3
Option 4

Option 4

  • Upload
    mksk

  • View
    217

  • Download
    0

Embed Size (px)

DESCRIPTION

MSI Studio Books Option. Created By Natalee Brown.

Citation preview

Page 1: Option 4

Option 4

Page 2: Option 4

The Nationwide Arena District Master Plan has served as the guidingdevelopment strategy for a vibrant, new downtown district. Designedaround the focal point of the Nationwide Arena, the district features thenightlife corridor Ludlow Alley, a grand movie theater, a concert venue, a AAA ballpark and restaurants full of atmosphere. In addition, residentialdevelopment establishes the Arena District as an emerging urban neighbor-hood. The Master Plan established a network of streets, open spaces, and an urban development blocks as the basis of this highly successful sports and entertainment destination, on what was once a vacant infill site. Therelationship between the district and the emerging riverfront park system is strengthened by McFerson Commons, a tree-lined triangular connection from the riverfront to the doors of the Arena. Parking structures are hidden within the blocks to protect the pedestrian streetscapes. MSI Design served as the primary consultant for the master planning details, and is responsiblefor all subsequent design and implementation for the district.

Designed around the focal point of the Nationwide Arena, the Streetscape District Plan establishes a network of streets and open spaces that help con-nect all of the unique sports and entertainment features of the district withinthe surrounding urban context. Thorough attention to detail in the selectionof site materials, landscape, site furnishings, custom lighting, and graphics enhance the overall district aesthetic. MSI Design had direct responsibil-ity for setting the design standards of the roadways, sidewalks, and finishgrades and materials throughout the project site. Dedicated to achieving theprimary vision of the project, MSI Design performed a full scope of design services, which began with master planning. In collaboration with projectengineers, MSI Design completed construction documents for over $12million in site improvements and also worked with the City of Columbus and project managers on site observation.

NATIONWIDE ARENA DISTRICT

COLUMBUS, OHIO

Page 3: Option 4

07