13
bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102 BMDH Project Weekly Update Friday 4 November 2016 | No 198 Construcon starng? Josh the Builder is ready to help!

onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Weekly Update Friday 4 November 2016 | No 198

Construction starting?

Josh the Builder

is ready to help!

Page 2: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Weekly Update Blacktown Hospital | Friday 4 November 2016 | No 198

STAFF PARKING ONLY

EMBARK BUILDING & CRESTWOOD CENTRE

HOSPITAL

P2

Blacktown Hospital

P11

BUNGARRIBEE

WESTERN SYDNEY UNI

P

Admin & Education

BLACKTOWN HOSPITAL

Temporary road changes

underway. Please print

and share the attached site

alert and advise patients

that the cancer centre

entry is available for drop-

off and pick-up.

Cabling and upgrade works

continue in the original

hospital building; there will

be some intermittent

outages to phone and data

on levels 3 and 4 between

7.30pm-3am. Affected

departments will be

notified.

Early works continue on

the Stage 2 site.

Work is progressing on

B47 refurb and B2Hub.

Sorry about the noise.

Demolition underway on

Panorama Parade. Please

stay on marked paths and

drive carefully.

High voltage Sydney Trains

cables around the hospital

site will be going

underground this month.

There will be work on

Panorama Parade and

further cabling

replacement work up to

Pendant Street. Affected

residents will be advised

directly.

Workers in Hospital Street

this week. Please take

care.

Renal

HOSPITAL

P10 now

24/7 staff

parking

DIARY

Saturday 5 November Relay for Life at Blacktown

International Sports Park

Wednesday 9 November Simply Voices Choir in Hospital

Street

Friday 18 November FREE Blacktown Hospital Research

& Education Symposium - registration & enquiries Maria

Belista on 8670 5150 or email [email protected]

Thursday 24 November Norwest Public School choir in

Hospital Street

NEXT

Staff Christmas Choir Callout - more info soon

Christmas Tree decorating competition - check your

Broadcasters

STAGE 2

P12

Blacktown Rd westbound only

ARE YOU

KEEPING UP

WITH THE NEWS?

Follow BMDH

Project

on social media

Facebook BMDH

Project

Twitter

@BMDHProject

Instagram @BMDHProject

Tag your posts to share with us

#BMDHProject

Or share your pics with us via

email (don’t forget your contact

details)

Roads and

access

changing

temporarily

During night

works traffic

will be

redirected

through mental

health road

and P2 carpark

Follow signs

and directions

Take extra care

Hospital

Street

works this

week

Pedestrian

diversions

here

Page 3: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Weekly Update Mount Druitt Hospital | Friday 4 November 2016 | No 198

Stage 2 early works

underway

Work underway around child care for the new community dialysis

centre.

Work underway around New Beginnings for the drug health expansion.

Builder’s compound now set up on site.

Please remember to drive carefully, stay on marked paths and follow

instructions from site staff.

What’s in Stage 2 at Mount Druitt Hospital?

A new community dialysis centre with dedicated parking

New MRI unit on level 2

New Recovery addition on level 2

New single-storey Drug Health expansion

New pre-admission clinics

Projects completed 2017

MOUNT

DRUITT

HOSPITAL

NEWS

Page 4: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

Are you involved in clinical care, research or education at Blacktown

Hospital or in the community?

Join us on Friday 18 November 2016 from 1pm for the inaugural

Hospital Symposium

Presentation and discussion groups

Keynote speech by Prof Peter Zelas

6pm Social function

Free event - registration essential

For information and registrations please contact

Maria Belista | 8670 5150 | [email protected]

Or visit bmdhproject.health.nsw.gov.au

BLACKTOWN HOSPITAL

RESEARCH AND EDUCATION

SYMPOSIUM

Innovation | Knowledge | Excellence

FREE

Page 5: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Brag Book Friday 4 November 2016 | No 198

RADIATING HAPPINESS

Our radiation therapy team were celebrating National Radiographers and Radiation Therapists Week with week with free

cupcakes for patients and a cake stall in Hospital Street. The cupcakes had helpful radiotherapy facts stuck in them, and

even the jelly was colour-coordinated! World Radiotherapy is November 8.

Page 6: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Brag Book Friday 4 November 2016 | No 198

WINNERS CIRCLE

PUMPKIN HOUR

YES WE CAN: Our junior builders at the Mount Druitt

Hospital Child Care Centre have a front row seat for the

construction of the new community dialysis centre. Young

Josh, pictured here with child care centre staffer Amber,

was checking out the site works this week and had his

dumptruck ready to lend a hand.

Meanwhile, if you’re at Mount Druitt, drop in to the

volunteers desk in the main entry. Patricia (pictured

below) and the team have the latest information about

Stage 2, or you can visit our website.

WALKING TALL: Congrats to Marie March & Gen

Langron from our physio team who walked away with a

Lyn March award for Excellence and the ACI

Muscoloskeletal Network Forum this week for Best Free

Paper.

CLEAN SWEEP: We

hope you had a great

Halloween on

Monday. If you

missed our witchy

video, you can see it

on Facebook.

Meanwhile, Nathan

was left cleaning up

the Halloween afters.

Good thing our

witches left him a

broom (unfortunately

not a Nimbus 2000!).

CAN WE BUILD IT?

Page 7: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Brag Book Friday 4 November 2016 | No 198

HONOURING THOSE WHO SERVED

WE WILL REMEMBER THEM: Have you seen the new

temporary exhibitions in the clinical services building at

Blacktown? On level 3 near the courtyards, Aboriginal

artist Thomas Brown has interpreted the ANZAC story

from an indigenous perspective in commemoration of the

100 year anniversary of ANZAC Day.

FIVE HATS

GREEN GLOBES: Healthshare NSW has won a Green

Globe innovation award for the My Food Choices

program. The program provided better food, and instant

ordering which supports patient nutrition and cuts down

food waste. And has peach crumble. Congratulations to

the team!

IN THE PINK

GO PINK OR GO HOME: Stage 2 FF&E manager Jenny

is still in the pink!

RELAY FOR LIFE

TAKE YOUR MARKS: Katie from our aged care team is

loaded up with merch and ready for Relay for Life this

weekend. If you’re running at Blacktown or just dropping

by to show your support, stop and say hi. We’re got lots of

project goodies and info to give away.

Page 8: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

BMDH Project Brag Book Friday 4 November 2016 | No 198

LOOK AT THEM WOW Our BMDH Admin and Exec teams are

on their way to the B2Hub - a new

activity-based space designed for how

we work, and how we’d like to work in

the future.

WSLHD will have the first hospitals in

Australia with the purpose-built units.

B2Hub will be first cab off the rank at

Blacktown (or maybe that should be

the first Uber), so this week we invited

all future B2Hub teams to an

introduction to NWOW session.

This will be followed with sessions for

paper independence, managing mobile

teams, working in mobile teams and

etiquette.

We asked staff what they liked, and

what they didn’t like about their

workplace. Luke , top left, said the

best thing was being easily accessible

to people because he’s located off a

main corridor. And the worst thing

was being easily accessible when you

have to do focused work, because

you’re always interrupted.

We decided to put it to the test and

pile into his office for a photo op and

we can confirm that it’s impossible to

do focused work with six extra people

in there.

Don’t worry Luke, quiet focus zones

are on the way with NWOW!

Left, middle and bottom, the teams

check out new layouts and zones for

different kinds of work (much like your

own home where you have different

rooms for different activities).

Thanks to everyone who attended.

Page 9: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

Blacktown Hospital Site Alert

Temporary road changes in

October and November at

Blacktown Hospital We’re completing infrastructure works at Blacktown Hospital in preparation for the start

of construction on the new acute services building next year.

We need to make some temporary road changes around the excavation site. Here’s what

Temporary road changes 1/2 | Issued 14 October 2016

USE THE SLIP ROAD

To avoid delays during this

time, we suggest you use the

Blacktown Road slip lane for

entry and exit to parking

areas.

DROP OFF AT CANCER

CENTRE ENTRY

To avoid delays, advise

carers to drop off and pick up

at the cancer centre entry,

near the bus stop.

FIRST ROAD CHANGE

21 October - 9 NOVEMBER

7.30 AM - 5.30PM

There will be traffic

redirection around the

multi-storey car park road

and pedestrian crossing.

Follow the signs and

instructions from site staff.

PLEASE TAKE CARE

Your safety is VERY important

to us. At the risk of sounding

like a broken record, we’d just

like to remind you one more

time to take care and always

follow directions.

SECOND ROAD CHANGE

24 OCTOBER - 3 NOVEMBER

NIGHT WORKS

9.30PM - 5.30AM

There will be traffic

redirection around the multi

-storey car park road and

pedestrian crossing.

Follow the signs and

instructions from site staff.

Change

of dates

Page 10: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided
Page 11: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

Blacktown Hospital Site Alert

Temporary road changes 2/2 | Issued 14 October 2016

Day works

21 Oct - 9 Nov

7.30am - 5.30pm

Night works

24 Oct - 3 Nov

9.30pm - 5.30am

Clinical Services Building

Original Building

P1 car park

Renal/Admin

Mental Health

Clinical Services Building

Original Building

P1 car park

Renal/Admin

Mental Health

Slip lane

entry

Cancer Centre entry

Slip lane

entry

Cancer Centre entry

Main

entry

Main

entry

One lane through traffic

Page 12: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

Sonia Jones | EMR2 Lead | 0409 166 774

Robyn Cook | EMR2 Project Manager | 0418 460 990 CONTACT US

Update to adult admission form Staff Info | Blacktown Hospital & Mount Druitt Hospital | October 2016

Page 13: onstruction starting? Josh the uilder is ready to help! · GREEN GLOES: Healthshare NSW has won a Green Globe innovation award for the My Food hoices program. The program provided

bmdhproject.health.nsw.gov.au |[email protected]| 1800 155 102

B2Hub construction | Issued 23 September 2016

Noisy works on level 2 for B2Hub

The former Pathology area on level 2 is

being refurbished for the B2Hub - a new

activity-based workspace for the

hospital administration units.

Demolition is underway and will be

followed by refurbishment work until

late 2016.

We appreciate your patience while we

deliver these new facilities for

Blacktown Hospital, and sorry about the

noise.

If you have any issues or concerns,

please contact the Project Office

on 1800 155 102.

NEW WAYS OF WORKING

Blacktown Hospital will be one of

the first hospitals in Australia

with activity-based workspaces.

Every NWOW workplace is

different because the design

reflects what people do and how

they do it, but generally there are

some common elements:

Quiet zones for concentrated

work

Private spaces for

confidential work or

discussion

Collaborative spaces for

shared work

Spaces for informal

interaction and breaks.

The new B2Hub will be a

purpose-built ‘home base’ for the

hospital admin team who are

currently housed in temporary

locations all over Blacktown and

other sites.

The B2Hub will also provide a

real-life model for activity-based

workspaces in the acute services

building.

It will allow clinical staff to

experience the new designs first-

hand and help them transition

smoothly to NWOW workspaces

when the new building is

completed in 2019.