KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.1 LVIA STUDY AREAS
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 1
A3 (420 mm x 297 mm)1:80,000
PREFERRED LINE ROUTE (OF THE 132 kV OVERHEAD LINE)
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.1.mxd
Scheme Name:
°
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 1 20.5
Kilometres
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.2 SHROPSHIRE LANDSCAPE TYPOLOGIES
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 1
A3 (420 mm x 297 mm)1:75,000
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION ANDOPERATIONS CORRIDOR
40m CONSULTATION BOUNDARY
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kVUNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARYLAYDOWN AREAS
PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.2.mxd
Scheme Name:
°
Settled pastoralfarmlands
Urban
Lowlandmoors Estate
farmlands
Timbered plateaufarmlands
Sandstonehills
Enclosed lowlandheaths
Principal settledfarmlands
Lowlandmoors
Settled pastoralfarmlands
Principal timberedfarmlands
Urban
OSWESTRY
WEM
REDNAL
COCKSHUTT Principal settledfarmlands
HIGH ENCLOSED PLATEAU
UPLAND SMALLHOLDINGS
PASTURE HILLS
WOODED RIVER GORGE
WOODED HILLS FARMLANDS
SANDSTONE HILLS
TIMBERED PLATEAU FARMLANDS
PRINCIPAL TIMBERED FARMLANDS
WOODED ESTATELANDS
ESTATE FARMLANDS
SETTLED PASTORAL FARMLANDS
PRINCIPAL SETTLED FARMLANDS
ENCLOSED LOWLAND HEATHS
LOWLAND MOORS
RIVERSIDE MEADOWS
LOWLAND MOSS
URBAN
LANDSCAPE TYPE DESCRIPTIVE UNITS (EXTRACTED FROM THE SHROPSHIRE LANDSCAPE TYPOLOGY, SEPTEMBER 2006)
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 1 20.5
Kilometres
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
1110
9
9
9
8
876
5
4
3
2
1
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.3 LANDSCAPE CHARACTER AREAS
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 1
A3 (420 mm x 297 mm)1:75,000
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.3.mxd
Scheme Name:
°
Settled pastoralfarmlands
Urban
Lowlandmoors Estate
farmlands
Timbered plateaufarmlands
Sandstonehills
Enclosed lowlandheaths
Principal settledfarmlands
Lowlandmoors
Settled pastoralfarmlands
Principal timberedfarmlands
Urban
OSWESTRY
WEM
REDNAL
COCKSHUTT Principal settledfarmlands
PROPOSED TEMPORARY ACCESS
1. URBAN: OSWESTRY
2. SETTLED PASTORAL FARMLANDS: OPEN
3. PRINCIPAL TIMBERED FARMLANDS:HALSTON HALL
4. ESTATE FARMLANDS: WOODHOUSEESTATE
5. LOWLAND MOORS: RIVER PERRY
6. ESTATE FARMLANDS: SEMI-INDUSTRIAL
7. ESTATE FARMLANDS: ELEVATED RIDGE
8. LOWLAND MOORS: WACKLEY BROOK &RIVER RODEN
9. PRINCIPAL SETTLED FARMLANDS:COCKSHUTT TO RUEWOOD
10. SETTLED PASTORAL FARMLANDS:WEM FRINGE
11. URBAN: WEM
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY ACCESS
HIGH ENCLOSED PLATEAU
UPLAND SMALLHOLDINGS
PASTURE HILLS
WOODED RIVER GORGE
WOODED HILLS FARMLANDS
SANDSTONE HILLS
TIMBERED PLATEAU FARMLANDS
PRINCIPAL TIMBERED FARMLANDS
WOODED ESTATELANDS
ESTATE FARMLANDS
SETTLED PASTORAL FARMLANDS
PRINCIPAL SETTLED FARMLANDS
ENCLOSED LOWLAND HEATHS
LOWLAND MOORS
RIVERSIDE MEADOWS
LOWLAND MOSS
URBAN
LANDSCAPE TYPE DESCRIPTIVE UNITS (EXTRACTED FROM THE SHROPSHIRE LANDSCAPE TYPOLOGY, SEPTEMBER 2006)
LANDSCAPE CHARACTER AREAS
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 1 20.5
Kilometres
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
WALESRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 1
A3 (420 mm x 297 mm)1:75,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4_OV.mxd
Scheme Name:
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUNDCABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED
COUNTRYSIDE STEWARDSHIP
REGISTERED PARK AND GARDENS
OPEN ACCESS LAND
ANCIENT WOODLAND INVENTORY
DECIDUOUS WOODLAND
NATIONAL FORESTRY INVENTORY
LANDFILL SITE (AUTHORISED &HISTORIC)
BURLTON SOLAR FARM
P!APPROX. LOCATION OF WINDTURBINES
## LISTED BUILDING (GRADE I, II*)
SCHEDULED MONUMENT
SSSI
RAMSAR
SHROPSHIRE NORTH CONSERVATIONAREAS
CHAPTER 7: LANDSCAPE AND VISUAL
FIGURE 7.4 LANDSCAPE DESIGNATIONSOVERVIEW
KEY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 1 20.5
Kilometres
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
CON
TIN
UES
ON
PAG
E 2
OF
5
OSWESTRY /CROESOSWALLT
Gobowen
St Martin's
Whittington
WestonRhyn
Trefonen
Treflach
Morda
Porth-y-waen
Llynclys
Morton
Hengoed
Middleton
MaesburyMarsh
Selattyn
Ball
Woolston
2 3 4 51
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.4 LANDSCAPE DESIGNATIONS
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd
Scheme Name:
PAGE 1 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUNDCABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED
COUNTRYSIDE STEWARDSHIP
REGISTERED PARK AND GARDENS
OPEN ACCESS
ANCIENT WOODLAND INVENTORY
DECIDUOUS WOODLAND
NATIONAL FORESTRY INVENTORY
LANDFILL SITE (AUTHORISED &HISTORIC)
BURLTON SOLAR FARM
P!APPROX. LOCATION OF WINDTURBINES
## LISTED BUILDING (GRADE I, II*)
SCHEDULED MONUMENT
SSSI
RAMSAR
SHROPSHIRE NORTH CONSERVATIONAREAS
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
CON
TIN
UES
ON
PAG
E 1
OF
5
CON
TIN
UES
ON
PAG
E 3
OF
5
Whittington
Perthy
Grimpo
WestFelton
LowerFrankton
Hindford
Middleton
Eardiston
NewMarton
Woolston
Haughton
Queen'sHead
Weirbrook
Hordley
Rednal
Babbinswood
13 4 52
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.4 LANDSCAPE DESIGNATIONS
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
02 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd
Scheme Name:
PAGE 2 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUNDCABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED
COUNTRYSIDE STEWARDSHIP
REGISTERED PARK AND GARDENS
OPEN ACCESS
ANCIENT WOODLAND INVENTORY
DECIDUOUS WOODLAND
NATIONAL FORESTRY INVENTORY
LANDFILL SITE (AUTHORISED &HISTORIC)
BURLTON SOLAR FARM
P!APPROX. LOCATION OF WINDTURBINES
## LISTED BUILDING (GRADE I, II*)
SCHEDULED MONUMENT
SSSI
RAMSAR
SHROPSHIRE NORTH CONSERVATIONAREAS
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
CON
TIN
UES
ON
PAG
E 2
OF
5
CON
TIN
UES
ON
PAG
E 4
OF
5
Ellesmere
Ruyton-XI-Towns
Welshampton
Cockshutt
ColemereTetchill
Bagley
WestonLullingfields
Stanwardinein the Fields
LowerHordley
Lee
Petton
Haughton
Hordley
Wykey
Kenwick
1 24 53
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.4 LANDSCAPE DESIGNATIONS
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
03 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd
Scheme Name:
PAGE 3 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUNDCABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED
COUNTRYSIDE STEWARDSHIP
REGISTERED PARK AND GARDENS
OPEN ACCESS
ANCIENT WOODLAND INVENTORY
DECIDUOUS WOODLAND
NATIONAL FORESTRY INVENTORY
LANDFILL SITE (AUTHORISED &HISTORIC)
BURLTON SOLAR FARM
P!APPROX. LOCATION OF WINDTURBINES
## LISTED BUILDING (GRADE I, II*)
SCHEDULED MONUMENT
SSSI
RAMSAR
SHROPSHIRE NORTH CONSERVATIONAREAS
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
CON
TIN
UES
ON
PAG
E 3
OF
5
CON
TIN
UES
ON
PAG
E 5
OF
5
Cockshutt
HarmerHill
Myddle
Northwood
Colemere
Loppington
Alderton
Lyneal
Petton
EnglishFrankton
Wolverley
Newtown
Burlton
Noneley
Sleap
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.4 LANDSCAPE DESIGNATIONS
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
04 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd
Scheme Name:
PAGE 4 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUNDCABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED
COUNTRYSIDE STEWARDSHIP
REGISTERED PARK AND GARDENS
OPEN ACCESS
ANCIENT WOODLAND INVENTORY
DECIDUOUS WOODLAND
NATIONAL FORESTRY INVENTORY
LANDFILL SITE (AUTHORISED &HISTORIC)
BURLTON SOLAR FARM
P!APPROX. LOCATION OF WINDTURBINES
## LISTED BUILDING (GRADE I, II*)
SCHEDULED MONUMENT
SSSI
RAMSAR
SHROPSHIRE NORTH CONSERVATIONAREAS
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
CON
TIN
UES
ON
PAG
E 4
OF
5
Wem
Prees
Clive
PreesGreen
Grinshill
HarmerHill
LeeBrockhurst
Edstaston
Alderton
Whixall
Paddolgreen
PrestonBrockhurst
QuinaBrook
Besford
Yorton
1 2 3 4 5
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.4 LANDSCAPE DESIGNATIONS
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
05 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd
Scheme Name:
PAGE 5 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUNDCABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED
COUNTRYSIDE STEWARDSHIP
REGISTERED PARK AND GARDENS
OPEN ACCESS
ANCIENT WOODLAND INVENTORY
DECIDUOUS WOODLAND
NATIONAL FORESTRY INVENTORY
LANDFILL SITE (AUTHORISED &HISTORIC)
BURLTON SOLAR FARM
P!APPROX. LOCATION OF WINDTURBINES
## LISTED BUILDING (GRADE I, II*)
SCHEDULED MONUMENT
SSSI
RAMSAR
SHROPSHIRE NORTH CONSERVATIONAREAS
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
P! P!
P!P!
P!P!
P!P!
P! P!P!
P!
P!P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P! P!
P!P!
P!
P!
P!P!P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!P!
P!
P!P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P!
P!
P!P!VP1 VP10
VP 11
VP12
VP13VP14
VP15VP16
VP17 VP18VP19
VP2
VP20VP21
VP22
VP23
VP24
VP25
VP26
VP27
VP28
VP29
VP3
VP30VP31
VP32
VP33
VP34
VP35
VP36VP37VP38
VP39
VP4
VP40
VP41
VP42
VP43
VP44
VP45
VP46
VP47
VP48
VP49
VP5
VP50
VP51
VP52
VP53
VP54
VP55
VP56
VP57
VP58
VP59
VP6
VP60
VP61
VP62
VP63
VP64
VP65
VP66
VP67
VP68
VP69
VP7
VP70
VP71
VP72
VP73
VP74
VP75
VP76
VP8
VP9
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.5 TOPOGRAPHY - ELEVATION (AOD) FOR STUDY AREA
CHAPTER 7: LANDSCAPE AND VISUAL
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 1
A3 (420 mm x 297 mm)1:75,000
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUNDCABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED
VIEWPOINTS:
P! SIGNIFICANT
P! NON-SIGNIFICANT
P! NO VIEW
P! NO ACCESS
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.5.mxd
Scheme Name:
°
OSWESTRY
WEM
REDNAL
COCKSHUTT
Elevation (AOD)
62 - 74
74.1 - 76
76.1 - 78
78.1 - 80
80.1 - 82
82.1 - 84
84.1 - 86
86.1 - 88
88.1 - 90
90.1 - 92
92.1 - 94
94.1 - 96
96.1 - 98
98.1 - 100
100.1 - 102
102.1 - 104
104.1 - 106
106.1 - 108
108.1 - 110
110.1 - 112
112.1 - 114
114.1 - 116
116.1 - 118
118.1 - 120
120.1 - 122
122.1 - 124
124.1 - 126
126.1 - 128
128.1 - 379
ELEVATION (AOD)
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 1 20.5
Kilometres
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).