Copyright [insert date set by system] by [CH2M HILL entity] • Company Confidential
OPERATAION & MAINTENANCE OF
WORK ZONES
Santosh Kekane, Sr. Road Safety Audit Engr., CH2MHill
22nd January, 2015.
Presentation to P011 – East Corridor – Contractor Team
Live Bi-lingual (English + Chinese) Training to China Harbour Team
Important Information
• Presentation duration is about 1/2 hour• Ask Questions during presentation - Interactive• Switch off / Silent your mobile phones
CONTENT
3
Note – This presentation is adopted from Ashghal’s WZTMG Training Program with minor changes.
The risks you face working in or next toa roadway are serious but manageable,if a plan is prepared and employedappropriately.
We are striving for consistency in howwe apply traffic control measures so thedriver is reasonably assured of what toexpect and how to respond.
For the worker we want a work zonethat provides first for your safety and forsufficient area to accomplish theintended task, in an efficient andprofessional manner.
WHY ARE WE DISCUSSING
WORK ZONE ?
Conflicts to overcome in Work Zones
WORK ZONE FUNCTIONSAll Work Zones are meant to offer 2 key function at site.
The functions of TTM is to warn, control, protect & guide road users through or around a work zone. –WZTMG Ver. 1.1., 2014
INFORMATION
PROTECTION
O & M of Work Zones
Operational Tools
Installation Procedure
Installation of Traffic Control Devices
Maintenance Tools
Work Zone Checklists
Process Safety Review –Biweekly
Safety Checklist –Twice a week
Working at Night
• Visibility is greatly reduced at night.
• Your risk of getting injured or killed increases in the dark.
• Drivers may be more tired, sleepy, and less attentive.
Hazards & Problems:
• poor visibility
• glare off lights
• adverse weather conditions
• tired drivers
• inattentive workers
Some Bad Practices
At pedestrianized area height of
signs to be minimum 2.1 mGap in
Barriers
No reflective sheeting / delineation
Gap in barriers
Improper Barrier Installation
Poor Sign Face Disconnected barrier
Poor Sign Installation No delineation at Barrier
20