76
0FF ON Esc SMASolid-Q50-60-IN-BE-en-10 | Version 1.0 ENGLISH Operating Manual SMA SOLID-Q 50 / SMA SOLID-Q PRO 60

Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

  • Upload
    vuanh

  • View
    224

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

0FF

ON

Esc

SMASolid-Q50-60-IN-BE-en-10 | Version 1.0ENGLISH

Operating ManualSMA SOLID-Q 50 / SMA SOLID-Q PRO 60

Page 2: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

Legal Provisions SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-102

Legal ProvisionsThe information contained in these documents is property of SMA New Energy Technology(Jiangsu) Co., Ltd. Any publication, whether in whole or in part, requires prior written approval bySMA New Energy Technology (Jiangsu) Co., Ltd. Internal reproduction used solely for the purposeof product evaluation or other proper use is allowed and does not require prior approval.

TrademarksAll trademarks are recognized, even if not explicitly identified as such. Missing designations do notmean that a product or brand is not a registered trademark.Modbus® is a registered trademark of Schneider Electric and is licensed by theModbus Organization, Inc.QR Code is a registered trademark of DENSO WAVE INCORPORATED.Phillips® and Pozidriv® are registered trademarks of Phillips Screw Company.Torx® is a registered trademark of Acument Global Technologies, Inc.

SMA New Energy Technology (Jiangsu) Co., Ltd.No. 198 Xiangyang Road215011 Suzhou (China)SMA Service Line: +86 400 801 9996

Status: 3/7/2018Copyright © 2017 SMA New Energy Technology (Jiangsu) Co., Ltd. All rights reserved.

Page 3: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

Table of ContentsSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 3

Table of Contents1 Information on this Document................................................. 6

1.1 Validity ........................................................................................................................ 61.2 Target Group.............................................................................................................. 61.3 Symbols ...................................................................................................................... 61.4 Nomenclature............................................................................................................. 71.5 Typographies.............................................................................................................. 7

2 Safety ........................................................................................ 82.1 Intended Use .............................................................................................................. 82.2 Safety Information...................................................................................................... 8

3 Scope of Delivery ..................................................................... 11

4 Product Description .................................................................. 124.1 SOLID-Q ..................................................................................................................... 124.2 Control panel.............................................................................................................. 144.3 LED Signals ................................................................................................................. 14

5 Mounting................................................................................... 155.1 Requirements for Mounting ....................................................................................... 155.2 Mounting the Inverter................................................................................................. 18

6 Electrical Connection ................................................................ 226.1 Safety during Electrical Connection.......................................................................... 226.2 Overview of the Connection Area ............................................................................ 23

6.2.1 View from Below..................................................................................... 236.2.2 Interior View............................................................................................ 24

6.3 AC Connection........................................................................................................... 246.3.1 Requirements for the AC Connection .................................................... 246.3.2 Connecting the Inverter to the Utility Grid ............................................ 256.3.3 Connecting Additional Grounding ........................................................ 26

6.4 Connecting the Network Cables............................................................................... 276.5 DC Connection........................................................................................................... 34

6.5.1 Requirements for the DC Connection .................................................... 346.5.2 Assembling the DC Connectors ............................................................. 356.5.3 Connecting the PV Array........................................................................ 376.5.4 Disassembling the DC Connectors ........................................................ 38

7 Commissioning ......................................................................... 407.1 Commissioning the Inverter........................................................................................ 40

Page 4: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

Table of Contents SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-104

8 Using the Inverter User Interface............................................ 418.1 Site Map..................................................................................................................... 418.2 Start Page Design....................................................................................................... 438.3 Unlocking the User Interface ..................................................................................... 448.4 Accessing the Main Menu......................................................................................... 448.5 Displaying Statistics.................................................................................................... 458.6 Displaying the Event Log ........................................................................................... 458.7 Displaying the Device Information ............................................................................ 46

9 Configuration of the Inverter................................................... 479.1 Basic Configuration.................................................................................................... 47

9.1.1 Setting the Date and Time...................................................................... 479.1.2 Changing the Language ........................................................................ 479.1.3 Adjusting the Display Contrast .............................................................. 48

9.2 Setting the Communication........................................................................................ 489.3 Switching the Inverter On and Off............................................................................ 499.4 Entering the Password................................................................................................ 499.5 Feature Setting............................................................................................................ 50

9.5.1 Setting the Grid Code ............................................................................ 509.5.2 Setting the Insulation .............................................................................. 509.5.3 Setting the Smart String Monitoring ...................................................... 519.5.4 Setting the Active Power Control ........................................................... 529.5.5 Setting Reactive Power Control ............................................................. 529.5.6 Setting the PV Mode............................................................................... 539.5.7 Setting the Cumulative Generation........................................................ 54

9.6 Protection Setting........................................................................................................ 549.6.1 Setting the Voltage Thresholds .............................................................. 549.6.2 Setting the Frequency Thresholds .......................................................... 559.6.3 Setting the Reconnection Thresholds ..................................................... 55

9.7 Restoring Factory Settings.......................................................................................... 56

10 Disconnecting the Inverter from Voltage Sources ................. 57

11 Cleaning the Inverter ............................................................... 58

12 Troubleshooting........................................................................ 5912.1 Event Messages ......................................................................................................... 5912.2 Checking the PV System for Ground Faults .............................................................. 6212.3 Replacing Fuses.......................................................................................................... 6412.4 Cleaning or Replacing the Fans ................................................................................ 65

13 Decommissioning the Inverter................................................. 67

Page 5: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

Table of ContentsSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 5

14 Technical Data .......................................................................... 69

15 Contact ...................................................................................... 72

Page 6: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

1 Information on this Document SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-106

1 Information on this Document

1.1 ValidityThis document is valid for the following device types:

• SOLID-Q 50• SOLID-Q PRO 60

1.2 Target GroupThis document is intended for qualified persons and end users. Only qualified persons are allowedto perform the activities marked in this document with a warning symbol and the caption"Qualified person". Tasks that do not require any particular qualification are not marked and canalso be performed by end users. Qualified persons must have the following skills:

• Knowledge of how an inverter works and is operated• Training in how to deal with the dangers and risks associated with installing and using

electrical devices and installations• Training in the installation and commissioning of electrical devices and installations• Knowledge of the applicable standards and directives• Knowledge of and compliance with this document and all safety information

1.3 SymbolsSymbol Explanation

Indicates a hazardous situation which, if notavoided, will result in death or serious injury

Indicates a hazardous situation which, if notavoided, can result in death or serious injury

Indicates a hazardous situation which, if notavoided, can result in minor or moderate injury

Indicates a situation which, if not avoided, can re-sult in property damage

Sections describing activities to be performed byqualified persons only

Information that is important for a specific topic orgoal, but is not safety-relevant

Indicates a requirement for meeting a specific goal

Desired result

A problem that might occur

Page 7: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

1 Information on this DocumentSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 7

1.4 NomenclatureComplete designation Designation in this documentSOLID-Q 50 / SOLID-Q PRO 60 Inverter, product

1.5 TypographiesTypography Use Examplebold • Terminals

• Slots• Parameters• Elements on the user interface• Elements to be selected• Elements to be entered

• The value can be found inthe field Energy.

• Select Settings.• Enter 10 in the field

Minutes.

> • Connects several elements to beselected

• Select Settings > Date.

[Button] • Button to be selected or pressed • Select [Next].

Page 8: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

2 Safety SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-108

2 Safety

2.1 Intended UseThe SMA SOLID-Q is a transformerless PV inverter, with 3MPP trackers, that converts the directcurrent of the PV array to grid-compliant, three-phase current and feeds it into the utility grid.The product is suitable for indoor and outdoor use.PV modules with a high capacity to ground may only be used if their coupling capacity does notexceed 10 μF.All components must remain within their permitted operating ranges and their installationrequirements at all times.The product must only be used in countries for which it is approved or released by SMA NewEnergy Technology (Jiangsu) Co., Ltd. and the grid operator.Use this product only in accordance with the information provided in the enclosed documentationand with the locally applicable standards and directives. Any other application may causepersonal injury or property damage.Alterations to the product, e.g. changes or modifications, are only permitted with the express writtenpermission of SMA New Energy Technology (Jiangsu) Co., Ltd.. Unauthorized alterations will voidguarantee and warranty claims and in most cases terminate the operating license. SMA NewEnergy Technology (Jiangsu) Co., Ltd. shall not be held liable for any damage caused by suchchanges.Any use of the product other than that described in the Intended Use section does not qualify as theintended use.The enclosed documentation is an integral part of this product. Keep the documentation in aconvenient place for future reference and observe all instructions contained therein.The type label must remain permanently attached to the product.

2.2 Safety InformationThis section contains safety information that must be observed at all times when working on or withthe product.To prevent personal injury and property damage and to ensure long-term operation of the product,read this section carefully and observe all safety information at all times.

Page 9: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

2 SafetySMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 9

DANGERDanger to life due to high voltages of the PV arrayWhen exposed to light, the PV array generates dangerous DC voltage, which is present in theDC conductors and the live components of the inverter. Touching the DC conductors or the livecomponents can lead to lethal electric shocks. If you disconnect the DC connectors from theinverter under load, an electric arc may occur leading to electric shock and burns.

• Do not touch non-insulated cable ends.• Do not touch the DC conductors.• Do not touch any live components of the inverter.• Have the inverter mounted, installed and commissioned only by qualified persons with the

appropriate skills.• If an error occurs, have it rectified by qualified persons only.• Prior to performing any work on the inverter, disconnect it from all voltage sources as

described in this document.

DANGERDanger to life due to electric shockTouching an ungrounded PV module or array frame can cause a lethal electric shock.

• Connect and ground the frame of the PV modules, the array frame and the electricallyconductive surfaces so that there is continuous conduction. Observe the applicable localregulations.

CAUTIONRisk of burns due to hot enclosure partsSome parts of the enclosure can get hot during operation.

• During operation, do not touch any parts other than the display and the DC switch-disconnector of the inverter.

NOTICEDamage to the enclosure seal in subfreezing conditionsIf you open the product when temperatures are below freezing, the enclosure seals can bedamaged. Moisture can penetrate the product then.

• Only open the product if the ambient temperature is not below -5°C.• If a layer of ice has formed on the enclosure seal when temperatures are below freezing,

remove it prior to opening the product (e.g. by melting the ice with warm air). Observe theapplicable safety regulations.

Page 10: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

2 Safety SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1010

NOTICEDamage to the display or the type label due to the use of cleaning agents

• If the inverter is dirty, clean the enclosure, the enclosure lid, the type label, the display andthe LEDs with a damp cloth and clear water only.

Page 11: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

3 Scope of DeliverySMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 11

3 Scope of DeliveryCheck the scope of delivery for completeness and any externally visible damage. Contact yourdistributor if the scope of delivery is incomplete or damaged.

G H

CB

KI JF L

D

+

E

_

Esc

A

Figure 1: Components included in the scope of delivery

Position Quantity DesignationA 1 Inverter

B 1 Wall mounting bracket

C 1 Documentation

D 10/12* Positive DC connector

E 10/12* Negative DC connector

F 1 Sealing ring

G 4 Nut

H 4 Washer

I 4 Spring washer

J 2 Bolt M5

K 1 Bolt M5 (Reserve)

L 4 Heavy-duty anchor

* For SOLID-Q PRO 60

Page 12: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

4 Product Description SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1012

4 Product Description

4.1 SOLID-Q

0FF

ON

Esc

A

B

CSMA

Esc

D

Figure 2: Design of the inverter

Position DesignationA DC load-break switch

The inverter is equipped with a DC load-break switch. If the DC load-break switch is set to the position ON, it establishes a conductive connec-tion between the PV array and the inverter. Setting the DC load-breakswitch to the OFF position interrupts the DC electric circuit and com-pletely disconnects the PV array from the inverter. Disconnection takesplace at all poles.

B Control panelThe control panel of the inverter is equipped with an LCD display, threeLEDs und four buttons.

C Type labelThe type label uniquely identifies the inverter. The type label must remainpermanently attached to the product. You will find the following informa-tion on the type label:

• Device type (Model)• Device-specific characteristics

D Barcode with serial number

Page 13: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

4 Product DescriptionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 13

Symbols on the Inverter and on the Type LabelSymbol Explanation

Inverter

Observe the documentation

Data transmission

Grounding conductorThis symbol indicates the position for connecting a grounding conductor.

25 minDanger to life due to high voltages in the inverter; observe a waiting timeof 25 minutesHigh voltages that can cause lethal electric shocks are present in the livecomponents of the inverter.Prior to performing any work on the inverter, disconnect it from all volt-age sources as described in this document.

Risk of burns due to hot surfacesThe product can get hot during operation. Avoid contact during opera-tion. Prior to performing any work on the product, allow the product tocool down sufficiently.

Danger to life due to electric shockThe product operates at high voltages. Prior to performing any work onthe product, disconnect the product from voltage sources. All work on theproduct must be carried out by qualified persons only.

DangerThis symbol indicates that the inverter must be additionally grounded ifadditional grounding or equipotential bonding is required at the installa-tion site.

WEEE designationDo not dispose of the product together with the household waste but inaccordance with the disposal regulations for electronic waste applicableat the installation site.

CQCThe product is certified by the China Quality Certification Center.

Page 14: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

4 Product Description SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1014

4.2 Control panel

Esc

A

B

C

D

E F G H

Figure 3: Layout of the control panel

Position DesignationA Arrow button "Up"

B Arrow button "Down"

C Enter button

D ESC button

E LCD display

F Green LED

G Red LED

H Bicolor LED (red or green)

4.3 LED SignalsThe LEDs indicate the operating state of the inverter.

LED Status ExplanationGreen LED glowing Operation

The inverter is in operation.

Red LED glowing Interruption of feed-in operationThe inverter is no longer feeding into the utility grid. If anevent occurs, the corresponding event number will beshown in the display.

Bicolor LED glowing green Data receiptThe inverter is receiving data from another device.

glowing red Data transmissionThe inverter is sending data to another device.

Page 15: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

5 MountingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 15

5 Mounting

5.1 Requirements for MountingRequirements for the mounting location:

WARNINGDanger to life due to fire or explosionDespite careful construction, electrical devices can cause fires.

• Do not mount the product in areas containing highly flammable materials or gases.• Do not mount the product in potentially explosive atmospheres.

☐ The mounting location must be inaccessible to children.☐ A solid support surface must be available for mounting, e.g. concrete or masonry. When

mounted on drywall or similar materials, the inverter emits audible vibrations during operationwhich could be perceived as annoying.

☐ The mounting location must be suitable for the weight and dimensions of the inverter (seeSection 14 "Technical Data", page 69).

☐ The mounting location must not be exposed to direct solar irradiation. If the inverter is exposedto direct solar irradiation, the exterior plastic parts might age prematurely and overheatingmight occur. When becoming too hot, the inverter reduces its power output to avoidoverheating.

☐ The mounting location should be freely and safely accessible at all times without the need forany auxiliary equipment (such as scaffolding or lifting platforms). Non-fulfillment of thesecriteria may restrict servicing.

☐ To ensure optimum operation, the ambient temperature should be between -25°C and+40°C.

☐ Climatic conditions must be met (see Section 14 "Technical Data", page 69).

Permitted and prohibited mounting positions:☐ The inverter must only be mounted in one of the permitted positions. This will ensure that no

moisture can penetrate the inverter.☐ The inverter should be mounted in such way that display messages or LED signals can be read

without difficulty and buttons operated.☐ The following points must be observed in horizontal mounting positions.

– The support surface and the area around the inverter must be clean and free of obstacles.This will allow for sufficient heat dissipation.

– The inverter must be protected against water and floods.– The inverter must be protected against direct sunlight.– The fresh air requirement of the inverter and a proper heat dissipation must be assured.

Page 16: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

5 Mounting SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1016

Figure 4: Permitted and prohibited mounting positions

Dimensions for mounting:190 19065

305

431

54

65

Figure 5: Position of the anchoring points(Dimensions in mm)

Recommended Clearances:☐ Maintain the recommended clearances to walls as well as to other inverters or objects.☐ If multiple inverters are mounted in areas with high ambient temperatures, increase the

clearances between the inverters and ensure sufficient fresh-air supply.

Page 17: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

5 MountingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 17

300

500

400300

Figure 6: Recommended clearances(Dimensions in mm)

600

400400 400 400

600

600

600

400 400

600

400

500

500

Figure 7: Recommended clearances if mounting several inverters (dimensions in mm (in))

Page 18: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

5 Mounting SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1018

5.2 Mounting the Inverter

CAUTIONRisk of injury when lifting the inverter, or if it is droppedThe inverter weighs 63 kg. There is risk of injury if the inverter is lifted incorrectly or droppedwhile being transported or when attaching it to or removing it from the wall mounting bracket.

• Transport and lift the inverter carefully.

There are two options for mounting the inverter:• Mounting the inverter on the wall• Mounting the inverter on a Bracket

Mounting the Inverter on the Wall

1. CAUTIONRisk of injury due to damaged cablesThere may be power cables or other supply lines (e.g. gas or water) routed in the wall.

• Ensure that no lines are laid in the wall which could be damaged when drilling holes.

2. Align the wall mounting bracket horizontally on thewall and mark the position of the drill holes. Use thethree holes on the top and the lower hole in themiddle of the wall mounting bracket.

3. Set the wall mounting bracket aside and drill the marked holes (diameter: 14 mm).4. Insert one heavy-duty anchor into each drill hole.

5. Unscrew the bolt from the wall plug.

Page 19: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

5 MountingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 19

6. Secure the wall mounting bracket horizontally usingscrews, spring lock washers and washers.

4x4x

7. Hook the inverter into the wall mounting bracket.

Esc

8. Ensure that the inverter is securely in place.9. Secure the inverter to the wall mounting bracket. To

do so, insert one screw M5 each into the screw holeon both sides of the inverter and tighten them usinga Torx screwdriver (TX 25, torque: 2.5 Nm).

Esc

Page 20: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

5 Mounting SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1020

Mounting the Inverter on a Retainer1. Align the wall mounting bracket horizontally on the

bracket and mark the position of the drill holes. Forthis, use the holes on the top and bottom on theouter sides.

2. Set the wall mounting bracket aside and drill the marked holes (diameter: 10 mm).3. Remove the bolt from the wall plug.

4. Secure the wall mounting bracket horizontally onthe bracket using screws and washers.

4x4x

5. Hook the inverter into the wall mounting bracket.

Esc

Page 21: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

5 MountingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 21

6. Ensure that the inverter is securely in place.7. Secure the inverter to the wall mounting bracket. To

do so, insert one screw M5 each into the screw holeon both sides of the inverter and tighten them usinga Torx screwdriver (TX 25, torque: 2.5 Nm).

Esc

Page 22: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1022

6 Electrical Connection

6.1 Safety during Electrical ConnectionDANGER

Danger to life due to high voltages of the PV arrayWhen exposed to sunlight, the PV array generates dangerous DC voltage, which is present in theDC conductors and the live components of the inverter. Touching the DC conductors or the livecomponents can lead to lethal electric shocks. If you disconnect the DC connectors from theinverter under load, an electric arc may occur leading to electric shock and burns.

• Do not touch non-insulated cable ends.• Do not touch the DC conductors.• Do not touch any live components of the inverter.• Have the inverter mounted, installed and commissioned only by qualified persons with the

appropriate skills.• If an error occurs, have it rectified by qualified persons only.• Prior to performing any work on the inverter, disconnect it from all voltage sources as

described in this document.

NOTICEDamage to seals on the enclosure lids in subfreezing conditionsIf you open the enclosure lids when temperatures are below freezing, the enclosure seals can bedamaged. This can lead to moisture entering the inverter.

• Only open the enclosure lids if the ambient temperature is not below -5°C• If a layer of ice has formed on the seal of the lid when temperatures are below freezing,

remove it prior to opening the enclosure lids (e.g. by melting the ice with warm air).Observe the applicable safety regulations.

NOTICEDamage to the inverter due to electrostatic dischargeTouching electronic components can cause damage to or destroy the inverter throughelectrostatic discharge.

• Ground yourself before touching any component.

Page 23: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 23

6.2 Overview of the Connection Area

6.2.1 View from Below

COM1

COM2

AC OUT

A B C D E

F

Figure 8: Connection area and cable glands at the bottom of the inverter

Position DesignationA Positive and negative DC connectors, input A

B Positive and negative DC connectors, input B

C Positive and negative DC connectors, input C

D Enclosure opening with cable gland M25 for the network cables

E Enclosure opening with cable gland M50 for the AC connection

F Connection point for an additional grounding or equipotential bonding

Page 24: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1024

6.2.2 Interior View

A B C D E

L1 L2 L3 N

Figure 9: Connection areas in the interior of the inverter

Position DesignationA Switch for setting the type of communication

B Terminal block for the connection of a data cable for the communication viaRS485

C RJ45 jack for the connection of a data cable for communication via RS422

D Terminal block for the connection of L1, L2, L3 and N

E Connection point for protective conductors

6.3 AC Connection

6.3.1 Requirements for the AC ConnectionCable requirements:

☐ Cable made of aluminum or copper. When using cables made of aluminium, a bimetal ringterminal lug made of copper and aluminium must be used.

☐ External diameter: 25 mm to 38 mm☐ Conductor cross-section for SOLID-Q 50: 16 mm² to 35 mm²☐ Conductor cross-section for SOLID-Q Pro 60: 25 mm² to 50 mm²☐ Insulation stripping length: 18 mm☐ Sheath stripping length: 90 mm☐ The cable must be dimensioned in accordance with the local and national directives for the

dimensioning of cables. The requirements for the minimum wire size derive from thesedirectives. Factors influencing cable dimensioning include nominal AC current, cable type,routing method, cable bundling, ambient temperature and maximum desired line losses.

Page 25: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 25

Overvoltage category:The inverter can be used in grids of overvoltage category III or lower in accordance withIEC 60664-1. That means that the inverter can be permanently connected to the grid-connectionpoint of a building. In case of installations with long outdoor cabling routes, additional measures toreduce overvoltage category IV to overvoltage category III are required (see the TechnicalInformation "Overvoltage Protection" at www.SMA-Solar.com).

Additional grounding:Connection of additional groundingIn some countries, additional grounding is generally required. In each case, observe thelocally applicable regulations.

• If additional grounding is required, connect an additional grounding that has at least thesame cross-section as the connected grounding conductor to the connecting terminalplate for the AC cable (see Section 6.3.3, page 26). This prevents touch current if thegrounding conductor at the connecting terminal plate for the AC cable fails.

6.3.2 Connecting the Inverter to the Utility Grid

Additionally required mounting material:☐ Ring terminal lug with hole diameter: 6 mm

Requirements:☐ The connection requirements of the grid operator must be met.☐ The grid voltage must be within the permissible range. The exact operating range of the

inverter is specified in the operating parameters.

Procedure:1. Disconnect the circuit breaker from all three line conductors and secure against reconnection.2. If the lower enclosure lid is mounted, loosen all

screws of the lower enclosure lid using a Torxscrewdriver (TX 25) and remove the enclosure lid.

0

I

Esc

6x6x

3. Unscrew the swivel nut from the cable gland for theAC connection at the connector cap (AF: 60 mm).

Page 26: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1026

4. Thread the swivel nut over the AC cable.5. Dismantle the AC cable.6. Shorten L1, L2, L3 and N by 5 mm each so that the grounding conductor is 5 mm longer.7. Strip off the insulation of the conductors L1, L2, L3, N and PE by 18 mm.8. Fit the conductors L1, L2, L3, N and PE with ring terminal lugs. For a cable cross-section of

25 mm², for example, use an 25-6 ring terminal lug.9. Route the AC cable into the inverter through the cable gland.

10. CAUTIONRisk of fire if two conductors are connected to one terminalIf you connect two conductors to a terminal, a fire can occur due to a bad electricalconnection.

• Never connect more than one conductor per terminal.

11. Connect the grounding conductor to the protective grounding in accordance with the labeling(torque: 6 Nm).

12. Connect N, L1, L2 and L3 to the terminal block forthe AC cable according to the labeling (torque:8 Nm). The direction of the rotating magnetic fieldof L1, L2 and L3 is not relevant. L1L2

L3 N

13. Make sure that all conductors are securely in place.14. Tighten the swivel nut of the cable gland (AF:

60 mm, torque: 7 Nm).

6.3.3 Connecting Additional Grounding

If additional grounding or equipotential bonding is required locally, you can connect additionalgrounding to the inverter. This prevents touch current if the grounding conductor on the ACconnector fails.

Page 27: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 27

Additionally required material (not included in the scope of delivery):☐ One grounding cable☐ Ring terminal lug with hole diameter: 6 mm☐ Crimping tool

Cable requirement:☐ Grounding cable cross-section: max. 25 mm²

Procedure:1. Strip the grounding cable insulation.2. Insert the stripped part of the grounding cable into

the ring terminal lug and crimp using a crimpingtool.

3. Firmly screw the hexagon head screw with cross-head M6x14 through the ring terminal lug onto theconnection point for additional grounding (torque:6 Nm).

6.4 Connecting the Network Cables

DANGERDanger to life due to electric shockOvervoltages (e. g. in the case of a flash of lightning) can be further conducted into the buildingand to other connected devices in the same network via the network cable if there is noovervoltage protection.

• Ensure that all devices in the same network are integrated in the existing overvoltageprotection.

• When laying the network cable outdoors, attention must be given to suitable overvoltageprotection at the network cable transition from the inverter outdoors to the network inside thebuilding.

• The Ethernet interface of the inverter is classified as "TNV-1" and offers protection againstovervoltages up to 1.5 kV.

Page 28: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1028

Setting the Communication

A B C

Figure 10: Switch for setting the type of communication

Position DesignationA Switch for selecting the communication interface RS485 or RS422

B Switch for terminator 1

C Switch for terminator 2

Procedure:1. If the RS422 interface is used, set the switch for

selecting the communication interface to RS422.

2. If the RS485 interface is used, set the switch forselecting the communication interface to RS485.

Page 29: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 29

3. If only one inverter is used, set both switches for theterminators on OFF.

4. If more than one inverter is used:• If the RS422 interface is used, set on the last inverter of the communication chain both

switches for the terminators (close to the data capture device as reference point) on ON.• If the RS485 interface is used, set on the last

inverter of the communication chain one of thetwo switches for the terminators (close to thedata capture device as reference point) onON.

• On all other inverters, set both switches for theterminators on OFF.

Page 30: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1030

Connecting the Network Cable with RS422 Interface

Pin 1 Pin 8

8 7 6 5 4 3 2 1

Figure 11: Pin assignment of the RS422 interface

Pin Assignment1 TX_RS422A

2 TX_RS422B

3 RX_RS422A

4 GND

5 GND

6 RX_RS422B

7 +7 V

8 +7 V

Additionally required material (not included in the scope of delivery):☐ One network cable

Cable requirements:The cable length and quality affect the quality of the signal. Observe the following cablerequirements.

☐ Cable type: 100BaseTx☐ Cable category: Cat5, Cat5e, Cat6, Cat6a or Cat7☐ Plug type: RJ45 of Cat5, Cat5e, Cat6 or Cat6a☐ Shielding: SF/UTP, S/UTP, SF/FTP or S/FTP☐ Number of insulated conductor pairs and insulated conductor cross-section: at least 2 x 2 x

0.22 mm²☐ Maximum cable length between two nodes when using patch cables: 50 m☐ Maximum cable length between two nodes when using installation cables: 100 m☐ UV-resistant for outdoor use

Page 31: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 31

Procedure:

1. DANGERDanger to life due to electric shock

• Ensure that the inverter is disconnected from all voltage sources (see Section 10,page 57).

2. When using a self-assembly network cable, assemble the connector and connect to thenetwork cable (see connector documentation).

3. Unscrew the swivel nut from the network socket andpress both cable support sleeves out of the cablegland.

1

2

4. Move the swivel nut over the network cable andremove the sealing plug from one of the enclosureopenings of the two-hole cable support sleeve andinsert the network cable into the enclosure opening. 3

1

2

5. Lead the network cable through the cable glandand put the network plug of the cable into one ofthe network sockets of the communication assembly.

6. Attach the network cable with a cable tie.

Page 32: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1032

7. Press the two-hole cable support sleeve into thecable gland and screw the swivel nut onto thenetwork socket (AF: 29 mm).

1

2

8. If you would like to establish a direct connection, connect the other end of the network cabledirectly to the computer.

9. If you would like to integrate the inverter into a local network, connect the other end of thenetwork cable to the local network (e.g. via a router).

Connecting the Network Cable with RS485 Interface

A B GND

Figure 12: Pin assignment of the RS485 interface

Additionally required material (not included in the scope of delivery):☐ One network cable

Cable requirements:The cable length and quality affect the quality of the signal. Observe the following cablerequirements.

☐ Number of insulated conductor pairs and insulated conductor cross-section: at least2 x 2 x 1.0 mm²

☐ Diameter of the cable when using the cable support sleeve with one hole: at maximum 13 mmto 18 mm

☐ The cable used must be shielded.☐ The conductors must be twisted-pair.☐ Cables to be laid outdoors must be UV-resistant or routed in a UV-resistant cable channel.☐ The conductors lengths in the inverter must be as short as possible. This prevents contact with

live conductors.

Page 33: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 33

☐ If the conductor is to be installed without conduit, the conductor has to be suited for outdooruse.

☐ If the conductor is to be installed in a conduit together with live conductors, the conductor hasto be insulated in accordance with the local regulations.

Procedure:

1. DANGERDanger to life due to electric shock

• Ensure that the inverter is disconnected from all voltage sources (see Section 10,page 57).

2. When using a self-assembly network cable, fit the protective grounding with a ring terminallug.

3. Unscrew the swivel nut from the network socket andpress both cable support sleeves out of the cablegland.

1

2

4. Thread the swivel nut and the one-hole cablesupport sleeve over the network cable.

1

2

5. Thread the network cable through the cable gland.

Page 34: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1034

6. Connect A, B and GND to the terminal block for thecommunication assembly in accordance with thelabeling.

7. Attach the network cable with a cable tie.8. Press the one-hole cable support sleeve into the

cable gland and screw the swivel nut onto thenetwork socket (AF: 29 mm).

2

1

2

9. Check all cable glands for leaks. If there is a gap between cable and cable gland, seal it withfireproof sealing compound.

6.5 DC Connection

6.5.1 Requirements for the DC ConnectionRequirements for the PV modules:

☐ All PV modules must be of the same type.☐ All PV modules must be aligned and tilted identically.☐ On the coldest day based on statistical records, the open-circuit voltage of the PV array must

never exceed the maximum input voltage of the inverter.☐ The same number of series-connected PV modules must be connected to each string.☐ The maximum input current per string must be maintained and must not exceed the through-

fault current of the DC connectors (see Section 14 "Technical Data", page 69).☐ The thresholds for the input voltage and the input current of the inverter must be adhered to

(see Section 14 "Technical Data", page 69).☐ The positive connection cables of the PV modules must be fitted with the positive DC

connectors (for information on assembling DC connectors, see the DC connector installationmanual).

☐ The negative connection cables of the PV modules must be fitted with the negative DCconnectors (for information on assembling DC connectors, see the DC connector installationmanual).

Page 35: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 35

6.5.2 Assembling the DC Connectors

For connection to the inverter, all PV module connection cables must be fitted with the DCconnectors provided. Assemble the DC connectors as described in the following. Be sure to observethe correct polarity. The DC connectors are marked with the symbols "+" and "−".

Figure 13: Negative (A) and positive (B) DC connectors

Cable requirements:☐ Cable type: PV1-F, UL-ZKLA, USE2☐ External diameter: 5 mm to 8 mm☐ Conductor cross-section: 2.5 mm² to 6 mm²☐ Qty single wires: minimum 7☐ Nominal voltage: minimum 1000 V☐ Using bootlace ferrules is not allowed.

DANGERDanger to life due to high voltages on the DC conductorsWhen exposed to sunlight, the PV array generates dangerous DC voltage which is present in theDC conductors. Touching the DC conductors can lead to lethal electric shocks.

• Ensure that the inverter is disconnected from all voltage sources.• Do not touch non-insulated cable ends.• Do not touch the DC conductors.

NOTICEDestruction of the inverter due to overvoltageIf the open-circuit voltage of the PV modules exceeds the maximum input voltage of the inverter,the inverter can be destroyed due to overvoltage.

• If the open-circuit voltage of the PV modules exceeds the maximum input voltage of theinverter, do not connect any strings to the inverter and check the design of the PV system.

Procedure:1. Strip 12 mm of the cable insulation.

Page 36: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1036

2. Insert the stripped cable into the DC connector up tothe stop. When doing so, ensure that the strippedcable and the DC connector are of the samepolarity.

+

3. Press the clamping bracket down until it audiblysnaps into place.

+

☑ The stranded wire can be seen inside theclamping bracket chamber.

+

✖ The stranded wire cannot be seen in the chamber?The cable is not correctly in place.

• Release the clamping bracket. To do so,insert a screwdriver (blade width: 3.5 mm)into the clamping bracket and pry theclamping bracket open.

2

+

1

• Remove the cable and go back to step 2.4. Push the swivel nut up to the thread and tighten

(torque: 2 Nm).

+

1

2

Page 37: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 37

6.5.3 Connecting the PV Array

NOTICEDamage to the DC connectors due the use of contact cleaner of other cleaningagentsSome contact cleaners or other cleaning agents may contain substances that decompose theplastic of the DC connectors.

• Do not use contact cleaners or other cleaning agents for cleaning the DC connectors.

NOTICEDestruction of the inverter due to overvoltageIf the open-circuit voltage of the PV modules exceeds the maximum input voltage of the inverter,the inverter can be destroyed due to overvoltage.

• If the open-circuit voltage of the PV modules exceeds the maximum input voltage of theinverter, do not connect any strings to the inverter and check the design of the PV system.

NOTICEDestruction of the measuring device due to overvoltage

• Only use measuring devices with a DC input voltage range of 1000 V or higher.

Procedure:1. Ensure that the three-pole circuit breaker is switched off and cannot be reconnected.2. Ensure that the DC load-break switches are in the

OFF position and are secured against reconnection.0FF

ON

3. Check whether the DC connectors have the correct polarity.If the DC connector is equipped with a DC cable of the wrong polarity, the DC connector mustbe reassembled. The DC cable must always have the same polarity as the DC connector.

4. Ensure that the open-circuit voltage of the PV array does not exceed the maximum inputvoltage of the inverter and that there are no ground faults present in the PV arrays.

Page 38: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical Connection SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1038

5. Connect the assembled DC connectors to the inverter.☑ The DC connectors snap into place.

6. Ensure that all DC connectors are securely in place.

7. NOTICEDamage to the inverter due to moisture ingressIf there are any DC inputs remaining on the inverter that have not been used, the inverter isnot sealed and moisture can penetrate into the inverter. The inverter is only sealed if the DCconnectors are connected to the inverter with the DC conductors and any free DC inputs aresealed with sealing plugs.

• Seal the free DC inputs on the inverter using the sealing plugs.

6.5.4 Disassembling the DC Connectors

To disassemble the DC connectors (e.g. due to faulty assembly), proceed as follows.

DANGERDanger to life due to high voltages on the DC conductorsWhen exposed to sunlight, the PV array generates dangerous DC voltage which is present in theDC conductors. Touching the DC conductors can lead to lethal electric shocks.

• Ensure that the inverter is disconnected from all voltage sources.• Do not touch non-insulated cable ends.• Do not touch the DC conductors.

Procedure:1. Release and remove all DC connectors. To do this,

insert a flat-blade screwdriver or an angledscrewdriver (blade width 3.5 mm) into one of theslide slots and pull the DC connectors out in adownward direction. Do not pull on the cable.

2

1

2. Remove the DC connector swivel nut.

+

Page 39: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

6 Electrical ConnectionSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 39

3. Unlock the DC connector. To do this, insert a flat-blade screwdriver (blade width: 3.5 mm) into theside catch mechanism and pry the catch mechanismopen. +

2

3

1

4. Carefully pull the DC connector apart.5. Release the clamping bracket. To do so, insert a flat-

blade screwdriver (blade width: 3.5 mm) into theclamping bracket and pry the clamping bracketopen.

2

+

1

6. Remove the cable.

Page 40: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

7 Commissioning SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1040

7 Commissioning

7.1 Commissioning the Inverter

Requirements:☐ The AC circuit breaker must be correctly rated and mounted.☐ The inverter must be correctly mounted.☐ All cables must be correctly connected.☐ Unused enclosure openings must be sealed tightly with sealing plugs.

Procedure:1. If the lower enclosure lid had been removed, place

it in its position and tighten (torque: 2.5 Nm) allscrews with a Torx screwdriver (TX 25).

0FF

ON

Esc

5 3

2

1

4 6

2. Set the DC load-break switch of the inverter toposition ON.

0FF

ON

3. Switch on the AC circuit breaker.☑ The green LED is glowing.☑ Depending on the available power, the green LED glows faintly. The inverter is feeding in.✖ The red LED is glowing?

An event has occurred.• Find out which event has occurred and, if necessary, initiate countermeasures.

Page 41: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

8 Using the Inverter User InterfaceSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 41

8 Using the Inverter User Interface

8.1 Site MapUser interface page overview

4 8 13 17 22

t

P 55. 0 KW

60

▶▶

h0

W0

KWh0.0

h0

W0

KWh0.0

50

h0

W0

KWh0.0

0 0 0

CN NB /T 32004

20/04/2017 10 : 15DD/MM/YYYY hh : mm

2017

09/11/2013

11

2013

20/ 04/ 2017 10: 15

48329 W

53. 4 KWh

15234 . 5 KWh

U V236.1U V235.5

I A12.3I A12.5

U V237. 8 I A13.1

PF 0.98 PhaseFac Hz50.01 Runtime h12

Leading

ABC

ABC

[ 1] 12/04/2017 08 : 45 E12

[ 2] 11/04/2017 17 : 23 W156

[ 3] 30/03/2017 15 : 23 E43

[ 4] 07/02/2017 13 : 23 E45

[ 5] 18/02/2017 12 : 23 E01

Vpv 1 V580.8Vpv 2 V579.2

Ipv 1 A10.3Ipv 2 A9.8

Ppv 1 W Ppv 2 W5802 5798Vpv 3 V579.2 Ipv 3 A9.8

Ppv 3 W5802

Fuse : 0000 0000 0000

/2013

DeutschEnglish

简体中文繁體中文

3

0

00.00.00.00.00

TP: SOLID - Q 50

S/N: 1234567890123456

MCU: V1.00 03025- 01

HMI: 17621- 758R .50034- 01

STD: CN NB/T 32004

Power

Etoday

Days

Months

Years

Unlock

Slide from 'Down' to 'Esc' to unlock!

Operating information

Date&Time

Language

LCD Contrast

Modbus Address:

Communication Setting

Password:

Password1

Password1

Password1

[Turn on ]

Etotal

Error Code: 02

Operating information

Grid Code

Initializing...

Grid Code

Menu

Device Info

Settings

Event Log

Statistics

Statistics

Settings

Device Info

Daily Statistics

Monthly Statistics

Annual Statistcs

Basic Setting

Runtime

Peak

Etoday

Runtime

Peak

Emonth

Runtime

Peak

Eyear

Tunr on/off

Password

Factory Setting

Protection Setting

Feature Setting

Turn on/off

Communication Setting

Basic SettingLCD Contrast

Language

Date&Time

[Turn off ]

Turn on/off

Turn inverter OFF?

Event logs

Figure 14: User interface page overview

Page 42: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

8 Using the Inverter User Interface SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1042

Overview of the password protected pages of the user interface

CN NB/ T 32004

PF: 0.85 Phase: Leading

004524.8 kWh0

85

265. 5 V

255. 0 V185. 0 V

180. 0 V

12. 50 S12. 50 S12. 50 S30. 50 S

54. 50 Hz53. 50 Hz47. 50 Hz45. 50 Hz

12. 50 S12. 50 S12. 50 S12. 50 S

12. 50 S

180. 5 V180. 5 V

53. 50 Hz47. 50 Hz0 0 00

Active Power Control

Setting: Enable

Password

Password:

Feature Setting

Grid Code

IsolationSmart String Monitoring

Active Power Control

PV Mode

Cumulative Generation

Protection Setting

Voltage Threshold

Frequency Threshold

Reconnection Threshold

Factory Setting

RESTORE FACTORY SETTINGS?

Grid Code

Grid Code:

Isolation:

Isolation Mode:

1.PV-G-N AC-TF-N

2.PV-G-Y AC-TF-Y  

Output Limit: 80 %

PV Mode

PV Mode:

[Paralell ]

Voltage Threshold

OVP2:OVP1:UVP1:UVP2:

Frequency Threshold

Reconnection Setting

Password1

Password2

Password3

Smart String Monitoring

Setting: Enable

Factor:

Cumulative Generation

Cumulative Generation:

Reactive Power Control

Setting: Enable

[Independent]

OVP2:OVP1:UVP1:

UVP2:

OVR:UVR:

OFR:UFR:

Checking time:

Reactive Power Control

Figure 15: Overview of the password protected pages of the user interface

Page 43: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

8 Using the Inverter User InterfaceSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 43

8.2 Start Page Design

4 8 13 17 22

t

P 55

30s19/ 06/2016 12:23

48601 W

123.4 KWh

15234. 5 KWh

A

B

C

D

E

F

G

H

I

Power

Etotal

Error Code: 02

Etoday

Figure 16: Start page design

Position DesignationA Date & time

B Output power

C Daily yield

D Total yield

E Error number

F Countdown

G Operating mode:• Standby• Operation• Error

H Output power diagram

I Overvoltage protection display

The screen is automatically deactivated after 30 seconds without user input.From the main menu you can browse more pages with operation information using the arrow keys.

A

B

C

G

I

K

L

H

J

D

E

F

Vpv1 V580.8Vpv2 V579.2

Ipv 1 A10.3Ipv 2 A9.8

Ppv1 W Ppv2 W5802 5798Vpv3 V579.2 Ipv 3 A9.8

Ppv3 W5802

Fuse : 0000 0000 0000

▶▶

U V236.1U V235.5

I A12.3I A12.5

U V237.8 I A13.1

PF 0.98 PhaseFac Hz50.01 Runtime h12

Leading

ABC

A

B

C

Operating information Operating information

Figure 17: Operation information

Position DesignationA Grid voltage

B Displacement power factor

Page 44: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

8 Using the Inverter User Interface SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1044

Position DesignationC Grid frequency

D Output current

E Phase shift

F Operating time

G DC voltage

H DC input current

I MPP tracking 1 input power

J MPP tracking 2 input power

K MPP tracking 3 input power

L Status display of the DC fuses:• 0: Fuse OK• 1: Fuse defective

8.3 Unlocking the User Interface1. If the LCD display is off, press any button on the control panel to activate the LCD display.

☑ The screen for unlocking the LCD display is shown.2. Press the "Down" arrow key and the Esc key repeatedly one after another.

☑ The home page is displayed.

8.4 Accessing the Main MenuMenu

Statistics

Event Log

Settings

Device Info

Figure 18: Main menu

Procedure:1. Press the Enter key on the home page to enter the main menu.2. Press the "Up" or "Down" arrow keys to get to the desired menu item.3. Press Enter to get to the selected submenu.4. Press the Esc key to return to the home page.

Page 45: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

8 Using the Inverter User InterfaceSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 45

8.5 Displaying Statistics09/11/2013

h0

W0

KWh0.0

Statistics

Days

Months

Daily Statistics

Etoday

Peak

RuntimeYear

Figure 19: Statistics

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Statistics menu using the arrow keys.3. Press Enter.4. Select Days, Months or Years using the arrow keys.5. Press Enter.

8.6 Displaying the Event Log

A B[ 1] 12/04/2017 08: 45 E12

[2] 11/04/2017 17: 23

[3] 30/03/2017 15: 23 E43

[4] 07/02/2017 13: 23 E45

[5] 18/02/2017 12: 23 E01

E03

Event Logs

Figure 20: Event log

Position DesignationA Event time

B Event number

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Event Log menu using the arrow keys.3. Press Enter.4. Use the arrow keys to scroll through the error list.

Page 46: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

8 Using the Inverter User Interface SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1046

8.7 Displaying the Device Information

00.00.00.00.00

TP: SOLID- Q 50

S/N: 1234567890123456

STD: CN NB/T 32004

HMI: 17621- 758R .50034- 01

MCU: V1.00 03025- 01

Device Info

Figure 21: Device information

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Device Information menu using the arrow keys.3. Press Enter.4. Press the Esc key to return to the home page.

Page 47: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the InverterSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 47

9 Configuration of the Inverter

9.1 Basic Configuration

9.1.1 Setting the Date and Time

20/04/2017 10:15DD/MM/YYYY hh : mm

2017

Date&Time

Figure 22: Date and time

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Basic Setting > Date & Time Setting menu.3. Press Enter.4. Use the arrow keys to set the day, month, year, hour and minute one by one. Confirm by

pressing Enter each time.5. Press the Esc key to cancel the setting.

9.1.2 Changing the Language

DeutschEnglish

简体中文繁體中文

Language

Figure 23: Language selection

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Basic Setting > Language menu.3. Press Enter.4. Select the desired language using the arrow keys.5. Press Enter to adopt the setting.6. Press the Esc key to cancel the setting.

Page 48: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the Inverter SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1048

9.1.3 Adjusting the Display Contrast

50

LCD Contrast

Figure 24: Contrast setting

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Basic Setting > LCD Contrast menu.3. Press Enter.4. Select the desired contrast using the arrow keys.5. Press Enter to adopt the setting.6. Press the Esc key to cancel the setting.

9.2 Setting the Communication

3Modbus Address:

Communication Setting

Figure 25: Communication setting

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Communication Setting menu.3. Press Enter.4. Set the desired Modbus address using the arrow keys.5. Press Enter to adopt the setting.6. Press the Esc key to cancel.

Page 49: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the InverterSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 49

9.3 Switching the Inverter On and OffTurn on/off

[Turn off]

[Turn on]

Figure 26: Switching the inverter on and off

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Turn on/off menu.3. Press Enter.4. To start the inverter, select Turn on using the arrow keys.5. To stop the inverter, select Turn off using the arrow keys.6. Press Enter to adopt the setting.7. Press the Esc key to cancel.

9.4 Entering the PasswordFor accessing the settings of the advanced features, the protection setting and to restore the factorysettings, you must enter different passwords. Please contact us to request the passwords (seeSection 15, page 72).

0 0 00

Password

Password:

Figure 27: Password entry

NOTICESystem failures due to entry of incorrect parameter valuesThe system can become unstable and fail due to entry of incorrect parameter values. Allparameters that could affect the operational safety of the system are protected by the installerpassword.

• Only a qualified person is permitted to set and adjust system parameters.• Give the installer password only to qualified persons and operators.

Page 50: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the Inverter SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1050

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Setting menu.3. Select the Feature Setting, Protection Setting or Factory Setting menu.4. Press Enter.5. Set each digit using the arrow keys. Confirm by pressing Enter each time.6. Press the Esc key to cancel the entry.

9.5 Feature Setting

9.5.1 Setting the Grid Code

CN NB/T 32004

Grid Code

Grid Code:

Figure 28: Grid code setting

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Feature Setting menu.3. Enter the password for the feature setting (see Section 9.4, page 49).4. Select the Grid Code menu.5. Press Enter.6. Select the desired country setting using the arrow keys.7. Press Enter to adopt the setting.8. Press the Esc key to cancel.

9.5.2 Setting the InsulationIf an grounded PV array is used, a three-phase isolating transformer must be installed in order toguarantee the function of the inverter. The neutral conductor of the isolating transformer must beseparated from the grounding cable. The isolating transformer must only be installed for 1 inverter.

Page 51: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the InverterSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 51

In order to operate the inverter with a grounded PV array after installation, set the insulationparameter to PV-G-Y AC-TF-Y.

Isolation:

Isolation Mode:

1.PV-G-N AC-TF-N

2.PV-G-Y AC-TF-Y

Figure 29: Insulation setting

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Feature Setting menu.3. Enter the password for the feature setting (see Section 9.4, page 49).4. Select the Isolation menu.5. Press Enter.6. Select the desired insulation setting using the arrow keys.7. Press Enter to adopt the setting.8. Press the Esc key to cancel.

9.5.3 Setting the Smart String MonitoringThe inverter has an intelligent string-current monitoring function. The current values of the PV stringscan be read via the Modbus protocol. In addition, the inverter shows a warning message if theimbalance of the PV strings is above the warning threshold that has been set.

85

Smart String Monitoring

Setting: Enable

Factor:

Figure 30: Smart String setting

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Feature Setting menu.3. Enter the password for the feature setting (see Section 9.4, page 49).4. Select the Smart String Monitoring menu.5. Press Enter.6. To enable, select Enable using the arrow keys.

Page 52: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the Inverter SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1052

7. To disable, select Disable using the arrow keys.8. Press Enter.9. Set the warning threshold using the arrow keys.

10. Press Enter to adopt the setting.11. Press the Esc key to cancel.

9.5.4 Setting the Active Power ControlActive Power Control

Setting: Enable

Output Limit: 80%

Figure 31: Active power control setting

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Feature Setting menu.3. Enter the password for the feature setting (see Section 9.4, page 49).4. Select the Active Power Control menu.5. Press Enter.6. To enable, select Enable using the arrow keys.7. To disable, select Disable using the arrow keys.8. Press Enter.9. Set the desired limitation for the output power using the arrow keys.

10. Press Enter to adopt the setting.11. Press the Esc key to cancel.

9.5.5 Setting Reactive Power Control

PF: 0.85 Phase: Leading

Reactive Power Control

Setting: Enable

Figure 32: Setting the reactive power control

Procedure:1. Access the main menu (see Section 8.4, page 44).

Page 53: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the InverterSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 53

2. Select the Settings > Feature Setting menu.3. Enter the password for the feature setting (see Section 9.4, page 49).4. Select the Reactive Power Control menu.5. Press Enter.6. To enable, select Enable using the arrow keys.7. To disable, select Disable using the arrow keys.8. Press Enter.9. Set the desired displacement power factor using the arrow keys.

10. Press Enter.11. Set the desired phase shift using the arrow keys.12. Press Enter to adopt the setting.13. Press the Esc key to cancel.

9.5.6 Setting the PV ModePV Mode

PV Mode:

[Paralell ]

[Independent]

Figure 33: PV mode

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Feature Setting menu.3. Enter the password for the feature setting (see Section 9.4, page 49).4. Select the PV Mode menu.5. Press Enter.6. To enable the parallel operation, select Parallel using the arrow keys.7. To enable the independent operation, select Independent using the arrow keys.8. Press Enter to adopt the setting.9. Press the Esc key to cancel.

Page 54: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the Inverter SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1054

9.5.7 Setting the Cumulative Generation

004524 . 8 kWh0

Cumulative Generation

Cumulative Generation:

Figure 34: Total yield

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Feature Setting menu.3. Enter the password for the feature setting (see Section 9.4, page 49).4. Select the Cumulative Generation menu.5. Press Enter.6. Set each digit of the desired cumulative generation using the arrow keys. Confirm by pressing

Enter each time.7. Press Enter to adopt the setting.8. Press the Esc key to cancel.

9.6 Protection Setting

9.6.1 Setting the Voltage ThresholdsVoltage Threshold

265. 5 V12. 50 SOVP2:

185. 0 V12. 50 SOVP1:

255. 0 V12. 50 SUVP1:

180. 0 V30. 50 SUVP2:

Figure 35: Voltage thresholds

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Protection Setting menu.3. Enter password for the protection setting (see Section 9.4, page 49).4. Select the Voltage Thresholds menu.5. Press Enter.6. Using the arrow keys, select the desired thresholds and adjust accordingly.

Page 55: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the InverterSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 55

7. Press Enter to adopt the setting.8. Press the Esc key to cancel.

9.6.2 Setting the Frequency Thresholds

54. 50 Hz

53. 50 Hz

47. 50 Hz

45. 50 Hz

12. 50 S

12. 50 S

12. 50 S

12. 50 S

Frequency Threshold

OFP2:

OFP1:

UFP1:

UFP2:

Figure 36: Frequency thresholds

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Protection Setting menu.3. Enter password for the protection setting (see Section 9.4, page 49).4. Select the Frequency Thresholds menu.5. Press Enter.6. Using the arrow keys, select the desired thresholds and adjust accordingly.7. Press Enter to adopt the setting.8. Press the Esc key to cancel.

9.6.3 Setting the Reconnection Thresholds

12.

50 S

180.

5 V180

.5 V

53.

50 Hz

47.

50 Hz

Reconnection Setting

Checking Time:

UVR:OVR:

UFR:

OFR:

Figure 37: Reconnection thresholds

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Protection Setting menu.3. Enter password for the protection setting (see Section 9.4, page 49).4. Select the Reconnection Thresholds menu.5. Press Enter.6. Using the arrow keys, select the desired thresholds and adjust accordingly.

Page 56: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

9 Configuration of the Inverter SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1056

7. Press Enter to adopt the setting.8. Press the Esc key to cancel.

9.7 Restoring Factory SettingsTo restore the factory settings, you need a clear code. Please contact us to request the clear code(see Section 15, page 72).

Procedure:1. Access the main menu (see Section 8.4, page 44).2. Select the Settings > Factory Settings menu.3. Press Enter.4. Set each digit of the clear code using the arrow keys. Confirm by pressing Enter each time.

☑ The message Restore Factory Settings? appears.5. To restore the factory settings, press the Enter key.6. Press the Esc key to cancel.

Page 57: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

10 Disconnecting the Inverter from Voltage SourcesSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 57

10 Disconnecting the Inverter from Voltage Sources

Prior to performing any work on the inverter, always disconnect it from all voltage sources asdescribed in this section. Always adhere to the prescribed sequence.

NOTICEDestruction of the measuring device due to overvoltage

• Only use measuring devices with a DC input voltage range of 1000 V or higher.

Procedure:1. Disconnect the AC circuit breaker and secure it against reconnection.2. Set the DC load-break switch of the inverter to OFF

and secure against reconnection.0FF

ON

3. Wait until the LEDs have gone out.4. Ensure that no voltage is present at the DC inputs on the inverter using a suitable measuring

device.5. Disassemble the DC connectors Disassembling the DC Connectors.6. If the lower enclosure lid is mounted, loosen all screws of the lower enclosure lid using a Torx

screwdriver (TX 25) and remove the enclosure lid.7. Ensure that no voltage is present at the AC input of the inverter using a suitable measuring

device.8. Remove N, L1, L2 and L3 of the AC cable from the terminal block.

Page 58: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

11 Cleaning the Inverter SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1058

11 Cleaning the Inverter• Ensure that the inverter is free of dust, foliage and other dirt.

Page 59: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 TroubleshootingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 59

12 Troubleshooting

12.1 Event MessagesEventnumber

Message, cause Corrective measures

E01 Internal communication failureCommunication failure between mainprocessor and coprocessor

• Contact the Service (see Section 15"Contact", page 72).

E02 EEPROM R/W failureError when reading or writing on theEEPROM

E03 Relay check failureError when checking the relay

• Ensure that the grid voltage between L1/L2/L3-N is in the permissible range.

• Ensure that the N-PE voltage is less than20 V.

• Contact the Service (see Section 15"Contact", page 72).

E04 DC injection too highDC current is too high

• Contact the Service (see Section 15"Contact", page 72).

E08 AC HCT failureThe current sensor is not connected,not available or defective

E09 Residual Current Device failureThe device for detecting residual cur-rent is defective

E11 Internal software mismatchThe software versions of the main pro-cessor and coprocessor are different

• Check the software version.• Contact the Service (see Section 15

"Contact", page 72).

E33 f,ac out of rangeThe frequency of the utility grid is notwithin the configured limits The inverterhas disconnected from the utility grid.

• If possible, check the power frequency andobserve how often fluctuations occur.If fluctuations occur frequently and thismessage is displayed often, contact thegrid operator and request approval tochange the operating parameters of theinverter.If the grid operator gives his approval,discuss any changes to the operatingparameters with Service (see Section 15"Contact", page 72).

Page 60: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 Troubleshooting SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1060

Eventnumber

Message, cause Corrective measures

E34 V,ac out of rangeThe voltage of the utility grid is notwithin the configured limits The inverterhas disconnected from the utility grid.

• Check whether the grid voltage at theconnection point of the inverter ispermanently in the permissible range.If the grid voltage is outside the permissiblerange due to local grid conditions, contactthe grid operator. The grid operator mustagree with an adjustment of the voltage atthe feed-in point or with a change of themonitored operating limits.If the grid voltage is permanently within thepermissible range and this message is stilldisplayed, contact the Service (seeSection 15 "Contact", page 72).

E35 Utility lossThe connection to the utility grid is in-terruptedA stand-alone grid or a very largechange in the power frequency wasdetected. The inverter has discon-nected from the utility grid.

• Check the grid connection for significantshort-term frequency fluctuations.

• Check the fuses and AC load-break switch.

E36 The residual current is too highA ground fault has occurred.

• Check the groundings.• Check the PV system for ground faults (see

Section 12.2, page 62).• If this message is repeated frequently,

contact the Service (see Section 15"Contact", page 72).

E37 V,pv overvoltageSurge at the DC input

• Check whether the DC voltage is below themaximum input voltage of the inverter. Ifthe DC voltage is below the maximum inputvoltage of the inverter, reconnect the DCconnectors to the inverter.

• If the DC voltage exceeds the maximuminput voltage of the inverter, ensure that thePV array has been correctly rated orcontact the installer of the PV array.

• If this message is repeated frequently,contact the Service (see Section 15"Contact", page 72).

Page 61: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 TroubleshootingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 61

Eventnumber

Message, cause Corrective measures

E38 Isolation faultThe inverter has detected a groundfault in the PV array

• Check the PV system for ground faults (seeSection 12.2, page 62).

• If this message is repeated frequently,contact the Service (see Section 15"Contact", page 72).

E40 OvertemperatureTemperature inside the inverter is toohigh. The inverter has switched off dueto excessive temperature.

• Clean the cooling fins on the rear of theenclosure and the air ducts on the top usinga soft brush.

• Ensure that the inverter has sufficientventilation.

• Ensure that the ambient temperature doesnot exceed +60 °.

• Ensure that the inverter is not exposed todirect solar irradiation.

• Clean the fan and replace it, if necessary(see Section 12.4, page 65).

E41 Consistent Fault: Vac differentDifferent grid voltages detected

• If this message is repeated frequently,contact the Service (see Section 15"Contact", page 72).

E42 Consistent Fault: Fac differentDifferent grid frequencies detected

E43 Consistent Fault: Residual currentdifferentDifferent reverse currents detected

E44 Consistent Fault: DC injection dif-ferentDifferent DC components detected

E46 Too high DC bus voltageBUS voltage too high

• Check the PV system for ground faults (seeSection 12.2, page 62).

• If this message is repeated frequently,contact the Service (see Section 15"Contact", page 72).

Page 62: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 Troubleshooting SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1062

Eventnumber

Message, cause Corrective measures

E48 Average volt of ten minutes out ofrangeThe 10-minute mean value of the gridvoltage is outside the permitted range.The grid voltage or grid impedance atthe connection point is too high. Theinverter disconnects from the utilitygrid to maintain power quality.

• During the feed-in operation, checkwhether the grid voltage at the connectionpoint of the inverter is permanently in thepermissible range.If the grid voltage is outside the permissiblerange due to local grid conditions, contactthe grid operator. The grid operator mustagree with an adjustment of the voltage atthe feed-in point or with a change of themonitored operating limits.If the grid voltage is permanently within thepermissible range and this message is stilldisplayed, contact the Service (seeSection 15 "Contact", page 72).

W151 SPD defective • Contact the Service (see Section 15"Contact", page 72).W156 Internal fan abnormal

W157 External fan 1 abnormal • Clean the fan and replace it, if necessary(see Section 12.4, page 65).

• Contact the Service (see Section 15"Contact", page 72).

W158 External fan 2 abnormal

W161 Fuse abnormal • Check the fuses and replace them ifnecessary (see Section 12.3, page 64).

W163 PV string abnormalThe DC current of the string is outsidethe common range 70% to 100%.

• Contact the Service (see Section 15"Contact", page 72).

W166 CPU selftest warning - register ab-normal

W167 CPU selftest warning – RAM ab-normal

W168 CPU selftest warning – ROM ab-normal

12.2 Checking the PV System for Ground Faults

NOTICEDestruction of the measuring device due to overvoltage

• Only use measuring devices with a DC input voltage range of 1000 V or higher.

Page 63: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 TroubleshootingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 63

Procedure:In order to check the PV system for ground faults, perform the following actions in the prescribedorder. The exact procedure is described in the following sections.

• Check the PV system for ground faults by measuring the voltage.• If the voltage measurement was not successful, check the PV system via insulation resistance

measurement for ground faults.

Test by Measuring the VoltageProceed as follows to check each string in the PV system for ground faults.

Procedure:

1. DANGERDanger to life due to high voltages

• Disconnect the inverter from all voltage sources (see Section 10, page 57).

2. Measure the voltages:• Measure the voltage between the positive terminal and the ground potential (PE).• Measure the voltage between the negative terminal and the ground potential (PE).• Measure the voltage between the positive and negative terminals.

If the following results are present at the same time, there is a ground fault in the PVsystem:

☑ All measured voltages are stable.☑ The sum of the two voltages to ground potential is approximately equal to the

voltage between the positive and negative terminals.• If a ground fault is present, determine the location of the ground fault via the ratio of the

two measured voltages and eliminate the ground fault.

Example: Location of the ground faultThe example shows a ground fault between the second and third PV module.

3. If a definite ground fault cannot be measured and the message is still displayed, measure theinsulation resistance.

4. Reconnect the strings without ground faults to the inverter and recommission the inverter.

Test by Measuring the Insulation ResistanceIf the voltage measurement does not provide sufficient evidence of a ground fault, the insulationresistance measurement can provide more exact results.

Required devices:☐ Suitable device for safe disconnection and short-circuiting☐ Measuring device for insulation resistance

Procedure:1. Calculate the expected insulation resistance per string.

Page 64: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 Troubleshooting SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1064

2. DANGERDanger to life due to high voltages

• Disconnect the inverter from all voltage sources (see Section 10, page 57).

3. Install the short circuit device.4. Connect the measuring device for insulation resistance.5. Short-circuit the first string.6. Set the test voltage. The test voltage should be as close as possible to the maximum system

voltage of the PV modules but must not exceed it (see datasheet of the PV modules).7. Measure the insulation resistance.8. Eliminate the short circuit.9. Measure the remaining strings in the same manner.

☑ If the insulation resistance of a string deviates considerably from the theoreticallycalculated value, there is a ground fault present in that string.

10. Reconnect to the inverter only those strings from which the ground fault has been eliminated.11. Reconnect all other strings to the inverter.12. Recommission the inverter.13. If the inverter still displays an insulation error, contact the Service (see Section 15 "Contact",

page 72). The PV modules might not be suitable for the inverter in the present quantity.

12.3 Replacing Fuses

1. DANGERDanger to life due to high voltages

• Disconnect the inverter from all voltage sources (see Section 10, page 57).

2. CAUTIONRisk of burns due to hot enclosure parts

• Wait 30 minutes for the enclosure to cool down.

3. Ensure that the circuit breaker is switched off from all three line conductors and that it cannotbe reconnected.

4. Disassemble the DC connectors Disassembling the DC Connectors.

Page 65: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 TroubleshootingSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 65

5. Remove all screws of the lower enclosure lid using aTorx screwdriver (TX 25) and remove the enclosurelid.

0

I

Esc

6x6x

6. Use a suitable measuring device to ensure that no voltage is present at the AC connection.7. For each string, check the fuse for continuity using a testing device.8. Replace damaged fuses:

• Pull out the damaged fuse carefully.

• Insert the new fuse.9. Recommission the inverter (see Section 7.1, page 40).

12.4 Cleaning or Replacing the Fans

1. DANGERDanger to life due to high voltages

• Disconnect the inverter from all voltage sources (see Section 10, page 57).

2. CAUTIONRisk of burns due to hot enclosure parts

• Wait 30 minutes for the enclosure to cool down.

3. On both sides of the inverter loosen the screws of the fan guards using a Torx screwdriver(TX 25).

Page 66: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

12 Troubleshooting SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1066

4. Pull the fan guards 50 mm out of the ventilationshaft.

Esc

5. Disconnect the terminal of the fans using ascrewdriver (blade width: 3.5 mm) from the jack.

6. Remove the fan guards.7. Clean the fans and the fan guards.8. Replace the fans, if necessary.9. Slide the fan guards into the ventilation shaft.

10. Insert the terminal of the fans into the jack.11. Tighten (torque: 2.5 Nm) the screws of the fan guards using a Torx screwdriver (TX 25).12. Recommission the inverter (see Section 7.1, page 40).

Page 67: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

13 Decommissioning the InverterSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 67

13 Decommissioning the Inverter

To decommission the inverter completely upon completion of its service life, proceed as describedin this Section.

CAUTIONRisk of injury when lifting the inverter, or if it is droppedThe inverter weighs 63 kg. There is risk of injury if the inverter is lifted incorrectly or droppedwhile being transported or when attaching it to or removing it from the wall mounting bracket.

• Transport and lift the inverter carefully.

Procedure:

1. DANGERDanger to life due to high voltages

• Disconnect the inverter from all voltage sources (see Section 10, page 57).

2. CAUTIONRisk of burns due to hot enclosure parts

• Wait 30 minutes for the enclosure to cool down.

3. Ensure that the circuit breaker is switched off from all three line conductors and that it cannotbe reconnected.

4. Disassemble the DC connectors Disassembling the DC Connectors.5. Remove all screws of the lower enclosure lid using a

Torx screwdriver (TX 25) and remove the enclosurelid.

0

I

Esc

6x6x

6. Use a suitable measuring device to ensure that no voltage is present at the AC connection.7. Disassemble the AC connection.8. Unscrew the swivel nut from the cable gland for the AC connection at the connector cap (AF:

60 mm).9. Remove the AC cable.

10. Screw the swivel nut onto the cable gland for the AC connection.11. Unscrew the swivel nut for the network cable.12. Release the network cable plug and pull it out of the jack of the communication assembly.

Page 68: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

13 Decommissioning the Inverter SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1068

13. Take the cable support sleeve out of the threaded sleeve and remove the network cable fromthe cable support sleeve.

14. Lead the network cable out of the swivel nut.15. Screw the swivel nut onto the network port.16. If an additional grounding or an equipotential bonding is connected to the inverter, remove

the pan head screw M6x12 and remove the grounding cable.17. Using a Torx screwdriver (TX 25), unscrew the left- and right-hand pan head screws M5 used

to secure the inverter to the wall mounting bracket.18. Remove the inverter by lifting it vertically up and off the wall mounting bracket.19. Unscrew the screws for fastening the wall mounting bracket and remove the wall mounting

bracket.20. If the inverter is to be stored or shipped, pack the inverter, the AC connector, the DC connector

and the wall mounting bracket. Use the original packaging or packaging that is suitable forthe weight and dimensions of the inverter.

21. Dispose of the inverter in accordance with the locally applicable disposal regulations forelectronic waste.

Page 69: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

14 Technical DataSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 69

14 Technical DataDC Input

SOLID-Q 50 SOLID-Q PRO 60Maximum PV array power 62500 Wp (STC) 81000 Wp (STC)

Maximum DC power at cos φ = 1 56120 W 67350 W

DC rated power 51020 W 61200 W

Maximum input voltage 1000 V 1000 V

MPP voltage range 200 V to 950 V 200 V to 950 V

Rated input voltage 625 V 735 V

Minimum input voltage 200 V 200 V

Initial input voltage 300 V 300 V

Maximum input current, input A 30 A 40 A

Maximum input current, input B 30 A 40 A

Maximum input current, input C 40 A 40 A

Maximum short-circuit current, input A 45 A 60 A

Maximum short-circuit current, input B 45 A 60 A

Maximum short-circuit current, input C 60 A 60 A

Maximum input current per string 12 A 12 A

Number of independent MPP inputs 3 3

Strings per MPP input, input A 3 4

Strings per MPP input, input B 3 4

Strings per MPP input, input C 4 4

Overvoltage category in accordance withIEC 62109-1

II II

AC OutputSOLID-Q 50 SOLID-Q PRO 60

Rated power 50000 W 60000 W

Maximum apparent AC power 55000 VA 66000 VA

Nominal AC voltage 3 / N / PE;220 V / 380 V

3 / N / PE;230 V / 400 V

3 / PE; 480 V

AC voltage range* 160 V to 300 V (L-N) 277 V to 572 V (L-L)

Page 70: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

14 Technical Data SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1070

SOLID-Q 50 SOLID-Q PRO 60AC power frequency* 50 Hz / 60 Hz 50 Hz / 60 Hz

Operating range at AC power frequency 50 Hz 45 Hz to 55 Hz 45 Hz to 55 Hz

Operating range at AC power frequency 60 Hz 55 Hz to 65 Hz 55 Hz to 65 Hz

Maximum output current 80 A 80 A

AC rated current 75.8 A 72.2 A

Power factor at rated power 1 1

Displacement power factor cos φ, adjustable 0.8 overexcited to 0.8underexcited

0.8 overexcited to 0.8underexcited

Total harmonic distortion of the output currentwith total harmonic distortion of the AC voltage<2%, and AC power >50% of the rated power

≤3 % ≤3 %

Feed-in phases 3 3

Phase connection 3 3

Overvoltage category in accordance withIEC 62109-1

III III

* Depending on the configured country data set

EfficiencyMaximum efficiency, ηmax >98.3 %

European weighted efficiency, ηEU >98.0 %

CNCA/CTS 0002-2014: Chinese efficiency,ηCN

>98.0 %

Protective DevicesDC switch-disconnector Available

Ground fault monitoring Available

DC overvoltage protection Surge arrester type II

DC reverse polarity protection Available

AC short-circuit current capability Available

Galvanic isolation Not available

All-pole sensitive residual-current monitoring unit Available

Protection class in accordance withIEC 62109-1

I

Page 71: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

14 Technical DataSMA New Energy (Jiangsu) Co., Ltd.

Operating manual SMASolid-Q50-60-IN-BE-en-10 71

General DataWidth x height x depth 510 mm x 790 mm x 265 mm

Weight 63 kg

Operating temperature range -25°C to +60°C

Maximum operating altitude above mean sealevel (MSL)

3000 m

Derating operating altitude above mean sealevel (MSL)

3000 m

Typical noise emission 60 dB(A)

Topology Transformerless

Degree of protection for electronics in accor-dance with IEC 60529

IP65

Climatic category in accordance withIEC 60721-3-4

4K4H

Maximum permissible value for relative humid-ity, non-condensing

100 %

Protection class in accordance withIEC 62109-1

I

EquipmentDC connection SUNCLIX

AC connection AC connector

Communication: 2 x RS485 / 2 x RS422 As standard

Data bus Modbus

Smart string monitoring As standard

Page 72: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

15 Contact SMA New Energy (Jiangsu) Co., Ltd.

Operating manualSMASolid-Q50-60-IN-BE-en-1072

15 ContactIf you have technical problems with our products, please contact the SMA Service Line. Thefollowing data is required in order to provide you with the necessary assistance:

• Product device type• Product serial number• Product firmware version• Event message• Type and number of PV modules connected• Mounting location and mounting height of the product• Optional equipment, e.g. communication products• Special country-specific settings (if applicable)

China SMA New Energy Technology (Jiangsu) Co., Ltd.No. 198 Xiangyang Road215011 SuzhouService Hotline: +86 400 801 9996

India India SMA Solar India Pvt. Ltd.Mumbai+91 22 61713888

Page 73: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The
Page 74: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The
Page 75: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The
Page 76: Operating manual - SMA SOLID-Q 50 / SMA SOLID-Q PRO 60 · 2 Safety SMA New Energy (Jiangsu) Co., Ltd. 8 SMASolid-Q50-60-IN-BE-en-10 Operating manual 2 Safety 2.1 Intended Use The

www.SMA-China.com