OPEN SPACE AND RECREATION PLAN ELEMENT BOROUGH OF KEYPORT MONMOUTH COUNTY, NEW JERSEY Borough of Keyport Unified Planning Board December 14, 2017 Prepared By: Sean Moronski, P.P., AICP New Jersey Professional Planner License No. 05601 Original is Signed and Sealed

OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

OPEN SPACE AND RECREATION

PLAN ELEMENT

BOROUGH OF KEYPORT

MONMOUTH COUNTY, NEW JERSEY

Borough of Keyport Unified Planning Board

December 14, 2017

Prepared By:

Sean Moronski, P.P., AICP

New Jersey Professional Planner License No. 05601

Original is Signed and Sealed

Page 2: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

i

Table of Contents

I. EXECUTIVE SUMMARY .................................................................................................................1

II. GOALS AND POLICIES ....................................................................................................................4

III. INVENTORY .......................................................................................................................................7

IV. NEEDS ANALYSIS ...........................................................................................................................18

V. RESOURCE ASSESSMENT ............................................................................................................23

VI. ACTION PLAN ..................................................................................................................................31

VII. GENERAL OPEN SPACE SYSTEM MAP ....................................................................................43

VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ....................................................................44

IX. PUBLIC PARTICIPATION .............................................................................................................44

X. PLANNING ADOPTION ..................................................................................................................44

Page 3: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

ii

MAYOR AND COUNCIL

Harry M. Aumack II, Mayor

Matthew Goode, Council President

Isaiah Cooper

Collette Kennedy

Sophia Lamberson

Victoria Pacheco

Joseph Sheridan

UNIFIED PLANNING BOARD

Harry M. Aumack II, Class I

Nicholas Vecchio, Class II

Matthew Goode, Class III

Roger Benedict, Class IV, Chairman

Mark Sessa, Class IV, Vice Chairman

John J. Kovacs, Class IV, Secretary

Dennis Fotopoulos, Class IV

Lori Anne Davidson, Class IV

George Sappah, Class IV

Jacqueline Kovacs-Olsen, Alternate

Juan Carlos Oviedo, Alternate

Denise Nellis, Recording Secretary

Marc Leckstein, Attorney

Francis Mullan, P.E., Planning Board Engineer

Donna Miller, P.P., AICP, Planning Board Planner

BOROUGH ADMINISTRATION & STAFF

Stephen J. Gallo, Business Administrator

Tom Gallo Jr., Clean Community Coordinator

Denise Nellis, Administrative Secretary

David Olsen, Fire Inspector and Fire Sub-Code Official

Donna Purcell, Recycling Committee Coordinator, Registrar, Secretary to the Board of Health

MATRIX NEW WORLD ENGINEERING STAFF

Andrew Raichle, P.E.

Sean Moronski, P.P., AICP

Maciej Maslonka

Leah Thiel

Page 4: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

1

The Municipal Land Use Law (MLUL) provides that a Master Plan may include a Recreation Plan

Element and a Conservation Plan Element, which has the same characteristics of an Open Space Plan

Element. Having adopted its most recent Master Plan in March 2017, the Borough of Keyport has included

an Open Space Plan Element and Recreation Plan Element within that Plan.

To participate in the New Jersey Green Acres Planning Incentive (PI) funding category, the municipality

must have a Green Acres approved Open Space and Recreation Plan (OSRP) to be eligible for PI funding.

This updated OSRP is developed consistent with OSRP Guidelines provided by the Green Acres Program.

This updated Plan Element addresses items required for the Borough to participate in the Green Acres

Planning Incentive (PI) funding category, which awards 50 percent matching grants to local governments

to preserve lands identified in its OSRP.

For the goals and objectives of this OSRP, we incorporated those broad Master Plan goals that are directly

applicable to the OSRP. Objectives from the Master Plan regarding recreation and open space have been

incorporated into this updated OSRP. There is also an overview of policies that direct the philosophy of

the Borough regarding recreation and open space policy. As this OSRP is a restructuring of the Recreation

Plan (RPE) and Open Space & Conservation Plan Element (OSCPE) into a format that addresses the

requirements to participate in the PI funding, the goals, objectives, and intent of the RPE and OSCPE are

preserved in the OSRP. As such, the OSRP will also supersede the Recreation Plan Element and Open

Space & Conservation Plan Element of the Master Plan.

Keyport has many natural resources which help define the essential character, economy, and resilience of

the Borough. The Borough has considered a series of initiatives and projects to improve the waterfront

and landward opportunities presented to Keyport. This OSRP proposes Keyport increase its land

stewardship efforts and outlines strategies to meet the statutory purpose to preserve, conserve and utilize

natural resources. Land stewardship involves both landowners and government agencies.

The Borough’s approach to stewardship has many aspects, including public education and implementation

of ordinances for conservation easements and public waterfront access; stormwater management, and

protection of stream corridors, steep slopes, soil erosion, and forests. Public education on the importance

of stewardship in protecting these valuable natural resources is available through educational programs

offered by the County and State, and private non‐profit organizations, including the New Jersey

Conservation Foundation, NJ Baykeeper, and the Bayshore Regional Watershed Council. The Borough

will seek out these organizations to advance these efforts, and explore the creation of new programs

through Borough schools and Borough agencies such as the Recreation and the Environmental

Commissions and developing an official Parks and Recreation Department.

Page 5: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

2

This OSRP seeks to minimize further degradation of these resources for the 21st Century and beyond. The

plan recognizes the inherent limitations of our ability to disassemble the natural world and put it back

together again. It argues in favor of a lighter touch on the land, one that is more respectful of natural

systems, and that limits the resource commitments and impacts of human intervention. This calls for a

systems approach to natural resource conservation, where interconnected natural systems are viewed as a

collective resource, not a series of separate features. The variety of biological species is an indicator of

the health of an ecosystem.

Maintaining biological diversity requires protection of critical habitat areas. While habitats of endangered

or threatened plant or animal species are of special importance, threatened or endangered status may be

transient. For instance, the osprey and snowy egret may be removed from the protected list in the future,

yet their critical habitats will remain essential to their continued survival. Additionally, the extirpation of

rare species removes elements from the food chain that help maintain ecological balance. Protecting

biodiversity requires the protection of terrestrial and aquatic habitats that are highly susceptible to

degradation.

Pristine waters cannot be maintained without protection of their watershed areas. Freshwater wetlands

play an important role in filtering contaminants from the surface water and groundwater regime and, while

protected by state statutes, are not immune from impacts that occur beyond the regulated areas. Similarly,

the beautiful views of Raritan Bay and its waterfront access are unparalleled; yet such views are frequently

lost to development. Land development will be arranged to maximize the conservation of substantial assets

of critical habitat areas, by limiting the aerial extent of development and promoting conservation

techniques targeted to these resources. Aldo Leopold wrote in A Sand County Almanac:

"A land ethic, then, reflects the existence of an ecological conscience, and this in turn reflects a

conviction of individual responsibility for the health of the land. Health is the capacity of the land

or self‐renewal. Conservation is our effort to understand and preserve this capacity..."

In 2007, Keyport’s Mayor and Council authorized the preparation of a Natural Resource Inventory (NRI)

for the Borough. The NRI compiled an inventory of environmental resources within Keyport to be utilized

by the Borough’s Environmental Commission, Unified Planning Board and Borough Council to aid in the

evaluation of environmental issues in land use planning and the redevelopment process.

Page 6: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

3

This OSRP Element discusses the natural resources in the Borough and provides recommendations for the

conservation, preservation and appropriate use of these resources. It also identifies the Borough’s open

space and recreation facilities and their general condition, and offers recommendations for improvements.

Based on this analysis, an assessment of the adequacy of these facilities in terms of location, size, and

scope is developed.

The quality and quantity of open space and recreation facilities is one of the most visible aspects of

municipal government. The presence (and absence) of high quality recreation facilities directly relates to

peoples’ choices for residence, shopping and employment. This Plan Element provides a framework for

understanding the open space and recreation facilities and services offered in Keyport, and how these

facilities and services may be used and upgraded as a resource to preserve and enhance Keyport.

The current recreation and open space inventory is organized into open spaces that offer active recreational

opportunities and those that offer passive recreation. The Recreation Subcommittee recognized additional

open spaces that are now included in the official Keyport Recreation and Open Space Inventory (ROSI)

list, which increased the amount of NJDEP recognized open space in Keyport from approximately 14

acres to approximately 18 acres of accessible recreation area, and approximately 205 acres of open space

if wetlands and other land areas are included. A complete Stakeholder ROSI list is provided in this OSRP.

This inventory was used to prepare a resource assessment to determine if the facilities in Keyport offer

sufficient recreational opportunities for its residents, based on the National Recreation & Park Association

(NRPA). Please see the Needs Analysis Section for resource assessment. Based on the most recent

population estimates, and its existing ROSI, the Borough provides sufficient facilities according to the

NRPA Facilities Standards. To address what the Borough is lacking, this Element recommends the

Borough explore entering Intra-Local Government Cooperation Agreements with neighboring

municipalities for shared services.

The OSRP further describes recreation opportunities provided by the Monmouth County Recreation

Department, most notably the Henry Hudson Trail, of which over 1.5 miles travels through Keyport. A

recently drafted Municipal Public Access Plan (MPAP) describing the existing and proposed measures

the Borough will take to expand access and recreational opportunities to tidal waters in Keyport was

considered for this Element. This Plan is currently being reviewed by NJDEP and awaiting adoption.

Please see the Recommendations from the Municipal Public Access Draft.

Page 7: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

4

The OSRP sets forth the policy, goals and objectives for the natural resources of Keyport. This includes

Keyport’s physiography, stratigraphy, soils, aquifers, wellhead protection areas, streams, floodplains,

wetlands, forests, habitat for threatened and endangered species and other natural heritage sites. The

inventory also considers Keyport’s rich maritime history and culture a resource worth conserving. In

addition, this Element acknowledges Keyport’s vulnerability to climate change and its need to protect its

coastal areas.

Many of the Borough’s Master Plan goals are applicable to the OSRP. Specific objectives for recreation

and open space/conservation are outlined. A distinction is made between the terms “goals” and

“objectives.” It is not uncommon to conflate the terms. Each one has a different purpose, as follows:

1. Goals address the larger purposes of the Master Plan

2. Objectives address more specific approaches on how to achieve the goals of the Master Plan

The following goals of the Master Plan are applicable to this OSRP. These goals are numbered as found

in the Master Plan for easier reference. The goals are considered of equal importance and the sequence in

which they are listed holds no significance. Applicable Master Plan goals, listed below by the number

they are referenced in the Master Plan document, are as follows:

2. Preserve the marine focus of Keyport and residents access to the waters of Raritan Bay by

defining/preserving an area exclusively for marinas, boatyards, and other

marine/recreational uses.

Policy Statement: Continue a public-private partnership to enhance and expand the Marine and

Commercial economic base along Matawan Creek in balance with public access. New

development will be designed to provide enhanced public access to waterfront areas.

4. Ensure that Keyport continues as a Bayfront Community not prone to extensive damage

from natural hazards such as wind, rain, storm surge, and sea level rise through 2100.

Policy Statement: Identify wind, rain, storm surge, and sea level rise as hazards to the Borough, to

be accounted for in municipal planning, redevelopment, and new development. Limit development

intensity in the Special Flood Hazard Areas and implement structural changes to reduce the impact

of these natural hazards.

Page 8: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

5

5. Ensure that any development takes into consideration the Borough’s environmental features

and is designed to preserve these characteristics.

Policy Statement: Development must consider minimizing or avoiding intrusion on the Borough’s

environmental features, including, and not limited to its waterfront, streams, wetlands, floodplains,

marshes, etc. It must balance the vision of the recent Master Plan update with minimizing adverse

impacts on environmental features in the Borough. Preserving the Borough’s natural resources is

essential to preserving the quality of life in Keyport.

6. Provide a superior system of community facilities and services to address everyday needs of

the Borough and, to deal with service demands of new developments, and which are not

susceptible to destruction by natural hazards; wind, rain, storm surge, sea level rise.

Policy Statement: One of the general goals of the Master Plan, on Page 7 under the Goals and

Objectives section, is to ensure that as development and redevelopment occurs, appropriate

facilities and services necessary to address the needs of residents and visitors are maintained, even

considering the natural hazards identified for the community.

7. Maintain and enhance the scenic and historic Waterfront area, recognizing its value as a

community asset and focal point of the Borough.

Policy Statement: Throughout its history, the Keyport waterfront with its environmental features,

has been a prime asset of the community, both for commercial and recreational activities. Any

projects or activities need to be tailored toward preserving and enhancing the waterfront area.

11. Preserve, protect and maintain existing public spaces, including existing parks and

recreation facilities, and pursue opportunities to enhance and/or increase the number of

parks and recreation facilities in the Borough.

Policy Statement: The Borough is supportive of policies that will protect and preserve the natural

assets within the Borough’s borders, as detailed within the Natural Resource Inventory. Given that

most properties in Keyport are developed, the Borough encourages the enhancement and addition

of active and passive park and recreation opportunities.

12. Protect, preserve, and enhance historic sites, structures, and landscapes that are an integral

part of the Borough’s character and history.

Policy Statement: The Borough recognizes that preservation of its historic sites, structures, and

landscapes enhance the established character of Keyport. Future development and redevelopment

that occurs adjacent to historic sites, structures, and landscapes will take into consideration their

historic character and protect them through appropriate bulk standards, buffer areas, and other

related elements.

Page 9: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

6

15. Preserve and conserve environmentally sensitive land and open space.

Policy Statement: Identify opportunities to acquire and preserve additional open space. Implement

measures to enhance protections to environmentally sensitive areas.

The objectives applicable to the OSRP are from the Recreation and Open Space Plan Elements.

1. Enhance and upgrade existing active and passive recreation areas throughout the Borough.

2. Encourage unencumbered public access to the entire beachfront alongside the water’s edge.

3. Incorporate and preserve community gardens as passive parks in the Borough.

4. Encourage the Borough to acquire property that is eligible under the Green Acres program.

5. Develop and enhance ongoing relationships between the Borough and Board of Education to

address use of school district recreation facilities as a public asset to the Borough and its residents.

6. The Borough will consider establishing a separate Parks and Recreation Department to maintain

and expand all recreational opportunities in the Borough. The Borough is committed to dedicating

sufficient resources to properly maintain, improve and expand all recreational facilities.

1. Preserve environmentally sensitive features through sound planning and land use regulations.

2. Enhance public access to the waterfront, encouraging public waterfront activities and recognizing

the Bayshore as the Borough’s major environmental asset.

3. Take proactive actions to minimize potential flood damage through enforcement, and where

necessary, updating of the Borough’s Land Use Regulations. Such updates will reflect current best

practices and applicable State and Federal regulations as the Borough’s Ordinance, State, and

Federal regulations collectively regulate land use and development within Keyport.

As outlined in the Master Plan Recreation Element and affirmed in this OSRP, the Borough proposes to

expand and acquire new parks, when and where available and feasible, while protecting current parks and

their locations. All existing and new Borough parks would be expected to be refurbished within five to 10

years, and provide an inclusive environment for the public to enjoy, including differently-abled children.

The Borough will explore opportunities to expand recreation at the waterfront. This OSRP affirms the

recommendation that the Borough utilize the draft Municipal Public Access Plan (MPAP) to expand

access to tidal waters, creeks, marshes, etc., which will be further outlined under the OSRP Action Plan.

Page 10: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

7

While the total open space and recreation represent approximately 205 acres of land (23 percent of the

Borough’s incorporated land mass), we note that much of this land is not usable for recreational purposes,

as it is comprised of wetlands and other inaccessible areas. Approximately 18 acres of parks, recreation

areas, marinas and/or boat ramps are useable for recreation (approximately 4.6 percent of the Borough’s

land mass) and the remaining area of approximately 187 acres is comprised of undeveloped beaches,

dunes, uplands, wetlands, and other open spaces not included on the Green Acres ROSI list.

Keyport’s Beach Park and the adjacent municipal boat ramp are key waterfront and public access locations

in the Borough. In addition to the beaches, the waterfront parks, Cedar Street Park and Firemen’s Park are

active public recreational facilities on the waterfront. Olsen’s Boat Works, Pedersen’s Marina, Brown’s

Point Marina, a charter boat dock, and Keyport Yacht Club provide recreational access to the Raritan Bay.

NJDEP, through its Green Acres Program, provides funding to municipalities and counties for the

acquisition and improvement of lands held for conservation and recreation purposes. As a condition of

applying for and receiving Green Acres funding, each municipality or county is required to prepare and

maintain a Recreation and Open Space Inventory (ROSI), listing all Green Acres-funded properties in the

municipality or county as well as all other lands held for conservation and/or recreation purposes. Lands

listed on a ROSI include those owned, leased or otherwise controlled by the municipality (or county) and

may include land owned in fee, land leased by the municipality or county for recreation purposes, land

owned by a private entity upon which the municipality or county holds a conservation easement, or any

land in which the municipality or county holds a specific recreation and/or conservation interest.

Properties included on a ROSI are to be held for conservation and recreation purposes in perpetuity, and

may not be transferred from municipal or county ownership without first making an application to the

State House Commission for what is termed a “disposal” of such lands. Similarly, properties included on

a ROSI may not be used for purposes other than conservation or recreation without first making

application to the State House Commission for what is termed a “Diversion” of such lands.

Several public access locations are on the Borough’s official ROSI including Keyport Waterfront Park,

the Promenade, Fishing Pier, Beach Park, Fireman’s Park and Cedar Street Park. Together these areas

provide the bulk of Keyport’s municipal public access and are preserved in perpetuity through the Green

Acres program. On the following page, the recommended ROSI list is provided:

Page 11: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

8

127 13 & p/o 25.01ii Benjamin Terry Park 1.12 acres Y Passive

137 6 & 16 Cedar Street Park 3.38 acres Y Active

21.01 24.01iv Fishing Pier 0.2 acres Y Active

21.01 34iiv Mini Park 0.27 acres Y Passive

21.01 Several Lotsi Waterfront Park 5.14 acres Y Passive

21.02 20, 21, & 22 Fireman's Park 2.21 acres Y Passive

56 1 Main Street 2.13 acres Y Active

9 12.01 Therese Avenue 0.84 acres Y Passive

94 1, 2, & 3 Beach Park 2.48 acres Y Passive

94 45 Veterans Park 0.66 acres Y Passive

39 32 Kearney Street 0.5 acres N Passive

40 7 Jack Conway Park 0.1 acres N Active

83 7 Elizabeth Street Community Gardens 0.1 acres N Passive

63 1 Public Library Gardens 0.3 acres N Passive

72 1 Keyport Central School playgrounds,

baseball, and field hockey fields. 3.2 acres N

Active

68 1 Keyport High School football field 5.7 acres N Active

i. Waterfront Park is comprised of the following lots: 49, 49.01, 49.02, 49.03, 49.04, 49.05, 49.06, 50, 50.01,

51, & 51.02. Lot 49 is the area north of American Legion Drive, and Lot 50 is to be merged with Lot 49. Lot

51 is the portion east of American Legion Drive only.

ii. 0.76 ac. of Lot 25.01 included in this listing consisting of the adjacent offshore area within the confines of

Lot 13 shore footprint.

iii. Lot 34 includes a 0.05 acre area of existing Lot 49, which is south of the re-aligned American Legion Drive.

iv. This lot is subject to a 10-year Tidelands license beginning 01/20/12.

An Open Space & Recreation Site Map, depicting the location of each of the Borough’s inventoried open

space and recreation sites, is included on the following page and in Section VII of this OSRP Element.

The GIS data available for the map is the most recent accurate information available.

Page 12: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

9

Page 13: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

10

The Borough’s Parks Commission and Public Works Department is charged with maintaining all of

Keyport’s public parks and playgrounds as well as the gardens and grounds surrounding municipal

buildings. These open spaces enhance the quality of life by providing the beauty of nature and recreational

opportunities in and around the Borough’s built environment.

A passive recreation area is generally an undeveloped space or environmentally sensitive area that

requires minimal upkeep. Such parks may address the passive recreational needs for the health and well-

being of the public and the preservation of wildlife and the environment. The quality of the environment

and "naturalness" of an area is the focus of the recreational experience in a passive recreation area. Passive

recreation may be defined as a non-motorized activity that: “Offers constructive, restorative, and

pleasurable human benefits and fosters appreciation and understanding of open space and its purpose.”

Passive parks exist for low intensity recreation emphasizing the open space aspect of the park and allowing

for the preservation of natural habitats. It is an unencumbered and informal park for residents to kick a

ball, fly a kite, non-competitive organized sports, pick-up ball games, non-motorized sports, reading, bird

watching, mediation, etc.

The passive parks currently operating in the Borough of Keyport include those on Therese Avenue1,

Kearney Street, the Benjamin Terry Park, Veterans Park, Beach Park, Mini Park, Henry Hudson

Trail (linear park/recreation), the Borough’s Waterfront (American Legion Drive), Elizabeth

Community Gardens, Public Library Gardens, Fireman’s Park, Mosaic Benches by the boat ramp, and

the Keyport Central School Playground. In addition to this all the waterways and marshes in the Borough’s

jurisdiction are passively used as parks.

An active recreation area is generally any recreational activity that requires significant infrastructure for

the purposes of competitive sports or organized events. It is about engaging in adventure sports or outdoor

games. An active park refers to structured recreational activities which require specialized parkland

development and management which may restrict general use of the parkland or facility. Active recreation,

such as team sports, typically involves intensive management, maintenance, and therefore higher costs,

due to the need to provide substantial space to congregate and upkeep for compliance.

Active park status includes parks that need administration, scheduling, registrations or collect fees for use.

The active recreation areas operating in Keyport include the parks on Cedar Street and Main Street,

Munn Park, the Keyport High School football field and Keyport Central School baseball/hockey field.

The following section is a description of each recreational facility and the amenities each possess:

1Park names in bold indicate open space and recreation areas found on the official NJDEP ROSI list.

Page 14: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

11

Benjamin Terry Park

This approximately half acre, beachfront, passive park is located between Myrtle Avenue and Cedar

Street. The park is adjacent to Cedar

Street Park and Veterans Park. It

remains open for picnicking, pick-

up games, leisure activities and

other such uses. Parking is on-street

along Cedar Street. A photo of the

park follows:

Cedar Street Park

This is located adjacent to Benjamin Terry Park and is an active park and bayfront. The park has 2 public

tennis courts, a basketball court,

baseball/softball field and a

playground. Parking is available

on-street along Cedar Street and a

parking lot is also located on Pine

Street, adjacent to the baseball field.

There is a second photo of Cedar

Street Park on the following page.

Page 15: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

12

Cedar Street Park (continued)

Veteran’s Park

This is also a beach front passive park with benchesand ornamental grasses. Formalized access and parking

is recommended, increasing it where available without disrupting the natural integrity of the park. ADA

compliance and updated signage are also recommended, as necessary.

Page 16: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

13

Fishing Pier

The Keyport Fishing Pier is located

along the Keyport Waterfront Path,

in downtown. As the name

suggests, the pier offers

opportunities for saltwater fishing

and is one of two locations that

offer this activity in Monmouth

County.

Mini Park

This passive park is located adjacent in Keyport’s downtown, east of the intersection of West Front Street

and Main Street. The park offers

picnicking opportunities, as well as

convenient connection from the

downtown to the waterfront. The

park is also used as a venue for

several events the Borough hosts,

like summer concerts.

Page 17: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

14

Waterfront Park and Promenade

Keyport’s Waterfront Park and

Promenade is a four-acre park that

consists of a pavilion, pedestrian

plaza, lawn area and a free public

parking lot. The park was part of an

extensive revitalization project,

first conceived in the late 1980's as

an economic development venture

to attract visitors, businesses and

new residents.

The project consisted of the park,

promenade, and the replacement of

1,450 feet of bulkhead from

Fireman’s Park up to the Municipal Boat Launch. The project also included the redirection and

reconstruction of American Legion Drive to provide maximum waterfront recreational opportunities.

Fireman’s Park

This passive park is located along

West Front Street and the municipal

parking lot. The park plays host to

the Borough’s Farmer’s Market as

well.

Page 18: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

15

Main Street Park

The park is located along the northern edge of the Henry Hudson Trail, between Main Street and Broad

Street. The subcommittee

recommends this small, oddly

shaped parcel to be dedicated to

and developed into a

Tourist/Visitor Hub with a stone

parking lot for residents and guests

to park briefly, access street maps

of the Borough, recreational

facilities maps, upcoming events

and to connect to a Wi-Fi hub of

information. Recently, a skate park

and fitness trail were proposed for

this park, and a Monmouth County

Open Space Grant was secured for

the improvements.

Therese Avenue

This is a 0.86-acre park with a public basketball court, playground, and is located on the dead end of

Therese Avenue.

Page 19: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

16

Jack Conway Senior Park

Located on Kearney Street,

between Stout Street and Barnes

Street, the Jack Conway Senior

Park is a small park, with

picnicking opportunities, as well as

a playground and swing set.

Henry Hudson Rail-to-Trail

Built along the right-of-way of a former rail line, the Henry Hudson Trail is a 24-mile, 10-foot wide trail

owned and maintained by the

Monmouth County Recreation

Department. The northern portion

begins on the Atlantic Highlands

and Middletown border and travels

12 miles through Keyport, before

terminating at the Borough’s border

with Aberdeen.

Page 20: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

17

Elizabeth Street Community Gardens

Elizabeth Street Community Gardens is located at the intersection of Elizabeth and Church Streets and is

maintained by the Keyport Garden Club. This lot is used for growing organic food in a community setting

from April to December. There are plots available (measuring four feet by eight feet) to be leased for $25

per year and are first-come, first-serve. For more information, please see the Keyport Garden Club’s

website.

Note: Photo courtesy of Keyport Garden Club Facebook page.

Public Library Gardens

This site is a community garden located outside the public library at the intersection of 3rd and Broad

Streets.

Keyport Public Library; Note: Photo courtesy of keyportgardenclub.com

Page 21: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

18

As a built-out community, public open spaces in Keyport are at a premium. Such spaces will be properly

maintained and preserved. Suggested improvements relate to the needs identified for each facility, based

upon local priorities.

One method of evaluating a community’s recreation need is to apply the standards published by the

National Recreation & Park Association (NRPA) for recommended recreational amenities. These

standards provide guidelines for minimum number of facilities based on community population.

As the 2010 Census counted 7,240 residents, and 2015 estimates by the American Community Survey

place the population at 7,145, Keyport has an adequate number of dedicated active recreation facilities per

NRPA standards. By NRPA standards, the Borough’s lack of a public volleyball court and an additional

tennis court are noted. Recognizing the limited land area in the Borough for such active recreation uses,

the Borough should consider refurbishing its existing tennis facilities, and entering into an Intra-Local

Government Cooperation Agreements with neighboring municipalities, which could provide residents

with access to additional recreational facilities and programs not provided by Keyport. The Recreation

Subcommittee identified the Township of Hazlet as having excellent recreational facilities. It should also

be noted that despite not meeting the population standards established by the NRPA, other recreational

amenities are provided through facilities owned and maintained by the Keyport School District, including

a soccer, field hockey, and football fields, as well as a running track. As the facilities would need to fulfill

the needs of official school programs and events, some restrictions to the public exist.

*Facility is provided, owned, and maintained by Keyport School District

Softball Fields One (1) per 5,000 residents Meets Standard

Baseball Fields One (1) per 5,000 residents Meets Standard

Soccer Fields One (1) per 10,000 residents <10,000 residents*

Field Hockey Fields One (1) per 20,000 residents <20,000 residents*

Multi-purpose Fields No standards published

Basketball Courts One (1) per 5,000 residents Meets Standard

Volleyball Courts One (1) per 5,000 residents Does Not Meet Standards (1 existing non-public court)

Football Fields One (1) per 20,000 residents <20,000 residents*

Tennis Courts One (1) per 2,000 residents Does Not Meet Standards (2 existing courts)

Trails One system per region Meets Standard

Swimming Pools One (1) per 20,000 residents <20,000 residents

Running Track One (1) per 20,000 residents <20,000 residents

Community Centers One (1) per 25,000 residents Meets Standard (Senior Center)

Page 22: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

19

The recreation facilities considered when determining if the Borough meets the NRPA standards are listed

on the following page as:

Baseball/Softball:

Cedar Street Park, 53-199 Cedar Street

Atlantic Street Field, east of Central Elementary School at 335 Broad Street

Dilapidated diamond at Main Street Park, 173-183 Main Street

Soccer:

Jackson Street Fields, east end of Jackson Street, adjacent to football field

Field Hockey:

Atlantic Street Field, east of Central Elementary School

Basketball:

Keyport High School Gymnasium, 351 Broad Street (not public)

Small court at Cedar Street Park

Volleyball:

Keyport High School Gymnasium, 351 Broad Street (no public court)

Football:

Jackson Street Football Field

Tennis:

Two courts at Cedar Street Park

Trails:

Henry Hudson Bicycle Path

Community Center:

Keyport Senior Center, 110 2nd Street

Playground Equipment (Jungle Gym and/or Swings):

Jack Conway Park, Kearney Street between Stout and Barnes Streets

Therese Avenue Park, north end of Therese Avenue

Beach Park, 1-37 1st Street

Page 23: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

20

Central Elementary School, Atlantic Street side

Central Elementary School, Broad Street side

Veteran’s Park, 22 Myrtle Avenue

Benjamin Terry Park

Main Street Park

Running Track:

The track around the football field appears in poor condition. The high school’s track team only has away

events.

Swimming Pools:

No municipal pool in Keyport.

Marine:

Municipal Boat Ramp, 1 Broad Street

Fishing Pier, Keyport Waterfront Path

The Borough of Keyport also recognizes the dynamic recreational preferences of its residents, especially

among its younger generation. For years, the Borough has been exploring opportunities to install a skate

park in the Borough. In 2015, the Borough was awarded a grant from the Monmouth County Open Space

Trust Fund for the rehabilitation of the ballfield, and the installation of a new sidewalk, skate park, fitness

area, play area, and picnic area.

Balanced Land Use Standard Evaluation:

Balanced Land Use is the methodology used by the State of New Jersey to calculate public open space

needs. This approach estimates the minimum land area in Keyport that needs to be dedicated to public

open space needs. That approach is based on recreation and open space needs being generated by

development, which will occupy the remaining Borough land area.

The Balanced Land Use Standard recommends three percent of developed and developable land in a

municipality be devoted to recreation. Including Keyport’s passive parks and recreation areas, 41 acres,

or 4.6 percent of the Borough’s land use area, is reserved for recreational uses. Some of those areas,

however, do not have active recreational facilities. Undevelopable land such as wetlands and land

preserved as open space by the County or State is subtracted out of the total land area to determine the

municipal need for recreation and open space land area.

Page 24: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

21

Core System Standard Evaluation:

The NRPA developed the Core System standard, which is used to estimate need based on existing and

projected population. These standards recommend 10.5 acres of public park and recreation area per 1,000

people. Based on Keyport’s population of 7,145 people, by this standard the Borough needs to have over

75 acres of land devoted to public parks and recreation areas, highlighting an almost 50 percent deficit.

Each methodology needs to be considered with caution. They are intended to serve as a guide to determine

the minimum open space area and are not an exact science. As recommended in the Master Plan and

reaffirmed in this OSRP, the Recreation and Open Space committees will work to identify local recreation

and open space needs.

The Monmouth County Park System, under the guidance of the Monmouth County Board of Recreation

Commissioners, serves as the County's open space, park and recreation agency. Regional parks are the

backbone of the County Park System. They combine the functions of recreation and conservation areas,

providing a mix of recreational opportunities while preserving a major portion of the park in a natural,

undeveloped state.

Each regional park has some unique features or facilities that distinguish it from other regional parks and

attract visitors from throughout the county. All county residents need to be within 10 miles of at least one

Regional Park. The combined total acreage in the regional park and recreation area categories must equal

or exceed a standard of 10 acres per 1,000 county residents. Based on an estimated county population of

645,349, the target is 6,450 acres of regional parks and recreation areas. The Borough of Keyport does not

currently host any regional parks other than a segment of the Henry Hudson Rail-to-Trail.

Recreation areas are intended primarily to provide outdoor active recreation facilities, although they may

include indoor facilities for athletics and specialized programming. Recreation areas generally do not

contain a large environmentally sensitive area. All county residents must reside within eight miles of a

recreation area. As stated above, the combined total acreage of recreation area and regional park categories

need to equal or exceed a standard of 10 acres per 1,000 county residents.

Special use areas serve a special purpose or meet a specific need. Often, they are devoted to single-purpose

recreational, horticultural, historic or cultural activities such as gardens, marinas, and historical sites.

Because their acquisition is typically undertaken to preserve or take advantage of a specific existing or

potential resource of county significance rather than as a response to a calculated or projected recreation

need, there is no standard for their quantity or distribution.

Page 25: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

22

Conservation areas are created to permanently protect a natural resource of significance and are managed

for that purpose. Examples include water-related natural resources, mature woodland, noteworthy plant

or wildlife habitats, geological features and scenic landscapes. Due to their resource-driven function, there

is no quantitative standard for the number or distribution of conservation areas.

Golf courses are special purpose, daily fee recreation facilities. Nationally accepted standards suggest

there needs to be one daily fee 18-hole golf course for every 25,000 to 30,000 county residents. This need

can be satisfied by privately owned daily fee courses that are open to the public. Variation in course length

and difficulty is necessary to satisfy golfers of all skill levels. Portions of the property not developed for

golf may be used for other recreational activities or managed for conservation purposes.

Greenways are elongated and usually continuous strips of land or water under public control through

ownership, easement or other agreement. Greenways may serve both conservation and recreation needs

and, wherever possible, are to be planned to connect other park sites and centers of activity. Existing

natural corridors such as streams or man-made corridors such as railroad and utility rights-of-way often

guide the location of greenways. The Henry Hudson trail which passes through Keyport is a designated

greenway and is a part of larger trail passing through several other municipalities in the County.

Open lands are intended primarily to advance regional objectives for watershed protection and growth

development patterns and to enhance regional quality of life by preserving certain lands of county

significance in an essentially unimproved condition. Park land classified as open lands is not intended for

formal recreation use or park facilities, and may be made available for agriculture or land dependent

outdoor recreation uses such as hiking and horseback riding. Open lands generally receive minimal

maintenance and patrolling.

The Monmouth County Master Plan, adopted in October 2016, has identified county-wide open space and

recreation recommendations. They are as follows:

1. Assist the Monmouth County Park System (MCPS) in its preparation of updates to the Monmouth

County Open Space Plan (2006) and other similar or related studies, and incorporate the

Monmouth County Open Space Plan by reference as a component of the County Master Plan.

2. Work with all levels of government and nonprofit organizations to promote the preservation of

sensitive environmental systems and significant natural features through acquisition, deed

restrictions, conservation easements, redevelopment projects, zoning, and other techniques.

3. Provide technical and professional assistance to our municipal partners in support of their local

open space acquisition efforts and recreational facility improvements.

Page 26: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

23

The Borough of Keyport should engage with Monmouth County to explore opportunities for expanding

recreational opportunities within Keyport through any redevelopment projects, especially along its

waterfront.

Using the information provided in the Borough’s 2017 Recreation and Open Space & Conservation Plan

Elements Resource Assessment, Matrix has added the analyses to address the NJDEP criteria for

participation in Green Acres Planning Incentive funding. The result is a comprehensive assessment of

public and private land and water resources that have potential for providing open space or recreation

opportunities. This resource assessment examines opportunities for the creation of linear recreation and

open space facilities, supporting conservation objectives, supporting community objectives for

development and land use related to open space features, additional public access to coastal and inland

waters, and the development of recreation facilities.

For this assessment, we note those resources to be used for the promotion and enhancement of the

Borough’s recreation and open space inventory and facilities, and provide recommendations for their

conservation:

1. Periodically update the Borough’s 2007 Natural Resource Inventory to reflect the most

recent scientific findings and data regarding natural resources in the Borough, including

flood zone boundaries, and sea level rise projections.

2. Propose to create and nurture an active oyster culture that will aid in the conservation of the

Borough’s greatest resource and asset, its waterbodies. An active oyster culture engages

issues of water quality, rising tides and community based development along the Borough’s

waterfront, creeks and estuaries. Oysters are an integral part of our living shoreline strategy

which includes dunes, vegetation, reefs, oyster beds and other means. Living shorelines along the

estuaries, creeks, and when viable, in Keyport Harbor itself, must be established to add to the

Resilience of the Borough. As described by the Virginia Institute of Marine Science,

“Living Shoreline Treatments address erosion in lower energy situations by providing

long-term protection, restoration or enhancement of vegetated shoreline habitats through

strategic placement of plants, stone, sand fill and other structural or organic materials.

Living Shoreline Treatments do not include structures that sever the natural processes &

connections between uplands and aquatic areas.”

Page 27: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

24

Existing and future open spaces along the shorelines of Keyport Harbor and its estuaries can be

strategically incorporated with living shoreline projects to protect these spaces and other assets

inland. One such strategy the Borough is recommended to pursue is the development of oyster

cultures that engages issues of water quality, storm surge inundation, and community based

recreation along the Borough’s waterfront, creeks and estuaries. Oysters are an integral part of our

living shoreline strategy which includes dunes, vegetation, reefs, oyster beds and other means.

3. Maintain and conserve the natural habitat of the Borough

Trees are integral to Keyport's environmental resilience, cultural and civic history, as well as its

natural beauty. Every effort must be made to maintain their integrity and replenish those lost

through development, free cutting or natural disaster. Utilizing native plant species also ensures

local landscaping can survive and thrive in the local climate, minimizing the need for excessive

watering, as well as any impacts from non-native and invasive species. The Native Plant Society

of New Jersey’s provides a list that can provide recommended species to be utilized in landscaping.

4. Access to waterfront resources.

The Borough should reaffirm the commitment it made during the development of the Municipal

Public Access Plan (MPAP) in ensuring and providing for the public’s access to tidal waters within

the Borough. For goals and recommendations of the MPAP, please see the next section. For all

such waterfront properties, waterfront access for the public is to be considered at the time of

planning and permitting and right-of-way made a condition of Planning Board approval.

5. Energy and Air quality: Recommendations for energy and air quality are included within the

Green Building and Environmental Sustainability Plan Element of this Master Plan. This OSRP

Element promotes and supports those recommendations and offers the following additional

recommendations:

a. Amend the Borough Code to include landscaping standards that provide buildings with

maximum solar access, shading and wind protection.

b. Require air quality assessments at principal intersections for significant developments to

identify problem areas and mitigation strategies.

6. Wetland and Forest Resources

a. Existing and proposed greenways are to promote and preserve existing wetland and woodland

corridors to the greatest extent possible. This is especially important where greenways are

proposed along stream corridors.

b. Reforestation and afforestation of open spaces using native species is recommended to enhance

habitat, promote recharge, and reduce surface runoff, erosion and flooding.

c. A construction mitigation plan, which minimizes construction‐related impacts on woodlands,

will be required prior to disturbance of more than 10,000 square feet of woodlands.

Page 28: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

25

7. Groundwater

a. Ongoing public education is to be directed at water conservation and preventing the discharge

of toxic and hazardous pollutants to groundwater.

b. The Borough could conduct an environmental audit of groundwater quality, including an

analysis of existing groundwater samples and an identification of existing facilities, which

could adversely impact groundwater. Among the facilities to be mapped and inventoried are:

i. Underground storage tanks.

ii. Gas, fuel, and sewer line locations.

iii. Large septic systems for commercial/industrial use.

iv. Permitted community septic systems.

v. Hazardous substance storage areas and facilities.

vi. Permitted NJPDES groundwater or surface discharge facilities.

c. The Borough is recommended to consider a wellhead protection program to protect community

water supply systems and areas in the Borough with wells that might be threatened by

inappropriate land uses.

d. Stormwater management ordinances need to encourage the implementation of Best

Management Practices (BMP’s) that promote water quality objectives and the recharge of

groundwater supplies. Infiltration and water quality basins are recommended to be required

with new development to the greatest extent practical.

e. Landscaping standards may require the use of native and locally adapted plants, and designs,

which minimize irrigation, maintenance and turf areas and require mulches to preserve soil

moisture.

f. Irrigation systems for lawns and landscaping may be curtailed or eliminated in new

developments and drip irrigation for localized watering may be encouraged. The Borough

should explore implementing this strategy for its parks and facilities.

g. The Borough is recommended to evaluate alternative well testing methodologies to assure that

groundwater availability is accurately analyzed. Test wells installed as part of a groundwater

availability analysis need to also be tested for potability.

h. The Borough is recommended to relate the intensity of permitted development to conservative

estimates of:

i. Available water resources; and

ii. The ability of the soil and ground water to sustain on‐lot disposal systems without

degrading or impairing surface or ground water quality.

i. Limit impervious cover to foster maximum recharge and sustainable yields in the district and

regional watersheds dependent on groundwater supply.

Page 29: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

26

8. Steep Slopes

Strict adherence to development standards limiting the extent of disturbance to slopes greater than

15 percent, and requiring individual lot grading plans where disturbance is permitted.

9. Stream Corridors

a. Vegetated buffers are to be maintained along all stream corridors in the Borough. Where past

land use practices have resulted in the removal of trees along stream corridors, management

practices are encouraged to include the reestablishment of tree cover.

b. A stream corridor protection program is encouraged to be developed and implemented which

seeks to protect the stream corridor and adjacent wetlands, floodplains, and contributory

uplands with steep slopes. Management strategies and monitoring standards are encouraged to

be developed for stream corridor areas.

c. Keyport and neighboring municipalities are encouraged to develop consistent and/or compatible

management strategies along stream or river corridors.

10. Surface Water Quality

Water quality BMP’s are encouraged to be adhered to and refined, as needed, to protect the quality

of surface waters and promote maximum habitat values. These include:

a. Arrange development on the least porous soils to promote infiltration and reduce sediment and

pollutant loading;

b. Buffer strips and techniques to maximize overland flow, such as grassed swales and filter

strips;

c. Regional stormwater management approaches and extended detention facilities;

d. Wet ponds (retention basins) and wetland or marsh creation;

e. Infiltration practices to detain runoff, including trenches, basins, drywells and other structural

solutions; and

f. Water quality inlets and oil/grit separators.

11. Threatened and Endangered Species

a. An ongoing inventory of threatened and endangered species, combining the records of the

Natural Heritage Database with local sighting records are encouraged to be developed and

maintained.

b. Alternative development options are encouraged to be studied to aid in the preservation of

critical habitat for threatened and endangered species, where appropriate.

c. Conservation easements are encouraged to be used to protect habitat areas while maintaining

a reasonable level of a landowner’s utility of his or her land.

d. The Borough are encouraged to promote the potential re‐establishment of habitat on open space

lands while also protecting existing habitat through open space purchases.

Page 30: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

27

12. Light Pollution

a. Nationally recognized lighting recommendations for illuminance levels and uniformity ratios

are encouraged to be followed, such as contained in the Illuminating Engineering Society of

North America (IESNA) Lighting Handbook.

b. Architectural and sign lighting are encouraged to be designed to minimize light that does not

illuminate the target area.

c. Lighting of building exteriors are encouraged to be minimized or eliminated during those hours

when it is not needed. Lighting controls such as timers, dimmers, motion sensing devices, and

photo sensors are encouraged to be encouraged.

The Municipal Public Access Plan (MPAP) is intended to provide the Borough of Keyport with a

comprehensive plan to promote the public’s access to tidal waters and shorelines within the municipal

boundary. This MPAP was prepared by CME Associates, in conjunction with the New Jersey Department

of Environmental Protection (NJDEP). The MPAP draft status is still under review by NJDEP. The

following is a summary of recommendations proposed by the MPAP draft.

Maintain existing public access.

The MPAP reaffirmed the Borough’s commitment to maintain all existing public access to the Raritan

Bayfront. Most identified public access locations within the MPAP were well‐utilized by the public. This

well-utilization results in a significant increase in the amount of litter and maintenance required along the

waterfront, especially for the fishing pier and Promenade areas.

A requirement of the MPAP is to identify current and future caretakers of all public access points in the

municipality. The MPAP identified the Borough Public Works and Recreation Commission, which has

been dissolved and has been restructured into the Recreation Committee, as the entity that will continue

to maintain all access points owned or controlled by the Borough. Efforts to maintain and clean public

access areas are encouraged to include consistent cleaning of beaches and all public access areas

throughout the year. Beach Park and Cedar Street Park beaches were recommended to be cleaned once a

month from May to September each year to increase the appeal, and consequently visitors, to Keyport’s

beaches. These can be conducted by the Borough or through scheduled volunteer cleanups.

Additionally, maintenance and clean‐up frequency of the Promenade and all other public access areas are

encouraged to be increased in response to the high amount of use in the warmer months. This can include

installation of more trash and/or recycling receptacles and increased trash pick‐up times to help manage

the increase in solid waste volume. Another option to consider is to increase volunteer participation for

cleanups by offering incentives to participate such as local discounts or other similar incentives.

Page 31: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

28

Recommendations for maintenance activities are encouraged to include the following:

1. Install more trash and/or recycle receptacles along the Promenade and all public access areas;

2. Increase trash pick‐up for all public access areas to at least twice a week;

3. Promote more community and volunteer clean‐up events;

4. Purchase a beach sweeper in conjunction with adjacent municipalities for monthly beach clean‐

ups by the Borough and/or volunteers between May and September each year;

5. Increase enforcement of littering, especially as it relates to fishing‐related waste, and other

Borough ordinances through bike or foot patrols by appropriate Borough agencies;

6. Manage and replace vegetation as needed at each location;

7. Consider adopting an ordinance to fine park patrons who leave fish, fishing‐related waste or litter

in prohibited areas as an enforcement measure; and

8. If fines are adopted, consider creating a Municipal Public Access Fund where all proceeds for fines

could be deposited and used to upgrade and maintain public access facilities in Keyport.

Planned Enhancement to Public Access Locations and/or Facilities

The community needs assessment identified several public access locations or facilities that can be

enhanced. Recommendations for Promenade including Beach Park and Municipal Boat Launch:

1. Find an alternative to porta potty bathroom facilities. As the flood zone designation in this area

has been appealed and changed, it is recommended that the viability of constructing permanent

bathroom facilities at this location be explored. If this is not feasible, using portable restroom

trailers that have running water may be a suitable alternative.

2. Install a portable visitor center and/or kiosk to provide visitors with maps, events, information on

local businesses, and rules of the waterfront, and to answer any questions visitors may have.

Possible locations include the vacant lot where the Steamboat Museum was located the open space

near the clock, or another similar appropriate location.

3. Improve the municipal boat launch through dredging and extending the concrete slab. Any material

from dredging may be used to assist in capping the Aeromarine Site.

4. Install moveable chairs and tables near the Gazebo2 to allow patrons to comfortably eat near the

waterfront.

5. Improve pedestrian access to Beach Park and Promenade by installing traffic calming devices such

as raised crosswalks or LED pedestrian signs.

6. Identify opportunities for a ferry service along the Promenade. This is an existing recommendation

of the MPAP.

2 Since the Borough’s Municipal Public Access Plan (MPAP) was drafted, the Gazebo that is being referenced in

this recommendation has been removed. The OSRP still recommends the installation of moveable chairs and tables

at Fireman’s Park.

Page 32: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

29

7. Identify opportunities to install transient boat slips with a pump out station to increase daily visitors

to Keyport. A Boating Infrastructure Grant may assist in acquiring funds for installation. The

OSRP would suggest in addition to obtaining boating infrastructure grants, that the Borough may

explore utilizing existing waterfront resources and infrastructure, through partnerships with the

local marinas for facilities and staff for any slips and pump out stations.

8. Provide storefront access along American Legion Drive through ordinance or other means.

9. Identify opportunities for a kayak rental and storage area.

Recommendations for Cedar Street Park:

1. Increase pedestrian safety to Cedar Street Park through traffic calming measures.

2. Install a small boat access area to the bay for kayaks or canoes.

3. Identify an opportunity for transient boat slips, kayak rental and storage area.

4. Identify an opportunity for eco‐tours via small boat.

5. Parking needs will need to be addressed if a small boat access is created due to the increase of

vehicles to the park.

6. Install a bike lane from the Henry Hudson Trail to Cedar Street Park via Fulton Street and install

way‐finding signage from the trail to Keyport’s waterfront access areas.

7. Increase frequency of beach clean‐up at Cedar Street Park and improve beach access and

amenities.

It should be noted that while the MPAP makes these recommendations for Cedar Street Park, various

stakeholders recommended the adjacent Veteran’s Park as being a more suitable and appropriate location

for these recommendations. The Borough is currently exploring initiatives to improve waterfront access

and recreation.

Recommendations for Walnut Street:

Keyport’s Strategic Recovery Planning Report identifies Walnut Street’s beach access restoration as a key

goal. Superstorm Sandy damaged the beach access and it is recommended to restore beach access. This

may be done in conjunction with any development of the Aeromarine Site.

Increase Volume and Frequency of Visitors

The Borough of Keyport is committed to the economic development of the downtown business district

and the Borough. To that end, the Borough will continue to look for opportunities to increase the number

of public access locations along the Bayfront and enhance the connections between existing public access

areas and the downtown area. Increased public access may increase the number of visitors to Keyport

Borough, thereby generating an increase in the use of services provided by Keyport’s businesses.

Page 33: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

30

Recommendations:

1. Install transient boat slips and a pump‐outstation where viable;

2. Encourage creative food options in designated areas;

3. Increased murals and public art;

4. Additional public access areas;

5. Identify the potential for Eco‐tours;

6. Increased activities for beaches;

7. Continuous and improved beach access; and

8. Scenic viewing platforms for the bay and for wildlife along the creeks.

Preservation of Public Access Recommendations

The draft MPAP recognizes the Borough’s commitment to preserving its waterfront in perpetuity, and has

most of the waterfront access locations listed on the NJDEP ROSI. Additional measures can be taken to

preserve the public’s access, including conservation easements and resilience measures.

Currently, there are no conservation easements for public access areas in Keyport. However, the

Aeromarine Site is planned to have a significant portion of the site dedicated to public access. It is

recommended that the Borough place a conservation easement on the public access portion of the

Aeromarine Site to ensure the public can enjoy the Bayfront. Additionally, a conservation easement is

envisioned for the Luppatatong Creek to provide public access to the creek.

Superstorm Sandy resulted in significant damage to Keyport’s public access areas. The Borough’s SRPR,

the Community Resilience Plan Element, and the pending Keyport Borough Hazard Mitigation Plan

identify the damages and provides recommendations such as wave breaks, bulkheads and cooperation with

the U.S. Army Corp of Engineers to improve the Resilience of public access facilities. The Borough will

continue its efforts and explore opportunities to make the Borough’s public access facilities more resilient.

The following Borough goals as the action plan for this OSRP are the following:

1. The Borough seeks to align all Master Plan elements and all future projects in a way that

balances development and revitalization with conservation and preservation. Areas that are

identified in other Master Plan elements as appropriate for development or redevelopment

need to be designed to complement or enhance the natural resources and in such a way that

does not adversely impact natural resources or compromise the Resilience of existing

development in the Borough.

Page 34: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

31

2. The Borough is encouraged to acquire lands within the Borough for the purposes of

increasing the Borough’s open space, parks, waterfront access and promote more walkable

neighborhoods. This would include the acquisition of properties that are integral to the

character, economy, Resilience and identity of our community.

Both the Open Space and Conservation Element Subcommittees advocated policies that would

protect and preserve the natural assets within the Borough’s borders as detailed in the Natural

Resource Inventory. The protection of these resources can also provide recreational benefits, as

well as benefits pertaining to disaster mitigation and resilience.

Many studies, summarized in a May 2010 study synthesis, published by Active Living Research

(www.activelivingresearch.org) titled “The Economic Benefits of Open Space, Recreation

Facilities and Walkable Community Design” have concluded that walkable neighborhoods, parks

and open spaces generate economic benefits to local governments, home owners and businesses.

The Borough of Keyport affirms that new and existing open spaces bolster the economy, preserve

the character, fortifies the resilience of the Borough and plays an important role in the decision

making of the Borough’s policy-makers about zoning, land use, and the Borough-purchasing of

lands for parks and similar initiatives. The Borough will proactively seek to secure grants and

pursue other funding opportunities to purchase additional properties that will increase their public

open spaces inventory. The purchase of select properties on the waterfront, especially those that

are designated as environmentally sensitive areas (PA5), will enable greater access to the

waterfront and fulfill the Master Plan’s mandate to improve the resilience of the Borough. Potential

purchases could include waterfront property such as beaches, bulkheads, marinas, marshlands,

riparian zones, etc. Acquisitions beyond the waterfront could include lands contiguous with other

open spaces such as parks, trails, school grounds, banks of waterways, etc.

3. Develop a strategy for the acquisition of open spaces, through grants and other funding

opportunities, as well as improved land stewardship.

The Open Space and Conservation Element Subcommittees recommended the Borough seek

funding opportunities to acquire property to increasing our public open spaces. Any initiative by

the Borough to purchase privately-owned property to protect and preserve open spaces within the

Borough needs to create little-to-no burden to the taxpayer.

This strategy will not only help preserve natural resources within the Borough, it will provide

expanded recreational opportunities, and help to embolden the resilience of the Borough when

these properties are in flood-prone areas. One such example is obtaining grant funding and

County aid in restoring the Mott Street Bridge to allow free-flow of water to reduce marsh

expansion south of Maple Place. Achieving this could work towards wetlands restoration and

preserve and protect private property from tidal flooding damage.

Page 35: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

32

The Open Space and Conservation Subcommittee identified several funding sources to help

acquire open spaces including, and not limited to the following:

a. Blue Acres grants

b. Green Acres grants

c. Creative funding opportunities – Go Fund Me, Kickstarter, etc.

d. New Jersey open space grant opportunities

e. Farm Subsidies/Grants

In addition, the Recreation Element Subcommittee recommended the formation of a Parks and

Recreation Department whose responsibility was envisioned to include stewardship over all open

spaces. The Department’s mission was to ensure the protection and maintenance of opens spaces

and parks through collaboration with the Borough of Keyport, Keyport Department of Public

Works (KDPW), Keyport Recreation Commission and Environmental Commission, and resulting

in the preservation, utilization, maintenance and enjoyment of the parks/open spaces by the

Borough’s resident and visitors. Prior to acquisition, the Department would need to ensure

adequate protection and maintenance of public spaces. This would include strategies and routines

established by the Governing Body and Department of Public Works to keep these spaces clean,

mowed, manicured, painted and operational to provide a peaceful, inviting environment to

residents of the Borough and surrounding communities alike. Since the adoption of the Master

Plan, the Borough of Keyport has dissolved the Recreation Commission, and who was reformed

into the Recreation Committee.

4. Identify derelict and vacant property within the Borough for smart development to include

public open spaces for all residents. The Borough should also encourage new multi-family

development to set aside and provide for recreation and open spaces.

There is opportunity within the Borough for smart development to include open spaces in new

development plans. Any new multi-family residential developments greater than four units must

include a percentage of open space within or proximal to the developed property. This open space

is intended for the inhabitants of that developed area. If the area to be developed adjoins existing

open public space, the open space needs to be, where feasible, a continuation of access to that

public open space.

5. Mandate Borough Officials and appointed committees be vigilant with keeping the best

interests of our community as-a-whole at the forefront when considering further

development in Keyport. Borough officials and committees should encourage responsible

development practices.

Page 36: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

33

The OSRP recommends Borough officials and appointed committees to keep the interest of the

Borough and the goals of the Master Plan at heart when evaluating future development. Future

development applications should further the goals and recommendations of the Master Plan, and

improve, where practical and feasible, the greater public’s access to the natural resources of

Keyport, such as its waterfront.

The Borough should also increase public awareness of new development impacting open space.

Where new development may potentially impact open spaces within the Borough, codify that

notice must be given by the Borough to all Borough residents beyond the current “200 foot”

notification radius. Make every attempt to give notice to all residents via suitable means available

to the Borough, such as robo calls, social media platforms, Borough website, print notifications

and public notices, so that all residents may have the opportunity to participate in the discussion

and approval process.

Prior to construction, require a site plan that clearly indicates the areas of ground that will be

disturbed and ensure this plan is followed, imposing penalties where disturbances are created

outside of the outlined areas.

6. Maintain the natural habitat of the Borough, and monitor the uses of land located in or near

environmentally sensitive areas, including well-head protection areas. Encourage the

remediation of contaminated sites to enhance the local environment, protect residents and

return vacant sites to productive use.

The Borough should encourage the development of a strategy and GIS database that identifies sites

that present a higher risk of environmental contamination. This strategy and database can be used

to develop appropriate zoning amendments and encourage redevelopment planning efforts that

ensures any future change in use will result in a use that is less likely to contaminate the environs

or in acquisition of the site(s) as open space.

The OSRP recommends the Borough implement policies that maintain the natural habitat of

Keyport. As explained in Resource Assessment, the Borough should implement policies that

promotes the use local native species, that are drought and salt resistant. The OSRP further

emphasizes the importance of trees to Keyport. The Borough adopt ordinances that limit and

protect existing trees, as well as the replacement of trees with calipers of 4-inches or larger,

excluding dead/diseased trees. The Borough should monitor and engage with public utility

contractors to protect both public and private trees being pruned.

7. The Borough should also seek to explore passive recreational opportunities within

environmentally sensitive areas.

Page 37: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

34

As explained in the Resource Assessment section, and reinforced in this Action Plan, the Borough

contains many environmentally sensitive areas that can provide residents with passive recreational

opportunities, especially along its waterways, marshlands, the bay, and other valuable natural

resources.

8. We recognize climate change and the impact sea level rise will have on the economic,

residential, commercial and recreational viability of the Borough. The Borough should also

encourage techniques and strategies described in the Green Building and Sustainability

Element for any new multi-family developments.

The OSRP also recognizes the Borough’s need to become more resilient. As such, the OSRP

supports the recommendations of the Community Resilience Element. Especially those

recommendations that preserve and protect natural resources, as described in the Resource

Assessment section.

All new multi-family developments are to consider using strategies and technologies that limit

their impact on the natural environment. Any new development of multi-family dwellings above

4 units should seek to implement the strategies and best practices described in the Green Building

and Sustainability Element. Developers need to consider clustering their developments to limit the

amount of impervious surface that would be needed; and utilizing porous pavers and rain gardens

to further maximize the amount of water recharged into the ground during storm events.

9. The Borough strives to conserve and preserve natural resources to the maximum extent

practicable and seeks to implement “natural” projects such as living shorelines, oyster beds

and other green non-structural infrastructure projects and initiatives instead of structural

projects that rely on fabricated materials to the extent feasible.

As described in the Resource Assessment section, the Borough will explore opportunities to install

active oyster cultures and other living shoreline strategies in its future conservation and expansion

and improvement of its recreational opportunities.

10. The Borough will explore opportunities to partner with other entities to pursue opportunities

for conservation, recreation and preservation with adjoining communities.

Partnering with neighboring municipalities, state, county, federal and the private sectors to protect

and conserve shared natural environments, wildlife habitats, watersheds, waterways and properties

of historic significance can offset some of the costs associated with acquisition, maintenance and

upkeep. The partnerships can also provide cost leverage when seeking grant funding.

The single most important addition needed for the recreational future of Keyport is the creation of a Park

and Open Space Department. The Department would serve as a voice for the OSRP, and encourage an

Page 38: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

35

active citizenry to promote its goals and objectives at Unified Board and Council Meetings, ensuring the

plans set forth for Keyport’s parks, Green Acres, Blue Acres and community gardens are considered and

protected. They will be held responsible for the maintenance needs, funding, scheduling, etc. of the

Borough’s parks and recreational facilities. Department staff will also perform duties like that of a public

works employee, however, these duties will pertain specifically to parks and open space. The duties would

include and not be limited to attending to maintenance needs keeping our parks and facilities functioning

and accessible, landscaping, repairs, litter pick up, enforcement, etc.

Since the adoption of the Master Plan, the Keyport Recreation Commission has been dissolved and

restructured into the Recreation Committee. The Recreation Committee is expected to continue to plan

public events such as movie nights, the annual egg hunt, the Halloween Parade and the Holiday Tree

Lighting. It will work closely with the Senior Center and other volunteer groups to provide recreational

opportunities for to the Borough that reflect the different interests, cultures, ages and needs of our

community.

The Parks and Open Space Department Manager would be responsible for branding, marketing and

signage for the Borough’s parks. It will also create and oversee programs such as a memorial bench

program and adopt-a-park program.

The promotion of the Henry Hudson Trail (HHT) as a Keyport recreational attraction is recommended.

The Borough is encouraged to seek the County’s permission to utilize the unused linear areas along the

trail for small recreational stops. These stops may serve as a rest area with benches, a bird watch stop, an

exercise stop featuring a piece of exercise equipment, a small skateboard spot including an element such

as a rail, a meditation garden, etc. The Borough should also work closely with the County is extending the

HHT across the Garden State Parkway, connecting Keyport and the Bayshore region to Aberdeen,

Matawan, and eventually Freehold.

The Borough is encouraged to focus on expanding parks when and where available in the near future while

protecting current parks and their locations. It is envisioned that the parks would be interconnected to the

maximum extent practicable to form a comprehensive parks and open space network. Where existing land

uses intervene, delineated on-street routes to reconnect to the parks and open space network are

encouraged to be provided along with appropriate wayfinding signage. Over the course of five to 10 years,

all pre-existing parks are encouraged to be refurbished with at least two parks providing inclusive elements

for differently-abled children.

The Borough is encouraged to provide a boat ramp extension for non-motorized water sports and

recreation such as kayaking, fishing, paddle boards and a rental facility to rent such equipment. It is

encouraged to also simultaneously preserve and create access to all bodies of water including creeks,

marshes, etc. The Master Plan acknowledges the importance visitors to Keyport have on the local

Page 39: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

36

economy, especially the central business district. Keyport’s parks and recreation facilities are envisioned

to be designed and utilized primarily for the benefit of the residents of Keyport and not to be marketed as

a regional recreational destination.

Proposed Access Improvements and Facilities

Aeromarine Redevelopment

The Aeromarine Redevelopment plan includes the goal of providing “continuous public access to the

waterfront and to utilize design techniques that guard against the privatization of the waterfront”. This

public access would include the length of the Raritan Bay and Chingarora Creek waterfronts located within

the redevelopment area. Additionally, the plan calls for the development of active recreation facilities to

go along with the public access. The Plan stipulates that at least 31 acres of open space be accessible to

the public, of which at least 20 acres be free of environmental constraints. The Borough is committed to

providing public access to the Aeromarine Site area once all remediation efforts are

completed. Additionally, all trail designs are encouraged to consult the 1993 Bayshore Trail System

Design Manual or other suitable trail design manuals.

Luppatatong Creek Access

As noted earlier, two developments that were approved and never built included proposed public access

along Luppatatong Creek. The Borough will continue to look for opportunities to provide a public access

facility in this area which may include an area for small boats, including kayaks and canoes, to launch

from.

1. Using a pre-existing structure such as the school or civic center, create a Recreation Center that

offers classes, activities, collects payment for events, etc.

2. Establish a welcome center at an appropriate location. For example, Main Street Park could be

expanded to encompass the street and building. The size of the facility could be enlarged, and the

building could be used as a Welcome Center.

3. Require the Redevelopment Plan for the Aeromarine property include a recreational component

for public use.

4. Designating Cedar Street Park as the premier athletics park with a “tot-lot” play area for children

ages 5 through 12. This is where the Borough is encouraged to offer softball/baseball, basketball

and tennis facilities. Cedar Street Park will also house bathroom facilities, running water for water

fountains and an area or ramp for public access to launch non-motorized water crafts.

Page 40: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

37

5. Building a soccer field for “pick up” games when space becomes available.

6. No permanent structures shall exist on Benjamin Terry Park.

7. Encouraging the Harbor Commission to include rentals of kayaks and such at the Boat House

located at the boat ramp, as well as additional rental of small watercrafts at Veterans Park. The

installation of ticket machines at the Boat Ramp can make utilizing the ramp easier and more

convenient.

8. Serious consideration is encouraged to be given to include a dog park in the Borough.

9. Create or identify a “Teen Canteen”, a recreational hangout for teens and tweens similar to a

Boys/Girls Club or other civic league.

10. Add beach and water access at the end of Walnut Street with permanent fencing for safety.

11. The Recreation Advisory Committee will utilize the recreational offerings of neighboring towns

when available to eliminate duplication of efforts (for example, the Union Beach soccer league).

12. The Recreation Advisory Committee, and since its dissolution and restructuring, the Recreation

Committee, will work closely with the Historic Society to create a Keyport Historic Trail, a

walking tour of historic spots in the Borough.

13. Identify opportunities for “pocket parks” at appropriate locations, such as within or near the

business districts and waterfront areas. These small parks are encouraged to feature benches, public

art, landscaping and similar functional and aesthetic amenities.

14. Establish one or more measured mile walking/running routes and provide wayfinding signage, as

appropriate.

15. Provide new amenities to modernize parks and recreation areas as new amenities and technologies

become available. Examples include and are not limited to water bottle filling stations, phone

charging stations, wi-fi access, etc.

16. Explore ways to incorporate public art in parks and recreational areas, in business districts and

along the waterfront in a Creative Placemaking Element. The art may be in the form of visual art

or performing art, as appropriate, or both.

Page 41: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

38

17. Improve accessibility to Therese Street Park specifically making use of passage way from West

Front Street to Therese Street Park as recorded on the tax map. This would create two entrances

and exits to the park and increases the “walkability” of Keyport as a community.

18. With the recommendations of the Keyport Garden Club, the Borough shall identify sustainable

plants throughout our parks system.

19. Explore the viability of establishing additional parks, open space and waterfront public access via

the Blue Acres Program.

20. The Master Plan Recreation Subcommittee views the recreational facilities located at the

elementary and high schools as public assets to the Borough and areas that can provide great

exercise opportunities to the Borough’s residents. On-going relationships between the Borough

and Board of Education are encouraged to be fostered to facilitate the use of these important

resources by Borough residents at appropriate times.

21. The Borough is committed to dedicating sufficient resources to properly maintain, improve and

expand all recreational facilities.

Action Item Element

Promoted:

Conservation

or Recreation

Suggested

Implementation

Timeline

(Years)

1.5 3 5

1. The Borough seeks to align all Master Plan elements and all

future projects in a way that balances development and

revitalization with conservation and preservation.

Conservation

& Recreation

X

2. Acquire, preserve, protect and maintain public recreation and

open spaces.

Conservation

& Recreation

X

3. Develop a strategy for the acquisition and funding of open

spaces and improved land stewardship.

Conservation

& Recreation

X

4. Identify derelict and vacant property within the Borough for

smart development to include public open spaces for all

residents.

Recreation X

5. Borough officials and members of the Unified Planning

Board should mind the goals and intent of the Master Plan,

and encourage responsible development practices.

Conservation

& Recreation

X X X

Page 42: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

39

Action Item Element

Promoted:

Conservation

or Recreation

Suggested

Implementation

Timeline

(Years)

1.5 3 5

6. Maintain the natural habitat of the Borough, monitor the uses

of land located in or near environmentally sensitive areas,

identify and encourage the remediation of contaminated sites.

Conservation X

7. Seek to explore passive recreational opportunities within

environmentally sensitive areas.

Conservation

& Recreation

X

8. Borough officials and members of the Unified Planning

Board recognize the impact climate change will have.

Encourage techniques and strategies described in the Green

Building & Sustainability Element.

Conservation X

9. Conserve and preserve natural resources, and implement

green, “natural’ infrastructure projects.

Conservation X

10. Partner with other entities to pursue opportunities for

conservation, recreation and preservation with adjoining

communities.

Conservation

& Recreation

X

Other Recommendations

Recommendations Identified in the Resources Assessment

11. Periodically update the Borough’s 2007 Natural Resource

Inventory to reflect the most recent scientific findings and

data regarding natural resources in the Borough.

Conservation X

12. Propose to create and nurture an active oyster culture. Conservation X

13. Maintain and conserve the natural habitat of the Borough. Conservation X X X

14. Access to waterfront resources. Conservation

& Recreation

X

15. Energy and Air Quality. Conservation

& Recreation

X

16. Wetland and Forest Resources Conservation

& Recreation

X

17. Groundwater Conservation X

18. Steep Slopes Conservation X

19. Stream Corridors Conservation

& Recreation

X

20. Surface Water Quality Conservation

& Recreation

X

21. Threatened and Endangered Species Conservation X

Page 43: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

40

Action Item Element

Promoted:

Conservation

or Recreation

Suggested

Implementation

Timeline

(Years)

1.5 3 5

22. Light Pollution Conservation X

Other Recommendations

23. Redevelopment of existing structure for the purposes of a

Recreation Center

Conservation

& Recreation

X

24. Establish a welcome center at an appropriate location. Recreation X

25. Require the Redevelopment Plan for the Aeromarine property

include a recreational component for public use.

Conservation

& Recreation

X

26. Designating Cedar Street Park as the premier athletics park

with a play area for children ages 5 through 12.

Recreation X

27. Building a soccer field for non-structured use. Recreation X

28. Include rentals non-motorized watercraft at the boat ramp and

Veterans Park.

Recreation X

29. Dedicated dog park in the Borough. Recreation X

30. Create or identify a “Teen Canteen”, a recreational hangout

for young adults.

Recreation X

31. Add beach and water access at the end of Walnut Street with

permanent fencing for safety.

Recreation X

32. Partner and utilize the recreational offerings of neighboring

towns.

Recreation X

33. Create a Keyport Historic Trail, a walking tour of historic

locations.

Recreation X

34. Identify opportunities for “pocket parks” at appropriate

locations.

Recreation X

35. Establish one or more measured mile walking/running routes. Recreation X

36. Provide new amenities to modernize parks and recreation

areas.

Recreation X

37. Explore ways to incorporate public art in parks and

recreational areas.

Recreation X

38. Improve accessibility to Therese Street Park. Recreation X

39. Identify sustainable plants to be utilized in the parks system. Recreation X

40. Explore the viability of establishing additional parks, open

space and waterfront public access.

Recreation X

Page 44: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

41

Action Item Element

Promoted:

Conservation

or Recreation

Suggested

Implementation

Timeline

(Years)

1.5 3 5

41. Develop on-going relationships between the Borough and

Board of Education for the purposes of utilizing shared

recreational resources.

Recreation X

42. Dedicating sufficient resources to properly maintain, improve

and expand all recreational facilities.

Recreation X

Recommendations from the MPAP

Maintenance Activities

43. Install more trash and/or recycle receptacles. Recreation X

44. Increase trash pick‐up for all public access areas. Recreation X

45. Promote more community and volunteer clean‐up events. Conservation

& Recreation

X

46. Purchase a beach sweeper in conjunction with adjacent

municipalities.

Conservation

& Recreation

X

47. Increase enforcement of littering. Recreation X

48. Manage and replace vegetation as needed at each location Conservation

& Recreation

X

49. Consider adopting an ordinance to fine park patrons who

leave fishing-related waste in prohibited areas.

Recreation X

50. Creating a Municipal Public Access Fund, from fines

collected to maintain and upgrade public access facilities.

Conservation

& Recreation

X

Planned Enhancements to Public Access Locations and/or Facilities

51. Constructing permanent bathroom facilities at the Waterfront

Promenade.

Conservation

& Recreation

X

52. Install a portable visitor center and/or kiosk. Recreation X

53. Improve the municipal boat launch through dredging and

extending the concrete slab.

Conservation

& Recreation

X

54. Install moveable chairs and tables. Recreation X

55. Installing traffic calming devices to improve access to Beach

Park and Promenade.

Recreation X

56. Identify opportunities to install and/or partner with existing

marinas, for overnight and dock and dine boat slips. with a

pump‐outstation, and the Baykeeper pump out boat operator,

Head Mistress.

Recreation X

Page 45: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

42

Action Item Element

Promoted:

Conservation

or Recreation

Suggested

Implementation

Timeline

(Years)

1.5 3 5

57. Provide storefront access along American Legion Drive. Recreation X

58. Identify opportunities for a kayak rental and storage area. Recreation X

Recommendations for Cedar Street Park

59. Traffic calming measures for increased pedestrian safety. Recreation X

60. Install a small boat access area to the bay for kayaks or canoes. Recreation X

61. Identify an opportunity for kayak rental and storage area. Recreation X

62. Identify an opportunity for eco‐tours via small boat. Recreation X

63. Parking needs (for the small boat access). Recreation X

64. Install a bike lane from the Henry Hudson Trail to Cedar

Street Park.

Recreation X

65. Increase frequency of beach clean‐up Conservation

& Recreation

X

Increase Volume and Frequency of Visitors

66. Install a pump‐outstation where viable, and promote the

services of the Baykeeper pump out boat operator, Head

Mistress.

Recreation X

67. Increase and encourage creative food options in designated

areas.

Recreation X

68. Increased murals and public art. Recreation X

69. Additional public access areas. Conservation

& Recreation

X

70. Identify the potential for Eco‐tours. Conservation

& Recreation

X

71. Continuous and improved beach access. Conservation

& Recreation

X

72. Scenic viewing platforms for the bay and for wildlife along

the creeks.

Conservation

& Recreation

X

Page 46: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

43

Page 47: OPEN SPACE AND RECREATION PLAN ELEMENT...Nov 30, 2017  · VIII. ADDITIONAL PARCEL DATA REQUIREMENTS ... For instance, the osprey and snowy egret may be removed from the protected

44

The mapped information will be submitted as required by Green Acres Open Space and Recreation Plan

Guidelines for Participation in the Green Acres Planning Incentive Program.

Background information from the Recreation and Open Space/Conservation Elements of the Borough

Master Plan adopted March 23, 2017 was used to draft this updated OSRP. There were several

subcommittee hearings and the Master Plan public review process. Each discussed the details of each

element, including the Recreation and Open Space/Conservation Elements that provide the core elements

of this updated OSRP.

The Master Plan, which includes within its findings items related to resiliency and was funded by a Post-

Sandy Planning Assistance Grant, was subject to public meetings, subcommittee meetings, and public

comment, on the following dates:

July 14, 2016

August 14, 2016

September 21, 2016: public meeting

November 3, 2016

January 4, 2017

January 12, 2017

January 26, 2017

March 23, 2017: plan was adopted

For a plan to be certified by Green Acres, at least two publicly noticed meetings are required. These

meetings are anticipated to be held during the regularly scheduled Unified Planning Board meetings at a

date to be determined:

1. October 26, 2017: Publicly noticed Planning Board meeting for public input on the OSRP.

2. December 14, 2017: Publicly noticed Planning Board hearing to present the draft OSRP for

consideration for adoption, to answer questions from the public and to provide advisory services

as needed.

Presentation materials such as PowerPoint presentations, handouts, and mapping are to be prepared for

each meeting noted above, as required.