ONGOING PROJECTS Construction Underway
GAS | The AmericasU.S.
ATLANTIC COAST PIPELINE LLC – (2/18)Owners: Dominion Energy; Duke Energy; Piedmont
Natural Gas and Southern Company GasProject: Atlantic Coast PipelineType: Project includes construction of pipelineLength: 600 milesDiameter: 20, 36 and 42 inchesLocation: Harrison County, WV – Chesapeake, VACapacity: 1.5 Bcf/dCompletion: 4Q 2019Comments: Project will transport domestically-
produced, clean-burning natural gas from West Virginia to communities in Virginia and North Carolina that lack the infrastructure needed to generate cleaner electricity, heat homes and power new industries
Contractor: Spring Ridge Constructors LLCType: Project includes pipeline construction
Contractor: Michels Corp.Type: Project includes pipeline construction
Contractor: Price Gregory International Inc.Type: Project includes pipeline construction
Contractor: Rockford Corp.Type: Project includes pipeline construction
Contractor: U.S. Pipeline Inc.Type: Project includes pipeline construction
Project: Atlantic Coast PipelineSegment: Supply Header ProjectType: Project includes pipeline construction and
facility modificationsLength: 38 milesDiameter: 30 inchesLocation: Westmoreland County, PA; Wetzel County,
WVCapacity: 1.5 MMDth/dCompletion: 4Q 2019Comments: Project will move Marcellus Shale gas
from Ohio, West Virginia and Pennsylvania into the Atlantic Coast Pipeline for further delivery to Virginia and North Carolina
Contractor: Ace Pipeline Inc. Type: Project includes pipeline construction
BIRDSBORO POWER LLC – (5/18)Project: Birdsboro PipelineType: Project includes construction of pipelineLength: 14 milesDiameter: 24 or 30 inches
Location: Oley Township, PACapacity: 79 MDth/d
Contractor: InfraSourceType: Project includes pipeline construction
BLUE MOUNTAIN MIDSTREAM LLC — (7/18)Project: Blue Mountain Delivery ProjectType: Project includes pipeline constructionLength: 10 milesLocation: Grady County, OKCapacity: 255 MMcf/dComments: Project will run from Blue Mountain
Midstream’s natural gas processing plant in Grady County, OK
BOARDWALK LOUISIANA MIDSTREAM LLC –(REV 7/17)Operator: Gulf South Pipeline LPProject: Coastal Bend HeaderType: Project includes the construction of
pipeline, three compressor stations and seven meter stations
Length: 66 milesDiameter: 16 and 36 inchesLocation: Port Neches, TX - Devers, TXCompletion: 3Q 2018
Contractor: Sunland ConstructionType: Project includes pipeline construction
BOARDWALK PIPELINE PARTNERS LP –(3/18)Operator: Gulf South Pipeline LPProject: St. Charles Parish Expansion ProjectType: Project includes construction of pipeline
and a new compressor stationLength: 1.25 milesDiameter: 16 inchesLocation: Montz, LACapacity: 133 Mcf/dCompletion: 3Q 2018Comments: Project will connect to Gulf South’s
24-inch Index 270 pipeline
CARDINAL MIDSTREAM III LLC – (4/18)Owner: Cardinal Midstream LLCProject: Iron Horse Gathering SystemType: Project includes construction of a gas
gathering and processing systemLength: 100Location: Canadian, Grady, Caddo and McClain
counties, OKCapacity: 200 MMcf/dCompletion: 3Q 2018Comments: System includes the Iron Horse Plant,
designed to accommodate additional expansions that would bring total processing capacity to 600 MMcf/d to serve production growth, and is anchored
by a long-term acreage dedication from Travis Peak Resources LLC
CHENIERE CORPUS CHRISTI PIPELINE LP – (5/17)
Project: Corpus Christi PipelineType: Project includes pipeline constructionLength: 23 milesDiameter: 48 inchesLocation: Sinton, TX – Corpus Christi, TXCompletion: 2019 Comments: Pipeline will allow for the interconnection
points with interstate and intrastate natural gas transmission pipelines in South Texas, including Tennessee Gas Pipeline, Southcross, Kinder Morgan Tejas Pipeline and Transcontinental Gas Pipeline. The line will terminate at the proposed Corpus Christi Liquefaction Plant
Contractor: Associated Pipe LineType: Project includes pipeline construction
COLUMBIA PIPELINE GROUP INC. – (4/18)Owner: TransCanada Corp.Project: B-System ProjectType: Project includes construction of pipeline,
replacement of existing pipeline and upgrades to equipment and facilities
Length: 20.8 milesDiameter: 20 inchesLocation: Fairfield and Franklin counties, OHCompletion: 3Q 2018Comments: Project will also retire an existing 17.6 mile
pipeline as part of Columbia’s ongoing Modernization Program to ensure the safe and reliable delivery of vital natural gas supply lines for the wider Columbus, OH metro area
Contractor: Price Gregory International Inc.Type: Project includes construction of pipeline,
replacement of existing pipeline and upgrades to equipment and facilities
CONSUMERS ENERGY – (10/17)Project: Saginaw Trail PipelineType: Project will be executed in five phases
and includes take up and relay of existing pipeline
Length: 94 milesDiameter: 24 inchesLocation: Saginaw, Genesee and Oakland counties,
MICompletion: 2022Comments: Project is part of the Transmission
Enhancements for Deliverability & Integrity (TED-I) and will be built in five stages
27pipeline-news.com | December 2018 | Pipeline News
Contractor: Welded ConstructionType: Project includes construction of Phase 1
of the pipeline
DTE ENERGY — (8/18)Operator: NEXUS Gas Transmission SystemProject: NEXUS ProjectType: Project includes pipeline construction and
four compressor stationsLength: 255 milesDiameter: 42 inchesLocation: Ohio and MichiganCapacity: 1.5 Bcf/dCompletion:4Q 2019
Contractor: FluorType: Front-end engineering and design
Contractor: Michels Corp.Type: Pipeline constructionLocation: Ohio and Michigan
Contractor: Latex ConstructionType: Pipeline constructionLocation: Ohio
Contractor: M.G. Dyess Inc.Type: Pipeline constructionLocation: Ohio
EASTERN SHORE NATURAL GAS CO. – (4/18)Owner: Chesapeake Utilities Corp.Project: 2017 Expansion ProjectType: Project includes pipeline looping,
upgrades to existing metering facilities and installation of a compressor unit
Length: 40 milesDiameter: 10, 16 and 24 inchesLocation: Pennsylvania, Maryland, DelawareCapacity: 86 MDth/dCompletion: 3Q 2018
Contractor: Voshell Bros. WeldingType: Project includes pipeline welding
Contractor: Appalachian Pipeline Contractors LLPType: Project includes pipeline engineering and
construction
ENABLE MIDSTREAM PARTNERS – (9/18)Operator: Oklahoma Gas and Electric (OG&E) Project: Muskogee PipelineType: Project includes construction of pipeline
and associated metering facilitiesLength: 68 milesDiameter: 20 inchesLocation: OklahomaCapacity: 228 Mcf/dCompletion: 4Q 2018Comments: The 20-year contract will support OG&E’s
planned conversion of two 500 megawatt coal-fired generating units to natural gas
ONGOING PROJECTS Construction Underway
28 Pipeline News | December 2018 | pipeline-news.com
Contractor: R&R Pipeline Inc.Type: Project includes pipeline construction
Contractor: Troy Construction Co.Type: Project includes pipeline construction
Project: Enable Gas Transmission Expansion/Enable Oklahoma Intrastate Transmission Expansion
Type: Project includes the expansion of two existing pipelines
Location: Oklahoma (SCOOP/STACK)Capacity: 205 MMcf/d
ENBRIDGE INC. – (10/18)Project: South Texas Expansion ProjectType: Project includes mainline reversal, new
compression and station reversal on existing pipeline
Location: Vidor, TX – Petronila, TXCapacity: 400 MDth/dCompletion: 4Q 2018Comments: Project will expand the existing South
Texas Pipeline System in South Texas, an area with increasing load from the market in Mexico
ENERGY TRANSFER PARTNERS — (1/18)Project: Revolution PipelineType: Project includes the construction of
pipeline and a fractionation facilityLength: 120 milesDiameter: 24 and 30 inchesCapacity: 440 MMcf/dLocation: Butler County, PA – Revolution Plant
Contractor: Capstone EnergyType: Project includes pipeline construction
Contractor: WillbrosType: Project includes pipeline construction
Contractor: PumpcoType: Project includes pipeline construction
EQT MIDSTREAM PARTNERS LP – (2/18)Project: Equitrans Expansion ProjectType: Project includes construction of pipeline
and expansion of existing compressor stations
Length: 8 milesDiameter: 6 and 30 inchesLocation: Greene, Allegheny and Washington
counties, PA; Wetzel County, WVCapacity: 600 MDth/d
GULF COAST EXPRESS PIPELINE LLC – (6/18)Project: Gulf Coast Express Pipeline ProjectType: Project includes pipeline constructionLength: 447 milesDiameter: 36 and 42 inchesLocation: Coyanosa, TX - Agua Dulce, TXCapacity: 1.92 Bcf/dStart: 2Q 2018Completion: 3Q 2019
Project: Driver to High Plains Lateral
Type: Project includes construction of a pipeline lateral
Length: 9 miles Diameter: 36 inchesLocation: Midland, TXComments: Project is associated with the Gulf Coast
Express Pipeline
Contractor: Taylor Construction Co. Inc.Type: Project includes pipeline construction
Contractor: Pumpco Inc.Type: Project includes pipeline construction
Contractor: Strike LLCType: Project includes pipeline construction
JACKALOPE GAS GATHERING SERVICES LLC– (9/18)Project: Jackalope Gas Gathering System
ExpansionType: Project includes expansion of an existing
gathering system and the associated Bucking Horse Gas Processing Facility
Location: Converse County, WYCapacity: 200 MMcf/dCompletion: 4Q 2019
KINDER MORGAN INC.– (9/18)Project: SK PipelineType: Project includes construction of pipeline
and additional compressor facilitiesLength: 40 milesDiameter: 30 inchesLocation: West Columbia, TX - Stratton Ridge, TXCapacity: 320 MDth/d Completion:3Q 2019
Operator: Kinder Morgan Louisiana Pipeline LLC Project: Sabine Pass Expansion ProjectType: Project includes construction of a tap
and lateral; modification of three existing delivery interconnects; construction of additional compression; construction of header pipelines; and the abandonment and replacement of a meter station
Length: 1.6 milesLocation: Cameron Parish, LACapacity: 600 MDth/dCompletion:2Q 2019
Operator: Tennessee Gas Pipeline Co. LLCProject: Abandonment and Capacity Restoration
Project (ACR Project)Type: Project includes abandonment of
certain natural gas pipeline facilities and modifications of existing pipeline facilities and compressor stations
Length: 964 miles (abandonment) 14 miles (construction)Diameter: 2 , 16, 30 and 36 inchesLocation: Natchitoches Parish, LA; Columbiana County, OH; KentuckyComments: Project will abandon pipeline facilities
from Station 40 in Natchitoches Parish, LA, to Station 216 in Columbiana
County, OH, and construct replacement facilities in OH and KY. Construction of
the replacement facilities will enable TGP to abandon the lines by sale to UMTP, which plans to convert the lines to non-jurisdictional natural gas liquids transportation as a component of the UMTP Project
Project: Gulf Coast Southbound Expansion Phase IType: Project includes the construction of
a new compressor station, modifying existing valve sites and replacement of a minimal length of pipeline facilities, as well as modifications to NGPL’s existing compressor station facilities
Location: Cass, Victoria, Wharton and Angelina counties, TX; White County, AR
Capacity: 460 MDth/dCompletion: 4Q 2018
Project: Gulf Coast Southbound Expansion Phase II
Type: Project includes construction of additional compression facilities at NGPL’s new compressor station
Location: Chicago Market, IL - Agua Dulce Hub, LACapacity: 250 MDth/dCompletion: 4Q 2019
MILLENNIUM PIPELINE CO. LLC – (3/18)Project: Eastern System UpgradeType: Project includes construction of looped
pipeline, new compression capabilities and upgrades to existing stations
Length: 10 milesDiameter: 36 inchesLocation: Rockland County, NYCapacity: 200 MDth/dCompletion: 4Q 2018
MOUNTAIN VALLEY PIPELINE LLC – (2/18)Project: Mountain Valley PipelineType: Project includes construction of pipeline
and three compressor stationsLength: 301 milesDiameter: 42 inchesLocation: Wetzel County, WV - Pittsylvania County,
VACapacity: 2 Bcf/dCompletion: 4Q 2018
Contractor: Precision Pipeline LLCType: Project includes pipeline construction
Contractor: Price Gregory InternationalType: Project includes pipeline construction
Contractor: US Trinity Energy Services LLCType: Project includes pipeline construction
NATURAL GAS PIPELINE CO. OF AMERICA LLC– (2/18)Owner: Kinder Morgan Inc.Project: Gulf Coast Southbound Expansion ProjectType: Project includes construction of a new
compressor station, modifications to existing compressor station facilities and valve sites, and replacement of existing pipeline facilities
2929
Location: Cass County, TX; White County, ARCapacity: 460 MDth/dCompletion: 4Q 2018Comments: Project is a market-driven response
to access increasing domestic natural gas supplies available to NGPL’s Gulf Coast Mainline System for delivery to growing industrial demand and export opportunities in the Gulf Coast area
NEXTERA ENERGY INC. – (5/18) Project: Okeechobee Lateral ProjectType: Project includes construction of a pipeline
lateral, receiver and launcher and other associated facilities
Length: 5.2 milesDiameter: 24 inches Location: Okeechobee County, FLCapacity: 12 MMcf/dStart: 3Q 2018Completion:1Q 2019
Contractor: Rockford Corp.Type: Project includes pipeline construction
NIOCORP DEVELOPMENTS LTD. – (1/18)Operator: Rockies Express Pipeline LLCProject: Elk Creek LateralType: Project includes pipeline construction
Length: 28 milesLocation: Marshall County, KS – Elk Creek, NECapacity: 26.8 Mcf/dComments: Pipeline will supply NioCorp’s planned
Elk Creek Superalloy Facility (Elk Creek Facility)
Contractor: Rockies Express Pipeline LLCType: Contract includes the design,
construction, and operation of the pipeline
ONEOK INC. — (8/18)Type: Project includes expansions of the existing
WesTex Transmission and ONEOK Gas Transportation systems, and making the Roadrunner Gas Transmission Pipeline bi-directional
Location: Permian Basin and OklahomaCapacity: 1.7 Bcf/dCompletion: 1Q 2019Comments: Projects are backed by multiple firm
transportation commitments
PACIFIC GAS AND ELECTRIC CO. – (8/17)Operator: Northwest Natural Gas Co.Project: North Mist Expansion ProjectType: Project includes pipeline construction, a
new reservoir and a compressor station
Length: 13 milesDiameter: 16 inchesLocation: Portland, ORCapacity: 2.5 Bcf/dCompletion: 4Q 2018
Contractor: FluorType: Project includes front-end engineering
and design
Contractor: Snelson Companies Inc.Type: Project includes pipeline installation
PASO NORTE PIPELINE GROUP – (REV 5/18)Project: Paso Norte PipelineType: Project includes pipeline constructionLength: 340 milesDiameter: 32 inchesLocation: Deming, NM - Mexico/ChihuahuaCapacity: 366 MMcf/dComments: Project will deliver efficient, clean
burning, and cost effective natural gas from the United States to a dynamic region of North Central Mexico; the western portion of the State of Chihuahua
ONGOING PROJECTS Construction Underway
30 Pipeline News | December 2018 | pipeline-news.com
PAIUTE PIPELINE CO. – (9/18) Project: 2018 Expansion Project Type: Project includes pipeline replacement and
pipeline loopingLength: 8.4 milesDiameter: 12 and 20 inchesLocation: Douglas and Lyon counties, NECapacity: 4.6 MDth/d Comments: Project is an expansion of the existing
Carson and South Tahoe laterals
PIEDMONT NATURAL GAS CO. INC. – (3/18)Project: Line 434 ProjectType: Project includes construction of gas
distribution lines and facilitiesLength: 35 milesDiameter: 30 inchesLocation: Laurinburg, NCCapacity: 80 Bcf/yComments: Project will put swine-waste gas on
Piedmont’s system for use by Duke Energy at two of its plants (H.F. Lee Station Combined Cycle Plant and Sutton Combined Cycle Plant)
Contractor: Troy Construction Co.Type: Project includes pipeline construction
POMELO CONNECTOR LLC – (4/18)Owner: Canyon Midstream Partners LLCProject: Pomelo Connector PipelineType: Project includes construction of pipeline
and a compressor stationLength: 14 milesDiameter: 30 inchesLocation: Nueces County, TXCapacity: 400 MDth/dComments: Project will provide firm transportation
capacity between Texas Eastern Transmission LP and the Nueces Header to be constructed by Valley Crossing Pipeline LLC
SPIRE INC. – (3/18)Operator: Spire STL Pipeline LLCProject: Spire STL PipelineType: Project includes installation of steel
pipeline and minor modifications to line 880
Length: 65 milesDiameter: 24 inchesLocation: Scott County, IL - St. Louis County, MOCapacity: 400 MDth/dCompletion: 4Q 2019Comments: Project will connect to the existing
Rockies Express Pipeline
Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offloading of pipe
Contractor: Michels Corp.Type: Project includes pipeline construction
STERLING ENERGY – (3/18)Project: Jackson Lake Gas Gathering SystemType: Project includes construction of a pipeline
gathering systemLength: 12.2 miles
Diameter: 12 inchesLocation: Morgan County, CO – Weldona, COCompletion: 1Q 2020Comments: Project will connect to the Jackson
Lake Gas Processing Facility and be built adjacent to another pipeline that is already on the property
TALLGRASS INTERSTATE GAS TRANSMISSIONLLC – (2/18)Owner: Tallgrass Energy Partners LPProject: Segment 55 Pipeline Abandonment
ProjectType: Project includes abandoning an existing
pipeline segment in placeLength: 47 milesDiameter: 16 inchesLocation: Converse and Platte counties, WYComments: Segment will be sold to Tallgrass
Midstream LLC and converted to a crude oil pipeline
TAPROOT ROCKIES MIDSTREAM LLC – (9/18)Project: Taproot Rockies Midstream SystemType: Project includes the construction and
operation of a multi-product midstream system in the DJ Basin comprised of natural gas, crude oil and produced water gathering, natural gas treating and processing and fresh water supply
Location: Weld County, COCompletion: 4Q 2018Comments: System will initially serve a substantial
acreage dedication from Bison Oil & Gas II LLC and strategically position Taproot to provide similar midstream services to other operators active in this area
TRANSCANADA CORP. – (10/18)Project: Eastern Panhandle ExpansionType: Project includes pipeline constructionLength: 4 milesDiameter: 8 inchesLocation: Fulton County, PA - Morgan County, WVCapacity: 47.5 MMcf/dStart: 2Q 2018Comments: Project will provide firm capacity to
Mountaineer Gas
Operator: Columbia Pipeline Group Inc.Project: Gulf Xpress Project Type: Project includes construction of three
compressor stations, modifications to three existing compressor stations and one regulating station
Location: Marshall and Cabell counties, WV Capacity: 2.7 Bcf/dCompletion: 4Q 2018Comments: Project is associated with the Mountaineer
XPress Project
Contractor: ProFoam LLCType: Project includes providing foam breakers
on pipeline
Contractor: Welded Construction LP Type: Project includes pipeline construction
TRANSCONTINENTAL GAS PIPE LINE CO. LLC– (5/18)Project: St. James Supply LateralType: Project includes construction of pipeline,
compressor stations and a pig receiver siteLength: .7 milesDiameter: 20 inchesLocation: St. James Parish, LACapacity: 161.5 MDth/dCompletion: 2020
UGI ENERGY SERVICES — (7/18)Project: Auburn Gathering System ExpansionType: Project includes construction of two
additional compressor stationsLocation: Susquehanna and Wyoming counties, PACapacity: 150 MMcf/dCompletion: 4Q 2018Comments: Project will transport gas from acreage
being produced by Cabot Oil & Gas and will boost total system capacity to 620 MMcf/d
WBI ENERGY INC. – (10/18)Project: Valley Expansion Pipeline ProjectType: Project includes construction of pipeline,
interconnect facilities, an electric compressor station, replacement of two existing town border stations and the construction a regulator station
Length: 38 milesDiameter: 16 inchesLocation: Clay County MN; Cass, Burleigh, Stutsman
and Barnes counties, NDCapacity: 40 MMcf/dCompletion: 4Q 2018
Project: Line Section 27 ExpansionType: Project includes expansion of the existing
Line Section 27 pipeline including pipeline construction and installation of associated facilities
Length: 13 milesDiameter: 24 inchesLocation: Northwest North DakotaCapacity: 200 MMcf/dCompletion: 4Q 2018Comments: Upon completion, the total transportation
capacity on WBI Energy’s Line Section 27 will be over 600 MDth/d
WILLIAMS PARTNERS LP – (11/18)Operator: Transcontinental Gas Pipe Line Co. LLCProject: Rivervale South to Market ProjectType: Project includes pipeline looping,
upgrades and existing facility modifications
Length: 11 milesLocation: New JerseyCapacity: 190 MDth/dCompletion: 2Q 2019
Operator: Northwest Pipeline LLCProject: North Seattle Lateral Upgrade ProjectType: Project includes pipeline removal and
replacement with 20-inch diameter line and facility upgrades
31pipeline-news.com | December 2018 | Pipeline News
Length: 7 milesDiameter: 8 inchesLocation: Snohomish County, WA
Operator: Transcontinental Gas Pipe Line Company, LLC
Project: Gulf Connector Expansion ProjectType: Project includes increasing compression
on the existing pipelineLocation: Texas – LouisianaCapacity: 475 MDth/dCompletion: 1Q 2019
WILLIAMS TRANSCONTINENTAL – (REV 3/18)Owner: Williams Partners LPProject: Southeast Market Pipelines ProjectSegment: Hillabee Expansion (Phases I, II and III)Type: Project includes pipeline looping and
installation of additional compression on the mainline
Length: 45 milesDiameter: 42 inchesLocation: Coosa, Chilton and Choctaw counties, ALCapacity: 1.2 MMDth/dCompletion: 4Q 2021
CanadaENBRIDGE INC. — (6/18)Project: Spruce Ridge ProgramType: Project includes the addition of two
new sections of pipeline and additional compression on an existing pipeline
Length: 25 milesDiameter: 24 and 36 inchesLocation: Chetwynd, BC and Fort St. John, BCCapacity: 402 MMcf/dCompletion: 3Q 2019
KEYERA CORP. – (2/18)Project: North Wapiti Pipeline SystemType: Project includes construction of a sour
gas gathering pipeline, a condensate and water pipeline, and a compressor station
Length: 21 milesDiameter: 8 and 12 inchesLocation: Grande Prairie, ABCapacity: 150 MMcf/dCompletion: 2Q 2019
NOVA GAS TRANSMISSION LTD. — (9/18)Project: Northwest Mainline Loop (Boundary Lake
North Section)Type: Project includes pipeline loopingLength: 14 milesLocation: Clear Hills County, AB
Comments: Project will transport sweet natural gas from a tie in connection adjacent to the Owl Lake South Meter Station to the existing Hidden Lake Compressor Station
PEMBINA PIPELINE CORP. — (7/18)Project: Peace Pipeline Expansion (Phase VI)Type: Project includes pipeline construction and
installation of additional pump stationsDiameter: 16 and 20 inchesLocation: LaGlace - Wapitiand, AB and Kakwa to
Lator, ABCompletion: 1Q 2020
TRANSCANADA CORP. – (11/18)Operator: Coastal GasLink Pipeline Ltd.Project: Coastal GasLink PipelineType: Project includes construction of pipeline
and compressor stationsLength: 416 milesDiameter: 48 inchesLocation: Dawson Creek - Kitimat, B.C.Completion: 2Q 2024
Contractor: Pacific Atlantic Pipeline Construction Inc.Type: Contract includes pipeline construction
Contractor: Surerus Murphy Joint VentureType: Contract includes pipeline construction
32 Pipeline News | December 2018 | pipeline-news.com
ONGOING PROJECTS Construction Underway
Contractor: SA Energy GroupType: Contract includes pipeline construction
Contractor: Macro Spiecapag Joint VentureType: Contract includes pipeline construction
Project: North Montney ProjectType: Project includes construction of pipeline,
associated metering facilities, valve sites and compression facilities
Length: 190 milesDiameter: 42 inchesLocation: Peace River, ABCompletion: 3Q 2019
Contractor: Quanta Services Inc.Type: Contract includes pipeline construction
for spread three of the mainlineLength: 39 milesLocation: Fort St. John, BC
Contractor: Macro Enterprises Inc.Type: Contract includes pipeline construction
for spread two of the project
Contractor: SpiecapagType: Contract includes pipelaying for the
project
Caribbean/South & Central America
ENCANA – (REV 11/17)Owner: Argentine GovernmentProject: Noreste Argentino PipelineType: Project includes the construction of
a main trunk line, branch lines and compressor stations
Length: 910 milesDiameter: 30 inchesLocation: Buenos Aires - UruguayCapacity: 10 Bcm/yCost: $2 billionCompletion: 2Q 2018Comments: Project will be carried out in three
different construction phases: Salta, Formosa and Santa Fe
Contractor: Siat and TubaceroType: Project includes pipeline supply
Contractor: VertúaSegment: SaltaType: Project includes pipeline construction
Contractor: Techint-PanedileSegment: FormosaType: Project includes pipeline construction
Contractor: Helport-CPC-Rovella Carranza and Contreras Hermanos
Segment: Santa FeType: Project includes pipeline construction
ENERGÍA ARGENTINA S.A. – (REV 1/18)Project: Argentina Northeast Gas PipelineSegment 1: Formosa, Salta and Santa Fe
Segment 2: Formosa, Chaco and Santa FeSegment 3: Corrientes and MisionesType: Project includes the construction of three
sections, comprising 1,810km of trunk lines and 2,334km of branch lines
Length: 2,574 miles (trunklines: 1,450) (gathering lines: 1,124 miles)Diameter: 24 inches (trunklines) 4 to 10 inches (gathering lines)Location: Formosa, Chaco, Santa Fe, Salta,
Corrientes and Misiones provinces, Argentina
Capacity: 11.2 MMcf/dCompletion: 2Q 2018Comments: Project will supply natural gas to 168 cities
and will connect to the national pipeline network and to the Juana Azurduy Pipeline linking Argentina with Bolivia
Contractor: TenarisType: Contract includes pipe supplyLength: 1,330 miles (trunklines) 403 miles (gathering lines)
Contractor: SIAT S.A. Type: Contract includes pipe supply
Contractor: Techint E&C-PanedileType: Contract includes engineering and
constructionSegment: Section I
Contractor: Vertúa S.A.Type: Contract includes engineering and
constructionSegment: Section II
Contractor: Helport-CPC-Rovella Carranza and Contreras Hnos
Type: Contract includes engineering and construction
Segment: Section III
PERU – (REV 11/17)Project: Southern Peruvian GaslineType: Project includes pipeline constructionLength: 620 milesDiameter: 32 inchesLocation: Camisea field - Southern PeruCapacity: 800 MMcf/dStatus: Peru has canceled a contract for
construction of the pipeline after the consortium hired to build it failed to meet its financing deadline. Odebrecht SA, the subject of a multinational corruption investigation, led the consortium with a 55% stake, Enagas SA held 25% and Grupo Grana y Montero 20%
Comments: If built, project will improve the existing Peruvian Energy Network, contributing to the development of an Energy Node and Petrochemical Hub in Southern Peru
Contractor: Tipiel SAType: Project includes the front-end
engineering and design for the pipeline
MexicoCOMISION FEDERAL DE ELECTRICIDAD –(12/17)Project: Empalme Branch PipelineType: Project includes pipeline constructionLength: 12.5 milesDiameter: 24 inchesLocation: Sonora - EmpalmeCapacity: 236 MMcf/dStatus: Project is experiencing commissioning
delays Completion: 1Q 2018Comments: Project will transport gas from the Sásabe-
Guaymas and Guaymas-El Oro pipelines to a combined cycle power plant
Contractor: Gasoducto de AguaprietaType: Project includes pipeline construction
Project: Hermosillo Branch PipelineType: Project includes pipeline constructionLength: 30 milesDiameter: 16 inchesLocation: Sonora - HermosilloCapacity: 100 MMcf/dStatus: Project is experiencing commissioning
delays Comments: Project will transport gas from the Sásabe
-Guaymas Pipeline to a combined cycle power plant
Contractor: Gas Natural del NoroesteType: Project includes pipeline constructionCost:
FERMACA PIPELINE EL ENCINO, S DE R.L. DE C.V. – (REV 6/17)Owner: FermacaProject: La Laguna–Aguascalientes Natural Gas
PipelineType: Project involves building and operating a
natural gas pipelineLength: 290 milesDiameter: 42 inchesLocation: Durango - Zacatecas - AguascalientesCapacity: 1.2 Bcf/dCompletion: 2Q 2018Comments: Pipeline will supply CFE’s power plants
in Aguascalientes and Jalico states, as well as central and western parts of the country
Contractor: Fermaca Pipeline el Encino, S de R.L. de C.V.
Type: Project includes engineering, procurement and construction for the pipeline
TRANSCANADA CORP. – (REV 7/17)Project: Tuxpan-Tula PipelineType: Project includes the construction and
operation of a natural gas pipelineLength: 155 milesDiameter: 36 inchesLocation: Tuxpan, Veracruz - TulaCapacity: 703 MMcf/dCompletion: 2Q 2018
Comments: Pipeline will transport natural gas brought from the US (through a future South Texas-Tuxpan Maritime Pipeline) to the states of Veracruz, Puebla and Hidalgo where it will be connected to the country’s pipeline network
Contractor: Jacobs Engineering GroupType: Project includes engineering,
procurement and construction for the pipeline
Project: Tula - Villa de Reyes PipelineType: Project involves pipeline constructionLength: 284 milesDiameter: 36 inchesLocation: Tula, Hidalgo - Villa de Reyes, San Luis
PotosíCapacity: 550 MMcf/dCompletion: 2Q 2018Comments: Pipeline will supply natural gas to the
CFE’s power generation plants located in the States of Hidalgo and San Luis
Potosí, as well as the Central and Western regions of the country
NGL | The AmericasU.S.
APACHE MIDSTREAM/SALT CREEK MIDSTREAM — (7/18)
Project: SCM Alpine Header SystemType: Project includes construction of two
pipelinesLocation: Reeves County, TX - Waha, TXCapacity: 445 MbpdCompletion: 1Q 2019Comments: Project will interconnect to downstream
pipelines providing access to Mont Belvieu and Corpus Christi fractionation facilities
Contractor: ARM MidstreamType: Contract includes pipeline construction
and operation
DCP MIDSTREAM LP – (7/17)Project: Sand Hills Pipeline Extension (Phase II)Type: Project includes the partial looping of the
pipeline and the addition of seven new pump stations in the initial phase of the extension
Capacity: 85 MbpdLocation: Mont Belvieu, TXCompletion: 2Q 2018Comments: Future expansion could include the
addition of a full loop of Sand Hills, which could increase capacity by over 100 Mbpd to a minimum of 550 Mbpd
ENTERPRISE PRODUCTS PARTNERS LP – (6/17)Project: Shin Oak NGL PipelineType: Project includes the construction of
pipelineLength: 571 milesDiameter: 24 inchesLocation: Gaines County, TX - Mont Belvieu, TX
Capacity: 250 Mbpd (initial) 600 Mbpd (maximum)Completion: 2Q 2019Comments: Project will have an initial design capacity
of 250 Mbpd, expandable to 600 Mbpd
EPIC NGL PIPELINE LP – (REV 5/18)Project: EPIC NGL PipelineType: Project includes construction of pipelineLength: 650 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,
TX - Corpus Christi, TX Capacity: 220 Mbpd (initial) 440 Mbpd (maximum)Completion: 1Q 2019Comments: First phase of the project is complete
Project: WPX LateralType: Project includes construction of a pipeline
lateralLength: 6 milesDiameter: 8 inchesLocation: Reeves County, TXCompletion: 1Q 2019Comments: Project is associated with the EPIC NGL
Pipeline
ONEOK INC. – (11/18)Project: Arbuckle II NGL PipelineType: Project includes pipeline constructionLength: 530 milesDiameter: 24 and 30 inchesLocation: Oklahoma - Mont Belvieu, TXCapacity: 500 Mbpd (initial), 1 MMbpd (maximum)Completion: 1Q 2021
PHILLIPS 66 — (8/18)Project: Sweeny PipelineType: Project includes associated pipeline
construction for the Sweeny Hub Expansion
Location: Old Ocean, TXCompletion: 4Q 2020Comments: Project is part of the Sweeny Hub
Expansion
TARGA RESOURCES CORP. – (REV 5/18)Project: Grand Prix NGL PipelineType: Project includes construction of pipelineLength: 75 milesDiameter: 24, 30 inchesLocation: West Texas - Mont Belvieu, TX North Texas - OklahomaCapacity: 450 Mbpd (initial) 950 Mbpd (maximum)Completion: 2Q 2019Comments: Targa announced the Grand Prix NGL
Pipeline Extension, which will run from North Texas to Oklahoma and have an initial capacity of 300 Mbpd and a maximum capacity of 950 Mbpd
Contractor: WHC Energy Services Inc.Type: Project includes pipeline construction
WEST TEXAS LPG PIPELINE LTD. – (REV 6/18)Project: Delaware Basin ExtensionType: Project includes construction of pipeline,
two pump stations and pipeline loopingLength: 120 milesDiameter: 16 inches Location: Midland, TX - Reeves County, TXCapacity: 110 Mbpd (initial)
Contractor: WHC Energy Services LLCType: Project includes pipeline construction
Project: Delaware Basin Extension LoopingType: Project includes construction of pipeline loopingLength: 30 milesDiameter: 16 inches Location: Midland and Howard counties, TXComments: Project is associated with the Delaware Basin Extension on the existing West Texas LPG Pipeline
Contractor: WHC Energy Services LLCType: Project includes pipeline construction
CanadaKEYERA CORP. – (2/18)Project: Keylink NGL Gathering Pipeline SystemType: Project includes pipeline construction and
utilization of existing pipelineLength: 150 milesLocation: West-central AlbertaCapacity: 22 MbpdCompletion: 3Q 2018Comments: Project will provide producers in west-
central Alberta with a pipeline alternative for transporting NGLs from a number of Keyera gas plants
OIL | The Americas U.S.
BAYOU BRIDGE PIPELINE LLC – (3/18)Project: Bayou Bridge PipelineType: Project will be built in two phases and
includes the construction of new pipelineLength: 163 milesDiameter: 12 and 24 inchesLocation: Lake Charles, LA - St. James, LACapacity: 280 Mbpd (initial), 480 Mbpd (maximum)Completion: 4Q 2018Comments: Project will connect key Louisiana refining
operations with new, sustainable and diverse sources of American energy production
Contractor: Stupp Corp.Type: Project includes sourcing the steel
fabrication and providing storage and logistics for the pipe until placed in the ground
Contractor: TRC Solutions Inc.Type: Project includes providing civil survey and
engineering design services
Contractor: Troy Construction Co.Type: Project includes pipeline construction
(spreads one and two)
33pipeline-news.com | December 2018 | Pipeline News
34 Pipeline News | December 2018 | pipeline-news.com
ONGOING PROJECTS Construction Underway
Contractor: Sunland Construction Inc.Type: Project includes pipeline construction
(spreads three and four)
Project: Line 78 Project Contractor: Minnesota Ltd. LLCType: Project includes the removal of pipelineDiameter: 24 inchesLocation: Will County, IL Supt: Kerry Schott
ENERGY TRANSFER PARTNERS – (REV 10/17)Project: Panhandle Backhaul ProjectType: Project includes upgrades and
modifications to allow for bi-directional flow of natural gas on their existing pipeline systems
Location: Allen, Hamilton, Vermillion and Parke counties, IN; Douglas County, IL; Lenawee County, MI
Capacity: 750 MMcf/dComments: Project will interconnect with the Rover
Pipeline
Contractor: BigInch Fabricators and Construction Inc.Type: Project includes the installation of pipeline Length: 24 milesDiameter: 2 and 24 inchesLocation: Hamilton County, IN
Contractor: BigInch Fabricators and Construction Inc.Type: Project includes the installation and
station fabrication of various pipelineDiameter: 2 to 36 inchesLocation: Parke County, IN
ENLINK MIDSTREAM PARTNERS LP — (8/18)Project: Avenger Crude Oil Gathering SystemType: Project includes construction of a
gathering systemLength: 57 milesLocation: Eddy and Lea counties, NMCapacity: 1.8 Bcf/dCompletion: 1Q 2019Comments: System is anchored by a 10-year contract
with Devon Energy Corp. and is supported by dedications from Devon’s Todd (Eddy and Lea Counties, NM) and Potato Basin (Eddy County, NM) development areas
EPIC PIPELINE CO. LLC – (REV 9/18)Project: EPIC Crude Oil PipelineType: Project includes pipeline construction Length: 730 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,
TX - Corpus Christi, TX Capacity: 550 MbpdCompletion: 1Q 2019Status: EPIC has executed definitive agreements
to add Diamondback Energy as a strategic partner and signed other new primary shippers
Comments: Project will link producers’ NGL reserves in the Permian and Eagle Ford Basins to Gulf Coast refiners, petrochemical companies and export markets, and will run side by side with the previously announced EPIC NGL Pipeline
Contractor: Pumpco Inc. Type: Project includes pipeline construction
Contractor: Holloman Corp. Type: Project includes pipeline construction
Contractor: MPG Pipeline Contractors LLCType: Project includes pipeline construction
ENLINK MIDSTREAM PARTNERS LP — (7/18)Project: Redbud Pipeline SystemType: Project includes construction of a
gathering systemLocation: Blaine County, OKCompletion: 3Q 2018Comments: System will build upon the Black Coyote
footprint, with total 2018 growth capital expenditures related to this expansion expected to be approximately $40 million
ENTERPRISE PRODUCTS PARTNERS LP – (9/18)
Project: Seaway 2 Pipeline ExpansionType: Project includes adding drag reducing
agents to boost capacity on the Seaway 2 line by about 100 Mbpd
Capacity: 100 MbpdCompletion: 3Q 2018
EXXONMOBIL PIPELINE CO. — (6/18)Project: Delaware Connector PipelineType: Project includes pipeline constructionLength: 48 milesDiameter: 30 inchesLocation: Loving and Winkler counties, TXComments: Pipeline will help the company triple
Permian output by 2025
GIBSON ENERGY INC. – (4/18)Project: Viking PipelineType: Project includes pipeline constructionLength: 75 milesLocation: Viking Basin – Hardisty, ABCapacity: 13.3 Mbpd (initial), 25 Mbpd
(maximum) Completion: 1Q 2019
GRAY OAK PIPELINE LLC – (REV 12/18)Project: Gray Oak PipelineType: Project includes pipeline constructionLength: 850 milesLocation: Reeves, Loving, Winkler, and Crane
counties, TX - Corpus Christi, TX – Freeport, TX – Houston, TX
Capacity: 700 Mbpd (initial), 1 MMbpd (maximum)Status: Project is undergoing an open season
for the Eagle Ford Segment of the system
Completion: 2Q 2019Comments: System is launching a binding expansion
open season to solicit shipper commitments for services from West Texas
JUPITERMLP LLC – (11/18)Project: Jupiter PipelineType: Project includes construction of pipelineLength: 670 milesDiameter: 16, 20 inchesLocation: Orla, TX – Port of Brownsville, TXCapacity: 30 MbphCompletion: 2020
MAGELLAN MIDSTREAM PARTNERS LP — (REV 6/18)Project: Delaware Basin PipelineType: Project includes construction of pipeline
and a terminal, which will offer broad inbound and outbound pipeline access to parties that connect to the facility
Length: 60 milesDiameter: 24 inchesLocation: Wink, TX - Crane, TXCapacity: 250 Mbpd (initial) 600 Mbpd (expandable)Status: Project is under construction and will
undergo an open season at a later dateCompletion: 2Q 2019
Project: Wink to Western LateralType: Project includes construction of a pipeline
lateralLength: 3 milesDiameter: 24 inchesLocation: Wink, TXComments: Project is associated with the Delaware
Basin Pipeline
NOBLE MIDSTREAM PARTNERS LP – (11/18)Project: Wink Trunk LineType: Project includes pipeline constructionLength: 95 milesDiameter: 20 inchesLocation: Pecos County, TX - Winkler County, TXCapacity: 200 MbpdCompletion: 2Q 2019
NUSTAR PERMIAN TRANSPORTATION ANDSTORAGE LLC – (6/18)Project: County Line Lateral Pipeline System/
County Line Lateral LoopType: Project includes construction of multiple
interconnects connecting to the existing system
Location: Howard County, TXLength: 13 milesDiameter: 16 inchesCapacity: 70 Mbpd
ORYX MIDSTREAM SERVICES II LLC – (REV 8/18)Project: Oryx II PipelineType: Project includes pipeline construction and
loopingLength: 400 milesDiameter: 16, 20 and 24 inches
35pipeline-news.com | December 2018 | Pipeline News
Location: Carlsbad, NM - Midland, TXCapacity: 650 Mbpd (transportation), 1.5 MMbbl (storage)Completion: 4Q 2019
Contractor: Holloman Corp.Type: Contract includes the engineering, procurement and construction
of pipeline
PLAINS ALL AMERICAN PIPELINE LP – (11/18)Project: Sunrise Pipeline System ExpansionType: Project includes construction of pipeline and utilization of existing
pipelineLength: 180 milesDiameter: 24 inchesLocation: Colorado City, TX – Wichita Falls, TXCapacity: 120 MbpdStart: 4Q 2018Completion: 2Q 2019
Contractor: Holloman Corp.Type: Contract includes pipeline construction
Contractor: Energy Services South LLCType: Contract includes pipeline construction
Project: Cactus II PipelineType: Project includes construction of two pipelines that will connect to
the existing Cactus networkLength: 80 milesDiameter: 20 inchesLocation: Odessa, TX – McCamey, TX (first pipeline), Corpus Christi, TX – Ingleside, TX (second pipeline)Capacity: 185 MbpdStatus: Project’s capacity has been fully committedCompletion: 4Q 2019
SEABROOK LOGISTICS LLC – (3/18)Owner 1: Magellan Midstream Partners LP, 50%Owner 2: LBC Tank Terminals LLC, 50%Type: Project includes the construction a bi-directional pipelineLength: 13 milesDiameter: 24 inchesLocation: Seabrook, TX
Contractor: Troy Construction Co.Type: Project includes pipeline construction
TALLGRASS PONY EXPRESS PIPELINE LLC – (2/18)Owner: Tallgrass Energy Partners LPProject: Platteville ExtensionType: Project includes construction of facilities to connect Holly Frontier’s
refinery complexLength: 55 milesLocation: Platteville, COCapacity: 44 Mbpd (initial), 80 Mbpd (maximum)Completion: 2Q 2018
CanadaENBRIDGE ATHABASCA – (REV 6/17)Project: Athabasca Pipeline TwinningType: Project includes: a new pump station at the existing Kirby Lake
Terminal; a new pump station at the existing Bonnyville Station; and a new 36-inch pipeline
Length: 214 milesLocation: Kirby Lake
35pipeline-news.com | December 2018 | Pipeline News
Comments: The in-service date of the project has been delayed until 2017 due to changes in production estimates from oil sands operations
PEMBINA PIPELINE CORP. – (REV 11/17)Project: Phase IV ExpansionType: Project involves the expansion of the Fox Creek and Namao Pipeline
through two new pump stationsLocation: Fox Creek - NamaoCapacity: 180 MbpdCompletion:4Q 2018Comments: Pembina has the ability to further expand capacity between Fox Creek
and Namao by adding additional pump stations
Project: Phase V ExpansionType: Project involves pipeline construction, installation of a new pump station
and upgrading an existing pump stationLocation: Lator and Fox Creek, ABLength: 60 milesDiameter: 20 inchesCapacity: 260 Mbpd (transmission) 40 Mbbl (storage)Status: Clearing of the right-of-way is almost completeCompletion: 4Q 2018Comments: Project will address capacity constraints between Lator and Fox Creek by
adding capacity, which will support growth in the prolific Monteny and Deep Basin resource plays
ONGOING PROJECTS Construction Underway
36 Pipeline News | December 2018 | pipeline-news.com
PRODUCTS The Americas
U.S.AIR LIQUIDE AMERICA CORP. – (3/18)Owner: Air Liquide SAProject: Air Liquide St. James PipelineType: Project includes pipeline constructionLength: 25 milesDiameter: 12 inchesLocation: St. James Parish, LACost: $170 millionCompletion: 4Q 2019
Contractor: Air Liquide Global E&C SolutionsType: Project includes engineering
Contractor: Hollico Inc.Type: Project includes pipeline construction
BUCKEYE PARTNERS LP – (REV 6/17)Project: Michigan/Ohio Pipeline Expansion Project
(Phase II)Type: Project includes the reversal on a portion
of the existing Laurel Pipeline to facilitate the transportation of refined petroleum products
Location: Pittsburgh, PACompletion: 2018
Project: Michigan/Ohio Pipeline Expansion (Phase I)Type: Project includes the reversal of a portion
of the existing Laurel PipelineLocation: Detroit, MI, Lima, OH and Midland, PA
CENEX PIPELINE LLC – (5/18)Project: Cenex Pipeline ReplacementType: Project includes 8-inch pipeline
replacementLength: 182 milesDiameter: 10 inchesLocation: Sidney, MT – Minot, NDCompletion: 2Q 2019
ONEOK INC. – (11/18)Project: West Texas LPG System Expansion IIType: Project includes upgrades to two existing
pumps and pipeline looping on the existing West Texas LPG System
Location: Midland County, TX – Loving County, TXCapacity: 80 MbpdCompletion: 1Q 2020
OFFSHORE The Americas
U.S.ENBRIDGE INC. — (6/18)Project: Stampede Oil PipelineType: Project includesLength: 16 milesDiameter: 18 inchesLocation: Gulf of Mexico (offshore Louisiana)
Capacity: 100 MbpdCompletion: 4Q 2018
FIELDWOOD ENERGY – (11/18)Project: Katmai Field DevelopmentType: Project includes the development of the
deepwater Katmai FieldLength: 25 milesDiameter: 12 inchesLocation: US Gulf of Mexico (Green Canyon 40)
Contractor: Subsea Integration AllianceType: Contract includes project management,
engineering, procurement, construction and installation of a flowline and tie-ins
INFRAESTRUCTURA MARINA DEL GOLFO – (4/18)
Owner: TransCanada Corp.Project: Sur de Texas-Tuxpan PipelineType: Project includes pipeline constructionLength: 497 milesDiameter: 42 inchesCapacity: 2.6 MMcf/dLocation: Gulf of Mexico - Tuxpan, VeracruzCompletion: 4Q 2019Comments: The subsea gas pipeline will interconnect
with the Nueces-Brownsville Pipeline and the Tuxpan-Tula Pipeline
Contractor: M2 SubseaType: Project includes pipeline span support
installation for the projectComments: M² Subsea will manage the project
working closely with local partner Frontera Resources using the Mexican flagged multipurpose support vessel Tehuana, as well as installing grout supports along the southern leg of the pipeline to prevent stress during installation and hydrostatic testing
Contractor: AllseasType: Project includes the supply a Ballgrab
Pipeline Recovery Tool (PRT) for a subsea pipeline
Contractor: Nippon Steel & Sumitomo Metal Corp./Mitsui & Co. Ltd.
Type: Project includes the supply of a 600,000 ton steel order consisting of large diameter welded steel pipe and plate as raw material for the pipeline
Contractor: Shawcor Ltd.Type: Project includes the coating of pipe with
the application of concrete weight coating in a variety of thicknesses (2.25, 2.75 and 3.5 inches) and the installation of 5,000 sacrificial anodes
SUBSEA 7 – (5/17)Owner: BPProject: Mad Dog 2 developmentType: Project includes the engineering,
procurement, construction and installation of the subsea umbilicals, risers and pipeline systems and associated
subsea architecture for the projectLocation: Offshore New Orleans
TECHNIP FMC – (5/17)Owner: Shell Offshore Inc.Project: Kaikias deep water projectType: Project includes the delivery, integration,
and installation of the subsea production system and subsea riser, jumper and flowline equipment for phase one of the project
Location: Gulf of Mexico
CanadaHUSKY ENERGY — (10/17)Owner 2: Suncor Energy (25%)Owner 3: Nalcor Energy (5%)Project: West White Rose Extension ProjectType: Project includes the construction of a new
fixed wellhead platform in the White Rose Field
Location: offshore St. JohnsCapacity: 75 MbpdCompletion: 1Q 2022
Contractor: TechnipFMC Type: Contract includes engineering,
procurement, construction and installation subsea equipment, including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the recently announced West White Rose platform to the existing SeaRose FPSO vessel
MexicoPEMEX EXPLORACIÓN Y PRODUCCIÓN –(9/18)Project: Ayatsil Field PipelineType: Project includes subsea pipeline flowline
installation in support of its Ayatsil FieldLength: 3 milesDiameter: 8 and 24 inchesLocation: Bay of Campeche, offshore MexicoCompletion: 1Q 2019
Contractor: McDermott International Inc.Type: Contract includes design and detailed
engineering, procurement, construction and installation of two subsea pipelines
GAS | International Africa
DANGOTE INDUSTRIES LTD. – (4/18)Owner: Dangote GroupProject: East West Offshore Gas Gathering SystemType: Project includes construction of two
parallel subsea pipelinesLength: 684 milesDiameter: 38 inchesLocation: Bonny, Rivers - Ogidigben – Olokola -
Lekki, LagosCapacity: 3 Bcf/d
37pipeline-news.com | December 2018 | Pipeline News
Completion: 3Q 2018 (Phase I) 2Q 2025 (Phase II)Comments: Project will create a corridor for
evacuation of trapped gas from offshore platforms in Nigeria to allow their monetization and will deliver gas to a new build gas receiving plant to be located at the Dangote Refinery Complex in Lekki, Lagos
Contractor: Paradigm Environmental System Consultants
Type: Contracts includes conducting an Environmental Impact Assessment for the project
GALSI PIPELINE – (REV 10/16) Owners: Sonatrach/Edison/Enel/Hera GroupProject: Galsi PipelineType: Project includes the construction of
351 miles of offshore pipeline crossing the Mediterranean Sea and 161 miles of onshore pipeline, including gas compression facilities
Length: 512 milesLocation: Koudiet Draouche - PiombinoCompletion: 2018Comments: The initial transport capacity will be 8 Bcm
per year
KINGDOM OF MOROCCO/FEDERAL REPUBLIC OF NIGERIA – (1/17)Pipeline: Trans-African Pipeline Type: Project includes the construction of a new
gas pipelineLocation: Nigeria – Morocco - Europe.Comments: The Trans-African Pipeline will improve
access to energy across West Africa and establish a competitive regional market for electricity
NIGERIAN NATIONAL PETROLEUM CORP. —(6/18)Project: Ajaokuta - Kaduna – Kano (AKK) PipelineType: Project includes pipeline constructionLength: 381 milesDiameter: 40 inches
Location: Kaduna - KanoCost: $2.8 billionCompletion: 4Q 2020Comments: Project will help establish connectivity
between the East, West and North parts of Nigeria
Contractor: OilServe/OandoType: Contract includes construction of Lot 1 of
the pipelineLength: 125 milesCost: $855 million
Contractor: Brentex/China Petroleum Pipeline BureauType: Contract includes construction of Lot 3 of
the pipelineLength: 137 milesCost: $1.2 billion
Asia PacificAPA GROUP – (3/18)Owner 1: Gold Road Resources Ltd., 50%Owner 2: Gold Fields Ltd., 50%Project: Yamarna Gas PipelineType: Project includes pipeline construction and
a gas-fired stationLength: 123 milesLocation: Yamarna, Western AustraliaCost: $180 millionComments: Project is part of the Gruyere Project and
will be built east of Laverton in Western Australia, running from a connection point off the existing Eastern Goldfields Gas Pipeline to the new Gruyere gold mine project site
Contractor: NacapType: Project includes pipeline construction
ARROW ENERGY – (REV 5/16)Project: Arrow Bowen PipelineType: Project includes the construction of high-
pressure steel pipelineLength: 512 milesLocation: Bowen Basin - GladstoneCompletion: 2018
AZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 11/15)Project: Azeri PipelineType: Project includes the construction of new
pipelineLength: 2,175 milesLocation: Georgia, Turkey, Greece, Bulgaria, Albania
and ItalyCompletion: 2019Comments: Pipeline will have a capacity of 16 Bcm/y
GAIL INDIA LTD. – (3/18)Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas
Pipeline (Phase I)Type: Project includes construction of a
transmission pipeline and multiple spur lines
Length: 470 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Phulpur – DobhiCapacity: 565 Bcf/d (Phase I and II)Cost: $50 millionCompletion: 4Q 2018Comments: Project will usher Industrial development
in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries
Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,
procurement and construction
Contract: IL&FS Engineering & Construction Co. Ltd.Type: Project includes pipelaying
Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase II)
Type: Project includes pipeline constructionLength: 1,180 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Jharkhand - West Bengal - OdishaCapacity: 565 Bcf/d (Phase I and II)Cost: $146 millionCompletion: 4Q 2020Comments: Project will usher Industrial development
in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries
Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,
procurement and construction
Contract: IL&FS Engineering & Construction Co. Ltd.Type: Project includes pipelaying