145
Label CF# Start date End date (m Project leader Project title Call name Name of contracting authority Total budget (thousand s of euros) Budget allocated to the unit (thousands euros) CF1 01-2008 12-2011 Cornel Iacob Techniques and practical methods for determine the volume of trees in relation to the diameter measured at stump/Procedee tehnice si metode practice pentru determinarea volumului arborilor in raport cu diametrul masurat la cioata RNP - ROMSILVA Research Programme RNP - ROMSILVA 65.10 65.10 CF2 01-2011 12-2011 Cornel Iacob Pedo-station study of agricultural land located in the common grazing Crucea in order to introduce in forest/Studiul pedo-stational al terenului agricol situat in Pasunea Comunei Crucea in vederea introducerii in fond forestier private funds City hall Crucea, jud. Suceava 1.65 1.65 CF3 01-2010 12-2011 Ionel Popa Climatic sensitivity of Pinus nigra Arnold in Slovenia and Romania under actual climatic changes - challenges for sustainable forest management PNCDI 2 - Capacities MECTS - ANCS 2.50 2.50 Ongoing projects/contracts at the date of submission (from public, private, national or international sources, other than the "nucleu" program).

Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

Label

CF#

Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of

contracting

authority

Total

budget

(thousand

s of

euros)

Budget

allocated to

the unit

(thousands

euros)CF1 01-2008 12-2011 Cornel Iacob Techniques and practical methods for

determine the volume of trees in

relation to the diameter measured at

stump/Procedee tehnice si metode

practice pentru determinarea

volumului arborilor in raport cu

diametrul masurat la cioata

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

65.10 65.10

CF2 01-2011 12-2011 Cornel Iacob Pedo-station study of agricultural land

located in the common grazing

Crucea in order to introduce in

forest/Studiul pedo-stational al

terenului agricol situat in Pasunea

Comunei Crucea in vederea

introducerii in fond forestier

private funds City hall

Crucea, jud.

Suceava

1.65 1.65

CF3 01-2010 12-2011 Ionel Popa Climatic sensitivity of Pinus nigra

Arnold in Slovenia and Romania

under actual climatic changes -

challenges for sustainable forest

management

PNCDI 2 -

Capacities

MECTS -

ANCS

2.50 2.50

Ongoing projects/contracts at the date of submission (from public, private, national or international sources, other than

the "nucleu" program).

Page 2: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF4 09-2008 12-2011 Ionel Popa Inter-institutional program for the

diagnosis, prevention and control of

medical conditions with major

epidemiological importance to

wildlife/Program de cooperare inter-

instituţională pentru diagnosticul,

profilaxia şi combaterea stărilor

patologice cu importanţă

epidemiologică majoră la animale

sălbatice

PNCDI 2 -

Partnerships

MECTS -

CNMP

185.00 11.00

CF5 01-2008 12-2011 Ovidiu Badea Long-term effects of air pollution and

climate change on forest ecosystems

from Bucegi National Park and

Natural Park Piatra Craiului/Efectele

pe termen lung ale poluării

atmosferice şi modificărilor climatice

asupra ecosistemelor forestiere din

Parcul Natural Bucegi şi Parcul

Naţional Piatra Craiului

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

139.50 139.50

CF6 05-2009 12-2011 Radu Vlad Statistical mathematics models and

sort tables in Norway spruce stands

damaged by cervids/Modele statistico-

matematice si tabele de sortare in

arborete de molid vatamate de

cervide

PNCDI 2-

Ideas

MECTS -

CNCSIS

97.50 97.50

CF7 01-2011 12-2013 Ion Barbu Study on influences of global warming

on the distribution of tree species in

forest management and its

impact/Studiu privind influenţele

încălzirii globale asupra distributiei

speciilor de arbori si impactul

acesteia in gestionarea padurilor

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

34.85 34.85

Page 3: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF8 10-2011 09-2014 Ionel Popa Dendroecological reconstruction of

disturbance history in oldgrowth

forests from Eastern Carpathians

PNCDI 2 -

Human

resources

MECTS -

UEFISCDI

165.12 165.12

CF9 01-2010 12-2014 Ovidiu Badea Environmental quality and pressure

assessement across Europe: the

LTER network as an integrated and

shared system for ecosystem

monitoring (EnvEurope)

Life+ UE 6067.89 109.00

CF10 06-2010 06-2012 Bouriaud

Olivier

Greenhouse gas GHG Europe/Gaze

cu efect de seră GHG Europe

PNCDI 2 -

Capacities

MECTS -

ANCS

62.34 62.34

CF11 06-2009 06-2013 Bouriaud

Olivier

Carbo-Extreme FP-7 EU 3300.00 20.00

CF12 01-2011 11-2013 Brad Remus

Radu

The Elaboration of guidelines for the

sorter of round timber/Elaborarea

ghidului sortatorului de lemn rotund

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

25.29 13.79

CF13 01-2011 11-2013 Ciuvăț Liviu Afforestation monitoring project of

degraded land, estimation of carbon

accumulation and accumulation

resimulation/Monitorizarea proiectului

de împădurire a terenurilor

degradate, estimarea acumulării de

carbon și resimularea acumulării

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

48.28 48.28

CF14 01-2011 11-2013 Dănescu

Florin, Dănuț

Chira

Abnormal dryness of pine stands,

beech, oak, ash, etc., damage factors

and management methods/Uscarea

anormală a arboretelor de pin, fag,

stejar, frasin ș.a.m.d.-factori cauzali și

metode de gestionare

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

57.47 57.47

Page 4: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF15 01-2011 11-2013 Iovu Biris Guidelines for management of forest

habitats of community interest

included in Natura 2000

sites/Stabilirea masurilor de

management pentru habitatele

forestiere de interes comunitar

incluse in siturile Natura 2000

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

70.59 70.59

CF16 11-2010 11-2013 Teodosiu

Marius

The Evaluation of Biodiversity in

Natural Protected Areas of National

Interest: Voievodeasa Forest,

Marginea Forest District, Codrul

Secular Loben, and Moldovita

Forestry District as support for

grounding management

plans/Evaluarea biodiversităţii în ariile

naturale protejate, de interes naţional

Pădurea Voievodeasa, Ocolul silvic

Marginea şi Codrul Secular Loben,

Ocolul silvic Moldoviţa, ca suport

pentru fundamentarea planurilor de

management

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

60.00 60.00

CF17 01-2010 12-2013 Bouriaud

Olivier

GHG Europe FP-7 EU 6600.00 300.00

CF18 10-2011 10-2014 Bouriaud

Olivier

Forest GHG Management PNCDI - Ideas MECTS -

UEFISCDI

8925.70 269.00

CF19 10-2011 10-2014 Petritan Any

Mary

Stand structure and gap disturbance

regime existing in natural sessile oak

forests and their ecological

implications on

regeneration/Structura și regimul de

disturbanta a golurilor existente intr-o

padure naturala de gorun si

implicat iile ecologice ale acestora

asupra regenerarii

PNCDI 2 -

Human

resources

MECTS -

UEFISCDI

174.40 174.40

Page 5: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF20 01-2011 12-2014 Virgil

Scărlătescu

Identification and monitoring of forests

with high conservation value in the

context of forest certification

process/Identificarea şi monitorizarea

pădurilor cu valoare ridicată de

conservare în contextul certificării

forestiere

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

74.60 18.60

CF21 01-2000 12-2011 Mihai

Georgeta

Seed crop stimulation in seed

orchards-technical

assistance/Asistenţă tehnică privind

conducerea şi îngrijirea plantajelor în

vederea stimulării fructificaţie

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

33.00 33.00

CF22 01-2009 12-2011 Mihai

Georgeta

Researches to pass to second

generation seed orchards/Cercetări

privind trecerea la generaţia a II-a de

plantaje de rasinoase

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

44.00 44.00

CF23 04-2010 09-2012 Postolache

Dragos

Mapping of genetic diversity and

evaluation of postglacial migration of

white oaks, common and oriental

hornbeam by the means of

chloroplastic DNA markers

(DIVAMAP)/Cartografierea diversităţii

genetice şi evaluarea căilor de

migraţie postglaciare cu ajutorul

markerilor ADN cloroplastici a

speciilor de stejari albi, carpenului şi

cărpiniţei din România şi Bulgaria

PNCDI 2 -

Capacities

MECTS -

ANCS

7.61 7.61

Page 6: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF24 03-2009 10-2012 Parnuta

Gheorghe

Updating of the National Catalogue

for basic materials and Elaboration of

Management Guidelines according to

national and international regulations/

Revizuirea şi actualizarea Catalogului

Naţional al surselor pentru materiale

forestiere de reproducere şi a

instrucţiunilor de management ale

acestora în conformitate cu

rezultatele cercetărilor naţionale şi

europene

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

122.10 122.10

CF25 01-2010 12-2012 Parnuta

Gheorghe

Bilateral Cooperation Romania-

Bavaria/Proiecte bilaterale de

cercetare România – Bavaria

private funds MADR 8.00 5.00

CF26 01-2011 12-2013 Mihai

Georgeta

Researches regarding the adaptation

of coniferous species to climate

changes/Cercetari privind adaptarea

speciilor forestiere de rasinoase la

schimbarile climatice

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

125.60 46.50

CF27 02-2011 12-2013 Parnuta

Gheorghe,

Oneață

Marian

Establishment of seed orchards for

Oak species, Sycamore maple and

Wild cherry in order to insure a

genetically improved seed

basis/Crearea de plantaje de seminţe

de paltin de munte, stejar penduculat

si cires pasaresc in vederea asigurarii

unei baze seminologice genetice

ameliorate

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

41.86 11.60

CF28 02-2011 12-2013 Parnuta

Gheorghe

Evaluation of genetic variability of

some Norway spruce natural

populations tested in multisite

trials/Evaluarea variabilităţii genetice

a unor populaţii naturale de molid

testate in culturi multistaţionale

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

93.02 23.30

Page 7: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF29 01-2011 12-2014 Filat Mihai Selection of valuable natural

populations for poplars and willows

species in order to be preserved as

"in situ" genetic resources/Selectia de

populatii valoroase de specii

autohtone de plopi si salcii in vederea

conservarii lor 'in situ' ca resurse

genetice

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

55.81 14.00

CF30 11-2011 10-2015 Parnuta

Gheorghe

Designing Trees For The Furure

(TREES 4 FUTURE)

FP-7 UE 9059.18 72.54

CF31 permanentlypermanentlyMihai

Georgeta

Seed testing analyses/Asistenţă

tehnică analize de seminte

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

8.00 8.00

CF32 07-2011 12-2011 Georgeta

IONESCU

Study regarding the population

estimation of large carnivores and

wild cats in Romania in order to

maintain a favourable conservation

status condition and to determine the

number of individuals of strictly

protected species that can be

relocated the 2010-2011 hunting

season/Studiul privind estimarea

populaţiilor de carnivore mari şi pisică

sălbatică din România în vederea

menţinerii într-o stare favorabila de

conservareşi pentru stabilirea

numarului de exemplare din speciile

strict protejate care se pot reloca în

cadrul sezonului de vânătoare 2010-

2011

Biodiversity

Conservation

MMP 16.38 16.38

Page 8: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF33 09-2008 12-2011 Claudiu

PAŞCA

Phenotypic and genetic

characterization appreciation,with

molecular techniques of the wild boar

(Sus scrofa ferus) population, with

identifying the impact on ecosystems

of the area to avoid genetic

vulnerability of the

species/Aprecierea fenotipica si

caracterizarea genetica prin tehnici

moleculare a unor populaíi de mistreti

Sus scrofa ferus cu stabilirea

factorilor de impact asupra

ecosistemelor din areal pentru

evitarea vulnerabilitatii genetice a

speciei

PNCDI 2 -

Partnerships

MECTS -

CNMP

46.98 37.81

CF34 03-2010 05-2012 Constandach

e Cristinel

MONITOR II - Practical Use of

MONITORing in Natural Disaster

Management

PCT SEE RNP -

ROMSILVA

136.00 29.90

CF35 01-2009 11-2012 Constandach

e Cristinel

Research on behavior, development

and management methods / tending

operation and regeneration of forest

plantation on degraded

lands/Cercetări privind comportarea,

evoluţia şi modalităţile de

conducere/îngrijire şi regenerare a

culturilor forestiere instalate pe

terenuri degradate

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

37.21 37.21

CF36 01-2008 11-2012 Guiman

Gheorghe

Research on the implementation of

long and continuous treatments with

regeneration /Cercetări asupra

aplicării tratamentelor cu perioadă

lungă şi continuă de regenerare

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

58.14 58.14

Page 9: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF37 01-2009 11-2012 Greavu

Manole

Recovery technologies of natural

stands from the forest steppe of South

Dobrogea/Tehnologii de refacere a

arboretelor natural - fundamentale din

silvostepa Dobrogei de sud

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

46.51 46.51

CF38 01-2011 11-2012 Mihaila Elena Researche on decreasing the number

of seedlings in the plantating,

correlating with the site

conditions/Cercetări privind

posibilitatea reducerii desimii de

plantare, în funcţie de condiţiile

staţionale

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

48.80 48.80

CF39 01-2011 11-2012 Mihaila Elena Researche regarding the

improvement the weeding technology

in nurseries and young

plantations/Cercetări privind

îmbunătăţirea tehnologiilor de

combatere a buruienilor din pepiniere

şi plantaţii silvice

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

58.14 58.14

CF40 01-2011 11-2012 Davidescu

Serban

Research regarding integration of

hydrotechnical works for watershed

management with forest road

works/Cercetări privind integrarea

lucrărilor de drumuri cu lucrări de

corectarea torenţilor

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

41.86 41.86

CF41 01-2011 12-2013 Constandach

e Cristinel

Ecological reconstruction of pine

forests affected by harmful factors

/Reconstructia ecologica a pinetelor

afectate de factori vătămători

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

69.77 69.77

Page 10: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF42 01-2011 12-2011 Danut Chira Compensatory measures for

restoration and / or improve habitats

in protected areas ROSCI0129 North

West of Gorj region and ROSCI0069

Domogled Cerna Valley affected by

the project "Road connecting National

Road 66A km 47+600 – km 66+204

Câmpu lui Neag-Cerna"/Măsuri

compensatorii pentru refacerea şi /

sau îmbunătăţirea habitatelor din

ariile protejate ROSCI0129 Nordul

Gorjului de Vest şi ROSCI0069

Domogled - Valea Cernei afectate de

realizarea proiectului „Drum de

legătură DN 66A km 47+600 – km

66+204 Câmpu lui Neag-Cerna”

private funds DRDP

Timişoara

3.78 3.78

CF43 01-2009 12-2011 S. Vals Detection, prognosis, and pest eco -

biology of Nycteola asian on young

stands of poplar plantations in the

Danube meadow/Cercetări privind

depistarea, prognoza, ecobiologia şi

combaterea dăunătorilor Nycteola

asiatica în plantaţiile tinere şi

arborete de plopi din Lunca Dunării

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

28.58 28.58

CF44 01-2009 12-2011 Ioan Tăut Researches regarding pathogens of

forest cultures/Cercetări privind

agenţii patogeni din culturile silvice

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

28.58 28.58

Page 11: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF45 01-2011 12-2011 Constantin

Ciornei

Testing of repellents products

designed to protect against

plantations attack of

herbivores/Testarea unor produse

repelente noi, administrabile prin

stropire, destinate protejarii

plantatiilor de foioase impotriva

atacurilor produse de vanat

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

11.82 11.82

CF46 01-2011 12-2011 Constantin

Nețoiu

Pest control in accordance with new

technologies and control substances

on nurseries and seed

orchards/Cercetari privind

combaterea daunatorilor din

pepiniere si plantaje plantaje in

concordanta cu noile tehnologii si

substante de combatere

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

21.28 21.28

CF47 01-2011 12-2011 Constantin

Nețoiu

Improving the application of ultra-

volume (ULV) treatment technologies

against forest pests/Perfectionarea

tehnologiilor de aplicare a

tratamentelor cu volum ultraredus

(ulv) împotriva daunatorilor forestieri

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

23.65 23.65

CF48 01-2007 12-2011 Constantin

Nețoiu

Technical assistance for deciduos

forest seed pests/AT privind

daunatorii seminofagi ai foioaselor

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

35.69 35.69

CF49 01-2007 12-2011 Tomescu

Romica

Technical assistance for treatments

of deciduous forests pests/AT pentru

realizarea lucrărilor de combatere a

defoliatorilor din pădurile de foioase

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

43.34 43.34

Page 12: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF50 01-2009 12-2011 Mihalciuc

Vasile

Technical assistance for monitoring

Lymantria monachapests on

coniferous trees in order to alert the

timely appearance of gradations/AT

privind monitorizarea defoliatorului

Lymantria monacha în cuprinsul

arboretelor de răşinoase, în vederea

semnalării în timp util a apariţiei

gradaţiilor

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

40.49 40.49

CF51 01-2009 12-2011 Ioan Tăut Technical assistance for disease

prevention and control in forest

cultures (nurseries and

plantations/AT privind prevenirea şi

combaterea bolilor în culturile silvice

(pepiniere şi plantaţii

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

30.97 30.97

CF52 01-2011 12-2011 Tatiana Blaga Technical assistance for ash

integrated pest management /AT

privind combaterea integrată a

dăunătorilor frasinului

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

11.82 11.82

CF53 09-2008 12-2011 Constantin

Nețoiu

Identification and exploitation of

Trichogramma sp. bioform in

agriculture and forest ecosystems .

Management and impact of bioactive

nanomaterials technology in

propagation of the

parasitoids/Cercetări de identificare şi

de valorificare a bioforme-lor de

Trichogramma din agro- şi silvo-

ecosisteme. Impactul şi

managementul introducerii

nanomateriale-lor bioactive în

tehnologia de înmulţire a oofagului

PNCDI 2 -

Partnerships

MECTS -

CNMP

0.00 26.98

Page 13: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF54 09-2008 12-2011 Constantin

Nețoiu

Impact of pollution and climate

change on biodiversity and socio

economic status of the population in

the middle basin of the Jiu

river/Evaluarea efectelor poluarii si a

schimbarilor climatice asupra

biodiversitatii si starii socio-

economice a populatiei in bazinul

mijlociu al Jiului

PNCDI 2 -

Partnerships

MECTS -

CNMP

0.00 25.72

CF55 09-2008 12-2011 Danut Chira Analysis of factors pressure on

protected areas in the Clisura

Danube/Analiza factorilor de presiune

asupra ariilor protejate din Clisura

Dunării

PNCDI 2 -

Partnerships

MECTS -

CNMP

308.49 111.03

CF56 01-2010 12-2012 Ioan Tăut Testing of plant protection products

new, low environmental impact, as

alternatives to European norms and

standards prohibited by

FSC/Cecrcetări privind testarea unor

produse fitosanitare noi, cu impact

redus asupra mediului, ca alternativă

la produsele interzise de normele

europene şi standardele F.S.C.

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

47.86 47.86

CF57 01-2010 12-2013 Constantin

Ciornei

New technologies for integrated pest

management of soil from

greenhouses, nurseries and

plantations/Cercetări privind

elaborarea de noi tehnologii de

combatere integrată a dăunătorilor de

sol din solarii, pepiniere şi plantaţii

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

38.29 38.29

Page 14: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF58 01-2011 12-2013 Constantin

Nețoiu

Conservation and expansion in

culture of valuable genotypes of

acacia var. Oltenia (Robinia

pseudacacia var. Oltenia)/Asistenţă

tehnică privind conservarea şi

extinderea în cultură a genotipurilor

valoroase de salcâm var. oltenica

(Robinia pseudacacia var. Oltenica

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

11.82 11.82

CF59 01-2009 12-2011 Lorent Adrian Studies to describe and GIS

geospatial data building for EU

importance sites, special conservation

areas and protected areas /Studiu

privind caracterizarea si crearea

bazei de date GIS a fondului forestier

de stat si a fondului forestier

administrat de RNP din siturilor de

importanta comunitara (SCI-uri), ariile

speciale de conservare avifaunistica

(SPA-uri) si rezervatiile naturale

RNP -

ROMSILVA

Research

Programme

RNP -

ROMSILVA

52.32 52.33

CF60 09-2008 12-2011 Lorent Adrian Building and implementation of a

integrated management system for

apiarian activity to enhance it

exploatation profitability in S-SW area

of Muntenia region /Realizarea si

implementarea unui sistem integrat

de planificare a stuparitului pastoral

in vederea rentabilizarii exploatatiilor

apicole din zona de S-SV a Munteniei

(STUPAS)

PNCDI 2 -

Partnerships

MECTS -

CNMP

175.80 32.21

Page 15: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

CF61 09-2008 12-2011 Gancz

Vladimir

Complex System to Apply GIS and

Remote Sensing Techniques to

Support Integrated Management

Activities of the Romanian Coast

Zone /Sistem complex de aplicare a

tehnicilor de GIS si teledetectie in

sprijinul activitatilor de gestiune

integrata azonei costiere romanesti

(IMAGIS)

PNCDI 2 -

Partnerships

MECTS -

CNMP

203.54 22.00

CF62 Ian.2011 Dec.2011 Viorica Achim Geospatial database building and

digital maps for forest district Branesti

RNP -

ROMSILVA

Research

RNP-Romsilva 9.70 9.70

CF63 Ian.2011 Dec.2011 Viorica Achim Geospatial database building and

digital maps for forest district Faget

RNP -

ROMSILVA

Research

RNP-Romsilva 24.50 24.50

CF64 Ian.2011 Dec.2011 Viorica Achim Geospatial database building and

digital maps for forest district Vama

RNP -

ROMSILVA

Research

RNP-Romsilva 13.60 13.60

CF65 Ian.2011 Dec.2011 Ioana Nitu Geospatial database building and

digital maps for forest district Bacesti

RNP -

ROMSILVA

Research

RNP-Romsilva 23.50 23.50

CF66 Ian.2011 Dec.2011 Ioana Nitu Geospatial database building and

digital maps for forest district Putna

RNP -

ROMSILVA

Research

RNP-Romsilva 10.40 10.40

CF67 Ian.2011 Dec.2011 Ioana Nitu Geospatial database building and

digital maps for forest district

Dr.Turnu Severin

RNP -

ROMSILVA

Research

RNP-Romsilva 20.20 20.20

CF68 Ian.2011 Dec.2011 Catalin

Stanciu

Geospatial database building and

digital maps for forest district Gurgiu

RNP -

ROMSILVA

Research

RNP-Romsilva 21.10 21.10

CF69 Ian.2011 Dec.2011 Catalin

Stanciu

Geospatial database building and

digital maps for forest district Brodoc

RNP -

ROMSILVA

Research

RNP-Romsilva 22.10 22.10

CF70 Ian.2011 Dec.2011 Anca Dumitru Geospatial database building and

digital maps for forest district

Dolhasca

RNP -

ROMSILVA

Research

RNP-Romsilva 18.80 18.80

CF71 Ian.2011 Dec.2011 Anca Dumitru Geospatial database building and

digital maps for forest district Vaslui

RNP -

ROMSILVA

Research

RNP-Romsilva 25.70 25.70

CF72 09-2006 12-2012 Gheorghe

Marin

National Forest Inventary MMP-

Research

Programme

MMP 7000.00 7000.00

Page 16: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

Label

F#

Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of

contracting

authority

Total

budget

(thousand

s of

euros)

Budget

allocated to

the unit

(thousands

euros)

F1 10-2005 09-2007 Ionel Popa Reconstruction of paleoclimatic and

environmental changes in the last five

centuries of the National Park

Calimani/Reconstituirea

paleoclimatului şi a modificărilor de

mediu din ultimele 5 secole din Parcul

naţional Călimani

CEEX_ET MECTS -

CNCSIS

32.50 32.50

F2 01-2007 12-2007 Cornel Iacob Research in experimental areas about

the quality of trees standing on

Norway spruce spruce, fir and beech

growth in relation with the intensity of

the sforestry work/Cercetari in

suprafete experimentale permanente

privind cesterea si calitatea

arboretelor echiene de molid, brad si

fag, in raport cu intensitatea taierilor

de ingrijire si conducere a arboretelor

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 16.30 16.30

F3 01-2007 12-2007 Cornel Iacob Periodic inventories in long-term

experimental areas/Inventarieri

periodice in suprafetele

experimentale de lunga durata de

silvotehnica

ICAS

Research

Programme

ICAS 8.10 8.10

Projects/contracts finalized in the period 2007-2011 (from public, private, national or international sources, other than

the "nucleu" program)

Page 17: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F4 01-2007 12-2007 Cornel Iacob Technical memorandum on the

removal of forest perimeter Bungart -

Gusterita, in order to extend the clay

career/Memoriul tehnic privind

scoaterea din fond forestier a

perimetrului Bungart - Gusterita, in

scopul extinderii carierei de argila

private funds SC Tondach

Produktion

SRL - Sibiu

1.75 1.75

F5 01-2007 12-2007 Cornel Iacob Study on restoration - replacement of

forest stands with hornbeam from

ICAS Tg. Mures/Studiul privind

refacerea - substituirea arboretelor

carpinizate din padurea ICAS Tg.

Mures

ICAS

Research

Programme

ICAS 5.50 5.50

F6 01-2007 12-2007 Ion Barbu Study on the assessment of

atmospheric deposition monitoring in

the network intensive forest

ecosystems (Level II)/Studiu privind

evaluarea depunerilor atmosferice în

reţeaua de supraveghere intensivă a

ecosistemelor forestire (nivelul II)

MADR

Research

Programme

MADR 4.65 4.65

F7 01-2006 12-2007 Ionel Popa Investigation of spatial and temporal

variability of environmental change of

the Carpathian region during the past

five century

PNCDI 2 -

Capacities

MECTS -

ANCS

1.00 1.00

F8 01-2007 12-2007 Ovidiu Badea Annual assessment of forest health

surveys in permanent transnational

network (16 x 16km) and submit

annual information to EU and ICP-

Forest/Evaluarea anuală a stării de

sănătate a pădurilor în reţeaua

transnaţională de sondaje

permanente (16 x 16km) şi

transmiterea informaţiilor anuale

MADR

Research

Programme

MADR 58.14 58.14

Page 18: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F9 03-2006 03-2008 Ionel Popa Modern methods of assessment,

environmental risk analysis and

forecast products due to catastrophic

windthrow/Metode moderne de

evaluare, analiză şi prognoză a

riscului ecologic datorat doborâturilor

produse de vânt cu efecte

catastrofale

CEEX_ET MECTS -

CNCSIS

32.50 32.50

F10 03-2006 03-2008 Ionel Popa Growth models in artificial

ecosystems of spruce in relation to

environmental factors and forestry

work/Modele auxologice în

ecosisteme artificiale de molid în

raport cu factorii de mediu şi lucrările

silvotehnice

CEEX_ET MECTS -

CNCSIS

32.50 32.50

F11 05-2005 04-2008 Ovidiu Badea Long-term effects of air pollution on

forest ecosystems Bucegi Natural

Park (EPAEFOR)/Efectele pe termen

lung ale poluării atmosferice asupra

ecosistemelor forestiere din Parcul

Natural Bucegi (EPAEFOR)

CEEX-Mener MECTS -

CNMP

348.80 279.10

F12 05-2005 04-2008 Ovidiu Badea The role of populations / species in

generating resources and services as

a basis for policies and strategies of

biodiversity conservation/Rolul

populaţiilor/speciilor in generarea de

resurse si servicii ca fundament

pentru politicile si strategiile de

conservare a biodiversităţii

CEEX-Mener Bucharest

University

348.80 34.80

Page 19: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F13 08-2006 09-2008 Ionel Popa Holocene climate change impact and

current dynamics in the Romanian

Carpathians alpine environments.

Implications for risk management and

landscape/Impactul schimbărilor

climatice asupra dinamicii Holocene

şi actuale a mediilor alpine din

Carpaţii Româneşti. Implicaţii în

gestiunea riscului şi amenajarea

peisajului

CEEX-Mener Timisoara

West

University

23.25 20.90

F14 10-2006 09-2008 Ionel Popa Variation of the dendroclimatological

response of beech (Fagus sylvatica)

located at the eastern limit of the

area/Variaţia răspunsului

dendroclimatologic al fagului (Fagus

sylvatica) aflat la limita estică a

arealului

CEEX_ET MECTS -

CNCSIS

32.50 32.50

F15 10-2006 09-2008 Ovidiu Badea Reconstruction of hystorical dynamics

of the structure of natural forest

ecosystems under the impact of risk

factors bydendro-ecology techniques

/Reconstituirea dinamicii istorice a

structurii ecosistemelor forestiere

naturale sub impactul factorilor de

risc naturali prin tehnici de

CEEX_PD MECTS -

CNCSIS

76.50 76.50

F16 08-2006 10-2008 Radu Vlad Functional rehabilitations

technologies in the Norway spruce

ecosystems affected by biotic

disturbances factors -

MOTEHNOREAB/Tehnologii de

reabilitare a funcţionalităţii

ecosistemelor de molid afectate de

factori biotici perturbatori –

CEEX-

Relansin

Bucharest

Polytehnic

University

346.50 251.10

Page 20: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F17 01-2008 12-2008 Cornel Iacob Study report on environmental impact

assessment of forest out of the

perimeter Bungard - Gusterita and

expanding clay quarry/Raport la

studiul de evaluare a impactului

asupra mediului privind scoaterea din

fond forestier a perimetrului Bungard -

Gusterita si extinderea carierei de

argila

private funds SC Tondach

Produktion

SRL - Sibiu

4.05 4.05

F18 01-2005 12-2008 Ion Barbu Modelling and forecasting the risk of

drought and fires in forest ecosystems

in Romania/Modelarea şi prognoza

riscului de apariţie a secetei şi

incendiilor în ecosistemele forestiere

din România

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 18.52 18.52

F19 01-2008 12-2009 Ionel Popa Climate sensitivity of european beech

(Fagus sylvatica) and Norway spruce

(Picea abies Karst) at their south-

eastern distribution limit under global

changes

PNCDI 2 -

Capacities

MECTS -

ANCS

11.40 11.40

F20 11-2006 09-2010 Ion Barbu Research on the necessity, methods

and effects of teh conversion of

coniferous stands from outside of the

natural area of vegetation/Cercetări

privind necesitatea, modalităţile şi

efectele conversiei arboretelor de

răşinoase din afara arealului natural

de vegetaţie

MADR

Sectorial

Research

Programme

MADR 182.25 182.25

F21 10-2007 09-2010 Ionel Popa The dynamics of inter- and intra-

annual growth processes in forest

ecosystems of the upper limit of

vegetation/Dinamica inter- şi intra-

anuală a proceselor auxologice în

ecosistemele forestiere de la limita

superioară a vegetaţiei (

PNCDI 2 -

Ideas

MECTS -

CNCSIS

169.50 169.50

Page 21: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F22 11-2006 09-2010 Ionel Popa Implementation of the national

network of dendrochronological series

for coniferous species

REDODENDRONET/Implementarea

reţelei naţionale de serii

dendrocronologice pentru speciile de

răşinoase – RODENDRONET

MADR

Sectorial

Research

Programme

MADR 162.80 162.80

F23 01-2010 12-2010 Cornel Iacob Pedo-station study of the land to be

exchanged between Village Hall and

Porumbacu de jos and forest district

Avrig/Studiul pedo-stational al

terenurilor ce urmeaza a fi schimbate

intre Primaria Comunei Porumbacu

de Jos si O.S. Avrig

private funds City hall

Porumbacu de

Jos, jud. Sibiu

3.37 3.37

F24 09-2007 12-2010 Ionel Popa Creating a georeferenced digital

database in Suceava plateau by the

image monitoring on degraded land,

as decision support in environmental

rehabilitation/Crearea unei baze de

date georeferenţiate în podişul

Sucevei prin monitorizarea pe imagini

digitale a terenurilor degradate, ca

suport decizional în reabilitatea

ecologică

PNCDI 2 -

Partnerships

MECTS -

CNMP

348.80 29.50

F25 01-2009 06-2011 Ovidiu Badea Further developement and

implementation of an EU-level forest

monitoring system (FutMon)

Life+ UE 14258.55 886.00

Page 22: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F26 03-2005 03-2007 Blujdea Viorel Instruments, guidelines and indicators

for integrating environmental

prospects in forest and agricultural

practices in rural water management

from top - down approaches to the

involvement of local

communities/Instrumente, ghiduri şI

indicatori pentru integrarea

prospectelor de mediu in practicile

agricole forestiere şi de gestiune a

apei în mediul rural de la abordările

top - down la implicarea comunităţilor

CEEX-Mener Reasearch

Institute for soil

science and

agrochemistry

70.40 70.40

F27 03-2003 07-2007 Blada Ioan Restoration of forest habitats from

Pietrosul Rodnei Biosphere Reserve

LIFE Natura

Programme,

LIFE03NAT/R

EU 213.47 213.47

F28 02-2006 10-2007 Dănescu

Florin

Researches on the implementation of

regional catalogs for forest

ecosystems differentiation and

classification/Cercetări privind

realizarea cataloagelor regionale

pentru diferenţierea şi clasificarea

ecosistemelor forestiere

MADR

Research

Programme

MADR 53.41 53.41

F29 01-2005 11-2007 Bolea

Valentin

Scientific grounding for the method of

Bioindicators used in evaluating and

monitoring the level of pollution in

forest ecosystems and green

spaces/Fundamentarea ştiinţifică a

metodei bioindicatorilor în evaluarea

şi supravegherea nivelurilor de

poluare în ecosisteme forestiere şi

spaţii verzi.

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 23.74 23.74

Page 23: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F30 01-2007 11-2007 Dănescu

Florin

Pedostational researches in forest

ecosystems in Dobrogea in order to

sustain their management

measures/Cercetări pedostaţionale în

ecosistemele forestiere din Dobrogea

în vederea fundamentării măsurilor

de gestionare a acestora

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 27.74 27.74

F31 01-2005 11-2007 Dragoi

Simona

Evaluation of recreational and

conservation functions of forest

ecosystems in national and natural

parks in Romania/Evaluarea funcţiilor

recreativă şi de conservare ale

ecosistemelor forestiere din parcurile

naţionale şi naturale din România

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 136.50 136.50

F32 01-2005 11-2007 Seghedin

Georgeta

Studies on the identification of high

conservation value forests as a basis

for forest certification process/Studii

privind identificarea elementelor de

biodiversitate relevante pentru

procesul de certificare a pădurilor

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 14.84 14.84

F33 02-2006 11-2007 Simona

Dragoi

Study regarding the substantiation

assessment for forest protection

functions in order to determine

compensation for forest

owners/Studiu privind fundamentarea

evaluării funcţiilor de protecţie a

pădurii în vederea stabilirii

compensaţiilor pentru deţinătorii de

păduri

MADR

Research

Programme

MADR 41.54 41.54

Page 24: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F34 11-2005 12-2007 Biris Iovu-

Adrian

Elaboration of an inventory system for

natural sites of Community interest

NATURA 2000 in accordance with the

EU Birds and Habitats/Elaborarea

sistemului informatic pentru

inventarierea siturilor naturale de

interes comunitar NATURA 2000 in

conformitate cu prevederile

directivelor UE Păsari şi Habitate

MAPM

Studies

MAPM 207.72 207.72

F35 01-2006 12-2007 Blujdea Viorel The establishment of a thematic

network in the field of afforestation

within the regional process of

implementing the United Nations

Convention to Combat

Desertification/Realizarea reţelei

tematice în domeniul împăduririlor în

cadrul procesului regional de

implementare a Convenţiei Naţiunilor

Unite pentru combaterea deşertificării

MADR

Research

Programme

MADR 56.48 56.48

F36 01-2007 12-2007 Brad Remus Technical assistance concerning the

round timber sorting at Arad, Deva

and Timişoara Resita County Forest

Administration/Asistenţă tehnică

privind sortarea lemnului rotund la

Direcţiile Silvice Arad, Deva, Reşiţa şi

Timişoara

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 4.45 4.45

Page 25: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F37 01-2007 12-2007 Dănescu

Florin

Pedostational study in order to

achieve an exchange of land between

SC Novaci 2000 SRL and Comana

Forest District (Giurgiu Forest District)

(4.06 ha)/Studiu pedostaţional în

vederea efectuării unui schimb de

teren între S.C. Novaci 2000 S.R.L.

şi Ocolul Silvic Comana (D.S.

Giurgiu) (4.06 ha)

private funds S.C. Novaci

2000 S.R.L

1.19 1.19

F38 01-2007 12-2007 Dănescu

Florin

Pedostational study in order to

achieve an exchange of land (2.07

ha) with Urziceni Forest

District/Studiu pedostaţional în

vederea realizării unui schimb de

teren (2.07 ha) cu Ocolul Silvic

private funds Andronie Mihai 1.04 1.04

F39 01-2007 12-2007 Dincă Maria The production of some ornamental

forest species of great interest from

cuttings and seeds in Brasov

greenhouse and Sacele and Mihaesti

nurseries/Producerea unor specii

forestiere ornamentale de interes

deosebit, din butaşi şi seminţe, în

sera ICAS – Staţiunea Braşov şi

pepinierele Ocoalelor Silvice

Experimentale Săcele şi Mihăeşti

ICAS

Research

Programme

ICAS 8.90 8.90

Page 26: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F40 03-2007 12-2007 Fratila Eugen Inventory, mapping and sustainable

management measures for the

regions with intact forest

landscapes/Inventarierea, cartarea şi

elaborarea măsurilor de management

durabil a regiunilor cu peisaje

forestiere intacte

MMDD

studies

MMDD 41.54 41.54

F41 03-2007 12-2007 Oliver Merce Research on the influence of air

pollution on trees in the city of

Timisoara /Cercetari privind influenta

poluarii aerului asupra arborilor din

Municipiul Timisoara Parcul Copiilor,

Parcul Poporului, Parcul Padurice -

Giroc

private funds City hall

Timisoara

4.55 4.55

F42 01-2007 12-2007 Oneata

Marian

Obtaining decorative forest species

of high interes through grafting at

ICAS nursery Ştefăneşti/Producerea

unor specii forestiere ornamentale de

interes deosebit, prin altoire, la

Pepiniera ICAS Ştefăneşti

ICAS

Research

Programme

ICAS 5.93 5.93

F43 03-2006 03-2008 Biris Iovu-

Adrian

Structure and dynamics of natural

forest ecosystems, background for

close-to-nature sylvicultural activities

and sustainable forest management

(NATFORMAN)/Structura şi dinamica

ecosistemelor forestiere naturale,

suport pentru fundamentarea de

măsuri silviculturale apropiate de

natură şi pentru o gestionare durabilă

a pădurilor

CEEX-Mener MECTS -

CNMP

300.00 190.65

Page 27: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F44 04-2007 10-2008 Blujdea Viorel Study under EEC 2152/2003 Forest

Focus regulation on developing

harmonized methods for assessing

carbon sequestred in European

forests/Studiu privind dezvoltarea de

metode armonizate pentru evaluarea

carbonului stocat in padurile Europei

(conform Directivei Forest Focus EEC

2152/2003

Forest Focus

regulationEEC

2152/2003

EU 10.00 10.00

F45 04-2008 11-2008 Biris Iovu-

Adrian

Realizing preparation analyses for the

negociation of sites of community

importance list participation to

biogeographical seminars and

researches for designating new sites

in accordance with the EC

requirements/Realizarea de analize

în vederea pregătirii negocierii

siturilor de importanţă comunitară cu

Comisia Europeană, participarea la

seminariile biogeografice şi realizarea

cercetărilor necesare în vederea

completării listei siturilor de

importanţă comunitară şi a bazei de

date cu cerinţele Comisiei Europene

MAPM

Studies

MAPM 5.56 5.56

Page 28: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F46 01-2006 11-2008 Biris Iovu-

Adrian

Structure and dynamics of natural

forest ecosystems, background for

close-to-nature sylvicultural activities

and sustainable forest management

(NATFORMAN)/Structura şi dinamica

ecosistemelor forestiere naturale,

suport pentru fundamentarea de

măsuri silviculturale apropiate de

natură şi pentru o gestionare durabilă

a pădurilor (cofinanțare RNP)

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 16.08 16.08

F47 01-2007 11-2008 Bolea

Valentin

Monitoring of pollution through

bioindicators/Monitorizarea poluării

prin bioindicatori

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 35.61 35.61

F48 01-2006 11-2008 Dincă Lucian Definition, evaluation and risk zoning

for the Romanian forests/Definirea,

evaluarea şi zonarea riscurilor pentru

pădurile României

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 52.99 52.99

F49 01-2008 12-2008 Dănescu

Florin

Pedostational study in order to

achieve an exchange of land (13.0

ha) with Slobozia Forest District

(Slobozia Forest Department)/Studiu

pedostaţional în vederea realizării

unui schimb de teren (13.0 ha) cu

Direcţia Silvică Slobozia (Ocolul Silvic

Slobozia)

private funds Dumitru Rodica 1.37 1.37

F50 06-2008 12-2008 Oliver Merce Health analysis and influence of air

pollution on trees in the Timisoara

city/Analiza starii de sanatate si

influenta poluarii aerului asupra

arborilor din Municipiul Timisoara

private funds City hall

Timisoara

6.25 6.25

Page 29: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F51 01-2007 12-2008 Scărlătescu

Virgil

Sylvotechnical researche concerning

the main mixture species (Prunus

avium L., Fraxinus excelsior L., Acer

pseudoplatanus L.) for increasing the

stability and biodiversity of stands in

Mihăeşti Experimental Forest District

in the context of sustainable forest

management/Cercetări privind

silvotehnice speciilor principale de

amestec (Prunus avium L., Fraxinus

excelsior L., Acer pseudoplatanus L.)

pentru creşterea stabilităţii şi

biodiversităţii arboretelor din Ocolul

Silvic Experimental Mihăeşti, în

contextul gestionării durabile a

pădurilor

ICAS

Research

Programme

ICAS 9.51 9.51

F52 01-2007 12-2008 Stoiculescu

Cristian

Substantiation study concerning the

Jiu Corridor Natural Park

establishment/Studiu de

fundamentare pentru constituirea

Parcului Natural Coridorul Jiului

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 29.90 29.90

F53 03-2006 12-2008 Teodosiu

Marius

Establishment and exploitation of

national phenology networks, as

support for the assessment of climate

change and its impacts on the forest

fund/Constituirea şi exploatarea

reţelei naţionale de fenologie, ca

suport pentru evaluarea schimbărilor

climatice şi a impactului acestora

asupra fondului forestier

Forest

Monitoring

Programme

MADR 40.00 40.00

Page 30: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F54 01-2007 12-2008 Teodosiu

Marius

Building, Development and upgrading

of the ICAS and Editura Silvica

websites/Crearea, implementarea şi

reactualizarea siturilor web ale

Editurii Silvice şi ICAS (

ICAS

Research

Programme

ICAS 27.56 27.56

F55 01-2008 12-2008 Tudor Radoi Ecological behaviour of wood species

in BE Bărăgan experimental

cultures/Comportamentul ecologic al

speciilor lemnoase în culturile

experimentale din BE Bărăgan

ICAS

Research

Programme

ICAS 5.43 5.43

F56 01-2007 12-2008 Ungureanu

Cezar

Study regarding the abnormal drying

of oak within the forests of public

property in Satu Mare Forest District

and the establishment of technical

solutions for forest

regeneration/Studiu privind

fenomenul de uscare anormală a

stejarului din pădurile proprietatea

publică a statului în SD Satu Mare şi

stabilirea soluţiilor tehnice de

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 36.71 36.71

F57 01-2007 12-2008 Voiculescu

Ion

Transforming the medicinal plants

pilot station into an experimental base

for the multiplication and propagation

material of medicinal plants extended

to cultures/Transformarea staţiei pilot

de plante medicinale în bază de

multiplicare şi sursă de material de

înmulţire pentru extinderea în cultură

a unor specii de plante medicinale

ICAS

Research

Programme

ICAS 6.79 6.79

Page 31: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F58 01-2007 12-2008 Merce Oliver Substantiation study concerning the

Codru Moma Nature Park

establishment/Studiu de

fundamentare pentru constituirea

Parcului Natural Codru Moma

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 29.90 29.90

F59 11-2005 08-2009 Biris Iovu-

Adrian

Protecting and Managing priority

forest, sub-alpine and alpine habitats

in Romania

LIFE Natura EU 10.00 10.00

F60 03-2007 09-2009 Blujdea Viorel JIFOR: Joint Implementation initiative

for forestry-based climate mitigation

QUEST

Program

Natural

Environment

Research

Council -

England

52.11 52.11

F61 01-2007 11-2009 Biris Iovu-

Adrian

Expanding and Modernizing the

capacity of Informing, Gathering and

Promoting research results in Forestry

Sciences -

INFODOCPROSILV/Extinderea şi

modernizarea capacităţii de Informare

, Documentare ştiinţifică şi

Promovarea rezultatelor în domeniul

Silviculturii

PNCDI 2 -

Capacities

MECTS -

ANCS

91.88 91.88

F62 01-2007 11-2009 Blujdea

Viorel,Oneață

Marian

Project monitoring for degraded

lands afforestation, carbon storage

evaluation, reporting and storage

resimulation (CFS international

project support)/Monitorizarea

proiectului de împădurire a terenurilor

degradate, estimarea acumulării de

carbon, raportarea şi resimularea

acumulării (asistenţă proiect

internaţional CFS)

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 14.46 14.46

Page 32: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F63 04-2007 11-2009 Oliver Merce Grounding study for the establishment

of Codru Moma Natural Park./Studiu

de fundamentare pentru constituirea

Parcului Natural Codru Moma

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 23.94 17.37

F64 08-2008 12-2009 Blujdea Viorel Increased biomass production with

fast-growing tree species in short-

rotation forestry: impact of species,

clone selection and socio-economic

impacts

ASO Call 4 -

18 – 2009

Natural

Environment

Research

Council -

England

17.98 17.98

F65 01-2008 12-2009 Corina

Coanda

Conservation and development of

Trees and shrubs collection of

Simeria Arboretum/

Conservarea şi dezvoltarea colecţiei

de arbori şi arbuşti a Arboretumului

Simeria

ICAS

Research

Programme

ICAS 14.46 14.46

F66 01-2009 12-2009 Cornici Danut Structural evolution of beech forests

in Caransebes Experimental Forest

District with thinnings of varied

intensity degree/Cercetări privind

evoluţia structurală a făgetelor din

cadrul Ocolului Silvic Experimental

Caransebeş parcurse cu rărituri de

diferite grade de intensitate

ICAS

Research

Programme

ICAS 7.23 7.23

F67 01-2009 12-2009 Dănescu

Florin

Pedostational study for 5.0 ha of

forest area of Corbeanca, forest stand

Petreşti, Property of SC Property

Network 2002 S.A. -

Bucharest/Studiu pedostaţional

pentru suprafaţa de 5.0 ha din

pădurea Corbeanca, trupul de pădure

Petreşti, Proprietatea S.C. Imobiliar

Network 2002 S.A. - Bucureşti.

private funds S.C. Imobiliar

Network 2002

S.A. -

Bucureşti.

3.61 3.61

Page 33: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F68 01-2009 12-2009 Dănescu

Florin

Pedostational study for a 2000 sqm

farmland owned by S.C. Sunset

Properties LLC and provided as

compensation to Galati Forest District

(Galati DS) in order to achieve the

exchange of lands trhough a

permanent removal of that land from

the forest fund/Studiu pedostaţional

pentru un teren arabil în suprafaţă de

2000 m.p. aflat în proprietatea S.C.

Sunset Properties S.R.L. şi oferit în

compensare O.S. Galaţi (D.S. Galaţi)

în vederea realizării unui schimb de

teren prin scoaterea definitivă a

suprafeţei solicitate din fondul

forestier

private funds S.C. Sunset

Properties

S.R.L.

0.24 0.24

Page 34: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F69 01-2009 12-2009 Dănescu

Florin

Pedostational study for a land

classified as "wooded pasture" with a

surface of 3 ha owned by Pietroasa

Local Council - Bihor county provided

as compensation to Sudrigiu Forest

Department (Oradea Forest District)

in order to achieve a land exchange

through permanent removal from the

forest ground/Studiu pedostaţional

pentru un teren încadrat ca „păşune

împădurită” în suprafaţă de 3 ha aflat

în proprietatea Consiliului Local

Pietroasa - judetul Bihor şi oferit în

compensare O.S. Sudrigiu (D.S.

Oradea) în vederea realizării unui

schimb de teren prin scoaterea

definitivă a suprafeţei solicitate din

fondul forestier.

private funds County council

Pietroasa -

judetul Bihor

3.04 3.04

F70 01-2008 12-2009 Oneata

Marian

The establishment of physiological

parameters to ornamental seedlings

in half-controlled conditions/Stabilirea

parametrilor fiziologici la puieţii

ornamentali în condiţii semicontrolate

ICAS

Research

Programme

ICAS 5.43 5.43

Page 35: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F71 11-2009 01-2010 Scărlătescu

Virgil

Report on the evaluation of the impact

on biodiversity of the application of

forestry interventions for forest

regeneration within the protected area

of Seaca-Optăşani/Raport la studiul

de evaluare a impactului asupra

biodiversităţii generat de aplicarea

intervenţiilor silvotehnice pentru

regenerarea pădurilor în cadrul Ariei

naturale protejate Seaca-Optăşani

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.00 2.00

F72 02-2007 02-2010 Blujdea Viorel Modelling the carbon stock in

transitional ecosystemic forms

associated with change and the use

of forest lands in Romania/Modelarea

stocării carbonului în forme

ecosistemice tranzitorii asociate

schimbării, utilizării terenurilor

forestiere din România

PNCDI 2 -

Partnerships

MECTS -

CNMP

255.16 255.16

Page 36: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F73 12-2009 02-2010 Dănescu

Florin

Pedostational study for evaluating the

main species productivity of an

afforestation land included in

"construction" category with the

surface of 356.93 sq.m. administrated

by Galati Forest Department (Galati

Forest District) and located on the

territory of Hanu Conachi Forest

Department (Galati Forest District),

U.P. III Independenta, u.a.

73c./Studiu pedostaţional în vederea

stabilirii speciei principale de bază şi

a clasei de producţie pentru un teren

din categoria „construcţii” în suprafaţă

de 356.93 m.p. aflat în administrarea

O.S. Galaţi (D.S. Galaţi) şi situat pe

teritoriul O.S. Hanu Conachi (D.S.

Galaţi), U.P. III Independenţa, u.a.

73C.

private funds S.C. Sunset

Properties

S.R.L.

0.12 0.12

F74 01-2010 02-2010 Scărlătescu

Virgil

Report on the evaluation of the impact

on biodiversity of forestry

interventions realized for the

regeneration and the management of

stands from "Calugareasca Romanian

Peony Reserve"/Raport la studiul de

evaluare a impactului asupra

biodiversităţii generat de aplicarea

intervenţiilor silvotehnice pentru

conducerea şi regenerarea

arboretelor din cadrul

„Rezervaţiei de bujor românesc

Călugăreasca”

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.00 2.00

Page 37: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F75 04-2006 04-2010 Blujdea Viorel Assessment and monitoring of global

environmental change on forest

ecosystems, reconstruction,

conservation of biodiversity for

ecological reconstruction of

forest/Evaluarea și monitorizarea

modificărilor globale de mediu asupra

sistemelor forestiere, refacerea,

conservarea biodiversității pentru

reconstrucția forestieră ecologică

MADR

Sectorial

Research

Programme

MADR 66.00 66.00

F76 09-2006 11-2010 Biris Iovu-

Adrian

Conservation and integrated

management of Danube islands,

Romania/Conservarea şi

managementul integrat al ostroavelor

de pe Dunăre, România

LIFE Natura EU 567.95 51.58

F77 01-2007 11-2010 Dănescu

Florin

Study regarding the identification of

risk forest areas of flooding and

stagnant water from precipitation in

the plain region/Studiu privind

identificarea suprafețelor forestiere cu

risc de inundare și stagnare a apei

din precipitații în regiunea de câmpie

MADR

Sectorial

Research

Programme

MADR 121.30 121.30

F78 09-2009 12-2010 Biris Iovu-

Adrian

Research project concerning "Natura

2000" ecological network in

Romania/Proiect de cercetare în

vederea îndeplinirii obligaţiilor ce

revin ţării noastre în ceea ce priveşte

aplicarea reglementărilor comunitare

privind reţeaua ecologică Natura

2000” - Activităţile Specifice

B(“Punerea în aplicare a deciziilor

Comisiei Europene privind Directiva

Habitate 92/43/CEE”)

MAPM

Studies

MAPM 714.00 714.00

Page 38: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F79 01-2010 12-2010 Dănescu

Florin

Study concerning the restoration of

environment with the purpose of

returning a surface of 5.3 ha located

at Fusea Gravel , Răcari Forest

District, VI Zăvoaiele Argeşului, u. a.

49A, u. a. 75 back to the forest

use/Studiu de refacere a mediului în

vederea redării în circuitul silvic a

suprafeţei de 5,3 ha, situată la

Balastiera Fusea, în O.S. Răcari,

U.P. VI Zăvoaiele Argeşului, u. a.

49A, u. a. 75A

private funds SC LAFARGE

Agregate

Betoane SA

1.19 1.19

F80 01-2010 12-2010 Dănescu

Florin

Study concerning the restoration of

environment with the purpose of

returning a surface of 9.9 ha located

at Fusea Gravel , Răcari Forest

District, VI Zăvoaiele Argeşului, u. a.

49A, u. a. 75 back to the forest use

74A, C, D, u. a. 75A, B/Studiu de

refacere a mediului în vederea redării

în circuitul silvic a suprafeţei de 9,9

ha, situată la Balastiera Fusea, în

O.S. Răcari, U.P. VI Zăvoaiele

Argeşului, u. a. 74A, C, D, u. a. 75A,

B

private funds SC LAFARGE

Agregate

Betoane SA

1.78 1.78

F81 01-2010 12-2010 Dănescu

Florin

Study on the reforestation of 3 former

oil wells sites/Studiu de specialitate în

vederea reîmpăduririi

amplasamentelor a 3 sonde

private funds OMV Petrom

SA

20.43 20.43

F82 01-2006 12-2010 Parnuta

Gheorghe

A cost Action E52 Evaluation of

Beech Genetic Resources for

Sustainable Forestry

COST EU 500.00 7.00

Page 39: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F83 01-2007 12-2010 Teodosiu

Marius

Study regarding the status of the main

climate parameters, phenology and

litter deposition in intensive

monitoring network of forest

ecosystems/Studiu privind starea

principalilor parametri climatici,

fenologia şi depunerile de litieră în

reţeaua de supraveghere intensivă a

ecosistemelor forestiere (nivel II)

Forest

Monitoring

Programme

MADR 75.00 75.00

F84 01-2009 12-2010 Turcu Daniel-

Ond

Researches concening the process of

normal mortality of trees in the quasi-

virgin beech forests from the

Izvoarele Nerei Reserve/Cercetări

privind fenomenul de mortalitate

normală a arborilor în făgetele

cvasivirgine din Rezervaţia Izvoarele

Nerei

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 23.53 23.53

F85 01-2001 12-2010 Voiculescu

Ion

Evaluation study of the environmental

impact of harvesting berries from the

spontaneous forest flora/Studiu de

evaluare a impactului asupra

mediului generat de recoltarea

fructelor de pădure din flora spontană

a fondului forestier

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 20.73 20.73

F86 01-2001 12-2010 Voiculescu

Ion

Evaluation study of the environmental

impact of harvesting edible

mushrooms from the spontaneous

forest flora/Studiu de evaluare a

impactului asupra mediului generat

de recoltarea ciupercilor comestibile

din flora spontană a fondului forestier

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 20.73 20.73

Page 40: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F87 01-2001 12-2010 Voiculescu

Ion

Evaluation study of the environmental

impact of harvesting medicinal plants

from the spontaneous forest

flora/Studiu de evaluare a impactului

asupra mediului generat de

recoltarea plantelor medicinale din

flora spontană a fondului forestier

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 20.73 20.73

F88 03-2009 03-2011 Dincă Lucian The Use of Cultures Installed on

Waste Heaps for Energetic

purposes/Utilizarea în scopuri

energetice a culturilor instalate pe

haldele de steril

PNCDI 2 -

Partnerships

MECTS -

CNMP

191.38 73.32

F89 01-2009 11-2011 Biris Iovu-

Adrian

Improvement of the producive,

Pprotective and social potentialL of

the

accessory forestry products by

processing with advanced integrative

methods, at the level of some affected

areas - BIOFOREPRO/Prelucrarea

integrativă avansată a produselor

forestiere accesorii

PNCDI 2 -

Partnerships

MECTS -

CNMP

191.20 92.16

F90 01-2010 11-2011 Oneata

Marian

Testing substances that accelerate

leaf fall on forest saplings in order to

extend the autumn planting

season/Experimentarea unor

substanțe pentru grăbirea căderii

frunzelor la puieții forestieri în

vederea prelungirii sezonului de

plantare în toamnă

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 16.30 12.19

Page 41: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F91 10-2005 10-2008 Postolache

Dragos

Adveanced technologies for

propagation, conservation and

somaclonal selection of ornamental

trees and shrubs for landscape

rahabilitation)

(ARBOOR)/Biotehnologii avansate de

multiplicare, conservare si selectie

somaclonala a arborilor si arbustilor

ornamentali pentru reabilitare

peisagistica

CEEX-

BIOTECH

MECTS -

CNMP

61.22 34.13

F92 01-2006 11-2008 Mihai

Georgeta

Genetic evaluation of coniferous seed

orchards in order to pass to advance

breeding generations /Studiu privind

evaluarea genetică a plantajelor de

răşinoase în vederea trecerii la

generaţii avansate de ameliorare

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 53.00 53.00

F93 10-2005 11-2008 Parnuta

Gheorghe

Conservation and sustainable

Management of the Forest Genetic

Resources (COREGE -

FOREST)/Conservarea şi

Managementul Durabil al Resurselor

Genetice Forestiere din România

CEEX-Mener MECTS -

CNMP

440.07 416.58

F94 01-2006 12-2008 Mihai

Georgeta

Study of genetic variability of the main

forest species in order to establish the

tested seed sources and comply with

the E.U. norms (TREE-

VARGEN)/Studierea variabilităţii

genetice a principalelor specii

forestiere în vederea stabilirii surselor

de seminţe testate şi armonizării cu

reglementările U.E.

CEEX-Mener MECTS -

CNMP

391.00 349.67

Page 42: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F95 02-2006 11-2009 Parnuta

Gheorghe

Establishment of seed orchards for

Oak species, Sycamore maple and

Wild cherry in order to insure a

genetically improved seed

basis/Crearea de plantaje de seminţe

de paltin de munte, stejar penduculat

si cires pasaresc in vederea asigurarii

unei baze seminologice genetice

ameliorate

ICAS

Research

Programme

ICAS 11.60 11.60

F96 04-2009 11-2009 Postolache

Dragos

Evaluation of genetic diversity of the

most valuable Pedunculate and

Sessile oak provenances and genetic

resources form Souther Romania and

Bulgaria, by the means of genetic

markers(OAK)/Evaluarea diversităţii

genetice cu ajutorul markerilor

moleculari a celor mai valoroase

provenienţe şi resurse genetice

forestiere de stejar şi gorun din sudul

României şi Bulgaria

PNCDI 2 -

Capacities

MECTS -

ANCS

1.40 1.40

F97 01-2007 12-2009 Filat Mihai Researches for production of poplars

and wilows clones with high economic

value and high resistance to harmful

factors/Cercetari pentru introducerea

in cultura de specii/clone de plop si

salcie cu potential silvoproductiv

superior si rezistenta sporita la

adversitati

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 37.21 37.21

Page 43: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F98 01-2008 12-2009 Nica Sorin

Marius

Increased biomass production with

fast-growing tree species in short-

rotation forestry: impact of species

and clone selection and socio-

economic impacts/Cresterea

productiei de biomasa cu specii

repede crescatoare in culturi cu

cicluri scurte de productie: impactul

sectiei specilor si al clonelor si

impactul socio-economic

See Era ZSI -Austrian

Science and

Research

Liaison Office

20.00 5.00

F99 01-2007 12-2010 Parnuta

Gheorghe

EUFGIS- European Information

System on Forest Genetic Resources

(EUFGIS)

FP7 EU 1107.70 1.20

F100 09-2007 12-2010 Popescu

Flaviu

Evaluation and mapping of genetic

diversity of autochtounus oak species

from Romania in order to insure the

sustainble and dynamic management

of ofrest geentic resources

(OAKGIS)/Evaluarea şi cartarea

diversităţii genetice a speciilor de

stejari autohtoni din România în

scopul gestionării durabile a

ecosistemelor forestiere şi

conservarea dinamică a resurselor

genetice

PNCDI 2 -

Partnerships

MECTS -

CNMP

319.38 170.77

F101 10-2007 12-2010 Popescu

Flaviu

Breeding of economically important

forest tree species by the means of

molecular biotechnologies

(SALTRANS)/Utilizarea

biotehnologiilor moleculare in

ameliorarea plantelor de cultura de

interes economic

PNCDI 2 -

Partnerships

MECTS -

CNMP

245.09 23.31

Page 44: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F102 09-2007 12-2010 Postolache

Dragos

Study of biodiversity for Norway

spruce and Silver fir forests located in

NATURA 2000 sites, using modern

multidisciplinary methods

(CONBIODIV)/Studiul biodiversitatii

padurilor de molid si brad din arii

protejate Natura 2000 prin metode

moderne, pluridisciplinare

PNCDI 2 -

Partnerships

MECTS -

CNMP

301.62 38.07

F103 06-2006 03-2011 Parnuta

Gheorghe

TREEBREEDEX: a working model

network of tree improvement for

competitive, multifunctional and

sustainable European forestry

(TREEBREEDEX)

FP6 EU 2800.00 205.45

F104 09-2008 11-2011 Filat Mihai Researches concerning the cultivation

and valorification of fast growing

poplar clones, in short

rotations/Cercetari privind cultivarea

si valorificarea energetica a unor

clone de plopi rapid crescatoare, in

cicluri scurte de productie (PLEN)

PNCDI 2 -

Partnerships

MECTS -

CNMP

562.01 104.65

F105 10-2008 11-2011 Palada

Magdalena

Conservation of some certified breeds

of ornamental plants with importance

in floricol industry/Conservarea unor

soiuri autohtone omologate de plante

ornamentale cu importanta in

industria floricola

PNCDI 2 -

Partnerships

MECTS -

CNMP

171.21 17.25

F106 01-2007 12-2011 Filat Mihai Technical asistance concerning

utilization of poplars and willows in

platations/Asistenta tehnica in culturi

de plante mama la unitati cultivatoare

de plop si salcie

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 41.86 41.86

Page 45: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F107 01-2007 12-2011 Filat Mihai Technical asistance concerning

production and utilization in platation

of poplars big slips /Asistenţa tehnică

privind producerea si utilizarea

sadelor de plop la plantatii

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 39.53 39.53

F108 01-2007 12-2007 Ion MIREA Developing the management

plan for wild hamster/Elaborarea

planului de management pentru

hârciog

Biodiversity

Conservation

MAPM 4.51 4.51

F109 01-2006 12-2007 Marius POPA Design of the informational system for

hunting management at national

level/Proiectarea sistemului

informaţional unic la nivel naţional în

domeniul cinegetic

MADR

Research

Programme

MADR 5.41 5.41

F110 01-2007 12-2007 Marius POPA Remodeling hunting funds that

overlap protected areas/Rearondarea

fondurilor devânătoare care se

suprapun peste ariile protejate

MADR

Research

Programme

MADR 2.71 2.71

F111 01-2007 12-2007 Ovidiu

IONESCU

Bear Ethology around Romania BEAR FP6 EU 123.56 26.95

Page 46: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F112 01-2007 12-2009 Ovidiu

IONESCU,Ge

orgeta

Ionescu

Study regarding the population

estimation of large carnivores and

wild cats in Romania in order to

maintain a favourable conservation

status condition and to determine the

number of individuals of strictly

protected species that can be

relocated the 2010-2011 hunting

season/Studiul privind estimarea

populaţiilor de carnivore mari şi pisică

sălbatică din România în vederea

menţinerii într-o stare favorabila de

conservareşi pentru stabilirea

numarului de exemplare din speciile

strict protejate care se pot reloca în

cadrul sezonului de vânătoare 2010-

2011

Biodiversity

Conservation

MAPM 30.67 30.67

F113 01-2007 12-2007 Ramon JURJ Technical assistance on monitoring

the population of bears in the

Prahova valley basin,Barsa and

Miercurea Ciuc depression/AT privind

Monitorizarea populaţiei de urs în

bazinul Văii Prahova, depresiunea

Ţara Bârsei şi Miercurea Ciuc

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 3.21 3.21

Page 47: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F114 01-2006 12-2007 Ramon JURJ Identification and design of methods

to compensate damages caused by

large carnivores and development of

management plan for damages

caused by large

carnivores/Identificarea şi

conceperea unor metode de

compensare a pagubelor produse de

carnivorele mari şi elaborarea

planului de management al

conflictelor provocate de carnivorele

mari

MADR

Research

Programme

MAPM 13.53 13.53

F115 01-2007 12-2008 Ion CRISTEA The management of living aquatic

resources in mountain basins of

Romania, as required by EU/Plan de

management al resurselor acvatice vii

din bazinele hidrografice montane ale

Romaniei, conform cerintelor Uniunii

Europene"

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 1.00 1.00

F116 01-2008 12-2008 Ramon JURJ Technical assistance for relocation of

bear individuals with deviant behavior

near Sinaia/AT privind Relocarea

exemplarelor de urs cu

comportament deviat din zona Sinaia

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.13 2.13

F117 01-2008 12-2008 Ramon JURJ Reliability study on the hunting area of

the National Park Bucegi/Studiu

privind bonitatea fondurilor de

vânătoarea din perimetru Parcului

Natural Bucegi

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.84 2.84

Page 48: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F118 01-2009 12-2009 Ramon JURJ Technical assistance to capture

bears, transport and health assistance

for the animals captured and their

relocation to other hunting funds from

Sinaia FC 25/AT pentru capturarea

urşilor, asistarea transportului şi a

sănătăţii animalelor capturate si

relocarea acestora din FC 25 Sinaia

în alte fonduri cinegetice

private funds Prahova Forest

Administration

0.65 0.65

F119 01-2009 12-2009 Ramon JURJ CPS Capturing,tranquilizing and

relocating bears of the public domain

in Sinaia area/CPS Capturarea,

tranchilizare si relocarea urşi de pe

domeniul public din zona Sinaia

private funds Sinaia Town

Hall

1.08 1.08

F120 01-2007 12-2010 Georgeta

IONESCU

Research on beaver eco-ethology in

Romania /Cercetari privind eco-

etologia castorului in Romania

PNCDI 2 -

Partnerships

MECTS -

CNMP

91.72 91.72

F121 01-2006 12-2010 Ovidiu

IONESCU

Research regarding forest and wildlife

management in protected

areas/Cercetări privind

managementul silvocinegetic în ariile

protejate

MADR

Sectorial

Research

Programme

MADR 86.40 86.40

F122 01-2008 12-2010 Ovidiu

IONESCU

Development of a research center

and conservation,at European Union

standards,of large carnivores in

protected areas

Romania/Dezvoltarea unui centru de

cercetare si conservare, de nivel

european, a carnivorelor mari in ariile

protejate din Romania

PNCDI 2 -

Partnerships

MECTS -

CNMP

107.75 107.75

Page 49: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F123 01-2007 12-2010 Ovidiu

IONESCU

Scientific study for creating a model to

implement Natura 2000 legislation in

Romania, taking as a case study

species listed in the Habitats Directive

92/43/EEC (Annex

II)/Fundamentarea ştiinţifică a unui

model de implementare a legislaţiei

Natura 2000 în România, luând ca

studiu de caz speciile de animale

listate în Directiva Habitate

92/43/EEC (Anexa II)”

PNCDI 2 -

Partnerships

MECTS -

CNMP

19.22 19.22

F124 01-2010 12-2010 Ramon JURJ Consulting and technical assistance

on capturing bears/Consultanţă şi

asistenţă tehnică privind capturare

urşi

POS MEDIU RNP-Romsilva 2.28 2.28

F125 01-2008 12-2011 Claudiu

Pașca

Phenotypic and genetic

characterization appreciation,with

molecular techniques of the wild boar

(Sus scrofa ferus) population, with

identifying the impact on ecosystems

of the area to avoid genetic

vulnerability of the

species/Aprecierea fenotipica si

caracterizarea genetica prin tehnici

moleculare a unor populaíi de mistreti

Sus scrofa ferus cu stabilirea

factorilor de impact asupra

ecosistemelor din areal pentru

evitarea vulnerabilitatii genetice a

speciei

PNCDI 2 -

Partnerships

MECTS -

CNMP

10.72 10.72

Page 50: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F126 01-2009 12-2011 Ion Cristea Assessment of genetic variability

distribution and characterization of

salmonids in Romania/Evaluarea

distributiei si caracterizarea

variabilitatii genetice la salmonidele

din Romania

private funds Faculty of

Biology,

University of

Bucharest

23.47 23.47

F127 04-2007 10-2007 Adorjani

Andrei

Erosion control and watershed

management from forested

areas/Combaterea eroziunii solului şi

amenajarea bazinelor hidrografice

torenţiale în patrimoniul silvic

private funds INHGA 54.65 54.65

F128 09-2007 11-2007 Davidescu

Şerban

Study regarding land use, alongshore

drift and erosion control works in the

forested areas of Banat region

watersheds/Studiu privind folosinţa

terenurilor şi efluenţa aluviunilor şi

lucrările de CES din fond silvic în

bazinul Banat

private funds Aquaproiect SA 19.37 19.37

F129 09-2007 11-2007 Ungurean

Cezar

Study regarding land use, alongshore

drift and erosion control works in the

forested areas of Somes river

watershed and Tisa river

watershed/Studiu privind folosinţa

terenurilor şi efluenţa aluviunilor şi

lucrările de CES din fond silvic în

bazinul Someş-Tisa

private funds Aquaproiect SA 17.59 17.59

Page 51: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F130 09-2007 11-2007 Adorjani

Andrei

Study regarding land use, alongshore

drift and erosion control works in the

forested areas of Olt river

watershed/Studiu privind folosinţa

terenurilor şi efluenţa aluviunilor şi

lucrările de CES din fond silvic în

bazinul Olt

private funds Aquaproiect SA 33.20 33.20

F131 09-2007 03-2008 Constandach

e Cristinel

Afforestation anthropic polluted,

degraded lands inside the

ArcelorMittal SA Galaţi/Împădurirea

terenurilor poluate, degradate

antropic din incinta ArcelorMittal SA

Galaţi

private funds ArcelorMittal

Galati

6.98 6.98

F132 11-2007 03-2008 Ungurean

Cezar

Coblesului Valley watershed

management/Corectarea torenţilor

din BH Valea Cobleşului

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 1.94 1.94

F133 11-2007 03-2008 Ungurean

Cezar

Mica Valley watershed

management/Corectarea torenţilor

din BH Valea Mică

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.76 2.76

F134 02-2007 10-2008 Florin

Dănescu

Study regarding oak dying in state

forests, County Forest Administration

Satu Mare/Studiu privind uscarea

anormală a stejarului în pădurile

proprietate publică a statului în DS

Satu Mare

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 12.87 12.87

F135 09-2008 10-2008 Ungurean

Cezar

Renewing calamited forest road

Saltruc, Forest District Frasin/

Refacerea drumului forestier

calamitat Sălătruc, O.S. Frasin

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 9.82 9.82

Page 52: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F136 09-2008 10-2008 Ungurean

Cezar

Renewing calamited forest road

Voevodeasa, Forest District

Marginea/ Refacerea drumului

forestier calamitat Voevodeasa, O.S.

Marginea

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 5.12 5.12

F137 09-2006 11-2008 Constandach

e Cristinel

Ecological restoration and sustainable

management of degraded land by

depth erosion and / or landslides in

Moldova area/Reabilitarea ecologică

şi managementul durabil al zonelor

cu terenuri afectate de ravene şi/sau

alunecări de teren din Moldova

CEEX-Mener CCDCES 348.80 34.90

F138 09-2008 11-2008 Ungurean

Cezar

Restoration of degraded lands of

Mărtiniş bad land perimeter, Mărtiniş

locality, Harghita County/Perimetrul

de ameliorare Mărtiniş, loc. Mărtiniş,

jud. Harghita

private funds ITRSV Brasov 6.13 6.13

F139 01-2008 12-2008 Adorjani

Andrei

Garda Seaca Valley watershed

management/Corectarea torenţilor

din b.h. Garda Seaca

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 1.77 1.77

F140 01-2008 12-2008 Adorjani

Andrei

Documentation for renewing calamity

forest road SALATRUC/Documentatii

Reabilitare drumuri forestiere

calamitate SALATRUC

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 36.11 36.11

F141 01-2008 12-2008 Anastasiu

Costică

Afforestation of degraded lands Vaslui

County/Impadurire terenuri degradate

Vaslui

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.42 4.21

Page 53: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F142 01-2007 12-2008 Dinca Lucian Defining, evaluating and the risks for

Romania’s forest- CLIDOIN/Definirea,

evaluarea şi zonarea riscurilor pentru

pădurile României

CEEX-Mener MECTS -

CNMP

418.00 271.00

F143 01-2006 12-2008 Mihaila Elena Alternative technologies on

substitution of gazeous fuels and

utilization in a durable manner both

forestry resources and

coals/Tehnologii alternative de

înlocuire a combustibililor gazoşi prin

utilizarea durabilă combinată a

resurselor forestiere şi de cărbune

CEEX-

Relansin

Bucharest

Polytehnic

University

30.23 30.23

F144 01-2008 12-2008 Ungurean

Cezar

Talus consolidation on DJ

122/Consolidare taluz DJ 122

private funds County council

Covasna

3.43 3.43

F145 01-2008 12-2008 Ungureanu

Cezar

Moeciu Valley watershed

management, Brasov

County/Corectarea torenţilor din b.h.

Moeciu

private funds City hall Bran 4.65 4.65

F146 01-2008 12-2008 Ungureanu

Cezar

Ecological reconstruction on Mărtiniş

bad land perimeter, Harghita

County/Reconstrucţie ecologică în

perimetrul Mărtiniş

private funds ITRSV Brasov 6.01 6.01

F147 01-2006 12-2009 Adorjani

Andrei

Teascul Mare creek and Teascul Mic

creek watershed management,

Clabucet area, Brasov

County/Corectarea torentilor paraul

Teascul Mare, Teascul Mic din zona

Clabucet

private funds City hall

Predeal

3.32 3.32

Page 54: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F148 01-2006 12-2009 Anastasiu

Costică

Ecological reconstruction works on

degraded lands DS Tulcea/Lucrari de

reconstructie ecologica pe terenuri

degradate DS Tulcea

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 6.92 6.92

F149 01-2006 12-2009 Anastasiu

Costică

Ecological reconstruction on

degrdaded lands DS

Vaslui/Reconstructie ecologica pe

terenuri degradate DS Vaslui

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 12.82 12.82

F150 01-2006 12-2009 Gancz Corina Stational study/Studiu stational RNP -

ROMSILVA

RNP-Romsilva 7.39 7.39

F151 01-2006 12-2009 Greavu

Manole

Study on establish ecological

reconstruction technologies of

declining forest in Danube Delta

embanked areas/Studiu privind

stabilirea tehnologiilor de

reconstrucţie ecologică a pădurilor în

declin din incintele din Delta Dunării

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 34.88 34.88

F152 01-2010 02-2010 Ungurean

Cezar

Moeciului Valley watershed

management, Brasov

County/Amenajarea BH Valea

Moeciului

private funds OVITOPO SRL 1.11 1.11

F153 03-2010 04-2010 Ungurean

Cezar

Fenis Valley and Racilor Valley forest

roads protection against water flows,

Brasov County/Protejarea drumurilor

forestiere Valea Feniş şi Valea

Racilor împotriva viiturilor torenţiale

private funds UAT Augustin 4.43 4.43

Page 55: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F154 03-2010 04-2010 Ungurean

Cezar

Hotarelor Valley and Remetea Valley

forest roads protection against water

flows, Brasov County/Protejarea

drumurilor forestiere Valea Hotarelor

şi Valea Remetea împotriva viiturilor

torenţiale

private funds UAT Comuna

Apaţa

3.04 3.04

F155 04-2011 05-2010 Ungurean

Cezar

Project concerning the enclosure and

development of Brebina hunting

complex, Brasov County/Proiect de

împrejmuire şi amenajare a

complexului de vînătoare Brebina

private funds RPLP Piatra

Craiului

4.33 4.33

F156 05-2010 06-2010 Ungurean

Cezar

Garda Seaca Valley watershed

management -revision/Corectarea

torentilor din BH Garda Seaca -

reproiectare

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.43 2.43

F157 06-2010 07-2010 Ungurean

Cezar

Forest management study for park-

like forest, compartment 63% Socola

forest, Management Unit II

Băneasa/Studiu de amenajare în

pădure parc u.a. 63% din trupul de

pădure Socola, UP II Băneasa

private funds SC Masterange

Romania SRL

2.21 2.21

Page 56: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F158 04-2010 10-2010 Constandach

e Cristinel

Stational study to substantiate the

technical solutions for ecological

restoration of land affected by

landslides from forest managed by

Forestry Department of Suceava,

Forestry Districts Brodina and

Falcau/Studiu stational pentru

fundamentarea soluţiilor tehnice de

reconstrucţie ecologică a unor

terenuri afectate de alunecări din

fond forestier, administrate de

Direcţia Silvică Suceava, Ocolul Silvic

Brodina şi Ocolul Silvic Falcau

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 3.49 3.49

F159 01-2010 12-2010 Adorjani

Andrei

Garda Seaca Valley watershed

management - ob. 1/Corectarea

torentilor din BH Garda Seaca - ob1

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.43 2.43

F160 01-2008 12-2010 Costăchescu

Corneliu

Extension of the output of researche

for the prevention of climate aridity

through the establishment of

shelterbelts in south of Oltenia Region

and researche on the influence of

these shelterbelts upon local climate

and agricultural crops/Extensia

rezultatelor cercetării pentru

prevenirea / combaterea aridizării

climei prin crearea de perdele

forestiere de protecţie a câmpului în

sudul Olteniei şi cercetări privind

efectul instalării acestora asupra

MAKIS MADR 254.65 254.65

Page 57: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F161 01-2010 12-2010 Davidescu

Şerban

Tiganilor Valley watershed

management, Bihor

County/Amenajarea bazinului

hidrografic torential Valea Tiganilor

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 6.92 6.92

F162 01-2010 12-2010 Gancz Corina Stational study OS Racari/Studiul

stational OS Racari

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.07 2.07

F163 01-2006 12-2010 Mihaila Elena Researches on type of agroforestry

systems in Romania/Studii privind

dezvoltarea sistemelor agrosilvice în

România

MADR

Sectorial

Research

Programme

MADR 149.50 149.50

F164 01-2010 12-2010 Ungurean

Cezar

Hotarelor Valley and Remetea Valley

forest roads protection against water

flows, Brasov County/Protejarea

drumurilor forestiere Valea Hotarelor

si Valea Remetea impotriva viiturilor

torentiale

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 3.04 3.04

F165 06-2011 08-2011 Davidescu

Şerban

Renewing of the Ciotorogu forest

road, Caras Severin County/Refacere

drum forestier Ciotorogu

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 3.58 3.58

F166 07-2011 08-2011 Ungurean

Cezar

Forest reconstruction on degraded

land in Mărtiniş perimeter, Harghita

County/Reconstruţie ecologică pe

terenuri degradate în perimetrul de

ameliorare Mărtiniş

private funds ITRSV Brasov 5.16 5.16

F167 05-2011 09-2011 Ungurean

Cezar

Renewing of the Siriu axial forest road

- feasibility study revision/Drum auto-

forestier Siriu axial

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 2.78 2.78

Page 58: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F168 01-2006 11-2011 Anastasiu

Costică

Study concerning the substitution of

hybrid black poplar stands on Prut

meadow and reversing to natural

forest type/Studiu privind substituirea

arboretelor de plop euramerican din

Lunca Prutului şi revenirea la tipul

natural fundamental

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 34.90 34.90

F169 01-2008 11-2011 Guiman

Gheorghe

Dog rose, seadbuckthorn and elder

biotypes selection of the spontaneous

flora, to create germplasm fund -

support for reconstruction of

degraded lands and climat effects

mitigation/Selecţia biotipurilor de

măceş, cătină şi soc din flora

spontană, în vederea constituirii

fondului de germoplasmă - suport

pentru reconstrucţia ecologică a

terenurilor degradate şi diminuarea

efectelor climatice

PNCDI 2 -

Partnerships

MECTS -

CNMP

6.98

F170 01-2005 12-2007 Chira Danut Main factors that produce decline of

deciduous and coniferous species,

establishing management solutions

stands/Cercetări privind factorii care

produc uscarea la principalele specii

de foioase şi răşinoase, cu stabilirea

soluţiilor de gestionare a arboretelor

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

Page 59: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F171 01-2005 12-2007 Chira

Florentina

Detection, prevention and control of

nutritional diseases in nurseries and

plantations/Cercetări privind

depistarea, prevenirea şi combaterea

bolilor de nutriţie în pepiniere şi

plantaţii

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

F172 01-2005 12-2007 Ciornei

Constantin

Research on knowledge of biology,

ecology and development of methods

for detecting, forecasting and

integrated control of species from

Noctuidae family in oaks

forests/Cercetări privind cunoaşterea

biologiei, ecologiei şi elaborării unor

metode de depistare, prognoză şi

combatere integrată a speciilor de

noctuide defoliatoare în pădurile de

cvercinee

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 11.99 11.99

F173 01-2005 12-2007 Ciornei

Constantin

Viral preparations in relation with the

treatments used in the control of

defoliating insects

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

F174 01-2005 12-2007 Ioan Tăut Technical assistance on disease

prevention and control of forest

cultures/AT privind prevenirea şi

combaterea bolilor din culturile silvice

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

F175 01-2005 12-2007 Mihalciuc

Vasile

Research on insect bio-ecology of

pine stands, the application of

appropriate preventive and control

measures/Cercetări privind bio-

ecologia insectelor dăunătoare de

tulpină din arboretele de pin, în

vederea aplicării măsurilor adecvate

de prevenire şi combatere

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

Page 60: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F176 01-2007 12-2007 Mihalciuc

Vasile

Integrated pest management and

dynamic study of the hamful species

in resinous stand affected by windfall

and snowbreak/Combaterea integrată

a dăunătorilor de tulpină ai

răşinoaselor din zonele afectate de

doborâturi şi rupturi de vânt sau de

zăpadă

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

F177 01-2006 12-2007 Netoiu

Constantin

Improve application technology of

ultra low volume treatments (ULV)

against forest pests/Perfecţionarea

tehnologiilor de aplicare a

tratamentelor cu volum ultra redus

(ULV) împotriva dăunătorilor

forestieri

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 11.99 11.99

F178 01-2004 12-2007 Olenici

Nicoale

Quantification of Hylobius abietis

attack risk and protective measures in

different resinous cultures of D.S.

Suceava/AT privind cuantificarea

riscului de atac de Hylobius abietis şi

diferenţierea măsurilor de protecţie în

culturile de răşinoase din Direcţia

Silvică Suceava

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

F179 01-2006 12-2007 Olenici

Nicoale

Pristiphora abietina, biology,

prognosis and pest

management/Cercetări privind

biologia, prognoza şi combaterea

dăunătorului Pristiphora abietina

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 8.99 8.99

F180 01-2007 12-2007 Vals

Salvatore

Detection, prognosis and biology of

Nycteola asiatica L. /Cercetari privind

depistarea, prognoza, biologia si

combaterea daunatorului Nycteola

asiatica L.

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 11.99 11.99

Page 61: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F181 01-2007 12-2008 Chira

Florentina

Emerging fungi that threaten forest

plants/Ciuperci emergente care

ameninţă plantele forestiere

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 18.52 18.52

F182 01-2005 12-2008 Ciornei

Constantin

Influence of pesticides on the

ecological balance in oaks forests

affected by diseases and

pests/Influenţa utilizării de durată a

pesticidelor asupra echilibrului

ecologic în pădurile de cvercinee

afectate de boli şi dăunători

(Influence of pesticides on the

ecological balance in oaks forests

affected by diseases and pests

CEEX-Agral Institute of

biological

research Iasi

0.00 69.80

F183 01-2006 12-2008 Ioan Tăut Prognosis, biology and control of

Lymantria dispar in beech

stands/Cercetări privind depistarea,

prognoza, biologia şi combaterea

defoliatorului Lymantria dispar în

arboretele cu fag

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 22.79 22.79

F184 01-2007 12-2008 Mihalciuc

Vasile

Population dynamics of Lymantria

monacha across resinous stands and

timely alert to the appearance of

gradations/Studiul dinamicii

populaţiilor de Lymantria monacha în

cuprinsul arboretelor de răşinoase, în

vederea semnalării în timp util a

apariţiei gradaţiilor defoliatorului

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 19.94 19.94

Page 62: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F185 01-2007 12-2008 Olenici

Nicoale

Ips typographus and Hylobius abietis

response at different rates of release

of alpha pinene in combination with

aggregation pheromone manly

ethanol/Cercetări privind răspunsul

adulţilor de Ips typographus şi

Hylobius abietis la diferite rate de

eliberare a alfa-pinenului în

combinaţie cu feromon agregativ,

respectiv cu etanol

CEEX - Grant MECTS -

ANCS

54.42 54.42

F186 01-2006 12-2008 Vals

Salvatore

Research on the detection, prognosis,

biology and pest management of

Pygaera anastomosis L. in the

Danube Delta/Cercetări privind

depistarea, prognoza, biologia şi

combaterea dăunătorului Pygaera

anastomosis L. în arboretele din

Lunca şi Delta Dunării

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 25.64 25.64

F187 01-2007 12-2009 Bârcă Mihai Population control by pheromone

method in early outbreaks of

Lymantria dispar/Perfecţionarea

metodei feromonale de control

populaţional in focarele incipiente de

Lymantria dispar

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 29.31 29.31

F188 01-2007 12-2009 Bolea

Valentin

Integrated and biological control of

chestnut and oak

cancer/Combaterea integrată,

silviculturală şi biologică, a cancerului

castanului şi gorunului (II)

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 37.31 37.31

Page 63: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F189 01-2007 12-2009 Chira Danut European Network of emerging

diseases and threats through invasive

alien species in forest ecosystems

FP6 EU 380.80 13.84

F190 01-2007 12-2009 Chira Danut Infrastructure renewal and expansion

of laboratories for the study and

monitoring of forest

ecosystems/Modernizarea şi

extinderea infrastructurii

laboratoarelor pentru studiul şi

monitorizarea ecosistemelor

forestiere

PNCDI 2 -

Capacities

MECTS -

ANCS

498.61 498.61

F191 01-2009 12-2009 Chira

Florentina

Detection, disease prevention and

control of nurseries and forest

plantations/Depistarea, prevenirea şi

combaterea bolilor de pepiniere şi

plantaţii

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 3.54 3.54

F192 01-2008 12-2009 Chira

Florentina

Establishing the creditworthiness of

land taken out of the forest for hydro

Balea Valley, loc. Cârţişoara, Sibiu

County and those offered in

compensation/Studiu de stabilire a

bonităţii terenurilor ce se scot din

fondul forestier pentru Amenajare

hidroenergetică pe Valea Bâlea, loc.

Cârţişoara, jud. Sibiu şi a celor oferite

în compensare

private funds Forum

Development

SRL

4.57 4.57

F193 01-2009 12-2009 Ciornei

Constantin

Integrated control of invasive insect

species in deciduous

forests/Combaterea integrală a

speciilor de insecte invazive din

păduri de foioase

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 11.80 11.80

Page 64: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F194 01-2007 12-2009 Ciornei

Constantin

Methods and products for biological

control and integrated pest in

nurseries and greenhouses/Metode şi

produse noi de combatere biologica

şi integrată a dăunătorilor din

pepiniere şi solarii

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 39.97 39.97

F195 01-2009 12-2009 Mihalciuc

Vasile

Pest presence in forest stands and

nurseries/Stabilirea prezenţei

dăunătorilor din arborete – pepiniere

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 3.54 3.54

F196 01-2009 12-2009 Mihalciuc

Vasile

The sanitary condition of resinous

stands and protection measures

against pest insect/Starea sanitara a

rasinoaselor si masurile de protectie

impotriva insectelor daunatoare

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 0.63 0.63

F197 01-2007 12-2009 Netoiu

Constantin

Technical assistance in detection,

prognosis and combat defoliants

beetle Stereonichus fraxini/AT privind

revizuirea reţelei de monitoring

amplasată în arboretele de răşinoase,

pentru supravegherea evoluţiei

populaţiilor defoliatorului Lymantria

monacha din zona I de vulnerabilitate

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 27.78 27.78

F198 01-2006 12-2009 Olenici

Nicoale

Study on identification of invasive

alien insect species in

Romania/Studiu privind identificarea

speciilor de insecte străine invasive

din România

MADR

Research

Programme

MADR 67.96 67.96

Page 65: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F199 01-2007 12-2009 Tomescu

Romică

Management of virgin beech forests

at Nera region in Romania and the

Walloon Region - Belgium/Făgetul

virgin Nera şi gestionarea făgetelor în

România şi Regiunea Valonă –

Belgia

MADR

Research

Programme

MADR 49.57 49.57

F200 01-2008 12-2010 Bârcă MIhai Improvement of technology in

detection of Geometridae family and

prognosis of the attack that can be

produced by them/Îmbunătăţirea

tehnologiei de depistare a

dăunătorilor din speciile de

Geometridae şi prognoza atacurilor

ce pot fi produse de aceştia

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 14.94 14.94

F201 01-2009 12-2010 Ciornei

Constantin

Integrated management of root pest

in nurseries and greenhouses/AT

privind combaterea integrată a

dăunătorilor de rădăcină din

pepiniere şi solarii

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 19.08 19.08

F202 01-2010 12-2010 Ciornei

Constantin

Development of technologies for bio

preparates inoculated to protect

forest land from pests

attack/Elaborarea tehnologiilor de

obţinere şi aplicare a biopreparatelor

inoculante, destinate protecţiei

culturilor forestiere, faţă de atacul

dăunătorilor de sol

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 4.84 4.84

Page 66: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F203 01-2007 12-2010 Ciornei

Constantin

Arrangement impact of Prut meadow

and solutions for rehabilitation of the

area to preserve the genetic potential

of natural resources and

biodiversity/Evaluarea efectelor

amenajarii luncii inferioare a Prutului

pentru conservarea potentialului

genetic al resurselor naturale si a

biodiversitatii in vederea identificarii

unor solutii de reabilitare a zonei

PNCDI 2 -

Partnerships

MECTS -

CNMP

0.00 49.40

F204 01-2007 12-2010 Mihalciuc

Vasile

Aerosol generator to protect plants

against pests and diseases based on

the technologies developed and used

in aviation industry/Generator de

aerosol pentru protectia plantelor

împotriva bolilor şi dăunătorilor

conceput şi realizat pe baza

tehnologiilor utilizate în industria

aeronautică

PNCDI 2 -

Partnerships

MECTS -

CNMP

0.00 9.79

F205 01-2006 12-2010 Tomescu

Romică

Nera Virgin Beech forest and

sustainable management of beech

forests in Wallon Region

Co-operation

Programme

Between

Flanders and

the Candidate

Member

States

in Central and

Eastern

Europe

Reg. Valonă,

Univ. Catolică

Louvain,

MADR

113.20

Page 67: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F206 01-2009 12-2010 Vals

Salvatore

Detection, prognosis and control of

Pygaera anastomosis on poplar

plantations in the meadow of the

Danube Delta/AT privind depistarea,

prognoza şi combaterea dăunătorului

Pygaera anastomosis în plantaţiile de

plopi din Lunca şi Delta Dunării

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 19.13 19.13

F207 01-2009 12-2011 Mihalciuc

Vasile

Technical assistance on the review of

the monitoring network located in

resinuos stands , for overseeing the

development of Lymantria monacha

populations in vulnerability area/AT

privind utilizarea preparatelor virale în

combaterea principalelor insecte

defoliatoare la foioase

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 23.82 23.82

F208 10-2005 05-2008 Gancz

Vladimir

Models for Evaluation and

Forecasting of pollutants Impact and

Climate Change on Forest

Vegetation/Modele pentru evaluarea

si predictia impactului poluantilor si

schimbarilor climatice asupra

fondului forestier (FORMEPI)

CEEX-Ceres National

Institute of

research and

development of

optoelectronics

98.93 98.93

F209 10-2005 09-2008 Gancz

Vladimir

Spatial Data Infrastructure for

Environmental Protection

Applications/Infrastructuri de date

spatiale pentru aplicatii de protectia

mediului (INSPAM)

CEEX Romanian

space agency

23.26 23.26

Page 68: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F210 10-2005 10-2008 Gancz

Vladimir

Building of National Network and an

Integrated Management Information

System Concerning Use and Land

Cover as Support for GMES

applications/Realizarea unei retele

nationale si a unui sistem

informational unificat pentru

managementul informatiilor despre

acoperirea si utilizarea terenului in

sprijinul dezvoltarii aplicatiilor GMES

(LUCIUS)

CEEX Romanian

space agency

58.14 58.14

F211 05-2007 11-2009 Lorent Adrian Technical asistance for GIS

databases building for protected

areas managed by RNP (National

Forest Authority)/Asistenta tehnica

privind realizarea bazei de date GIS

pentru ariile protejate administrate de

RNP-Romsilva

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 69.77 69.77

F212 09-2007 09-2010 Gancz

Vladimir

Developing of New Products Derived

from Satellite Data Adapted for Users

from Hydro-Meteorological Risk

Management Authorities/Dezvoltarea

de noi produse derivate din date

satelitare adaptate cerintelor

utilizatorilor din domeniul gestionarii

situatiilor de risc hidro-meteorologic

(RISCSAT)

PNCDI 2 -

Partnerships

MECTS -

CNMP

73.46 73.46

Page 69: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F213 09-2007 09-2010 Gancz

Vladimir

Monitoring and Forecasting

Evaluation of the Feedback Impacts

of the Climate Change on land

Use/Cover based on Sitellite and Bio-

Geophysiscs In Situ

Data/Monitorizarea si evaluarea

predictiva pentru Romania a

impactului feedbackurilor schimbarilor

climatice asupra utilizarii/acoperirii

terenurilor din date satelitare si

biogeofizice in situ (MOSATCLIM)

PNCDI 2 -

Partnerships

MECTS -

CNMP

65.11 65.11

F214 10-2006 12-2010 Petrila Marius Studies for Using Digital Very High

Spatial Resolution Ortho-Rectified

Imagery for Forest Management

Planning and Forestry Cadaster, for a

Test Area/Studiu privind utilizarea

ortofotoplanurilor bazate pe imagini

digitale de înaltă rezoluţie spaţială in

amenajarea padurilor si cadastru

forestier într-o zona test

MADR

Sectorial

Research

Programme

MADR 93.35 93.35

F215 02-2009 09-2011 Joita Apostol Applications and Basic Services for

Land Use Monitoring Using

Geospatial Data and

Technologies/Aplicatii si servicii de

baza pentru monitorizarea utilizarii

terenului folosind date si tehnologii

geospatiale (MUTER)

PNCDI 2 -

Partnerships

MECTS -

CNMP

34.88 34.88

Page 70: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F216 Ian.2009 Dec.2010 Ioana Nitu,

Viorica Achim

Use of digital photogrammetry in

forestry: building orthophotomaps,

1:5000 basic maps and digital terrain

model/Utilizarea fotogrammetriei

digitale in silvicultura: obtinerea

ortofotoplanurilor, a planurilor

topografice de bază la scara 1:5000

si a modelului digital al terenului

RNP -

ROMSILVA

Research

Programme

RNP-Romsilva 34.90 34.90

F217 Ian.2007 Dec.2007 Viorica Achim Geospatial database building and

digital maps for forest district Caiuti

RNP -

ROMSILVA

Research

RNP-Romsilva 20.90 20.90

F218 Ian.2007 Dec.2007 Viorica Achim Geospatial database building and

digital maps for forest district Pipirig

RNP -

ROMSILVA

Research

RNP-Romsilva 11.90 11.90

F219 Ian.2007 Dec.2007 Catalin

Stanciu

Geospatial database building and

digital maps for forest district Grivita

RNP -

ROMSILVA

Research

RNP-Romsilva 21.10 21.10

F220 Ian.2007 Dec.2007 Iulia Palaghiu Geospatial database building and

digital maps for forest district

Manastirea Casin

RNP -

ROMSILVA

Research

RNP-Romsilva 20.60 20.60

F221 Ian.2007 Dec.2007 Iulia Palaghiu Geospatial database building and

digital maps for forest district Tg.

Neamt

RNP -

ROMSILVA

Research

RNP-Romsilva 17.20 17.20

F222 Ian.2007 Dec.2007 Viorica Achim Geospatial database building and

digital maps for forest district

Dobrovat

RNP -

ROMSILVA

Research

RNP-Romsilva 16.90 16.90

F223 Ian.2007 Dec.2007 Viorica Achim Geospatial database building and

digital maps for forest district Romani

RNP -

ROMSILVA

Research

RNP-Romsilva 21.50 21.50

F224 Ian.2008 Dec.2008 Iulia Palaghiu Geospatial database building and

digital maps for forest district Strehaia

RNP -

ROMSILVA

Research

RNP-Romsilva 22.60 22.60

F225 Ian.2008 Dec.2008 Iulia Palaghiu Geospatial database building and

digital maps for forest district Traian

RNP -

ROMSILVA

Research

RNP-Romsilva 29.90 29.90

F226 Ian.2008 Dec.2008 Ioana Nitu Geospatial database building and

digital maps for forest district Viseu

RNP -

ROMSILVA

Research

RNP-Romsilva 30.50 30.50

F227 Ian.2008 Dec.2008 Catalin

Stanciu

Geospatial database building and

digital maps for forest district

Fantanele

RNP -

ROMSILVA

Research

RNP-Romsilva 25.20 25.20

Page 71: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F228 Ian.2009 Dec.2009 Viorica Achim Geospatial database building and

digital maps for forest district Rasca

RNP -

ROMSILVA

Research

RNP-Romsilva 15.30 15.30

F229 Ian.2009 Dec.2009 Viorica Achim Geospatial database building and

digital maps for forest district Frasin

RNP -

ROMSILVA

Research

RNP-Romsilva 16.20 16.20

F230 Ian.2009 Dec.2009 Viorica Achim Geospatial database building and

digital maps for forest district Malini

RNP -

ROMSILVA

Research

RNP-Romsilva 19.60 19.60

F231 Ian.2009 Dec.2009 Ioana Nitu Geospatial database building and

digital maps for forest district

Padureni

RNP -

ROMSILVA

Research

RNP-Romsilva 17.90 17.90

F232 Ian.2009 Dec.2009 Ioana Nitu Geospatial database building and

digital maps for forest district Orsova

RNP -

ROMSILVA

Research

RNP-Romsilva 31.90 31.90

F233 Ian.2009 Dec.2009 Catalin

Stanciu

Geospatial database building and

digital maps for forest district Babeni

RNP -

ROMSILVA

Research

RNP-Romsilva 24.20 24.20

F234 Ian.2009 Dec.2009 Anca Dumitru Geospatial database building and

digital maps for forest district Brosteni

RNP -

ROMSILVA

Research

RNP-Romsilva 28.80 28.80

F235 Ian.2010 Dec.2010 Viorica Achim Geospatial database building and

digital maps for forest district

Marginea

RNP -

ROMSILVA

Research

RNP-Romsilva 23.60 23.60

F236 Ian.2010 Dec.2010 Viorica Achim Geospatial database building and

digital maps for forest district

Miercurea Sibiului

RNP -

ROMSILVA

Research

RNP-Romsilva 19.30 19.30

F237 Ian.2010 Dec.2010 Ioana Nitu Geospatial database building and

digital maps for forest district Slanic

RNP -

ROMSILVA

Research

RNP-Romsilva 21.60 21.60

F238 Ian.2010 Dec.2010 Ioana Nitu Geospatial database building and

digital maps for forest district Rastolita

RNP -

ROMSILVA

Research

RNP-Romsilva 27.30 27.30

F239 Ian.2010 Dec.2010 Catalin

Stanciu

Geospatial database building and

digital maps for forest district Caracal

RNP -

ROMSILVA

Research

RNP-Romsilva 26.60 26.60

F240 Ian.2010 Dec.2010 Catalin

Stanciu

Geospatial database building and

digital maps for forest district Borlesti

RNP -

ROMSILVA

Research

RNP-Romsilva 18.60 18.60

F241 Ian.2010 Dec.2010 Anca Dumitru Geospatial database building and

digital maps for forest district Borca

RNP -

ROMSILVA

Research

RNP-Romsilva 11.90 11.90

Page 72: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F242 Ian.2010 Dec.2010 Anca Dumitru Geospatial database building and

digital maps for forest district Lunca

Bradului

RNP -

ROMSILVA

Research

RNP-Romsilva 26.50 26.50

F243 05-2011 11-2011 Gheorghe

Marin

The development of the Land Use,

Land Use Change and Forestry

(LULUCF) sector of the National

Inventory of Emissions of

Greenhouse Gases in the 2011

reporting year, in accordance with its

obligations assumed as a Party to the

United Nations Framework

Convention on Climate Change

(UNFCCC) and the obligations

assumed as a Party to the Kyoto

Protocol (KP)/Elaborarea Sectorului

INEGES Folosinţa Terenurilor,

Schimbarea Folosinţei Terenurilor şi

Silvicultură (LULUCF) din raportarea

pe anul 2011, în acord cu obligaţiile

asumate în calitate de Parte la

Convenţia-Cadru a Naţiunilor Unite

asupra Schimbărilor Climatice

(UNFCCC) şi cu obligaţiile asumate

în calitate de Parte la Protocolul de la

Kyoto (KP)

MMP-

Research

Programme

MMP 34.03 34.03

Page 73: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority

F244 10-2011 11-2011 Gheorghe

MarinSupport for the implementation of the

EU requirements regarding the

monitoring and reporting of carbon

dioxide (CO2) emissions and other

greenhouse gases/Sprijin pentru

implementarea cerinţelor UE privind

monitorizarea şi raportarea emisiilor

de dioxid de carbon (CO2) şi ale altor

gaze cu efect de seră

MMP-

Research

Programme

MMP 28.84 28.84

EU

MECTS

CNMP

ANCS

CNCSIS

UEFISCDI

MMP

MAPM

MMDD

MADR

RNP

ICAS

ITRSV

European Union

Ministry of Education, Research, Youth and Sports

National Center for Program Management

Ministry of Agriculture and Rural Development

National Forest Administration

Forest Rearch and Management Institute

Regional Forestry Inspectorate

National Agencies for Scientific Research

National Council of Scientific Researc in Higher Education

Executive Unit for Financing Higer Education, Research Development and Innovation

Ministry of Environment and Forestry

Ministry of Waters and Environment Protection

Ministry of Environment and Sustainable Development

Page 74: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 75: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 76: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 77: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 78: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 79: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 80: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 81: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 82: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 83: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 84: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 85: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 86: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 87: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 88: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 89: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 90: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 91: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 92: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 93: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 94: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 95: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 96: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 97: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 98: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 99: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 100: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 101: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 102: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 103: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 104: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 105: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 106: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 107: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 108: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 109: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 110: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 111: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 112: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 113: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 114: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 115: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 116: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 117: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 118: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 119: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 120: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 121: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 122: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 123: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 124: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 125: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 126: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 127: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 128: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 129: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 130: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 131: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 132: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 133: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 134: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 135: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 136: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 137: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 138: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 139: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 140: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 141: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 142: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 143: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 144: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority
Page 145: Ongoing projects/contracts at the date of submission (from ... · Label CF# Start date (mm-yyyy)End date (mm-yyyy)Project leader Project title Call name Name of contracting authority