Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Azure Minerals Ltd
Annual General Meeting 19th November 2013
On the Road to Mining in
For
per
sona
l use
onl
y
Azure in Mexico
Loreto
Panchita
Promontorio
La Tortuga
For
per
sona
l use
onl
y
Pipeline to Production
Reconnaissance Exploration
Los Chinos Copper-Zinc
San Eduardo Copper
Early Stage Exploration
Pozo de Nacho Molybdenum
La Tortuga Copper Loreto Copper
Advanced Exploration
Panchita Gold
El Tecolote Copper-Zinc
Development Studies
Promontorio - Cascada Copper-Gold-Silver
For
per
sona
l use
onl
y
Promontorio Project
CASCADA
RISCO DORADO
For
per
sona
l use
onl
y
Risco Dorado Prospect – 1 DDH 11.0m @ 1.5% Cu, 0.4g/t Au & 29g/t Ag
Cascada Deposit - 18 DDH
Promontorio Resource 840,000t @ 4.1% CuEq
Promontorio Exploration
Activity
Post-mineralisation volcanic cover rocks
For
per
sona
l use
onl
y
JORC Mineral Resource(1)
(@ 0.5% CuEq cut-off) Tonnes CuEq(2)
(%) Cu (%)
Au (g/t)
Ag (g/t)
Indicated 610,000 4.4 2.7 1.7 56
Inferred 230,000 3.3 1.8 1.5 56
TOTAL 840,000 4.1 2.5 1.6 56
Promontorio – JORC Mineral Resource
High confidence resource with 75% in Indicated category
100% of Indicated Resource contained in 2 veins - Veta Grande and Santiago
Good exploration upside to increase resources
(1) Details of the resources classification and estimation methodologies are contained in Azure’s ASX announcement, released on 10th May 2013 (2) See Appendix for Copper Equivalency (CuEq) Statement
For
per
sona
l use
onl
y
For
per
sona
l use
onl
y
Post-mineralisation volcanic cover rocks
Cascada Drilling
High Grade Copper Zone
Copper Mineralised Envelope
Gold Mineralised Envelope
For
per
sona
l use
onl
y
Cascada Drill Intercepts
DRILL HOLE HIGH GRADE
COPPER ZONE COPPER MINERALISED
ENVELOPE
APR-DD-087 35.9m @ 4.5% CuEq 70.0m @ 2.6% CuEq
APR-DD-089 32.9m @ 6.3% CuEq 129.0m @ 2.9% CuEq
APR-DD-091 29.4m @ 7.4% CuEq 61.5m @ 4.1% CuEq
APR-DD-092 32.4m @ 3.7% CuEq 56.0m @ 2.9% CuEq
APR-DD-093 40.9m @ 5.5% CuEq 101.5m @ 3.0% CuEq
APR-DD-098 19.0m @ 6.0% CuEq High grade zone only
APR-DD-104 6.8m @ 2.6% CuEq 49.6m @ 1.4% CuEq
For
per
sona
l use
onl
y
Cascada APR-DD-087
5.12m @ 10.2% Cu
For
per
sona
l use
onl
y
Risco Dorado – 1 DDH 11.0m @ 1.5% Cu
Cascada Promontorio Resource 840,000t @ 4.1% CuEq
IP Plan View 300m Below Surface
Chargeability
For
per
sona
l use
onl
y
IP Section View Through Cascada
Resistivity
Chargeability
Azure’s Drilling At Cascada Porphyry Copper Target
For
per
sona
l use
onl
y
Milestones & News Flow
Cascada & Promontorio
• IP survey & interpretation: Completed
• Fundraising Completed
• Exploration drilling: Q4 2013 to Q1 2014
• Resource estimation: Commence Q1 2014
• Metallurgical testwork: Commence Q1 2014 For
per
sona
l use
onl
y
Land of Opportunity
For
per
sona
l use
onl
y
APPENDIX - Statements
Competent Person Statement – Exploration Results and Mineral Resources
Information in this document that relates to Exploration Results and Mineral Resources are based on information compiled by Mr Tony Rovira, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Rovira is a full-time employee of Azure Minerals Limited. Mr Rovira has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Rovira consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Copper Equivalency Statement:
• Copper Equivalent (CuEq) was based on the following assumed metal prices that were guided by the three year averages at the data cut-off date: US$3.25/lb for Cu, US$1,450/oz for Au and US$27.50/oz for Ag.
• The CuEq grade accounts for the following metal recoveries, which were based on metallurgical testwork completed by independent metallurgical laboratories AMDEL and Ammtec, under the supervision of Coffey Mining Pty Ltd: 97.9% for Cu, 93.4% for Au, and 97% for Ag.
• The following formula was used to calculate the equivalent grade: CuEq (%) = (Cu% x 0.979) + (Au (g/t) x 0.6077) + (Ag (g/t) x 0.0120)
• It is Azure’s belief that all elements included in the metal equivalent calculation have a reasonable potential to be recovered.
For
per
sona
l use
onl
y