11
PT. Mora Taiamat ika I ndonesia Grha9, JalaiiPanat ar anNo9Proklsmasi ( 021) 3199 8600morateli ndo Jakar t a Pusat 10320 - Indonesia.O www.mor at et i ndo.co.id O @moratet i ndo Nomor : 004/ MTI/CORSEC/EXT/I I/2018Jakarta, 19 Februar i 2018 Lampiran : 2 ( dua) berkas KepadaYth. PT. Bursa Efek Indonesia Indonesia St ock Exchange Buil di ng Jl . Jend. Sudirman Kav 52- 53 Jakart a Selat an 12190, Indonesi a U. p: Kepal a Di vi si Peni l al an Peni sahaan Gr up 3 Per ihal : Perbaikan Lapor an Realisasi Penggunaan Dana Obligasi I Moratelindo Tahun 2017 - per 31 Desember 2017 Sur at i nl kami sampaikan ber dasar kan Pasal 2 ayat 2.4, 2. 5, 2.6, 2.7 ( "Lapor an Real i asasi Penggunaan Dana") pada Akt a Perj anj i an Perwaliamanat an Obl igasi I Mor at eli ndo Tahun 2017 nomor 65, tert anggal 25 Sept ember 2017, ant ar a PT Mor a Telemat i ka Indonesia ( "Emi ten") dengan PT. Bank Mega Tbk. CWali Amanat ") yang telah di ubah melalui Akta Perubahan I Per janj ian Perwal iamanatan Obl i gasi I Morateli ndo Tahun 2017, nomor 56, t er tanggal 17 November 2017, dibuat dihadapan Di na Chozie, SH., Notar i s Penggant i dar i Notar i s Fathiah Heimi, SH., Not ar i s di Jakar ta (unt uk selanj ut nya disebut "PWA") dan ber dasarkan Per at uran Otorit as j asa Keuangan nomor 30/ POJK04/ 2015 t ent ang Laporan Reali sasi Penggunaan Dana Hasi l Penawar an Vmum (untuk selanjutnya di sebut "POJK 30") dan ber dasar kan per atur an nomor I-E tentang Kewaj i ban Penyampaian I nf ormasi (untuk selanjutnya disebut "IDXI -E) Dengan hor mat, Ber dasarkan PWA, POJK 30, IDX I- E dan merujuk kepada Surat Emit en tentang Laporan Realisasi Penggunaan Dana Obli gasi I Mor atelindo Tahun 2017 - Per 31 Desember 2017 Nomor : 001/ MTI/Corsec/ EXT/l/ 2018 tanggal 12 Januari 2018 ( "Surat Emi ten") dan Surat Ot or i t as Jasa Keuangan tent ang Konf ir masi Laporan Reali sasi Penggunaan Dana Hasi l Penawaran Umum PT Mora Tel emat ika I ndonesia Nomor S-348/ PM.22/2018 tanggal 8 Februari 2018 ( "Sur at OJK") sebagaimana t er l ampi r , mel alui surat ini kami sampaikan pember i tahuan kepada Wal i Amanat dan PT Bur sa Efek I ndonesia mengenai Perbai kan Laporan Realisasi Penggunaan Dana Obli gasi I Moratelindo Tahun 2017 - pPer 31 Desember 2017 ( "Perbai kan LRPD") . Perbaikan LRPD sebagai mana di maksud paragrap di atas, di maksudkan untuk member ikan inf ormasi mengenai rinci an biaya yang t elah di kel uarkan oleh Emi t en daiam r angka pel aksanaan penawaran umum guna memenuhi ketentuan POJK 30 pada Pasal 15 BAB IV Pengungkapan Bi aya Emi si . Apabila memerlukan informasi lebi h lanj ut mengenai hal ini, mohon dapat menghubungi Bapak Henry Rizard Rumopa ( 081310278078 - henry.rumopa@moratelindo.co.i d at au corsec@morat eli ndo.co. id) t er kait infor masi mengenai i su hukum dan Bapak Genta Andika Put ra (081287667934 - genta. putra@morat eli ndo.co.i d) ter kai t inf ormasi mengenai i su keuangan dan akunt ansi . or at eli ndo

oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

PT. Mora Taiamatika IndonesiaGrha9,JalaiiPanataranNo9Proklsmasi•(021)3199 8600• moratelindoJakarta Pusat 10320 - Indonesia.O www.moratetindo.co.id O @moratetindo

Nomor: 004/MTI/CORSEC/EXT/II/2018Jakarta, 19 Februari 2018Lampiran : 2 (dua) berkas

KepadaYth.

PT. Bursa Efek IndonesiaIndonesia Stock Exchange BuildingJl.Jend. Sudirman Kav 52-53Jakarta Selatan 12190, IndonesiaU.p: Kepala Divisi Penilalan Penisahaan Grup 3

Perihal: Perbaikan Laporan Realisasi Penggunaan Dana Obligasi I Moratelindo Tahun2017 - per 31 Desember 2017

Surat inl kami sampaikan berdasarkan Pasal 2 ayat 2.4, 2.5, 2.6, 2.7 ("Laporan Realiasasi

Penggunaan Dana") pada Akta Perjanjian Perwaliamanatan Obligasi I Moratelindo Tahun 2017nomor 65, tertanggal 25 September 2017, antara PT Mora Telematika Indonesia ("Emiten")dengan PT. Bank Mega Tbk. CWali Amanat") yang telah diubah melalui Akta Perubahan IPerjanjian Perwaliamanatan Obligasi I Moratelindo Tahun 2017, nomor 56, tertanggal 17November 2017, dibuat dihadapan Dina Chozie, SH., Notaris Pengganti dari Notaris FathiahHeimi, SH., Notaris di Jakarta (untuk selanjutnya disebut "PWA") dan berdasarkan PeraturanOtoritas jasa Keuangan nomor 30/POJK04/2015 tentang Laporan Realisasi Penggunaan DanaHasil Penawaran Vmum (untuk selanjutnya disebut "POJK 30") dan berdasarkan peraturan

nomor I-E tentang Kewajiban Penyampaian Informasi (untuk selanjutnya disebut "IDXI-E)

Dengan hormat,

Berdasarkan PWA, POJK 30, IDX I-E dan merujuk kepada Surat Emiten tentang LaporanRealisasi Penggunaan Dana Obligasi I Moratelindo Tahun 2017 - Per 31 Desember 2017 Nomor:001/MTI/Corsec/EXT/l/2018 tanggal 12 Januari 2018 ("Surat Emiten") dan Surat OtoritasJasa Keuangan tentang Konfirmasi Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum

PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("SuratOJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan kepada WaliAmanat dan PT Bursa Efek Indonesia mengenai Perbaikan Laporan Realisasi Penggunaan DanaObligasi I Moratelindo Tahun 2017 - pPer 31 Desember 2017 ("Perbaikan LRPD").

Perbaikan LRPD sebagaimana dimaksud paragrap diatas, dimaksudkan untuk memberikaninformasi mengenai rincian biaya yang telah dikeluarkan oleh Emiten daiam rangka

pelaksanaan penawaran umum guna memenuhi ketentuan POJK 30 pada Pasal 15 BAB IVPengungkapan Biaya Emisi.

Apabila memerlukan informasi lebih lanjut mengenai hal ini, mohon dapat menghubungi BapakHenry Rizard Rumopa (081310278078 - [email protected] [email protected]) terkait informasi mengenai isu hukum dan Bapak Genta AndikaPutra (081287667934 - [email protected]) terkait informasi mengenai isu

keuangan dan akuntansi.

oratelindo

Page 2: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

• {021)3199 8600 . • moratelindoO www.morateiindo.co.id O @mofatelindo

PT. Mon Tdematika IndooMiaGiha 9. Jalan Panataran No 9 ProklamasiJakarta Pusat 10320 - Indonesia.

Nama: Henry Rizard Rumopa

Jabatan: Sekretaris PerusahaanJabatan: Wakil Direktur Utama

ra teliPT. Mora Telematika

Demikian kami sampaikan, atas perhatian dan kerjasamanya kami ucapkan terima kasih.

Horraat Kami,

PT Mora Telematika Indonesia

ratelindo

Page 3: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

Kp. : D.04/PM.221222

Gedtmg Sumitro Djojobiidikusumo. Jalan Lopangan BapMng Timur Mo. 2-4 Jakarta 10710Telepun : 021 29600000 (hunting!; Fakaimile ; 021 3857917 (hunting); Sims : ww.ojk.go.id

Nomor : S-3^^/PM.22/2018Jakarta, 8 Februari 2018Sifat: BiasaHal: Konfirmasi Laporan Realisasi Penggunaan Dana Hasil Penawaran

Umum PT Mora Telematika Indonesia

Tth. DireiESl PT Mora Telematika Indonesia ("Peiaeroan")Grha 9 Jl. Panataran No. 9, ProklamasiJakarta 10320

Sehubungan dengan surat Perseroan nomor 001/MTI/Corsec/EXT/I/2018 tanggal12 Januari 2018 perihal Laporan Realisasi Penggunaan Dana Obligasi I MoratelindoTahun 2017 - Per 31 Desember 2017, dapat kami sampaikan hal-hal sebagai berikut:

1.Melalui surat tersebut Perseroan menyampaikan Laporan Realisasi Penggunaan Dana("LRPD") Hasil Penawaran Umum tanggal 31 Desember 2017.

2.Sebagaimana Saudara ketahui, ketentuan terkait Laporan Realisasi Penggunaan

Dana ("LRPD") diatur dalam POJK Nomor 30/POJK.04/2015 tentang LaporanRealisasi Penggunaan Dana Hasil Penawaran Umum, antara lain sebagai berikut:BAB W Pengungkapan Biaya Emisi

PasallSBmiten wajib mengungkapkan rindan biaya gang telah dikeluarkan dalam rangkapelaksanaan Penawaran Umum dalam LRPD.Penjelasan Pasal ISBiaya dimaksud antara lain:

a.Biaya jasa penjaminan (underwriting fee);b.Biaya jasa manajemen Penawaran Umum (management fee);

c Biaya jasa penjualan (selling fee);d.Biaya jasa Profesi Penunjang Pasar Modal;e.Biaya jasa Lembaga Penunjang Pasar Modal;

f.Biaya jasa konsultasi keuangan (financial advisory fee);g.Biaya pendgftaran; dan/atauh. Biaya lain sepanjang telah diungkapkan dalam Prospektus.

3.Berdasarkan penelaahan kami LRPD per 31 Desember 2017 atas Penawaran Umum

Obligasi I Perseroan belum menyampaikan rincian biaya yang telah dikeluarkan

dalam rangka pelaksanaan Penawaran Umum.4.Sehubungan dengan hal tersebut diatas, Perseroan agar menyampaikan revisi LRPD

dimaksud, termasuk rincian biaya yang telah dikeluarkan dalam rangka pelaksanaanPenawaran Umum. Revisi dimaksud agar diterima OJK paling lambat 7 (tujuh) harikerja setelah tanggal surat ini.

5.Selanjutnya, Perseroan juga diingatkan agar memperhatikan dan memenuhiketentuan perihal Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum

sebagaimana diatur dalam POJK Nomor 30/POJK.04/2015.Demikian untuk menjadi perhatian Saudara.

Kepala Departemen PengawasanPasar Modal 2B,

OTORITASJASAKEUANGAN

Page 4: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

4 "11

i i 1i a

i S

!• 1a ^

kil 1la \ a

v\!a a

a a

I "+"

31a i

i 1

}! It Ml

|.i 1a i

1 i 1

! 1i a

mi 11a a

1

Page 5: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

Sebagai Catatan:Berdasakan Prospektus tertanggal 25 November 2017, Bab II

tentang Rencana Penggunaan Dana yang Diperoleh darl Penawaran

Umum, halaman 15, Biaya Iain-Iain adalah sekitar: 0,167%, terdiri

dari:-Biaya Pencatatan di BEI sebesar 0,017 % atau Rp 165.000.000

-Biaya Pendaftaran KSEI sebesar 0,0004% atau Rp 38.500.000

-Biaya Pendaftaran OJK sebesar 0,050% atau sebesar Rp

500.000.000

-percetakan sebesar 0,053% sebesar Rp 533.479.628

-Public Expose sebesar 0,008% atau Rp 75.664.600

-Audit Penjatahan sebesar 0,011% atau Rp 110.000.000

-dan Iain-Iain sekitar sebesar 0,024% atau Rp 242.211.000

12,455,855,228.00Total

1,664,855,228.00

2,035,000,000.00

1,606,000,000.00

825,000,000.00

5,500,000,000.00

825,000,000.00Nilai

biaya lain

biaya jasa konsultasi

keuangan

biaya jasa lembagapenunjang pasa modal

biaya jasa profesi

penunjang pasar modal

Biaya jasa penjualan(selling fee)

Biaya jasa penyelenggaraan

(management fee)

Biaya jasa penjaminan

(underwriting fee)

Jem's biaya

7

6

5

4

3

2

1No

Rincian Biaya Penawaran Umum

Page 6: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

2O-Dec-17

TarwrtBayar ;

Backbone - Jakarta Surabaya

Katwangan -• ' • .•.= .• •;-'^• .-. ; •; , './^-' ' .-.•••.•.•..:.

Rp 102,011,143,002

102,011,143,002.48

NUaiTaglhan(DPP)

Total

017/JMP/XN/2017

NoTagihanJEJARING MITRAPERSADA, PT

Pemasok

1

No

Laporan Reallsasl Penggunaan Dana Hasll Penawaran Umum Obllgasl I Moratelindo 2017 Seri A dan Sari BPT Mora Telematika Indonesia

Investasi Backbone (85%)Per31Desember2017

Page 7: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

20-Dec-17

10-Dec-n

20-Dec-17

2O-Dec-17

2O-Dec-17

2O-Dec-17

20-Dec-17

2O-Dec-17

2O-Dec-17

2O-Dec-17

20-Dec-17

2O-Dec-17

2M>ec-17

20-Dec-17

20-Dec-17

2O-Oec-17

2O-Dec-17

20-0ec-17

2O-DBC-17

20-Dec-17

20-Dec-17

20-Dec-17

2O-Dec-17

20-Dec-17

20-Dec-17

20-Dec-17

2O-Dec-17

20-Dec-17

20-Dec-17

20-Dec-17

2O-Dec-17

2Q-Dec-17

2O-Dec-17

2O-Decl7

Tannal Bayer

Equipment - DP 2O% - Router & Switch Site Ancoi

Equipment - DP 20% - Additional OLT H80O00SCUK01 (Super Control Unit Board),Accessories, H8O5GPFD (16 Ports GPON OLT Interface Board) Support Site SunterIcon

Equipment - DP 20% - Pembelian OLT, ONT, NMS Huawei For 30K HP For JakartaBarat ft Jakarta Selatan - OLT

Equipment - DP 20% - Router Site Piuit

Equipment - OP 20% - Router ft 5witch Srte Cervino

Equipment - DP 20% - Additional OLT H80K24MABO01 (Middle Service ShelfSupport Vector)

Equipment - DP 20% - Additional OLT (Middle Service Shelf Support Vector, 16Ports GPON OLT Interface Board, Accesories ft Service Site Untas Artha

Equipment - DP 20% - Router ft Switch Site Grha9

Equipment - DP 20% - Router Site Cempaka Mas

Equipment - DP 20% - Router Site Bum! Putera

Equipment - DP 20% - OLT Moratel-Jakpro-Rusun Marunda

Equipment - DP 20% - Router Site APT. ITC Kuningan

Equipment- DP 20%-Additional OLTJMiddle Service Shelf Support Vector, SuperControl Unit Board, Accesories Package) SiteTendean

Equipment - DP 20% - Router Site Bll Jakarta

Equipment - DP 20% - Service Router

Equipment - DP 20% - Router Site Wsma BSG

Equipment - DP 20% - Additional OLT 16 Port GPON, Super Control Unit Board,Middle Service Shelf Support Site NDC Jakarta

Equipment - DP 20%- Router & Switch Site Untas Antam

Equipment - DP 20% - Router & Switch Site Bogor

Equipment - DP 20% - Router ft Switch Site iTC Mangga Dua

Equipment - DP 20% - Additional OLT Middle Service Shelf Support Vector SuperControl Unit Board, Accesories, Middle Service Shelf Support HP Site Graha 9

Equipment - DP 20% - Router & Switch Site NIX Jakarta

Equipment - DP 20% - Additional Card CR5D00L4XF72 (4-Port lOGBase LAN/WAN-SFP+ Physical Interface Card (PIC) Router

Equipment - DP 20% - Router Site Karang Asam

Equipment - DP 20% - Router & Switch SiteTendean

Equipment • DP 20% - Router & Switch Site Untas Artha

Equipment - DP 20% - OLT, Accesories, Service Support Site Antam

Equipment - DP 20% - Router & Switch Site Sunter icon

Equipment - DP 20% - Router Site Apt Pemnata Hijau

Equipment - DP 20% - ONT Jakarta Barat & Jakarta Selatan

Equipment - DP 20% - OLT Service Jakarta Barat & Jakarta Selatan

Equipment - DP 20% - Router Site fTC Fatmawati

Equipment - DP 20% -13-U2000

Equipment ^ DP 20% - Router ft Switch Site Cyber

teterangan

ftp 4,992,619,788

60,488,713.87

154,421,181.07

1,277,956,268.28

50,873,324.82

60,488,713.87

154,421,181.07

154,421,181.07

70,697,935.29

48,065,788.93

50,873,324.82

204,597,812.15

50,873,324.82

23,511,910.56

50,873,324.82

272,502,662.40

50,873,324.82

154,421,181.07

60,488,713.87

60,488,713.87

48,065,788.93

23,511,910.56

60,488,713.87

27,035,596.80

50,873,324.82

60,488,713.87

60,488,713.87

23,511,910.56

60,488,713.87

48,065,788.93

852,912,504.00

29,785,703.61

50,873,324.82

513,992,562.39

70,697,935.29

NHalTagHwn(DPP)

Total

PT17101O49

PT17101346

PT171O1126A

PT171O1062

PT17101059

PT17101347

PT17101341

PT17101054

PT17101O66

PT17101063

PT17101050

PT17101O47

PT17101342

PT17101057

PT171O1O51

PT17101061

PT17101345

PT17101046

PT171O1O55

PT17101048

PT17101344

PT17101060

PT17103787

PT1710I056

PT17101058

PT17101053

PT17101343

PT17101064

PT17101065

PT17101128A

PT17101127A

PT17101045

PT17101052

PT17101067

NoTagihan

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT.PT

HUAWEITECHINVESTMENT,PT

HUAWEITECHINVESTMENT.PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENLPT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT. PT

HUAWEITECHINVESTMENT.PT

HUAWEITECHINVESTMENT.PT

HUAWEITECHINVESTM ENL.PT

HUAWEI TECHINVESTMENT.PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT. PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHINVESTMENT, PT

HUAWEITECHNVESTMENT, PT

HUAWEITECHNVESTMENT. PT

HUAWEITECHNVESTMENT.PT

HUAWEITECHNVESTMENT. PT

HUAWEITECHNVESTMENT, PT

HUAWEITECHNVESTMENT, PT

HUAWEITECHNVESTMENT, PT

HUAWEITECHNVESTMENT. PT

HUAWEITECHNVESTMENT. PT

HUAWEITECHNVESTMENT, PT

HUAWEI TECHNVESTMENT,PT

HUAWEITECHNVESTMENT.PT

Pemasok

34

33

32

31

30

29

28

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

tto

mran Realisasi Penggunaan Dana Hasil Penawaran Umum Obligasi I Moratallndo 2017 Seri A dan Sari BPT Mora Telematika Indonesia

Investasl FTTX (5%) - EquipmentPer31Desember2017

Page 8: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27Dec-17

27-Dec-17

27-Dec-17

27-Oec-17

27-Dec-17

27-Dec-17

27-Oec-17

27-Oec-17

27-Dec-17

27-Oec-17

27-Dec-17

27-Dec-17

Tanggal Bayar

Sewa Link LL Cyber o Jl. Merpatl Gn Sahari Kemayoran BW 45Mbps Cust Kantor Imlgrasi Kelas 1 Jakarta Pusat Periode Dec 2017

Sewa Link LL Cyber 1 o Jl. Raya Bojong Indah, Rawa Buaya BW 20Mbps Cust PT. Acset Indonesia Periode Dec 2017

Taglhan atas Kekurangan Link Upgrade POLTEK Ul dari 20 to 100Mbps Refer PO 123012 Periode Dec 2017

Sewa Link Cyber ~ Bekasi, MTISTIE Trisakti - a Bekasi BW 100Mbps Cust YAY Trisakti Periode Dec 2017

Sewa Link Cyber - Wisma DPR Rl Kopo BW 25 Mbps Cust DPR RlPeriode Dec 2017

Sewa Link Renewal Cyber <> Office 88 Kota Casablanca BW 20Mbps Cust PT. Sarana Global Indinesla Refer PO 121836 PeriodeDec 2017

Sewa Link LL IDC Duren 3 <> Office 88 Lantal 37 Jl Casablanca BW20 Mbps Cust PT. Duta Intidaya Periode Dec 2017

Renewal Sewa link Cyber <> Kasablanka (PT. Money Gram)kapasltas 4 Mbps untuk cutomer MIPL (Refer PO 115639) Dec '17

Sewa Link LL POP Wan XP Pekanbaru <> Univ Islam Riau BW 200Mbps Cust Unlv Islam Rlau Periode Dec 2017

Pekerjaan Virtual Machine Service Support Cust PT. Global Artha:utures Periode Dec 2017

Perpanjangan Kebutuhan virtual Machine Service (VPS) Cust PT.Adab Alam Elektronik (Refer PO 126124) Periode Dec 2017

Local loop Upgrade Cyber <> Setia Budi 4 Mbpsperiode Dec '17

Sewa Perangkat AP & Manage Service Untuk Support CustomerUNI5BA Bandung Periode 25 November 2017 - 24 Desember 2017

Sewa Link LL Cyber APJII o Qualcomm Inlernatfonal Indonesia BW20 Mbps Cust MIPL Periode Dec 2017

Perpanjangan Sewa Collo 19" Full Rack dan FR10 A-Add Power FullRack 10 A (Refer PO126869) Periode Dec 2017

nstalasi dan Sewa Link LL BBU 8andung <> JL R.E mattadinata No52 Citarum bandung BW 50 Mbps Cust Yayasan Taruna BaktlPeriode 1-30 Nov 2017

Sewa link Gd.BEJ Tower- Gd.Cyber perlnde Dec 2017

Keterangan

5,500,000.00

5,500,000.00

7,500,000.00

7,925,000.00

7,000,000.00

10,000,000.00

5,000,000.00

2,500,000.00

18,500,000.00

8,626,000.00

6,406,000.00

5,506,000.00

17,200,000.00

13,000,000.00

14,000,000.00

5,000,000.00

9,600,000.00

NHalTagihan(DPP

1712074

1712067

1712071

1712068

1712069

08209/MKT/XH/KK-12/2017R

08631/MICT/XII/KK-12/2017

08197/MKT/XII/KK-12/2017

015/INV/DMNET-PKU/XII/17

CMP18005S7/1217

CMP1800588/1217

CBN0011S94/1217

046/INV-CDC/XH/17

0097/LA/MTI/XH/17

CBN9013549/1217

NV1711000189

1727374

NoTaglhan

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

ENVISION, PT

ENVISION, PT

ENVISION, PT

DUMAIMANDIRINET.PT

CYBERINDOMEGAPERSADA,PT

CYBERINDOMEGAPERSADA.PT

CY8ERIND0ADITAMA, PT

COMET DATACONNECT.PT

CIRCLECOMNUSANTARANDONESIA,PT

CBNNUSANTARA,RT

BITTEKNOIOGINUSANTARA,PT

ARTHAmEKOMINDO,PT

Pemasok

Operaslonal

Operasional

Operaslonal

Operasional

Operasional

Operasional

Operasional

Operasional

Operasional

Operaslonal

Operasional

Operaslonal

Operasional

Operasional

Operasional

Operasional

Operasional

Tlpe

17

IS

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

No

isi Penggunaan Dana HasJI Penawaran Umum ObllgasI I Moratellndo 2017 Sari A dan Serf BPT Mora Telematika Indonesia

Modal Kerja (10%)Per31Desember2017

Page 9: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

Sewa Link LL NIX Ball <> Jl Nangka Denpasar ball BW 100 MbpsCust PT. Sampoerna Telekomunlkaasi Indonesia Periode Dec 2017

By Instalasi dan Sewa Link LL NIX Bali <>JI. Petitenget No 51B,Kuta Utara, Bali BW 10 Mbps Cust PT. Total Bangui PersadaPeriode 20 - 30 Nov 2017

Sewa link Cyber <> Evite Jl. Teuku Umar Cibitung BW 5 Mbps CustPT. Permata Bekasi Sukadana dan PO 126072 - Sewa Link Cyber 1<> Jl Warung Buncit No 8 BW 25 Mbps Cust PT. Giesecke &Devrient Indonesia Periode Dec 2017

Perpanjangan Sewa Management Cable di Omadata PeriodeDesember2017

Biaya CrossConnect SSF Untuk MIPL Periode 1 Khun setelah BAST(12 Feb 2017 -11 Feb 2018) refer SO No 048/SO/MMR/17

Sewa Link MMR <> Capital Place Lt. 6 BW 50 Mbps Cust FT.Cyberindo Aditama Periode Dec 2017

Sewa Link wisma Dharmala <> Mojokerto Ngoro BW 2 Mbps CustMIPL Periode Dec 2017

Sewa Link LL Cyber APJII o Soewarna Park BW 1 Mbps Cust MIPLPeriode Dec 2017

Sewa link LL Cyber APJII o Wlsma raharja BW 1 Mbps Cust MIPLPeriode Dec 2017

Sewa Link batam <> Jl. A. Yani Panbif Industrie Estate Factory BW20 Mbps Cust PT. Reach Network Service Indonesia Periode Dec2017

Sewa Link Cyber - Jl. Inspeksi Cakung Drain Clllncing BW 10 MbpsCust Indosat Periode Dec 2017

Sewa Link LL Inna garuda <> Ruko Casagra Jl Ring Road UtaraYogyakarta BW 75 Mbps Cust PTSolusi Transportasi Indonesia(GRAB) Yogya Periode Dec 2017

Sewa Link SF Jogya o Jl. Babarsari Yogyakarta BW 50 Mbps CustPT. Angkasa Sarana Teknik Komunlkasl Periode Dec 2017

Sewa Link Yogyakarta - Jl. Gerilya tanjung purwekerto BW 10 MbpsCust PT. Jarlngan Multimedia Indonesia Periode Dec 2017

Biaya Perpanjangan Sewa Collocation (Refer PO 119735) PeriodeDec 2017

By Sewa Unk 11 Cyber o Jl. JVgung Karya Tanjung BW 10 MbpsCust PT. Dunia Express Transfndo Periode Dec 2017

Sewa Link LL Downgrade CYber o Jl Kepala Cengklr Raya Blok CFrom 50 to 20 Mbps Cust PT. Mutubeton Pritnax (Refer PO123310}Periode Dec 2017

Sewa Unk Cyber - Gd. Trisakd Cut Mutla BW 120 Mbps CustYayasan Pendidikan Perbanas Jakarta Periode Dec 2017

Sewa Link Lastmile Cyber <> Hotel Narita Jl. KH Hasylm Ashari BW15 Mbps Cust PT. Papandayan Indah Permal Periode Dec 2017

Sewa Link Upgrade dan Relokasi LL Cyber <? Jl. Baru CipendawaBekasi BW15 to 22 Mbps Cost PT. Franks Indonesia Cabang BekaslPeriode Dec 2017

8,000,000.00

6,026,700.00

5,750,000.00

3,500,000.00

6,750,000.00

4,700,000.00

5,100,000.00

3,200,000.00

3,200,000.00

19,200,000.00

11,000,000.00

8,000,000.00

5,000,000.00

1.300,000.00

85,800,000.00

3,500,000.00

3,500.000.00

7,925,000.00

3,965.000.00

4,706,000.00

007/SIAP-INVAII/2017

010/SIAP-INVAI/2017

17/INV.PGDAH/2017

2831

919

CORP/17/12/7523

1531

1533

1534

1532

1530

884B/WL-JCN/17/12

884/WL-JCN/17/12

66/Wl-JCN/17/12

IDC.3D-4911/04-12/17/RC

1712075

1712072

1712073

1712070

1712066

SINERGI INTIANDALANPRIMA.PT

SINERGIINTIANDALANPRIMA.PT

PARSAORANGLOBALDATATRANS,PT

OMADATAINDONESIA

NTT IndonesiaNexcenter

NETTOCYBERINDON ESIA.PT

MEDIANUSAPERMANA, PT

MEDIANUSAPERMANA, PT

MEDIANUSAPERMANA, PT

MEDIANUSAPERMANA, PT

MEDIANUSAPERMANA, FT

JEMBATANCITRANUSANTARA.FT

JEMBATANCITRANUSANTARA,PT

JEMBATANCITRANUSANTARA.PT

IDC INDONESIA.PT

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

GRAHAANUGERAHSEJAHTERA, PT

Operaslonal

Operaslonal

Operaslonal

Operaslonal

Operaslonal

Operasional

Operasional

Operaslonat

Operasional

Operaslonal

Operasional

Operaslonal

Operaslonal

Operaslonal

Operasional

Operasional

Operaslonal

Operaslonal

Operasional

Operaslonal

37

36

35

34

33

32

31

30

29

28

27

26

25

24

23

22

21

20

19

IS

Page 10: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Dec-17

27-Oec-17

27-Oec-17

27-Oec-17

27-Oec-17

27-Oec-17

Sewa Link Cyber Jl. Ir Juanda Clkampek BW 4 Mbaps CustomerBalai Kesehatan Mata Masyarakat Periode Dec 2017

Sewa Link Cyber <> Jl. Marunda Makmur Bekasi Dowgrade From 10Mbps to 3 Mbps Cust PT. Aggreko Energy Service IndonesiaPeriode Dec 2017

Sewa Link LL Cyber o Hotel POP Bandara Jl Jusern Sastranegara,tangerang BW 20 Mbps Cust PT. Kota Bintang Rahayu Periode Dec2017

Sewa Link LL Cyber o Bidakara 2 Lt 18 BW 10 Mbps Cust PT BCAAsia Periode Dec 2017

Sewa Link - Jl. Raden Inten BW 3 Mbps Cust PT. Buena PersadaMining Service Periode Dec 2017

Sewa Link LL cyber o Jl. Matraman Raya, Palmerah BW 4 MbpsCust PT. Balalrung Period Dec 2017

Sewa Link Cyber ** Bogor Jl Padjajaran BW 5 Mbps Cust PT. SaveroIndohotel Nusantara Periode Dec 2017

By Instalasi + By Tahunan + Sewa Shaft Kabel DC Teknovatus BSD,Vault Smart Agri Periode 22 Sept - 21 Dec 2017

Sewa Link Cyber o Jl Kartlni, Margahayu, Bekasi timur Bw 60 MbpsCust Yayasan llomata Stiaml Periode 27 - 30 Nov 2017

Biaya Sewa Cisco Router & Manage Service Support CustomerUNISBA Periode Desember 2017

Biaya Sewa Cisco 29O1-VSEC/K9 Untuk Support Customer CNOOCPeriode Desember 2017 - MRC

Rp 379,835,700

2,000,000.00

1,500,000.00

3,500,000.00

3,000,000.00

2,250,000.00

1,500.000.00

2,500,000.00

4,800,000.00

1,000,000.00

5,100,000.00

3,800,000.00

Total

71628799

71628802

71628826

71628829

71628773

71628834

71628800

328/I5S/XI/20178

027/TDI/XI/2017-fin

10149

10148

WIFIKUINDONESIA, PT

WIFIKUINDONESIA, PT

WIFIKUINDONESIA, PT

WIFIKUINDONESIA, PT

WIFIKUINDONESIA, PT

WIFIKUINDONESIA, PT

WIFIKUINDONESIA, PT

TEKNOVATUSSOLUSISEJAHTERA,PT

TECHNOLOGYDATAINDONESIA.PT

SOLUTECHGLOBAL ASIA

SOLUTECHGLOBAL ASIA

Operasional

Operaslonal

Operaslonal

Operaslonal

Operasional

Operasional

Operaslonal

Operasional

Operaslonal

Operasionat

Operasional

48

47

46

45

44

43

42

41

40

39

38

Page 11: oratelindo · 2020. 2. 12. · PT Mora Telematika Indonesia Nomor S-348/PM.22/2018 tanggal 8 Februari 2018 ("Surat OJK") sebagaimana terlampir, melalui surat ini kami sampaikan pemberitahuan

Slsa Dana Penawaran Umum ObligasJ I Moratelindo 2017 betum diperfunakan karena menyesuaikan progress pembangungunan Prayek Backbone Serat Optik, FTTXdan modal kerja Perseraan

530,160^46^82S80,160^46^350^000^000,000100,000,000.000250,000,000,000

imM* ' "

SaUoltekanlntSIroSfea Dana 0MatiTotalOnCaUARO

BukanAfl UasiBukan Afl ftasiHutaHWHI

3.4Npa6.5% pa•>••

7harllBul^ntomkaWaklM

29Desemtr201711 Desember 2017'̂anaatH^mpaan)

4BR/JCN/256/XII/2017AB 086299Ktyat - .;• V.^./' "

MandirlBTPKBank

DeposftoDeposftomtnnnMl^^MiWM

21

Mn

PT Mora T^ematlka IndonesiaPer31Desember2017