  • Oracle e-Business suite r12 upgrade Fact sheet

    FOcus yOur testing eFFOrts & prepare FOr Key impacted areas Using a cloud-based virtual supercomputer, Panaya ran its patent-pending impact analysis on Oracle EBS R12.

    The analysis results were then coupled with impact estimates based on experience with hundreds of real-world Oracle R12 EBS upgrades. If youre an ERP Director preparing for an upgrade to R12, these facts and estimates can help you focus your testing efforts and prepare for key impacted areas.

    Overview of upgrade issues

    Custom Code

    Standard API Changes

    Form Personalization

    Changed DB Objects

    Standard Forms Changes

    Standard Concurrents Changes

    Setup Changes

    ~46% of custom code is unused

    37 standard APIs removed 16 standard APIs changed

    6 personalization need to be replaced (based on deleted forms)

    2 personalization need to be adjusted (based on deleted blocks/fields)

    708 standard objects removed 395 standard objects became obsolete

    110 standard forms removed 198 standard form blocks changed

    87 standard concurrents removed 22 standard concurrents changed or

    became obsolete

    30 Value Sets will be impacted by the upgrade 5 Alerts will be impacted by the upgrade

    To expect on an average Oracle EBS system upgrading to R12 (12.1.3)

    impact distribution by product Family

    2.96%Process Manufacturing

    2.63%CRM

    6.75%Other

    Free analysis of yOur eBs system

    Get your own EBS system analyzed at no charge and see how R12 will impact you.

    Sign up for the free analysis attinyurl.com/PanayaAnalysis

    impact distriButiOn By mOdules

    Financial modules impact distribution

    logistics modules impact distribution

    process manufacturing modules impact distribution

    crm modules impact distribution

    WWW.panayainc.cOm

    58.2%Financials

    29.46%Logistic

    52.25% GL

    79.52% PO

    65.72% GMI

    36.48% OKC

    1.48% PA

    0.34% BOM

    8.27% GME

    0.61% MSC

    8.28% GMF

    11.01% GMD

    6.79% MSC

    2.49% Other

    0.67% Other

    6.72% Other

    14.22% Other

    25.32% AP

    18.46% AR

    18.86% INV

    21.58% CS

    14.21% AST

  • standard api changes What they are: They are Application Program Interfaces, which are standard stored procedure, package or functions created for performing specific activities in the Oracle EBS. These are designed to integrate between non-Oracle systems and Oracle EBS or to extend the functionality of the base products.

    How theyre affected by an upgrade: Although they should have remained valid from release to release, and patches should have not altered the API behavior, Panaya found that EBS customers will find as many as 37 standard APIs have been removed after upgrading to R12 and as many as 16 APIs became obsolete.

    FOrm persOnaliZatiOn What they are: With the Oracle EBS release 11.5.10, Oracle has introduced a mechanism which revolutionizes the way forms can be customized to fulfill customer needs. Oracle has provided a simple and easy feature to implement customer specific requirements without modifying the underlying forms code. The personalization feature provided in the latest release is easy, faster and requires minimum development effort.

    How theyre affected by an upgrade: Due to the fact that form personalization is aimed to change standard form behavior, it is very sensitive to any changes made in the forms. If a form, form block or field were deleted or changed, the personalization can be impacted. Oracle customers will find as many as 8 form personalizations that need to be handled during an R12 upgrade.

    standard FOrms changeWhat they are: Forms are used to view and edit data in database-driven applications. Oracle EBS uses thousands of forms to provide all the business logic in its different modules. These forms are the front end user interface to oracle EBS users, which are used on a daily basis for executing organizational business processes.

    How theyre affected by an upgrade: As Oracle EBS forms are frequently used on a daily basis by users, they are very sensitive to any user interface changes. Such changes need to be handled first of all by the IT staff to understand the nature of these changes, test them and adapt them to the organizational business processes. From a training perspective, users need to be trained on the changes in the Forms to help them adapt to their new functionalities.

    changed dB OBJects What they are: Oracle provides powerful customization technologies for the Oracle standard processes, to fit the organization needs. Most of these customizations query the relevant information from Oracles standard database objects such as tables, views and more.

    How theyre affected by an upgrade: Due to the fact that in the R12 release Oracle implemented major changes in the core architecture (e.g. EBS Suite Tax Management and Sub Ledger Accounting), many tables, views and other objects were impacted. Oracle customers will find as many as 708 standard objects removed after upgrading to R12 and as many as 395 objects that became obsolete. Obsolete objects are especially hard to identify, because the objects exist in R12 but are no longer supported by Oracle and new data will not be documented any more in these objects.

    standard cOncurrent change What they are: Concurrent Processing is a feature of Oracle EBS that lets you perform multiple tasks simultaneously. Oracle EBS Concurrent Processing lets you run long, data-dependent functions at the same time as your users perform online operations. Typically, a concurrent program is a long-running, data-intensive task, such as posting a journal or generating a report.

    How theyre affected by an upgrade: Oracle customers will find as many as 87 standard Concurrents removed after upgrading to R12 and as many as 22 standard Concurrents that change or became obsolete. Typically, business critical processes are being handling by these Concurrents and must be handled by the organization during the upgrade.

    Oracle is a registered trademark of Oracle. Oracle and other Oracle products

    and services mentioned herein as well as their respective logos are trademarks

    or registered trademarks of Oracle.

    Oracle e-Business suite r12 upgrade Fact sheet

    WWW.panayainc.cOm

    about panaya Panaya's software-as-a-service helps companies that use SAP or Oracle reduce 80% of their upgrade and testing risk and effort. Utilizing a

    cloud-based supercomputer, Panaya simulates the upcoming upgrade, automatically pinpointing which custom programs will break as a result

    of the upgrade and automatically fixing most of these problems. Panayas testing solutions dramatically expedite ERP testing and eliminate

    the need for manual test script maintenance. Seamlessly capturing business knowledge in the background, as users work with the ERP

    applications, Panaya automatically generates plain-English test scripts that are rapidly executed and continually self-adjust based on test results.

    For further information visit our website.