59
 I-64 Kanawha River Bridge South Charleston & Dunbar W.V

OTEC (Kanawha River Bridge) s Williamson

  • Upload
    stevewv

  • View
    227

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 1/59

 

I-64 Kanawha River Bridge

South Charleston & Dunbar W.V

Page 2: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 2/59

 

Contract Information

Owners: WVDOT / FHWADesigner: T.Y. Lin InternationalLet: February 2007

Contractor: Brayman Construction Corporation Finley Engineering GroupMichael Baker, Jr.

Awarded: March 2007

Start Date: May 2007Completion Date: October 2010

Page 3: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 3/59

 

Bid Results

Steel Alternative $113 Million

Concrete Alternative $83 Million

Bridge Items: $75Million 

( $379 / SF )Second Largest Contract Awarded

Page 4: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 4/59

 

Concrete

Segmental Box Girder 

Page 5: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 5/59

 

Topics of Interest

• Superstructure Concrete strength 6,500 psi• Mass Concrete• Main Piers• Balanced cantilever construction

• 167 cast-in-place segments• 760’ Main Span length longest continuous segmental

span in North America• 90 cantilever tendons 22-0.6”•

34 span tendons 19-0.6”• Post Tensioning• Grouting

Page 6: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 6/59

 

 WVDOH Class H Modified (6500 psi) concrete

Arrow Concrete

Page 7: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 7/59 

Mix Design Requirements

Air Entrained 6500 psi

Low E modulus of elasticity, and creep

Workable mix ranging from a 4” to 8”Slump

Low Rapid Chloride Permeabilityrequirement.

Page 8: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 8/59 

Page 9: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 9/59 

Page 10: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 10/59 

Page 11: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 11/59 

Page 12: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 12/59 

Special Provision SP601: Mass Concrete•Any Placement with Least Dimension Greater then 48.0Inches

•Maximum Allowable Temperature Difference Shall be

Limited to 35 Degrees F•Maximum Allowable Concrete Temperature Shall beLimited to 160 Degrees F

•Temperature Monitoring System to Ensure Compliance

•Thermal Control Plan Submitted Describing Methods andProcedures to Satisfy Requirements

•Temperature Monitoring System to Ensure Compliance

•Mix Design’s Conforming to SP601 Requirements

•Conforming to These Requirements will be at no Addition

(I-64 KRB) MASSCONCRETE

Page 13: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 13/59

 

Insulated Forms

Page 14: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 14/59

 

Insulated Blankets

Page 15: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 15/59

 

Method of Controlling Maximum Temperature andDifferential

(EMBEDDED COOLING PIPE)

Page 16: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 16/59

 

Page 17: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 17/59

 

CL

PIER

7'-0"

15'-0"

15'-0

"

CL BOX

18'-3" 18'-3"12'-0" 12'-0"

60'-6"

18'-3"

18'-3"

12'-0"

12'-0"

60'-6"

14'-3" 9'-0" 7'-0"14'-3"

7'-0"

1

4'-3"

9'-0"

7'-0"

14'-3"

7' SHAFT (TYP.)

9'-0"

9'-0"

Main Pier Foundation

Page 18: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 18/59

 

Main Piers

Transverse View Elevation View

Page 19: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 19/59

 

Page 20: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 20/59

 

Erection of the Form Traveler 

.

Page 21: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 21/59

 

Page 22: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 22/59

 

Form Traveler Construction

Balanced cantilever construction method

Strukturas form travelers with DOKA

formworkCross Sections varied from 16’ to 38’ inheight created unique formwork

challenges

Page 23: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 23/59

 

Superstructure Cross-section

10'-0“SHOULDER

12'-0" AUXLANE

6'-0“OFFSET

3 TRAVEL LANES@ 12'-0" = 36'-0"

1'-6"

2" OVERLAY

NEAR MID-SPAN

1'-6"16'-0"

38'-0"

9"

1 3/8 '' VERTICALPT BAR

TRANSVERSE TENDON4-0.6'' STRANDS

5'-0"

NEAR MAIN PIER

Page 24: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 24/59

 

Page 25: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 25/59

 

Page 26: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 26/59

 

Page 27: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 27/59

 

Page 28: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 28/59

 

Cantilever Cycle

L

T 1T 1

C P I E R

 

Page 29: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 29/59

 

Cantilever Cycle

LC P I E R

 

1 W

Page 30: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 30/59

 

Cantilever Cycle

LC P I E R

1 W

T 2

T 2

Page 31: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 31/59

 

Cantilever Cycle

LC P I E R

1 W1 E

 

2 W

Page 32: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 32/59

 

Cantilever Cycle

LC P I E R

1 W1 E

 

2 W

Page 33: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 33/59

 

Cantilever Cycle

 

T 3

T 3

LC P I E R

1 W1 E

2 W

Page 34: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 34/59

 

Cantilever Cycle

LC P I E R

1 W2 W1 E

2 E

Page 35: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 35/59

 

Cantilever Cycle

Page 36: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 36/59

 

Page 37: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 37/59

 

Page 38: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 38/59

 

Post Tensioning (Stressing)

Tendons stressed to 75% of guaranteed yieldstrength

Vertical P.T. Bar Longitudinal Deck Tendons

Cantilever Tendons

Draped TendonsSpan Tendons

Page 39: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 39/59

 

Page 40: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 40/59

 

Page 41: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 41/59

 

Page 42: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 42/59

 

Page 43: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 43/59

 

Page 44: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 44/59

 

Page 45: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 45/59

 

Page 46: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 46/59

 

Cantilever Tendons

 

Cantilever TendonDuctsSpare

Ducts

Anchorage

Page 47: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 47/59

 

Page 48: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 48/59

 

Page 49: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 49/59

 

Page 50: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 50/59

 

Page 51: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 51/59

 

Page 52: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 52/59

 

Page 53: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 53/59

 

Span Tendons

Anchorage

SpanTendonDucts

Page 54: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 54/59

 

Tendon Grouting

High Shear Colloidal Mixer 

Pre Bagged, Thixotropic, ZERO Bleed,grout supplied by BASF Chemical

Start grout from the Low Point to HighPoints

Page 55: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 55/59

 

Page 56: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 56/59

 

Page 57: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 57/59

 

Page 58: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 58/59

 

Low Points and High Points

THANK YOU

Page 59: OTEC (Kanawha River Bridge) s Williamson

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 59/59

THANK YOU