113
Original SHEET NO. 1 -- NSP wISCONSIN NORTHERN STATES POWER COMPANY CANCELS SHEETNO. __ M. RS.C. NO.I GAS -- MICHIGAN , NATURALGAS SERVICE NORTHERNSTATESPOWER COMPANY RATES, RULES & REGULATIONS FOR NATURALGAS SERVICE EFFECTIVE IN GOGEBICCOUNTY Bessemer,City Ironwood,City Wakefield,City Bessemer,Township Ironwood,Township -_ Wakefield,Township ONTONAGONCOUNTY Bergland,Township McMillan,Township IN THE STATEOF MICHIGAN CANCELLED BY ORDER.....c_ ( 2.- ?" 9_. REMOVED BY' _,_ DATE _/--C_-- c_ { -- ISSUED January 1 _ 1987 f/o__ EFFECTIVE FOR SERVICE RENDERED ON ' i{<(jAi'i 021987 AND AFTER Januar.y l, 1987 .. BY: E M THEISEN t_k_ ' ISSUED UNDER AUTHORITY OF THE MICHIGAN •. _. .._ _'_0/,_. /_ PUBLIC SER. COMM. DATED November4, 1986._ PRESIDENT CLAIRE, WISCONSIN. \_ IN CASE NO. EAU U-8493 | r NORTHERN STATES POWER-CANCELLED-202

Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEETNO. 1 --NSP wISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO.

__ M. RS.C. NO.I GAS -- MICHIGAN ,

NATURALGAS SERVICE

NORTHERNSTATESPOWER COMPANY

RATES,RULES & REGULATIONS

FOR

NATURALGAS SERVICE

EFFECTIVE

IN

GOGEBICCOUNTY

Bessemer,CityIronwood,CityWakefield,City

Bessemer,TownshipIronwood,Township

-_ Wakefield,Township

ONTONAGONCOUNTY

Bergland,TownshipMcMillan,Township

IN THE STATE OF

MICHIGAN

CANCELLEDBY

ORDER.....c_(2.- ?"9_.

REMOVEDBY'_,_

DATE _/--C_-- c_ {

-- ISSUED January 1_ 1987 f/o__ EFFECTIVE FOR SERVICE RENDERED ON' i{<(jAi'i021987 AND AFTER Januar.yl, 1987 ..

BY: E M THEISEN t_k_ ' ISSUED UNDERAUTHORITY OF THE MICHIGAN

• . _. ..__'_0/,_. /_ PUBLIC SER. COMM. DATED November4, 1986._PRESIDENT

CLAIRE, WISCONSIN. \_ IN CASE NO.EAU U-8493|

r

NORTHERN STATES POWER-CANCELLED-202

Page 2: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 28th Revised Sheet No. 2NORTHERN STATES POWER COMPANY Cancels 27th Revised Sheet No. 2

(To update sheet numbers and effective dates)

TABLE OF CONTENTS- CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATETitle Sheet First Rev. 1 5-15-01

Table of Contents-Check List Twenty eighth Rev. 2 9-17-02" Third Rev. 3 9-17-02

" Original 4 1-01-87" Twenty third Rev. 5 9-17-02" Original 5.1 9-17-02

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take Second Rev. 13 9-17-024 Gas Cost Recovery Clause Second Rev. 13 9-17-02

4.A Applicability of Clause Second Rev. 13 9-17-02 ff , i }_)."A-.')-.4.B Booked Cost of Gas Second Rev. 13 9-17-Q2- ,_L1,£]7_...............4.B. 1 Booked Cost Included Second Rev. 13 9-17-(J24.B.2 Booked Cost Excluded First Rev. 14 5_28_87[_E_t01,_E[)_g 0Q.__ .......-_

L

4.C Billing Second Rev.15 2-01-9,6 ,n / _, 2_4.D General Conditions Second Rev. 15 2-01-969gi 7._,d_".__(e__"_,______

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refunds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Second Revised 16 9-17-02

6 Termination of Service at

Customer Request Second Revised 16 9-17-02

MIf:HIC_AN pHRI I(; t

Issued September :7, 200_ ERVIC_COMMISSION !_ffective for Service Rendered on and after

I _eptember 17, 2002.

By: M.L. Swenso t ' OCT1 6 2002 rssued_Under Authority Of The MichiganPresident I_.S.C. Dated September 16, 2002

Eau Claire, Wisco: tsinF_L_:__("1"-j_j/\/_ Ii Case No. U-13365

NORTHERN STATES POWER-CANCELLED-203

Page 3: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 27th Revised Sheet No. 2NORTHERN STATES POWER COMPANY Cancels 26th Revised Sheet No. 2

(To update sheet numbers and effective dates)

TABLE OF CONTENTS- CHECK LIST

I

t CA_CEI_I.ED8Y _ ,_ r :_ SHEET EFFECTIVEDESCRIPTIONI NUIvmER DATE

t--i _ t'_ First Rev. 1 5-15-01Table of Contents-C_dei_J_2_stB-'l "_ID _____. Twenty seveth Rev. 2 4-01-02

" Second Rev. 3 2-03-99

,, --__i o / _(__6]_ .... Original 4 1-01-87" ...... _ Twenty second Rev. 5 4-01-02

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99- 2 inch or larger in diameter Original 11 1-01-87

1.C _ Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-8724.C Billing Second Rev. 15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refunds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

Issued August 14, _02 UlCHtGANPUBLIC gffeetive For bills render on and after the firstS_.._ERVICECOf'_MISslON- illing cycle of the April, 2002, billing mouth.

By: M.L. Swens¢ ssued Under Authority Of The MichiganPresident SEP 1 7 2002 '.s.c. Dated July 23, 2002Eau Claire, Wisco sin Case No. U-13222

NORTHERN STATES POWER-CANCELLED-204

Page 4: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 26th Revised Sheet No. 2NORTHERN STATES POWER COMPANY Cancels 25rd Revised Sheet No. 2

(To update sheet numbers and effective dates)

TABLE OF CONTENTS- CHECK LIST

SHEET EFFECTIVEDESCRIPTION CAItCELLEDBYTitle Sheet ORDER_ [3 "2__'7_____,_NUMBER DATE....................... First Rev. 1 05-15-01

TableofContents-CteckLi$1_ y Q._ ........... Twenty sixth Rev. 2 01-01-02,, REh0vLu[ Second Rev. 3 2-03-99

" _ Original 4 1-01-87,, L)AT__ - Twenty first Rev. 5 01-01-02

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11o 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interrupfible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-8724.C Billing Second Rev. 15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refimds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

_ustomer Request Original 16 1-01-87 " -

Issued September 18,2GGI MICHIGANPUBLIC Effective For Service Render on and AfterSERVICECOMMISSION October 1_2001

By: J.L. Larsen Issued Under Authority Of The Michigan

President _AR | _02 P.S.C. Dated May 15, 2001Eau Claire, Wisconsi a In Case No. U-12751

0_p '

NORTHERN STATES POWER-CANCELLED-205

Page 5: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 25th Revised Sheet No. 2NORTHERN STATES POWER COMPANY Cancels 24rd Revised Sheet No. 2

(To update sheet numbers and effective dates)

TABJ_E OF _TF,_TS-CHECK LIST

t CAf',ICELLEDBY [_........SI-mET EFFECTIWDESCRIPTION _ ._ ,._ NUMBER DATETitle Sheet -,m,.: ...... _'=])3"s_ First Rev. 1 05-15-01

Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99

" ............. Original 4 1-01-87" Twentieth Rev. 5 10-01-01

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-8724.C Billing Second Rev. 15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refunds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

UlOtllP_ltl DIII_I IP

Issued September 18, 2001 SERVlC_C0MMISSl0N Effective For Service Render on and AfterOctober 1, 2001Issued Under Authority Of The Michigan

By: J.L. Larsen _AR | 200_President P.S.C. Dated May 15, 2001Eau Claire, Wisconsil In Case No. U-12751

NORTHERN STATES POWER-CANCELLED-206

Page 6: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 24th Revised Sheet No. 2NORTHERN STATES POWER COMPANY Cancels 23rd Revised Sheet No. 2

(To update sheet numbers and effective dates)

TABLE OF CONTENTS- CHECK LIST

ICA.CaLED _ SHEET EFFECTIVEDESCRIPTION ] 0RDEffl-4 I'Z.._ ['7,. ....... NUMBER DATE

/ _ ,,_ First Rev. 1 05-15-01Table of Contents-Ctleg_"_[_-tD B¥_ Twenty fourth Rev. 2 7-01-01

,, l ] Second Rev. 3 2-03-99,, ;-.-_ _ ! _ o%. - Original4 1-01-87" ............. Nineteenth Rev. 5 7-01-01

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DES CRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-87

24.C Billing Second Rev. 15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refunds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

' _ Effective For Service Render on and AfterIssued August 16, 20111 SERVICEC0M_ISSl0NJuly 01, 2001

By: J.L. Larsen Issued Under Authority Of The MichiganPresident SEP 4 2001 P.S.C. Dated May 15, 2001Eau Claire, Wisconsi In Case No. U-12751

FILED_

NORTHERN STATES POWER-CANCELLED-207

Page 7: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 23rd Revised Sheet No. 2NORTHERN STATES POWER COMPANY Cancels 22nd Revised Sheet No. 2

(To update sheet numbers and effective dates)

TABLE OF CONTENTS- CHECK LIST

CANCELLEDBY SHEET EFFECTIVEDESCRIPTION ORDER_ . -_-_- NUMBER DATETitle Sheet tl r_# First Rev. 1 05-15-01Table of Contents-ChegI_!C_ BY Twenty third Rev. 2 05-15-01

I!

,, :_TE___ " q--_ Second Rev. 3 2-03-99- .. Original 4 1-01-87

" - Eighteenth Rev. 5 05-15-01Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-87

24.C Billing Second Rev. 15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refunds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

Effective For Service Render on and AfterIssued August 16, 2 El01 SERVICECOMMISSIONMay 15, 2001

By: J.L. Larsen Issued Under Authority Of The MichiganPresident SEP 4 200| P.S.C. Dated May 15, 2001Eau Claire, Wisconsin In Case No. U-12751

FILED _'_

NORTHERN STATES POWER-CANCELLED-208

Page 8: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

I

NSP WISCONSIN 22nd Revised Sheet No. 2

Northern States Power Company Cancels 21th Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVE

DESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87Table of Contents-Check List Twenty second Rev. 2 10-01-00 R

" Second Rev. 3 2-03-99

" Original 4 1-01-87" Seventeenth Rev. 5 10-01-00 R

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONS ___ -

°°/RULE SHEET EFFECTIV__

__ :_ t:7 =z_r-rl c'_

NUMBER DESCRIPTION NUMBER DATE _ _: := T-

1 Extension Rules and Procedures Original 8 1-01-87 : 1,_ _ _ _1.A Mains -<

- 2 inch or less in diameter Original 8 1-01-87 ,- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-87 :1.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-87 ,,1.F Groups of Customers Original 12 1-01-87 .2 Availability of In{ermptible Gas Original 12 1-01-87 tn

3 Penalty for Unauthorized Take First Rev. 13 5-28-87 __ _ _:____

4 Gas Cost Recovery Clause First Rev. 13 5-28-87 l,o _4.A Applicability of Clause First Rev. 13 5-28-87 I_ _4.B Booked Cost of Gas First Rev. 13 5-28=87 m _ ==

II4.B. 1 Booked Cost Included First Rev. 13 5-28-87 _z4.B.2 Booked Cost Excluded First Rev. 14 5-28-87

p

24.C Billing Second Rev. 15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refunds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

ISSUED October 17, 2000.BY: J. L. Larsen

PRESIDENT

EAU CLAIRE, WISCONSIN

NORTHERN STATES POWER-CANCELLED-209

Page 9: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP w,sco s,N 21st Revised Sheet No. 2

Northern States Power Company Cancels 20th Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVE

DESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87Table of Contents-Check List Twenty First Rev. 2 4-01-00 R

" Second Rev. 3 2-03-99

" Original 4 1-01-87" Sixteenth Rev. 5 4-01-00 R

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-87 -

1.A Mains ._ _- 2 inch or less in diameter Original 8 1-01-87 '_ _ m=_ _

- over 2 inch in diameter Original 9 1-01-87 _. _" ff_1.B Services o _ _

- less than 2 inch in diameter Second Rev. 10 7-17-99 _" -_ to _

- 2 inch or larger in diameter Original 11 1-01-87 _ _ (41.C Extraordinary Investment Original 11 1-01-87 _ _ A_1.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-8712 Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-87 _.,,4.A Applicability of Clause First Rev. 13 5-28-87 ,,_4.B Booked Cost of Gas First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-87 e._ :__:4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 _,. <o

m_24.C Billing Second Rev. 15 2-01-96 o_'>4.D General Conditions Second Rev. 15 2-01-96 _n _:=_:-_4.E Receipt of Refunds Second Rev. 15 2-01-96 ,_4.F GCR Customer Refunds Original 15.1 2-01-96 ="4.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

ISSUED May 16, 2000.

BY: J.L. Larsen

PRESIDENTEAU CLAIRE, WISCONSIN

NORTHERN STATES POWER-CANCELLED-210

Page 10: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP 20th Revised Sheet No. 2

Northern States Power Company Cancels 19th Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CI-IECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87 "------'--'----_o,_ ___1Table of Contents-Check List Eighteenth Rev. 2 2-03-99 _'- _ _ g /--I _ VO C2. /

" Second Rev. 3 2-03-99 In _ _ _ |rrl i'-

" Original 4 1-01-87 Io-.. o /5[_ |" Fifteenth Rev. 5 4-01-99 I'_ _ |_, 1/11"-31

Index of Communities Served Original 6 1-01-87 /_ tk_ !I_x _)!_3 /

Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIV]NUMBER DESCRIPTION NUMBER DATE i

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter Second Rev. 10 7-17-99 R

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-87 -.,, . .4.A Applicability of Clause First Rev. 13 5-28-87 ,,, _4.B Booked Cost of Gas First Rev. 13 5-28-87

4.B.1 Booked Cost Included First Rev. 13 5-28-87 _ _ ,_4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 ,-,-,-

24.C Billing Second Rev. 15 2-01-96 ) _ o,."_4.D General Conditions Second Rev. 15 2-01-96 _ -_ "_ _

4.E Receipt of Refunds Second Rev. 15 2-01-96 I! o,,--4.F GCR Customer Refunds Original 15.1 2-01-96 =4.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at .... :

Customer Request Original 16 1-01- 87

ISSUED July 27, 1999

BY: J.L. LarsenPRESIDENT

EAU CLAIRE, WISCONSIN

NORTHERN STATES POWER-CANCELLED-211

Page 11: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP 19thRevised SheetNo.2Northern States Power Company Cancels 18th Revised Sheet No. 2M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVE

DESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87Table of Contents-Check List Nineteenth Rev. 2 4-01-99 R

" Second Rev. 3 2-03-99

" Original 4 1-01-87" Fifteenth Rev. 5 4-01-99 R

Index of Communities Served Original 6 1-01-87Franchise Data Original 7

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-87 II _ _ :_ _. t1.A Mains I /" _ _ _ |

-2inchorlessindiameter Original8 1-01-87 |___. ,_I_}._=- over 2 inch in diameter Original 9 1-01-87 _ _ o

1.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

-2 inch or larger in diameter Original 11 1-01-87 1___ _/_ t

1.C Extraordinary Investment Original 11 1-01-87I.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-87 _.1.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-87 _-4.A Applicability of Clause First Rev. 13 5-28-87 !g

4.B Booked Cost of Gas First Rev. 13 5-28-87 i(,_, _: _

4.B.1 Booked Cost Included First Rev. 13 5-28-87 _! -_ < _4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 m_'"

24.C Billing Second Rev. 15 2-01-96 oa _:=_4.D General Conditions Second Rev. 15 2-01-96 I _ o,____=4.E Receipt of Refunds Second Rev. 15 2-01-96 ¢._ =_ o4.F GCR Customer Refunds Original 15.1 2-01-96 I4.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

ISSUED April 22, 1999

BY: J.L. Larsen

PRESIDENT

EAU CLAIRE, WISCONSIN

NORTHERN STATES POWER-CANCELLED-212

Page 12: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP WISCONSIN 18th Revised Sheet No. 2

Northern States Power Company Cancels 17th Revised _SheetNo. 2M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87Table of Contents-Check List Eighteenth Rev. 2 2-03-99 R

" Second Rev. 3 2-03-99 R" Original 4 1-01-87" Fourteenth Rev. 5 4-01-98

Index of Communities Served Original 6 1-01-87Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVE _NUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 I-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of&as First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-87

24.C Billing Second Rev.15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964 .F GCR Customer Refunds Original 15.1 2-01-964.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87MICHIGANPUBLIC

ISSUED February 15, 1999 _ _I_0RD£R___ _l __-__ ....!

BY: J.L. Larsen REMOVEDB "PRESIDENT

NORTHERN STATES POWER-CANCELLED-213

Page 13: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 17th Revised Sheet No. 2

Northern States Power Company Cancels 16th Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVE

DESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87Table of Contents-Check List Seventeenth Rev. 2 12-07-98

,, First Rev. 3 6-17-88

,, Original 4 1-01-87,, Fourteenth Rev. 5 4-01-98

Index of Communities Served Original 6 1-01-87Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-87

1.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-87

3 Penalty for Unauthorized Take First Rev. 13 5-28-87 _

4 Gas Cost Recovery Clause First Rev. 13 5-28-87 _ c _I4.A Applicability of Clause First Rev. 13 5-28-87 N: ,r4.B Booked Cost of Gas First Rev. 13 5-28-87

e-'a

4.B.1 Booked Cost Included First Rev. 13 5-28-87 _ -_ "'4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 _ _.-., >_ t

24.C Billing Second Rev.15 2-01-96 _ o_ ,_- =4.D General Conditions Second Rev. 15 2-01-96 -

4.E Receipt of Refunds Third Rev. 15 12-07-984.F GCR Customer Refunds First Rev. 15.1 12-07-984.G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request = Original 16 1-01-87Effective for Service Rendered on

- ' MICHIGANPOSUC........Issued: January 4, 1999 SERVICECOMMISSION and after December 7, 1998

By: J.L. Larsen iI ¢]AH ',_i.1 Issued Under Authority of Michigan

President 0 9 P.S.C. Dated December 7, 1998Eau Claire, Wisconsin In Case No. U-11226-R

FILE , - •-o

NORTHERN STATES POWER-CANCELLED-214

Page 14: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 16th Revised Sheet No. 2

Northern States Power Company Cancels 15th Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87Table of Contents-Check List Sixteenth Rev. 2 4-01-98

" First Rev. 3 6-17-88

" Original 4 1-01-87" Fourteenth Rev. 5 4-01-98

Index of Communities Served Original 6 1-01-87Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DES CRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 1-01-87 i1.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-87I.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-87

4.B Booked Cost of Gas First Rev. 13 5-28-87 _._ _ --°"-4.B.1 Booked Cost Included First Rev. 13 5-28-87 d _ f i4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 Ca _ i ,-, i

24.C Billing Second Rev.15 2-01-96 m>- Yl I4.D General Conditions Second Rev. 15 2-01-96 i c,, _

4.E Receipt of Refunds Second Rev. 15 2-01-96 _ _ _ I

4.F GCR Customer Refunds Original 15.1 2-01-96 _ c=4.G Non-GCR Customer Refunds Original 15.2 2-01-96 '-_ _5 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01- 87

Issued: April 24, 1998 Effective for Service Rendered on

D and after April 1, 1998

By: J.A. Noer Issued Under Authority of MichiganPresident P.S.C. Dated April 14, 1998Eau Claire, Wisconsin In Case No. U-11576

NORTHERN STATES POWER-CANCELLEDL215

Page 15: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 15th Revised Sheet No. 2

Northern States Power Company Cancels 14th Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CRECK LIST

SHEET " EFFECTIVEDESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87Table of Contents-Check List Fifteenth Rev. 2 4-01-97

" First Rev. 3 6-17-88

" Original 4 1-01-87" Thirteenth Rev. 5 4-01-97

• - Index of Communities Served Original 6 1-01-87Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Intermptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas ...... First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-87 ....

4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 _ _ |24.C Billing Second Rev.15 2-01-96 I _ _,i .]4.D General Conditions Second Rev. 15 2-01-96 tin m _- "

4.E Receipt of Refunds Second Rev. 15 2-01-96 _ -4.F GCR Customer Refunds Original 15.1 2-01-96 _ _ _f

4.G Non-GCR Customer Refunds Original 15.2 2-01-96 _ _ ,,'5 Restoration of Service Original 16 1-01-87 ,-9 t56 Termination of Service at

Customer Request Original 16 1-01-87I

Issued: July 3, 1997 _/,/_'_" "O2_,, Effective for Service Rendered on

_._Rx'x_-\_'_ "%__ and after April 1, 1997

By: J.A. Noer r_,,_..,,-ii._i[_=0 CT g _,_Y ( _] Issued Under Authority of the MichiganPresident _" -_Z_-__] P.S.C. Dated May 22, 1997

Eau Claire, Wisconsin _ In Case No. U-11226

/

NORTHERN STATES POWER-CANCELLED-216

Page 16: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 14th Revised Sheet No. 2

Northern States Power Company Cancels 13th Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - Michigan• TABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87Table of Contents-Check List Fourteenth Rev. 2 4-01-96

" First Rev. 3 6-17-88

" Original 4 1-01-87" Twelfth Rev. 5 4-01-96

Index of Communities Served Original 6 1-01-87Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-87

24.C Billing Second Rev. 15 2-0 _,96L._IOELLEDBY

4.D General Conditions Second Rev. 15 2-0 _gER_ (_,,___11_-(_ _4.E Receipt of Refunds Second Rev. 15 2-0 - /_-

4.F GCR Customer Refunds Original 15.1 2-0 -96A0VE0 BY4. G Non-GCR Customer Refunds Original 15.2 2-01 -9_"

5 Restoration of Service Original 16 1-01 "§_TE_ 1{2"_7 _ _ y '6 Termination of Service at . •. -

Customer Request Original 16 1-01-87

Issued: April 30, 1996 _a .... -t Effective for Service Rendered onand after

By: J.A. Noer Issued Under Authority of the MichiganPresident < _ P.S.C. Dated

Eau Claire, Wisconsin __y In Case No.

NORTHERN STATES POWER-CANCELLED-217

Page 17: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 13th Revised Sheet No. 2

Northern States Power Company Cancels 12th First Revised Sheet No. 2

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87Table of Contents-Check List Twelfth Rev. 2 4-01-93

" First Rev. 3 6-17-88

" Original 4 1-01-87" Tenth Rev. 5 4-01-93

Index of Communities Served Original 6 1-01-87Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-87 _1.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B. 1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-87

24.C Billing Second Rev. 15 2-01-964.D General Conditions Second Rev. 15 2-01-96

4.E Receipt of Refunds Second Rev. 15 2-01-964.F GCR Customer Refunds Original 15.1 2-01-964. G Non-GCR Customer Refunds Original 15.2 2-01-965 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

Issued: E ectiveforSerand after ORDER_o//// _ d /

By: J.A. Noer Issued Under Au hority of the MichiganPresident P.S.C. Dated _EMOVEDBY _;_-_4

Eau Claire, Wisconsin _N_"_x_ In Case No. DArE 5"-/g/._{"NORTHERN STATES POWER-CANCELLED-218

Page 18: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin Thirteenth Sheet No. 2

Northern States Power Company Cancels Twelfth Sheet No. 2

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATETitle Sheet Original 1 1-01-87

Table of Contents-Check List Thirteenth Rev. 2 4-01-94" First Rev. 3 6-17-88

" Original 4 1-01-87" Eleventh Rev. 5 4-01-94

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 1-01-871.C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-87

4 Gas Cost Recovery Clause First Rev. 13 5-28-87 [4.A Applicability of Clause First Rev. 13 5-28-87 I

4.B Booked Cost of Gas First Rev. 13 5-28-87 _! _ '

4.B.1 Booked Cost Included First Rev. 13 5-28-87 _ i _a ,_

4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 N_J %24.C Billing First Rev. 15 5-28-87 ._ >4.D General Conditions First Rev. 15 5-28-87 " I _" "_"5 Restoration of Service Original 16 1-01-87 _ "_" _"

6 Termination of Service at o< o_" "',_- _ 'Customer Request __inal 16 1-01-87

,¢z,<h,c,,.f,/ L,,_OX % Effective for Service Rendered on.

Issued: _December 15, 1994 f_'_%??__ and afterApril 1, 1994By: LA. Noer Issued Under Authority of the Michig_

Presid ent ___/_/'__1 0 ]_4]_/ P.S.C. Dated Nov ember 10 , 1994Eau Claire, Wisconsin In Case No. U-10491

NORTHERN STATES POWER-CANCELLED-219

Page 19: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin Twelfth Sheet No. 2

Northern States Power Company Cancels E]eventh SheetNo. 2

M.P.S.C. NO.1 Gas- Michigan

TABLE OF CONTENTS - CHECK LISTSHEET EFFECTIVE

DESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87 -

Table of Contents-Check List Twelfth Rev. 2 4-01-93" First Rev. 3 6-17-88

" Original 4 1-01-87" Tenth Rev. 5 4-01-93

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONSRULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1.B Services- less than 2 inch in diameter First Rev. 10 12-14-88

- 2 inch or larger in diameter Original 11 1-01-871. C Extraordinary Investment Origin_ 11 1-01-871.D Measurement of Extensions Original I1 1-01-871.E Reactivating Service Original 12 1-01-871.F Groups of Customers Original 12 _ 1-01-872 Availability of Interrupfible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-87 _ --'_-!4.A Applicability of Clause First Rev. 13 5-28-87 14.B Booked Cost of Gas First Rev. 13 5-28-87 /4.B. 1 Booked Cost Included First Rev. 13 5-28-87 _ "_"

4.B.2 Booked Cost Excluded First Rev. 14 5-28-87 _-1 _ _>.._._ 124.C Billing First Rev. 15 5-28-87 '%_t "7"4.D General Conditions First Rev. 15 5-28-87 _ _ _,_t. !

5 Restoration of Service Original 16 1-01-87 _ ,6 Termination_ at _ ='= _ .'-

Custo_,le_%_, Original 16 1-01-87 oo__.__._

---_-_ _ EFFECTIVEFORSERVICERENDEREDONIssued June 14, ANDAFTER April 1, 1993

By:J.A. NOER _, ,_',fif/_.}_ ISSUEDUNDERAUTHORITYOF THE MICHIGANPRESIDENT _. - ' P.S.C.DATED May 21, 1993EAUCLAIRE,WISCONSIN_ _ IN CASENO. U-10191-

NORTHERN STATES POWER-CANCELLED-220

Page 20: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

1N_I'S]:) Wisconsin Eleventh SheetNo. 2

Northern States Power Company Cancels Tenth Sheet No. 2

M.P.S.C. NO.1 Gas- Michigan

TABLEOF CONTENTS- CHECKLISTi

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet OriginalI 1-01-87

Table of Contents- Check List EleventhRev. 2 4-01-92" First Rev. 3 6-17-88" Original4 1-01-87" Ninth Rev. 5 4-01-92

Index of CommunitiesServed Original 6 1-01-87

FranchiseData Original7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 ExtensionRules and Procedures Original8 1-01-871.A Mains

- 2 inch or less in diameter Original8 1-01-87- over 2 inch in diameter Original9 1-01-87

I.B Services- less than 2 inch in diameter First Rev. 10 12-14-88- 2 inch or larger in diameter Original 11 1-01-87

1.C ExtraordinaryInvestment Original 11 1-01-87I.D Measurementof Extensions Original 11 1-01-87I.E ReactivatingService Original 12 1-01-87I.F Groups of Customers Original 12 1-01-872 Availabilityof InterruptibleGas Original 12 1-01-873 Penaltyfor UnauthorizedTake First Rev. 13 5-28-874 Gas Cost RecoveryClause First Rev. 13 5-28-874.A Applicabilityof Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-874.C Billing First Rev. 15 5-28-87_4.D GeneralConditions First Rev. 15 5-28-87

.... 5 . R_t^J_ationof Service Original 16 1-01-87

;L_DBY Terminationof Serviceat

O_DE___!lOt_ I ,,.Cus_omer Request Original 16 1-01-87 .'i_'-,,_.., y//_",)_

t_ME -- FFECTIVEFORSERVICERENDEREDON"l" ,,LJ

Issued May 28, i992 fQ_,)_'_'_'_O_NDAFTER April 1, 1992

By:E.J.MoINTYRE I{_{ JUNU2 1992]_JSUEDUNDERAUTHORITYOFTHEMICHIGANPRESIDENT _\__\__,_,¢?¢_7 /t.t_F_.S.C.DATED May 6, 1992

EAU CLAIRE,WISCONSIN _ CASE NO. U-I0027

NORTHERN STATES POWER-CANCELLED-221

Page 21: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Wisconsin Tenth SheetNo. 2

Northern States Power Company Cancels Ninth SheetNo. 2

JI.P.S.C.NO.1 Gas- MichiganTABLEOF CONTENTS- CHECKLIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87

Table of Contents- Check List Tenth Rev. 2 4-01-91" First Rev. 3 6-17-88" Original 4 1-01-87" Eighth Rev. 5 4-01-91

Index of CommunitiesServed Original6 1-01-87

FranchiseData Original 7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 ExtensionRules and Procedures Original8 1-01-87I.A Mains

- 2 inch or less in diameter Original8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter First Rev. 10 12-14-88- 2 inch or larger in diameter Original 11 1-01-87

I.C ExtraordinaryInvestment Original 11 1-01-87I.D Measurementof Extensions Original 11 1-01-87I.E ReactivatingService Original 12 1-01-87I.F Groupsof Customers Original 12 1-01-872 Availabilityof InterruptibleGas Original 12 1-01-873 Penaltyfor UnauthorizedTake First Rev. 13 5-28-874 Gas Cost RecoveryClause First Rev. 13 5-28-874.A Applicabilityof Clause First Rev. 13 5-28-874.B BookedCost of Gas First Rev. 13 5-28-874.B.1 BookedCost Included First Rev. 13 5-28-874.B.2 BookedCost Excluded First Rev. 14 5-28-874.C Billing First Rev. 15 5-28-874.D GeneralConditions First Rev. 15 5-28-875 Restorationof Service Original 16 1-01-87

._ 6 - _. '_._Terminaqionof Service atCANCELLEDBY Customer Request Original 16 1-01-87

ORDER_-/@_ 27 I, '- ,

I

REMOVEDBY _}_ I

DATE _ -_ -_2-..... :' EFFECTIVEFOR SERVICERENDEREDON

';_.=a,_....APril 24, 1_ _I--__ ANDAFTER April 1, 1991I

By:E.J.MclNTYRE " APR 2 9 1991 ISSUEDUNDER AUTHORITY OFTHE MICHIGANPRESIDENT

EAU CLAIRE,WlSCONSIN_ )/__y INCASE NO. U-9802

NORTHERN STATES POWER-CANCELLED-222

Page 22: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Ninth Revised SHEETNO. .2wISCONSIN .

NORTHERN STATES POWER COMPANY OANCELsEighth Revised SHEET NO. 2

.. M.P.S.C. NO.I GAS -- MICH!GAN

TABLE OF CONTENTS -CHECK LIST-

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87

Table of Contents - Check List Ninth Rev. 2 4-01-90,, First Rev. 3 6-17-88,, Original 4 1-01-87,, Seventh Rev. 5 4-01-90

_Index of Communities Served -----'--- Original 6 1-01-87CANCELLEDBY

Franchise Data QR_ER,._{_2.__(_#______..... Original 7 1-01-87

RULES AND REGULATIONS REMOVEDBY_-_._/ --

RULE DKiE_ _/-_7_ _/-- SHEET EFFECTIVENUMBER DESCRIPTION ....... NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871cA Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter First Rev. 10 12-14-88- 2 inch or larger in diameter Original 11 1-01-87

1.C Extraordinary Investment Original 11 1-01-87IoD Measurement of Extensions Original 11 1-01-87I.E Reactivating Service Original 12 1-01-87I.F .Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-874.C Billing First Revo 15 5-28-874.D General Conditions First Rev. 15' 5-28-875 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01J87

June 1 1990 EFFECTIVE FOR SERVICE RENDERED ONISSUED ' , AND AFTER April 1, 1990

BY; E.M. THEISEN ,(._ ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT ,_. PUBLIC SER. COMM. DATEDMaV 18, 1990

EAU CLAIRE, WISCONSIN. IN CASE NO. U-9525i

NORTHERN STATES POWER-CANCELLED-223

Page 23: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Eighth Revised SHEET NO. 2]_SP wISCONSIN

NORTHERN STATES POWER COMPANY CANCEL_eventhRevised SHEETNO. 2

-. M.R S.C. NO.I GAS -- MIOHIGAN

TABLE,OF--.CONTE-NT-S---CHEC_,LIST• |CANL'E_LE!)BY 1

I ---_ -- - --I SHEET EFFECTIVE

DESCRIPTION ilRLt"i'?VE:BY _2>7 " I- NUMBER DATE

T,,,e,,ee Lo,,,- _LI I

Table of Contents - Check L'I_L EighthRev. 2 4-01-89,, First Rev. 3 6-17-88,, Original4 1-01-87,, Sixth Rev. 5 4-01-89

Index of CommunitiesServed Original 6 1-01-87

FranchiseData Original7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

I ExtensionRules and Procedures Original8 1-01-87I.A Mains

...." - 2 inch or less in diameter Original8 1-01-87- over 2 inch in diameter Original9 1-01-87

i.B Services- less than 2 inch in diameter First Rev. 10 12-14-88- 2 inch or larger in diameter Original11 1-01-87

I.C ExtraordinaryInvestment Original11 1-01-87I.D Measurementof Extensions Original11 1-01-87I.E .ReactivatingService Original12 .I-01-87I.F Groups of Customers Original12 1-01-872 Availabilityof InterruptibleGas Original 12 1-01-873 Penalty for UnauthorizedTake First Rev. 13 5-28-874 Gas Cost RecoveryClause First Rev. 13 5-28-874.A Applicabilityof Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.I Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-874.C Billing First Rev. 15 5-28-874.D GeneralConditions First Rev. 15 5-28-875 Restorationof Service Original 16 1-01-876 Terminationof Service at

Customer Request Original 16 1-01-87

EFFECTIVE FOR SERVICE RENDERED ON

ISSUED ..,L" AND AFTER April 1, 1989

BY: E.M. THEISEN ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT PUBLIC SER. COMM. DATED May 9. 19S9

EAU CLAIRE, WISCONSIN IN CASE NO. U-9297I

NORTHERN STATES POWER-CANCELLED-224

Page 24: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Seventh ReviSeS_EET NO._ 2_N _._]P WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS Sixth Revised SHEET NO,_ 2d

.. M.R S.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87

Table of Contents - Check List Seventh Rev. 2 3-31-89" First Rev. 3 6-17-88,, Original 4 1-01-87,, Fifth Rev. 5 3-31-89

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diame#er Original 9 1-01-87

I.B Services- less than 2 inch in diameter First Rev. 10 12-14-88- 2 inch or larger in diameter Original 11 1-01-87

I.C Extraordinary Investment Original 11 1-01-87I.D Measurement of Extensions Original 11 1-01-87I.E Reactivating Service Original 12 1-01-87I.F Groups of Customers Original 12 1-01-872 Avail ability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-874.C Billing First Rev. 15 5-28-874.D General Conditions First Rev. 15 5-28-875 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request JO_!gin__! - !-6 ! Oi-87

I CANCELLEDBY!,'.m_EL]_#-#_#?

, .._ ! ,'-;_v,_,_RY_¢'__EFFECTIIVE FOR SERVICE RENDERED ON

ISSUED April 6, 1989 ___b"'E_.l _X_m__ND,_,,__,!_ ....:_q_L.'-.d:-_.#.

; I. :. ......... _

II_J'PRII 1989 UED UNDER AUTHORITY OF THE MICHIGANBY: E. M. THEISEN

PRES,DENT -----___\(_\_'_BL'C,\_'_\..... --."?_ SER.COMM.DATED

EAU CLAIRE, WISCONSIN. "__IN. CASE NO.

I

NORTHERN STATES POWER-CANCELLED-225

Page 25: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Fifth v-i --_...---_ _^ 2=NORTHERN STATES POWER COMPANY. CANCELS Re--sed.=-_N_-r--'_Nu./

M.R S.C.. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87

Table of Contents - Check List Sixth Rev, 2 12-14-88" First Rev. 3 6-17-88" Original 4 1-01-87." Fourth Rev, 5 4-01-88

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONS

' RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-87I,A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I,B Services- less than 2 inch in diameter First Rev. 10 12-14-88- 2 inch or larger in diameter Original 11 1-01-87

1,C Extraordinary Investment Original 11 1-01-871.D Measurement of Extensions Original 11 1-01-87I,E Reactivating Service Original 12 1-01-87I.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev, 13 5-28-874,A Applicability of Clause First Rev, 13 5-28-874,B Booked Cost of Gas First Rev, 13 5-28-874,B,1 Booked Cost Included First Rev, 13 5-28-874,B,2 Booked Cost Excquded First Rev, 14 5-28-874,C Billing First Rev, 15 5-28-874,D General Conditions First Rev, 15 5-28-875 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

December 20, 1988 __ CANCELLEDBY fissuED __ ORDER,_'__ _/_.-,F_ .- ._t'

PRESIDENTEAU CLAIRE, WISCONSIN. __ _ DATE/t'-//"-_7

J

NORTHERN STATES POWER-CANCELLED-226

Page 26: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

• Fifth Revised SHEET NO 2NSP w,SCONS,.Fourth Revised 2

, NORTHERN STATES POWER COMPANY CANCELS SHEET NO._

M.R S.C.= NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87

Table of Contents - Check List Fifth Rev. 2 6-17-88" First Rev. 3 6-17-88" Original 4 1-01-87" Fourth Rev. 5 4-01-88

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTI VENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter Original 10 1-01-87- 2 inch or larger in diameter Original 11 1-01-87

1.C Extraordinary Investment Original 11 1-01-87I.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01-871,F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev, 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.I Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-874.C Billing First Rev. 15 5-28-874.D= General Conditions First Rev, 15 5-28-875 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

CANCELLED BY i

ISSUED July 29, 1988 -_/_/ - _ \(_\\ : OROER#_#F_Z__/70

II( AUG.17 988)E}jBY : E. M. THEI SEN REMOVED

EAU CLAIRE, WISCONSIN. _ --"

NORTHERN STATES POWER-CANCELLED-227

Page 27: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

' N S P Fourth Revised SHEET NO. 2_, WISCONSINThird RevisedsHEET NO.2, NORTHERN STATES POWER COMPANY CANCELS

-. M.R S.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST

I

SHEET EFFECTIVE•DESCRIPT ION NUMBER DATE_=

Title Sheet Original 1 1-01-87

Table of Contents - Check List Fourth Rev. 2 4-01-88

" Original 3 1-01-87" Original 4 1-01-87" Fourth Rev. 5 4-01-88

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

.......' RULES AND REGULATIONS

i,-,. RULE SHEET EFFECTIVE" "- NUMBER DESCRIPTION NUMBER DATE

1 - Extension Rules and Procedures Original 8 1-01-87I.A Mains -

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter Original 10 1-01-87- 2 inch or larger in diameter Original 11 1-01-87

1.C Extraordinary Investment Original 11 1-01-87I.D Measurement of Extensions Original 11 1-01-87I.E Reactivating Service Original 12 1-01-87

-' I.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-87

- 4.B.2 Booked Cost Excluded First Rev. 14 5-28-87-- 4.C Billing First Rev. 15 5-28-87

4.D General Conditions First Rev. 15 5-28-875 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-.87

, CANCELLEDBYISSUED May 18, 1988 _--_<_' ORDER/i/- _//f-7

PRESIDENT __ __/.##

EAU CLAIRE, WISCONSIN .... __ DATEFI_/7. --OC;'_

NORTHERN STATES POWER-CANCELEED-228

Page 28: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

I

Third Revised SHEETNO. 2NSP WISCONSIN

Second Revised SHEET NO., 2NORTHERN STATES POWER COMPANY CANCELS

M. RS.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original i 1-01-87

- Table of Contents - Check List Third Rev. 2 10-28-87,, Original 3 1-01-87,, Original 4 1-01-87,, Third Rev. 5 10-28-87

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871cA Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter Original 10 1-01-87- 2 inch or larger in diameter Original 11 1-01-87

1oC Extraordinary Investment Original 11 _. 1-01-87I.D Measurement of Extensions Original 11 1-01-87I.E Reactivating Service Original 12 1-01-87I.F Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874cA Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-874.C Billing First Rev. 15 5-28-874.D General Conditions First Rev. 15 5-28-875 Restoration of Service Original 16 1-01-876 Termination of Service at o

Customer Request Original 16 1-01.-87

ISSUED November 10, 1987 _ _ i CANCELLEDBY '

.,,, II<(.ov7m7i 111PRESIDENT C._ _ f_-_ [ REMOVED BY._,/PJz/7__

lNORTHERN STATES POWER-CANCELLED-229

Page 29: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Second Revised SHEET NO. 2w,sco.sl.First Revised 2

NORTHERN STATES POWER COMPANY CANCELS SHEETNO,,

M.R S.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST

SHEET EFFECTIVE

DESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87

Table of Contents - Check List Second Rev. 2 4-01-87,, Original 3 1-01-87,, Original 4 1-01-87,, Second Rev. 5 4-01-87

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-871 .A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

1. B Services- less than 2 inch in diameter Original 10 1-01-87- 2 inch or larger in diameter Original 11 1-01-87

1.C Extraordinary Investment Original 11 1-01-87I.D Measurement of Extensions Original 11 1-01-871.E Reactivating Service Original 12 1-01_-87I.F .Groups of Customers Original 12 1-01-872 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-874.B Booked Cost of Gas First Rev. 13 5-28-874.B.1 Booked Cost Included First Rev. 13 5-28-874.B.2 Booked Cost Excluded First Rev. 14 5-28-874.C Billing First Rev. 15 5-28-874.D General Conditions First Rev. 15 5-28-875 Restoration of Service Original 16 1-01-876 Termination of Service at

Customer Request Original 16 1-01-87

ISSUED August 12, 1987 __k - CANCELLEDBY

BY: E.M. THEISEN '_98

EAU CLAIRE, WISCONSIN. '_C')/_._,..= _'_Y DATE__ //-17-_Y

NORTHERN STATES POWER-CANCELLED-230

Page 30: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

First Revsied 2NSP w,sco,s,,NORTHERN STATES POWER COMPANY CANCELS Original SHEETNO., 2

M.P.S.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-01-87

Table of Contents - Check List First Rev. 2 5-28-87" Original 3 1-01-87" --- Original 4 1-01-87" Original 5 1-01-87

Index of Communities Served Original 6 1-01-87

Franchise Data Original 7 1-01-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-01-87I.A Mains

- 2 inch or less in diameter Original 8 1-01-87- over 2 inch in diameter Original 9 1-01-87

I.B Services- less than 2 inch in diameter Original 10 1-01-87- 2 inch or larger in diameter Original 11 1-01-87

1.C Extraordinary Investment Original 11 1-01-87I.D ' Measurement of Extensions Original 11 1-01-87I.E Reactivating'Service Original 12 1-01-87I.F Groups of Customers ' Original i2 1-01-87

,. 2 Availability of Interruptible Gas Original 12 1-01-873 Penalty for Unauthorized Take First Rev. 13 5-28-874 Gas Cost Recovery Clause First Rev. 13 5-28-874.A Applicability of Clause First Rev. 13 5-28-87

4_B Booked Cost of Gas First Rev. 13 5-28-87

4_B,1 Booked Cost Included First Rev. 13 5-28-874_B 2 Booked Cost Excluded First Rev. 14 5-28-874:_C Billing First Rev. 15 5-28-87

General Conditions First Rev. 15 5-28-87

,_ _ _4_D Restoration of Service Original 16 1-01-87 __6 , Termination of Service at_ Customer Request Original 16 1-01-87

c._ L=.f ,,"

"C.: C:) _ rm

EFFECTIVE _Vlf_jgTRENDERED ONJune 4, 1987 F_RayISSUED _ m _ AND AFTER •

• BY: E.M. THEISEN ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT PUBLIC SER. COMM. DATED May 27, 1987

EAU CLAIRE, WISCONSIN. IN CASE NO. U-8648i

NORTHERN STATES POWER-CANCELLED-231

Page 31: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO. 2]I_SP WISCONSIN '"

NORTHERN STATES POWER COMPANY CANCELS SHEETNO. --

M.P.S.G. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS - CHECK LIST

SHEET EFFECTIVEDESCRIPTION NUMBER DATE

Title Sheet Original 1 1-1-87

Table of Contents - Check List Original 2 1-1-87. " Original 3 1-1-87

" Original 4 1-1-87" Original 5 1-1-87

Index of Communities Served Original 6 1-1-87

Franchise Data Original 7 i-1-87

RULES AND REGULATIONS

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

1 Extension Rules and Procedures Original 8 1-1-871.A Mains

- 2 inch or less in diameter Original 8 1-1-87- over 2 inch in diameter Original 9 1-i-87

1.B Services- less than 2 inch in diameter Original 10 .1-1-87- 2 inch or larger in diameter Original 11 1-1-87

1.C Extraordinary Investment Original 11 1-1-87I.D Measurement of Extensions Original 11 1-1-87I.E Reactivating Service Original 12 1-i-87I.F _Groups of Customers Original 12 1-1-872 Availability of Interruptible Gas Original 12 I-1-873 _- Penalty for Unauthorized Take Original 13 1-I-874 Gas Cost Recovery Clause Original 13 1-1-87

4.B Booked Cost of Gas Original 13 1-1-87t

i _ 4.B.1 Booked Cost Included Original 13 1-1-87, 4.B.2 Booked Cost Excluded Original 14 1-1-87

_I _,_ 4.C Billing Original 15 1-1-87,,, _. > 4.D General Conditions Original 15 1-1-87O ,,, O

_ _ 5 Restoration of Service Original 16 1-1-87<:Z C_: .,,,.

o _- 6 Termination of Service at-- Customer Request Original 16 1-1-87

__ EFFECTIVE FOR SERVICE RENDERED ON

ISSUED January 1_ 1987 O AND AFTER January 1_ 1987I/ _/

BY: E.M. THEISEN ,,,_,---___((<_(JAN02 1987 ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT _\_f___'_/_CO// PUBLIC SER. COMM. DATEDNovember 4_ 1986,

*'"°NS'" ,N°..NONORTHERN STATES POWER-CANCELLED-232

Page 32: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NORTHERN STATES POWER COMPANY Cancels First Revised Sheet No. 3

P. S. C. NO. 1 GAS -- MICHIGAN

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

7 Temporary Gas Service First Rev. 16 2-02-99 R8 Definitions: Classes of Customers

and General Gas Terms Original 17 1-01-879 Definitions: Affecting

• Residential Service Original 18 1-01-8710 Discrimination Prohibited Original 20 1-01-8711 Form of Proceedings Original 20 1-01-8712 Billing Frequency Original 20 1-01-8713 Estimated Billing Original 20 1-01-8714 Customer Meter Reading Original 21 1-01-g715 Budget Payment Plan Original 21 1-01-8716 Cycle Billing Original 23 1-01-8717 Payment of Bills Original 23 1-01-8718 Computation of Payment Period Original 23 1-01-8719 Discounts and Late Payment

Charges Prohibited First Rev. 24 2-02-99 R20 Billing Information First Rev. 24 2-02-99 R21 Separate Bills Original 25 1-01-8722 Special Services Original 25 1-01-8723 Deposits: New Service Original 25 1-01-8724 Deposits: Existing Service Original 25 1-01-8725 Other Standards Prohibited First Rev. 26 6-17-8826 General Deposit Conditions - Res. First Rev. 26 6-17-8827 Guarantee in Lieu of Deposit Original 28 1-01-8728 Guarantee Terms and Conditions Original 28 1-01-8729 Deposit Refunds Original 28 1-01-8730 Applicability Original 29 1-01-8731 Complaint Procedures Original 29 1-01-8732 Personnel Procedures Required Original 29 1-01-8733 Utility Hearing Officers Original 30 1-01-8734 Publication of Procedures Original 30 1-01-8735 Public Access to Rules and Rates Original 31 1-01-8736 Reporting Requirement Original 31 1-01-8737 Inspection Original 31 1-01-8738 Time of Discontinuation Original 32 1-01-8739 Manner of Discontinuation Original 32 1-01-87

CM_CELLEDI)Y ,, SERVICECOMMISSION_

ISSUED February15,1999 0_DEfL_-_AL/H_I____3-"r_'''_'_ -______L/._-_-_- IBY: J.L.tarsen e¢19 MAR2 2 1999PRESIDENT ,,a_u

EAU CLAIRE, WISCONSIN O_ _0 _. _E,,:_:_:E._. : FILED

NORTHERN STATES POWER-CANCELLED-233

Page 33: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP First Revised 3WISCONSIN SHEET NO.,

NORTHERN STATES POWER COMPANY CANCELS Original SHEET NO. 3

RS.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

7 Temporary Gas Service Original 16 1- 1-878 Definitions: Classes of Customers

and General Gas Terms Original 17 i- 1-879 Definitions: Affecting

Residential Service Original 18 1- 1-8710 Discrimination Prohibited Original 20 1- 1-8711 Form of Proceedings Original 20 1- 1-8712 Billing Frequency Original 20 1- 1-8713 Estimated Billing Original 20 1- 1-8714 Customer Meter Reading Original 21 i- 1-8715 Budget Payment Plan Original 21 i- 1-8716 Cycle Billing Original 23 1- 1-8717 Payment of Bills Original 23 1- 1-8718 Computation of Payment Period Original 23 1- 1-8719 Discounts and Late Payment

Charges Prohibited Original 24 1- 1-8720 Billing Information Original 24 1- 1-8721 Separate Bills Original 25 1- 1-8722 Special Services Original 25 1-1-8723 Deposits: New Service Original 25 1- 1-8724 Deposits: Existing Service Original 25 1- 1-8725 Other Standards Prohibited First Rev. 26 6-17-8826 General Deposit Conditions - R-es. First Rev. 26 6-17-8827 Guarantee in Lieu of Deposit Original 28 I- 1-8728 Guarantee Terms and Conditions Original 28 1- 1-8729 Deposit Refunds Original 28 i- 1-8730 Applicability Original 29 1- 1-8731 Complaint Procedures Original 29 i- 1-8732 Personnel Procedures Required Original 29 1- 1-8733 utility Hearing Officers Original 30 1- 1-8734 Publication of Procedures Original 30 1- 1-8735 Public Access to Rules and Rates Original 31 1- 1-8736 Reporting Requirement Original 31 1- 1-8737 Inspection Original 3E 1- 1-8738 Time of Discontinuation Original 32 1- 1-8739 Manner of Discontinuation Original 32 1- 1-87

ISSUEO July 29, 1988 <_,O_ 0RDER_._k__l_6_/,, \__

REMOVEDBY_ ,

PRESIDENT D_TE---''_" "_'_ _ _ --

EAU CLAIRE1 WISCONSIN.

NORTHERN STATES POWER-CANCELLED-234

Page 34: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO. 3NSP wiscoNsiNNORTHERN STATES POWER COMPANY CANCELS SHEETNO._

RS.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

7 Temporary Gas Service Original 16 1-1-878 Definitions: Classes of Customers

and General Gas Terms Original 17 1-1-879 Definitions: Affecting

Residential Service Original 18 1-1-8710 Discrimination Prohibited Original 20 1-1-8711 Form of Proceedings Original 20 1-1-8712 Billing Frequency Original 20 1-1-8713 Estimated Billing Original 20 1-1-8714 Customer Meter Reading Original 21 1-1-8715 Budget Payment Plan Original 21 1-1-8716 Cycle Billing Original 23 i-1-8717 Payment of Bills Original 23 1-1-8718 Computation of Payment Period Original 23 1-1-8719 Discounts and Late Payment

Charges Prohibited Original 24 1-1-8720 Billing Information Original 24 1-1-8721 Separate Bills Original 25 1-1-8722 Special Services Original 25 1-1-8723 Deposits: New Service Original 25 1-1-8724 Deposits: Existing Service Original 25 1-1-8725 Other Standards Prohibited Original 26 I-1-8726 General Deposit Conditions - Res. Original 26 1-1-8727 Guarantee in Lieu of Deposit Original 28 1-1-8728 Guarantee Terms and Conditions Original 28 1-1-8729 Deposit Refunds Original 28 1-1-8730 Applicability Original 29 i-1-8731 Complaint Procedures Original 29 1-1-8732 Personnel Procedures Required Original 29 1-1-8733 Utility Hearing Officers Original 30 1-1-8734 Publication of Procedures Original 30 1-i-8735 Public Access to Rules and Rates Original 31 I-1-8736 Reporting Requirement Original 31 1-1-8737 Inspection Original 31 1-1-8738 Time of Discontinuation Original 32 1-i-8739 Manner of Discontinuation Original 32 1-1-87

CANCELLEDBY

OR',)ER_ - C 1517

RE;. OVEDBY

EFFECTIVE FOR SERVICE RENDERED ON

ISSUED Januar-_; , AND AFTER January l, 1987

BY; E.M. THEISEN ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT PUBLIC SER. COMM. DATED November 4, 1986_

EAU CLAIRED WISCONSIN.__/_#' IN CASE NO. U-8493 ,

f

NORTHERN STATES POWER-CANCELLED-235

Page 35: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 23rd Revised Sheet No. 5NORTHERN STATES POWER COMPANY Cancels 21th Revised Sheet No. 5

(To update sheet numbers and effective dates)

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77 Corrections for Gas

Measurements Original 57 1-01-8778 Gas Curtailment Provisions First Rev. 58 9-17-0278.A Plan 1 First Rev. 58 9-17-0278.B Plan 2 First Rev. 59 9-17-02

Plan 2 - Priorities First Rev. 60 9-17-02Cancelled. First Rev. 61 9-17-02

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87

__Priority of Service Status Original 64 1-01-87; Gas Cost Recovery Factors Twenty-first Rev. 65 10-01-02

_._,L__ ;_ ._. ,'_-_"_ :;1,. GCRC-Contingency Mechanism Twelfth Rev. 66 4-01-02...... _¢RC-Contingency Mechanism Original 66.01 4-01-02

RE,IO'ED M CH GANmJ UCSERVICECOMN_ISSION

........ OCTI 6 2002

Issued September 27, 2002 LFILE_-_'_-Ef_ Services Rendered on and afterSeptember 17, 2002.

By: M. L. Swenson Issued Under Authority Of The MichiganPresident P.S.C. Dated September 16, 2002Eau Claire, Wisconsin In Case No. U-13365

NORTHERN STATES POWER-CANCELLED-236

Page 36: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 22st Revised Sheet No. 5NORTHERN STATES POWER COMPANY Cancels 21th Revised Sheet No. 5

(To update sheet numbers and effective dates)

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77 Corrections for GasMeasurements Original 57 1-01-87

78" Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 I-01-87

....,_" . Special Terms and Conditions Original 62 1-01-87"_ Definitions for Gas Service Original 63 1-01-87

_ _ Priority of Service Status Original 64 1-01-87eta" _ Gas Cost Recovery Factors Twentieth Rev. 65 4-01-02"-" GCRC-Contingency Mechanism Twelfth Rev. 66 4-01-02.2'_, GCRC-Contingency Mechanism Original 66.01 4-01-02,., . GAS RATES- _ _ SHEET EFFECTIVE,,--I

ua _ _.Ao DESCRIPTION NUMBER DATE

o 3 _ Residential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled)Original 70 1-01-87Emergency Winter Peak Service Original 71 1-01-87

_'_ _erd_tc-_ PUBLIC Original 72 1-01-87[ssued August 14, 2002 SERVICEC0_MISSt0N Erfeetive for bills rendered on and after the first

billing cycle of the Apri L 2002, billing month.By: M. L. Swens_,n n _ _ _ 2002 Issued Under Authority Of The MichiganPresident P S.C. Dated July 23_ 2002Eau Claire, Wiscc,nsi Ii Case No. U-13222

NORTHERN STATES POWER-CANCELLED-237

Page 37: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 21st Revised Sheet No. 5NORTHERN STATES POWER COMPANY Cancels 20th Revised Sheet No. 5

(To update sheet numbers and effective dates)

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87 > m , >Rule 52 Original 54 1-01-87 -_ _ , or"

['_ ¢..

77.B Adjustment of Bills Because _ _ £-_

of Meter Errors Original 55 1-01-87 _-- ___Rule 61 Original 55 1-01-87 -,3 _ JO iRule 62 Original 56 1-01-87 :"-- 3 1"3

Rule 63 Original 56 1-01-87 iO (3 r3t

Rule 64 Original 56 1-01-87 !r-o _ ,d

Rule 65 Original 57 1-01-87 i _77 Corrections for Gas .....

Measurements Original 57 1-01-8778 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Nineteenth Rev. 65 01-01-02GCRC - Contigency Mechanism Eleventh Rev. 66 4-0i-01

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled)Original 70 1-01-87Emergency Winter Peak Service Original 71 1-01-87

Special Terms Original 72 1-01-87

Issued December 7_2001 MICHIGANPUBLIC Effective For Service Render on and AfterSERVICECOMMISSION January. 1_2002

By: J.L. Larsen Issued Under Authority Of The Michigan

President MAR | 2002 P.S.C. Dated May 15, 2001Eau Claire, Wiseons: n In Case No. U-12751

¢.

NORTHERN STATES POWER-CANCELLED-238

Page 38: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 20th Revised Sheet No. 5NORTHERN STATES POWER COMPANY Cancels 19th Revised Sheet No. 5

(To update sheet numbers and effective dates)TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVE.gUMt3ER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 r 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Because l-'_-- =._ , oof Meter Errors Original 55 1-01-87 ; _ _':' ,_'>

Rule 61 Original 55 1-01-87 _ , or.-Rule 62 Original56 1-01-87 _ _ ;Rule 63 Original 56 1-01-87 I _ - =Rule 64 Original 56 1-01-87 /

Rule 65 Original 57 1-01-87 0 '177 Corrections for Gas - ._ Ixl

Measurements Original 57 1-01-87v

78 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87

Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Eighteenth Rev. 65 10-01-01GCRC - Contigency Mechanism Eleventh Rev. 66 4-01-01

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70Emergency Winter Peak Service Original 71 1-01-87

Special T_H_CHIGA N PUBLIC ! Original 72 1-01-87

Issued September 1 ;,200,01SERVICEC0MMIS_O_ Effective For Service Render on and AfterOctober 1, 2001

By: J.L. Larsen | MAil | Issued Under Authority Of The Michigan

President [ P.S.C. Dated May 15, 2001Eau Claire, Wiscon in "------ In Case No. U-12751

FILED___.__") "_

m

NORTHERN STATES POWER-CANCELLED-239

Page 39: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 19th Revised Sheet No. 5NORTHERN STATES POWER COMPANY Cancels 18th Revised Sheet No. 5

(To update sheet numbers and effective dates)

TABLE OF CONTENTS - CHECK LIST (Continued)I

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-87i76 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87 7-J

Adj _-" >77.B ustment of Bills Because _ =5_) k'_

of Meter Errors Original 55 1-01-87 _< __Rule 61 Original 55 1-01-87 m :

Rule 62 Original 56 1-01-87 "_ .,,-_'< • -<t=) iRule 63 Original 56 1-01-87 .._Rule 64 Original 56 1-01-87 I _'_ " 'Rule 65 Original 57 1-01-87 "_ " '

77 Corrections for Gas :_ 3 li

Measurements Original 57 1-01-87 .78 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Seventeenth Rev. 65 7-01-01GCRC - Contigency Mechanism Eleventh Rev. 66 4-01-01

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70Emergency Winter Peak Service Original 71 1-01-87

Special Terms _ Original 72 1-01-87

Issued August 16, 2t 10T'-" MICHIGANPUBLIC Effective For Service Render on and AfterSERVICECOI_MISSION_ July 1, 2001r

By: J.L. Larsen _ Issued Under Authority Of The Michigan

President l SEP 4 _}01 P.S.C. Dated May 15, 2001Eau Claire, Wiscom n In Case No. U-12751

FILED. C"_ _If __ --

NORTHERN STATES POWER-CANCELLED-240

Page 40: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 18th Revised Sheet No. 5NORTHERN STATES POWER COMPANY Cancels 17th Revised Sheet No. 5

(To update sheet numbers and effective dates)TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATF - _

• ,CANCELLEDBY74 Regulating and Metering Original 51 1-01-_ ORDER_75 Temporary Suspension of Service Original 51 1-01-8

76 Escaping Gas Original 51 1-01-877 Gas Metering and Gas Metering REMOVEDBY

Equipment Original 52 1-01-8' DATE___.77.A Inspection and Tests Original 52 1-01-87 ___.__.___---_ ---'-----

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01- 87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77 Corrections for GasMeasurements Original 57 1-01-87

78 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Sixteenth Rev. 65 4-01-01GCRC - Contigency Mechanism Eleventh Rev. 66 4-01-01

GAS RATESSHEET EFFECTIVE

DES CRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70Emergency Winter Peak Service Original 71 1-01-87

Special Terms . Original 72 1-01-87

Issued August 16, 2(_ MICHIGANpUBLiC Effective For Service Render on and AfterSERVICECOMMISSION_ April 1, 2001[

By: J.L. Larsen _ Issued Under Authority Of The Michigan

President L SEP 4 2001 P.S.C. Dated May 15, 2001Eau Claire, Wiscon_ in In Case No. U-12751

NORTHERN STATES POWER-CANCELLED-241

Page 41: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

1N SP Wisconsin 17th Revised Sheet No. 5

Northern States Power Company Cancels 16th Revised Sheet No. 5

M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHE,CK LIST (Continued)

RULE SHEET EFFECTIVE

NUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering (3riginal 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering _.

Equipment Original 52 1-01-87 _ _ _ ] 177.A Inspection and Tests Original 52 1-01-87 " _ m

Rule51 Original52 1-01-87--!il" _l _m _I_ ._ -._.__

Rule 52 Original 54 1-01-87 "_ _ ! !177.B Adjustment of Bills Because " - _

of Meter Errors Original 55 1-01-87 !Rule 61 Original 55 1-01-87

Rule 62 Original 56 1-01-87 ] _ kRule 63 Original 56 1-01-87 / 2

Rule 64 Original 56 1-01-87 |Rule 65 Original 57 1-01-87 _ [ _77 Corrections for Gas

Measurements Original 57 1-01-8778 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-87

78.B Plan 2 Original 59 1-01-87Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87

Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Fifteenth Rev. 65 10-01-00 RGCRC - Reconciliation Tenth Rev. 66 4-01-97

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATE

Residential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70 1-01-87Emergency Winter Peak Service Original 71 1-01-87

Special Terms Original 72 1-01-87

Issued: October 17, 2000 MICHIGANPUBLIC Effective for Service Rendered onSERVICECOMMISSION and after October 1, 2000

i

OCT 2 3 _0 / Issued Under Authority of the MichiganBy: J.L. Larson

President l k P.S.C. Dated September 28, 2000Eau Claire, Wisconsin ' In Case No. U-12241

FILED _-._-_-'__ )

NORTHERN STATES POWER-CANCELLED-242

Page 42: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 16th Revised Sheet No. 5

Northern States Power Company Cancels 15th Revised Sheet No. 5

M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVEN-SMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87

Rule 63 Original 56 1-01-87 _ N ,_ _=eRule 64 Original 56 1-01-87 -n _ ,_ c_

_7 t'rl

Rule 65 Original 57 1-01-87 m r-77 Corrections for Gas O m

Measurements Original 57 1-01-87 ,,_ ,2 "<78 Gas Curtailment Provisions Original 58 1-01-87 _ _78.A Plan 1 Original 58 1-01-87 _ _ l"78.B Plan 2 Original 59 1-01-87 O _

Plan 2 - Priorities Original 60 1-01-87 CJ "Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Fourteenth Rev. 65 4-01-00 RGCRC - Reconciliation Tenth Rev. 66 4-01-97

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70 1-01-87Emergency Winter Peak Service Original 71 i-01-87

Special Terms Original 72 1-01-87

Issued: May 16, 2000 MICHIGANPUBLIC Effective for Servl_ceRendered on

SERVICECOMMISSION, . and after April 1, 2000F

By: J.L. Larson _ dlJ_ 5 2000 Issued Under Authority of the Michigan

President L P.S.C. Dated April 24, 2000Eau Claire, Wisconsin "-w";- ao In Case No. U-12241

FILED_, _, p I_

NORTHERN STATES POWER-CANCELLED-243

Page 43: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin lSth Revised Sheet No. 5

Northern States Power Company cnce 14th Revised Sheet No. 5

M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8" o :_ o c_75 Temporary Suspension of Service Original 51 1-01-8" _ m _ z76 Escaping Gas Original 51 1-01-8' ,¢ ,_ m

77 Gas Metering and Gas Metering _ _Equipment Original 52 1-01-8' 3", L

77.A Inspection and Tests Original 52 1-01-8' 1

Rule 51 Original 52 1-01-8' _ )- ro

Rule 52 Original 54 1-01-8' 0 _77.B Adjustment of Bills Because 0

of Meter Errors Original 55 1-01-8Rule 61 Original 55 1-01-8Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77 Corrections for GasMeasurements Original 57 1-01-87

78 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87

Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Thirteenth Rev. 65 4-01-99 RGCRC - Reconciliation Tenth Rev. 66 4-01-97

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70 1-01-87Emergency Winter Peak Service Original 71 1-01-87

Special Terms Original 72 1-01-87

Issued: April 22, 1999 Effective for Service Rendered onMICHIGANPUBLIC and after April 1, 1999SERVICECOMMISSION

By: J.L. Larson Issued Under Authority of the MichiganPresident MAY 3 ]999 P.S.C. Dated April 13, 1999

Eau Claire, Wisconsin In Case No. U-11875

NORTHERN STATES POWER-CANCELLED-244

Page 44: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 14th Revised Sheet No. 5

Northern States Power Company Cancels 13th Revised Sheet No. 5

M.P.S.C. NO. 1 Gas - Michigan

I TABLE OF CONTENTS - CHECK LIST (Continued)RULE SHEET EFFECTIVE

INUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 "1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01 -8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01- 87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87

Rule 64 Original 56 1-01-87Rule 65 Original. 57 1-01-87

77 Corrections for GasMeasurements Original 57 1-01-87

78 Gas Curtailment Provisions Original 58 1-01-87 =78.A Plan 1 Original 58 1-01-87 > m _78.B Plan 2 Original 59 1-01-87 _ -¢_ ,:_t:' ._'-

Plan 2 - Priorities Original 60 1-01-87 ktl N I._Plan 2 - Priorities contd. Original 61 1-01-87 _ _

79 Priority of Service Original 62 1-01-87 _J _'_ _ ! :,

Definitions for Priority of I _ _Service Original 62 1-01-87 .,aJ ,_

Special Terms and Conditions Original 62 1-01-87 _lDefinitions for Gas Service Original 63 1-01-87 |Priority of Service Status Original 64 1-01-87 ,_ JGas Cost Recovery Factors Twelfth Rev. 65 4-01-98GCRC - Reconciliation Tenth Rev. 66 4-01-97

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87

Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70 1-01-87Emergency Winter Peak Service Original 71 1-01-87

Special Terms Original 72 1-01-87

Issued: April 24, 1998 Effective for Service Rendered onand after April 1, 1998

By: J.A. Noer Issued Under Authority of the MichiganPresident P.S.C. Dated April 14, 1998

Eau Claire, Wisconsin In Case No. U-11576

NORTHERN STATES POWER-CANCELLED-245- -

Page 45: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 13th Revised Sheet No. 5

Northern States Power Company Cancels 12th Revised Sheet No. 5

M.P.S.C. NO. 1 Gas - Michigan

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-87

76 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77 Corrections for Gas

Measurements Original 57 1-01-8778 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-87

78.B Plan 2 Original 59 1-01-87Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87

Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87 non oS ista s0 i6407

f Gas Cost Recovery Factors Eleventh Rev. 65 4-01-97

•-..9 GCRC - Reconciliation Tenth Rev. 66 4-01-97GAS RATES

¢2_1 r_| _ SHEET EFFECTIVE

Residential General Service First Rev. 67 7-01-87

___ Commercial Industrial Gen. Svc. First Rev. 68 7-01-87

, Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70 1-01-87Emergency Winter Peak Service Original 71 1-01-87

"" Special Terms Original 72 1-01-87

Issued: July 3, 1997

..... Effective for Service Rendered onR.._,tqr_ and after April 1, 1997

By: J.A. Noer g_ OCT _ __1997 _ Issued Under Authority ofthe MichiganPresident _ . t_ _ P.S.C. Dated .May 22, 1997

Eau Claire, Wisconsin . __".,,,.i_ In Case No. U-11226

NORTHERN STATES POWEN-CANCE[_[_ED-246

Page 46: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 12th Revised Sheet No. 5

Northern States Power Company Cancels l lth Revised Sheet No. 5

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CHECK LIST (Continued)

RULE _ SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-8.7Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77 Corrections for GasMeasurements Original 57 1-01-87

78 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Tenth Rev. 65 4-01-96GCRC - Reconciliation Ninth Rev. 66 12-21-95 --

GAS RATES• SHEET EFFECTIVE

DESCRIPTION NUMBER DATE/$'t o] _'.ff_ AResidential General Service First Rev.-----_67 7-fft_ 7_,_._ f_-_ _/

Commercial Industrial Gen. Svc. First Rev. 68 7-_¢o_;_%.- -_Commercial Industrial Inter. First Rev. 69 7_01_8r7 -V_-t/

1-01- 7 _4_2 O,._q"Special Contract-Summary (Cancelled) Original 70 001118_:,.Emergency Winter Peak Service Original 71 1-

Special Terms Original 72 1-01-87 _ _'_,_ "Effective for Service Rendbf'ed on

Issued: April 30, 1996 ___ and afterBy: J.A. Noer i_,l ] Issued Under Authority of the MichiganPresident _( MAY0 6 1996 P.S.C. Dated

Eau Claire, Wisconsin k\_Zg//'_'' In Case No.

NORTHERN STATES POWER-CANCEI_I_ED-247

Page 47: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin llth Revised Sheet No. 5

Northern States Power Company Cancels 10th Revised Sheet No. 5

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77 Corrections for Gas

Measurements Original 57 1-01-8778 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87Gas Cost Recovery Factors Ninth Rev. 65 4-01-95GCRC - Reconciliation Ninth Rev. 66 12-21-95

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEResidential General Service First Rev. 67 7-01-87Commercial Industrial Gen. Svc. First Rev. 68 7-01-87Commercial Industrial Inter. First Rev. 69 7-01-87

Special Contract-Summary (Cancelled) Original 70 1-01-87Emergency Winter Peak Service Original 71 1-01-87

Special Terms,,___ Original 72 1-01-87

Issued: 1/_-_& -X__-'_ . Effective for Service Rendered on

__% I.. _,_"Q_OO_ and after CI_NCELLEDBy

By: J.A. Noer _@ ',____ IssuedUnde t_l_al_.rityof the Michigan

President P.S.C. Date_ -_it//_ _/Eau Claire, Wisconsin In Case No. REMOVEDBY. _/'_)')_

NORTHERN STATES POWER-CANCELLED-248

Page 48: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin Eleventh Sheet No. 5

Northern States Power Company Cancels Tenth Sheet No. 5

M.P.S.C. NO. 1 Gas - MichiganTABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77. Corrections for GasMeasurements Original 57 1-01-87

78 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87

Priority of Service Status Original 64 1-01-87Cost Recovery Factors Eighth Rev. 65 4-01-94

GCRC - Rec°nciliati°n GAS RATESSec°ndRev. 66 3-31-89 [(__ _,1 -ISHEET EFFECq ][VEg_ ,--_._,_

DESCRIPTION NUMBER DATE _ "_/ "_t '_Residential General Service First Rev 67 7-01-87 [ _1 N/

!

• _..

Commercial Industrial Gen. Svc. First Rev. 68 7-01-87 _ _t _J _x• • " 7 "_ ,_ XCommercial Industnal Inter• First Rev. 69 7-01-8 _ _ 71 ,-, _.

Special Contract-SummaryryC_eCancelled) Original 70 1-01-87 --_ _'_1__ NoEmergency Winter P_ Original 71 1-01-87 _ _ =, _ -

Special Terms _/__.___. Original 72 1-01-87 |___.__. .....Issued: December 15, 1994 //_'_/_ "- _"_t_\_ Effective for Service Rendered on

l[i , , .oo, andafterApril 1, 1994< Utb 1 0 1W4. _

i1_ Ut_?_, _?t)tJl_ ]_]] Issued Under Authority of the MichiganBy: J.A. Noer _\_/,¢/7/ /¢_/1 P.S.C. Dated November 10, 1994President ,___vJ_ - --

Eau Claire, Wisconsin _J In Case No U 10491

NORTHERN STATES POWER-CANCELLED-249

Page 49: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

MS1 D wisconsin Tenth Sheet No. 5

Northern States Power Company Cancels Ninth Sheet No. 5

M.P.S.C. NO.1 Gas- Michigan

TABLE OF CONTENTS - CHECK LIST (Continued)RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 _Regulating and Metering Original 51 1-01-87-75 Temporary Suspension of Service Original 51 - 1-01-87 --76 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77. Corrections for Gas

Measurements Original 57 1-01-8778 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87

I .......... Priority of Service Status Original 64 1-01-87: Gas Cost Recovery Factors Seventh Rev. 65 4-01-93

GCRC - Reconciliation Second Rev. 66 3-31-89

-. _ x,.. GAS RATES'_ SHEET EFFECTIVE_>i

, ,._ DESCRIPTION NUMBER DATE_i >- , Residential Genera[ Service First Rev. 67 7-01-87

=_t "_ t._ Commercial Industrial Gen. Svc. First Rev. 68 7-01-87,I _ o> Commercial Industrial Inter. First Rev. 69 7-01-87

_ _ _: Special Contract-Summary (Cancelled) Original 70 1-01-87

I .... ......... Emergency Winter Peak Service Original 71 1-01-87

/ Special T/___ Original 72 1-01-87

....... E T RVCE RED ONI s e dune 14, 1993 :) April 1, 1993s u d I///t _fX" -O'_ A AND AFTER ....Ea dUll2 1 _/_ --1993 , O,,ED"NDERAOrHORIWOFTHEMtCHIGA.By: J.A. NOER rJ , ,_ou v .PRESIDENT _ ,2_"___. s _] P.S.C. DATED May 21, t993

t_#_j,"_ // INOASENO. U-10191EAUCLAIRE,WISCONSIN

NORTHERN STATES POWER-CANCELLED-250

Page 50: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

TSt I Wisconsin Ninth SheetNo. 5

NorthernStates Power Company Cancels Ei ghth SheetNo. 5

M.P.S.C. NO.1 Gas- Michigan

TABLE.0F CONTENTS- CHECKLIST (Continued).

RULE SHEET EFFECTIVENUMBER DESCRIPTION _ NUMBER DATE" -

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests. Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77. B Adjustment of Bil I s Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77.C Correctionsfor GasMeasurements Original57 1-01-87

78 Gas CurtailmentProvisions Original58 1-01-8778.A Plan I Original 58 1-01-8778.B Plan 2 Original59 1-01-87

Plan 2- Priorities Original60 1-01-87Plan 2 - Prioritiescontd. Original61 1-01-87

79 Priorityof Service Original 62 1-01-87Definitionsfor PriorityofService Original62 1-01-87

SpecialTerms and Conditions Original62 1-01-87Definitionsfor Gas Service Original 63 1-01-87Priorityof ServiceStatus Original 64 1-01-87Gas Cost RecoveryFactors Sixth Rev. 65 4-01-92GCRC - Reconciliation Second Rev. 66 3-31-89

GAS RATESSHEET _ EFFECTIVE•

DESCRIPTION NUMBER DATEr

-. ResidentialGeneralService First Rev.-67 7-01-87CommercialIndustrialGen. Svc. First Rev. 68 7-01-87

_-_..... Comm_rcialIndustrialInter. First Rev. 69 7-01-87#.

/J._._II:,_,_EDBY Spec al Contract-Summary(Cancelled)Original70 1-01-87;_ _,:_,/o/_f Emer!rencyWinter Peak Service Original71 1-01-87 _.-' Sp,_cialTerms Original 72 1-01-87 ii_

ATL7/ -I/

" ' __,_,_ - " #C_Ke,D_EFFECTIVEFORSERVICERENDEREDONIssued May 28_ 1992 __ANDAFTER_t, (p April 1_ 1992

By: E.J. MclNTYRE __-_ISSUED UNDERAUTHORITYOF THEMICHIGAN

NORTHERN STATES POWER-CANCELLED-251

Page 51: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

1_S] ) Wisconsin Eiqhth SheetNo. 5

Northern States Power Company Cancels Seventh SheetNo. 5

M.P.S.C. NO.1 Gas- MichiganTABLEOF CONTENTS- CHECKLIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Ori gi nal 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77.C Correctionsfor GasMeasurements Original 57 1-01-87

78 Gas CurtailmentProvisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-87

li 78.B Plan 2 Original 59 1-01-87Plan 2 - Priorities Original 60 1-01-87Plan 2 - Prioritiescontd. Original 61 1-01-87

79 Priorityof Service Original 62 1-01-87Definitionsfor PriorityofService Original 62 1-01-87

SpecialTerms and Conditions Original 62 1-01-87Definitionsfor Gas Service Original 63 1-01-87Priorityof ServiceStatus Original 64 1-01-87Gas Cost RecoveryFactors Fifth Rev. 65 4-01-91GCRC -Reconciliation Second Rev. 66 3-31-89

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATE

esidentialGeneralService First Rev. 67 7-01-87

_ommercial IndustrialGen. Svc. First Rev. 68 7-01-87_ommercial IndustrialInter. First Rev. 69 7-01-87

pecial Contract-Summary(Cancelled)Original 70 1-01-87_ .mergencyWinter Peak Service Original 71 1-01-87

_ _ _? SpecialTerms Original 72 1-01-87

•Issued April 24, 199 ANDAFI'ER April 1_ 1991

II._-( 2 1991 ISSUEDUNDERAUTHORITY'-" By: E.J. MclNTYRE APR MICHIGAN

P.s.c.o,T O

NORTHERN STATES POWER-CANCELLED-252

Page 52: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Seventh Revised SHEETNO. 5NSP w,scoNs,.NORTHERN STATES POWER COMPANY CANCELS Sixth Revised SHEETNO. 5

-. M.P.S.C. NO.I GAS -- MICH!GAN

TABLE OF CONTENTS- CHECKLIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-01-8775 Temporary Suspension of Service Original 51 1-01-8776 Escaping Gas Original 51 1-01-8777 Gas Metering and Gas Metering

Equipment Original 52 1-01-8777.A Inspection and Tests Original 52 1-01-87

Rule 51 Original 52 1-01-87Rule 52 Original 54 1-01-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77.C Corrections for GasMeasurements Original 57 1-01-87

78 Gas Curtailment Provisions Original 58 1-01-8778.A Plan 1 Original 58 1-01-8778.B Plan 2 Original 59 1-01-87

Plan 2 -Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1-01-87

79 Priority of Service Original 62 1-01-87Definitions for Priority of

Service Original 62 1-01-87Special Terms and Conditions Original 62 1-01-87Definitions for Gas Service Original 63 1-01-87Priority of Service Status Original 64 1-01-87

.... Gas Cost Recovery Factors Fourth Rev. 65 4-01-90GCRC - Reconciliation Second Rev. 66 3-31-89

GAS RATESSHEET EFFECTIVE

_ DESCRIPTION NUMBER DATE_ Residential General Service First Rev. 67 7-01-87

>- _ Commercial Industrial Gen Svc First Rev. 68 7-01-87rll , ,

== _ Commercial Industrial Inter. First Rev. 69 7-01-87Special Contract-Summary (Cancelled)Original 70 1-01-87

_ _ Original 71 1-01-87< Emergency Winter Peak Service.- c: Special Terms Original 72 1-01-87m

EFFECTIVE FOR .SEI_VICE RENDERED ONISSUED June 1, 1990 AND AFTER April 1, 1990

BY; E. M. THEISEN ISSUEDUNDER AUTHORITY OF THE MICHIGAN

PRESIDENT _%__/_'\r_-__) _, PUBL,C SER. COMM.DATED May 18_ 1990EAU CLAIRE, WISCONSIN . IN CASE NO. UT9525

NORTHERN STATES POWER-CANCELLED-25g

Page 53: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP _ixtn Kevlsea SHEET NO. b.. WISCONSIN

NORTHERN STATES POWER COMPANY CANCEL_ifthRevised SHEETNO. 5

M.R S.C. NO.! GAS -- MICHIGAN' !

TABLE OF CONTENTS -CHECK LIST :(Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original51 1-01-8775 TemporarySuspensionof Service Original51 1-01-8776 EscapingGas Original51 1-01-8777 Gas Metering and Gas Metering

Equipment Original52 1-01-8777.A Inspectionand Tests Original52 1-01-87

Rlle 51 Original52 1-01-87Rule 52 Original54 1-01-87

77.B Adjustmentof Bills Becauseof Meter Errors Original 55 1-01-87

Rule 61 Original 55 1-01-87Rule 62 Original 56 1-01-87Rule 63 Original 56 1-01-87Rule 64 Original 56 1-01-87Rule 65 Original 57 1-01-87

77.C Corrections for GasMeasurements Original 57 1-01-87

78 Gas Curtailment Provisions Original 58 1-01-87" \ 78.A Plan 1 Original 58 1-01-87

78.B Plan 2 Original 59 1-01-87Plan 2 - Priorities Original 60 1-01-87Plan 2 - Priorities contd. Original 61 1"-01-87

79 Priority of Service Original62 1-01-87Definitionsfor Priority ofService Original62 1-01-87

Special Terms and Conditions Original62 1-01-87Definitionsfor Gas Service Original63 1-01-87Priority of ServiceStatus Original64 1-01-87Gas Cost RecoveryFactors Third Rev. 65 4-01-89GCRC - Reconciliation Second Rev. 66 3-31-89

GAS RATES

SHEET EFFECTIVE?&,_'__,. DESCRIPTION NUMBER DATE

_ _ _ Residential General Service First Rev. 67 7-01-87_ _, Commercial Industrial Gen. Svc. First Rev. 68 7-01-87_. Commercial Industrial Inter. First Rev 69 7-01-87_ < Special Contract-Summary(Canceled)Original 70. 1-01-87

"_ EmergencyWinter Peak Service Original71 1-01-87.Special Terms Original72 1-01-87

. _ERVICE RENDERED ON

,,.,.,.,,.-,,,,,=,N ,,,,OONO,, o, ,,,c=o,,,,-" ' . PRESIDENT __ZC_I PUBLICSER.10MM.DATED May 9, 1989""i. "I EAU CLAIRE, WISCONSIN

• __y IN CASE NO. , U 9297

NORTHERN STATES POWER-CANCELLED-254

Page 54: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Fifth Revised 5

NSP w,scoNs,N .o._NORTHERN STATES POWER COMPANY CANCELSFourth Revsied SHEETNO. 5

' .. M.P.S.C. NO.I GAS -- MICHIGAN

TABLE OF=CONTENTS-CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRI PTI0 N NUMBER DATE

74 Regulating and Metering Original 51 1-1-8775 Temporary Suspension of Service Original 51 1-1-8776 Escaping Gas Original 51 1-1-8777 Gas Metering and Gas Metering

Equipment Original 52 1-I-8777.A Inspection and Tests Original 52 1-1-87

Rule 51 Original 52 1-1-87Rule 52 Original 54 1-1-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-1-87

Rule 61 . Original 55 i-1-87Rule 62 Original 56 1-1-87Rule 63 Original 56 1-1-87Rule 64 Original 56 1-1-87Rule 65 Original 57 1-1-87

77.C Corrections for GasMeasurements Original 57 1-1-87

78 Gas Curtailment Provisions Original 58 1-1-8778.A Plan I Original 58 1-i-8778.B Plan 2 ,_ Original 59 1-1-87

Plan 2 - Priorities Original 60 1-1-87Plan 2 - Priorities contd. Original 61 1-1-87

79 Priority of Service Original 62 1-1-87Definitions for Priority of

Service Original 62 1-1-87Special Terms and Conditions Original 62 1-1-87Definitions for Gas Service Original 63 1-1-87Priority of Service Status Original 64 1-1-87Gas Cost Recovery Factors Second Rev. 65 4-1-88

• : ........ GCRC - Reconciliation Second Rev. 66 3-31-89

GAS RATES

_ SHEET EFFECTIVE-m DESCRIPTION NUMBER DATE

_' Residential General Service First Rev. 67 7-1-87_' Commercial Industrial Gen.-Svc. First Rev. 68 7-i-87

_ Commercial Industrial Inter. First Rev. 69 7-1-87_ _ Special Contract-Summary (Cancelled) Original 70 1-1-87_=, ,,, < Emergency Winter Peak Service Original 7"1 1-1-87

_ Special Terms Original 72 1-1-87

April 6, 1989 ,___v_= _--___ EFFECTIVE FOR SERVICE RENDERED ON

ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT ___ _=_=_/_// PUBLIC SER. COMM. DATEDEAU CLAIRE_ WISCONSIN. ) _ IN CASE NO.

r

NORTHERN STATES POWER-CANCELLED-255

Page 55: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

F

, Fourth Revised SHEETNO 5]_SP WISCONSIN

, NORTHERN STATES POWER COMPANY CANCELS Third RevisedsHEE T NO. 5

• ,. M.P.S.C. NO.I GAS -- MICHIGAN !

TABLE OF CONTENTS- CHECKLIST (Continued)

RULE SHEET ' EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-1-8775 Temporary Suspension of Service Original 51 1-1-8776 Escaping Gas Original 51 1-1-8777 Gas Metering and Gas Metering

Equipment Original 52 1-1-8777.A Inspection and Tests Original 52 1-1-87

Rule 51 Original 52 1-1-87Rule 52 Original 54 1-1-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-1-87

Rule 61 Original 55 I-1-87Rule 62 Original 56 1-1-87Rule 63 Original 56 ;; 1-1-87Rule 64 Original 56 :::i_ 1-1-87Rule 65 Original 57 ; 1-1-87

77.C Corrections for GasMeasurements Original 57 1-1-87

78 Gas Curtailment Provisions Original 58 I-1-8778.A Plan 1 Original 58 ,:1-1'8778.B Plan 2 Original 59 1-1-87

Plan 2 - Priorities Original 60 1-1-87Plan 2 - Priorities contd. Original 61 1-1-87

79 Priority of Service Original 62 1-1-87Definitions for Priority of

Service Original 62 1-1-87Special Terms and Conditions Original 62 1-1-87Definitions for Gas Service Original 63 1-1-87Priority of Service Status Original 6& ,1-I-87Gas Cost Recovery Factors Second Rev. 65 4-1-88GCRC - Reconciliation First Rev. 66 10-28-87

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATE

Residential General Service First Rev 67 7-1-87Commercial Industrial Gen. Svc. First Rev. 68 7-1-87Commercial Industrial Inter. First Rev. 69 7-1-87Special Contract-Summary (Cancelled) Original 70 1-1-87Emergency Winter Peak Service Original 71 1-1-87

Special Terms Original 72 1-1-87

ISSUED May 18, 1988 __ _ CANCELLEDBY

BY: E.M. THEISEN I AY 251088 "PRESIDENT _\ ;7_j_2_/ Z___/J REMOVED BY _fg_'U

t EAU CLAIRE, WISCONSIN. '_':__ • DATE /./_[I__C_

NORTHERN STATES POWER-CANCELLED-256

Page 56: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Third Revised SHEET NO. 5WISCONSIN

NORTHERN STATES POWER COMPANY CANCELSSecond ReviSed SHEET NO. 5

M,R S,C, .NO.I ELECTRIC -- MICHIGAN,|l

TABLE OF CONTENTS - CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-i-8775 Temporary Suspension of Service Original 51 1-1-8776 Escaping Gas Original 51 1-1-8777 Gas Metering and Gas Metering

Equipment Original 52 I-1-8777.A Inspection and Tests Original 52 1-1-87

Rule 51 Original 52 1-1-87Rule 52 Original 54 1-1-87

77.B Adjustment of Bills Because

of Meter Errors Original 55 I-i-87Rule 61 Original 55 i-1-87Rule 62 Original 56 i-1-87Rule 63 Original 56 i-I-87Rule 64 Original 56 1-1-87Rule 65 Original 57 1-1-87

77.C Corrections for Gas

Measurements Original 57 1-1-8778 Gas Curtailment Provisions Original 58 1-1-8778.A Plan 1 Original 58 I-1-8778.B plan 2 Original 59 1-1-87

Plan 2 - Priorities Original 60 1-1-87Plan 2 - Priorities contd. Original 61 1-1-87

79 Priority of Service Original 62 1-i-87Definitions for Priority ofService Original 62 i-1-87

Special Terms and Conditions Original 62 I-i-87Definitions for Gas Service Original 63 i-1-87Priority of Service Status Original 64 1-1-87Gas Cost Recovery Factors First Rev. 65 4-1-87GCRC - Reconciliation First Rev. 66 10-28-87

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATE

Residential General Service First Rev. 67 7-i-87Commercial Industrial Gen. Svc. First Rev. 68 7-1-87Commercial Industrial Inter. First Rev. 69 7-i-87Special Contract-Summary (Cancelled) Original 70 1-i-87Emergency Winter Peak Service Original 71 1-1-87

Special Terms Original 72 I-1-87

ISSUED November 10, 1987 CANCELing)BYOR.'_;ER_/L/-_'>'--_

BY : E. M. THEISEN ....................... '_

PRESIDENT REMOVEB BY _EAU CLAIRE, WISCONSIN. i

DATE _- -_ _-- _ _i

i

NORTHERN STATE8 POWER-CANCELLED-257

Page 57: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Second Revised 5___ WISCONSIN SHEETNO.

NORTHERN STATES POWER COMPANY CANCELS First Revised SHEET NO.5_

M.P.S.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 _ Regulating and Metering Original 51 1-1-8775 Temporary Suspension of Service Original 51 1-1-8776 Escaping Gas Original 51 1-1-8777 Gas Metering and Gas Metering

Equipment Original 52 1-1-8777.A Inspection and Tests Original 52 1-1-87

Rule 51 Original 52 1-1-87Rule 52 Original 54 1-1-87

77.B Adjustment of Bills Becauseof Meter Errors Original 55 1-1-87

Rule 61 Original 55 1-1-87Rule 62 Original 56 1-1-87Rule 63 Original 56 1-1-87Rule 64 Original 56 1-1-87Rule 65 Original 57 1-1-87

77.C Corrections for GasMeasurements Ori gi nal 57 1-1-87

78 Gas Curtailment Provisions Original 58 1-1-8778.A Plan 1 Original 58 1-1-8778.B Plan 2 Original 59 1-1-87

Plan 2 - Priorities Original 60 1-1-87Plan 2 - Priorities contd. Original 61 1-1-87

79 Priority of Service Original 62 1-1-87Definitions for Priority of

Service Original 62 1-1-87Special Terms and Conditions Original 62 1-1-87Definitions for Gas Service Original 63 i-1-87Priority of Service Status Original 64 i-1-87Gas Cost Recovery Factors First Rev. 65 4-1-87GCRC - Reconciliation Original 66 1-1-87

GAS RATESSHEET EFFECTIVE

DESCRIPTION NUMBER DATEr

Residential General Service First Rev. 67 7-1-87Commercial Industrial Gen. Svc. First Rev. 68 7-1-87Commercial Industrial Inter, First Rev. 69 7-1-87Special Contract-Summary (Cancelled)Original 70 1-1-87Emergency Winter Peak Service Original 71 i-1-87

• Special Terms Original 72 1-1-87

ISSUED August 12, 1987 IGANCELLEDBY/_)/,_/7-_-_'

BY: E.M. THEISEN

PRESIDENT - i_R_MOVED"BY -- ;--

EAU CLAIRE, WISCONSIN . DATE_ ,[/s _'/- , ._

NORTHERN STATES POWER-CANCELLED-258

Page 58: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

First Revised 51_l_j_ WISCONSIN SHEETNO.

NORTHERN STATES POWER COMPANY CANCELS Original SHEETNO. 5M.R S.C. NO.! GAS -- MICHIGAN

TABLE OF CONTENTS- CHECKLIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulating and Metering Original 51 1-1-8775 Temporary Suspension of Service Original 51 1-1-8776 Escaping Gas Original 51 1-1-8777 Gas Metering and Gas Metering

Equipment Ori gi nal 52 1-1-8777,A Inspection and Tests Original 52 1-1-87

Rule 51 Original 52 1-1-87Rule 52 Original 54 1-1-87

77,B Adjustment of Bills Becauseof Meter Errors Original 55 1-1-87

Rule 61 Original 55 1-I-87Rule 62 Original 56 1-1-87Rule 63 Original 56 1-1-87Rule 64 Original 56 1-1-87Rule 65 Original 57 I-i-87

77,C Corrections for GasMeasurements Ori gi nal 57 1-1-87

78 Gas Curtailment Provisions Original 58 1-1-8778,A Plan 1 Original 58 1-1-8778,B Plan 2 Original 59 1-1-87

Plan 2 - Priorities Original 60 1-1-87Plan 2 - Priorities contd, Original 61 1-1-87

79 Priority of Service Original 62 1-1-87Definitions for Priority of

Service Original 62 1-1-87Special Terms and Conditions Original 62 1-1-87Definitions for Gas Service Original 63 1-1-87Priority of Service Status Original 64 1-1-87

' .'.: Gas Cost Recovery Factors Original 65 1-1-87GCRC- Reconciliation Original 66 1-1-87

GAS RATES"_ SHEET EFFECTIVE

,_ _ _ DESCRIPTION NUMBER DATE

_, _-i Residential General Service First Revised 7-1-87_ _ Commercial Industrial General Ser, First Revised 7-i-87

_ _i : Commercial Industrial Interruptible First Revised 7-1-87

< __ <_! Special Contract-Summary (Cancelled) Original 70 1-1-87_ _ Emergency Winter Peak Service Original 71 1-1-87

Special Terms Original 72 1-1-87

ISSUED June 22, 1987 <_ 5_L,_O_r_ EFFECTIVEANDAFTER FOR JulySERVICEI,1987RENDERED ON

BY: E.M. THEISEN (( IJUL021987) // ISSUED UNDER AUI:HORITY OF THE MICHIGANPRESIDENT _)#r/<'/_P7/f_J//'PUBLIC SER.COMM. DATED June 9, 1987

EAU CLAIRE, WISCONSIN. __ IN CASE NO. U-8696f

NORTHERN STATES POWER-CANCELLED-259

Page 59: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO. 5NSP WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO.--M. RS.C. NO.I GAS -- MICHIGAN

TABLE OF CONTENTS- CHECK LIST (Continued)

RULE SHEET EFFECTIVENUMBER DESCRIPTION NUMBER DATE

74 Regulatingand Metering Original51 1-1-8775 TemporarySuspensionof Service Original51 1-1-8776 EscapingGas Original51 1-1-8777 Gas Meteringand Gas Metering

Equipment Original52 1-1-8777.A Inspectionand Tests Original52 1-i-87

Rule 51 Original52 1-1-87Rule 52 Original54 I-1-87

77.B Adjustmentof Bills Becauseof Meter Errors Original55 I-i-87Rule 61 Original55 1-1-87Rule 62 Original56 1-1-87Rule 63 Original56 1-1-87Rule 64 Original56 1-1-87Rule 65 Original57 1-1-87

77.C Correctionsfor GasMeasurements Original57 1-1-87

78 Gas CurtailmentProvisions Original58 1-1-8778.A Plan 1 Original58 I-1-8778.B Plan 2 Original59 i-1-87

Plan 2 - Priorities Original60 1-1-87Plan 2 - Prioritiescontd. Original61 1-1-87

79 Priorityof Service Original62 1-I-87Definitionsfor PriorityofService Original62 1-1-87

SpecialTerms and Conditions Original62 1-1-87Definitionsfor Gas Service Original63 1-1-87Priorityof ServiceStatus Original64 1-1-87

i Gas Cost RecoveryFactors Original65 i-1-87GCRC - Reconciliation Original66 1-1-87

t GAS RATES

_ _ SHEET EFFECTIVEi DESCRIPTION NUMBER DATE

_ ResidentialGeneralService Original67 1-1-87

_ _ < CommercialIndustrialGeneralSer. Original68 1-1-87o _ _= CommercialIndustrialInterruptible Original69 1-1-87

SpecialContract-Summary(Cancelled)Original70 1-1-87EmergencyWinterPeak Service Original71 1-1-87SpecialTerms Original72 1-1-87

__ EFFECTIVE FOR SERVICE RENDERED ON

ISSUED January1_ 1987 AND AFTER January1_ 1987

BY : E. M. THEI SEN _<:_|_)_}J ISSUED UNDER AUTHORITY oF THE MICHIGANDATED November 4_ 1986

E AU CLAIRE, WISCONSIN. _Oj/_'_ __2_' IN CASE NO. U-8493 _

NORTHERN STATES POWER-CANCEllED-260

Page 60: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

,c NORTHERN STATES POWER COMPANY d_NcEks:Ori,q inal SHEETNO. "I0

M R S C. NO I GAS -- MICHIGAN

S TAN D AR D RULES AN D REGULATIONS

(b.2) For Additional New Customers:The Company will refund to the depositor an amount equalto four (4) times the net revenue (gross revenue less costof gas) times the DKT of gas consumed during the firstfull year of service, from each additional customer who isfurnished service from such extension within five (5)years after the date of its construction.

(3) Additional Charges for All ApplicantsAn additional nonrefundable charge will also be required for:

(a) Winter construction (construction between December 15 and March i5at the rate of $2 per foot; if, however, unusual or extraordinaryexpenses are incurred due to the installation of facilitiesduring winter construction, the customer will be required to payall additional expenses incurred which are in excess of thestandard per foot charges as stated in Section I.A above.

(b) The customer shall pay for any permits and inspection fees require,by state or local ordinances for cutting streets or highways, orfor converting or connecting any gas utilization equipment.

B. Service LinesFor all new customers, the Company will extend service under thefollowing schedule:

(1) Service Lines Less Than 2 Inches in Diameter

(a) Company will install a service lateral and meter to serve a newcustomer without cost to the customer provided:

i_ _ (a.l) The service lateral does not extend more than mid-

:ELLEDBY way beyondthe building wall nearest the gas main._RBER___I_ _ (a.2) The service latera] does not exceed a total of 60

y_])_) feet in length from the property line, includingrEPrOVED_ __. _ (a.1) above, = if the gas main is located in street

I_ _" l f}-_'7___ right-of-way._-_I ATE_ _ (a.3) The service lateral does not exceed a total of 90• I feet in length from the property line, including

(a.1) above, if the gas main is located in an alleyright-of-way.

(b) For service laterals exceeding the limits described in (a) above,a non-refundable charge of $4.00 per foot will be made for thatlength in excess of the allowable limits. ,

__ EFFECTIVE FOR SERVICE RENDERED ON

K AFTER December 14, 1988ISSUED December 20, 1988 _AND .....

"I!BY: E.M. THEISEN _IISSUED UNDER AUTHORITY OF THE MICHIGAN

'_\_¢_,_'_' UBLIC SER COMM DATED December 13, 1988PRESIDENT 1 P

EAU CLAIRE_ WISCONSIN. __ IN CASE NO. U-9170

NORTHERN STATES POWER CANCELLED 261

Page 61: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

OrlginaI SHEET NO. 10NSP WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO.

M. RS.C. NO.I GAS -- MICHIGANi

STANDARD RULES AND REGULATIONS

(b.2) For Additional New Customers:The Company will refund to the depositor an amount equalto four (4) times the net revenue (gross revenue less costof gas) times the DKT of gas consumed during the firstfull year of service, from each additional customer who isfurnished service from such extension within five (5)years after the date of its construction.

(3) Additional Charges for All Applicants

An additional nonrefundable charge will also be required for:

(a) Winter construction (construction between December 15 andMarch 15) at the rate of $2 per foot; if, however, unusual or r

extraordinary expenses are incurred due to the installation offacilities during winter construction, the customer will berequired to pay all additional expenses incurred which are inexcess of the standard per foot charges as stated in Section I.Aabove.

(b) The customer shall pay for any permits and inspection feesrequired by state or local ordinances for cutting streets orhighways, or for converting or connecting any gas utilizationequipment.

B. Service Lines

For all new customers, the Company will extend service under thefollowing schedule:

J

(1) Service Lines Less Than 2 Inches in Diameter

(a) All Applicants Other Than Mobile Home Applicants In MobileHome Courts $200 flat charge for the first 50 feet or less.$4.00 charge per foot for each foot in excess of 50 feet.

(b) Mobile Home Applicants In Mobile Home Courts For service linesto individual mobile homes, when installed with necessary gasmains in easements provided by mobile home court operators.

$100 flat charge for the first 25 feet or le_s, %4.00 charg_ __

per foot for each foot in excess of 25 fe,_ANCELLEDBYORDER_- _/7_

REMOVEDBY ,v_/C"_'l

I naTF /- -)f-_P_

EFFECTIVE JFOR SE_VlC_ R_Nn_RFD ONISSUED January ]. 1987 _ AND AFTER January l, 1987

BY : E. M. T HE I SE N ISSUED UNDER AUTHORITY OF THE MICHIGAN

co.OT,o"ove er'EAU CLAIRE, WISCONSIN. _,__ IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-262

Page 62: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

First Revised SHEET NO. 13NSP wISCONSIN .

NORTHERN STATES POWER COMPANY CANCELS Original SHEETNO. 13 ,..

M. RS.C. NO.I GAS -- MICHIGAN -

STANDARD RULES AND REGULATIONS

3. Penalty for Unauthorized Take

Penalty which will apply to customers served on Schedule Nos. 61 and 62who fail to comply with a Company request that customers curtail orsuspend all use of gas as requested:

A. If customer fails to curtail his use of gas when requested to do soby the Company, in addition to the regular charges set forth in theapplicable rate schedule for such unauthorized take, customer willbe billed the higher of:

(1) An amount equal to any payment the Company is required to maketo its pipeline supplier under terms of their contract resultingfrom customer's failure to curtail service; or

(2) $1.00 per therm for such unauthorized take.

If applicable, the charge for unauthorized take shall be added to thenormal billing for the month immediately succeeding the billing periodduring which the unauthorized take occurred.

4. Gas Cost Recovery Clause

A. Applicability of Clause

All rates for gas service, unless otherwise provided in theapplicable rate schedule, shall include a Gas Cost Recovery Factorto allow the Company to recover the booked costs of gas sold by theCompany to Michigan customers if incurred under reasonable andprudent policies and practices.

B. Booked Cost of Gas Sold

1. Booked cost of gas sold as used in this rule includes thefollowing as expensed on the books of the Company:

p, In_tterstatePurchases: Cost for gas service.

ICANCELLEDBYIi 0RDEP_LYI

__ _ EFFECTIVE FOR SERVICE RENDERED ONISSUED June /Jr, AND AFTER May 28, 1987

((_( __. ISSUED UNDER AUTHORITY O, THE MICHIGANBY: E.M. THEISEN .... JUN 1.01987

. 27,1987PRESIDENT

, ISCONSIN \_-)-x_-//r',_'O//.. U-8648

EAU CLAIRE W ___ IN CASE NO.

NORTHERN STATES POWER-CANCELLED-263

Page 63: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO. 13NSP wISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO. • --

M. RS.C. NO.I GAS -- MICHIGAN

i

STANDARD RULES AND REGULATIONS

3. Penalty for Unauthorized Take

Penalty which will apply to customers served on Schedule Nos. 61 and 62who fail to comply with a Company request that customers curtail orsuspend all use of gas as requested:

A. If customer fails to curtail his use of gas when requested to do soby the Company, in addition to the regular charges set forth in theapplicable rate schedule for such unauthorized take, customer willbe billed the higher of:

(1) An amount equal to any payment the Company is required to maketo its pipeline supplier under terms of their contract resultingfrom customer's failure to curtail service; or

(2) $1.00 per therm for such unauthorized take.

If applicable, the charge for unauthorized take shall be added to thenormal billing for the month immediately succeeding the billing periodduring which the unauthorized take occurred.

4. Gas Cost Recovery Clause

A. Applicability of Clause

All rates for gas service, unless otherwise provided in theapplicable rate schedule, shall include a Gas Cost Recovery Factor toallow the Company to recover the booked costs of gas sold by theCompany to Michigan customers if incurred under reasonable andprudent policies and practices.

B. Booked Cost of Gas Sold

1. Booked cost of gas sold as used in this rule includes thefollowing as expensed on the books of the Company:

a. Interstate Purchases: Cost for gas service;

_E_0VEDBY,_

4 /

DATE

EFFECTIVE FOR SERWCE RENDERED ON

ISSUED AND AFTER January 1, 1987 ....

ISSUED UNDER AUTHORITY OF THE MICHIGAN

BY:PRESIDENTE.M. THE,SEN _J_._ PUBL,C SER. COMM. DATED NOVemBer 4, l'86

NORTHERN STATES POWER-CANCELLED-264

Page 64: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO. 14NSP WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO. -

M. RS.C. NO, I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

b. Intrastate Purchases: Costs for gas service incurred pur-suant to all contracts on file with the Michigan PublicService Commission.

c. Company-Produced Natural Gas: Costs which vary with volumeproduced.

d. Company-Produced SubstituteNatural Gas: Costs forfeedstock used to produce substitute natural gas.

e. Liquefied Petroleum Air Gas: Costs for propane used toproduce a propane-air gas mixture.

f. Storage Gas: Net costs of gas injected and withdrawn fromunderground storage facilities.

g. Purchases From Other Michigan Utilities: Costs for gasservice pursuant to contracts approved by the appropriateregulatory body.

h. Supplier Refunds And Credits: Refunds and credits fromsuppliers in the period realized.

2. Booked cost of gas sold as used in this rule specificallyexcludes the following items:

a. Gas used by the Company, at the annual average booked costof gas sold.

b. Lost and unaccounted for gas, at the annual average bookedcost of gas sold.

c. Gas sold at a price which does not include a gas costrecovery factor, at the incremental cost from the Company'ssuppliers.

d. Contract, tariff and other penalties, unless the customersof the Company benefit as a result of payment of suchpenalties.

CANCELLEDBY

OROER_ .._0,__FC/

REMOVED

DATE.

' ._'_' _K,_ EFFECTIVE FOR SERVICE RENDERED ON

___,_v_ AND AFTER January l, 1987ISSUED .... i/_---_t' \_'

BY: E.M. THEISEN i{<! JA_| 02,1987) ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDE NT _\t._k _/_ !C_ii PUBLIC SER. COMM. DATED NOVember 4, 1986,Nc,s,,o.EAU CLAIRE, WISCONSIN. U-8493

NORTHERN STATES POWER-CANCELLED-265

Page 65: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 2nd Revised Sheet No. 15

Northern States Power Company Cancels 1st Revised Sheet No. 15

M.P.S.C. NO. 1 Gas - MichiganSTANDARD RULES AND REGULATIONS

C. Billing

(1) In applying the Gas Cost Recovery Factor per Mcf or dekatherm, any fractionof 0.01 cent shall be rounded to the nearest 0.01 cent.

(2) Each month the Company shall include in its rates a gas Cost Recovery Factorup to the maximum authorized by the Commission as shown on Sheet No. 65.For months in which the Michigan Public Service Commission has notapproved a specific Gas Cost Recovery Factor, the Company may include anappropriate Gas Cost Recovery Factors in its rates if authorized by law to doSO.

(3) The Gas Cost Recovery Factor shall be the same per therm for each billedcustomer. The factor shall be placed into effect in the first billing cycle of eachmonthly billing period and shall continue in effect throughout all cycles in eachmonthly billing period.

(4) The Gas Cost Recovery Factor shall appear on all customer bills.

D. General Conditions

(1) At least fifteen days prior to each billing month, the Company will notify thePublic Service Commission staff as to the actual factor or factors to be billed to

its customers in the subsequent month.

(2) This Gas Cost Recovery Clause is authorized by the provisions of 1982 P.A_304. A copy of that act is available for public inspection at each business officeof the Company. The Company will provide a copy of the act to any customerupon request.

E. Receipt of Refunds

(1) Supplier Refunds

._.__._- _ Within 15 days after receipt of a supplier refund (in the form of check, wire_t_l_!_._-__ BY transfer or bill credit), the Company shall provide written notification to the0RD_R__L4 I I "L."L{; _ Michigan Public Service Commission Staff of:

REMOVEi38Y_-_--_--'--- a. The amount of the refund, including interest.b. Date received.

i_ R..o - ci _ c. Explanation of the reasons for the refund.I)ATE!_ _ d. P_ ered by the refund (historical refund period).

__ _,_ Effective for ServiceRendered onIssued: January_12, 1996 _g_._'q/_l,,_--_ _ ,,._\ and after February_1, 1996

By: J.A. Noer Issued Under Authority of the MichiganPresident .2 2_ -_ _. P.S.C. Dated December 20, 1995

Eau Claire, Wisconsin _// In Case No. U-10491-R

NORTHERN STATES POWER-CANCELLED-266

Page 66: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

First Revised SHEET NO. 15N_P WISCONSINNORTHERN STATES POWER COMPANY CANCELS Original SHEET NO, 15

M. RS.C. NO.I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

C. Billing

1. In applying the Gas Cost Recovery Factor per Mcf or dekatherm,any fraction of 0.01 cent shall be rounded to the nearest0.01 cent.

2. Each month the Company shall include in its rates a gas CostRecovery Factor up to the maximum authorized by the Commissionas shown on Sheet No. 65. For months in which the MichiganPublic Service Commission has not approved a specific Gas CostRecovery Factor, the Company may include an appropriate Gas CostRecovery Factors in its rates if authorized by law to do so.

3. The Gas Cost Recovery Factor shall be the same per therm foreach billed customer. The factor shall be placed into effect inthe first billing cycle of each monthly billing period and shallcontinue in effect throughout all cycles in each monthly billingperiod.

4. The Gas Cost Recovery Factor shall appear on all customer bills.

D. General Conditions

1. At least fifteen days prior to each billing month, the Companywill notify the Public Service Commission staff as to the actualfactor or factors to be billed to its customers in the subsequentmonth.

2. This Gas Cost Recovery Clause is authorized by the provisions of1982 P.Ao 304. A copy of that act is available for publicinspection at each business office of the Company. The Companywill provide a copy of the act to any customer upon request.

CANCELLEDBYoRDERLL°- -

REMOVEDBY2 __

DATE l- ;7-_-_._ _" . _

__7 EFFECTIVE FOR SERVICE RENDERED ONISSUE{) June 4, 1987 _,./_'>'"_)\ _, AND AFTER May 28, 1987

BY: E.M. THEISEN JUN I01987 ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT t\_7 ¢1_'-0'_'_/_ ._/J PIJBL,C SER. COMM. DATED Ma',/ 27, 1987EAU CLAIRE, WISCONSIN. IN CASE NO. U-8648

NORTHERN STATES POWER-CANCELLED-267

Page 67: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

15Original SHEET NO.NSP WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO. ,,

M. RS.C. NO, I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

C. Billing,

1. In applying the Gas Cost Recovery Factor per Hcf or dekatherm,any fraction of 0.01 cent shall be rounded to the nearest 0.01cent.

2. Each month the Company shall include in its rates a Gas CostRecovery Factor up to the maximum authorized by the Commissionas shown on Sheet No. 65. For months in which the MichiganPublic Service Commission has not approved a specific Gas CostRecovery Factor, the Company may include an appropriate Gas CostRecovery Factor in its rates if authorized by law to do so.

3. The Gas Cost Recovery Factor shall be the same per therm foreach billed customer. The factor shall be placed into effect in

the first billing cycle of each monthly billing period and shallcontinue in effect throughout all cycles in each monthly billingperiod.

4. The Gas Cost Recovery Factor shall appear on all customer bills.

D. General Conditions

1. At least fifteen days prior to each billingmonth, the Companywill notify the Public Service Commission staff as to the actualfactor or factors to be billed to its customers in the subsequentmonth.

2. This Gas Cost Recovery Clause is authorized by the provisions of1982 P.A. 304. A copy of that act is available for publicinspection at each business Office of the Company. The Companywill provide a copy of the act to any customer upon request.

CANCELLEDBY

ORDER _" _ c(

REMQVEODATE ,_.- {_-_"7

4

F. CT,VE.oRSE.V,CE.E.D .E0ISSUED January 1, 1987 //..';__'-T_.__ AND AFTER January I, 1987

((_'_ _" _i, _/I, -" ISSUED UNDER AUTHORITY OF THE MICHIGANBY: E.M. THEISEN AN 0 igo,PRESIDENT __(J_ _. _ PUBLIC SER. COMM. DATED November 4_ 1986.EAU CLAIRE_ WISCONSIN. _/_ IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-268

Page 68: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin Original Sheet No. 15.1

Northern States Power Company

M.P.S.C. NO. 1 Gas - MichiganSTANDARD RULES AND REGULATIONS

Additionally, if any portion of the refund is properly allocable to non-GCRcustomers, this allocation and amount, along with calculations of deductionstherefrom for Company Use andLost and Unaccounted For volumes, shall alsobe included in the written notification.

Failure of the utility to report the receipt of a refined to the Commission Staffina timely manner shall result in an interest penalty of 50% over the normalauthorized rate of return on common equity for the period of time the utilities failto comply with the notification requirement.

Allocation of refunds between Michigan and Wisconsin shall be based upon theconsumption in each state duringthe historical refined period.

The Michigan refund liability is equal to the product of the total supplier refundand the ratio of Michigan rate schedule sales to total NSP sales during thehistorical refund period. -_

CAhlCELLEOBYS Refund Liability- S Supplier Refund ORDERkJk ) ) "L..'D.__lo(Michigan Sales/Total NSP Sales)

F. GCR Customer Refunds REMOVEDBY Q 3"_ C

(1) Supplier Refunds DArE

All supplier refunds allocable to GCR customers shall be reflected as reductionto the GCR Cost of Gas Sold in the month received and included in the Cost of

Purchased and Produced Gas. No deductions for Company Use and Lost andUnaccounted For Gas volumes shall be made from refunds allocated to GCRcustomers.

(2) GCR Reconciliation

Prior year GCR over/under recoveries due to reconciliation provisions of theCompany's GCR Clause, shall be computed annually according to the provisionsof 1982 PA 304. Such overfunder-recoveries and any Commission orderedadjustments or disallowances associated with the prior GCR year shall bereflected separately below the GCR Cost of Gas Sold line on the GCROver/Under-recovery Reconciliation report.

(3) Other Refunds

All other refunds shall be reflected in the month the refund is received and shall

be included on a separate line below the Cost of Gas Sold line on theOver/Under-recovery Reconciliation Report so that such refunds are readily

identifiable. __ ,_

Issued: January_12, 1996 and after February i, 1996

By: J.A. Noer I(_.( dAN2 2 1996} ll Issued Under Authofity ofthe Michigan

President _k_k J_-_v_2_' /_¢O_/ P.S.C. Dated December 20, 1995Ean Claire, Wisconsin In Case No. U-10491-R

NORTHERN STATES POWER-CANCELLED-269

Page 69: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP WISCONSIN First Revised Sheet No. 16

NORTHI_.RN STATES POWER COMPANY Cancels Original Sheet No. 16

M. P. S. C. NO. 1 GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

5. Restoration of Service

When service has been disconnected in accordance with these rules, chargesfor re-establishing service will be actual labor and transportation costsfor disconnect and reconnect. A minimum charge of $16.50 shall apply Runless the customer requests reconnection during other than regularworking hours, in which case a minimum charge of $32.00 will apply. _ _ o

If an authorized Company employee is sent to a premises for the purpose of _ _ mdisconnecting service for the nonpayment of an undisputed delinquent bill, _ _ _said employee may accept payment and in such case shall not discontinue _service if customer then and there tenders payment in full together with a "_ _,,

reasonable charge for sending the employee to the premises, if" _'J i_i.o_6. Termination of Service at Customer Request _ _ i

A. Any customer who desires a discontinuance of gas supply because he i _' Ivacatin.g,the premises, or because of any other reason, unless there is !a provaslon to the contrary in the service contract or applicable rateschedule, should give advance notice to the Company of such desire andshall be liable for all gas supplied the premises to be vacated untilsuch notice can be carried out by the Company, but not more than twoworking days after notice is given by the customer.

B. When a customer requests a disconnection and reconnection of service atthe same location within any 12 month period the customer must pay areconnect charge which is the higher of:

(1) The charges for connection of service in paragraph 5) above, or. R

(2) The fixed charge set forth in the applicable rate schedule timesthe number of months service was disconnected.

7. Temporary Gas Service _1

A customer taking temporary gas service shall pay the rates applicable to !! ithe class or service rendered and shall be subject to these rules and ,__._| _

regulations. In such ease, the Company may require that the customer pay in _ _ /advance the cost of the installation and removal of all facilities, _ g ¢._ Z_3_I .

including the meter, required to furnish the desired service, less the ,-o,/lt

salvage value of such facilities.

EFFECTIVE FOR SERVICE RENDERED ON

ISSUED Februa_ 15J999 AND AFTER Februarg 3, 1999

BY: J.L. Lal'sen ISSUED UNDER AUTHORITY OF THE MICHIGAN "PRESIDENT PUBLIC SER. COMM. DATED February 2, 1999EAU CLAIRE, WISCONSIN IN CASE NO.., U-11807

- NORTHERN STATES POWER-CANCELLED-270

Page 70: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO. 16NSP wiscoNsiNNORTHERN STATES POWER COMPANY CANCELS SHEETNO. ,,

M. RS.C. NO.I GAS -- MICHIGANJ

STANDARD RULES AND REGULATIONS

5. Restoration of Service

When service has been disconnected in accordance with these rules, chargesfor re-establishing service will be actual labor and transportation costsfor disconnect and reconnect. A minimum charge of $12.25 shall applyunless the customer requests reconnection during other than regularworking hours, in which case a minimum charge of $32.00 will apply.

If an authorized Company employee is sent to a premises for the purpose ofdisconnecting service for the nonpayment of an undisputed delinquent bill,said employee may accept payment and in such case shall not discontinueservice if customer then and there tenders payment in full together with areasonable charge for sending the employee to the premises.

6. Termination of Service at Customer Request

A. Any customer who desires a discontinuance of gas supply because he isvacating the premises, or because of any other reason, unless there isa provision to the contrary in the service contract or applicable rateschedule, should give advance notice to the Company of such desire andshall be liable for all gas supplied the premises to be vacated untilsuch notice can be carried out by the Company, but not more than twoworking days after notice is given by the customer.

B. When a customer requests a disconnection and reconnection of service atthe same location within any 12 month period the customer must pay areconnect charge which is the higher of:

(1) Actual labor and transportation charges associated with therestoration of services; or

(2) The fixed charge set forth in the applicable rate schedule timesthe number of months service was disconnected.

7. Temporary Gas Service

A customer taking temporary gas service shall pay the rates applicable tothe class of service rendered and shall be subject to these rules andregulations. In such case, the Company may require that the customer pay inadvance the cost of the installation and removal of all facilities,including the meter, required to furnish the de_-i_-e_-s_=_v-i_-eT_-}ems--_esalvage value of such facilities. ,CANCELLEDBY

ORDER.C_LI.X_ o _ .....

R MOVEOBy. D Qi

ISSUED January l, 1987 AND -Af_PE_ -

_\_._\_ /_..# PUBLIC SER.COMMDATEDNovember 4, 1986 _PRESIDEN T

EAU CLAIRE, WISCONSIN. _"_7"_'----'_"-_ # IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-271

Page 71: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Original SHEETNO. 24WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO. -

M. RS.G. NO, I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

19. Discounts and Late Payment Charges Prohibited

The Company shall bill each customer for the amount of energy consumed andany other approved charges in accordance with the net rates in the tariffsand schedules approved by and on file with the Commission. The Companyshall not employ any net/gross payment discount provision or assess any latepayment charge in determining the amount of any bill due and owing by aresidential customer.

20. Billin 9 Information

Every bill rendered by the Company for residential utility service shallstate clearly:

(1) The beginning and ending meter readings of the billing period and thedates thereof. Utilities authorized to use a customer read and self-billingsystem need not provide this information.

(2) The due date. _CA_CELLEDBY

ORDER____L__(3) Any previous balance.

REMOVED(4) The amount due for energy usage.

DATE(5) The amount due for other authorized charges.

(6) The total amount due.

(7) The statement that "rate schedules and an explanation of how tocalculate the accuracy of the bill are available and will be mailed uponrequest."

(8) The statement, "Register any inquiry or complaint about this bill priorto the due date."

(9) The address and telephone number of the Company designating where thecustomer may initiate an inquiry or complaint regarding the bill as renderedor the service provided by the Company.

(10) The statement, "This utility is regulated by the Michigan Public ServiceCommission, Lansing, Michigan."

4

.__ EFFECTIVE FOR SERVICE RENDERED

ON

ISSUED January I, 1987 AND AFTER January I, 1987

BY : E. M. THEtSEN ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT _\¢.._\_-2//?_/r_j)/] PUBLIC SER. COMM. DATEDNOVember4, 1986,

EAU CLAIRE, WISCONSIN . " _-"_----"_k __ IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-272

Page 72: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

26Original SHEET NO.NSP WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO.,

M. RS.G. NO.I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

25. Other Standards Prohibited

The Company shall not require a cash deposit or other guarantee as acondition of new or continued utility service based upon commercial creditstandards, income, home ownership, residential location, race, color, creed,sex, age, national origin, or any other criteria not authorized by theserules.

26. General Deposit Conditions - Residential

A cash deposit required pursuant to these rules is subject to the followingterms and conditions:

(1) A deposit required as a condition of new service due to a prioroutstanding account not in dispute shall not exceed the lesser of the amountof the prior outstanding account or $100. The utility may also requirepayment of the prior outstanding account as a condition of new service.

J

(2) A deposit required as a condition of continued service due todiscontinuance for nonpayment shall not exceed the lesser of an amount equalto the actual or estimated maximum monthly bill for service at thecustomer's premises, or $100. The Company may also require payment of theprior outstanding account as a condition of continued service.

(3) A deposit required for new or continued service due to unauthorizedinterference or use shall not exceed $100.

(4) Before requiring a deposit as a condition of continued service, theutility shall have offered the customer, prior to discontinuance fornonpayment, the opportunity to enter into a settlement agreement as providedin Settlement Agreement section of the Rules and Regulations.

(5) Interest at the rate of 6% per annum shall be payable on all deposits.Interest shall be credited semi-annually upon the service account of thecustomer or paid upon the return of the deposit, whichever occurs first.The Commission, by order, may revise the annual interest rate not later thanJanuary 31 of each year, after having given notice of the proposed revisionby publication in three (3) daily newspapers of general circulation, one (I)of which shall be in the Upper Peninsula, and having afforded all interested

-"_-_ parties the opportunity to comment upon the proposed internistrate.

CANCELLED BY

ORDER__(- _/ 5 "7

REMOVEDBYU 2d4

, j . RVICE RENDERED ONISSUED January l, 1987 _ )':/.'_%_--_,_.t_\\_ AND AFTER January l, 1987

_"_'_ '° "_ - _I_t ISSUED UNDER AUTHORITY OF THE MICHIGANBY: E.M. THEISEN _E

PRESIDENT

E AU CLAIRE, WISCONSIN. _"___ _ IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-273

Page 73: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Orlginal ,. SHEETNO. 58NSP w,scoNs,NNORTHERN STATES POWER COMPANY CANCELS --SHEET NO._

M. RS.C. NO.I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

78. GASCURTAILMENTPROVISIONS

A. ORDEROF GASCURTAILMENT- Plan 1(To Stay WithinContractDemands)

Whenever,in the Company'ssole opinion,the Company'sgas supply is curtailedby NorthernNaturalGas Companyso as to requirethe Companyto curtailorinterruptserviceto its customersto avoid the paymentof penaltiesfor over-take of gas, such curtailmentor interruptionshall be made in the inverseorder of the prioritiesset forth below. Curtailmentor interruptionsofcustomerswithin the same priorityshall be made, so far as possible,on apro-ratabasis.

The Companymay deviatefrom this order of curtailmentor interruptionforbrief periods,in order to avoid shutdownof customer'sfacilitiesin forcemajeureor similarsituations. In case of such deviation,the Companywillso far as practicablesubsequentlyequalizethe curtailmentswithin anypriority.

Priorities

PRIORITYI - GeneralService--Firm--ResidentialRate Sheet No. 67

P

PRIORITYII - GeneralService--Firm--Commercialand IndustrialRate Sheet No. 68

PRIORITYIII - SpecialContract--Firm--IndustrialRate Sheet No. (Cancelled)

PRIORITYIV - Small Volume InterruptibleService--CommercialandIndustrialRate Sheet No. 69

PRIORITY.V - Large Volume Interruptible--IndustrialRate Sheet No. (Cancelled)

PENALTY - For use of gas in violation of any curtailment orinterruption notice or order issued by the Company,

_NCELLEDBY $1,00 per therm.

EFFECTIVE FOR SERVICE RENDERED ON

ISSUED _ ._" AND AFTER January1, 1987

BY: E.M. THEISEN I(_( JAN 0219B7 _ ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRES,DENT . _.__/_, PUBL,CSER.COMM.DATEDNovember4, 1986 ..EAU CLAmE, WiSCONS,N. \_/,_. /_y ,N CASENO. U-8493

-- NORTHERN STATES POWER-CANCELLED-274

Page 74: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Orlglnai SHEET NO._NSP w,scoNs,NNORTHERN STATES POWER COMPANY CANCELS_ SHEET NO. --

M. RS.C. NO,I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

78. GASCURTAILMENTPROVISIONS(Continued)

B. ORDER OF GAS CURTAILMENT- Plan 2(ToStay Within SuppliesCurtailedBelowContractDemands)

Whenever,in the Company'ssole opinion,the Company'sgas supply is curtailedbelow the contractdemandquantityspecifiedin the Company'sserviceagreementswith NorthernNaturalGas Company,so as to requirethe Companyto curtailorinterruptserviceto avoid the paymentof penaltiesfor overtakeof gas, suchcurtailmentor interruptionshall be made in accordancewith the prioritiesofNorthernNaturalGas Company'scurtailmentplan on file with and as authorizedby the FederalPower Commissionas set forth below. Except as providedherein,curtailmentor interruptionsof customerswithinthe same priorityshall bemade, so far as possible,on a pro rata basis.

The Companymay deviatefrom this order of curtailmentor interruptionfor briefperiodsin order to avoid shutdownof customer'sfacilitiesin force majeureorsimilarsituations. In case of such deviation,the Companywill, so far aspracticable,subsequentlyequalizethe curtailmentwithin any priority.

The Companymay also deviatefrom this order of curtailmentor interruptionandinterruptinterruptibleloads of a higherpriorityto avoid curtailingfirmloads of a lower priority,when such firm loadsdo not have alternatefuel capa-bility. Such interruptionsof interruptibleloads will be made in the inverseorder of the prioritiesin which such interruptibleloads are classified,with"full or 100 percent interruptionto be directedand achievedin each prioritybeforeproceedingto the next priority: Interruptionswill be terminatedinreverseorder as gas suppliespermit. Interruptionsof interruptibleloadswithin any prioritYwill be done on a pro rata basis as far as practicable. Anydeviationsfrom such pro rata interruptionswill be equalizedsubsequentlytothe extent practicable.

CAN,CELLEDBV, Zo......ORDER

" '__K_,_t EFFECTIVE FORjanuarySERVICEI,1987RENDEREDON

i ssUEOJaVa " ' "" "" _'__ _9_7_!_ AND AFTER ,,.M. ISSUED UNDER AUTHORITY OF THE _flCHIGAN

BY: E. I_1_\ j_/_/2Y../_// PUBLICSER.COMM.DATEDNOvembeP4_ 1986PRESI DENT

EAU CLAIRE " ........... _ -,× _".,'_ U-8493' _,._LJ//_,...,_//_',_,_#"// IN CASE NO. ..

NORTHERN STATES POWER-CANCELLED-275

Page 75: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEETNO._]_I_P WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS_ -SHEET NO._ _-M. RS.C. NO.I GAS -- MICHIGAN

STANDARD RULES AND REGULATIONS

PRIORITIESOF CUSTOMERCLASSIFICATIONS-Plan 2

Priority• (1) (a) Residential,small commercialand irrigationrequirementsless

than 50 Mcf on a peak day.

(b) All commercialand irrigationrequirementsfrom 50 Mcf per daythrough199 Mcf per day and all industrialrequirementsthrough199 Mcf per day.

(c) Customerstorage injectionrequirements.

(d) Requirementsgreaterthan 199 Mcf per day for schools,hospitals,sanitationfacilities,correctionalinstitutions,police protec-tion and fire protection,exceptwhere the use of a fuel otherthan naturalgas is economicallypracticableand that fuel isreasonablyavaifable.

(e) Requirementsfor essentialagriculturaluses as certifiedby theU.S.D.A.,except where the use of boilerfuel other than naturalgas is economicallypracticableand that fuel is reasonablyavailable.

If curtailmentin this Category(1) is required,the order of cur-tailmentshall be (e), (d), (c), (b) and then (a).

(2) Requirementsfor essentialprocessand feedstockuses and plant protec-tion other than when productionoperationsare shut down, except wherethe use of a fuel other than naturalgas is economicallypracticableand that fuel is reasonablyavailable.

(3) All commercialand industrialrequirementsfrom 200 Mcf per day through499 Mcf per day, not otherwiseclassified.

(4) All commercialand industrialrequirementsfor non-boileruse 500 Mcfper day and over, not otherwiseclassified;all commercialrequirementsfrom 500 Mcf per day through1,499 Mcf per day, not otherwiseclassified.

.....(=5.).........Industrialrequirementsfor boilerfuel use from 500 Mcf per dayotherwiseclassified.1,499 Mcf per day, not

l ./"x_ EFFECTIVE FOR SERVICERENDEREDON

ISSUED AND AFTER January l, 1987 --

BY: E.M. . _'_/ PUBLICSER.COMM.DATEDNovember4_ 1986

EAU CLAIRE, WIS ONSIN. IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-276

Page 76: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

r NSP WISCONSIN urlglnai SHEETNO. 61

NORTHERN STATES POWER COMPANY CANCELS SHEET NO. r

M. RS.C. NO.I GAS -- MICHIGANii i i i rl ii ii

STANDARD RULES AND REGULATIONS

PRIORITIES OF CUSTOMERCLASSIFICATIONS- Plan 2 (Continued)

Priority

(6) Commercialand industrialrquirementsfor boilerfuel use from1,500 Mcf per day through2,999 Mcf per day, not otherwiseclassified.

(7) Commercialand industrialrequirementsfor boiler fuel use from3,000 Mcf per day through10,000Mcf per day, not otherwiseclassified.

(8) Commercialand industrialrequirementsfor boilerfuel use over10,000Mcf per day, not otherwiseclassified.

CA CELL D

I,7_" ,o_.-a Vt_ " h;

iSSUED L " -'_" EFFECTIVE FOR SERVICE RENDERED ON........ AND AFTER January], ]987 _-

BY: E.M. _ 198 ISSUED UNDER AUTHORITY OF THE MICHIGAN

• \\___J PUBLICSER.COMM.DATEDNovember4_, ]986PRESIDEN

EAU CLAIRE, WISCONSIN. _,_"_O._x. ""_// IN CASE NO. U-8493 II

NORTHERN STATES POWER-CANCELLED-277

Page 77: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 21st Revised Sheet No. 65NORTHERN STATES POWER COMPANY Cancels 20th Revised Sheet No. 65

(To update Gas Cost Recovery Factors)

GAS COST RECOVERY FACTORS

The following monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

First Ouarter

April 2002 .................... $.38609 per therm.

May 2002 ..................... $.38609 per therm.

June 2002 ..................... $.38609 per therm.

Second Quarter

July 2002 ..................... $.42263 per therm.

August 2002 ................... $.42263 per therm.

September 2002 $.42263 per therm.

Third Quarter

October 2002 .................. $.47599 per therm.

November 2002 ................ $.47599 per therm.

........... December 2002 ................. $.47599 per dterm.

,._ :'.: 9 _ _ Fourth Quarter

...... _dnuary 2003 .................. $.47599 per tnerm.

_,I0_,_.[) _$_F-_.bruary 2003 .................. $.47599 per therm.!

_T _ 2- _-0_ A_rch2003 .................... $.47599pertherm.=-- (1-)-The.m'aximum Gas Cost Recovery Factors shown above are subject to adjustment

pursuant to the contingency mechanism. See Sheet No 66.

(2) The Gas Cost Recovery factors shown above are the maximum Gas Cost Recovery

Factors the Company may charge (subject to the contingency mechanism adjustmenO .The actual Gas Cost Recovery Factors charged in any month maybe less titan that shown.

Contact the Company or the Commission for the actual rates charged.

(3) The Company will file by December 31, 2002for maximum Gas Cost RecoveryFactors for April 2003 through March 2004. The Gas Cost Recovery Factor to be charged

beginning April 2003 is authorized pursuant to §6(h)(9) of 1982 PA 304, as amended,

MCL 460. 6h et seq.

Issued Septemb_,'r 27, "."_f_'._'lcECOM_tSS_O_ Effective for bills rendered on and after the first

billing cycle of the October, 2002 billing month.

By: M. L. Swen son Issued Under Authority Of The MichiganPresident OCT 1 fi 2002 P.S.C. Dated July 23, 2002

Eau Claire, Wis _'ons_ In Case No. U-13222

NORTHERN STATES POWER-CANCELLED-278

Page 78: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 20th Revised Sheet No. 65NORTHERN STATES POWER COMPANY Cancels 19th Revised Sheet No. 65

(To update Gas Cost Recovery Factors)

GAS COST RECOVERY FACTORS

The following monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

First Quarter

April2002 .................... $.38609 per therm.

May 2002 ..................... $.38609 per therm.

June 2002 ..................... $.38609 per therm.

Second Quarter ._ :_

July2002 $.42263pertherm. _ _ mi_

August 2002 ................... $.42263 per therm. _

September2002 $.42263pertlterm. "_"_I_.__l_ i

!6,.Third Quarter _ _

October 2002 .................. $.42263 per therm.

November 2002 ................ $.42263 per therm.

December 2002 ................. $.42263 per therm, k_

Fourth Quarter

January 2003 .................. $.42263 per therm.

February 2003 .................. $.42263 per therm.

March 2003 .................... $.42263 per thernt.

(1) The maximum Gas Cost Recovery Factors shown above are subject to adjustntent

pursuant to the contingency mechanism. See Sheet No 66.

(2) The Gas Cost Recovery factors shown above are the maximum Gas Cost Recovery

Factors the Company may charge (subject to the contingency mechanism adjustmenO .The actual Gas Cost Recovery Factors charged in arty month maybe less titan that shown.Contact the Company or the Commission for the actual rates charged.

(3) The Company will file by December 31, 2002 for maximum Gas Cost Recovery

Factors for AprE 2003 through March 2004. The Gas Cost Recovery Factor to be charged

beginning April 2003 is authorized pursuant to §6(h)(9) of 1982 PA 304, as amended,

MCL 460. 6h et seq.

Issued August 14 2002. MICHIGANPUBLIC Effective for bills rendered on and after the firstSERVICE¢0MMISSl0N billing cycle of the April_ 2002 billing month.r

By: M.L. Swe ]son[ Issued Under Authority Of The Michigan

President [ SEia ] _ _002 P.S.C. Dated July 23, 2002

Eau Claire, Wi _con_in In Case No. U-13222

: NORTHERN STATES POWER-CANCELLED'279

Page 79: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 19th Revised Sheet No. 65NORTHERN STATES POWER COMPANY Cancels 18th Revised Sheet No. 65

(To update Third Quarter Gas Cost Recovery Factors)

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

First Quarter

April 2001 .................... $. 72992per therm.

May 2001 ..................... $.67037 per therm.

June 2001 ..................... $. 67037per therm. >_ m_ =o°>°

Second Quarter _: _

July 2001 ..................... $.56355*per therm. _9 _ .C_

August 2001 ................... $.56355*per therm. _ _'_

September 2001 ................ $.56355*pertherm. _ _ ,,_Third Quarter IH

October 2001 .................. $.49887* per thenn.

November 2001 ................ $.49887* per therm.

December 2001 ................. $.49887* per therm.

Fourth Quarter

January 2002 .................. $. 53083*per therm.

February 2002 .................. $.53083* per therm.

March 2002 .................... $. 53083*per therm.

The above Gas Cost Recovery Factors above are subject to adjustment pursuant to the

contingency mechanism. See Sheet No 66.

* These factors have been adjustedpursuant to the contingency ntechanism. See SheetNo 66.

Issued December 7_ 2001 Effective For Service Render on and After

MICHIGAI_PUBUC January 1_ 2002By: J.L. Larsen _SERVICE COMMISSION Issued Under Authority Of The Michigan

President _ t MAF! .i P.S.C. Dated May 15, 2001Eau Claire, Wisco/sin 2002 In Case No. U-12751

!LFILED_

NORTHERN STATES POWER-CANCELLED-280

Page 80: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 18th Revised Sheet No. 65

NORTHERN STATES POWER COMPANY Cancels 17th Revised Sheet No. 65

(To update Third Quarter Gas Cost Recovery Factors)

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,

Gas Cost Recovery Clause:

First Quarter

April 2001 .................... $. 72992per therm.

May 2001 ..................... $.67037 per therm.

June 2001 ..................... $.67037per therm. "l! _i_ _ _° °>

Second Quarter ?_ r_ _

July 2001 ..................... $.56355*pertherm. '_ E

August 2001 ................... $.56355*per therm. __ -_eeoo/................*eeraThird Quarter t_ _'x3October 2001 .................. $.49887* per therm.

November 2001 ................ $.49887* per therm.

December 2001 ................. $.49887* per therm.

Fourth Quarter

January 2002 .................. $. 75787per therm.

February 2002 .................. $. 75787per therm.

March 2002 .................... $. 75787per therm.

The above Gas Cost Recovery Factors above are subject to adjustment pursuant to the

contingency mechanism. See Sheet No 66.

* These factors have been adjustedpursuant to the contingency mechanism. See SheetNo 66.

Issued September 8, 2001 MICHIGANPUBLIC Effective For Service Render on and AfterSERVICECOMMISSIONOctober 1, 2001

By: J.L. Larsen [ Issued Under Authority Of The Michigan

President t MAB | 2002 P.S.C. Dated May 15, 2001Eau Claire, Wiscol sin In Case No. U-12751

FILED _'_ ,__ .'_

NORTHERN STATES POWER-CANCELLED-281

Page 81: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 17th Revised Sheet No. 65

NORTHERN STATES POWER COMPANY Cancels 16th Revised Sheet No. 65

(To update Second Quarter Gas Cost Recovery Factors)

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to RuIe 4,

Gas Cost Recovery Clause:

First Quarter

April 2001 .................... $. 72992per therm.

May 2001 ..................... $.67037per therm.

June 2001 ..................... $.67037 per therm.

Second Quarter

July 2001 ..................... $.56355*per therm. (- L _ o=70

August 2001. $.56355*per therm. I :_ _ _ _'''''°''''°'°*'''" _t _1 ['rl

Septethber2001 ................ $.56355*pertherm. ' VO _ __...-

ThirdQuarter ' iLO bO-_l__[

October 2001 .................. $. 72031 per therm.

November 2001 ................ $. 72031 per therm.

December 2001 ................. $. 72031 per therm.

Fourth Quarter ....

January 2002 .................. $. 75787per therm.

February 2002 .................. $. 75787per tlterm.

March 2002 .................... $. 75787per therm.

The above Gas Cost Recovery Factors above are subject to adjustment pursuant to the

contingency mechanism. See Sheet No 66.

* These factors have been adjustedpursuant to the contingency mechanism. See SheetNo 66.

Effective For Service Render on and AfterIssued August 16, 2 ,ux'a_ MICHIGANPUBLIC

SERVICECO_MISSION July 1, 2001

By: J.L. Larsen Issued Under Authority Of The MichiganP.S.C. Dated May 15, 2001

President SEP 4 2001Eau Claire, Wiscon .in In Case No. U-12751

FILED e _ip

" NORTHERN STATES POWER-CANCELLED-282

Page 82: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas 16th Revised Sheet No. 65NORTHERN STATES POWER COMPANY Cancels 15th Revised Sheet No. 65

(To update Gas Cost Recovery Factors)

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,

Gas Cost Recovery Clause:

First Quarter

April2001 .................... $.72992 per therm.

May 2001 ..................... $.67037per therm.

June 2001 ..................... $.67037 per therm.

Second Quarter

July 2001 ..................... $. 67915per therm.

August 2001 ................... $.67915 per therm.

September 2001 ................ $. 67915per therm.

Third Quarter

October 2001 .................. $. 72031 per therm.

November 2001 ................ $. 72031 per therm.

December 2001 ................. $. 72031 per therm.

Fourth Quarter

January 2002 .................. $. 75787per therm.

February 2002 .................. $. 75787per therm.

March 2002 .................... $. 75787per therm.

The above Gas Cost Recovery Factors above are subject to adjustment pursuant to the

contingency mechanism. See Sheet No 66.

CAr_ICELLEI)B'--"'-"-"_ __

oRDER

_AT_

Issued August 16, 2( 01 MICHIGANPUBLIC Effective For Service Render on and AfterSERVICECOMMISSIONApril 1, 2001

By: J.L. Larsen Issued Under Authority Of The MichiganPresident SEP 4 2001 P.S.C. Dated May 15, 2001

Eau Claire, Wiscon_ in In Case No. U-12751

FILED _ _f

NORTHERN STATES POWER-CANCELLED-283

Page 83: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 15th Revised Sheet No. 65

Northern States Power Company Cancels 14th Revised Sheet No. 65

M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 2000 $.40150 per therm. _ N _

May 2000 $.40150 per therm. _ "_

June 2000 $.40150 per therm. _ _ _

July 2000 $.40150 per therm. ,-e

August 2000 $.40150 per therm.

September 2000 $.40150 per therm.

October 2000 $.64200 per therm. R

November 2000 $.64200 per therm.

December 2000 $.64200 per therm.

January 2001 $.64200 per therm.

February 2001 $.64200 per therm.

March 2001 $.64200 per therm. R

Effective For Service Rendered OnMICHIGAN PUBLIC

Issued October 17, 20(_0 SERVICECOMMISSION_ And After October 1, 2000i

By: J.L. Larson OCT 2 3 _ [ Issued Under Authority Of The Michigan

President } Q.<_) _p:_:_' I P.S.C. Dated September 28, 2000

Eau Claire, Wisconsin In Case No. U-12241FILE ,.

NORTHERN STATES POWER-CANCELLED-284

Page 84: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 14th Revised Sheet No. 65

Northern States Power Company Cancels 13th Revised Sheet No. 65M.P.S.C. NO. 1 Gas - Michigan

.GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 2000 $.40150 per therm. R

May 2000 $.40150 per therm.

June 2000 $.40150 per therm.

July 2000 $.40150 per therm.

August 2000 $.40150 per therm.

September 2000 $.40150 per therm.

October 2000 $.40150 per therm.

D November 2000 $.40150 per therm.

December 2000 $.40150 per therm.

January 2001 $.40150 per therm.

February 200I $.40150 per therm.

March 200i $.40150 per therm. R

MICHIGANPUBLIC CANCELLEDBY .,_ SERVICECOMMISSION ORDER_,2.__ /

JUN 5 2000 RE_OV_ag_

Effective For Service Rendered On} Issued May 16, 2000 And After

By: J.L. Larson Issued Under Authority Of The MichiganPresident P.S.C. Dated_Eau Claire, Wisconsin In Case No. U-12241

NORTHERN STATES POWFI___AMc,=_ _=r-, n_=

Page 85: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 13th Revised Sheet No. 65

• Northern States Power Company Cancels 12th Revised Sheet No. 65

M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 1999 $.37549 per therm. R

May 1999 $.37549 per therm.

June 1999 $.37549 per therm. _ _ _ =-:=13 rnar-

July 1999 $.37549 per therm. _:

August 1999 $.37549 per therm. _q _ _b

September 1999 $.37549 per therm, o _

October 1999 $.37549 per therm.I

November 1999 $.37549 per therm.

December 1999 $.37549 per therm.

January 2000 $.37549 per therm.

February 2000 $.37549 per therm.

March 2000 $.37549 per therm. 1_ Ri

I

MICHIGANPUBLIC ISERVICECOMMISSION

| I

MAY31999 ii

0.._13? , _

Effective For Service Rendered On

Issued April 22, 1999 And After April 1, 1999

By: J.L. Larson Issued Under Authority Of The MichiganPresident P.S.C. Dated April 13, 1999Eau Claire, Wisconsin In Case No. U-11875

NORTHERN STATES POWER-CANCELLED-286

Page 86: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 12th Revised Sheet No. 65

Northern States Power Company Cancels 11th Revised Sheet No. 65M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 1998 ................. $.37488 per therm.

May 1998..................... $.37488 per therm.

June 1998 ................... $.37488 per therm.

July 1998 .................... $.37488 per therm.

August 1998 ................... $.37488 per therm.

September 1998 ................. $.37488 per therm.

October 1998 .................. $.37488 per therm.

November 1998 ................ $.37488 per therm.

December 1998 ................. $.37488 per therm.

January 1999 ................. $.37488 per therm.

February 1999 .................. $.37488 per therm.

March 1999 ................... $.37488 per therm.

.CANCELLEO;BY

REMOVEDBY __.--_.__ .....

Effective For Service Rendered On

Issued April 24, 1998 And After April 1, 1998

By: J.A. Noer Issued Under Authority Of The MichiganPresident P.S.C. Dated April 14, 1998

Eau Claire, Wisconsin In Case No. U-11576

NORTHERN STATES POWER-CANCELLED-287

Page 87: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

FNSP Wisconsin 11th Revised Sheet No. 65

Northern States Power Company Cancels 10th Revised Sheet No. 65

M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 1997 ................. $.37427 per therm.

May 1997..................... $.37427 per therm.

June 19967 ................... $.37427 per therm.

July 1997.................... $.37427 per therm.

August 1997................... $.37427 per therm.

September 1997 ................. $.37427 per therm.

October 1997 .................. $.37427 per therm.

November 1997 ................ $.37427 per therm.

December 1997 ................. $.37427 per therm.

January 1998 ................. $.37427 per therm.

February 1998 .................. $.37427 per therm.

March 1998 ................... $.37427 per therm.

oa_ 5 F (_" qg

.f_Z_,"xOSERVI6,_ Effective For Service Rendered OnIssued July 3, 1997 /(R%_: - "O_\ And After April 1, 1997

By: J.A. Noer 'a: _ " 7_ Issued Under Authority Of The MichiganPresident _t_ 2- 7"/--_H_ 0 CT _ _ 199,_. P.S.C. Dated Max/22, 1997Eau Claire, Wisconsin _ _ _,_@--¢__._______ In CaseNo. U-11226

m

NORTHERN STATES POWER-CANCELLED-288

Page 88: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 10th Revised Sheet No. 65

Northern States Power Company Cancels 9th Revised Sheet No. 65

M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 1996 .................. $.33610 per therm.

May 1996..................... $.33610 per therm.

June 1996..................... $.33610 per therm.

July 1996..................... $.33610 per therm.

August 1996L.................. $.33610 per therm.

September 1996 ................. $.33610 per therm.

October 1996 .................. $.33610 per therm.

November 1996 ................. $.33610 per therm.

December 1996................. $.33610 per therm.

January 1997 ................. $.33610 per therm.

February 1997 .................. $.33610 per therm.

March 1997 ................... $.33610 per therm.

CANCELLED &

ORDER_REMOVEDBY_

DATE_

IssuedApril 30, 1 _ AND AFTER April 1, 1996

By: J.A. NOE ISSUED UNDERAUTHORITY OF THE MICHIGANPRESIDENT P.S.C. DATED April 26, 1996EAU CLAIRE, IN CASE NO U-11061

NORTHERN STATES POWER-CANCELLED-289

Page 89: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 9th Revised Sheet No. 65

Northern States Power Company Cancels 8th Revised Sheet No. 65

M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 1995 .................................................. $.37199 per therm.

May 1995 ................................................... $.37199 per therm.

June 1995 .................................................. $.37199 per therm.

July 1995 ................................................... $.37199 per therm.

August 1995 ............................................... $.37199 per therm.

September 1995 .......................................... $.37199 per therm.

October 1995 .............................................. $.37199 per therm.

November 1995 .......................................... $.37199 per therm.

December 1995 ........................................... $.37199 per therm.

January 1996 ............................................... $.37199 per therm.

February 1996 ............................................. $.37199 per therm.

March 1996 ................................................ $.37199 per therm_

,!

CANCELLEDBYOROERLY/'/o_I

[(_(FEB 0 8 1996"_' " /<<

g-' -""___TIVE FOR SERVICE RENDERED ONIssued: April 28, 1995 _ _AFTER April 1, 1995

By: J.A. NOER ISSUED UNDER AUTHORITY OF THE MICHIGANPRESIDENT P.S.C. DATED April 27_1995EAU CLAIRE, WISCONSIN IN CASE NO. U-10751

NORTHERN STATES POWER-CANCELLED-290

Page 90: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin Eighth Sheet No. 65

Northern States Power Company Cancels Seventh Sheet No. 65

M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas cost recovery factors are authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 1994 .................. $.38793 per therm.

May 1994 ..................... $.38793 per therm.

June 1994 ..................... $.38793 per therm.

July 1994 ..................... $.38793 per therm.

August 1994 ................... $.38793 per therm.

September 1994 ................. $.38793 per therm.

October 1994 .................. $.38793 per therm.

November 1994 ................ $.38793 per therm.

December 1994 ................. $.38793 per therm.

January 1995 .................. $.38793 per therm.

February 1995 ................. $.38793 per therm.

March 1995 ................... $.38793 per therm.

i,, e i .: .... ,, | ....

I;A_CELLEDBYORDER_ / a7 5"/ ____----

REMOVEDBY_ ---

! ]rIVE FOR SERVICE RENDERED ON1\_2_ --_ _ _TER April 1, 1994Issued [_f____ l

By: J.A. NOER __ _ED UNDER AUTHORITY OF THE MICHIGAaN

PRESIDENT "_._sw_p'.;S.C. DATED November 10, 1994EAU CLAIRE, WISCONSIN IN CASE NO. U-10491

NORTHERN STATES POWER-CANCELLED-291

Page 91: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

_TSP Wisconsin Seventh Sheet No. 55

Northern States Power Company Cancels Sixth Sheet No. 65

M.P.S.C. NO.1 Gas- Michigan

GAS COST RECOVERY FACTORS

The listed monthly gas-cost recovery factors are-authorized pursuant to Rule 4,Gas Cost Recovery Clause:

April 1993 ...................... $.35951

May 1993 ....................... $.35951

June 1993 ....................... $.35951

July 1993 ....................... $.35951

August 1993 ..................... $.3595i

September 1993 ................... $.35951

October 1993 ..................... $.35951

November 1993 ................... $.35951

December 1993 ................... $.35951

January 1994 ..................... $.35951

February 1994 .................... $.35951

March 1994 ...................... $.35951

CANCELLEDBY

REMOVEDBY.__;,_"_)_/'/f

DATE_/2-/_, _'/_7/ . . ....

A

D ,ssued June 14, 199f/__/_'_"'_X_ EFFECT,VE FOR SERV,CE RENDERED ON

By: J.A. NOER \ 3_f._ ISSUED UNDER AUTHORITY OF THE MICHIGANPRESIDENT _)x - ' /_._..-// P.S.C. DATED May 21, 1993

EAU CLAIRE. WISCONSIN -*,_ IN CASE NO. U-10191

NORTHERN STATES POWER-CANCELLED-292

Page 92: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

_S_ :1)Wisconsin Sixth Sheet No. 65

Northern States Power Company Cancels Fifth Sheet No. 65

M.P.S.C. NO.1 Gas- Michigan

Gas Cost Recovery Factors

The listed monthly gas cost recovery factors are authorized pursuant toRule 4, Gas Cost Recovery Clause:

April 1992 ....................... $.32852

May 1992 ......................... $.32852

June 1992 ........................ $.32852

July 1992 ........................ $.32852

August 1992 ...................... $.32852

September 1992 ................... $.32852

October 1992 ..................... $.32852

November 1992 .................... $.32852

December 1992 .................... $.32852

January 1993 ..................... $.32852

February 1993 .................... $.32852

March 1993 ....................... $.32852

. ,L__ ...... J|: ....

CANCELLEDBY

ORDER/'(-I P /'_ / , :. ..

REMOVEDBY _A _t/_/ ,. ""

DA$E._j _/'"_'_ "

___ EFFECTIVE FOR SERVICE RENDERED ON

Issued '_ AND AFTER April 1, 1992

By:E.J.MclNTYRE _ ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT ._jr/_.__Z_// P.S.C. DATED May 6, 1992

NORTHERN STATES POWEN-CANCELLED-29g

Page 93: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

l_St ) Wisconsin Fifth Sheet No. 65

Northern States Power Company Cancels Fourth SheetNo. 65

M.P.S.C. NO.1 Gas- MichiganGas Cost Recovery Factors

The listedmonthly gas cost recoveryfactorsare authorizedpursuantto

Rule 4, Gas Cost RecoveryClause:

April 1991 .......................$ .33847 per therm

May 1991 .........................$ " " "

June 1991 ........................$ " " "

July 1991 ........................$ " " "

August 1991 ......................$ " " "

September1991 ...................$ " " "

October 1991 .....................$ " " "

November 1991 .................... $ " " "

December 1991 .................... $ " " "

January 1992 ..................... $ " " "

February 1992 .................... $ " " "

March 1992 ....................... $ " " "

,i,_ . ii ,, ii ii ii. ii

CANCELLEDBY

REMOVEDBYS_/

DATE u/-_- ?z_

E EOT.V O.Issued April 24, 199_(_,/_g _'_\_O_ ANDAFFER April 1, 1991

((_(APR2 9 1991'_

By:E.J. Mc,NTYRE __/_J._,SSUEDUNDERAUTHOR'TYOFTHEM'CH'GAN__._/_7_/

PRESIDENT . ;, P.S.C.DATED April 17, 1991EAUCLAIRE.WISCONSIN INCASENO. U-9802

NORTHERN STATES POWER-CANCELLED-294

Page 94: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Fourth Revised SHEET NO._ _WISCONSIN Third Revised 65NORTHERN STATES POWER COMPANY CANCELS SHEET NO.

-. M.P.S.C. NO.I GAS -- MICHIGAN

Gas Cost Recovery Factors

The listed monthly gas cost recovery factors are authorized pursuant to

Rule 4, Gas Cost Recovery Clause:

April 1990 ....................... $ .33847 per therm

May 1990 ......................... $ " " "

June 1990 ........................ $ " " "

July 1990 ........................ $ " " "

August 1990 ...................... $ " " "

September 1990 ................... $ " " "

October 1990 ..................... $ " " "

November 1990 .................... $ " " "

December 1990 .................... $ " " "

January 1991 ..................... $ " " "

February 1991 .................... $ " " "

March 1991 ....................... $ " " "

_J

CANCELLEDBYOR,.')ER_I-f_o_

I DA.TE l-l-P-i" ?/

EFFECTIVE FOR SERVICE RENDERED ON

ISSUED June 1:1990 AND AFTER April 1, 1990

BY. _... THE,SEN JUN 0 _ I_(_0 )_,ll ISSUED UNDER AUTHORITY OF THE MICHIGAN

NORTHERN STATES POWER-CANCELLED-295

Page 95: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP w,scoNs,NNORTHERN STATES POWER COMPANY CANCELSSeCondRevised SHEET NO._ 155

,. M,P,S,C, NO, I GAS -- MICHIGAN

I

Gas Cost Recovery Factors

The listed monthly gas cost recovery factors are authorized pursuant to

Rule 4, Gas Cost Recovery Clause:

April 1989 ....................... $ ,33463 per therm

May 1989 ......................... $ " " "

June 1989 ........................ $ " " "

July 1989 ........................ $ " " "

August 1989 ...................... $ " " "

September 1989 ................... $ " " "

October 1989 ..................... $ " " "

November 1989 .................... $ " " "

December 1989 .................... $ " " "

January 1990 ..................... $ " " "

February 1990 .................... $ " " "

March 1990 ....................... $ " " "

i , ,i

CANCELLEDBYORDER.U- _'S _ 5_

REMOVEDBY,-'_'_m_'*_'_

DATE_ _ -- _'"_

EFFECTIVE FOR SERVICE RENDERED ON

ISSUED ....:- AND AFTER April I, 1989I

BY' E.M. THEISEN ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT PUBLIC SER.COMM. DATED May 9, 1989

' EAU CLAIRE, WISCONSI IN CASE NO. U-9297r

I

NORTHERN STATES POWER-CANCELLED-296

Page 96: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

, Second Revised 651_ _._ ]P wiscoNsiN SHEETNO.

First Revised 65, NORTHERN STATES POWER COMPANY CANCELS SHEETNO..-

, -. M.P.S.C. NO.I GAS ,-- MICHIGAN

Gas Cost Recovery Factors

The listed monthly gas cost recovery factors are authorized pursuant to

Rule 4, Gas Cost Recovery Clause:

April 1988 ....................... $ .30476 per therm

May 1988 ......................... $ " " "

June 1988 " $ " " "

July 1988 ........................ $ " " "

Augd:st 1988 ...................... $ " " ".C:;,;:

September 1988 ................... $ " " "

October 1988 ..................... $ " " "

November 1988 .................... $ " " "

December 1988 .................... $ " " "

January 1989 ............... .. .... $ " " "

February 1989 .................... $ " " "

March 1989 ....................... $ " " "

, , , , ,, r

CANCELLED

_-_\ EFFECTIVE FOR SERVICE RENDERED ONI _ I I i I

.,. E... T.E,SE. _(.<..(_'Y.25 mB8}__11SS"_DU.O_RAU..O.,_OF_.E MICHIGAN,,,,,O,N. ,,,.co...o,.,o,,,,o,EAU CLAIRE, WISCONSIN. __ IN CASE NO ,U 895,

NORTHERN STATES POWER-CANCELLED-297

Page 97: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

First Revised SHEETNO 65__ WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS Original SHEET NO. 65

M.P.S.C. NO.I GAS -- MICHIGAN

Gas Cost Recovery Factors

The listed monthly gas cost recovery factors are authorized pursuant to

Rule 4, Gas Cost Recovery Clause:

April 1987 ....................... $ .32184 per therm

May 1987 ......................... $ " " "

June 1987 ........................ $ " " "

July 1987 ........................ $ " " "

August 1987 ...................... $ " " "

September 1987 ................... $ " " "

October 1987 ..................... $ " " "

November 1987 .................... $ " " "

December 1987 .................... $ " " "

January 1988 ..................... $ " " "

February 1988 .................... $ " " "

March 1988 ....................... $ " " "

CANCELLEDBY

OR_:EI__/__---_

REMOVED BY_ ."

EFFECTIVE. FOR. SE.R_VI_E RENDERED ON

ISSUED ALI_USt 12, 1987 _ AND AFTER _prl/ ±, 1987

<_Au6241987)EIIBY: E. M. THEISEN .. ISSUED UNDER AUI:HORITY OF THE MICHIGAN

P,,s,o ,TEAU CLAIRE, WISCONSIN. _ /.(_IN CASE NO. U-8647

NORTHERN STATES POWER-CANCELLED-298

Page 98: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO..._NSP wISCONSIN

NORTHERN STATES POWER COMPANY CANCELS SHEETNO.,-..,-----M. RS.G. NO.I GAS -- MICHIGAN

Gas Cost RecoveryFactors

The listedmonthlygas cost recoveryfactorsare authorizedpursuantto

Rule 4, Gas Cost RecoveryClause:

April 1986 .......................$ .41786 per therm

May 1986 .........................$ " " "

June 1986 ........................$ " " "

July 1986 ........................$ " " "

August 1986 ......................$ " " "

September1986 ...................$ " " "

October1986 .....................$ " " "

November1986 ....................$ .33688 " "

December1986 ....................$ " " "

January1987 .....................$ " " "

February1987 ....................$ " " "

March 1987 .......................$ " " "

ORD V.- _._ ' '

,_MOVEDBYP_

DATE_ _f _ - _ _

,...c.,v..o.,.v,c....o,..oo.ISSUED Januaryl, 1987 //_L_%..L_(_ _',0_AND AFTER January l i I,_7

BY,PRESIDENTE.M. T HE , BEN' '\_"__[(_t_'/- >'__}

JAIl 011087 _,, ISSUED UNDER AUTHORITY OF THE MICHIGANt/_._ __J _._,cs,.oo...o,,_o,ove_b_4,1986EAU CLAIRE, WISCONSIN. ___ IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-299

Page 99: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

M. P. S. C. NO. 1 - Gas llth Revised Sheet No. 66NORTHERN STATES POWER COMPANY Cancels 10th Revised Sheet No. 66

(To summarize and explain the contingency mechanism)

! GAS COST RECOVERY FACTORS

Contingency Mechanism

The Gas Cost Recovery _Factors on Page 65 above are subject to adjustmentpursuant tothe following contingency mechanism:

The Gas Cost Recovery factors on Sheet G65 shall be adjusted by $0. O008per therm forevery $0.O1per MMBtu increase or decrease in the NYMEX futures eontraet prieesfor theupcoming quarter. The contingent factor shall be equal to. 08 times (NYMEX futurescontract average price for the quarter less the NYMEX base priee for the quarter.)

Tire NYMEX futures contract average price for the upcoming quarter shall be calculatedusing the simple average of the actual monthly NYMEX futures eontraetpriees, at the timeof calculation, at least fifteen days but no more than thirty days prior to tire beginning ofthe quarter.

Tile calculation of the contingent factor and an updated rate sheet No. 65 will be suppliedto the Michigan Public Service Commission at least 15 days prior to the beginning of thequarter.

Tile NYMEX base prices are as follows:

1st Quarter - April 2001 through June 2001

$5.338 per MMBtu.

2"dQuarter - July 2001 though September 2001

$5.405 per 3Jll4Btu

3rdQuarter - October 2001 through December 2001

$5.517per MMBtu

4th Quarter - January 2002 through March 2002

$5.42 0 per MMBtu

CANCELLEDBY _ -

DATE _'}//? l..°_----

Issued August 16, 2( 01 _AICHIGA_IPUBLIC Effective for Service Rendered On andS[RVICEC0,',_MISSION after April 1, 2001

By: J.L. Larsen Issued Under Authority Of The Michigan

President SEP 4 2001 P.S.C. Dated May 15, 2001Eau Claire, Wiscons in In Case No. U-12751

FILED (_ _I r

NORTHERN STATES POWER-CANCELLED-300

Page 100: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 10th Revised Sheet No. 66

Northern States Power Company Cancels 9th Revised Sheet No. 66M.P.S.C. NO. 1 Gas - Michigan

This Sheet Reserved For Future Use

CANCELLEDBYORDERblI_..'_,S/_.......'-_- ....

, REMOVEDBY_

DATE _ - "-i' " 0__/.__

Effective for Service RenderedonIssued: July 3, 1997 and after April 1, 1997

By: J.A. Noer Issued Under Authority of the MichiganPresident P.S.C. Dated May 22, 1997Eau Claire, Wisconsin In Case No. U-11226

NORTHERN STATES POWER-CANCELLED-301

Page 101: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP Wisconsin 9th Revised Sheet No. 66

Northern States Power Company Cancels 8th Revised Sheet No. 66

M.P.S.C. NO. 1 Gas - Michigan

GAS COST RECOVERY CLAUSE RECONCILIATION

12-MONTH PERIOD - APRIL 1994 - MARCH 1995

Pursuant to the Michigan Public Service Commission Case No. U-10491-R dated

December 20, 1995, a gas cost recovery refund credit factor of $0.03455 per therm

shall be applied to usage from April 1994 through March 1995 and credited to bills

issued in its January 1996 billing cycles for all standard tariffs subject to the Gas Cost

Recovery Clause.

CANCELLEDBYORDER__[_//_-t/_3-a9-_

REMOVEDBY 5__

DATE _ ///"_]-aT_-7--ff 7

l

._ _-_ Effective for Service Rendered on

Issued: January_12, 1996 ,_ _.__ and after December 21, 1995

By: J.A. Noer _'_ _\" Issued Under Authority of the Michigan

President . _t¢,__,dAN 2 2 1996} P.S.C. Dated December 20, 1995

Eau Claire, Wisconsin "k_ ;/_("i_ ..//d In Case No. U- 10491-R

NORTHERN STATES POWER-CANCELLED-302

Page 102: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Second Revised SHEET NO._66' NSP wISCONSIN

NORTHERN STATES POWER COMPANY CANCELSFirst Revised SHEETNO, 66Iw

,. M.P.S.C. NO.I ,GAS -- MICHIGAN

GASCOSTRECOVERYCLAUSERECONCILIATION12-Month Period - April 1987-March 1988

Pursuant to the Michigan Public Service Commission Case No. U-8647-R datedMarch 30, 1989, a gas cost recovery refund credit factor of $.02165 pertherm shall be applied to usage from April 1987 through March 1988 andcredited to bills issued in its April 1989 billing cycles for all standardtariffs subject to the Gas Cost Recovery Clause.

_/\CR_CELLEDBY/ I

_ATE_

EFFECTIVE FOR SERVICE RENDERED ONISSUED April 6, 1989 AND AFTER March 31, 1989

BY: E.M. THEISEN ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT PUBLIC SER. COMM. DATED March 30, 1989

EAU CLAIRE, WISCONSIN. IN CASE NO. U-8647-R=

NORTHERN STATES POWER-CANCELLED-303

Page 103: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

First Revised SHEET NO. 66NSP WISCONSIN

NORTHERN STATES POWER COMPANY CANCELS Original SHEETNO, 66

M.P.S.C. NO.I GAS -- MICHIGAN

GAS COST RECOVERY CLAUSE RECONCILIATION12-Month Period -April 1986-March 1987

Pursuant to the Michigan Public Service Commission Case No. U-8385-R datedOctober 27, 1987, a gas cost recovery refund credit factor of $.01788 pertherm shall be applied to usage from April 1986 through March 1987 andcredited to bills issued in its December 1987 billing cycles for allstandard tariffs subject to the Gas Cost Recovery Clause.

I REi,I.;YEDBY-,_r"' ..2_}'_'Li=

: rE /#-I/-_7iDA ___ ......... --

ISSUED November 10, 19/_ O _ _6 EFFECTIVE FOR SERVICE RENDERED ON

BY : E. M. THEI SEN _, ISSUED UNDER AUTHORITY OF THE MICHIGANPRESIDENT _k_ (_;)PUBLIC SER.COMM.DATED 0ctober 27, 19.87

EAU CLAIRE, WISCONSIN. O_O/__ IN CASE NO. U-8385-Ri

NORTHERN STATES POWER-CANCELLED-304

Page 104: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

I

NSP w,scoNs,N Original SHEETNO._ !

NORT,HERN STATES POWER COMPANY CANCELS SHEETNO. ,,

M. RS.C. NO.I GAS -- MICHIGAN

GAS COST RECOVERY CLAUSE RECONCILIATION12-Month Period - April 1984-March 1985

s

Pursuant to the Michigan Public Service Commission Case No. U-7875-R datedDecember 17, 1985, a gas cost recovery refund credit factor of $.03274 pertherm shall be applied to all usage during the January 1986 billing cyclefor all standard tariffs subject to the Gas Cost Recovery Clause.

CANCELLEDBYORDER_" _395- f--

REMOVEDBY /-Z,/'f_vP_

DATE //-/7-E-7

/___ EFFECTIVE FOR SERVICE RENDERED ON

ISSUED January l_ ]987 _.__A\c AND AFTER January l ; ]_

r) "_" ISSUED UNDER AuTHoRITY OF THE MICHIGANBY: E.M. THEISEN JAN 0-,_987PRESIDENT _\C_\__/_// PUBLICSER.COMM.DATEDNovember 4, 1986

,,\-__, ,,..oc..,.,.,.co..,.. ,.c.NO.,NORTHERN STATES POWER-CANCELLED-305

Page 105: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEETNO. 67NSP WISCONSIN

NORT,HERN STATES POWER COMPANY CANCELS SHEETNO. ,r--

M. RS.C. NO.I GAS -- MICHIGAN

RESIDENTIAL GENERAL SERVICE

Availability and Character of ServiceThe rate is available on a firm basis to any residential customer for the

general use of natural gas, subject to Gas Curtailment Provisions currentlyon file with the Michigan Public Service Commission.

Gas sold hereunder shall not be resold.

Contract required if delivery of gas is above base pressure of approximately7 inches of water column.

A special contract may be executed when unusual or extraordinary conditionsexist as provided in Rule C, Sheet Number 11.

Net Monthly Rate

Customer charge$5.50 per month, plus

Distribution charge$.1056 per therm, plus

Gas cost char@eThe monthly gas cost charge as set forth on Sheet Number 65.

Minimum bill

The applicable customer charge.

Rules & RegulationsService is subject to orders of regulatory bodies having jurisdiction and toCompany's Rules and Regulations currently on file in Company's offices.

Rate Code 1H4001B400

CANCELLEDBY

BY ...... .

' DATE "} - _ _ _- ?

_X EFFECTIVE FOR SERVICE RENDERED ONISSUED January 1_ 1987 /l,b'/_'_--_'_,:\o"_ AFTER January 1_ 1987

, //_/ " �_.__ AND ....

ISSUED UNDER AUI_HORITY OF TNE MICHIGANBY: E.M. THEISEN" JAH l _IPRESIDENT "_--c_ - !i PUBLIC SER. COMM. DATED November 4_ 1986

"_L,_. (_'.:_ U-8493EAU CLAIRE, WISCONSIN" \_Z4,-___.J._,. _/ IN CASE NO,

jNORTHERN STATES POWER-CANCELLED-306

Page 106: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP First RevisedWISCONSIN SHEETNO. 67

NORTHERN STATES POWER COMPANY CANCELS Original SHEETNO. 67

M. RS.C. NO.I GAS -- MICHIGAN

RESIDENTIAL GENERALSERVICE

Availability and Character of ServiceThe rate is available on a firm basis to any residential customer for thegeneral use of natural gas, subject to Gas Curtailment Provisions currentlyon file with the Michigan Public Service Commission.

Gas sold hereunder shall not be resold.

Contract required if delivery of gas is above base pressure of approximately7 inches of water column.

A special contract may be executed when unusual or extraordinary conditionsexist as provided in Rule C, Sheet Number 11.

Net Monthly Rate

Customer charge$5.50 per month, plus

Distribution charqe$.0994 per therm, plus

Gas cost chargeThe monthly gas cost charge as set forth on Sheet Number 65.

Minimum billThe applicable customer charge.

Rules & RegulationsService is subject to orders of regulatory bodies having jurisdiction and toCompany's Rules and Regulations currently on file in Company's offices.

Rate Code 1H4001B400

CANCELLEDi_Y

ORDER .....,

_

ISSUED June 22, 1987 EFFECTIVE FOR SERVICE RENDERED ONAND AFTER July 1, 1987

BY: E.M. THEISEN ISSUED UNDER AUTHORITY OF THE MICHIGAN

PRESIDENT PUBLIC SER. COMM. DATED June 9_ 19?_7

EAU CLAIRE, WISCONSIN. IN CASE NO. U-8696=

NORTHERN STATES POWER-CANCELLED-307

Page 107: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

First Revised SHEETNO. 68NSP w,scoNs,NNORTHERN STATES POWER COMPANY CANCELS Original SHEET NO. 68

M.R S.C. NO.I GAS -- MICHIGAN

COMMERCIALAND INDUSTRIAL GENERALSERVICE

Availability and Character of ServiceThe rate is available on a firm basis to any commercial or industrial customerfor the general use of natural gas, subject to Gas Curtailment Provisionscurrently on file with the Michigan Public Service Commission.

Gas sold hereunder shall not be resold.

Contract required if delivery of gas is above base pressure of approximately7 inches of water column.

A special contract may be executed when unusual or extraordinary conditionsexist as provided in Rule C, Sheet Number 11.

Net Monthly Rate

Customer charge$10.00 per month, plus

Distribution charge$.07095 per therm, plus

Gas cost chargeThe monthly gas cost charge as set forth on Sheet Number 65.

Minimum bill

The applicable customer charge.

Rules and RegulationsService is subject to orders of regulatory bodies having jurisdiction and toCompany's Rules and Regulations currently on file in Company's offices.

Rate Code 3H4003B4003L400

CANCELLED.BY, .

A

June 22, 1987 __ EFFECTIVE FOR SERVICE RENDERED ONISSUED AND AFTER July 1, 1987

BY: E.M. THEISEN J L 0P.1 ISSUED UNDER AuTHoRITY OF THE "MICHIGAN

PRESIDENT _\('_c_k__// PUBLIC SER. COMM. DATED June 9, 1987

EAU CLAIRE, WISCONSIN, _ IN CASE NO. U-8696

NORTHERN STATES POWER-CANCELLED-308

Page 108: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEETNO. 68]II_ S P wISCONSIN

NORT,HERN STATES POWER COMPANY CANCELS SHEETNO._

M. RS.C. NO.1 GAB -- MICHIGANi

COMMERCIAL AND INDUSTRIAL GENERAL SERVICE

Availability and Character of ServiceThe rate is available on a firm basis to any commercial or industrial customerfor the general use of natural gas, subject to Gas Curtailment Provisionscurrently on file with the Michigan Public Service Commission.

Gas sold hereunder shall not be resold.

Contract required if delivery of gas is above base pressure of approximately7 inches of water column.

A special contract may be executed when unusual or extraordinary conditionsexist as provided in Rule C, Sheet Number 11.

Net Monthly Rate

Customer charge$10.00 per month, plus

Distribution charge$.07715 per therm, plus

Gas cost chargeThe monthly gas cost charge as set forth on Sheet Number 65.

Minimum billThe applicable customer charge.

Rules and RegulationsService is subject to orders of regulatory bodies having jurisdiction and toCompany's Rules and Regulations currently on file in Company's offices.

Rate Code 3H400---- , _. =

3L4003B400 ICANCELLEDBY [

I,E_:,_,EuBY, -, :

i . . , = ,'

i y7.... --

__z/__ EFFECTIVE FOR SERVICE RENDERED ONISSUED Januar.yl) 1987 , AND AFTER Januar.y1,, 1_7 ..

• /_; _ _I_ ISSUED UNDER AuTHoRITY OF THE MICHIGANBY: E.M. THEISEN t(_((j ,,_ .... ,,PRESIDENT _\ _://_/_ ,1_,_ PUBLIC SER. COMM. DATED November 4) 1986

EAU CLAIRE, WISCONSIN. _._' / _i IN CASE NO. U-8493

NORTHERN STATES POWER-CANCELLED-309

Page 109: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

l

First Revised 69NSP WISCONSIN SHEETNO.

NORTHERN STATES POWER COMPANY CANCELS Original SHEETNO. 69M.P.S.C. NO.| GAS -- MICHIGAN

COMMERCIALAND INDUSTRIAL - INTERRUPTIBLE USE

Availablity and Character of ServiceThis rate is available under contract on an interruptible basis for commercialor industrial loads (including space heating) to customers who agree: (1) tocurtail use of gas whenever requested by the Company; (2) to provide and main-tain adequate standby facilities suitable to the Company; (3) to have availableat all times sufficient standby fuel to maintain a continuous fuel supply duringperiods of curtailment in the delivery of gas sold hereunder; and (4) shall havefuel requirements of 25,000 therms per year, or more. Subject, however, to theGas Curtailment Provisions currently on file with the Michigan Public ServiceCommission. Gas sold hereunder shall not be resold.

Contract required for service hereunder with a term of not less than one year.

A special contract may be executed when unusual or extraordinary conditionsexist as provided in Rule C, Sheet Number 11.

Net Monthly Rate

Customer charge$20.00 per month, plus

Distribution charge$.0388 per therm, plus

Gas cost chargeThe monthly gas cost charge as set forth on Sheet Number 65.

Minimum annual charqeThe minimum annual charge shall be $1,000 subject to a discount of $5.00 foreach full 24 hours that service is not available in each 12-month period coveredunder the contract.

Rules and RegulationsService is subject to orders of regulatory bodies having jurisdiction and theCompany'sRules and Regulations currently on file in the Company's offices.

Rate Code 31365 CANCELLEDBV.3i565 oRoER,,, % 6S_.54567

,o,,..o.,.oONiSSUED June 22, 1987 AND AFTER July I, 1987

BY : E.M. THEISEN JUL 0 P,1987 SSSUEDUNDER AUTHORITYOF THE MICHIGAN

PRESIDENT \_,/__._. PUBLICSER. COMM.DATED June 9,-1987EAU CLAIRE, WISCONSIN. _O/h_ /_,( _ IN CASE NO. U-8696

i

NORTHERN STATES POWER-CANCELLED-310

Page 110: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

NSP WISCONSIN Original SHEETNO. 6gi

NORTHERN STATES POWER COMPANY CANCELS SHEETNO., ,

M. RS.G. NO.I GAB -- MICHIGANr

COMMERCIALAND INDUSTRIAL - INTERRUPTIBLE USE

Availablity and Character of ServiceThis rate is available under contract on an interruptible basis for commercialor industrial loads (including space heating) to customers who agree: (1) tocurtail use of gas whenever requested by the Company; (2) to provide and main-tain adequate standby facilities suitable to the Company; (3) to have availableat all times sufficient standby fuel to maintain a continuous fuel supply duringperiods of curtailment in the delivery of gas sold hereunder; and (4) shall havefuel requirements of 25,000 therms per year, or more. Subject, however, to theGas Curtailment Provisions currently on file with the Michigan Public ServiceCommission. Gas sold hereunder shall not be resold.

Contract required for service hereunder with a term of not less than one year.

A special contract may be executed when unusual or extraordinary conditionsexist as provided in Rule C, Sheet Number 11.

Net Monthly Rate

Customer charge$20.00 per month, plus

Distribution charge$.0450 per therm, plus

Gas cost chargeThe monthly gas cost charge as set forth on Sheet Number 65.

Minimum annual chargeThe minimum annual charge shall be $1,000 subject to a discount of $5.00 foreach full 24 hours that service is not available in each 12-month period coveredunder the contract.

Rules and RegulationsService is subject to orders of regulatory bodies having jurisdiction and theCompany's Rules and Regulations currently on file in the Company's offices.

.L...

CANCELLEDBY ....

Rate Code 31365 ORbER_W-SP_f( i31565 _, - _ _,- =54567 _ REMOVEDBY,_

DAle 7- _ -- __ :.

EFFECTIVE FOR SERVICE RENDERED ON

ISSUED AND AFTER January 1, 1997

BY." E.M. THEISEN ISSUEDUNDER AuTHoRITY OF THE MICHISAN

PRESIDENT PUBLICSER.COMM.DATEDNovember 4_ 1986.

EAU CLAIRE, WISCONSIN. IN CASE NO. U-8493s

NORTHERN STATES POWER-CANCELLED-311

Page 111: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEETNO. 70NSF II WISCONSIN

NORT,HERN STATES POWER COMPANY CANCELS SHEETNO....

M. RS.C. NO.! GAS -- MICHIGANi

SPECIALCONTRACT

SUMMARY

CANCELLED

i

d:> " EFFECTIVE FOR SERVICE RENDERED ON

ISSUED January1_ 1987 _ _ AND AFTER January1: 1987 ....

°/':__BY: E.M. THEISEN <_\JAN 0_7 j_jj ISSUED UNDER AUI_HORITY OF THE MICHIGAN

PUBLIC SER. COMM. bATED November4_ 1986

PRESIDENT . "?"...- / _//EAU CLAIRE, WISCONSIN ' U-8493

_/_., ..._y IN CASE NO. ,

N()RTHERN STATES POWER-CANCELLED-312

Page 112: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO. 7]NSP wISCONSIN "

NORT,HERN STATES POWER COMPANY CANCELS SHEETNO....

M. RS.C. NO.I GAB -- MICHIGAN

EMERGENCYWINTER PEAK SERVICE

EffectiveIn: Entire territoryserved.

Availabilityand Characterof Service:This emergencygas serviceis availableto any interruptiblecustomerof theCompanypurchasinggas under rate schedulenumbers61 or 62, to supply limitedgas serviceto such customerwhen the customeris confrontedwith an emergencysituation,such as breakdownof alternatefuel equipment,unavailabilityofalternatefuel, or other circumstanceswhich preventthe use of alternatefuelsand are beyond the reasonablecontrolof the customer.

This emergencyserviceis availableonly when the Company, in its sole judgment,shall have sufficientgas availableunder the terms of its contractwithNorthernNaturalGas Company,or can releasesufficientgas from the operationof its Park Falls peak shavingfacility. "Sufficient"gas as used hereinshall mean quantitiesthat can be deliveredwithoutcurtailingdeliveriestocustomerspurchasinggas on firm servicerate schedules.

Separatearrangementsmust be made with the Companyfor each emergencyforwhich serviceis requiredand the Companymay denyisuchservice,if, in itssole judgment,it does not have sufficientgas from sourcesspecifiedabove toprovidesuch emergencyservicerequests. Service_nder this rate scheduleissubjectto curtailmentor interruptionby the Companyat any time, on not lessthan 30 minutes'noticeto the customer.

In the event the Companydoes not have sufficientgas availableto satisfyallrequestsfor emergencygas serviceunder this ratelschedule,such serviceandany curtailmentsof such servicewill be in the order of the followingpriorities:

First Priority: CommercialHeat - this includes_ospitals,schools,etc.SecondPriority: CommercialProcessThird Priority: IndustrialProcessFourthPriority: IndustrialHeat

Servicewill be providedin the order of the foregoingprioritiesand cur-tailmentsof servicewill be in the inverseorder Of such priorities.

U,_IE ( - _ _v L -

(C ntinuedon Sheet Number72)

EFFECrlVe FOR SERVICE RENDERED ONISSUEO Januar.y1_ 1987 ANO _FTER Januaryl_ 1987

• _ : ISSUEI UNDER AU1LHORITY OF THE MICHIGANBY: E.M. THEISEN AN 0_'Lq8 '

PRESIDENT _,._ _...._/_//_.._..I=tlBL,,SER.COMM.DATED November4,U_8493 1986EAU CLAIRE, WISCONSIN. _/_...._ _" _/_ IN C, SE NO. ..,_ _.y,

NORTHERN STATES POWER-CANCELLED-313

Page 113: Original NSP wISCONSIN NORTHERN STATES POWER COMPANY ... · Table of Contents-Check List Twenty fifth Rev. 2 10-01-01,, _..__ f .- O _ Second Rev. 3 2-03-99" ..... Original 4 1-01-87"

Original SHEET NO..._NSP wiSCONSINNORT,HERN STATES POWER COMPANY CANCELS ,,. SHEET NO., .

M. RS.G. NO.t GAS -- MIGHIGANJ

EMERGENCYWINTERPEAK SERVICE (Continued)

Net Rate per Month:(A) Emergencygas deliveriesmade hereunderwill be includedwith normal(non-emergency)usage and billed out at the applicableinterruptiblerate.

(B) To the bill determinedfrom (A) above will be added the followingsurcharges:

(1) $.58 per therm of temporaryemergencydeliveries;

(2) Plus the followingadjustmentif applicable: Subsequentto August 8,1979, if the cost of No. 2 fuel oil deliveredto the Company'sFlambeauElectricGeneratingStationat Park Falls,Wisconsinisincreasedor decreasedabove or below the base cost of $.66595pergallon,there will be a correspondingadjustmentto the cost pertherm in (1) above in accordancewith the followingcomputation:(a) From the currentcost per gallon of No. 2 fuel oil deliveredto

FlambeauStation,subtract$.66595per gallon;(b) Dividethe total obtainedin line (a) by $1.40 (equivalentcost

per therm of naturalgas);(c) Round the quotientin line (b) to the nearestwhole cent and add

this amountto the $.58 shown in (1) above.

EffectiveDate:This rate shall becomeeffectiveas indicatedbelow when approvedby the regu-latory Commissionhavingjurisdictionand may be terminatedat any time thatthe Companyreportsto such regulatoryCommissionthat "sufficient"gashereunderis no longeravailable.

i

SpecialTerms:(A) Serviceunder this rate schedule is for the exclusiveuse of the customerand is not to be resold or sharedwith others.

(B) Gas meters will be read by the Company immediatelyprecedingandfollowingall emergencyserviceprovidedunder this rate schedule.

(C) In the event a customerfails to curtailserviceunder this rate schedulewhen requestedby the Company,the Companyshall have the right to turn offthe customer'sgas supplyprovidedunder this rate schedule.

(D) The penaltyfor unauthorizedtake of gas set forth on Sheet Number13 ofthe Company'sRules and Regulationsshall apply. ......-- ............

CAf_CELLEDDV

l--

EFFECTIVE FOR SERVICE----IqENDERED ON

' |,""_-__,/l_--f_ _ 1_!} ISSUED UNDER AUTHORITY OF THE MICHIGANBY" E.M. THEISEN AL],,,g_j987

_C,3//,_\_ PUBLIC SER. COMM. bATED November4_ 1986,,uc..,,,,,,,,,co,,,,. .. c.s,NO. U- 493NORTHERN STATES POWER-CANCELI_ED-314