Operational challenges in implementing energy efficiency in existing buildings
Bangko Sentral ng Pilipinas
Engr. Robert B. CabiadActing Deputy Director
Facilities Management and Engineering Department
Vision
A World-class Facility that promotes the
health, comfort and productivity of BSP
employees and other occupants while
maximizing energy efficiency and sustainability
Constructed in 1972
Design by : Arch. Gabriel P Formoso
Total Floor Area: 137,942 sqm
Building footprint area: 21,009 sqm
Pavement and Landscape area: 46,921 sqm
Lot Area: 67,930 sqm
Wall / Window Area ratio: 1/6
BSP Building Facts
The BSP Main Complex in Manila houses the offices of the
Governor, the Monetary Board and the different operating departments/
offices. The Complex has several buildings, namely: 5-Storey
building, Multi-storey building, the EDPC building and the BSP Money
Museum, which showcases the Bank's collection of currencies.
BSP Head Office
The Security Plant Complex which is located in Quezon City houses a
banknote printing plant, a securities printing plant, a mint and a gold
refinery. The banknote printing plant and the mint take care of producing
currency notes and coins, respectively.
BSP Security Plant Complex
BSP Regional Offices and Branches
The BSP has three regional offices performing cash operations, cash
administration, loans and rediscounting, bank supervision and gold
buying operations. These regional offices are located in La Union, Cebu
City and Davao City.
Head Office
Head Office
Head Office
Head Office
Head Office
Head Office
Head Office
Head Office
Head Office
Energy Conservation Measures
In 2001, In line with
the President’s call
for all government
offices and
employees to help in
the austerity program
of the
Government, all
personnel of the
Bank are enjoined to
observe the following
measures;
On Energy
Conservation
On Water
Conservation
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Total 23,9 24,2 25,9 25,6 25,2 22,9 20,2 20,0 18,4 16,6 16,4 15,9 16,1 16,9 17,0 16,7 17,0 16,5
-
5,000,000.00
10,000,000.00
15,000,000.00
20,000,000.00
25,000,000.00
30,000,000.00
Co
nsu
mp
tio
n (
kWH
r)
Electricity consumption (2000-2017)
In 2005, BSP created its first Enercon officer under the DOE; BSP FMED rationalizes its operation
In 2005, DOE launched its Palit-Ilaw Program; BSP changes from 40W to 28W lighting
In 2012, BSP switches to LED (16W) and installs VFDs
Energy Data
Business Case/ Feasibility Study
• Risk Assessment / Alternatives / ROI
Budgeting •Accountability
Procurement •Three Quotations
Implementation •Project Management
Project Implementation Process
Inverters
LED
VFDs
Air Curtains
Automatic Doors
Metering
Energy Star Rated ComputersSolar PV
Window Tints
Building Management System
Auto mode for escalators
2000 20182008 2009 2010 2011 2012 2013 2014 2015 2016 20172007
Magnetic Bearing Chiller
Complete Energy Efficiency Project
Magnetic Chillers
Solar PV
Occupancy Sensors
Full Automation
BERDE Rating (3 Star)
New elevator
with
regenerative
braking system
Metering
Building Re-Wire
Cooling Tower Replacement
2018 2019 2021 2022 2023 2040
Proposed Energy Efficiency Project
2020
Challenges
• Baseline Data
• Quotations
• Long project duration
Energy Campaign
Thank you
Retrofit Fluorescent Lamp with LED (2006-2015) form 40,000 units
40 Watts Flourescent to 28,000 16 Watts LED.
Trim down energy consumption by 72% in Lighting
Trim down energy consumption for Air Conditioning by 72% (Or reduction
of 327 TR of Air Conditioning Load)
Repair of Various Electrical
Equipment - Replacement of
electrical panels at EDPC Building
Upgrade of ATS controllers
New Load break Switches for the BSP Head Complex - ongoing preparation
Installation of power meters with data logging
Upgrading the Electrical System
Upgrading to environmental friendly electric generators
More efficient lighting
Use of mini electric generators
Relocation of Power Center
1. Installation of Variable Frequency Drives on Motor Driven
Equipment, Installation of Magnetic Bearing Chillers, Automatic
Condenser Cleaner, and Full Automation of the HVAC System.
2. Replacement of old equipment such as Air Handling
Units, Pumps, Piping System, and Air Distribution System.
The Annual Energy cost of the Centralized Air Conditoning System
Operation Was Reduced from 73,656,000.00 to 58,924,800.00
during the upgrading process that starts in 2013.
Upgrade the Centralized Air Conditioning
System (2013-present):
Upgrading of Air Conditioning System
Building and Energy Management
Building Management System of the BSP Head Office
1,000 TR Magnetic Bearing Chiller at the BSP Head Office
Utilize more renewable source of energy (bankwide)
PV Cells at the Roofdeck of EDPC Building, BSP Head Office
Improvement in Building Envelope
Optimized envelope
Optimized glazing
Optimized shading
Natural ventilation