19
Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Embed Size (px)

DESCRIPTION

– Raveling – Crack Resistance Durability Issues 3

Citation preview

Page 1: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Optimizing the Durability and Functionality of PFC Surfaces

Don WatsonTest Track Sponsor MeetingMay 11, 2011

1

Page 2: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Objective• Durability Issues–Raveling–Crack Resistance

• Functionality Issues–Permeability– Smoothness– Structural Value

2

Page 3: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

–Raveling–Crack Resistance

Durability Issues

3

Page 4: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

4

Raveling

Page 5: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Change in Texture with Traffic

5

1.00

1.10

1.20

1.30

1.40

1.50

1.60

1.70

0.00 2.00 4.00 6.00 8.00 10.00

Text

ure

Dept

h (m

m)

ESALs (Million)

N1

N2

N13

S3

S4

S8

Page 6: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Crack Resistance

6

Page 7: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

PFC Surface Cracks (Tack Method)

• 2006 crack susceptible dense Superpave mix– Surface cracks after 1.9M ESALs (Rehab at 5.6M)

• 2009 PFC surface placed with conventional tack– Surface cracks after 2.2M (cracking/pumping at 8.2M)

• 2009 bonded PFC surface placed with spray paver– Surface cracks after 4.1M (looks good at 8.2M)

7

Page 8: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

OGFC Surface Cracks (Tack Method)

Conventional Tack

Bonded

8

Page 9: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

5/2/2011 Crack Maps (N2 / N1)

9

Page 10: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

–Permeability– Smoothness– Structural Value

Functionality Issues

10

Page 11: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Permeability

11

Page 12: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Same Mix Drains Better at 1¼”

N1 - ¾”Bonded

N2 - ¾”Tacked

S8 - 1¼”Tacked

12

Page 13: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Smoothness

13

Page 14: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Change in Smoothness with Traffic

14

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00

IRI (

in/m

i)

ESALs (Millions)

N1

N2

N13

S3

S4

S8

Page 15: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Structural Value

15

Page 16: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Structural Contribution of OGFC

16

Page 17: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Similar Rutting Performance

17

Page 18: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Similar Strain Response

50% RAP

Virgin Mixes

18

Page 19: Optimizing the Durability and Functionality of PFC Surfaces Don Watson Test Track Sponsor Meeting May 11, 2011 1

Questions??

19