8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 1/59
I-64 Kanawha River Bridge
South Charleston & Dunbar W.V
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 2/59
Contract Information
Owners: WVDOT / FHWADesigner: T.Y. Lin InternationalLet: February 2007
Contractor: Brayman Construction Corporation Finley Engineering GroupMichael Baker, Jr.
Awarded: March 2007
Start Date: May 2007Completion Date: October 2010
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 3/59
Bid Results
Steel Alternative $113 Million
Concrete Alternative $83 Million
Bridge Items: $75Million
( $379 / SF )Second Largest Contract Awarded
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 4/59
Concrete
Segmental Box Girder
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 5/59
Topics of Interest
• Superstructure Concrete strength 6,500 psi• Mass Concrete• Main Piers• Balanced cantilever construction
• 167 cast-in-place segments• 760’ Main Span length longest continuous segmental
span in North America• 90 cantilever tendons 22-0.6”•
34 span tendons 19-0.6”• Post Tensioning• Grouting
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 6/59
WVDOH Class H Modified (6500 psi) concrete
Arrow Concrete
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 7/59
Mix Design Requirements
Air Entrained 6500 psi
Low E modulus of elasticity, and creep
Workable mix ranging from a 4” to 8”Slump
Low Rapid Chloride Permeabilityrequirement.
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 8/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 9/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 10/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 11/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 12/59
Special Provision SP601: Mass Concrete•Any Placement with Least Dimension Greater then 48.0Inches
•Maximum Allowable Temperature Difference Shall be
Limited to 35 Degrees F•Maximum Allowable Concrete Temperature Shall beLimited to 160 Degrees F
•Temperature Monitoring System to Ensure Compliance
•Thermal Control Plan Submitted Describing Methods andProcedures to Satisfy Requirements
•Temperature Monitoring System to Ensure Compliance
•Mix Design’s Conforming to SP601 Requirements
•Conforming to These Requirements will be at no Addition
(I-64 KRB) MASSCONCRETE
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 13/59
Insulated Forms
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 14/59
Insulated Blankets
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 15/59
Method of Controlling Maximum Temperature andDifferential
(EMBEDDED COOLING PIPE)
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 16/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 17/59
CL
PIER
7'-0"
15'-0"
15'-0
"
CL BOX
18'-3" 18'-3"12'-0" 12'-0"
60'-6"
18'-3"
18'-3"
12'-0"
12'-0"
60'-6"
14'-3" 9'-0" 7'-0"14'-3"
7'-0"
1
4'-3"
9'-0"
7'-0"
14'-3"
7' SHAFT (TYP.)
9'-0"
9'-0"
Main Pier Foundation
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 18/59
Main Piers
Transverse View Elevation View
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 19/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 20/59
Erection of the Form Traveler
.
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 21/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 22/59
Form Traveler Construction
Balanced cantilever construction method
Strukturas form travelers with DOKA
formworkCross Sections varied from 16’ to 38’ inheight created unique formwork
challenges
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 23/59
Superstructure Cross-section
10'-0“SHOULDER
12'-0" AUXLANE
6'-0“OFFSET
3 TRAVEL LANES@ 12'-0" = 36'-0"
1'-6"
2" OVERLAY
NEAR MID-SPAN
1'-6"16'-0"
38'-0"
9"
1 3/8 '' VERTICALPT BAR
TRANSVERSE TENDON4-0.6'' STRANDS
5'-0"
NEAR MAIN PIER
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 24/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 25/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 26/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 27/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 28/59
Cantilever Cycle
L
T 1T 1
C P I E R
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 29/59
Cantilever Cycle
LC P I E R
1 W
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 30/59
Cantilever Cycle
LC P I E R
1 W
T 2
T 2
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 31/59
Cantilever Cycle
LC P I E R
1 W1 E
2 W
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 32/59
Cantilever Cycle
LC P I E R
1 W1 E
2 W
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 33/59
Cantilever Cycle
T 3
T 3
LC P I E R
1 W1 E
2 W
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 34/59
Cantilever Cycle
LC P I E R
1 W2 W1 E
2 E
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 35/59
Cantilever Cycle
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 36/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 37/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 38/59
Post Tensioning (Stressing)
Tendons stressed to 75% of guaranteed yieldstrength
Vertical P.T. Bar Longitudinal Deck Tendons
Cantilever Tendons
Draped TendonsSpan Tendons
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 39/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 40/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 41/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 42/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 43/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 44/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 45/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 46/59
Cantilever Tendons
Cantilever TendonDuctsSpare
Ducts
Anchorage
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 47/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 48/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 49/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 50/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 51/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 52/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 53/59
Span Tendons
Anchorage
SpanTendonDucts
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 54/59
Tendon Grouting
High Shear Colloidal Mixer
Pre Bagged, Thixotropic, ZERO Bleed,grout supplied by BASF Chemical
Start grout from the Low Point to HighPoints
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 55/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 56/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 57/59
8/6/2019 OTEC (Kanawha River Bridge) s Williamson
http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 58/59
Low Points and High Points