication

•Questions

Page 3: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Introduction

•Since both industry and DND have traditionally shared Logistics data based

on MIL-STD-1388-2B, it is extremely important that processes and

procedures are in place to execute the movement of data from the vendor to

DND.

•It is essential that vendors and DND share a clear understanding of the

steps involved in the transition and the data requirements associated with

each step.

•Effective direct communication between industry and DND data specialists

is a key element in the reduction of project risk.

•We will explore some of the key processes specific to the Navy Fleet Data

Management transition of data. Many of these processes are common to Air

and Land elements as well as such may be applied accordingly.

Page 4: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

DA

F

END

End

C

Finalize EFT Migrate to MES-D

Register System

ERN

Receive and

Validate LSAR

Deliverables

Load to OmegaPS

Supportability

Receive and

Validate IPC

PPB Data Set(s)

Perform IP

Activities

Conduct

Supportability

Analysis

Condition MES-D

Master Data

(Fit Definition

Module)

Initiate Naval

Maintenance

Management

System

Transfer MES-D to

SAP

Validate MES-D

Data by TA

Migrate Core LSA

Data to MES-D

Process ESLCN to

DSCO CGCM and

MA

B

E

Page 5: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

•Register the System Level Equipment in DND and update the Equipment

Family Tree in OmegaPS

END

A

Raise DND 752

Generate Hull/

Platform EFT

Block Diagram

(MES-D)

Install and Identify

ERN on Hull/

Platform (MES-D)

Impact Analysis on

Class/Ship

Configuration

(EFT)

Confirmation/

Validation of 752Process DND 752Yes

No

Page 6: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

•Register the System Level Equipment in DND and update the Equipment

Family Tree in OmegaPS

END

A

Raise DND 752

Generate Hull/

Platform EFT

Block Diagram

(MES-D)

Install and Identify

ERN on Hull/

Platform (MES-D)

Impact Analysis on

Class/Ship

Configuration

(EFT)

Confirmation/

Validation of 752Process DND 752Yes

No

Page 7: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

END

A

Raise DND 752

Generate Hull/

Platform EFT

Block Diagram

(MES-D)

Install and Identify

ERN on Hull/

Platform (MES-D)

Impact Analysis on

Class/Ship

Configuration

(EFT)

Confirmation/

Validation of 752Process DND 752Yes

No

Page 8: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

B

EBS Only

LCMM Template

MS Access

ASCII.txt

Load Data in

SandBox

Receive

Deliverables from

PMO

SOW

Compliancy

Check

No

Load Data 13882B

Compliancy

Module

13882B

Compliancy

Check

Yes

No

EndYes

Page 9: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

B

EBS Only

LCMM Template

MS Access

ASCII.txt

Load Data in

SandBox

Receive

Deliverables from

PMO

SOW

Compliancy

Check

No

Load Data 13882B

Compliancy

Module

13882B

Compliancy

Check

Yes

No

EndYes

Page 10: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

B

EBS Only

LCMM Template

MS Access

ASCII.txt

Load Data in

SandBox

Receive

Deliverables from

PMO

SOW

Compliancy

Check

No

Load Data 13882B

Compliancy

Module

13882B

Compliancy

Check

Yes

No

EndYes

Page 11: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

B

EBS Only

LCMM Template

MS Access

ASCII.txt

Load Data in

SandBox

Receive

Deliverables from

PMO

SOW

Compliancy

Check

No

Load Data 13882B

Compliancy

Module

13882B

Compliancy

Check

Yes

No

EndYes

Page 12: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

Receive and Validate LSAR Deliverables CSO ILS Workflow

FD

MP

MO

/ T

AO

EM

/ C

on

tra

cto

r

REVISED

16 May 2010

DATE

23 March 2010

PAGE

1 OF 6

DRAWN BY

Pennant Canada

Produce LSAR

DeliverablesSend to PMO / TA

Correct and

Re-Submit LSARSend to PMO / TA

Receive Deficiencies

ReportSend to OEM for Corrections

Validate LSAR

Deliverables FormatSend to +DMMS 3 Fleet Data

Management@ADM(Mat)

DMMS@Ottawa-Hull

Delivery

Compliance CheckLoad Data in Sanbox

Conduct Initial Review of

Deliverables

Pass

Fail

Load Data 13882B

Compliancy Module ENDPass

Fail

PMO / TA may authorize FDM

to liaise directly with the OEM

contractor source of the

deliverable for clarification and

corrections.

Page 13: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

Receive and Validate LSAR Deliverables CSO ILS Workflow

FD

MP

MO

/ T

AO

EM

/ C

on

tra

cto

r

REVISED

16 May 2010

DATE

23 March 2010

PAGE

1 OF 6

DRAWN BY

Pennant Canada

Produce LSAR

DeliverablesSend to PMO / TA

Correct and

Re-Submit LSARSend to PMO / TA

Receive Deficiencies

ReportSend to OEM for Corrections

Validate LSAR

Deliverables FormatSend to +DMMS 3 Fleet Data

Management@ADM(Mat)

DMMS@Ottawa-Hull

Delivery

Compliance CheckLoad Data in Sanbox

Conduct Initial Review of

Deliverables

Pass

Fail

Load Data 13882B

Compliancy Module ENDPass

Fail

PMO / TA may authorize FDM

to liaise directly with the OEM

contractor source of the

deliverable for clarification and

corrections.

Page 14: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

Receive and Validate LSAR Deliverables CSO ILS Workflow

FD

MP

MO

/ T

AO

EM

/ C

on

tra

cto

r

REVISED

16 May 2010

DATE

23 March 2010

PAGE

1 OF 6

DRAWN BY

Pennant Canada

Produce LSAR

DeliverablesSend to PMO / TA

Correct and

Re-Submit LSARSend to PMO / TA

Receive Deficiencies

ReportSend to OEM for Corrections

Validate LSAR

Deliverables FormatSend to +DMMS 3 Fleet Data

Management@ADM(Mat)

DMMS@Ottawa-Hull

Delivery

Compliance CheckLoad Data in Sanbox

Conduct Initial Review of

Deliverables

Pass

Fail

Load Data 13882B

Compliancy Module ENDPass

Fail

PMO / TA may authorize FDM

to liaise directly with the OEM

contractor source of the

deliverable for clarification and

corrections.

Page 15: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

•Expansion of the Equipment Family Tree (sub system equipments)

EndD

Update Hull/

Platform

Definition EFT

(MES-D)

Generate Hull/

Platform EFT

Block Diagram

Register Sub

ERN(s) (DND 752)Yes

Confirmation/

Validation of

DND 752

Process DND 752

No

Reserve

Functional

Locations in SAP

Page 16: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

•Expansion of the Equipment Family Tree (sub system equipments)

EndD

Update Hull/

Platform

Definition EFT

(MES-D)

Generate Hull/

Platform EFT

Block Diagram

Register Sub

ERN(s) (DND 752)Yes

Confirmation/

Validation of

DND 752

Process DND 752

No

Reserve

Functional

Locations in SAP

Page 17: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

•Conditioning Data in OmegaPS for DND Navy for ERP and DRMIS

E Build Functional

Structures

Assign Usable On

Codes

ERN/EAC

Assignment of

Material

Map Physical and

Functional

Structures

Build

Configurations

Assign Structure

Codes

Validate Fit

Definition DataEND

Page 18: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

E Build Functional

Structures

Assign Usable On

Codes

ERN/EAC

Assignment of

Material

Map Physical and

Functional

Structures

Build

Configurations

Assign Structure

Codes

Validate Fit

Definition DataEND

Page 19: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

•Conditioning Data in OmegaPS for DND Navy for ERP and DRMIS

E Build Functional

Structures

Assign Usable On

Codes

ERN/EAC

Assignment of

Material

Map Physical and

Functional

Structures

Build

Configurations

Assign Structure

Codes

Validate Fit

Definition DataEND

Page 20: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

•Conditioning Data in OmegaPS for DND Navy for ERP and DRMIS

E Build Functional

Structures

Assign Usable On

Codes

ERN/EAC

Assignment of

Material

Map Physical and

Functional

Structures

Build

Configurations

Assign Structure

Codes

Validate Fit

Definition DataEND

Page 21: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

E Build Functional

Structures

Assign Usable On

Codes

ERN/EAC

Assignment of

Material

Map Physical and

Functional

Structures

Build

Configurations

Assign Structure

Codes

Validate Fit

Definition DataEND

Page 22: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

Non Complex

Complex

Depth of Detail

End

F

Build Manually in

SAP

Migrate MDP Data

to SAP

Extract Data Set(s)

From MES-D

Master Data

Condition Data

Set(s)

Merge Oracle BI

Data to Applicable

MDP Tab(s)

Validate SAP DataValidate MDP

Data

Determine Data

Requirements

Notify NEM of

Equipment

Change to

Structure - EC

Process

Page 23: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Data Flow Process

Non Complex

Complex

Depth of Detail

End

F

Build Manually in

SAP

Migrate MDP Data

to SAP

Extract Data Set(s)

From MES-D

Master Data

Condition Data

Set(s)

Merge Oracle BI

Data to Applicable

MDP Tab(s)

Validate SAP DataValidate MDP

Data

Determine Data

Requirements

Notify NEM of

Equipment

Change to

Structure - EC

Process

Page 24: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Communication

•Set up an Integrated project team of LSA data specialists

•DND reps that will be doing the work

•OEM reps that will be doing the work

•Prevents delays in the delivery of data

•Ensures the project objectives are met

•Allows DND and Industry to leverage experience and expertise

•A Simple phone call or e-mail can reduce delays by months. A current DND

Navy project is currently benefiting from this. The DND LSA specialist is

communicating directly with the Vendor LSA specialist in the creation of

compliant data sets.

•A stepped approach is used.

•Structure ---- X and H tables

•Failures ---- B Tables

•Maintenance Tasks --- C tables

•Other tables

•Data at each step is trial loaded into OmegaPS to ensure data

integrity and corrective

•This data represents the fundamental information required for

operations.

Page 25: OmegaPS UGM 2010 - Pennant International Group plc Data...OmegaPS UGM 2010 Accepting Data into DND from Vendors Mike Petik Pennant Canada Mikepetik@sympatico.ca OmegaPS UGM 2010 …

Questions?