8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
1/61
www.huawei.com
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved.
OptiX RTN 600 Equipment
Commissioning
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
2/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 2
Learning Guide
Before studying this course, you are supposed to complete the
study on
Basics of digital microwave communications or related
knowledge
OptiX RTN 600 Product Introduction
OptiX RTN 600 Networking and Protection Mechanism
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
3/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 3
References
Digital Microwave Communications Basics
OptiX RTN 600 Radio Transmission System Configuration
Guide
OptiX RTN 600 Radio Transmission System Commissioning
Guide
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
4/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 4
Objectives
Upon completion of this course, you will be able to:
Finish proper preparations before the commissioning
Performing NE commissioning of the OptiX RTN 600
Performing hop commissioning of the OptiX RTN 600
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
5/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 5
Contents
1. Preparations for the OptiX RTN 600 Commissioning
2. NE Commissioning of the OptiX RTN 600
3. Hop Commissioning of the OptiX RTN 600
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
6/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 6
Contents
1. Preparations for the OptiX RTN 600 Commissioning
1.1 Determining Commissioning Items
1.2 Preparing Related Documents
1.3 Preparing Related Tools
1.4 Checking Commissioning Conditions
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
7/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 7
Determining Commissioning Items
1. NE Commissioning Items
Commissioning Item Optional/Require
d
Remarks
Powering on the
equipment Required
Check fan status after power on if fan is
available.
Testing indicators RequiredCheck whether all indicators work
normally or not.
Accessing the Web LCT Required -
Configuring the data Required -
Performing the service
loopback testOptional
Recommend to test if instrument
available on site.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
8/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 8
Determining Commissioning Items (cont.)
1. NE Commissioning Items (cont.)
Commissioning Item Optional/Require
d
Remarks
Testing E1 cablesconnections
Optional It applies to the station where the E1service is accessed.
Checking the receive
and transmit power of
the optical interface
Optional
It applies to the station where the SDH
optical interface service is accessed.
Testing the RF transmitpower
Required Use the Web LCT to query the RFtransmit power.
Testing the
active/standby cross-
connect board switching
Required
It only applies to the equipment
configured with the active and standby
cross-connect boards.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
9/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 9
2. Hop Commissioning Items
Commissioning Item Optional/
Required
Remarks
Aligning the antenna Required -
Testing the ECC Required -
Testing the
orderwire phone
Optional
It is applicable when there is the
order wire phone available between
stations.
Testing all services Required
Test all service types turned up at
the station like the E1, STM-1, and
WS.
Determining Commissioning Items (cont.)
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
10/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 10
Commissioning
Item
Optional/Require
dRemarks
Testing the clocktracing
Required Check and ensure that the clocksource can be traced normally.
Testing the IF
switching modesRequired
It is applicable when the 1+1
HSB/FD/SD protection is configured.
Testing the SNCPswitching
Required It is applicable when the SNCP isconfigured.
Testing the long-
term BERRequired
Generally perform the test for 24
hours according to the actual
conditions
2. Hop Commissioning Items (cont.)
Determining Commissioning Items (cont.)
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
11/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 11
Preparing Related Documents
Engineering design documents like
OptiX RTN 600 Radio Transmission System Network Planning
Document
OptiX RTN 600 Radio Transmission System Engineering
Design Document
Commissioning guide documents like:
OptiX RTN 600 Radio Transmission System Commissioning
Guide
OptiX RTN 600 Radio Transmission System Quick Installation
and Commissioning Guide
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
12/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 12
Preparing Tools
The tools that are required include the common tools, special tools
and instruments. The recommended list is as follows:
Type Description
Common
tool
Adjustable wrench, percussion drill, sharp-nose pliers, and
electric knife
Special
tool
Anti-static glove, ESD-preventive wrist strap, telescope,
and intercom
InstrumentMulti-meter, BER tester, and laptop computer (installed
with the Web LCT)
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
13/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 13
Checking NE Commissioning Conditions
The hardware installation complete.
The power supply is normal.
The cable / fiber installation.
Web LCT is available.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
14/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 14
Checking Hop Commissioning Conditions
The NE commissioning is complete.
The weather condition.
Safety of the operation at a high altitude.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
15/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 15
Summary
This chapter describes the following contents:
NE commissioning items and hop commissioning items
Documents and tools prepared before the commissioning
Commissioning conditions
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
16/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 16
Contents
1. Preparations for the OptiX RTN 600 Commissioning
2. NE Commissioning of the OptiX RTN 600
3. Hop Commissioning of the OptiX RTN 600
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
17/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 17
Contents
2. NE Commissioning of the OptiX RTN 600
2.1 Powering On the Equipment
2.2 Testing Indicators
2.3 Accessing the Web LCT
2.4 Configuring the Data
2.5 Performing the Service Loopback test
2.6 Testing the Connections of the E1 Cables
2.7 Testing the Transmit and Receive Optical Power
2.8 Testing the RF Transmit Power
2.9 Testing the Active/Standby Cross-Connect Board Switching
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
18/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 18
Powering On the Equipment
Prerequisites
Hardware installation complete and power is available.
The power supply must be available, and the fuse capacity of
the power supply must meet the requirements.
Tools and Instruments
Multi-meter
Procedure Turn off all power switches on equipment.
Turn on the input power switch of the cabinet.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
19/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 19
Powering On the Equipment (cont.)
Test power volt and polarity.
Turn on the switch on PXC board.
Monitor fan and indicators.
Turn on the power of ODU.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
20/61
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page 20
Testing Indicators
Prerequisites
After 5 minutes power on
Tools and Instruments
None.
Procedure
Press or release the button on SCC.
LAMP
TEST
button
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
21/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 21
Accessing the Web LCT
Prerequisites
After power on.
Tools and Instruments
Laptop computer installed with Web LCT
Cross cable
Procedure
Connect cable.
Start Web LCT on laptop computer.
Set IP of computer.
Set the options of the Internet Explorer (IE).
NM interface
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
22/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 22
Accessing the Web LCT(con.)
On desktop, double-click the Start Web
LCT icon. The system displays the
USER LOGIN window of the Web LCT
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
23/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 23
Accessing the Web LCT (con.)
Enter User Name and Password, and then click Login. The
user name of the Web LCT is admin by default, and the
corresponding password is T2000 by default.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
24/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 24
Configuring the Data
Prerequisites
After Web LCT access.
Tools and Instruments
Web LCT
Procedure
Set the new ID and IP as the planning document request.
Configure all the existing boards in equipment.
Monitor board indicators again.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
25/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 25
Checking alarm
Prerequisites
The equipment must be connected to the Web LCT.
Data configuration must be complete.
Tools, Instruments, and Materials
Web LCT
Procedure
Select an NE from the Object Tree in the NE Explorer, and then click in the
toolbar.
Select Auto Refresh.
Check the displayed alarm information.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
26/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 26
Testing Transmit and Receive Optical
Power
Prerequisites
Fiber connection is available.
Boards are configured
Tools and Instruments
Web LCT or optical power meter
Procedure
Disable automatic laser shutdown (ALS) function.
Check the transmit and receive optical power by Web LCT or optical
power meter.
Judge the power value is normal or not.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
27/61
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
28/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 28
Testing E1 Cable Connections
Prerequisites
Service and cable connection available.
Tools and Instruments
Web LCT and BER tester
Procedure
Connect tester and set the outloop.
Release outloop, AIS alarm should occur. All the ports can be test together.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
29/61
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
30/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 30
Testing Active/Standby Cross-
connect Switching
Prerequisites
Service be configured.
The active and standby cross-connect boards be configured.
Tools and Instruments
Web LCT and BER tester
Procedure
Current status of two PXC should be normal.
Switch PXC board by Web LCT and monitor their status and alarms.
Restore back PXC board.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
31/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 31
Questions
What is the procedure to access Web LCT?
How should the E1 port be set and connected for testing the connections
of E1 cables? How to adopt the testing it quickly?
Why shall we disable the ATPC function when test RF transmit power?
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
32/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 32
Summary
Powering on the equipment
Testing indicators
Accessing the Web LCT
Checking Alarm
Configuring the data
Testing the transmit and receive optical power
Performing the service loopback test
Testing the connections of E1 cables
Testing the RF transmit power
Testing the active/standby cross-connect board switching
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
33/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 33
Contents
1. Preparations for the OptiX RTN 600 Commissioning
2. NE Commissioning of the OptiX RTN 600
3. Hop Commissioning of the OptiX RTN 600
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
34/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 34
Contents
3. Hop Commissioning of the OptiX RTN 600
3.1 Aligning the Single-PolarizedAntenna
3.2 Aligning the Dual-Polarized Antennas
3.3 Testing the ECC
3.3 Testing the E1 Service
3.3 Testing the Ethernet Service
3.4 Testing the WS Service
3.5 Testing the order wire
3.6 Testing the Clock Tracing
3.7 Testing the IF 1+1 Switching
3.8 Testing the SNCP Switching
3.9 Testing the 24-Hour BER
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
35/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 35
Aligning the Single-PolarizedAntenna
Prerequisites
The NE commissioning is complete.
Weather is suitable for commissioning.
The on-site conditions and personnel fit for high altitude operation.
ATPC disabled.
Tools and Instruments
Wrench, multi-meter and intercom.
Procedure
1. Rotate antenna approximately.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
36/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 36
RS
SI
Aligning the Single-PolarizedAntenna(cont.)
Procedure (cont.) 2. Test VBNC value:
VBNC
RSL
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
37/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 37
Aligning the Single-PolarizedAntenna(cont.)
Procedure (cont.)
3. Rotate antenna in horizontal manner widely to search the
highest VBNC.
4. Adjust the elevation angle to search the highest VBNC.
5. Aligning the remote antenna.
6. Repeat step 2 to step 5 for 2 to 4 times until get the highest
VBNC at both sides.
7. Tighten all the screws to fix antenna and make a mark.
8. Read the current RSL for both sides.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
38/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 38
Aligning the Single-PolarizedAntenna(cont.)
Precautions
Align the antennas respectively in case of two antennas
configured at both sides.
1+1 SD.
1+1 FD + SD.
The antenna adjustment device is screw bolt.
Make the test line with BNC interface for multimeter in advance.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
39/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 39
Aligning the Dual-PolarizedAntenna
Prerequisites
The NE commissioning of the radio equipment at both ends of the
radio link must be complete.
The weather must be suitable for outdoor work. There should be
no rain, snow or fog between stations.
The on-site conditions must meet the requirement for performing
operations at high altitudes and the personnel in charge of
commissioning the antenna must be trained to work at high
altitudes.
The ATPC function must be disabled.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
40/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 40
Aligning the Dual-PolarizedAntenna(cont.)
Tools, Instruments, and Materials
Ejector lever
Multi-meter
Procedure
1.Power off the vertically polarized ODUs at both ends of the
radio link, power on the horizontally polarized ODUs at both ends
of the radio link, and thus ensure that the antennas transmit
horizontally polarized signals.
2.Adjust the azimuth angle and elevation angle of the antennas at
both ends and ensure that the main lobe of the horizontally
polarized signals is aligned with the antenna.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
41/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 41
Aligning the Dual-PolarizedAntenna(cont.)
3.Measure the RSL (P1) of the horizontally polarized signals at
the local end.
4.Adjust the feed boom at the local end, and ensure that the RSL
of the vertically polarized signals reaches the lower threshold (P2).
5.Record the angle (D1) of the current feed boom.
6.Power off the horizontally polarized ODUs at both ends
of the radio link, power on the vertically polarized ODUs at
both ends of the radio link, and thus ensure that the
antennas transmit vertically polarized signals.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
42/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 42
Aligning the Dual-PolarizedAntenna(cont.)
7.Measure the RSL (P3) of the vertically polarized signals
at the local end by referring to 3.
8.Power on the horizontally polarized ODU at the local end,
and calculate the level (P4) of the horizontally polarized
signals received at the local end by referring to 4. The
calculated XPD2 (XPD2 = P3 P4) should not be less than
30 dB.
9.Record the angle (D2) of the current feed boom.
http://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htmhttp://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htmhttp://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htmhttp://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htm8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
43/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 43
Aligning the Dual-PolarizedAntenna(cont.)
10.Repeat 3to 9to adjust the feed boom slightly (ranging
from D1 to D2), and ensure that XPD1 and XPD2 are not
less than 30 dB.
11.Tighten all the screws of the antennas.
http://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htmhttp://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htmhttp://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htmhttp://localhost/var/www/apps/Local%20Settings/Temp/Rar$EX25.4922/web/01-04%20HOP%20Commissioning%20Guide.htm8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
44/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 44
Testing the ECC
Prerequisites
Antenna alignment must be complete.
The NE must have access to the Web LCT.
Tools and Instruments
Web LCT
Precautions
Test the ECC at one end of the radio link.
Procedure Add and set the attributes of the remote NE in Web LCT
Observe Login Statusof the newly added remote NE.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
45/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 45
Testing the E1 Service
Prerequisites
The E1 service must be available.
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Procedure
BER tester connected to local site.
Remote site set the loopback.
No errors in 5 or 10 minutes.
Release all loopbacks.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
46/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 46
Testing the E1 Service (con.)
When there isnt BER tester, the PRBS function of
PDH board can test the E1 service instead of BER
tester.
Setting the loop-back of an E1 interface at remote site.
Configuring PRBS function at local site.
Observing the testing result.
Releasing loop-back
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
47/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 47
Testing the Ethernet Service
Prerequisite
The Ethernet service must be configured between stations.
Tools, Instruments, and Materials
Web LCT
One laptop
Connection diagram for testing the Ethernet service
Configuration for testing the Ethernet service
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
48/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 48
Testing the Ethernet Service(cont.)
Cable connection for the IDU (NE 1)
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
49/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 49
Testing the Ethernet Service(cont.)
Cable connection for the IDU (NE 2)
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
50/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 50
Testing the Ethernet Service(cont.)
Procedure
1.On the IDU side of NE 1, use an Ethernet cable to connect the
Ethernet port of the laptop to the Ethernet service port of the Ethernet
board, as shown in The Ethernet service port enables service
transmission between NEs.
2.On the IDU side of NE 2, use an Ethernet cable to connect the
Ethernet port of the SCC to the Ethernet service port of the Ethernet
board, The Ethernet service port enables service transmission
between NEs.
3.Set the IP address of the laptop, and ensure that the IP
address and the IP address of NE 2 belong to the same
network segment.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
51/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 51
Testing the Ethernet Service(cont.)
Display the Command Prompt window of laptop A, and run the ping
129.9.0.2 -n 200 -l 2000 command.
After you run the command, check the result. There should not
be lost packets, that is, the output display should contain the
following information: Lost = 0 (0% loss)
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
52/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 52
Testing the WS Service
Prerequisites
The WS service must be configured.
Antenna alignment must be complete.
Tools and Instruments
BER tester
Procedure
At local site, connect the BER tester to the WS port.
At remote site, perform the hardware inloop for the WS port.
Test the BER for 5 to 10 minutes by BER tester. No bit errors shouldoccur.
Release the loopback.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
53/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 53
Testing the order wire
Prerequisites
The order wire phone must be correctly installed at the station.
The data of the order wire must be configured.
Antenna alignment must be complete.
Tools and Instruments
None.
Procedure
Dial the number of remote site.
Check the voice is clear or not.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
54/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 54
Testing the Clock Tracing
Prerequisites
The clock tracing priority list must be configured.
Tools and Instruments
Web LCT
Procedure
Query the current clock priority table by using the Web LCT.
Query the current . Manual switch the PXC board.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
55/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 55
Testing the IF 1+1 Switching
Prerequisites
The equipment must be configured with the IF 1+1 protection.
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Procedure
Connect E1 tester in local E1 port and set loopback in remote site.
Query the working status of IF board.
Mute the active ODU to start the IF switch.
Check status and alarms.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
56/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 56
Testing the IF 1+1 Switching (cont.)
Procedure (cont.)
Check the bit errors generate in switching.
Test the restoration of IF 1+1 switching.
Power on the main ODU.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
57/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 57
Testing the SNCP Switching
Prerequisites
The equipment must be configured with the SNCP protection.
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Procedure
Connect tester for E1 ports and perform the bit error testing.
Power of the ODU to trigger the SNCP switch.
Check the service status, alarms and bit errors.
Test the restoration of SNCP.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
58/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 58
Testing the 24-Hour BER
Prerequisites
Antenna alignment must be complete.
Tools and Instruments
BER tester and Web LCT
Procedure
Cascade the E1 ports with the BER
tester at one site.
Perform the loopback at the other
sites.
Test bit error for 24 hours.
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
59/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 59
Questions
What is the procedure to aligning antennas?
How long should it take to test the E1 service and WS service
respectively by using the BER tester?
What alarms occur after the IF 1+1 switching is complete?
How can we ensure that SNCP switching is successful?
How should we handle bit errors occurring in the 24-hour BER test?
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
60/61
Copyright 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 60
Summary
The commissioning items in hop commissioning: 3.1 Aligning the Single-PolarizedAntenna
3.2 Aligning the Dual-Polarized Antennas
3.3 Testing the ECC
3.3 Testing the E1 Service
3.3 Testing the Ethernet Service
3.4 Testing the WS Service
3.5 Testing the order wire
3.6 Testing the Clock Tracing
3.7 Testing the IF 1+1 Switching
3.8 Testing the SNCP Switching 3.9 Testing the 24-Hour BER
8/12/2019 OTF101702 OptiX RTN 600 Equipment Commissioning ISSUE 1.01
61/61
Thank youwww.huawei.com