On-Demand Architecture for Network-Critical Physical Infrastructure
Large Data Centres
Small & Medium Data Centres
Computer Rooms & Closets
David BlumanisAPC, Data Centre Consultant, Asia Pacific
Network-Critical Physical Infrastructure (NCPI)
Essential foundation
of reliability
You have a large NCPI investment
Cooling Equipment: 6%
Power Equipment: 17%
Racks: 3%
Engineering &Installation: 19%
Space: 17%
Electricity: 27%Service: 13%
Typical 10 yr lifecycle TCO from $80K to $140K per rack
Source: APC White Paper #6
Network-Critical Physical Infrastructure Challenges
• Rapid changes in IT technology
• High density
• High operating/service costs
• Increasing availability expectations
• Server consolidation
• Regulatory requirementsIn response, APC is changing the way the world designs, installs, operates, manages and maintains Network-Critical Physical Infrastructure (NCPI)
The Business Value Equation for Network-Critical Physical Infrastructure
Availability Agility
TCOValue
x=
What are the barriers to improving value by 10x?
10 XAvailability Agility
TCOValue
x=
• Equipment Reliability
• Mean-Time-To-Recover
• Human Error
Your entitlement: Reduce downtime by 90%
80% less
50% less
Case Study of Downtime Failures
Root Causes
0%
5%
10%
15%
20%
25%
30%
35%
EquipmentFailure
Human Error ConstructionRelated
DesignRelated
ExternalCauses
Consistent with Surveys which attribute 60% or more of failures to Human Error
Standardisation enables improved availability
• Modularise• Pre-test systems in the
factory• Hot swappable• Pre-Integrate Power-
Cooling-Rack Management & diagnostics
• One-Time Engineering• Unique training
requirements• On-site assembly• On-site testing• Custom programming
Standardise To Eliminate
Standardisation accelerates learning at all levels, reducing human error and increasing availability
Availability
TCOValue
x=
• Speed of Deployment
• Ability to Scale
• Ability to Reconfigure
Your entitlement: As much as 10 x the agility
100% easier
80% less time
100% easier
10 XAgility
Data Centre traditional design
• The Design Concept is built on standardised parts that can be scaled to meet the need?
• Construction Design incorporates a “Lego Block” approach of pre-engineered components?
• Construction is mainly done in a factory instead of on-site?
• Commissioning tests pre-integrated infrastructure systems.
What if……
20% lessAvailability Agility
TCOValue
x=
• Capital Cost
• Electricity Costs
• Service Costs
Your entitlement: As much 20% overall NCPI TCO
10% less
30% less
30% less
Waste due to oversizing
Reference: APC White paper #37
The Business Value Equation for Network-Critical Physical Infrastructure
Availability Agility
TCOValue
x=
Brayton International“ InfraStruXure™ gives control of the power to the IT professional. I can allocate the power the way I want to, without calling in an electrician.”
INDUSTRYManufacturing
APPLICATIONNew data centre
REQUIREMENTAdaptability and control
Markus M. Hill, Director, Technology & Information Services
High Point, NCUnited States
Olympus Corporation
“ Above all we wanted to avoid having to spend a fortune on initial costs before the server room was even filled.”
Masashi AsanoAssistant ManagerInformation Systems DepartmentTokyo, Japan
INDUSTRYTechnology
APPLICATIONNew server room
REQUIREMENTScalability
ADCS Inc
INDUSTRY
Finance
APPLICATION
New data center
REQUIREMENT
Higher availability with lower total cost of ownership
Cliff Rittel
Director of IT
Poway, CA
United States
“ With InfraStruXure™, the total cost of ownership was much lower. This was the deciding factor.”
Avon Old Farms School“ With only two systems people to support the entire campus, it’s an immense help to have such an easy-to-manage solution as InfraStruXure™.”
Deb CaseDirector of Information Technology Avon, CT
INDUSTRYEducation
APPLICATIONNew data CentreREQUIREMENTAbility to manage with limited personnel
Just Some Australian Customers
Telstra
Toyota
Woolworths
Lend Lease
Tenix Defense
Commonwealth Bank
General Motors Holden