19
On-Demand Architecture for Network- Critical Physical Infrastructure Large Data Centres Small & Medium Data Centres Computer Rooms & Closets David Blumanis APC, Data Centre Consultant, Asia Pacific

On-Demand Architecture for Network-Critical Physical Infrastructure

  • Upload
    ranee

  • View
    41

  • Download
    0

Embed Size (px)

DESCRIPTION

On-Demand Architecture for Network-Critical Physical Infrastructure. Large Data Centres Small & Medium Data Centres Computer Rooms & Closets. David Blumanis APC, Data Centre Consultant, Asia Pacific. Network-Critical Physical Infrastructure (NCPI). - PowerPoint PPT Presentation

Citation preview

Page 1: On-Demand Architecture for              Network-Critical Physical Infrastructure

On-Demand Architecture for Network-Critical Physical Infrastructure

Large Data Centres

Small & Medium Data Centres

Computer Rooms & Closets

David BlumanisAPC, Data Centre Consultant, Asia Pacific

Page 2: On-Demand Architecture for              Network-Critical Physical Infrastructure

Network-Critical Physical Infrastructure (NCPI)

Essential foundation

of reliability

Page 3: On-Demand Architecture for              Network-Critical Physical Infrastructure

You have a large NCPI investment

Cooling Equipment: 6%

Power Equipment: 17%

Racks: 3%

Engineering &Installation: 19%

Space: 17%

Electricity: 27%Service: 13%

Typical 10 yr lifecycle TCO from $80K to $140K per rack

Source: APC White Paper #6

Page 4: On-Demand Architecture for              Network-Critical Physical Infrastructure

Network-Critical Physical Infrastructure Challenges

• Rapid changes in IT technology

• High density

• High operating/service costs

• Increasing availability expectations

• Server consolidation

• Regulatory requirementsIn response, APC is changing the way the world designs, installs, operates, manages and maintains Network-Critical Physical Infrastructure (NCPI)

Page 5: On-Demand Architecture for              Network-Critical Physical Infrastructure

The Business Value Equation for Network-Critical Physical Infrastructure

Availability Agility

TCOValue

x=

What are the barriers to improving value by 10x?

Page 6: On-Demand Architecture for              Network-Critical Physical Infrastructure

10 XAvailability Agility

TCOValue

x=

• Equipment Reliability

• Mean-Time-To-Recover

• Human Error

Your entitlement: Reduce downtime by 90%

80% less

50% less

Page 7: On-Demand Architecture for              Network-Critical Physical Infrastructure

Case Study of Downtime Failures

Root Causes

0%

5%

10%

15%

20%

25%

30%

35%

EquipmentFailure

Human Error ConstructionRelated

DesignRelated

ExternalCauses

Consistent with Surveys which attribute 60% or more of failures to Human Error

Page 8: On-Demand Architecture for              Network-Critical Physical Infrastructure

Standardisation enables improved availability

• Modularise• Pre-test systems in the

factory• Hot swappable• Pre-Integrate Power-

Cooling-Rack Management & diagnostics

• One-Time Engineering• Unique training

requirements• On-site assembly• On-site testing• Custom programming

Standardise To Eliminate

Standardisation accelerates learning at all levels, reducing human error and increasing availability

Page 9: On-Demand Architecture for              Network-Critical Physical Infrastructure

Availability

TCOValue

x=

• Speed of Deployment

• Ability to Scale

• Ability to Reconfigure

Your entitlement: As much as 10 x the agility

100% easier

80% less time

100% easier

10 XAgility

Page 10: On-Demand Architecture for              Network-Critical Physical Infrastructure

Data Centre traditional design

Page 11: On-Demand Architecture for              Network-Critical Physical Infrastructure

• The Design Concept is built on standardised parts that can be scaled to meet the need?

• Construction Design incorporates a “Lego Block” approach of pre-engineered components?

• Construction is mainly done in a factory instead of on-site?

• Commissioning tests pre-integrated infrastructure systems.

What if……

Page 12: On-Demand Architecture for              Network-Critical Physical Infrastructure

20% lessAvailability Agility

TCOValue

x=

• Capital Cost

• Electricity Costs

• Service Costs

Your entitlement: As much 20% overall NCPI TCO

10% less

30% less

30% less

Page 13: On-Demand Architecture for              Network-Critical Physical Infrastructure

Waste due to oversizing

Reference: APC White paper #37

Page 14: On-Demand Architecture for              Network-Critical Physical Infrastructure

The Business Value Equation for Network-Critical Physical Infrastructure

Availability Agility

TCOValue

x=

Page 15: On-Demand Architecture for              Network-Critical Physical Infrastructure

Brayton International“ InfraStruXure™ gives control of the power to the IT professional. I can allocate the power the way I want to, without calling in an electrician.”

INDUSTRYManufacturing

APPLICATIONNew data centre

REQUIREMENTAdaptability and control

Markus M. Hill, Director, Technology & Information Services

High Point, NCUnited States

Page 16: On-Demand Architecture for              Network-Critical Physical Infrastructure

Olympus Corporation

“ Above all we wanted to avoid having to spend a fortune on initial costs before the server room was even filled.”

Masashi AsanoAssistant ManagerInformation Systems DepartmentTokyo, Japan

INDUSTRYTechnology

APPLICATIONNew server room

REQUIREMENTScalability

Page 17: On-Demand Architecture for              Network-Critical Physical Infrastructure

ADCS Inc

INDUSTRY

Finance

APPLICATION

New data center

REQUIREMENT

Higher availability with lower total cost of ownership

Cliff Rittel

Director of IT

Poway, CA

United States

“ With InfraStruXure™, the total cost of ownership was much lower. This was the deciding factor.”

Page 18: On-Demand Architecture for              Network-Critical Physical Infrastructure

Avon Old Farms School“ With only two systems people to support the entire campus, it’s an immense help to have such an easy-to-manage solution as InfraStruXure™.”

Deb CaseDirector of Information Technology Avon, CT

INDUSTRYEducation

APPLICATIONNew data CentreREQUIREMENTAbility to manage with limited personnel

Page 19: On-Demand Architecture for              Network-Critical Physical Infrastructure

Just Some Australian Customers

Telstra

Toyota

Woolworths

Lend Lease

Tenix Defense

Commonwealth Bank

General Motors Holden