61
ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION YEAR ENDED DECEMBER 31, 2018

ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY

ANNUAL REPORT DOCUMENTATION

YEAR ENDED DECEMBER 31, 2018

Page 2: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

2

TABLE OF CONTENTS Page OPERATIONS & ACCOMPLISHMENTS 3 PROJECTS LIST 30 OPERATIONS & MAINTENANCE PLAN 32 CAPITAL BUDGET PLAN 33 ANALYSIS OF 2018 ACTUAL TO BUDGET RESULTS 34 OCWA MEASUREMENTS REPORT 37 MANAGEMENT SALARIES & BIOGRAPHIES 40 MANAGEMENT’S ASSESSMENT OF INTERNAL CONTROLS 42 CERTIFICATION OF EXECUTIVE DIRECTOR 43 AND FISCAL OFFICER DEBT SERVICE SCHEDULES 44 REAL PROPERTY REPORT APPENDIX

Page 3: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

3

OPERATIONS & ACCOMPLISHMENTS Introduction Onondaga County Water Authority’s (OCWA) Operations & Accomplishments Report for the fiscal year ended December 31, 2018 introduces the major activities that had an effect on the operations of the Authority and it also addresses the financial performance and status of OCWA. Operational Highlights Operations returned to a more normal pace in 2018 after the unusually active and transformative year experienced in 2017 when OCWA assumed the operation and maintenance of Onondaga County's Metropolitan Water Board / Onondaga County Water District (MWB). As we entered 2018 all Lake Ontario water system facilities and all former MWB personnel were fully integrated into OCWA and throughout this discussion benefits of the consolidation are recognized. It should be noted, based on cost savings generated by the consolidation, the Authority did not raise water rates for 2018 after annual rate increases being implemented from 2001-2017. Although rates were not increased for 2018, OCWA did see an increase in water sales revenues, the nature of which will be discussed below. OCWA's oversight of MWB’s CARE project took a turn in 2018, when it was determined the installation of Variable Frequency Drives (VFDs) for the three new raw water pumps and the three new clearwater pumps employed by the Lake Ontario water treatment plant. In addition to obtaining the projected energy savings anticipated by the energy performance contract, the installation of the VFDs will lead to more flexible operations and enhanced operations that will have a positive impact on water quality. By the end of January 2018 all Lake Ontario facility controls systems and all former MWB employees had been fully integrated into the OCWA system. The combined systems are now operated with 8 fewer employees than the total staffing required to operate two separate systems and the downsizing was achieved through attrition. In spite of the reduction in the number of employees, overall distribution operations and facilities maintenance were greatly enhanced by pulling together strengths of two, formerly separate, operations together under one roof. Early in 2018 OCWA successfully completed the replacement Marcellus water treatment plant fluoride delivery system, which was funded by a NYS Health Department grant. Building on the success of the Marcellus application, OCWA applied for and was awarded a grant to undertake a similar project at the Lake Ontario plant. Work on the Lake Ontario plant project was started late in 2018 and completion is slated for completion early in 2019. Combined, the two awards are saving OCWA rate payers $1.4 million for the improvements at both plants.

Page 4: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

4

Service Area The Water System supplies water for domestic, commercial and industrial uses and for fire protection in part or all of 35 towns/cities and 15 villages in Onondaga County (outside the City of Syracuse), and in parts of the Counties of Oswego, Madison, Oneida and Cayuga.

The area served in Onondaga County includes the major portion of the Towns of Camillus, Cicero, Geddes and Salina, as well as parts of the Towns of Clay, DeWitt, Lysander, Manlius, Marcellus, Onondaga, Lafayette, Pompey, Elbridge, Van Buren, Otisco, Spafford, and Skaneateles. Additionally, the Authority serves in Onondaga County the Villages of Camillus, Fayetteville, Liverpool, Manlius, Minoa, North Syracuse, Baldwinsville, East Syracuse, Marcellus, and Solvay. In Oswego County the Authority serves the Villages of Central Square and Phoenix and the Towns of Hasting, West Monroe, Constantia, Hannibal, Granby, Minetto, Oswego, Volney and Schroeppel. The Authority also has provides intermittent service in Oswego County to the City of Fulton and the Town of Scriba. In Madison County the Authority serves the Villages of Canastota and Chittenango and parts of the Towns of Sullivan, Lenox and Lincoln. In Oneida County the Authority serves the Village of Sylvan Beach and parts of the Towns of Vienna, Verona and Annsville. In Cayuga County the Authority serves part of the Town of Sterling.

As of December 31, 2018, the Authority is providing water services directly to 95,100 residential accounts, 6,680 commercial accounts, 49 industrial accounts, and 18 wholesale accounts. The estimated population of the residential units (including wholesale residential customers) served was 500,000. For all of 2018 OCWA added at total of 546 accounts (209 metered services). Heading in to 2019 OCWA and the communities it serves has 23 development projects in various stages, which upon build out will add approximately 200 new residential customers. Additionally, Town water projects are at various stages in the Towns of Constantia, Granby, Volney, Sullivan, Hasting, Schroeppel and Parish, that if completed, has the potential to add well over 1,000 residential and commercial accounts to the system.

Page 5: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

5

Source of Supply

For 2018 46.3% of the water supply of the Water System was drawn from the Authority’s source at Otisco Lake, 50.5% was provided by the Lake Ontario supply (which is now under OCWA management) and 3.2% was purchased from the City of Syracuse's Skaneateles Lake supply OCWA now directly manages over 95% of its available water source which provided 96.8% of OCWA's 2018 water demand.

The 15 largest industrial customers within these areas, served directly by the Water System, in

order of usage, are:

Customer 2018 Consumption (in Gallons) % of Industrial Sales % of All Sales Solvay Paperboard 813,270,000 31.61% 7.18% Anheuser Busch 608,190,000 23.64% 5.37% Sunoco, Inc. R&M 256,939,000 9.99% 2.27% Clinton Ditch Co-op 133,500,000 5.19% 1.18% Crucible Steel 132,233,000 5.14% 1.17% Bristol Labs 118,860,000 4.62% 1.05% Queensboro Farms 65,380,000 2.54% 0.58% Carr St. (Co-Gen) 47,430,000 1.84% 0.42% Frazer Jones 42,480,000 1.65% 0.37% Community General 38,440.,000 1.49% 0.34% Covanta Onondaga LP 37,680,000 1.46% 0.33% Chemtrade Solutions Inc. 36,380,000 1.41% 0.32% Meadowbrook Treatment Plant 33,998,000 1.32% 0.30% Ameripride Linen & Apparel 25,120,000 0.98% 0.22% Lockheed Martin 24,830,000 0.97% 0.22% TOTAL TOP 15 SALES 2,340,707,000 95.82% 21.59% TOTAL INDUSTRIAL SALES 2,572,973,000 TOTAL ALL SALES 11,333,108,000

Page 6: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

6

The following tabulation shows, for recent years, the average daily quantity of water from the various sources of supply.

WATER OBTAINED FROM SOURCES OF SUPPLY (Average Gallons Per Day)

YEAR OTISCO LAKE LAKE ONTARIO CITY OF SYRACUSE

SOURCES TOTAL

2005 17,632,897 26,381,390 529,506 44,550,662

2006 16,772,679 21,263,156 482,810 38,524,849

2007 16,671,945 23,305,208 562,342 40,599,057

2008 16,516,595 21,568,024 453,729 38,545,505

2009 15,994,000 19,595,000 1,226,000 36,815,000

2010 16,778,016 19,203,734 1,306,120 37,287,870

2011 17,283,745 18,538,652 1,410,433 37,232,830

2012 17,246,609 19,816,303 1,163.298 38,226,210

2013 16,951,128 18,173,547 1,005,002 36,134,410

2014 17,543,150 18,637,823 1,125,978 36,859,446

2015 18,495,274 19,304,753 1,108,937 38,913,712

2016 17,774,549 19,300,844 1,123.209 38,202,724

2017 17,036,277 18,166,282 1,295,019 36,497,578

2018 17,274,000 19,115,000 1,200,000 37,589,000

1 In 2009, the City of Syracuse, the MWB and the Authority agreed to modify their respective responsibilities for the operation and maintenance of certain regional water facilities (the Southern Branch system), with the Authority assuming responsibility for the operation and maintenance and the parties agreeing the Authority would purchase water directly from the City rather than from MWB (who had purchased the water from the City under the prior arrangements). As a result, the amount of water purchased from MWB decreased and the amount purchased from the City increased by an equal amount, but the source of the water had not changed.

Condition of Properties: Inspections of the visible physical plant of the Water System show it generally to be in good operating condition and well maintained. All structures are of substantial construction. The chemical properties of Otisco Lake Reservoir water are such that corrosion and tuberculation of underground piping is practically non-existent, and pipes in the ground for over 75 years have almost the same carrying capacities today as when new. Water System water losses are low, indicating a tight system with proper maintenance and control of leakage. The Water System has not realized any damage from any severe storms or flooding.

Adequacy of System: Since the acquisition of the Water System by the Authority in December 1955, improvements have been made to keep pace with demands. The Water System has adequate capacity to meet the peak demands of the Water System. The Authority’s Capital Reinvestment Program is designed to address problem areas in a prioritized manner as identified on an ongoing basis.

Quality Control: OCWA has been at the forefront of the industry being proactive in taking steps to improve and maintain the quality of the water above the state and federal mandates. The

Page 7: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

7

Authority has received numerous awards attesting to the exceptional quality of their water, including 20 consecutive years of compliance with the USEPA's Partnership for Safe Water for the Otisco Lake treatment plant and 4 consecutive years for the Lake Ontario treatment plant.

Present Water Sales: The metropolitan Syracuse area, which the Authority services, is well established as a major industrial, commercial and distribution center. Ample electrical power is available, and transportation facilities include a major railroad, major airlines, the New York State Barge Canal, the New York Thruway and Interstate Routes 81, 481 and 690. The area (which includes Onondaga County and other surrounding communities) has a diverse economic backbone of manufacturing and industrial facilities, educational institutions, and healthcare facilities. However, over the past decade the regional population has decreased slightly (less than 1%) and the area has seen a modest decrease in major industrial and manufacturing operations.

Nonetheless, the Authority has seen a steady increase in the number of its customers. The Authority has increased customer base through assuming operations of existing village and town water systems, operating newly constructed town water systems and through a moderate increase of new customers within its existing water service area. The Authority’s annual growth in its customer base has averaged 2% since 2000 and accelerated somewhat during 2008 and 2009 and again in 2013 due to acquisition of existing village and town water systems coupled with the construction of new town water systems. This follows a growth rate during the 1990’s that was a modest 1% per year. Also, over the past five years, the Authority’s large customer base has remained stable in number with some fluctuation in overall use. At the same time, the Authority’s overall water sales have remained relatively flat due to the decrease in industrial and manufacturing operations and a nation-wide trend of water conservation.

The Authority expanded into Cayuga County during 2015 with an extension into the northeast portion of the Town of Sterling. By the end of December 2018, 53 of the possible 80 accounts in the area had been activated.

The Authority also maintains a pro-active maintenance department and leak detection department which allows the Authority to maintain high quality service and continue to operate the system in a sound economical manner. The Authority also continues its efforts to remain competitive through initiatives such as streamlining operations through increased automation and use of technology advancements.

The Authority remains at the forefront of innovation through in-house development of programs aimed at improving and protecting OCWA assets. OCWA's home grown all hazards (vulnerability) assessment platform assists with the Authority's ongoing asset management program. The vulnerability assessment program updates daily as opposed to every 5 years as presently required. The all hazards assessment program includes a cyber security component aimed at addressing regulations recently put in place by the New York State Department of Health (NYSDOH). It should be noted that OCWA is current with respect to submission of its five-year update of the vulnerability assessment with the new cybersecurity component was submitted to that is required to be submitted to NYSDOH. Another home-grown program developed by OCWA is its innovative digital platform designed to track hydrant maintenance. This program is also tied to OCWA's asset management and by the close of 2018 all hydrants

Page 8: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

8

maintenance performed was entered into the system using the new program. It is worth noting that the hydrant maintenance program has been recognized by numerous organizations for its innovative approach to asset management. During 2018 a valve maintenance program, that essentially uses the same platform as the hydrant maintenance program, was being deployed.

Water demand is illustrated by a comparison of water sales, revenues and physical plant of the Water System in 1985, 1995, 2005, 2015 and 2018 as shown in the following table:

ITEM

1985

1995 2005 2015 2018

Average Metered Water Sales 41.76 MGD 39.13 MGD 37.38 MGD 31.30 MGD 31.05 MGD

Operating Revenue $13,648,129 $17,546,000 $25,357,872 $43,814,483 $47,144,767

Miles of Mains Owned & Leased 875.5 1,332.72 1,651.39 2,021.15 2,140.54

Active Accounts 44,603 69,445 85,318 101,409 103,300

Fire Hydrants 4,563 7,765 9,817 12,991 13,400 Average daily quantity of water sales and yearly totals of metered water sales by the Water System during the twelve months ended December 31, 2018 were as follows:

CLASSIFICATION

AVERAGE DAILY SALES

(1000 gallons)

YEARLY TOTALS

(1000 gallons)

Residential & Commercial 17,812 6,501,440

Industrial 7,049 2,572,973

Wholesale 6,188 2,258,695

TOTAL 31,049 11,333,108

WATER METERED & BILLED (in Million Gallons)

2012 2013 2014 2015 2016 2017 2018

Residential & Commercial 6,446 6,506 6,675 6,517 6,710 6,348 6,501

Industrials 2,658 2,583 2,509 2,725 2,640 2,443 2,573

Wholesale 2,774 1,968 2,091 2,182 2,174 2,051 2,259

Total 11,878 11,057 11,276 11,424 11,524 10,842 11,333

Page 9: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

9

Future Water Sales: The numbers of residential and commercial accounts are expected to show continued, modest increases. However, residential use has declined as the number of people per household shrinks and water efficient appliances and fixtures are increasingly installed. Local highway facilities and a present program of extensive interstate and arterial route construction in and around the City of Syracuse assist this growth in residential and commercial sales. The Authority also continues to expand in to new areas formerly served by private wells or small, outdated municipal water systems in Onondaga, Oswego, Madison, Oneida and Cayuga Counties. It should also be noted that wholesale customer use drops as former systems are converted to retail accounts. Also, with the push nationally for water conservation, industrial water use continues to decline.

The Authority is currently limited to an average of 20 million gallons per day (mgd) from Otisco Lake. Water demand over and above what the Otisco Lake supply can cover is met with supplemental water purchased from the Lake Ontario system. The Lake Ontario system is capable of producing 60 mgd and can deliver 50 million gallons per day to Onondaga County. An additional 3 million gallons per day are available for purchase from the City of Syracuse. Ultimately the combined system delivery capacity is 73 mgd to Onondaga County and beyond, with more than 95% under the management of OCWA.

Awards and Recognition

The Marcellus water treatment plant has continued to maintain its Phase 3 certification under the United States Environmental Protection Agency (USEPA) Partnership for Safe Water program and in 2017 the plant completed its 20th straight year of compliance with the voluntary program. In past years the plant has the five, 10 and 15-year recognition awards from the Director of the USEPA and 2018 the plant received the 20-year Director's Award. The Lake Ontario Plant, which recently joined the voluntary program, completed its 4th consecutive year of compliance with the Partnership. It should be noted that the Partnership program supports the Authority and other utilities in voluntary efforts to achieve greater control and removal of microbial impurities. The Authority's Otisco water treatment plant was the eighth in the nation to be certified under this program. Both treatment plants are an example of how the Authority sets a higher standard for the quality of their water than what the state and federal government mandates.

Page 10: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

10

Financial Highlights Operations returned to a more normal pace in 2018 after the unusually active and transformative year experienced in 2017 when OCWA assumed the operation and maintenance of Onondaga County's Metropolitan Water Board / Onondaga County Water District (MWB). As we entered 2018 all Lake Ontario water system facilities and all former MWB personnel were fully integrated into OCWA and throughout this discussion the benefits of the consolidation are recognized. It should be noted, based on cost savings generated by the consolidation, the Authority did not raise water rates for 2018 after annual rate increases being implemented from 2001-2017. Although rates were not increased for 2018, OCWA did see an increase in water sales revenues, the nature of which will be discussed below. Regarding revenues, OCWA’s 2018 total revenues increased by $2,510,765 (5.65%) over 2017. Water revenue was up $998,278 over the previous year's total. Residential and Commercial revenue was up by $654,657 and mainly attributed to a more normal summer season after the record rains experienced in the spring and summer of 2017. Municipal revenues increased by $191,235 due in part to the summer weather and in part due to having the Village of Phoenix on the books for a full year after becoming a wholesale customer in the second half of 2017. Industrial revenues rose $170,645 due in part to modest increases in water used coupled with having Giovanni Foods as a customer for the entire year after connecting to the system in June of 2017. 2018 gallons sold increased by 483.8 million gallons (MG) over 2017 sales and resulted in the increase in water revenues. Residential sales increased by 93.3 MG, Commercial sales were up 59.8 MG, Industrial sales increased by 122.8 MG and Municipal sales climbed 207.9 MG. The increases in residential, commercial and municipal sales were primarily tied to the summer weather experience in 2018, as opposed to the record rains seen in the spring and summer of 2017. Municipal sales were also positively impacted by the Village of Phoenix being a wholesale customer for the entire year after connecting to the OCWA system in the summer of 2017. Industrial sales were generally up across the board and the addition of new industrial accounts pushed the total even higher. Beyond water sales, grant revenues in 2018 increased by $1,845,858 over 2017’s amount. Funding was received from the New York State Department of Health for the Otisco Lake fluoride feed system replacement ($693,714), the Lake Ontario fluoride feed system replacement ($35,588) and from New York's Department of State ($1,189,076) consolidation fund as a result of the OCWA / MWB consolidation.

Page 11: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

11

Financial Highlights – Continued OCWA’s 2018 total customer account base increased by 546 (0.54%) over 2017's year-end total. By year end OCWA’s total customer base totaled 103,330 accounts with 101,882 metered residential, commercial, industrial and wholesale accounts. Customer account growth was again well below average and 125 accounts lower than the total number of new accounts added in 2017. On the expense side, the Authority's operating expenses (less depreciation and amortization) for 2018 were $127,836 (0.4%) more than 2017 expenses. While the total increase is low, there were some offsetting increases and decreases in specific expense categories that will be covered below. It is also worth noting that keeping expenses in check for 2018 reflects the ongoing benefit related to the 2017 consolidation of the OCWA and MWB systems Labor expense for 2018 increased $602,529 (5.4%) and is partly attributed to wage increases for the Teamsters union personnel (3.0%), CSEA union personnel (4.0%) and Administrative personnel (4.0%). In addition to wages increases, the night crew that was established at the end of 2017 was on the payroll for all of 2018. The night crew is dedicated to hydrant maintenance and valve operations and is attached to Distribution Maintenance. 2018 employee benefits decreased by $66,858 from 2017. The decreased expense is primarily attributed to a $444,368 decrease for OCWA’s New York State Retirement System expense for the year. Offsetting the decrease in retirement expense was a $267,717 increase for employee health care and an increase of $46,093 for Social Security and Medicare expense tied to increased labor expense for the year. 2018 electric expense increased by $233,898 (15.4%) over 2017. Part of the increase is due to a 3% increase in production over the previous. Additionally, supply cost for both National Grid and NYSEG increased for the year. Also contributing to the increase was the startup of the Lake Ontario facilities solar arrays, increasing electric expense by $90,794. Outside Contractor expense in 2018 increased by $386,462 over the previous year. Due to the number of main repairs, the cost of paving and restoration of those locations increased by $105,387 over 2017. Because of a significantly positive budget variance, OCWA decided to wash several tanks at a cost of $81,300. $68,346 was spent to complete the ARC-Flash electric program for the Lake Ontario facilities to make the sites safety compliant. Other Lake Ontario facility related projects included $23,303 for the wetlands mitigation study for the Terminal reservoir site in Clay and $27,010 for the separation of the gas and electric services for the former MWB administration center that was turned over to Onondaga County. Transportation Expense was up $114,516 over the previous year, with the cost of fuel increasing $95,334 for 2018.

Page 12: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

12

Financial Highlights – Continued Another significant change is the decrease of $1,120,280 in MWB legacy costs from 2017 to 2018. In addition to a decrease in the legacy costs themselves, the County applied $1.2 million of MWB reserves to reduce the amount that OCWA was required to pay. No reserves were applied to 2017 costs. 2018 Miscellaneous Administration expenses were down $97,554 from 2017 with a $116,513 increase for 2018 capitalized labor cost being responsible for the overall decreased expense.

Page 13: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

13

Summary of Statements of Net Position

Page 14: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

14

Summary of Statements of Net Position – Continued Total Assets increased by $7,340,528 in 2018 as a result of the following items:

The increase in cash of $2,936,877 is primarily due to a $1,362,543 increase in the General Revenue Fund and a $1,679,329 increase in the General Authority Fund.

Accounts receivable have increased by $175,542 or 1.6%. Accounts Receivable – Special increased by the largest amount ($150,692) due to the $251,235 billing near year end for OCWA’s fluoride grant. The two components that comprise accounts receivable for water sales are accounts receivable for water that has been billed to customers which decreased by $13,579 and the estimated revenue that has been accrued on accounts which increased by $54,269. And finally, Accounts Receivable – Miscellaneous decreased by $15,841.

Materials, supplies and prepaid expenses decreased by $517,105 (13.2%) as compared to 2017 levels. The largest part of this variance is the $678,256 decrease in prepaid insurance. This is mostly due to OCWA not paying its 2019 worker’s compensation premium of nearly $700,000 until after the beginning of the year. Whereas the entire 2018 premium was paid in December of 2017. Other smaller components of the variance include increases to inventory ($28,692) and prepaid service contracts ($131,313).

Restricted assets decreased by $1,062,091 (10.6%) in 2018. This decrease is due to the net effect of decreases to construction funds ($755,698), bond funds ($430,585) and customer deposits ($283,535), partially offset by increases to the Renewal & Replacement Fund ($390,315) and bond reserve funds ($17,112).

Intangible assets, net increased to $75,421 at the end of 2018 from $0 at the end of 2017. Improvements made by OCWA to Onondaga County owned facilities as part of MWB consolidation agreement are set up as intangible assets as ownership of those facilities remains with the County.

Plant and water rights increased due to additional capital projects either completed or in progress at the end of 2018. A detailed outline of the additions is located just after Table 4 “Capital Assets at Year End” later in this analysis.

Page 15: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

15

Summary of Statements of Net Position – Continued Deferred Outflows of Resources decreased by $10,087 in 2018 as a result of the following:

Deferred Amount on Refunding decreased by $90,154. Deferred Amount on Refunding is the difference between the reacquisition price and the net carrying amount of the old debt for two bond issues that were advance refunded. It is being recognized as a component of interest expense over the remaining life of the old debt. The amount recognized as a component of interest expense in 2018 was $90,154.

Deferred Outflow to Other Post-Employment Benefits decreased by $1,233,001 in 2018. This information is based on calculations performed by OCWA’s actuary that allow for the creation of GASB 75 entries.

Deferred Contributions to Pension Plan increased by $1,313,068 based on information provided by the NYS & Local Retirement System to enable the calculation of required GASB 68 entries.

Total liabilities decreased by $5,669,222 in 2018 as a result of the following items:

Accounts Payable and Accrued Liabilities decreased by $147,632 (3.4%) in 2018 due primarily to the decrease of $360,833 in the amount due to Onondaga County for legacy costs related to the MWB consolidation. Partially offsetting that decrease were increases in Accounts Payable - $142,365 and Accrued Payroll - $49,838.

Liabilities Payable from Restricted Assets decreased by $138,109 (12.9%) as compared to 2017 due to the combination of several factors. Customer deposits decreased by $323,525, accrued interest on bonds decreased by $26,876 and retainage held at year end decreased by $36,676. Partially offsetting the decreases is an increase in accounts payable for capital work in the amount of $248,971.

The Bonds Payable balance decreased by $3.47 million for a couple of reasons. First,

principal payments totaling $3,225,000 were made during the year. It was also affected by the amortization of bond premium in the amount of $249,878 during 2018.

GASB Statement No. 75 establishes guidance for the financial reporting of OPEB. It does not require that the unfunded liability actually be funded, only that the Authority account for the unfunded liability. The financial statements at December 31, 2018 include a liability in the amount of $31,746,682 that was determined by OCWA’s actuary that represents the Authority’s unfunded liability. This is an increase of $279,756 over the 2017 amount.

Page 16: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

16

Summary of Statements of Net Position – Continued

Due to NYS Retirement System decreased by $2,170,162. This represents the

Authority’s share of the total net pension liability based on information provided by the New York State Local Retirement System. This information is provided by the System on an annual basis.

Capital Lease Obligations decreased by $18,200 due to principal payments made on various leases.

Deferred Inflows of Resources increased by $4,056,435 over the end of 2017 at which time the balance was $4,065,479.

Deferred Inflows from Other Post-Employment Benefits increased to $4,300,066 at the end of 2018 from $3,552,392 at the end of 2017. This again is information based on calculations performed by OCWA’s actuary that allow for the creation of GASB 75 entries.

Deferred Inflows from Pension Plan increased to $3,821,248 at the end of 2018 from $513,087 at the end of 2017. This again is based on information provided by NYS & Local Retirement System and enables the calculation of required GASB 68 entries.

Net Position is the difference between all the other elements of the statement. That is assets plus deferred outflows, less liabilities, less deferred inflows. Review of Revenues

2017 2018 Residential/Commercial Sales 32,531,788$ 33,186,445$ Industrial Sales 4,631,813 4,802,458Municipal (Water Utility) Sales 3,807,391 3,998,626Fire Protection 1,411,201 1,392,942Miscellaneous Revenue 1,949,538 1,298,566Grant Income 72,520 1,918,378Interest from Investments Held in Trust 218,401 476,740Loss on Disposal of Fixed Assets 11,350 70,612 TOTAL REVENUES 44,634,002$ 47,144,767$

TABLE 2

Page 17: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

17

Review of Revenues - Continued

Total Revenue increased by $2,510,765 (5.6%) in 2018 as compared to 2017. That amount is comprised of the following variances.

The most significant variance was the $1,845,858 increase in Grant Income. It was comprised of $1,189,076 related to a consolidation grant from the NYS Department of State and $729,302 of grant funds to upgrade OCWA’s fluoride systems.

No rate increases were implemented by OCWA in 2018. This was determined during the budget process in late 2017 and was based on the projected requirements for 2018 and took into account changes that were expected at the time to have an effect on 2018 operations.

Total water revenues for 2018 increased by $998,278 (2.4%) over the previous year. Residential and Commercial sales increased by $654,657 (2.0%), Industrial sales increased by $170,645 (3.7%), Municipal sales increased by $191,235 (5.0%). On the other hand, Fire Protection decreased by $18,259 (1.3%).

Residential and Commercial sales increased by $654,657 (2.0%) in 2018 as compared to 2017. Since there was no rate increase, the main factor that affected revenue was consumption. Residential and Commercial consumption increased from 6,348 MG in 2017 to 6,501 MG in 2018. The increase of 153 MG equates to a 2.4% rise in the number of gallons billed. Much of the consumption variance is weather related as 2017 was rainy, especially in the spring and early summer. Whereas 2018 was relatively dry and warm especially in the first part of the summer.

Industrial sales increased by $170,645 (3.7%) as compared to the 2017 amounts. As with Residential and Commercial sales there was no rate increase so the main factor affecting revenue was consumption. Industrial consumption increased from 2,450 MG in 2017 to 2,573 MG in 2018. The increase of 123 MG equates to a 5.0% rise in the number of gallons billed.

Municipal sales increased by $191,235 (5.0%) as compared to the 2017 amounts. As above, since there was no rate increase in 2018, the main factor that affected revenue was consumption. Municipal consumption increased from 2,051 MG in 2017 to 2,259 MG in 2018. The increase of 208 MG equates to a 10.1% rise in the number of gallons billed. In addition to the increased consumption due to the weather, the Village of Phoenix was a customer for the full year after having become a customer in the summer of 2017.

Miscellaneous Revenue decreased by $650,972 (33.4%) over the 2017 amount. Two items comprise the majority of this decrease. First, in 2017 OCWA received over $500,000 in assets from Onondaga County as a result of the consolidation with MWB. OCWA received no donated assets in 2018. Second, in 2017 OCWA billed the County for certain of its expenses related to the consolidation which added more than $156,000 in revenue. There were no such billings in 2018.

Page 18: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

18

Review of Revenues – Continued

Interest from Investments Held in Trust increased by $258,339 (118.3%) over the 2017 amount. Significant increases in both money market and Treasury bill yields over the course of the year account for the rise in interest.

Review of Expenses

Total expenses for 2017 increased by just $264,745 (0.7%) compared to fiscal year 2017. Areas of expense that experienced significant changes, both plus and minus, in 2018 included: labor, legacy costs, pensions, interest expense, purchased water, health insurance, worker’s compensation and general liability insurances, purchased water, electric/gas, transportation, outside contractors and depreciation are discussed below. Labor Changes Impacting Operations, Maintenance, and General and Administrative Expenses Labor expenses in operations, maintenance and general and administrative accounts increased by $602,529 (5.4%) during 2018 as compared to 2017 amounts. Both Teamsters and CSEA contracts included wage increases effective January 1, 2018. The rates for CSEA employees increased by 4.0% and Teamsters employees by 3.0%. OCWA’s non-union administrative personnel also received a 4% increase. In addition, OCWA staffing included three more full-time employees at the end of 2018 than at the end of 2017.

Restated 2017 2018 Operations 13,830,444$ 14,267,708$ Purchased Water 1,111,665 1,218,810General and Administrative 9,513,302 7,506,622Less: Burden Applied (1,067,490) (1,193,620)Depreciation 6,111,680 6,375,914Bond Premium Amortization (249,874) (249,874)Water District Lease Amortization 481,443 473,650Maintenance 7,288,960 9,005,197Other Expense 2,487,371 2,367,839 TOTAL EXPENSES 39,507,501$ 39,772,246$

TABLE 3

Page 19: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

19

Review of Expenses – Continued Notable Expense Changes (Other Than Labor) Three of the larger decreases in expense from 2017 to 2018 are legacy costs, pension expense and interest expenses. The amount legacy costs that, per the consolidation agreement, the Authority pays to Onondaga County on an annual basis to balance the budgeted appropriations made by the County on behalf of the District decreased by $1,120,280 in 2018 as compared to 2017. The amount is the net of costs still incurred by the County for such items as debt service, employee benefits and interdepartmental charges over and above amounts collected for ad valorem taxes and appropriated fund balance. This decrease was primarily due to the County applying $1.2 million of MWB reserves in 2018 to offset the costs. This was not done in 2017. Pension Expense decreased by $444,368 (22.0%) in 2018 as compared to 2017 based on the GASB 68 calculations provided by the NYS Local Retirement System. The NYSLRS calculates pension expense and other information on an annual basis and provides it to the Authority for inclusion in financials. Interest expenses decreased by $119,532 (4.8%) in 2018. The main reason for the reduction was a decrease in bond interest expense of $116,826 (4.7%) in 2018. Another smaller component of the decrease was a decline of $2,706 in lease interest expense. Significant expense increases from 2017 to 2018 include the following: Purchased water cost increased by $107,145 (9.64%) in 2018. OCWA felt the full effect of a large rate increase implemented by the City of Syracuse in the summer of 2017. Purchases from the City rose to $1,218,810 in 2018 from $958,605 in 2017, an increase of $260,205 (27.1%). This increase was somewhat mitigated by the $153,060 decrease in purchases from the Town of Clay. The decrease was because beginning in 2018 OCWA started netting the amount of water it purchases from the Town against the amount of water it sells to the Town. Group health insurance had an overall increase of $267,717 (7.49%) as compared to 2017 for the Authority’s employees and retirees. In addition to having more covered employees in 2018 than 2017, the Authority experienced premium increases for CSEA and non-union employees of 8.7% and 4% for Teamsters employees. Worker’s Compensation premium increased by $32,211 and the expense related to various other insurances, including general liability, increased by $41,792. This last increase includes the addition of pollution and drone policies in 2018.

Page 20: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

20

Review of Expenses – Continued Notable Expense Changes (Other Than Labor) – Continued OCWA experienced a $233,898 (15.4%) increase in its electric and natural gas charges in 2018 as compared to 2017 amounts. Some of the increase is related to pump the additional water that OCWA produced in 2018 and some due to increased supply costs. The cost for MWB initiated solar power, some of which only started in July of 2017, increased by $90,794 (74.1%) in 2018. Also, payments to National Grid and NYSEG increased by $164,056 (13.3%) and $17,280 (14.1%) respectively. The Authority’s expense for Outside Contractors increased by $386,462 (19.3%) in 2018 as compared to 2017. Some of the expenses, such as the $105,387 additional cost for paving restoration work, increased in 2018 because of operational requirements. Others increased because OCWA chose to do additional work because of 2018’s favorable financial position. Examples of the latter include tank washing - $81,300 and right-of-way clearing - $47,280. In addition, there were still several items related to the consolidation with MWB required action. These include the $27,010 cost to separate power at former MWB administration building which allowed OCWA to return that building to the County for repurposing, the $68,346 cost of having arc flash assessments performed on various former MWB facilities and the $23,303 cost of wetland mitigation at a former MWB facility. Depreciation increased by $264,234 (4.3%) in 2018 as compared to 2017 figures. This is a reflection of the fact that OCWA added over $10.1 million to Water Plant in Service in 2017 as well as over $12.35 million in 2018. Fuel costs for the Authority’s vehicles increased by a total of $95,334 (31.2%) in 2018. Gasoline costs increased from $203,700 in 2017 to $251,833 in 2018 and diesel increased from $101,610 to 148,811 over the same period. In addition, the cost to repair and maintain OCWA’s vehicles and equipment increased by a total of $29,850 (6.7%) in 2018. Summary of Overall 2018 Operations In 2018, OCWA experienced a net income before capital contributions of $7,372,521, an increase of $2,246,020 from the net income of $5,126,501 for the fiscal year ended December 31, 2017. This is comprised of the following factors: Total Revenues increased by $2,510,765 (5.6%) in 2018. This is primarily comprised of increases to Water Revenues - $998,278, Grant Income - $1,845,858 and Interest Income - $258,339, partially offset by a decrease in Miscellaneous Revenue - $650,972. Total Expenses increased by $264,745 (0.7%) in 2018. This is the net result of increases in: health insurance, power, contractors, depreciation and transportation cost, etc. nearly offset by significant decreased in legacy costs, pension expense and interest expense

Page 21: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

21

OCWA Budget Process Each year the Authority’s department managers prepare comprehensive draft budgets, one for operations and maintenance and one for capital projects. The executive staff combines the budgets and prepares a recommendation for the Authority’s Board to review in early October of each year. The Board, in turn, conducts a budget workshop with executive management and a final recommendation is made for approval by the Board at its October meeting. Per the implementation of New York State’s Public Authorities Accountability Act, OCWA’s annual budget process must be completed by the end of October. Copies of the approved budget are then forwarded to elected officials at the County and State level in accordance with PAAA guidelines. Executive management, also in accordance with OCWA’s trust indenture, provides a copy of the budgets to the Authority’s consulting engineer for review and approval. Executive management and the consulting engineer meet to review both budgets prior to the consulting engineer submitting their letter acknowledging satisfactory review. The operations and maintenance budget is generally not amended once it has been approved by the Board. On a monthly basis, each Authority department manager completes a budget variance, which is in turn submitted to the Executive Director. Also on a monthly basis, a summary budget variance report is provided to the Board and extraordinary variances (plus and minus) are explained. With respect to the capital budget, specific projects for the year are approved at the preceding year’s October board meeting. It should also be noted that although the October budget approval encompasses all approved projects for the coming year, each project must be submitted to the Board for approval of the project’s work authorization prior to the start of the project. Executive management also prepares 20-year capital budgets and 20-year operations and maintenance budgets for the Authority. Both budgets include a list of assumptions that are used to prepare the long-range projections. It should be noted that both long-range budgets are updated regularly and submitted to the OCWA Board for review and are ultimately added to the Authority’s annual business plan.

Page 22: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

22

System Growth Areas of growth included the following:

17 developer main extensions were completed in 2018, adding 15,705 feet of main. New customer connections will follow.

The Town of Constantia's Bernard’s Bay Water District (which will extend water lines to the east close to the western border of the Village of Cleveland) was completed, adding 45,000 feet of 6, 8 and 16-inch water main and 86 hydrants. New customers started connecting by year-end with the bulk of more than 300 (out of a potential 600) new customers connecting in 2019.

200 small service application packets were distributed during 2018.

A total of 546 water accounts were added by the end of 2018, including 509 metered accounts.

Areas of Growth, 2019 and Beyond

Related to the Bernard's Bay Water District, the Village of Cleveland intends to connect to

the OCWA system, using the Authority as a back-up source for the Village well supply.

With the Madison County (ARE) Park water system completed, the Clockville area is forming a water district and looking into funding options.

The Town of Sullivan and Madison County continue to work jointly on the development of a water system that would serve two small developments off Salt Springs Road in Manlius and Sullivan as well as the Clear Path for Veterans facility located on the border of the two towns.

The Town of Granby is moving forward with the development of Water Supply Area 7, with construction anticipated to start in the second half of 2019

The Town of Parish is pursuing funding for the developing of a system to serve portions of the town and village to the north of the Town of Hastings via a connection to the OCWA system.

By the end of 2018 a total of 23 small developer extensions, totaling 20,190 feet of main,

were designed and permitted by the OCWA Engineering department.

Page 23: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

23

Capital Assets at Year End (Net of Depreciation)

Increase to Water Plant in Service Highlights

Meter Testing Facility Upgrade - $857,424

Hydropillar Tank Rehabilitations - $806,709

12” Ext Milton Ave to Gertrude Ave - $704,816

12” Ext Bridge St - $631,882

The completion of various other water main projects - $4,197,085

Otisco Lake Fluoride System - $574,766

Eastview Tank Rehabilitation – $543,692

Yager Road Tank Rehabilitation - $531,810

Water meters in the amount of $817,161 as part of an ongoing meter replacement project

The installation of new and replacement water services – $837,787

The installation of new and replacement hydrants – $585,782

Total Percent Change 2017 2018 2016-2017 Water Plant in Service 312,037,248$ 324,387,448$ 3.96%Water Rights - Source 5,250,000 5,250,000 0.00%Construction Work-in-Progress (I&E) 6,192,290 5,168,543 -16.53%Water District Lease 23,169,890 23,169,890 0.00%Pre-Survey and Investigation 417,806 634,086 51.77%Jobbing in Progress 204,700 144,546 -29.39%Allowance for Depreciation (93,471,711) (98,751,384) 5.65%Accumulated Amortization/Water Districts (14,179,275) (14,652,925) 3.34%Residual Amortization/Water Rights (5,250,000) (5,250,000) 0.00%Deferred Charge - Capital Interest on FP (3,730) (1,102) -70.46% Total 234,367,218$ 240,099,102$ 2.45%

TABLE 4

Governmental Activities

Page 24: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

24

Capital Assets at Year End (Net of Depreciation) – Continued Construction Work-In-Progress Highlights Construction Work-In-Progress decreased by $1,023,747 during 2018, from $6,192,290 at the beginning of the year, to $5,168,543 at year end. Of that amount, $3,416,021 is related to the following five projects:

Raw Water Pump Station Variable Frequency Drives - $1,232,813

12” Relocation Route 5 Canastota - $733,181

Oakridge Tank Replacement - $612,738

Lake Ontario Fluoride System - $554,459

8” Ext Kathan Rd - $282,830

Pre-Survey and Investigation Highlights Pre-survey and investigation costs capture costs related to studies undertaken related to potential additions and improvements to the OCWA system. The Authority has created a project to track its costs related to Onondaga County’s CARE project. The total in the project at year-end is $425,853. When the CARE project is completed the Authority will create an intangible asset for the total amount of its costs. Jobbing in Progress Jobbing in progress captures costs associated with activities for which an individual or developer will pay for the job in full. The installation of new hydrants and large services within certain areas of OCWA’s system are examples of this. A deposit for the job is taken. When the project is completed, the Authority will either bill the developer if the actual cost is more than the deposit or refund a portion of the deposit if the cost is less. “Job Orders” are also used to capture costs associated with repairing or replacing assets, generally hydrants and services, which are hit and damaged by individuals. The Authority then bills the individual or the individual’s insurance for the repair cost. The account is also used to track the cost of contract operations and of maintenance agreements with various water systems.

Page 25: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

25

Long-Term Debt Administration The Authority has four General Water System Revenue Bond issues and two E.F.C. Drinking Water Bond issues outstanding with a remaining principal totaling $53,765,000 as of December 31, 2018. OCWA’s most recent bonds were issued in December 2016. On December 1, 2016, the Authority issued $12,320,000 in General Water System Revenue Refunding Bonds Series 2016A. The bonds bear interest at rates ranging from 2.0% to 5.0% and have a final maturity date of September 15, 2028. The bonds were issued to advance refund the Authority’s Series 2011 bonds maturing after September 15, 2018. The 2011 bonds were originally issued for capital improvements to the water system including construction of a third covered water storage tank, two large pump stations, one small pump station and various other capital projects. As of December 31, 2018, the 2016 bonds have a remaining balance of $12,285,000. This amount reflects a principal payment of $5,000 made in September 2018. On April 22, 2015, the Authority issued $5,200,000 in General Water System Revenue Bonds Series 2015A. The bonds bear interest at rates ranging from 1.0% to 3.375% and have a final maturity date of September 15, 2035. The bonds were issued for capital improvements to the water system including a water tank replacement, two pump stations, water tank improvements, Otisco Lake Dam improvements and water main improvements. As of December 31, 2018, these bonds have a remaining principal of $4,350,000. This amount reflects a principal payment of $200,000 made in September 2018. On March 5, 2013, the Authority issued $8,390,000 in General Water System Revenue Bonds Series 2013. The bonds bear interest at rates ranging from 2.0% to 4.5% and have a final maturity date of September 15, 2025. The bonds were issued to advance refund the Authority’s 2005 Series A bonds maturing after 2015. The 2005 Series A Bonds were originally issued to pay capital costs of certain improvements of the Water System. As of December 31, 2018, the 2013 bonds have a remaining principal of $5,990,000. This amount reflects a principal payment of $740,000 made in September 2018. The final principal payment of $1,000,000 on the General Water System Revenue Bonds Series 2011 was made on September 15, 2018. In December 2016, the 2011 Series bonds maturing after September 15, 2018 ($13,495,000) were advance refunded. The bonds were issued for capital improvements to the water system including construction of a third covered water storage tank, two large pump stations, one small pump station and various other capital projects.

Page 26: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

26

Long-Term Debt Administration – Continued The General Water System Revenue Bonds, Series 2010A have a remaining principal balance of $1,100,000 as of December 31, 2018. This amount reflects a principal payment of $130,000 made in September 2018. The required principal payment on the bond in 2019 is $135,000. The bonds bear interest at rates ranging from 3.0% to 5.0% and have a final maturity date of September 15, 2025. The bonds were issued to provide funds to redeem all outstanding 2001 Series A Bonds maturing after 2010 as well as provide funds for capital improvements. The E.F.C. Drinking Water Bonds, 2009 Series A have a remaining principal balance of $20,695,000 as of December 31, 2018. The remaining balance reflects a principal payment of $540,000 made in June 2018. The required principal payment on the bond in 2019 is $565,000. The interest rate is 4.8721%. Bonds mature serially in varying annual amounts and have a final maturity date of June 15, 2038. The E.F.C. Drinking Water Installment Bonds, 2008 Series A were issued in the amount of $14,226,510 and have a remaining principal balance of $9,345,000 as of December 31, 2018. This amount reflects a principal payment of $610,000 made in October 2018. The required principal payment on the bond in 2019 is $625,000. The 2008 Bonds mature serially in varying annual amounts through 2029, with an interest rate of 4.27%, one third of which is subsidized by E.F.C. (New York State Environmental Facilities Corporation). Pursuant to its Bond Resolution, all revenues collected by the Authority are pledged to the payment of principal and interest on the bonds. All such revenues are deposited in the name of a trustee for allocation to funds set up in accordance with the Bond Resolution. Bonds Outstanding as of Series Bonds December 31, 2019

2016 Series A Bonds $ 12,285,000 2015 Series Bonds 4,350,000 2013 Series Bonds 5,990,000 2011 Series Bonds 0 2010 Series A Bonds 1,100,000 2009 E.F.C. Bonds 20,695,000 2008 E.F.C. Bonds 9,345,000 Total

$ 53,765,000

Page 27: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

27

Long-Term Debt Administration – Continued OCWA Bond Rating On November 1, 2018, Moody’s Investors Service upgraded the Onondaga County Water Authority to Aa2 from Aa3 with a positive outlook. Looking Ahead As 2019 begins, OCWA is already gearing up to address the much-needed upgrades and improvements to the 50-year-old, 60 MGD Lake Ontario water treatment plant located in the Town of Oswego. The plant improvements and upgrades, once determined, coupled with other major capital needs identified in OCWA's 20- year capital budget, will serve as the main driver for future customer rate increases. To that end, OCWA implemented a $1.00 / month increase per equivalent dwelling unit (EDU), with the increased revenue being used to pay for costs related to capital improvements, including debt service expense related to the issuance of water revenue bonds. It should also be noted, with respect to operation and maintenance expenses, the savings generated by the consolidation of OCWA and MWB will have an ongoing, positive impact on rates and the Authority's ability to pay for the debt service related to the improvements to the Lake Ontario facilities. Further, the combined operations now allow for a more flexible and cost effective operation, of the now unified systems, again with a positive impact on OCWA's ability to fund capital projects. Other operation and maintenance activities also help lower expenses. For instance, the purchase of a vacuum truck is helping to facilitate quicker repairs, in many instances, with the added benefit of excavating a smaller footprint which in turn lowers to cost of restoration of the excavation site. OCWA's fulltime leak detection crew has aided the Authority greatly over the course of the past 24-months through early detection of leaking water mains and the facilitation of prompt repairs. By the end of 2018 daily water loss had dropped by 1.38 mgd as compared to the daily loss at the end of 2016. As a result, savings are generated with respect to both chemical and electric costs throughout the system and we anticipate seeing continued improvement in 2019 and beyond.

Page 28: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

28

Looking Ahead – Continued Rate increases since 2001 and up to and including 2019 are listed below: Residential / Fire Year Commercial Wholesale Industrial Protection 2019 $12.00 / EDU $12.00 / EDU $12.00 / EDU 0.00% 2018 0.00% 0.00% 0.00% 0.00% 2017 $4.00 / EDU $4.00 / EDU $4.00 / EDU 0.00% 2016 $4.00 / EDU + $4.00 / EDU + $4.00 / EDU + 5.00% $0.08/1,000 gal $0.08/1,000 gal $0.08/1,000 gal 2015 $12.00 / EDU + $12.00 / EDU + $12.00 / EDU + 0.00% $0.025 / 1,000 gal $0.025 / 1,000 gal $0.025 / 1,000 gal 2014 $8.00 / EDU $8.00 / EDU $8.00 / EDU 0.00% 2013 2.00% 2.00% 2.00% 0.00% 2012 2.47% 2.31% 2.38% 0.00% 2011 9.00% 9.00% 9.00% 0.00% 2010 12.00% 10.00% 10.00% 3.25% 2009 15.00% 15.00% 9.90% 3.25% 2008 7.70% 7.70% 6.70% 3.25% 2007 9.80% 9.80% 6.75% 4.00% 2006 6.00% 6.00% 4.00% 4.00% 2005 8.00% 8.00% 5.00% 5.00% 2004 15.00% 15.00% 3.00% 3.00% 2003 2.00% 2.00% 2.00% 2.00% 2002 2.00% 2.00% 2.00% 2.00%

With the consolidation of the OCWA and MWB well behind, the Authority's purchased water is solely limited to purchases from the City of Syracuse Water Department. OCWA's purchased water averaged 1.3 mgd or roughly 3.5% of the Authority's daily demand. The City's budget year runs July 1 – June 30 each year and as a result rate increase information typically becomes available 9 months after OCWA's annual budget is approved.

Chemical costs for 2019 are projected to increase 15% due in part to OCWA's ongoing

program to annually replace the carbon in one filter in both the Otisco Lake and Lake Ontario water treatment plants. Projected increased system demand and some price increases also contributed to the overall increase in chemical expense.

OCWA’s cost of electric and natural gas costs in 2019 are projected to increase roughly 5%, due in part to projected increases in the cost of supply, coupled with projected water demand.

Page 29: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

29

Looking Ahead – Continued

Outside Professional Services expenses for 2019 are projected to increase 10%, with the increase primarily attributed to monitoring costs related to OCWA's water sampling requirements related to round four of the USEPA's Unregulated Contaminant Monitoring Rule.

OCWA’s capital budget for 2019 includes the Authority's ongoing / recurring capital

expenditures including $3,000,000 for main replacement projects and funding for special projects. For instance, the 2019 capital budget funds major projects like the replacement of the Skyview and the Southwood water storage tanks ($3,750,000) located in the town of Camillus. The budget also includes $1,950,000 to kick off the review and design tied to the upgrade and improvements need for the 50-year-old, 60 MGD, Lake Ontario water treatment plant and related facilities and $7,000,000 for electrical upgrades and addition of auxiliary power systems for the Lake Ontario raw water intake pump station and the water treatment plant campus.

OCWA’s 2019 capital improvement program is funded in part by net income from 2018, coupled with use of capital construction funds established by the Authority. In addition to funds provided by OCWA operations, additional funding sources for 2019 capital projects include grant awards from the New York State Department of Health for fluoride system replacement project for Lake Ontario water treatment plant. An $846,000 NYS Water Infrastructure Improvement Act (WIIA) grant was awarded to OCWA for the improvement of the transmission mains in and around the Otisco Lake dam site. OCWA also anticipates additional funding will be received as part of a consolidation grant from the New York State Department of State (tied to the OCWA / MWB consolidation) that was awarded in 2017 and is covered under an agreement that was signed in February 2018. The 2019 budget also anticipates OCWA issuing water revenue bonds to fund the cost of major projects that over and above normal capital budget funding levels.

In addition to the major capital budget items addressed above, the 2019 capital budget also continues to fund the ongoing demand for meter replacements and upgrades, replacement of water mains, hydrants and valves. The budget also covers unending replacement of vehicles and heavy equipment. Additionally, the capital budget addresses building and facilities improvements ranging from control pit repairs and storage tank rehabilitation projects. All approved projects are in keeping with OCWA’s ongoing asset management efforts, whereby operating and engineering staff continually review and prioritize the overall needs related to replacement and or enhancement of all assets throughout the system.

Page 30: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

30

PROJECTS LIST

Partial list of projects initiated in 2018. Some require more than one year to complete.

Lake Ontario WTP Upgrade Oakridge Tank Replacement Raw Water Pump Station Variable Frequency Drives Lake Ontario WTP Fluoride System Improvements Chlorination System Improvements Eastern and Western Lake Ontario WTP Electrical System Upgrades Averna Heights PRV Upgrades 8” W Second St 12” Relocation NYS Route 5 Canastota 8” Ext & PRV Pit McDonald Rd 8” Ext Westside Pump Station – OCWEP 8” Ext Russet Lane 12” Ext Lake Rd (Green Rd to Huyck Dr) 8” Ext 4th St 12” Ext Rathburn Rd WTP to Co Rt 25 8” Ext Collamer Rd 8” Ext Collington Pointe East 8” Ext The Farmstead Sec 4 8” Ext Henderson & Northrup Blvd 8” Ext Schuyler St 8” Ext The Reserve at Bishop Brook 8” Ext Hummel Estates Phases 1 & 2 8” Ext Rolling Meadows 8” Ext Wrentham Dr New & Replacement Services - Various New & Replacement Hydrants - Various Meter Replacements - Various

Page 31: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

31

COMPLETED PROJECTS

Partial List of projects that OCWA placed into service in 2018

Otisco Lake WTP Fluoride System Improvements Meter Testing Facility Improvements Eastview Tank Rehabilitation Hydropillars Tank Rehabilitation Yager Road Tank Rehabilitation Academy Hill Pump Station Upgrade 8” Ext Crown Point Sec 2 8” Ext Maple Ave Route 104 8” Ext Hallinan Meadows 8” Ext Tulip St 6” Ext Leo Ave 8” Ext Cicero Elem to Lakeshore 8” Ext Wallington Meadows Sec 8 16 “ Replacement Kinderhook Rd 8” Ext Rolling Meadows Sec 1 8” Ext W Second St 12” Ext Bridge St 12” Ext Milton Ave 8” Ext W First St 6” Ext Kirsch Dr 8” Ext Timber Banks Sec 3 8” Relocation Allen Rd 8” Ext Westside Pump Station - OCWEP 8” Ext Sun Chevy Warehouse New & Replacement Services - Various New & Replacement Hydrants - Various Meter Replacements - Various

Page 32: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

32

Page 33: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

33

Page 34: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

34

ONONDAGA COUNTY WATER AUTHORITY I. Analysis of 2018 Financial Results – Actual to Budget

A. Water Revenues were $509,648 (1.2%) more than budgeted for the year.

Year to Date Variance Percent Residential Revenue $305,915 1.2% Commercial Revenue 213,498 2.8% Industrial Revenue (176,264) (3.5%) Municipal Revenue 198,269 5.2% Fire Protection Revenue (31,770) (2.2%) Total $509,648 1.2%

Total Water Revenues are not only up as compared to budget, they are also $998,278 (2.4%) more than at the end of December 2017. The primary reason for the revenue variance is that the weather in the summer of 2018 was warm and dry. This was especially true of the first part of the summer. This contributed to 483,811,000 more gallons being sold in 2018 than in 2017. Miscellaneous Revenues were $232,964 less than budgeted for 2018. The primary cause of this variance is that grant income was $331,622 less than budgeted. The shortfall from consolidation and fluoride grants will likely be received in 2019. Partially offsetting that large variance were the positive variances in other income - $57,374 and external customer charges - $15,320. Investment Income was $211,959 more than budgeted for the year. Significant increases in both money market and Treasury bill yields over the course of the year account for the growth in interest.

B. Total Expenses were $1,773,533 (4.3%) less than budgeted for the year.

Expense Categories that were significantly under budget for the year include:

Labor was $452,567 (3.7%) less than budgeted for the year. There were nine budgeted but unfilled positions in January 2018. By the end of the year the number was down to four, but the average number of unfilled positions each month was nearly seven. Also contributing to the positive variance was that the amount of labor charged to capital projects was $223,838 more than budgeted for the year. Slightly offsetting those two positive variances was that overtime was $77,224 more than budgeted for the year.

Page 35: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

35

Employee Benefits were $666,602 (9.1%) less than budgeted for the year. There are several items that comprise this variance. New York State Retirement System expense was $352,339 less than budgeted for the year. In addition, health insurance costs were $199,304 less than budgeted for the year. That was due to premiums being less than budgeted and because, as noted earlier, OCWA had less than a full complement of employees throughout the year. The number of employees also resulted in Social Security expense being $19,377 less than budgeted for the year. Lastly, travel and training expense was $34,640 less than budgeted. Outside Professional Service expenses were $747,258 (68.0%) under budget for the year. The largest part of this variance is the $700,000 budgeted for a pipe evaluation of the 54” main from Ontario to Clay. The project was not undertaken in 2018. Another contributing item is that of the $75,000 budgeted for a cost of service study, only $13,310 was charged to 2018. Other Expenses were $357,409 (7.3%) less than budgeted. Three items make up most of this variance. The largest is OPEB expense which after the actuarial calculations ended up being $247,149 less than budgeted. Next is vacation/sick leave accrued which after the year end calculation was $86,566 less than budgeted. The third item is insurance expense, which after the year end calculation of prepaid insurance ended up being $30,905 less than budgeted. Miscellaneous Administrative Expenses had a positive variance of $271,797 (37.4%) for the year. The primary reasons for this variance are: capitalized overhead was $222,838 (30.8%) more than budgeted, capitalized equipment was $5,391 (2.5%) more than budgeted and none of the $21,000 budgeted in this category for surveys/marketing was used. Other expense categories that were under budget for the year include: Chemicals- $118,753 (13.6%) and Bond Interest Expense - $4,173 (0.2%). Expense Categories that were significantly over budget for the year include: Purchased Water was $166,083 (15.8%) more than budgeted for the year. The 2018 Purchased Water budget was completed based on OCWA buying water from both the City of Syracuse and Town of Clay. However, beginning in January 2018 OCWA began netting the amount of water it “purchased” from the Town of Clay from the amount of water it sold to the town, so there were no purchases of water from the Town in 2018. Even so, OCWA was over budget in Purchased Water because the City of Syracuse rates increased substantially more than was anticipated in the 2018 budget.

Page 36: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

36

Electric/Gas costs were $169,526 (10.7%) over budget for the year. The main reason for this variance is that the 2018 budget was completed with only eight months of data as to the electric/gas costs for the former MWB facilities. Projections were made based on the information available, but were obviously not as close as we would like them to be. There were other factors as well, such as solar power at the Ontario WTP and more power usage due to higher water production. Outside Contractors were $163,722 (7.4%) more than budgeted for the year. Within OCWA there are certainly many areas where contractor expenses were under budget, but because in total the expense category is over budget several examples are provided where that is the case. Some of the work by contractors was performed because the work had to be completed, such as paving which was over budget by $102,586 for the year. And some because OCWA wanted the work to be done and was in a favorable financial position of OCWA in 2018. Examples of the latter include right-of-way clearing – over budget by $56,820 and tank washing – not budgeted in O&M, but cost $81,300. Supplies were $122,653 (9.3%) over budget for the year. There was a small negative variance of $2,989 in Inventory and a larger negative variance of $ 139,686 in Field Supplies. These were partially offset by the positive variance of $20,022 in Office Supplies. Due to the nature of supplies, there are no individual purchases that stick out. However, some of the larger negative departmental variances are: Distribution - Field Supplies - $44,320, Operations – Office Supplies - $16,410, Operations – Field Supplies - $18,895, Facilities Maintenance – Field Supplies - $60,998 and Meter Repair – Field Supplies - $39,830. As with Outside Contractors, some part of the negative variances are due to departments being allowed to purchase more due to OCWA’s favorable financial position for the year. Other expense categories that were over budget for the year include: Transportation - $25,654 (2.6%) and Depreciation and Amortization - $197,300 (3.1%).

C. Net Income Before Capital Contributions was $2,262,176 more than budgeted for the year.

Page 37: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

37

Onondaga County Water Authority

Measurements for NYS-ABO Annual Report Year Ending December 31, 2018

Board: 1. OCWA's Vision Statement and Mission are distributed and reviewed annually and revised as needed. On March 28, 2018 the OCWA Board adopted a new Vision Statement and Mission. 2. Ethic Policy Compliance: Policy distributed and reviewed annually. Most recently reviewed January 16, 2019. Acknowledgements collected from all Members of Board. 3. Board Member Training: All Board Member training is current. Finance: 1. OCWA Bond Rating Status currently Aa2 / Moody’s

a. On November 1, 2018, Moody’s Investors Service upgraded the Onondaga County Water Authority to Aa2 from Aa3 and removed the positive outlook that it had previously assigned.

2. Debt Service Coverage (Required, Goal and Actual) a. Required – 1.25x b. Goal – 1.75x c. Actual – 2.51x 3. Debt per Customer a. Year-end 2018 - $520 (Debt $53,765,000 / Customers 103,330) b. Year-end 2017 - $554 (Debt $56,990,000 / Customers 102,784) c. Year-end 2016 - $589 (Debt $60,115,000 / Customers 102,113) 4. Monthly Budget Variances a. All departmental variances completed for 2018 5. Annual Budget Fulfillment

a. The Net Income before Capital Contributions of $7,372,521 exceeded the 2018 budgeted amount of $5,110,345.

6. Quarterly and Annual Investment Activity

a. The 2018 annual report and four quarterly investment reports have all been accepted by the Board of Directors.

Page 38: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

38

Operations: 1. Water Quality Compliance a. The OCWA system recorded no violations during 2018. b. OCWA’s Marcellus Water Treatment Plant received the USEPA Partnership for Safe Water Director’s Award for 20 consecutive years of compliance with the Agency’s voluntary Phase III program requirements. The Lake Ontario Water Treatment Plant has received the award for 3 consecutive years. 2. Metered Ratio a. 2018 year-end Meter Ratio = 84.17% (up from 83.54% at the end of 2017) b. Water Production -- 13,721,826,000 (37.6 mgd) c. Water Sales -- 11,427,248 (31.3 mgd) d. Non-revenue use -- 122,802 (0.336 mgd) 3. Water Main Breaks

a. Total Repairs: 445 main breaks increase of 31 from 2017 and 75 more than 2016 b. Total Located by OCWA Leak Detection Personnel – 93 (increase of 8 / 2017) c. Leaks per Mile of Main – Total – 0.209 breaks per mile of main

d. Leaks per Mile of Main – Total minus leaks found by Leak Detection Crew – 0.165 breaks per mile of main without total detected.

4. Condition of OCWA Facilities –Facilities Inspection

a. OCWA submitted its vulnerability assessment in 2017 for all sites, and submitted documentation to the NYS Health Department, as required, on a five-year basis. OCWA utilizes its asset management system to conduct its vulnerability (All-Hazards) assessment and the system allows for the assessment to be updated daily.

b. In conjunction with the vulnerability assessment, Barton and Loguidice (OCWA’s Consulting Engineer) developed a detailed condition assessment program which utilizes our asset management system. Facility condition assessments are continually updated and documentation maintained in the computerized asset management system.

c. 13,284 (99.07%) of OCWA’s 13,400 hydrants were inspected at least once in 2018 . Hydrant Inspections are completed by field personnel utilizing tablets that download inspection data into OCWA’s GIS and asset management system.

d. Detailed inspections were completed on twelve water storage tanks.

Page 39: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

39

5. Customer Statistics: a. Total Accounts = 103,330 b. Total Metered Accounts = 101,882 1. Residential = 95,100 2. Commercial = 6,680 3. Municipal = 18 4. Industrial = 49 5. Hydrant Meters = 35 c. Fire Service Accounts = 1,444 d. Other Accounts = 4 Human Resources: 1. Employee Statistics: a. Total Full Time Equivalent Employees as of 12/31/2018 = 172 b. Accounts Served per Employee = 601 2. Employee Turnover Rate for 2018 a. Number of Employees Separated – Total of 9 b. Percent of Staff Separated - 5.23% 1. Percent separated per retirement - 3.49% 2. Percent separated voluntarily - 1.74% 3. Percent separated involuntary - 0.00% 3. Employee Development Contact Hours (Total and per employee) a. Total Development Hours - 4,649.8 Contact Hours b. Development Hours per Employee - 27.0 Contact Hours / Employee

Page 40: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

40

Management Salaries & Biographies

Last First Title Annualized Salary Actual Salary Hooker Michael Executive Director 170,652.56 170,526.34 Miller Geoffrey Deputy Executive Director 144,677.84 144,543.29 Brown Jeffrey Counsel 143,085.28 148,084.97 Marvin Curtis Fiscal Officer 125,925.60 125,804.92 Weiss Andrew Executive Engineer 125,000.00 124,854.41 Blanchard Barry Mgr. of Technical Support 112,192.60 112,529.26 Khanzadian Laureen Secretary Water Authority 110,681.68 110,998.92 Murphy Mark Water Plant Manager (Type A) 109,464.79 109,383.72 Sherlock Patrick Management Engineer 104,886.16 104,771.52 German George Water Maintenance Supervisors 100,406.43 101,112.02

Michael E. Hooker has been the Executive Director of the Authority since 1993. Prior to that time, he was General Manager of Hardin County Water District No. 1 in Radcliff, Kentucky and he has 40 years of waterworks management experience in both the public and private sectors. Mr. Hooker received a Bachelor of Science Degree from Montclair State College and a Masters Degree in Business Administration from Fairleigh Dickinson University. Geoffrey G. Miller has been the Deputy Executive Director at OCWA since 2015. Prior to that time, he was Executive Engineer at OCWA since 2006. He was previously employed as a waterworks and environmental engineer at an environmental engineering firm for over 19 years. Mr. Miller received Bachelor of Science degree from Clarkson University in Civil and Environmental Engineering. He is a licensed Professional Engineer in the State of New York; a Board Certified Environmental Engineer in the specialty of Water Supply and Wastewater; and a New York State Department of Health Certified Water System Operator. Jeffrey D. Brown, Esq. has been the full-time Legal Counsel at OCWA since 2015. Prior to that, he was a partner with the Mackenzie Hughes law firm where he represented the Onondaga County Water District and numerous other municipal governments. He also previously served as Regional Attorney for the New York State Department of Environmental Conservation, a law clerk to former U.S. District Judge Howard Munson and a member of the New York State Assembly. Mr. Brown has served in the United States military for 20 years and currently holds the rank of Lieutenant Colonel with the 174th Attack Wing. He received his Bachelor of Science degree from Cornell University and his Juris Doctor (cum laude) from Syracuse University.

Curtis R. Marvin has been Chief Fiscal Officer since 2015. Prior to that he was the Accounting Manager of the Authority since 1991. He was previously employed by the Onondaga County Health Department, Syracuse, New York. Mr. Marvin received a Bachelor of Science Degree in Accounting from LeMoyne College.

Page 41: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

41

Andrew J. Weiss has been the Executive Engineer at OCWA since 2015. Prior to that time, he was a Project Manager at a global consulting engineering firm specializing in water, wastewater and environmental engineering for over 10 years. Mr. Weiss received his Bachelor of Science degree in Environmental Resource Engineering from SUNY ESF at Syracuse. He is a licensed Professional Engineer in the State of New York, a New York State Department of Health Certified Water System Operator, and a Board Certified Environmental Engineer in Water Supply. Barry M. Blanchard has been the IT Manager (Manager of Technical Support) at OCWA since 2003. Previously he held positions of Senior Account Manager and Application Engineer with Intergraph Corporation (1990-2003). Mr. Blanchard received a Master of Science degree from the University of Maine in Surveying Engineering, a Bachelor of Science degree from SUNY ESF at Syracuse, and an Associate degree from SUNY ESF at Wanakena. Laurie Khanzadian has been the Manager of Human Resources, Safety and Insurance since 2011. In addition to her primary role, she serves as the Secretary to the Water Authority Board. She was previously employed by Onondaga County as the Personnel Manager of Social Services. Ms. Khanzadian received a Bachelor of Science degree in Labor & Industrial Relations from LeMoyne College. Mark Murphy has been the Water Plant Manager at the Otisco Water Treatment Plant since 1989. Prior to that he was Assistant Water Plant Manager (1987-1989), Water Plant Operator IA (1979-1987), Laborer and Summer Aide (1977-1979). Mark received an Associate’s Degree in Mathematics and Science from Onondaga Community College. He possesses a grade 1A Filtration Plant Water System Operator license issued by the New York State Department of Health. Patrick M. Sherlock has been the Management Engineer at OCWA since 2013. Prior to that time, he was Water Systems Construction Engineer, managing the Engineering Group at OCWA since 2008. He has been employed with OCWA in the Engineering Group since 1995. Mr. Sherlock received his Bachelor of Science degree from Clarkson University in Civil Engineering with a Professional Concentration in Environmental Engineering. He is a licensed Professional Engineer in the State of New York; a Board Certified Environmental Engineer in the specialty of Water Supply and Wastewater; and a New York State Department of Health Certified Water System Operator. George German has been employed at OCWA since November 1998, for the past 12 years as Distribution Maintenance Supervisor. Prior to that time, he held the titles of Assistant Supervisor, Crew Leader, Equipment Operator and Laborer. Mr. German’s more than 30 years of experience in the construction and maintenance of public water and sanitary systems also includes time with employers such as Lafayette Pipe, JJ Lane Construction, JK Tobin and Util-Co Pipe.

Page 42: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 43: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 44: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 45: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 46: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 47: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 48: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 49: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 50: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the
Page 51: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018

APPENDIX

REAL PROPERTY REPORT

Page 52: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Owner Type Previous Value 2018 ValueBuild/Str $1,100,000 $1,122,000

Equip/Cont $51,000 $52,020

Build/Str $1,500,000 $1,530,000

Equip/Cont $11,000 $11,220

Build/Str $46,000 $46,920

Build/Str $1,300,000 $1,326,000

Build/Str $3,300,000 $3,366,000

Equip/Cont $40,000 $40,800

Build/Str $2,500,000 $2,550,000

Equip/Cont $40,000 $40,800

Equip/Cont $13,000 $13,260

Build/Str $1,000,000 $1,020,000

Equip/Cont $51,000 $52,020

Build/Str $1,000,000 $1,020,000

Equip/Cont $14,000 $14,280

Build/Str $1,800,000 $1,836,000

Equip/Cont $64,000 $65,280

Build/Str $610,000 $622,200

Build/Str $1,000,000 $1,020,000

Build/Str $3,436,894 $3,505,632

Build.Str $2,305,323 $2,351,430

Equip/Cont $987,996 $1,007,756

Build/Str $580,000 $591,600

Build/Str $1,700,000 $1,734,000

Build/Str $10,000 $10,200

Equip/Cont $1,200,000 $1,224,000

Equip/Cont $25,000 $25,500

Build/Str $1,100,000 $1,122,000

Equip/Cont $33,000 $33,660

Build/Str $441,303 $450,129

Equip/Cont $33,028 $33,689

Build/Str $1,700,000 $1,734,000

Build/Str $640,000 $652,800

Equip/Cont $33,000 $33,660

Equip/Cont $33,000 $33,660

Build/Str $240,000 $244,800

Build/Str $250,000 $255,000

Build/Str $300,000 $306,000

Build/Str $640,000 $652,800

Build/Str $620,000 $632,400

Build/Str $600,000 $612,000

Build/Str $240,000 $244,800

Build/Str $1,100,000 $1,122,000

Build/Str $600,000 $612,000

Build/Str $960,000 $979,200

Equip/Cont $14,000 $14,280

Build/Str $3,700,000$3,774,000

Build/Str $4,400,000$4,488,000

Build/Str $986,000$1,005,720

Equip/Cont $724,000$738,480

Build/Str $3,571,314 $3,642,740

Build/Str $10,000 $10,200

Equip/Cont $1,530,563 $1,561,174

Equip/Cont $25,000 $25,500

SITE696 Clear Water Meter Vault Meter or control vault 1633 Rathburn Road, Oswego, NY, 13126 Clear Water Pump Station Meter Vault

SITE696 Clear Water Meter Vault Meter or control vault 1633 Rathburn Road, Oswego, NY, 13126 Clear Water Pump Station Meter Vault

SITE062 Oakridge Tank Ground Tank - Steel 515 Oakridge Dr, Camillus, NY 13031 Oakridge Dr. - Camillus - Contents

SITE030Hinsdale PS, Fairmount Reservoir / Service

Center

Ground Tank - Steel, Large Pump Station,

Facility / Building313 Hinsdale Road, Camillus, NY 13031

Hinsdale PS, Fairmount Reservoir / Service Center -

10,000,000 gal Tank

SITE030Hinsdale PS, Fairmount Reservoir / Service

Center

Ground Tank - Steel, Large Pump Station,

Facility / Building313 Hinsdale Road, Camillus, NY 13031

Hinsdale PS, Fairmount Reservoir / Service Center -

Building, Chlorine Building, Service Center, Pole Barn

SITE030Hinsdale PS, Fairmount Reservoir / Service

Center

Ground Tank - Steel, Large Pump Station,

Facility / Building

SITE696 Clear Water Pump Station and Sub Station Large Pump Station, Facility / Building 1633 Rathburn Road, Oswego, NY, 13126 Clear Water Pump Station - Contents

313 Hinsdale Road, Camillus, NY 13031Hinsdale PS, Fairmount Reservoir / Service Center -

Contents

SITE696 Clear Water Pump Station and Sub Station Large Pump Station, Facility / Building 1633 Rathburn Road, Oswego, NY, 13126 Clear Water Pump Station - Building

SITE730 Otisco Valley Tank Ground Tank - Steel 3353 Kinyon Rd, Marietta, NY 13110, USA Otisco Valley Tank - 388,000 gal

SITE885 Vienna Tank (Yager Tank) Ground Tank - Steel NY-13, New York, USA Vienna Tank (Yager Tank) - 200,000 gal

SITE885 Vienna Tank (Yager Tank) Ground Tank - Steel NY-13, New York, USA Vienna Tank (Yager Tank) - Contents

SITE030Hinsdale PS, Fairmount Reservoir / Service

Center

Ground Tank - Steel, Large Pump Station,

Facility / Building313 Hinsdale Road, Camillus, NY 13031

Hinsdale PS, Fairmount Reservoir / Service Center -

Domed Cover

SITE240 Westvale and Solvay Tanks Ground Tank - Steel 117 Southview Rd, Syracuse, NY 13209, USA Westvale  & Solvay Tanks - 900,000 gal

SITE585 Linda Road Tank Ground Tank - Steel 4733 Linda Dr, Syracuse, NY 13215, USA Linda Road Tank - 750,000 gal

SITE670 Southwood Tank Ground Tank - Steel 5018 Derringer Dr, Jamesville, NY 13078, USA Southwood Tank - 200,000 gal

SITE725 Tug Hill Tank Ground Tank - Steel 244 Tug Hill Rd, Oswego, NY 13126, USA Tug Hill Tank - 1,000,000 gal

SITE080 Warners Tank Ground Tank - Steel Canton St, Van Buren, NY, USA Warners Tank - 200,000 gal

SITE175 Coye Road Tank Ground Tank - Steel 6180 Coye Rd, Jamesville, NY 13078, USA Coye Road Tank - 125,000 gal

SITE240 Westvale and Solvay Tanks Ground Tank - Steel 117 Southview Rd, Syracuse, NY 13209, USA Westvale  & Solvay Tanks - 250,000 gal

SITE240 Westvale and Solvay Tanks Ground Tank - Steel 117 Southview Rd, Syracuse, NY 13209, USA Westvale  & Solvay Tanks - 500,000 gal

SITE077 Skyview Tanks Ground Tank - Steel 420 Skyview Terrace, Syracuse, NY 13219, USA Skyview Tanks - 2,000,000 gal

SITE077 Skyview Tanks Ground Tank - Steel 420 Skyview Terrace, Syracuse, NY 13219, USA Skyview Tanks - 500,000 gal

SITE077 Skyview Tanks Ground Tank - Steel 420 Skyview Terrace, Syracuse, NY 13219, USA Skyview Tanks - Contents

SITE077 Skyview Tanks Ground Tank - Steel 420 Skyview Terrace, Syracuse, NY 13219, USA Skyview Tanks - Contents

SITE650 Seneca Pump Station, Meter Pit, and Tank Ground Tank - Concrete, Large Pump Station, W Seneca Turnpike, Syracuse, NY, USA SENECA_METER_CONTENTS

SITE017 Eastview Tank (Camillus) Ground Tank - Steel 401 Blackmore Road, Camillus, NY 13031 Eastview Tank (Camillus) - 1,000,000 gal

SITE017 Eastview Tank (Camillus) Ground Tank - Steel 401 Blackmore Road, Camillus, NY 13031 Eastview Tank (Camillus) - Contents

SITE062 Oakridge Tank Ground Tank - Steel 515 Oakridge Dr, Camillus, NY 13031 Oakridge Dr. - Camillus - 500,000 gal

SITE650 Seneca Pump Station, Meter Pit, and Tank Ground Tank - Concrete, Large Pump Station, W Seneca Turnpike, Syracuse, NY, USA Seneca Pump Station and Tank - 2,000,000 gal

SITE650 Seneca Pump Station, Meter Pit, and Tank Ground Tank - Concrete, Large Pump Station, W Seneca Turnpike, Syracuse, NY, USA SENECA_METER_PIT

SITE650 Seneca Pump Station, Meter Pit, and Tank Ground Tank - Concrete, Large Pump Station, W Seneca Turnpike, Syracuse, NY, USA Seneca Pump Station and Tank - Contents

SITE362 Eastern Pump Station Large Pump Station 7784 Alverna Heights Dr., Fayetteville, NY 13066 Eastern Pump Station - Contents

SITE650 Seneca Pump Station, Meter Pit, and Tank Ground Tank - Concrete, Large Pump Station, W Seneca Turnpike, Syracuse, NY, USA Seneca Pump Station and Tank - Building

SITE390 Meadow Ridge Tank Ground Tank - Concrete 4563 Meadowridge Rd, Manlius, NY 13104, USA Meadow Ridge Tank - 500,000 gal

SITE575 Howlett Hill Tank Ground Tank - Concrete 4925 Howlett Hill Rd, Marcellus, NY 13108, USA Howlett Hill Tank - 1,000,000 gal

SITE655 Sentinel Heights Tanks Ground Tank - Concrete 4090 Sentinel Heights Rd, Jamesville, NY 13078, USA Sentinal Heights Tanks - (2) 1,500,000 gal

SITE362 Eastern Pump Station Large Pump Station 7784 Alverna Heights Dr., Fayetteville, NY 13066 Eastern Pump Station - Building

SITE895 Volney (2) Airport Tank Elevated Tank 150 Howard Rd, Fulton, NY 13069, USA Volney (2) Airport Tank - 300,000 gal

SITE895 Volney (2) Airport Tank Elevated Tank 150 Howard Rd, Fulton, NY 13069, USA Volney (2) Airport Tank - Contents

SITE285 Canastota Tank Ground Tank - Concrete 7738 Oxbow Rd, Canastota, NY 13032, USA Canastota Tank - 1,500,000 gal

SITE285 Canastota Tank Ground Tank - Concrete 7738 Oxbow Rd, Canastota, NY 13032, USA Canastota Tank - Contents

SITE310 Liverpool Tank Elevated Tank 401 Alder St, Liverpool, NY 13088, USA Liverpool Tank - Contents

SITE465 Limeledge Tank Elevated Tank 4185 NW Townline Rd, Marcellus, NY 13108, USA Limeledge Tank - Contents

SITE310 Liverpool Tank Elevated Tank 401 Alder St, Liverpool, NY 13088, USA Liverpool Tank - Generator

SITE465 Limeledge Tank Elevated Tank 4185 NW Townline Rd, Marcellus, NY 13108, USA Limeledge Tank - 150,000 gal

Elevated Tank County Rte 8, Granby, NY, USA Granby Tank - Building

SITE245 Granby Tank Elevated Tank County Rte 8, Granby, NY, USA Granby Tank - 300,000 gal

Central Square Tank - 1,000,000 gal

SITE265 Central Square Tank Elevated Tank 3345 NY-49, Central Square, NY 13036, USA Central Square Tank - Contents

SITE310 Liverpool Tank Elevated Tank 401 Alder St, Liverpool, NY 13088, USA Liverpool Tank - 1,000,000 gal

SITE265 Central Square Tank Elevated Tank 3345 NY-49, Central Square, NY 13036, USA

Site Site Type Address Insurance Contents

Onondaga County Water Authority

Facility Insured Values

120 Topaz Trail, Camillus, NY 13031 Hidden Knolls Tank - 250,000 gal

SITE160 Constantia Tank Elevated Tank 240 Nicholsville Rd, Bernhards Bay, NY 13028, USA Constantia Tank - 500,000 gal

SITE025 Hidden Knolls Tank Elevated Tank 120 Topaz Trail, Camillus, NY 13031 Hidden Knolls Tank - Contents

SITE025 Hidden Knolls Tank Elevated Tank

Leased

SITE160 Constantia Tank Elevated Tank 240 Nicholsville Rd, Bernhards Bay, NY 13028, USA Constantia Tank - Contents

SITE245 Granby Tank

Page

1

Of

10 3/15/2017 8:26:24 PM

Page 53: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Build/Str $10,000,000 $10,200,000Build/Str $1,000,000 $1,020,000Build/Str $4,000,000 $4,080,000

Build/Str $75,000 $76,500

Equip/Cont $2,133,894 $2,176,572

Equip/Cont $6,501,039 $6,631,060

Build/Str $2,339,513 $2,386,303

Equip/Cont $1,002,648 $1,022,701

Build/Str $0 $0

Equip/Cont $0 $0

Build/Str $0 $0

Build/Str $210,000 $214,200

Build/Str $620,000 $632,400

Equip/Cont $200,000 $204,000

Build/Str $100,000 $102,000

Equip/Cont $92,000 $93,840

Build/Str $840,000 $856,800

Build/Str $48,000 $48,960

Build/Str $130,000 $132,600

Build/Str $13,000 $13,260

Equip/Cont $130,000 $132,600

Equip/Cont $24,000 $24,480

Build/Str $270,000 $275,400

Equip/Cont $200,000 $204,000

Equip/Cont $280,000 $285,600

Build/Str $7,081,283 $7,222,908

Equip/Cont $3,034,835 $3,095,532

Build/Str $0 $0

Build/Str $0 $0

Equip/Cont $270,000 $275,400

Equip/Cont $140,000 $142,800

Equip/Cont $6,900 $7,038Build/Str $5,070,195 $5,171,599

Equip/Cont $2,172,941 $2,216,400

Build/Str $170,000 $173,400

Equip/Cont $150,000 $153,000

Build/Str $210,000 $214,200

Equip/Cont $250,000 $255,000

Build/Str $65,000 $66,300

Build/Str $240,000 $244,800

Equip/Cont $140,000 $142,800

Equip/Cont $8,400 $8,568

Equip/Cont $110,000 $112,200

Equip/Cont $220,000 $224,400

Equip/Cont $22,000 $22,440

Equip/Cont $5,600 $5,712

Build/Str $360,000 $367,200

Equip/Cont $330,000 $336,600

Build/Str $1,570,242$1,601,647

Equip/Cont $672,961$686,420

Build/Str $580,000 $591,600

Equip/Cont $1,200,000 $1,224,000

4170 Route 31, Clay, NY 13041 Administration Center - ContentsFacility / Building

SITE696 Ontario Water Treatment Plant Treatment Plant / Ground Tanks 1633 Rathburn Road, Oswego, NY, 13126 Water Treatment Plant - Building

SITE696 Ontario Water Treatment Plant Treatment Plant / Ground Tanks 1633 Rathburn Road, Oswego, NY, 13126 Water Treatment Plant - Backwash Tank 800,000 gal SITE696 Ontario Water Treatment Plant Treatment Plant / Ground Tanks 1633 Rathburn Road, Oswego, NY, 13126 Water Treatment Plant - Clearwells (2) 2,500,000 gal

SITE696 Ontario Water Treatment Plant Treatment Plant 1633 Rathburn Road, Oswego, NY, 13126 Water Treatment Plant - Storage Barn

SITE696

SITE696 Ontario Water Treatment Plant Treatment Plant 1633 Rathburn Road, Oswego, NY, 13126 Water Treatment Plant - Filter Beds

Ontario Water Treatment Plant Treatment Plant 1633 Rathburn Road, Oswego, NY, 13126 Water Treatment Plant - Contents

Administration Center Facility / Building 4170 Route 31, Clay, NY 13041 Administration Center - Building

Administration Center

SITE795 Wolf Street Pump Station Large Pump Station, Meter or Control Valve Pit 1320 Wolf St, Syracuse, NY 13208, USA Wolf Street Pump Station - Contents

SITE7967th North OCRRA, OCWA, Syr Meter Pit,

Subgrade, and Pump StationLarge Pump Station, Meter or Control Valve Pit 600 7th North Street, Liverpool, NY 13088

7th North Street Pump Station - Building, 3 meter pits -

Building

SITE835 Thurber Street Pump Station Large Pump Station, Meter or Control Valve Pit 115 Thurber St, Syracuse, NY 13210, USA Thurber Street Pump Station - Building

SITE835 Thurber Street Pump Station Large Pump Station, Meter or Control Valve Pit 115 Thurber St, Syracuse, NY 13210, USA Thurber Street Pump Station - Contents

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Contents

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Three VFD's

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Radio Install

SITE795 Wolf Street Pump Station Large Pump Station, Meter or Control Valve Pit 1320 Wolf St, Syracuse, NY 13208, USA Wolf Street Pump Station - Building

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Building

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Standby Emergency Generator

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Contents

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Two New Pumps

SITE015 Dunning Drive Pump Station Vault Large Pump Station, Meter or Control Valve Pit 412 Dunning Dr, Camillus, NY 13031 Dunning Drive Pump Station Vault - Contents

SITE075 Sherwood Pump Station Large Pump Station, Meter or Control Valve Pit 14 Sherwood Ave, Camillus, NY 13031, USA Sherwood Pump Station - Building

SITE075 Sherwood Pump Station Large Pump Station, Meter or Control Valve Pit 14 Sherwood Ave, Camillus, NY 13031, USA Sherwood Pump Station - Contents

SITE450 East Hill Pump Station Large Pump Station, Meter or Control Valve Pit 2506 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Pump Station - Roof and Roof Structure

SITE136 Farrell Pump StationLarge Pump Station, Sub Station,

Facilities/Buildings4170 Route 31, Clay, NY 13041

Farrell Pump Station - Pump Station, Sub-Station,

Chemical Storage Building, Control Structure, 2 Meter

pits, Valve control pit, 2 Storage Barns

Solvay Pump Station Large Pump Station 3123 Milton Ave, Solvay, NY 13209, USA Solvay Pump Station - Building

SITE225 Solvay Pump Station Large Pump Station 3123 Milton Ave, Solvay, NY 13209, USA Solvay Pump Station - Vault

SITE225 Solvay Pump Station Large Pump Station 3123 Milton Ave, Solvay, NY 13209, USA Solvay Pump Station - Contents

SITE880 Sylvan Beach Tank and Vienna Pump Station Ground Tank - Steel, Small Pump Station 2407 NY-13, Blossvale, NY 13308, USASylvan Beach Tank and Vienna Pump Station -

Contents

SITE040 Howlett Hill Pump Station Large Pump Station 2540 Lyons Road, Camillus, NY 13031 Howlett Hill Pump Station - Building

SITE040 Howlett Hill Pump Station Large Pump Station 2540 Lyons Road, Camillus, NY 13031 Howlett Hill Pump Station - Standby Emergency

SITE040 Howlett Hill Pump Station Large Pump Station 2540 Lyons Road, Camillus, NY 13031 Howlett Hill Pump Station - Contents

SITE880 Sylvan Beach Tank and Vienna Pump Station Ground Tank - Steel, Small Pump Station 2407 NY-13, Blossvale, NY 13308, USASylvan Beach Tank and Vienna Pump Station -

Rechlorination Building

SITE880 Sylvan Beach Tank and Vienna Pump Station Ground Tank - Steel, Small Pump Station 2407 NY-13, Blossvale, NY 13308, USA Sylvan Beach Tank and Vienna Pump Station - Building

SITE880 Sylvan Beach Tank and Vienna Pump Station Ground Tank - Steel, Small Pump Station 2407 NY-13, Blossvale, NY 13308, USASylvan Beach Tank and Vienna Pump Station - Radio

Building

SITE880 Sylvan Beach Tank and Vienna Pump Station Ground Tank - Steel, Small Pump Station 2407 NY-13, Blossvale, NY 13308, USASylvan Beach Tank and Vienna Pump Station -

Contents

SITE515 Abbey Pump Station and Tank Ground Tank - Steel, Small Pump Station 4445 Abbey Rd, Syracuse, NY 13215, USA Abbey Pump Station and Tank - Contents

SITE780 Salina Gardens Pump Station Ground Tank - Steel, Small Pump Station 3500 Court St, Syracuse, NY 13206, USA Salina Gardens Pump Station - Building

SITE780 Salina Gardens Pump Station Ground Tank - Steel, Small Pump Station 3500 Court St, Syracuse, NY 13206, USA Salina Gardens Pump Station - Contents

SITE880 Sylvan Beach Tank and Vienna Pump Station Ground Tank - Steel, Small Pump Station 2407 NY-13, Blossvale, NY 13308, USASylvan Beach Tank and Vienna Pump Station -

1,000,000 gal

SITE440 Skyridge Pump Station and Tank Ground Tank - Steel, Small Pump Station 8772 Horseshoe Ln, Chittenango, NY 13037, USA Skyridge Pump Station and Tank - Contents

SITE440

Skyridge Pump Station and Tank Ground Tank - Steel, Small Pump Station 8772 Horseshoe Ln, Chittenango, NY 13037, USA Skyridge Pump Station and Tank - 50,000 gal

SITE515 Abbey Pump Station and Tank Ground Tank - Steel, Small Pump Station 4445 Abbey Rd, Syracuse, NY 13215, USA Abbey Pump Station and Tank - Building

SITE515 Abbey Pump Station and Tank Ground Tank - Steel, Small Pump Station 4445 Abbey Rd, Syracuse, NY 13215, USA Abbey Pump Station and Tank - 750,000 gal

Skyridge Pump Station and Tank Ground Tank - Steel, Small Pump Station 8772 Horseshoe Ln, Chittenango, NY 13037, USA Skyridge Pump Station and Tank - Building

SITE440

Leased

SITE796

Farrell Pump StationLarge Pump Station, Sub Station,

Facilities/Buildings4170 Route 31, Clay, NY 13041

Farrell Pump Station - Pump Station, Sub-Station,

Chemical Storage Building, Control Structure, 2 Meter

pits, Valve control pit, 2 Storage Barns

SITE711 Raw Water Pump Station Large Pump Station and Sub Station 6th Ave, Oswego, NY 13126 Raw Water Pump Station - Contents

SITE225

7th North OCRRA, OCWA, Syr Meter Pit,

Subgrade, and Pump StationLarge Pump Station, Meter or Control Valve Pit 600 7th North Street, Liverpool, NY 13088 7th North Street Pump Station, 3 meter pits - Contents

SITE136

SITE225 Solvay Pump Station Large Pump Station 3123 Milton Ave, Solvay, NY 13209, USA Solvay Pump Station - Standby Emergency Generator

SITE225 Solvay Pump Station Large Pump Station 3123 Milton Ave, Solvay, NY 13209, USA Solvay Pump Station - Contents

SITE711 Raw Water Pump Station Large Pump Station and Sub Station 6th Ave, Oswego, NY 13126 Raw Water Pump Station - Building

SITE015 Dunning Drive Pump Station Vault Large Pump Station, Meter or Control Valve Pit 412 Dunning Dr, Camillus, NY 13031 Dunning Drive Pump Station Vault - Building

Page

2

Of

10 3/15/2017 8:26:24 PM

Page 54: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Build/Str $1,136,455$1,159,184

Build/Str $4,250,000$4,335,000

Equip/Cont $487,052$496,793

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $12,000 $12,240

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

SITE425Salt Springs Pump Station, Meter Pit, and

Tank

Large Pump Station, Meter or Control Valve

Pit, Ground Tank - Concrete7990 Salt Springs Rd, Manlius, NY 13104, USA Salt Springs Pump Station and Tank - 5,000,000 Gallons

SITE395 Minoa Meter Meter or Control Valve Pit 103 S Main St, Minoa, NY 13116, USA Minoa Meter

SITE395 Minoa Meter Meter or Control Valve Pit 103 S Main St, Minoa, NY 13116, USA Minoa Meter Contents

SITE400 Mott Road Pressure Reducing Valve Meter or Control Valve Pit 7173 Mott Rd, Fayetteville, NY 13066, USA Mott Road Pressure Reducing Valve

SITE400 Mott Road Pressure Reducing Valve Meter or Control Valve Pit 7173 Mott Rd, Fayetteville, NY 13066, USA Mott Road Pressure Reducing Valve Contents

SITE350 Churchill Road #1 Control Valve Meter or Control Valve Pit 430 Churchill Ln, Fayetteville, NY 13066, USA Churchill Road #1 Control Valve

SITE350 Churchill Road #1 Control Valve Meter or Control Valve Pit 430 Churchill Ln, Fayetteville, NY 13066, USA Churchill Road #1 Control Valve Contents

SITE355 Duguid Road Control Valve and Meter Pit Meter or Control Valve Pit 607 Briar Brook Run, Fayetteville, NY 13066 Duguid Road Control Valve and Meter Pit

SITE355 Duguid Road Control Valve and Meter Pit Meter or Control Valve Pit 607 Briar Brook Run, Fayetteville, NY 13066 Duguid Road Control Valve and Meter Pit Contents

SITE375 Hoag Lane Pressure Reducing Valve

SITE329 Golden Heights Control Valve Meter or Control Valve Pit 8016 Genesee Turnpike, Fayetteville, NY 13066, USA Golden Heights Control Valve

SITE329 Golden Heights Control Valve Meter or Control Valve Pit 8016 Genesee Turnpike, Fayetteville, NY 13066, USA Golden Heights Control Valve Contents

SITE330 Briar Brook Control Valve Meter or Control Valve Pit Brewerton Rd, New York, USA Briar Brook Control Valve - Control Vault

SITE330 Briar Brook Control Valve Meter or Control Valve Pit Brewerton Rd, New York, USA Briar Brook Control Valve - Contents

Meter or Control Valve Pit 398 Churchill Ln, Fayetteville, NY 13066, USA Hoag Lane Pressure Reducing Valve

SITE375 Hoag Lane Pressure Reducing Valve Meter or Control Valve Pit

SITE255 Bartell Road Control Valve Meter or Control Valve Pit 5698 Bartell Exd, Brewerton, NY 13029, USA Bartell Road Control Valve

SITE255 Bartell Road Control Valve Meter or Control Valve Pit 5698 Bartell Exd, Brewerton, NY 13029, USA Bartell Road Control Valve Contents

SITE270 Hastings Control Valve Meter or Control Valve Pit US-11, United States Hastings Control Valve

SITE270 Hastings Control Valve Meter or Control Valve Pit US-11, United States Hastings Control Valve Contents

SITE280 Lafayette Road Meter Meter or Control Valve Pit 4289 Lafayette Road, Jamesville, NY 13078 Lafayette Road Meter

SITE280 Lafayette Road Meter Meter or Control Valve Pit 4289 Lafayette Road, Jamesville, NY 13078 Lafayette Road Meter Contents

SITE300 Owl Wire Control Valve Meter or Control Valve Pit 3127 Seneca Turnpike, Canastota, NY 13032, USA Owl Wire Control Valve

SITE300 Owl Wire Control Valve Meter or Control Valve Pit 3127 Seneca Turnpike, Canastota, NY 13032, USA Owl Wire Control Valve Contents

SITE305 Peterboro Street Pressure Reducing Valve Meter or Control Valve Pit N Peterboro St, Canastota, NY 13032, USA Peterboro Street Pressure Reducing Valve

SITE305 Peterboro Street Pressure Reducing Valve Meter or Control Valve Pit N Peterboro St, Canastota, NY 13032, USA Peterboro Street Pressure Reducing Valve Contents

SITE195 Yale Avenue Pressure Reducing Valve Meter or Control Valve Pit 97 Yale Ave, Syracuse, NY 13201 Yale Avenue Pressure Reducing Valve

SITE195 Yale Avenue Pressure Reducing Valve Meter or Control Valve Pit 97 Yale Ave, Syracuse, NY 13201 Yale Avenue Pressure Reducing Valve Contents

SITE200 Beach Road Meter Meter or Control Valve Pit 6699 Beach Rd, Syracuse, NY 13209, USA Beach Road Meter - Meter Pit

SITE200 Beach Road Meter Meter or Control Valve Pit 6699 Beach Rd, Syracuse, NY 13209, USA Beach Road Meter - Contents

SITE210 Farrell Road Control Valve and Meter Pit Meter or Control Valve Pit 15 Silverbell Cir, Orchard Park, NY 14127Farrell Road Control Valve - North Geddes Phosphate

Station

SITE210 Farrell Road Control Valve and Meter Pit

Bamerick Road Meter

SITE165 Bamerick Road Meter Meter or Control Valve Pit 4724 Bamerick Rd, Jamesville, NY 13078, USA Bamerick Road Meter Contents

Meter or Control Valve Pit 15 Silverbell Cir, Orchard Park, NY 14127 Farrell Road Control Valve - Contents

SITE220 Solvay Paperboard Pressure Reducing Valve Meter or Control Valve Pit Milton Ave, Solvay, NY 13209, USA Solvay Paperboard Pressure Reducing Valve

SITE220 Solvay Paperboard Pressure Reducing Valve Meter or Control Valve Pit

SITE165 Bamerick Road Meter Meter or Control Valve Pit 4724 Bamerick Rd, Jamesville, NY 13078, USA

Milton Ave, Solvay, NY 13209, USA Solvay Paperboard Pressure Reducing Valve Contents

SITE230 Western Lights Pressure Reducing Valve Meter or Control Valve Pit 4746 Onondaga Blvd, Geddes, NY 13209 Western Lights Pressure Reducing Valve

SITE230 Western Lights Pressure Reducing Valve Meter or Control Valve Pit 4746 Onondaga Blvd, Geddes, NY 13209 Western Lights Pressure Reducing Valve Contents

398 Churchill Ln, Fayetteville, NY 13066, USA

SITE107 Mud Mill Control Valve Meter or Control Valve Pit 9185 Brewerton Rd, Brewerton, NY 13029, USA Mud Mill Control Valve

SITE107 Mud Mill Control Valve

Pardee Road Control Valve - Contents

Hoag Lane Pressure Reducing Valve Contents

SITE380 Hunt Lane Pressure Reducing Valve Meter or Control Valve Pit Hunt Ln, Fayetteville, NY 13066, USA Hunt Lane Pressure Reducing Valve

SITE380 Hunt Lane Pressure Reducing Valve Meter or Control Valve Pit Hunt Ln, Fayetteville, NY 13066, USA Hunt Lane Pressure Reducing Valve Contents

Meter or Control Valve Pit 9185 Brewerton Rd, Brewerton, NY 13029, USA Mud Mill Control Valve Contents

SITE110 Pardee Road Control Valve and Meter Pit Meter or Control Valve Pit 8410 Pardee Rd, Brewerton, NY 13029, USA Pardee Road Control Valve - Vault

SITE110 Pardee Road Control Valve and Meter Pit Meter or Control Valve Pit 8410 Pardee Rd, Brewerton, NY 13029, USA

SITE100 Cicero Airport Control Valve Meter or Control Valve Pit Cicero, NY 13039, USA Cicero Airport Control Valve

SITE100 Cicero Airport Control Valve Meter or Control Valve Pit Cicero, NY 13039, USA Cicero Airport Control Valve Contents

SITE105 McKinley Road Control Valve Meter or Control Valve Pit 5711 McKinley Rd, Cicero, NY, USA McKinley Road Control Valve - Vault

SITE105 McKinley Road Control Valve Meter or Control Valve Pit 5711 McKinley Rd, Cicero, NY, USA McKinley Road Control Valve - Contents

SITE020 Eight J (8J) Control Valve Meter or Control Valve Pit 3190 Milton Avenue, Camillus, NY 13031 Eight J (8J) Control Valve - Vault

SITE020 Eight J (8J) Control Valve Meter or Control Valve Pit 3190 Milton Avenue, Camillus, NY 13031 Eight J (8J) Control Valve - Contents and

SITE050 Kasson Road Control Valve Meter or Control Valve Pit 4596 Kasson Rd, Camillus, NY 13031 Kasson Road Control Valve - Vault

SITE050 Kasson Road Control Valve Meter or Control Valve Pit 4596 Kasson Rd, Camillus, NY 13031 Kasson Road Control Valve - Contents

SITE425Salt Springs Pump Station, Meter Pit, and

Tank

Large Pump Station, Meter or Control Valve

Pit, Ground Tank - Concrete7990 Salt Springs Rd, Manlius, NY 13104, USA Salt Springs Pump Station and Tank - Building

SITE425Salt Springs Pump Station, Meter Pit, and

Tank

Large Pump Station, Meter or Control Valve

Pit, Ground Tank - Concrete7990 Salt Springs Rd, Manlius, NY 13104, USA Salt Springs Pump Station and Tank - Contents

SITE010 Breed Road Pressure Reducing Valve Meter or Control Valve Pit 6200 Breed Road, Camillus, NY 13031Breed Road Pressure Reducing Valve - Pressure

Reducing & Meter Vault

SITE010 Breed Road Pressure Reducing Valve Meter or Control Valve Pit 6200 Breed Road, Camillus, NY 13031 Breed Road Pressure Reducing Valve - Contents

Leased

Page

3

Of

10 3/15/2017 8:26:24 PM

Page 55: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

$10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

$10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

$10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

SITE680Tanner Road (S. Onondaga) Pressure

Reducing ValveMeter or Control Valve Pit 3616 County Rd 129, Syracuse, NY 13215, USA Tanner Road (S. Onondaga) Pressure Reducing Valve

SITE640Sentinel Heights Pit #1 Pressure Reducing

ValveMeter or Control Valve Pit Rockwell Rd, Nedrow, NY 13120, USA Sentinel Heights Pit #1 Pressure Reducing Valve

SITE640Sentinel Heights Pit #1 Pressure Reducing

ValveMeter or Control Valve Pit Rockwell Rd, Nedrow, NY 13120, USA

Sentinel Heights Pit #1 Pressure Reducing Valve

Contents

SITE645 Rockwell Pit #2 Pressure Reducing Valve Meter or Control Valve Pit 412 Rockwell Rd, Nedrow, NY 13120, USA Rockwell Pit #2 Pressure Reducing Valve - PRA Vault

SITE645 Rockwell Pit #2 Pressure Reducing Valve Meter or Control Valve Pit 412 Rockwell Rd, Nedrow, NY 13120, USARockwell Pit #2 Pressure Reducing Valve - Contents

and Instrumentation

SITE630Onondaga Boulavard Pressure Reducing

ValveMeter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA Onondaga Boulavard Pressure Reducing Valve

SITE630Onondaga Boulavard Pressure Reducing

ValveMeter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA

Onondaga Boulavard Pressure Reducing Valve

Contents

SITE635 Onondaga Road Meter Meter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA Onondaga Road Meter

SITE635 Onondaga Road Meter Meter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA Onondaga Road Meter Contents

SITE617 Nob Hill Control Valve Meter or Control Valve Pit W Seneca Turnpike, Syracuse, NY, USA Nob Hill Control Valve

SITE617 Nob Hill Control Valve Meter or Control Valve Pit W Seneca Turnpike, Syracuse, NY, USA Nob Hill Control Valve Contents

SITE620 OCC Meter Pit Meter or Control Valve Pit Syracuse, NY 13207, USA OCC Meter Pit - Vault

SITE620 OCC Meter Pit Meter or Control Valve Pit Syracuse, NY 13207, USA OCC Meter Pit - Contents

SITE610 McDonald Road Pressure Reducing Valve Meter or Control Valve Pit 4671 McDonald Rd, Syracuse, NY 13215, USA McDonald Road Pressure Reducing Valve

SITE610 McDonald Road Pressure Reducing Valve Meter or Control Valve Pit 4671 McDonald Rd, Syracuse, NY 13215, USA McDonald Road Pressure Reducing Valve Contents

SITE615 Nixon Road Control Valve Meter or Control Valve Pit W Seneca Turnpike, Syracuse, NY, USA Nixon Road Control Valve - Vault

SITE615 Nixon Road Control Valve Meter or Control Valve Pit W Seneca Turnpike, Syracuse, NY, USA Nixon Road Control Valve - Contents

SITE560 Excalibur Drive Pressure Reducing Valve Meter or Control Valve Pit Excalibur Dr, Syracuse, NY 13215, USA Excalibur Drive Pressure Reducing Valve Contents

SITE580 Kelly's Corner Pressure Reducing Valve Meter or Control Valve Pit 5026 Cedarvale Rd, Syracuse, NY 13215, USA Kelly's Corner Pressure Reducing Valve - Vault

SITE580 Kelly's Corner Pressure Reducing Valve Meter or Control Valve Pit 5026 Cedarvale Rd, Syracuse, NY 13215, USA Kelly's Corner Pressure Reducing Valve - Contents

SITE605Makyes Road (S. Onondaga) Pressure

Reducing ValveMeter or Control Valve Pit 3855 Makyes Rd, Syracuse, NY 13215, USA

Makyes Road (S. Onondaga) Pressure Reducing Valve -

Radio Antenna Monopole

SITE540Cole Road (S. Onondaga) Pressure Reducing

ValveMeter or Control Valve Pit 4476 Cole Rd, Syracuse, NY 13215, USA

Cole Road (S. Onondaga) Pressure Reducing Valve

Contents

SITE550 Corporal Welch Pressure Reducing Valve Meter or Control Valve Pit 5148 Corporal Welch Rd, Syracuse, NY 13215, USA Corporal Welch Pressure Reducing Valve

SITE550 Corporal Welch Pressure Reducing Valve Meter or Control Valve Pit 5148 Corporal Welch Rd, Syracuse, NY 13215, USA Corporal Welch Pressure Reducing Valve Contents

SITE560 Excalibur Drive Pressure Reducing Valve Meter or Control Valve Pit Excalibur Dr, Syracuse, NY 13215, USA Excalibur Drive Pressure Reducing Valve

SITE525 Buxton Woods Control Valve Meter or Control Valve Pit 4810 Sherwood Dr, Syracuse, NY 13215, USA Buxton Woods Control Valve - Contents

SITE535Cemetary (S. Onondaga) Pressure Reducing

ValveMeter or Control Valve Pit Makyes Rd, Syracuse, NY 13215, USA Cemetary (S. Onondaga) Pressure Reducing Valve

SITE535Cemetary (S. Onondaga) Pressure Reducing

ValveMeter or Control Valve Pit Makyes Rd, Syracuse, NY 13215, USA

Cemetary (S. Onondaga) Pressure Reducing Valve

Contents

SITE540Cole Road (S. Onondaga) Pressure Reducing

ValveMeter or Control Valve Pit 4476 Cole Rd, Syracuse, NY 13215, USA Cole Road (S. Onondaga) Pressure Reducing Valve

SITE458 Glover Rd Pressure Reducing Valve Meter or Control Valve Pit 2291 Glover Road, Marcellus, NY, 13108, USA Glover Rd Pressure Reducing Valve - Contents

SITE520Abbey Road (S. Onondaga) Pressure

Reducing ValveMeter or Control Valve Pit 4012 Abbey Rd, Syracuse, NY 13215, USA Abbey Road (S. Onondaga) Pressure Reducing Valve

SITE520Abbey Road (S. Onondaga) Pressure

Reducing ValveMeter or Control Valve Pit 4012 Abbey Rd, Syracuse, NY 13215, USA

Abbey Road (S. Onondaga) Pressure Reducing Valve

Contents

SITE525 Buxton Woods Control Valve Meter or Control Valve Pit 4810 Sherwood Dr, Syracuse, NY 13215, USA Buxton Woods Control Valve - Vault

SITE420 Route 5 - Lyndon Pressure Reducing Valve Meter or Control Valve Pit Manlius, NY 13104, USA Route 5 - Lyndon Pressure Reducing Valve Contents

SITE430 Signal Hill Pressure Reducing Valve Meter or Control Valve Pit Genesee Turnpike, Manlius, NY 13104, USA Signal Hill Pressure Reducing Valve

SITE430 Signal Hill Pressure Reducing Valve Meter or Control Valve Pit Genesee Turnpike, Manlius, NY 13104, USA Signal Hill Pressure Reducing Valve Contents

SITE458 Glover Rd Pressure Reducing Valve Meter or Control Valve Pit 2291 Glover Road, Marcellus, NY, 13108, USA Glover Rd Pressure Reducing Valve - Pressure

SITE410 Pleasant Street Control Valve Meter or Control Valve Pit 610 Pleasant St, Manlius, NY 13104, USA Pleasant Street Control Valve Contents

SITE415Route 5 - Fayetteville - Pressure Reducing

Valve and Meter PitMeter or Control Valve Pit 5488 Golden Heights Dr, Fayetteville, NY 13066

Route 5 - Fayetteville - Pressure Reducing Valve and

Meter Pit

SITE415Route 5 - Fayetteville - Pressure Reducing

Valve and Meter PitMeter or Control Valve Pit 5488 Golden Heights Dr, Fayetteville, NY 13066

Route 5 - Fayetteville - Pressure Reducing Valve and

Meter Pit Contents

SITE420 Route 5 - Lyndon Pressure Reducing Valve Meter or Control Valve Pit Manlius, NY 13104, USA Route 5 - Lyndon Pressure Reducing Valve

SITE410 Pleasant Street Control Valve Meter or Control Valve Pit 610 Pleasant St, Manlius, NY 13104, USA Pleasant Street Control Valve

Leased

Page

4

Of

10 3/15/2017 8:26:24 PM

Page 56: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $30,000$30,600

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $200,000$204,000

Equip/Cont $25,000$25,500

Build/Str $82,313$83,959

Equip/Cont $20,578$20,990

Build/Str $30,000 $30,600

Equip/Cont $39,000 $39,780

Equip/Cont $10,000 $10,200

Build/Str $55,000 $56,100

Build/Str $110,000 $112,200

Equip/Cont $100,000 $102,000

Build/Str $37,000 $37,740

Equip/Cont $29,000 $29,580

Build/Str $35,000 $35,700

Equip/Cont $13,000 $13,260

Equip/Cont $26,000 $26,520

Equip/Cont $19,000 $19,380

Equip/Cont $10,000 $10,200

Build/Str $77,000 $78,540

Build/Str $210,000 $214,200

Equip/Cont $140,000 $142,800

Build/Str $180,000$183,600

Equip/Cont $180,000$183,600

Equip/Cont $67,000$68,340

Build/Str $150,000 $153,000

Equip/Cont $100,000 $102,000

Build/Str $300,000 $306,000

SITE180 Coye Road Pump Station Small Pump Station 4270 Coye Rd, Jamesville, NY 13078, USA Sherwood Pump Station - Building

SITE180 Coye Road Pump Station Small Pump Station 4270 Coye Rd, Jamesville, NY 13078, USA Sherwood Pump Station - Contents

SITE185 East Syracuse Pump Station Small Pump Station 330 E 1st St, East Syracuse, NY 13057, USA East Syracuse Pump Station - Building

SITE070 Scenic Meadows Pump Station Small Pump Station 103 Raspberry Ln, Camillus, NY 13031, USA Scenic Meadows Pump Station - Contents

SITE085 Warners Pump Station Small Pump Station 3300 Warners Rd, Camillus, NY 13031, USA Warners Pump Station - Building

SITE085 Warners Pump Station Small Pump Station 3300 Warners Rd, Camillus, NY 13031, USA Warners Pump Station - Contents

SITE085 Warners Pump Station Small Pump Station 3300 Warners Rd, Camillus, NY 13031, USAWarners Pump Station - Standby Emergency

Generator

SITE490 NE Townline Radio Tower OCWA - Organization, Facility / Building 4699 NE Townline Rd, Marcellus, NY 13108, USA NE Townline Radio Tower - Contents

SITE045 Kasson Road Pump Station Vault Small Pump Station 230 Kasson Road, Camillus, NY 13031 Kasson Road Pump Station Vault

SITE045 Kasson Road Pump Station Vault Small Pump Station 230 Kasson Road, Camillus, NY 13031 Kasson Road Pump Station Vault

SITE070 Scenic Meadows Pump Station Small Pump Station 103 Raspberry Ln, Camillus, NY 13031, USA Scenic Meadows Pump Station - Building

SITE565 Green Hills Pump Station Vault Meter or Control Valve Pit, Small Pump Station 5901 S Salina St, Syracuse, NY 13205, USA Green Hills Pump Station Vault - Contents

SITE490 NE Townline Radio Tower OCWA - Organization, Facility / Building 4699 NE Townline Rd, Marcellus, NY 13108, USA NE Townline Radio Tower - Radio Building

SITE490 NE Townline Radio Tower OCWA - Organization, Facility / Building 4699 NE Townline Rd, Marcellus, NY 13108, USA NE Townline Radio Tower - Generator

SITE490 NE Townline Radio Tower OCWA - Organization, Facility / Building 4699 NE Townline Rd, Marcellus, NY 13108, USA NE Townline Radio Tower - Antenna Tower

Meter or Control Valve Pit, Small Pump Station 704 Whedon Road, Camillus, NY 13031 Hidden Knolls Pump Station Vault - Vault

SITE235 Westvale Pump Station Meter or Control Valve Pit, Small Pump Station 3310 W Genesee St, Syracuse, NY 13209, USA Westvale Pump Station - Building

SITE235 Westvale Pump Station Meter or Control Valve Pit, Small Pump Station 3310 W Genesee St, Syracuse, NY 13209, USA Westvale Pump Station - Contents

SITE565 Green Hills Pump Station Vault Meter or Control Valve Pit, Small Pump Station 5901 S Salina St, Syracuse, NY 13205, USA Green Hills Pump Station Vault - Vault

SITE027 Hidden Knolls Pump Station Vault

SITE805 Chittenango Control Building Meter or Control Valve Pit, Facility / Building 7065 Lakeport Rd, Chittenango, NY 13037, USA Chittenango Control Building - Building

SITE820 Lakeport Control Station Meter or Control Valve Pit, Facility / Building 1975 NY-31, Chittenango, NY 13037, USA Lakeport Control Station - Control Building

SITE820 Lakeport Control Station Meter or Control Valve Pit, Facility / Building 1975 NY-31, Chittenango, NY 13037, USA Lakeport Control Station - Contents

SITE027 Hidden Knolls Pump Station Vault Meter or Control Valve Pit, Small Pump Station 704 Whedon Road, Camillus, NY 13031 Hidden Knolls Pump Station Vault - Contents

Sylvan Beach / Lenox Meter Pit Meter or Control Valve Pit 9187 NY-13, Canastota, NY 13032, USA Sylvan Beach / Lenox Meter Pit

SITE875 Sylvan Beach / Lenox Meter Pit Meter or Control Valve Pit 9187 NY-13, Canastota, NY 13032, USA Sylvan Beach / Lenox Meter Pit Contents

SITE889 Bock Road Meter Pit Meter or Control Valve Pit, Facility / Building 41 Bock Dr., Fulton , NY 13069 Bock Road Meter Pit

SITE889 Bock Road Meter Pit Meter or Control Valve Pit, Facility / Building 41 Bock Dr., Fulton , NY 13069 Bock Road Meter Pit Contents

Bolivar Road Pressure Reducing Valve

SITE800 Bolivar Road Pressure Reducing Valve Meter or Control Valve Pit 6983 Bolivar Rd, Chittenango, NY 13037, USA Bolivar Road Pressure Reducing Valve Contents

SITE815 Fly Road Control Valve Meter or Control Valve Pit 7065 Lakeport Rd, Chittenango, NY 13037, USA Fly Road Control Valve - Radio Antenna Monopole

SITE870 Old Rout 49 Pressure Reducing Valve Meter or Control Valve Pit Vienna, NY 13308, USA Old Rout 49 Pressure Reducing Valve

SITE870 Old Rout 49 Pressure Reducing Valve Meter or Control Valve Pit

Court Street Pressure Reducing Valve Meter or Control Valve Pit Court Street, Syracuse, NY 13201

Vienna, NY 13308, USA Old Rout 49 Pressure Reducing Valve Contents

SITE875

Town of Oswego Meter Pit

SITE721Town of Oswego Meter Pit & Pressure

Reducing Valve

Meter or Control Valve Pit 8059 Broadfield Rd, Manlius, NY 13104, USA Broadfield Road Meter

SITE727 Broadfield Road Meter Meter or Control Valve Pit 8059 Broadfield Rd, Manlius, NY 13104, USA Broadfield Road Meter Contents

SITE755 Court Street Pressure Reducing Valve Meter or Control Valve Pit Court Street, Syracuse, NY 13201 Court Street Pressure Reducing Valve

SITE755

Meter or Control Valve Pit NY-104, Oswego, NY 13126, USA Route 104 Oswego Pressure Reducing Valve Contents

Court Street Pressure Reducing Valve Contents

SITE800 Bolivar Road Pressure Reducing Valve Meter or Control Valve Pit 6983 Bolivar Rd, Chittenango, NY 13037, USA

SITE720Thompson Road (Oswego) Pressure Reducing

ValveMeter or Control Valve Pit Thompson Rd, Oswego, NY 13126, USA Thompson Road (Oswego) Pressure Reducing Valve

SITE720Thompson Road (Oswego) Pressure Reducing

ValveMeter or Control Valve Pit Thompson Rd, Oswego, NY 13126, USA

Thompson Road (Oswego) Pressure Reducing Valve

Contents

SITE721Town of Oswego Meter Pit & Pressure

Reducing ValveMeter or Control Valve Pit and PRV 1633 Rathburn Road, Oswego, NY, 13126

SITE690 Van Duyn Control Valve Meter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA Van Duyn Control Valve

SITE690 Van Duyn Control Valve Meter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA Van Duyn Control Valve Contents

Meter or Control Valve Pit and PRV 1633 Rathburn Road, Oswego, NY, 13126 Town of Oswego Meter Pit Contents

SITE727 Broadfield Road Meter

SITE695Cemetery Road (Oswego) Pressure Reducing

ValveMeter or Control Valve Pit 296 Cemetery Rd, Oswego, NY 13126, USA Cemetery Road (Oswego) Pressure Reducing Valve

SITE695Cemetery Road (Oswego) Pressure Reducing

ValveMeter or Control Valve Pit 296 Cemetery Rd, Oswego, NY 13126, USA

Cemetery Road (Oswego) Pressure Reducing Valve

Contents

SITE715 Route 104 Oswego Pressure Reducing Valve Meter or Control Valve Pit NY-104, Oswego, NY 13126, USA Route 104 Oswego Pressure Reducing Valve

SITE715 Route 104 Oswego Pressure Reducing Valve

SITE680Tanner Road (S. Onondaga) Pressure

Reducing ValveMeter or Control Valve Pit 3616 County Rd 129, Syracuse, NY 13215, USA

Tanner Road (S. Onondaga) Pressure Reducing Valve

Contents

SITE685 Unity Mutual Pressure Reducing Valve Meter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA Unity Mutual Pressure Reducing Valve

SITE685 Unity Mutual Pressure Reducing Valve Meter or Control Valve Pit Onondaga Terrace, Syracuse, NY 13207, USA Unity Mutual Pressure Reducing Valve Contents

Leased

Meter or Control Valve Pit, Facility / Building 7065 Lakeport Rd, Chittenango, NY 13037, USA Chittenango Control Building - ContentsSITE805 Chittenango Control Building

Page

5

Of

10 3/15/2017 8:26:24 PM

Page 57: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Equip/Cont $180,000 $183,600

Build/Str $150,000 $153,000

Equip/Cont $190,000 $193,800

Build/Str $330,000 $336,600

Equip/Cont $320,000 $326,400Build/Str $267,004 $272,344

Equip/Cont $391,709 $399,543

Build/Str $100,000 $102,000

Equip/Cont $79,000 $80,580

Equip/Cont $0 $0

Build/Str $0 $0

Build/Str $0 $0

Build/Str $240,000 $244,800

Equip/Cont $180,000 $183,600

Build/Str $480,000 $489,600

Equip/Cont $498,000 $507,960

Build/Str $46,301 $47,227

Equip/Cont $77,169 $78,712

Build/Str $150,000 $153,000

Equip/Cont $190,000 $193,800

Build/Str $110,000 $112,200

Equip/Cont $100,000 $102,000

Build/Str $49,000 $49,980

Equip/Cont $39,000 $39,780

Build/Str $48,000 $48,960

Equip/Cont $48,000 $48,960

Build/Str $120,000 $122,400

Equip/Cont $110,000 $112,200

Build/Str $210,000$214,200

Equip/Cont $170,000$173,400

Build/Str $339,749 $346,544Equip/Cont $391,606 $399,438

Build/Str $240,000$244,800

Equip/Cont $180,000$183,600

Build/Str $1,200,000 $1,224,000

Build/Str $640,000 $652,800

Build/Str $590,000 $601,800

Build/Str $1,200,000 $1,224,000

Equip/Cont $11,000 $11,220

Build/Str $1,376,040 $1,403,560

Equip/Cont $589,731 $601,526

Build/Str $1,200,000$1,224,000

Build/Str $19,123,695 $19,506,169

Equip/Cont $25,000 $25,500

Build/Str $240,000 $244,800

Equip/Cont $180,000 $183,600

Build/Str $400,000 $408,000

Equip/Cont $11,000 $11,220

Build/Str $240,000 $244,800

Equip/Cont $180,000 $183,600

Build/Str $1,200,000 $1,224,000

Equip/Cont $28,000 $28,560

$149,163,274 $152,146,539

SITE735 Indian Hill / Pompey Pines Tanks Ground Tank - Concrete, Elevated Tank 4173 Pompey Center Rd, Manlius, NY 13104, USA Indian Hill / Pompey Pines Tanks - 1,000,000 gal

SITE090 West Hill Tank Meter or Control Valve Pit 5644 Ike Dixon Rd, Camillus, NY 13031, USA West Hill Tank - 500,000 gal

Underground Reservoir 1377 NY-5, Chittenango, NY 13037, USA Chittenango Reservoir (Underground) - 1,250,000 gal

SITE855 Western Chlorination Building Chlorination Station 6641 Canton Street Road, Warners, NY 13164 Western Chlorination - Building

SITE855 Western Chlorination Building Chlorination Station 6641 Canton Street Road, Warners, NY 13164 Western Chlorination - Contents

Total for Leased / Owned

SITE925 Clockville Pump Station Small Pump Station

SITE625 OCC Reservoir (Underground) Underground Reservoir 4941 Onondaga Rd, Syracuse, NY 13215, USA OCC Reservoir (Underground) - 500,000 gal

SITE445

SITE810 Chittenango Reservoir (Underground)

1465 County Rte 12, Central Square, NY 13036, USA Caughdenoy Pump Station - Contents

SITE910 Constantia Pump Station Small Pump Station

SITE250 Granby Pump Station / PST_SYL24B Small Pump Station Pendergast Rd, Granby, NY 13069, USA Granby Pump Station - Contents

NY-49, West Monroe, NY 13167, USA Constantia Pump Station - ContentsSITE910 Constantia Pump Station Small Pump Station NY-49, West Monroe, NY 13167, USA Constantia Pump Station - Building

SITE260 Caughdenoy Pump Station Small Pump Station

SITE900 Volney (2) Airport Pump Station Small Pump Station 2033 County Rte 176, Fulton, NY 13069, USA Volney (2) Airport Pump Station - Contents

SITE905 Volney 1 Seneca Hill Pumping Station Small Pump Station Vaccum Cooler Dr, Oswego, NY 13126, USA Volney 1 Seneca Hill Pumping Station - Building

SITE905 Volney 1 Seneca Hill Pumping Station Small Pump Station Vaccum Cooler Dr, Oswego, NY 13126, USA Volney 1 Seneca Hill Pumping Station - Contents

Limeledge Pump Station and Highland 250,000 Tank -

Contents

SITE470 Limeledge Pump Station and Marcellus Tank Small Pump Station, Ground Tank - Steel Marcellus, NY 13108, USALimeledge Pump Station and Highland 250,000 Tank -

Building

SITE470 Limeledge Pump Station and Marcellus Tank Small Pump Station, Ground Tank - Steel Marcellus, NY 13108, USA

SITE675 Split Rock Pressure Reducing Valve Building Small Pump Station 5215 Onondaga Rd, Syracuse, NY 13215, USA Split Rock Pressure Reducing Valve Building - Contents

SITE865 North Bay Pump Station Small Pump Station 2007 NY-49, Blossvale, NY 13308, USA North Bay Pump Station - Building

SITE865 North Bay Pump Station Small Pump Station 2007 NY-49, Blossvale, NY 13308, USA North Bay Pump Station - Contents

SITE900 Volney (2) Airport Pump Station Small Pump Station 2033 County Rte 176, Fulton, NY 13069, USA Volney (2) Airport Pump Station - Building

SITE600 Makyes Road Pump Station Small Pump Station 4621 Makyes Rd, Syracuse, NY 13215, USA Makyes Road Pump Station - Contents

SITE660 South Avenue Pump Station Small Pump Station 2575 South Ave, Syracuse, NY 13207, USA South Avenue Pump Station - Building

SITE660 South Avenue Pump Station Small Pump Station 2575 South Ave, Syracuse, NY 13207, USA South Avenue Pump Station - Contents

SITE675 Split Rock Pressure Reducing Valve Building Small Pump Station 5215 Onondaga Rd, Syracuse, NY 13215, USASplit Rock Pressure Reducing Valve Building - Pressure

Reducing Station

SITE485 Otisco Valley Pump Station Small Pump Station 3770 NY-175, Marcellus, NY 13108, USA Otisco Valley Pump Station - Contents

SITE570 Groiler Road Pump Station Small Pump Station 4890 Grolier Rd, Syracuse, NY 13215, USA Groiler Road Pump Station - 250,000 gal

SITE570 Groiler Road Pump Station Small Pump Station 4890 Grolier Rd, Syracuse, NY 13215, USA Groiler Road Pump Station - Contents

SITE600 Makyes Road Pump Station Small Pump Station 4621 Makyes Rd, Syracuse, NY 13215, USA Makyes Road Pump Station - Building

SITE435 Skyridge Lower Well Small Pump Station 5570 Gulf Rd, Manlius, NY 13104, USA Skyridge Lower Well - Bldg/Fence Improvements

SITE475 North Street Pump Station Small Pump Station 2 North St, Marcellus, NY 13108, USA North Street Pump Station - Building

SITE475 North Street Pump Station Small Pump Station 2 North St, Marcellus, NY 13108, USA North Street Pump Station - Contents

SITE485 Otisco Valley Pump Station Small Pump Station 3770 NY-175, Marcellus, NY 13108, USA Otisco Valley Pump Station - Building

SITE315 Academy Hill Pump Station Small Pump Station 8135 E Seneca Turnpike, Manlius, NY 13104, USA Academy Hill Pump Station - Building

SITE315 Academy Hill Pump Station Small Pump Station 8135 E Seneca Turnpike, Manlius, NY 13104, USA Academy Hill Pump Station - Contents

SITE435 Skyridge Lower Well Small Pump Station 5570 Gulf Rd, Manlius, NY 13104, USA Skyridge Lower Well - Contents

SITE435 Skyridge Lower Well Small Pump Station 5570 Gulf Rd, Manlius, NY 13104, USA Skyridge Lower Well - Building

SITE215 Lakeland Pump Station Small Pump Station 325 Bridge St, Syracuse, NY 13209, USA Lakeland Pump Station - Building

SITE215 Lakeland Pump Station Small Pump Station 325 Bridge St, Syracuse, NY 13209, USA Lakeland Pump Station - Contents

SITE250 Granby Pump Station / PST_SYL24B Small Pump Station Pendergast Rd, Granby, NY 13069, USA Granby Pump Station - Building

SITE260 Caughdenoy Pump Station Small Pump Station 1465 County Rte 12, Central Square, NY 13036, USA Caughdenoy Pump Station - Building

SITE185 East Syracuse Pump Station Small Pump Station 330 E 1st St, East Syracuse, NY 13057, USA East Syracuse Pump Station - Contents

SITE151 Terminal Tanks Ground Tank, Concrete 4170 Route 31, Clay, NY 13041 Terminal Tanks

SITE151 Terminal Tanks Ground Tank, Concrete 4170 Route 31, Clay, NY 13041 Terminal Tanks Contents

Leased

SITE920 ARE Park Tank Elevated Tank 6649 Buyea Rd., Lincoln, NY 13043 ARE Tank - Contents

SITE915 ARE Pump Station Small Pump Station 6910 Tuttle Rd., Lincoln, NY 13043

SITE925 Clockville Pump Station Small Pump Station 7826 Oxbow Rd., Lincoln, NY 13043 Clockville Pump Station - Contents

7826 Oxbow Rd., Lincoln, NY 13043

East Hill Tank - 1,250,000 gal

SITE445 East Hill Tank Ground Tank - Steel 3050 W Seneca Turnpike, Marcellus, NY 13108, USA East Hill Tank - Contents

East Hill Tank Ground Tank - Steel 3050 W Seneca Turnpike, Marcellus, NY 13108, USA

Clockville Pump Station - Building

SITE920 ARE Park Tank Elevated Tank 6649 Buyea Rd., Lincoln, NY 13043 ARE Tank - Steel/Concrete, 132,000 gal.

ARE Pump Station - Contents

SITE915 ARE Pump Station Small Pump Station 6910 Tuttle Rd., Lincoln, NY 13043 ARE Pump Station - Building

SITE915 Clockville Tank Ground Tank 6910 Tuttle Rd., Lincoln, NY 13043 Clockville Tank - Contents

SITE915 Clockville Tank Ground Tank 6910 Tuttle Rd., Lincoln, NY 13043 Clockville Tank - Bolted Steel Tank 151,000 gal.

Page

6

Of

10 3/15/2017 8:26:24 PM

Page 58: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Build/Str $10,000 $10,200Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200Equip/Cont $25,000 $25,500

Build/Str $15,000 $15,300

Equip/Cont $25,000 $25,500

Build/Str $10,000 $15,200

Equip/Cont $25,000 $25,500Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200Equip/Cont $25,000 $25,500

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200Equip/Cont $25,000 $25,500

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $0 $0Equip/Cont $25,000 $25,500

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200Equip/Cont $25,000 $25,500

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

3489 Patchett Rd, Baldwinsville, NY 13027 Anheuser-Busch Meter Pit Contents

SITE307 Anheuser-Busch Meter Pit (2) Meter or Control Valve Pit 3489 Patchett Rd, Baldwinsville, NY 13027 Anheuser-Busch Meter Pit

SITE307 Anheuser-Busch Meter Pit (2) Meter or Control Valve Pit

SITE312 Route 370 Meter Pit Meter or Control Valve Pit 9250 Bendigo Dr, Baldwinsville, NY 13027 Route 370 Meter Pit

SITE312 Route 370 Meter Pit Meter or Control Valve Pit 9250 Bendigo Dr, Baldwinsville, NY 13027 Route 370 Meter Pit Contents

SITE313

SITE745 Buckley 3 Control Valve and Meter Pit Meter or Control Valve Pit Buckley Rd, Salina, NY, USA Buckley 3 Control Valve and Meter Pit

SITE745 Buckley 3 Control Valve and Meter Pit Meter or Control Valve Pit Buckley Rd, Salina, NY, USA Buckley 3 Control Valve and Meter Pit Contents

SITE716 Seneca Hill Meter Pit Meter or Control Valve Pit 30 Vaccum Cooler Dr., Oswego, NY 13126 Seneca Hill Meter Pit

SITE716 Seneca Hill Meter Pit Meter or Control Valve Pit 30 Vaccum Cooler Dr., Oswego, NY 13126 Seneca Hill Meter Pit Contents

SITE339 Burdick Road Meter Pit Meter or Control Valve Pit 7241 Taylor Rd, East Syracuse, NY 13057 Burdick Road Meter Pit

SITE339 Burdick Road Meter Pit Meter or Control Valve Pit 7241 Taylor Rd, East Syracuse, NY 13057 Burdick Road Meter Pit Contents

UDC Meter Pit

SITE313 UDC Meter Pit Meter or Control Valve Pit 2998 Belgium Rd., Baldwinsville, NY 13027 UDC Meter Pit Contents

SITE307 Anheuser-Busch Meter Pit Meter or Control Valve Pit 3489 Patchett Rd, Baldwinsville, NY 13027 Anheuser-Busch Meter Pit

SITE307 Anheuser-Busch Meter Pit Meter or Control Valve Pit 3489 Patchett Rd, Baldwinsville, NY 13027 Anheuser-Busch Meter Pit Contents

SITE311 River Road Meter Pit Meter or Control Valve Pit 3419 Long Shadow Dr, Baldwinsville, NY 13027 River Road Meter Pit

SITE311 River Road Meter Pit Meter or Control Valve Pit 3419 Long Shadow Dr, Baldwinsville, NY 13027 River Road Meter Pit Contents

UDC Meter Pit Meter or Control Valve Pit 2998 Belgium Rd., Baldwinsville, NY 13027

A-B Wst Tr Meter Pit

SITE306 A-B Wst Tr Meter Pit Meter or Control Valve Pit 2996 Belgium Rd, Baldwinsville, NY 13027 A-B Wst Tr Meter Pit Contents

SITE251 Town of Hannibal Meter Pit Meter or Control Valve Pit 8324 NY 104, Hannibal, NY 13074 Town of Hannibal Meter Pit Contents

SITE251 Town of Hannibal Meter Pit Meter or Control Valve Pit 8324 NY 104, Hannibal, NY 13074 Town of Hannibal Meter Pit

SITE306 A-B Wst Tr Meter Pit Meter or Control Valve Pit 2996 Belgium Rd, Baldwinsville, NY 13027

SITE193 Owens Road Meter Pit Meter or Control Valve Pit 292 Owens Road, Fulton , NY 13069 Owens Road Meter PitSITE193 Owens Road Meter Pit Meter or Control Valve Pit 292 Owens Road, Fulton , NY 13069 Owens Road Meter Pit Contents

SITE194 Riccelli Meter Pit Meter or Control Valve Pit 956 S First St, Fulton , NY 13069 Riccelli Meter Pit

SITE194 Riccelli Meter Pit Meter or Control Valve Pit 956 S First St, Fulton , NY 13069 Riccelli Meter Pit Contents

SITE191 Airport Meter Pit Meter or Control Valve Pit 2039 Whitaker Rd., Fulton , NY 13069 Airport Meter PitSITE191 Airport Meter Pit Meter or Control Valve Pit 2039 Whitaker Rd., Fulton , NY 13069 Airport Meter Pit Contents

SITE192 Fulton Meter Pit Meter or Control Valve Pit 960 1st St., Fulton , NY 13069 Fulton Meter Pit

SITE192 Fulton Meter Pit Meter or Control Valve Pit 960 1st St., Fulton , NY 13069 Fulton Meter Pit Contents

SITE188 Route 298 Meter Pit Meter or Control Valve Pit Collamer Crossing Pkwy, East Syracuse, NY 13057 Route 298 Meter PitSITE188 Route 298 Meter Pit Meter or Control Valve Pit Collamer Crossing Pkwy, East Syracuse, NY 13057 Route 298 Meter Pit Contents

SITE189 Taft Road Meter Pit Meter or Control Valve Pit 717 Old Liverpool Rd, Liverpool, NY 13088 Taft Road Meter Pit

SITE189 Taft Road Meter Pit Meter or Control Valve Pit 717 Old Liverpool Rd, Liverpool, NY 13088 Taft Road Meter Pit Contents

SITE186 Kirkville Road Meter Pit Meter or Control Valve Pit 6900 Kirkville Rd., E. Syracuse, NY 13057 Kirkville Road Meter PitSITE186 Kirkville Road Meter Pit Meter or Control Valve Pit 6900 Kirkville Rd., E. Syracuse, NY 13057 Kirkville Road Meter Pit Contents

SITE187 Meyers Road Meter Pit Meter or Control Valve Pit 175 Dunsbach Ferry Rd, Cohoes, NY 12047 Meyers Road Meter Pit

SITE187 Meyers Road Meter Pit Meter or Control Valve Pit 175 Dunsbach Ferry Rd, Cohoes, NY 12047 Meyers Road Meter Pit Contents

SITE169 Butternut Creek South Meter Pit Meter or Control Valve Pit 6849 Manlius Center Rd., East Syracuse, NY 13057 Butternut Creek South Meter PitSITE169 Butternut Creek South Meter Pit Meter or Control Valve Pit 6849 Manlius Center Rd., East Syracuse, NY 13057 Butternut Creek South Meter Pit Contents

SITE174 Collamer Interchange Meter Pit Meter or Control Valve Pit 6826 Collamer Rd, E Syracuse, NY 13057 Collamer Interchange Meter Pit

SITE174 Collamer Interchange Meter Pit Meter or Control Valve Pit 6826 Collamer Rd, E Syracuse, NY 13057 Collamer Interchange Meter Pit Contents

SITE168 Butternut Creek North Meter Pit Meter or Control Valve Pit East Ellis St., East Syracuse, NY 13057 Butternut Creek North Meter Pit Contents

SITE155 West Taft Road Control Valve and Meter Pit Meter or Control Valve Pit 4789 W. Taft Rd, Clay, NY 13088 West Taft Road Control Valve and Meter Pit

SITE155 West Taft Road Control Valve and Meter Pit Meter or Control Valve Pit 4789 W. Taft Rd, Clay, NY 13088 West Taft Road Control Valve and Meter Pit Contents

SITE168 Butternut Creek North Meter Pit Meter or Control Valve Pit East Ellis St., East Syracuse, NY 13057 Butternut Creek North Meter Pit

SITE145 South Bay Road Control Valve Meter or Control Valve Pit 6098 S Bay Rd, Cicero, NY 13039, USA South Bay Road Control Valve

SITE145 South Bay Road Control Valve Meter or Control Valve Pit 6098 S Bay Rd, Cicero, NY 13039, USA South Bay Road Control Valve Contents

SITE154 Waterhouse Road Meter Pit Meter or Control Valve Pit 8143 Henry Clay Blvd, Clay, NY 13041 Waterhouse Road Meter Pit

SITE154 Waterhouse Road Meter Pit Meter or Control Valve Pit 8143 Henry Clay Blvd, Clay, NY 13041 Waterhouse Road Meter Pit Contents

SITE139 Morgan Road Meter Pit Meter or Control Valve Pit 8530 Morgan Rd, Clay, NY 13041 Morgan Road Meter Pit

SITE139 Morgan Road Meter Pit Meter or Control Valve Pit 8530 Morgan Rd, Clay, NY 13041 Morgan Road Meter Pit Contents

SITE140 Route 57 Control Valve and Meter Pit Meter or Control Valve Pit 8350 Oswego Rd, Clay, NY 13090 Route 57 Control Valve and Meter PitSITE140 Route 57 Control Valve and Meter Pit Meter or Control Valve Pit 8350 Oswego Rd, Clay, NY 13090 Route 57 Control Valve and Meter Pit Contents

SITE137 Gaskin Road Meter Pit Meter or Control Valve Pit 4170 State Route 31, Clay, NY 13041 Gaskin Road Meter Pit

SITE137 Gaskin Road Meter Pit Meter or Control Valve Pit 4170 State Route 31, Clay, NY 13041 Gaskin Road Meter Pit Contents

SITE138 Henry Clay Blvd Meter Pit Meter or Control Valve Pit 8526 Henry Clay Blvd, Clay, NY 13041 Henry Clay Blvd Meter PitSITE138 Henry Clay Blvd Meter Pit Meter or Control Valve Pit 8526 Henry Clay Blvd, Clay, NY 13041 Henry Clay Blvd Meter Pit Contents

Meter or Control Valve Pit 8419 Burnet Road, Clay, NY 13041 Burnet Road Meter Pit

SITE128 Burnet Road Meter Pit Meter or Control Valve Pit 8419 Burnet Road, Clay, NY 13041 Burnet Road Meter Pit Contents

SITE130Caughdenoy Road Control Valve and Meter

PitMeter or Control Valve Pit 8548 Caughdenoy Rd, Clay, NY 13041, USA Caughdenoy Road Control Valve - Contents

SITE130Caughdenoy Road Control Valve and Meter

PitMeter or Control Valve Pit 8548 Caughdenoy Rd, Clay, NY 13041, USA Caughdenoy Road Control Valve - Vault, Control

SITE116 Sneller Road Meter Pit Meter or Control Valve Pit 8306 Pardee Rd., Cicero, NY 13039 Sneller Road Meter Pit

SITE115 Route 11 (Mud Mill CV and MP) Meter or Control Valve Pit 8457 Brewerton Rd, Cicero, NY 13029 Route 11 (Mud Mill CV and MP)SITE115 Route 11 (Mud Mill CV and MP) Meter or Control Valve Pit 8457 Brewerton Rd, Cicero, NY 13029 Route 11 (Mud Mill CV and MP) Contents

SITE116 Sneller Road Meter Pit Meter or Control Valve Pit 8306 Pardee Rd., Cicero, NY 13039 Sneller Road Meter Pit Contents

SITE117 South Bay Road Meter Pit Meter or Control Valve Pit 6112 Cobblestone Dr Apt, Cicero, NY 13039 South Bay Road Meter PitSITE117 South Bay Road Meter Pit Meter or Control Valve Pit 6112 Cobblestone Dr Apt, Cicero, NY 13039 South Bay Road Meter Pit Contents

SITE128 Burnet Road Meter Pit

Page

7

Of

10 3/15/2017 8:26:24 PM

Page 59: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $0 $0

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $2,500,000 $2,550,000

Equip/Cont $40,000 $40,800

Equip/Cont $1,300,000 $1,326,000

Build/Str $4,900,000 $4,998,000

Equip/Cont $40,000 $40,800

Build/Str $3,000,000 $3,060,000

Equip/Cont $40,000 $40,800

Build/Str $1,600,000 $1,632,000

Equip/Cont $28,000 $28,560

Build/Str $2,600,000 $2,652,000

Equip/Cont $89,000 $90,780

Build/Str $1,000,000 $1,020,000

Equip/Cont $14,000 $14,280

Build/Str. $860,000 $877,200

Build/Str $10,000 $10,200

Build/Str $14,000,000 $14,280,000

Build/Str $9,100,000 $9,282,000

Equip/Cont $25,000 $25,500

Equip/Cont $5,700 $5,814

Equip/Cont $10,000 $10,200

Equip/Cont $5,700 $5,814

Build/Str $9,100,000 $9,282,000

Equip/Cont $5,700 $5,814

Build/Str $480,000 $489,600

SITE836 6th North Street Meter Pit Meter or Control Valve Pit 302 6th North St, Syracuse, NY 13208 6th North Street Meter Pit Contents

SITE360 Eagleview Tank Ground Tank - Steel 4880 S Eagle Village Rd, Manlius, NY 13104, USA Eagleview Tank - 500,000 gal

Butternut Drive Control Valve and Meter Pit Meter or Control Valve Pit 5947 Butternut Dr, East Syracuse, NY 13057, USA Butternut Drive Control Valve and Meter Pit Contents

SITE750 Buckley South Control Valve and Meter Pit Meter or Control Valve Pit 1445 Buckley Rd, Syracuse, NY 13212, USA Buckley South Control Valve and Meter Pit

SITE750 Buckley South Control Valve and Meter Pit Meter or Control Valve Pit 1445 Buckley Rd, Syracuse, NY 13212, USA Buckley South Control Valve and Meter Pit Contents

SITE836 6th North Street Meter Pit Meter or Control Valve Pit 302 6th North St, Syracuse, NY 13208 6th North Street Meter Pit

Ground Tank - Concrete, Meter or Control

Valve Pit7740 Green Lakes Rd, Fayetteville, NY 13066, USA Eastern Reservoir / Alverna Heights - Contents

SITE325 Eastern Reservoir / Alverna HeightsGround Tank - Concrete, Meter or Control

Valve Pit7740 Green Lakes Rd, Fayetteville, NY 13066, USA Eastern Reservoir / Alverna Heights - Contents

SITE860 Winchell Road Tank Elevated Tank 6949 Winchell Rd, Warners, NY 13164, USA Winchell Road Tank - 1,000,000 gal

SITE860 Winchell Road Tank Elevated Tank 6949 Winchell Rd, Warners, NY 13164, USA Winchell Road Tank - Contents

SITE890 Volney 1 Seneca Hill Tank

SITE125 Buckley North Control Valve and Meter Pit Meter or Control Valve Pit 4762 Buckley Rd, Liverpool, NY 13088, USA Buckley North Control Valve and Meter Pit

SITE125 Buckley North Control Valve and Meter Pit Meter or Control Valve Pit 4762 Buckley Rd, Liverpool, NY 13088, USA Buckley North Control Valve and Meter Pit Contents

SITE840 Seneca Beach Control Valve and Meter Meter or Control Valve Pit 7629 Seneca Beach Dr, Baldwinsville, NY 13027, USASeneca Beach Control Valve and Meter - Control Valve

Vault

SITE170 Butternut Drive Control Valve and Meter Pit Meter or Control Valve Pit 5947 Butternut Dr, East Syracuse, NY 13057, USA

Owned

SITE325 Eastern Reservoir / Alverna HeightsGround Tank - Concrete, Meter or Control

Valve Pit7740 Green Lakes Rd, Fayetteville, NY 13066, USA Eastern Reservoir / Alverna Heights - Meter Vault

SITE325 Eastern Reservoir / Alverna HeightsGround Tank - Concrete, Meter or Control

Valve Pit7740 Green Lakes Rd, Fayetteville, NY 13066, USA

SITE325 Eastern Reservoir / Alverna HeightsGround Tank - Concrete, Meter or Control

Valve Pit7740 Green Lakes Rd, Fayetteville, NY 13066, USA Eastern Reservoir / Alverna Heights - Contents

SITE325 Eastern Reservoir / Alverna Heights

SITE325 Eastern Reservoir / Alverna HeightsGround Tank - Concrete, Meter or Control

Valve Pit7740 Green Lakes Rd, Fayetteville, NY 13066, USA METER_CONT_ALV

Eastern Reservoir / Alverna Heights - 30,000,000 gal

(Tank No. 1)

SITE325 Eastern Reservoir / Alverna HeightsGround Tank - Concrete, Meter or Control

Valve Pit7740 Green Lakes Rd, Fayetteville, NY 13066, USA

Eastern Reservoir / Alverna Heights - 20,000,000 gal

(Tank No. 2)

SITE855 Western Resevoir/Tank Ground Tank - Concrete 6641 Canton Street Road, Warners, NY 13164 Western Reseroir - 20,000,000 gal

SITE855 Western Resevoir/Tank Ground Tank - Concrete 6641 Canton Street Road, Warners, NY 13164 Western Reservoir - Contents

Elevated Tank 87 Manor Dr, Oswego, NY 13126, USA Volney 1 Seneca Hill Tank - 300,000 gal

SITE890 Volney 1 Seneca Hill Tank Elevated Tank 87 Manor Dr, Oswego, NY 13126, USA Volney 1 Seneca Hill Tank - Contents

SITE510 North Syracuse Tank Elevated Tank 106 Tuller Rd, Syracuse, NY 13212, USA North Syracuse Tank - 1,000,000 gal

SITE510 North Syracuse Tank Elevated Tank 106 Tuller Rd, Syracuse, NY 13212, USA North Syracuse Tank - Contents

SITE595 Makyes Road Tank Elevated Tank 4063 Makyes Rd, Syracuse, NY 13215, USA Makyes Road Tank - 500,000 gal

SITE595 Makyes Road Tank Elevated Tank 4063 Makyes Rd, Syracuse, NY 13215, USA Makyes Road Tank - Contents

SITE135 Clay Tank Elevated Tank Henry Clay Blvd, Clay, NY 13041, USA Clay Tank - 500,000 gal

SITE095 Brewerton Tank

SITE190 Thompson Road Tank Elevated Tank James St, New York, USA Thompson Road Tank - 2,000,000 gal

SITE190 Thompson Road Tank Elevated Tank James St, New York, USA Thompson Road Tank - Contents

Elevated Tank 9593 Brewerton Rd, Brewerton, NY 13029, USA

SITE095 Brewerton Tank Elevated Tank 9593 Brewerton Rd, Brewerton, NY 13029, USA Brewerton Tank - 1,000,000 gal

Brewerton Tank - Contents

Butternut Drive Control Valve and Meter Pit

SITE170

SITE840 Seneca Beach Control Valve and Meter Meter or Control Valve Pit 7629 Seneca Beach Dr, Baldwinsville, NY 13027, USASeneca Beach Control Valve and Meter - Contents and

Instrumentation

SITE851 Van Buren Meter Pit Meter or Control Valve Pit 7592 Van Buren Rd., Baldwinsville, NY 13027 Van Buren Meter PitSITE851 Van Buren Meter Pit Meter or Control Valve Pit 7592 Van Buren Rd., Baldwinsville, NY 13027 Van Buren Meter Pit Contents

SITE837 Connors Road Meter Pit Meter or Control Valve Pit 2608 Connors Rd, Baldwinsville, NY 13027 Connors Road Meter Pit

SITE837 Connors Road Meter Pit Meter or Control Valve Pit 2608 Connors Rd, Baldwinsville, NY 13027 Connors Road Meter Pit Contents

SITE839 Route 48 Meter Pit Meter or Control Valve Pit 7608 Maple Rd., Baldwinsville, NY 13027 Route 48 Meter Pit

SITE839 Route 48 Meter Pit Meter or Control Valve Pit 7608 Maple Rd., Baldwinsville, NY 13027 Route 48 Meter Pit Contents

SITE833 Rock Cut Road Meter Pit Meter or Control Valve Pit 608 County Office Bldg, Syracuse, NY 13212 Rock Cut Road Meter Pit

SITE833 Rock Cut Road Meter Pit Meter or Control Valve Pit 608 County Office Bldg, Syracuse, NY 13212 Rock Cut Road Meter Pit Contents

SITE757 Electronics Parkway Meter Pit Meter or Control Valve Pit 4817 Limestone Dr., Liverpool, NY 13088 Electronics Parkway Meter Pit

SITE757 Electronics Parkway Meter Pit Meter or Control Valve Pit 4817 Limestone Dr., Liverpool, NY 13088 Electronics Parkway Meter Pit Contents

SITE760 Hopkins Road Control Valve and Meter Pit Meter or Control Valve Pit 7 Hopkins Rd, Liverpool, NY 13088, USA Hopkins Road Control Valve and Meter Pit

SITE760 Hopkins Road Control Valve and Meter Pit Meter or Control Valve Pit 7 Hopkins Rd, Liverpool, NY 13088, USA Hopkins Road Control Valve and Meter Pit Contents

SITE391 Meadowbrook-Limestone Meter Pit Meter or Control Valve Pit 7534 Manlius Center Rd., Kirkville, NY 13082 Meadowbrook-Limestone Meter Pit

SITE391 Meadowbrook-Limestone Meter Pit Meter or Control Valve Pit 7534 Manlius Center Rd., Kirkville, NY 13082 Meadowbrook-Limestone Meter Pit Contents

Marcellus Pipe Bridges Bridges Masters Road, Marcellus, NY 13108, USA (7) Transmission Main Pipe Bridges

SITE094 Beacon North Meter Pit Meter or Control Valve Pit 6339 Running Ridge Rd, Syracuse, NY 13212 Beacon North Meter Pit Contents

SITE094 Beacon North Meter Pit Meter or Control Valve Pit 6339 Running Ridge Rd, Syracuse, NY 13212 Beacon North Meter Pit Contents

Page

8

Of

10 3/15/2017 8:26:24 PM

Page 60: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Build/Str $1,000,000 $1,020,000

Equip/Cont $51,000 $52,020

Build/Str $6,891,800 $7,029,636

Equip/Cont $2,410,900 $2,459,118

Build/Str $250,000$255,000

Equip/Cont $420,000$428,400

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000$10,200

Equip/Cont $25,000$25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $51,000 $52,020

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

Build/Str $82,000 $83,640

Equip/Cont $25,000 $25,500

Build/Str $10,000 $10,200

Equip/Cont $25,000 $25,500

$0

Equip/Cont $25,000 $25,500Build/Str $11,000,000 $11,220,000

Equip/Cont $1,500,000 $1,530,000

Equip/Cont $2,346,000 $2,392,920

Equip/Cont $690,000 $703,800

Build/Str $290,000 $295,800

Equip/Cont $65,000 $66,300

Build/Str $280,000 $285,600

Equip/Cont $170,000 $173,400

Build/Str $150,000 $153,000

Equip/Cont $190,000 $193,800

Owned

SITE740 Pompey Pines Pump Station Small Pump Station 4259 Pompey Center Rd, Manlius, NY 13104, USA Pompey Pines Pump Station - Building

SITE740 Pompey Pines Pump Station Small Pump Station 4259 Pompey Center Rd, Manlius, NY 13104, USA Pompey Pines Pump Station - Contents

SITE700 Oswego Service Center OCWA - Organization, Facility / Building 1743 Co Rte 7, Oswego, NY 13126, USA Oswego Service Center - Building

SITE700 Oswego Service Center OCWA - Organization, Facility / Building 1743 Co Rte 7, Oswego, NY 13126, USA Oswego Service Center - Contents

SITE065 Rolling Hills Pump Station Small Pump Station 15 Rolling Hills Road, Camillus, NY 13031 Rolling Hills Pump Station - Building

SITE065 Rolling Hills Pump Station Small Pump Station 15 Rolling Hills Road, Camillus, NY 13031 Rolling Hills Pump Station - Contents

SITE770 Northern Concourse Building OCWA - Organization 200 Northern Concourse, Syracuse, NY 13212, USA Northern Concourse Building - Administration Building

SITE770 Northern Concourse Building OCWA - Organization 200 Northern Concourse, Syracuse, NY 13212, USA Northern Concourse Building - Material Inventory

SITE770 Northern Concourse Building OCWA - Organization 200 Northern Concourse, Syracuse, NY 13212, USA Northern Concourse Building - Contents

SITE770 Northern Concourse Building OCWA - Organization 200 Northern Concourse, Syracuse, NY 13212, USA Northern Concourse Building - Computer Equipment

SITE838 Marion Meadows Pit Meter or Control Valve Pit 7582 Van Buren Rd, Baldwinsville, NY 13027, USA Marion Meadows Pit

SITE838 Marion Meadows Pit Meter or Control Valve Pit 7582 Van Buren Rd, Baldwinsville, NY 13027, USA Marion Meadows Pit Contents

OCWA Onondaga County Water Authority OCWA - Organization

SITE495 Schuyler Road Radio OCWA - Organization Schuyler Rd, Marietta, NY 13110, USA Schuyler Road Radio - Contents

SITE790 Teal Avenue Pressure Reducing Valve Meter or Control Valve Pit Grant Ct, Liverpool, NY 13090, USA Teal Avenue Pressure Reducing Valve

SITE790 Teal Avenue Pressure Reducing Valve Meter or Control Valve Pit Grant Ct, Liverpool, NY 13090, USA Teal Avenue Pressure Reducing Valve Contents

SITE830 Tuscarora (Chittenango) Control Valve Meter or Control Valve Pit 1007 Tuscarora Rd, Chittenango, NY 13037, USA Tuscarora (Chittenango) Control Valve - Control

SITE830 Tuscarora (Chittenango) Control Valve Meter or Control Valve Pit 1007 Tuscarora Rd, Chittenango, NY 13037, USA Tuscarora (Chittenango) Control Valve - Contents

SITE765 LeMoyne Control Valve Meter or Control Valve Pit 642 Old Liverpool Rd, Liverpool, NY 13088, USA LeMoyne Control Valve

SITE765 LeMoyne Control Valve Meter or Control Valve Pit 642 Old Liverpool Rd, Liverpool, NY 13088, USA LeMoyne Control Valve Contents

SITE785 Sixth North Control Valve Meter or Control Valve Pit 302 6th N St, Syracuse, NY 13208, USA Sixth North Control Valve

SITE785 Sixth North Control Valve Meter or Control Valve Pit 302 6th N St, Syracuse, NY 13208, USA Sixth North Control Valve Contents

SITE459 Glover Rd #2 Pressure Reducing Valve Meter or Control Valve Pit 2369 Glover Road, Marcellus, NY, 13108, USA Glover Rd #2 Pressure Reducing Valve - Pressure

SITE459 Glover Rd #2 Pressure Reducing Valve Meter or Control Valve Pit 2369 Glover Road, Marcellus, NY, 13108, USA Glover Rd #2 Pressure Reducing Valve - Contents

SITE545 Broad Road Pressure Reducing Valve Meter or Control Valve Pit NY-173, Syracuse, NY 13207, USA Broad Road Pressure Reducing Valve

SITE545 Broad Road Pressure Reducing Valve Meter or Control Valve Pit NY-173, Syracuse, NY 13207, USA Broad Road Pressure Reducing Valve Contents

SITE370 Green Lakes Road Meter Pit Meter or Control Valve Pit Green Lakes Park Dr, Fayetteville, NY 13066, USA Green Lakes Road Meter Pit

SITE370 Green Lakes Road Meter Pit Meter or Control Valve Pit Green Lakes Park Dr, Fayetteville, NY 13066, USA Green Lakes Road Meter Pit Contents

SITE455 Falls Road Pressure Reducing Valve Meter or Control Valve Pit Falls Rd, Marcellus, NY 13108, USA Falls Road Pressure Reducing Valve

SITE455 Falls Road Pressure Reducing Valve Meter or Control Valve Pit Falls Rd, Marcellus, NY 13108, USA Falls Road Pressure Reducing Valve Contents

SITE340 Butternut North Control Valve Meter or Control Valve Pit E Ellis St, East Syracuse, NY 13057, USA Butternut North Control Valve

SITE340 Butternut North Control Valve Meter or Control Valve Pit E Ellis St, East Syracuse, NY 13057, USA Butternut North Control Valve Contents

SITE345 Butternut South Control Valve Meter or Control Valve Pit 13104 Claymaster Dr, East Syracuse, NY 13057, USA Butternut South Control Valve

SITE345 Butternut South Control Valve Meter or Control Valve Pit 13104 Claymaster Dr, East Syracuse, NY 13057, USA Butternut South Control Valve Contents

SITE295 Main Street (Canastota) Pressure Reducing Meter or Control Valve Pit N Main St, Canastota, NY 13032, USA Main Street (Canastota) Pressure Reducing Valve -

SITE295 Main Street (Canastota) Pressure Reducing Meter or Control Valve Pit N Main St, Canastota, NY 13032, USA Main Street (Canastota) Pressure Reducing Valve -

SITE327 Girden Road Meter Pit Meter or Control Valve Pit 13104 Kirkville Rd N, Kirkville, NY 13082, USA Girden Road Meter Pit - Meter Vault

SITE327 Girden Road Meter Pit Meter or Control Valve Pit 13104 Kirkville Rd N, Kirkville, NY 13082, USA Girden Road Meter Pit - Contents

SITE120 Bear Road Control Valve Meter or Control Valve Pit 5010 Bear Springs Rd, Brewerton, NY 13029, USA Bear Road Control Valve - Control Vault

SITE120 Bear Road Control Valve Meter or Control Valve Pit 5010 Bear Springs Rd, Brewerton, NY 13029, USA Bear Road Control Valve - Contents

SITE150 Taft Road Control Valve Meter or Control Valve Pit 999 E Taft Rd, North Syracuse, NY 13212, USA Taft Road Control Valve - Vault

SITE150 Taft Road Control Valve Meter or Control Valve Pit 999 E Taft Rd, North Syracuse, NY 13212, USA Taft Road Control Valve - Contents

SITEO47 Kings Park Pressure Reducing Valve Meter or Control Valve Pit 4030 Split Rock Rd, Camillus, NY 13031, USA Kings Park Pressure Reducing Valve

SITEO47 Kings Park Pressure Reducing Valve Meter or Control Valve Pit 4030 Split Rock Rd, Camillus, NY 13031, USA Kings Park Pressure Reducing Valve Contents

SITE055 Maple Dr Pressure Reducing Valve Meter or Control Valve Pit 139 Maple Dr, Camillus, NY 13031 Maple Dr Pressure Reducing Valve

SITE055 Maple Dr Pressure Reducing Valve Meter or Control Valve Pit 139 Maple Dr, Camillus, NY 13031 Maple Dr Pressure Reducing Valve Contents

SITE060 Munro Road Pressure Reducing Valve Meter or Control Valve Pit 5338 Munro Rd, Camillus, NY 13031, Camillus, NY 13031Munro Road Pressure Reducing Valve - Precast

Concrete Vault

SITE060 Munro Road Pressure Reducing Valve Meter or Control Valve Pit 5338 Munro Rd, Camillus, NY 13031, Camillus, NY 13031 Munro Road Pressure Reducing Valve - Contents

SITE005 Belle Isle Pressure Reducing Valve Meter or Control Valve Pit 5959 Belle Isle Rd, Camillus, NY 13031 Belle Isle Pressure Reducing Valve

SITE005 Belle Isle Pressure Reducing Valve Meter or Control Valve Pit 5959 Belle Isle Rd, Camillus, NY 13031 Belle Isle Pressure Reducing Valve Contents

SITE012 Camillus Blow-Off Pit Meter or Control Valve Pit Bingham Place, Camillus, NY 13031 Camillus Blow-Off Pit

SITE012 Camillus Blow-Off Pit Meter or Control Valve Pit Bingham Place, Camillus, NY 13031 Camillus Blow-Off Pit Contents

SITE480 Otisco Lake Facility Intake / Dam 2785 Otisco Valley Rd, Marietta, NY 13110, USA

Otisco Lake Facility - Buildings (Dam Structure, Building

No. 1, Chlorine Building, Storage Building, Boat Dock,

Dry Chemical Storage, Stop Log Shed, Pavilion, Shed,

Fencing)

SITE480 Otisco Lake Facility Intake / Dam 2785 Otisco Valley Rd, Marietta, NY 13110, USA Otisco Lake Facility - Contents

SITE775 Park Street Pump Station and Control Valve Large Pump Station, Meter or Control Valve Pit 6430 Onondaga Lake Pkwy, Liverpool, NY 13088, USA Park Street Pump Station and Control Valve - Building

SITE775 Park Street Pump Station and Control Valve Large Pump Station, Meter or Control Valve Pit 6430 Onondaga Lake Pkwy, Liverpool, NY 13088, USA Park Street Pump Station and Control Valve - Contents

SITE735 Indian Hill / Pompey Pines Tanks Ground Tank - Concrete, Elevated Tank 4173 Pompey Center Rd, Manlius, NY 13104, USA Indian Hill / Pompey Pines Tanks - 150,000 gal

SITE735 Indian Hill / Pompey Pines Tanks Ground Tank - Concrete, Elevated Tank 4173 Pompey Center Rd, Manlius, NY 13104, USA Indian Hill / Pompey Pines Tanks - Contents

Page

9

Of

10 3/15/2017 8:26:24 PM

Page 61: ONONDAGA COUNTY WATER AUTHORITY · 2019-03-22 · ONONDAGA COUNTY WATER AUTHORITY ANNUAL REPORT DOCUMENTATION Year Ended December 31, 2018 5 Source of Supply For 2018 46.3% of the

Build/Str $1,300,000 $1,326,000Build/Str $270,000 $275,400

Equip/Cont $390,000 $397,800

Build/Str $75,000 $76,500

Build/Str $1,400,000 $1,428,000

Build/Str $190,000 $193,800

Build/Str $1,800,000 $1,836,000

Build/Str $5,100,000 $5,202,000

Build/Str $1,200,000 $1,224,000

Equip/Cont $1,900,000 $1,938,000

Equip/Cont $5,525,000 $5,635,500

Equip/Cont $11,000,000 $11,220,000

Build/Str $10,000 $10,200

Equip/Cont $15,000 $15,300

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$110,980,800 $113,205,416

$260,144,074 $265,351,955

SITE196 Granby Surge Valve Surge Valve 31 Wilcox Rd, Fulton, NY 13069, USA Surge Valve - Contents

Granby Surge Valve SITE196 Surge Valve 31 Wilcox Rd, Fulton, NY 13069, USA Surge Valve - Building

Owned

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Contents

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - 2008 Filter Expansion

Total for Leased / Owned

Overall Total

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Clearwell (2mg)

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Administration Building

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Clearwell (1mg)

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Filter Beds

SITE275 Hastings Pump Station and Tank Small Pump Station, Elevated Tank Corporate Park Dr, Central Square, NY 13036, USA Hastings Pump Station and Tank - Contents

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Pole Barn

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Backwash Tank

SITE505 Otisco Lake Water Treatment Plant Treatment Plant 2460 Lawrence Rd, Marcellus, NY 13108, USA Water Treatment Plant - Misc. Structures

SITE275 Hastings Pump Station and Tank Small Pump Station, Elevated Tank Corporate Park Dr, Central Square, NY 13036, USA Hastings Pump Station and Tank - 500,000 galSITE275 Hastings Pump Station and Tank Small Pump Station, Elevated Tank Corporate Park Dr, Central Square, NY 13036, USA Hastings Pump Station and Tank - Building

Cobbler Way, Town of Camillus

0.47 acres Vacant Property LaFayette Rd, Town of Onondaga

001.-01-02.1 24.26 acres Vacant Property Otisco Valley Rd, Town of Otisco

0.6 acres - Across from Dam Vacant Property Otisco Vly Rd, Town of Marcellus

13.7 acres - Transmission Line Vacant Property Otisco Vly Rd, Town of Marcellus

0.5 acres - Transmission Line Vacant Property

5.1 acres Vacant Property Otisco Vly Rd, Town of Marcellus 025.-01-59.1 

22.01 acres Vacant Property Otisco Vly Rd, Town of Marcellus 025.-01-34.1 

19.3 acres Vacant Property Otisco Valley Rd, Town of Otisco 024.-01-11.0 

.01 acres Vacant Property Court St, Town of Salina

Unknown Vacant Property Salina St N To West City, City of Syracuse

Unknown Vacant Property Salina St N To Seventh No, City of Syracuse

0.03 acres Vacant Property Fremont Rd, Town of Manlius

Nine mile creek bed, Town of Marcellus

2.11 acres - Transmission Line Vacant Property Nine Mile Crk, Town of Marcellus

0.14 acres Vacant Property Oakridge Dr, Town of Camillus

3.91 acres Vacant Property Buckley Rd, Town of Clay

0.1 acres Vacant Property Bennett St, Town of Cicero

60.78 acres Vacant Property Route 174, Town of Marcellus

0.21 acres Vacant Property Armstrong Rd Rear, Town of Geddes

0.23 acres Vacant Property

022.-01-25.1 

11.56 acres Vacant Property W Valley Rd, Town of Spafford 022.-01-01.1 

0.82 acres Vacant Property Willowdale Rd, Town of Spafford 021.-03-26.0 

91.12 acres - Old Pierce Farm Vacant Property Willowdale Off, Town of Spafford 021.-03-24.1 

8.14 acres - Transmission Line Vacant Property Schuyler Rd, Town of Marcellus

29.27 acres Vacant Property Otisco Lake South, Town of Spafford

0.09 acres Vacant Property W Valley Rd, Town of Spafford

1.56 acres Vacant Property W Valley Rd, Town of Spafford

5.39 acres - Transmission Line Vacant Property Cherry Vly Tpk, Town of Marcellus

0.92 acres Vacant Property Otisco Lake Blue Line, Town of Spafford

43.27 acres Vacant Property Otisco Valley Rd, Town of Otisco

0.14 acres Vacant Property Willowdale Off Hope Rd, Town of Spafford

25.23 acres - Unknown Vacant Property W Valley Rd, Town of Spafford

10.87 acres - Transmission Line Vacant Property Cherry Vly Tpk, Town of Marcellus 018.-03-14.0 

1.2 acres - Transmission Line Vacant Property Lawrence Rd, Town of Marcellus 017.-07-04.0 

44.18 acres - Transmission Line Vacant Property Lawrence Rd, Town of Marcellus 017.-06-04.1 

3.93 acres - Transmission Line Vacant Property Masters Rd, Town of Marcellus 017.-06-03.0 

6.46 acres Vacant Property Otisco Valley Rd, Town of Otisco 014.-01-02.1 

0.75 acres Vacant Property Nine Mile Crk, Town of Marcellus 010.-04-37.0 

0.04 acres Vacant Property Lawrence Rd, Town of Marcellus 017.-05-08.0 

15.73 acres Vacant Property Otisco Valley Rd, Town of Otisco 017.-04-15.0 

5.73 acres - Transmission Line Vacant Property Lawrence Rd, Town of Marcellus 017.-03-11.0 

7.72 acres Vacant Property Otisco Valley Rd, Town of Otisco 015.-01-02.1 

2.64 acres Vacant Property Otisco Valley Rd, Town of Otisco 002.-01-24.1 

019.-01-07.0 

020.-01-02.1 

020.-01-23.0 

021.-03-04.0 

022.-01-45.0 

022.-01-50.1 

022.-02-25.1 

1.22 acres Vacant Property Otisco Lake BlueLine, Town of Spafford 009.-02-13.0 

1.33 acres Vacant Property Limerick St, Town of Marcellus 008.-03-03.0 

4.79 acres Vacant Property Otisco Lake BlueLine, Town of Spafford 008.-02-45.0 

10.44 acres Vacant Property Rt 174, Town of Spafford 005.-02-09.1 

023.-01-02.0 

023.-01-25.0 

023.-01-26.0 

023.-02-31.1 

023.-02-31.2 

025.-01-60.1 

026.-01-07.0 

027.2-02-90.0 

037.-02-12.0 

061.-01-01.0 

064.-07-22.2 

088.-01-15.1 

112.-12-09.0 

600.-04-300.100 

888.-01-01.0 

888.-01-04.0 

0.52 acres Vacant Property North St, Village of Marcellus 002.-01-27.2 

3.28 acres - Transmission Line Vacant Property South St Rd, Town of Marcellus 014.-06-03.0 

1.52 acres - Transmission Line Vacant Property South St Rd, Town of Marcellus 014.-05-09.0 

Page

10

Of

10 3/15/2017 8:26:24 PM