March 2013
TSX: MND
Operations and Exploration Tour
This presentation contains "forward-looking statements" within the meaning of applicablesecurities laws, including statements relating to life of mine production plans and explorationplans, the Cerro Bayo restart plan and the growth and strategy of Mandalay. Readers arecautioned not to place undue reliance on forward-looking statements. Actual results anddevelopments may differ materially from those contemplated by these statements depending on,among other things, that exploration results at Cerro Bayo, Costerfield, and La Quebrada may notmeet management’s expectations, that Cerro Bayo and Costerfield capital, production andoperating cost results may not meet current plans, that reclamation costs associated withMandalay’s Furioso property may exceed current estimates, and changes in commodity prices andgeneral market and economic conditions. The factors identified above are not intended torepresent a complete list of the factors that could affect Mandalay. Although Mandalay hasattempted to identify important factors that could cause actual actions, events or results to differmaterially from those described in forward-looking statements, there may be other factors thatcause actions, events or results not to be as anticipated, estimated or intended. There can be noassurance that forward-looking statements will prove to be accurate, as actual results and futureevents could differ materially from those anticipated in such statements. Accordingly, readersshould not place undue reliance on forward-looking statements.
Forward-looking statements
2
Quality control and assurance programs are implemented in line with the standards of NationalInstrument 43-101.
The exploration program at Costerfield on the Augusta Deeps project is supervised by NeilSchunke (Member, AusIMM), a manager of the Company at Costerfield and a Qualified Person asdefined under National Instrument 43-101.
The exploration programs on the Cerro Bayo and La Quebrada projects are supervised by RonaldLuethe (Member, American Institute of Professional Geologists), General Manager of MandalayChile Ltda. and a Qualified Person as defined under National Instrument 43-101. Mr. Luethe hasvisited the Cerro Bayo and La Quebrada projects often during 2010 and 2011 and has supervisedthe collection and interpretation of scientific and technical information contained in thispresentation.
Dr. Mark Sander (COO of Mandalay and member AusIMM) has visited the Costerfield, Cerro Bayo,and La Quebrada projects various times during 2010 and 2011 and has supervised the scientificand technical information contained in this presentation.
Quality Control and Assurance
3
Cerro Bayo District - tour route and stops
4
LEYENDA
Inventario_Vetas_Lineas
Inventario_Vetas_Poligonos
Propiedad_Minera
OPERATIONS
EXPLORATION
Tailings¬«7
CERRO BAYO Overlook¬«1LAGUNA VERDE Overlook¬«2FABIOLA Mine and Vein Outcrop¬«3DAGNY Mine and Vein Outcrop¬«4DELIA Mine and Vein Outcrop¬«5Plant¬«6
Open Pit and low grade (deep?)¬«8Cerro Bayo overlook and viewsouth of Veta Madre, Sinter Hill,Meseta and Aguila¬«9
1) Cerro Bayo Overlook
5
Cerro BayoDome
Guanaco III
Guanaco I
Historic Cerro Bayo veins (e.g. Lucero) on right margin of dome
2) Cerro Bayo: Laguna Verde Area
Producing Mine or Planned mine (Vein Outcrop) Exploration Vein
6
Laguna Verde Area - detail
7
88
3) Fabiola Vein & Outcrops
9
Fabiola Mine
Additional Yasna Vein
Primary Ramp
• Currently Mining on 5 levels• Simple design of primary ramp and 2 raises for
ventilation and escape-way• Minimal operational development to access
Yasna vein and no extra capital development
10
4) Dagny Vein & Outcrops
11
5a) Delia NW Vein & Outcrops
12
5b) Delia SE Vein & Outcrops
5c) Delia Portal & Vein Outcrops
13
View to SE across Portal to Delia SE View to NW of
sheeted veins & main Delia
6) Concentrator
14
Added Q2, 2011
7) Tailings
15
• Permitted dam elevation 320 masl• Actual dam elevation 316 masl• Actual tails elevation 313.5 masl• Permitted and design capacity 2,300 kt• Required capacity for LOM 1,141 kt (including inferred)• Permitted capacity vs LOM 2X• Number of lifts required 2, each of 2 m• Estimated cost of next lift USD930,000 (in plan)
Cerro Bayo District Targets
16
1: TARGET GENERATION 2: BLUE SKY ‐ New Target Testing 3b1: EXTENSIONS/POTENTIAL Neighboring known reserves (Inferred
Resources Definition)
3b2: EXTENSIONS/POTENTIAL Neighboring known reserves (Inferred
Resources Definition)
1a Brillantes 2a Prospecting Laguna Flamenco
Fernanda Esperanza Marcela Zone Gabriela Zone
Roberta Inara Marcela N Gabriela
Constanza Sb Raúl N Gabriela Este
Brillantes Roadside Marcela S Lazo Gaby W
Francisca 2b Mallines W Raul Zone Josefina
1b Pampa La Perra Veta Larga Raul/Cindy Josefina Este
Pilar Mallines W Pascuerito Leyla
Elsa Jermy Raul W Guanaco Zone
Guanaco VII Graciela Cerro Bayo Guanaco I
1c Caiquenes Lourdes W Guanaco I Oeste
Caiquenes IV 3a: UNDERGROUND ‐ Neighboring known reserves (Inferred Resources Definition)
Lucero NW Guanaco II
Caiquenes III Lucero S Taitao
Tranque Dagny to Delia Myriam E Condor I
1d Mallines E Dagny to Fabiola/Yasna Mercedes Condor III
Meseta Fabiola to Coyita/Yasna Cascada Zone Taitao I
Aguila Fabiola to Delia/Dagny Cascada Taitao II
Sinter Hill Cascada E Taitao II Lazo
Leonora Coigues Taitao III Sur
1e Veta Madre Coigües Este Olivia
Madre Coigües Central Laguna Verde Open
Paralela Chinita zone
Segunda Chinita + other
1f Bahía Jara Chatito
1g Laguna Verde
4: INFILL‐ HIGHLY CERTAIN
Marcela Sur
Coyita
1717
Cerro Bayo District - targets
18
Cerro Bayo District – evolving conceptsDeep Level Exposures
Irreg. bx
Multiple generationsqtx veinLarge volume of low grade Ag>Au
High Mo
Mid Level Exposures
Through‐going veins
Quiescent fill??
Limited bx
Limited alteration
Variable Ag> Au, b.m.
Historic mining only on outcropping ore shoots
High Level Exposures
High Au
Intense silicification
Calcite replacement
Hydrothermal bx
Open space fill textures
1919
Approx. 1m
Breccia in pit wall
Py-Mo breccia in pit wall with older & younger qtz. vns.
8) Deep LevelOpen pit: py-mo bx cutting and cut by qtz veins
5 Mt of possibly economic low-grade dumps
Chinita Sector Veins
20
Chinita vn.Partly mined
22.4 g/t Au,5090 g/t Ag
7.1 g/t Au,396 g/t Ag
Chinita split? – 1.8m48.7 g/t Au, 28 g/t Ag
Upper LevelSinter Hill & Veta Madre
21
Sinter Hill
Cascada Vein
Veta Madre
Mandalay Resources – Cerro Bayo
22
1 Source: Roscoe Postle Associates, March 2013, documented in an independent NI 43 – 101 report to be filed within 45 days of March 6, 2013
23