10
Local Controller Data SAMPLE ROAD PROJECT YES RING 1 - RING 2 - START IN: 5 FIRST PHASE(S): COLOR DISPLAYED: 1 2 3 4 5 6 7 8 WB LT EB NB LT SB EB LT WB SB LT NB (SEC.) 7 20 7 10 7 20 7 10 ADDED INITIAL - - - - - - - - (SEC.) - - - - - - - - (SEC.) 3 3 3 3 3 3 3 3 *(SEC.) - - - - - - - - *(SEC.) - - - - - - - - *(SEC.) - - - - - - - - (SEC.) 15 60 15 40 15 60 20 40 (SEC.) 15 60 15 40 15 60 20 40 (SEC.) 4 5 4 5 4 5 4 5 (SEC.) 3 2 3 2 3 2 3 2 (SEC.) - 7 - 7 - 7 - 7 (SEC.) - 15 - 20 - 15 - 20 MAXIMUM (ON/OFF) OFF OFF OFF OFF OFF OFF OFF OFF MINIMUM (ON/OFF) OFF ON OFF OFF OFF ON OFF OFF PEDESTRIAN (ON/OFF) OFF OFF OFF OFF OFF OFF OFF OFF MEMORY (ON/OFF) OFF OFF OFF OFF OFF OFF OFF OFF MANUAL PATTERN AUTO SYSTEM SOURCE SYS SPLITS IN SECONDS TRANSITION SMOOTH DWELL/ADD TIME 0 OFFSET REFERNECE YELLOW PED RECALL NO CAL ZERO OVERRIDE NO RE-SYNC COUNT 0 ECPI COORD YES SYSTEM FORMAT STD OFFSET IN SECONDS MAX SELECT MAXINH FORCE OFF FLOAT USE PED TIME YES PED RESERVICE NO FO ADD INI GRN NO MULTISYNC NO Note: Any deviation from the standard econolite/siemens coord settings above will require OTO approval SAMPLE ROAD PROJECT Proposed Local Controller Data YIELD PERIOD MANUAL CONTROL: DIAL SIEMENS COORD SETTINGS OPERATION MODE (NORMAL) MAXIMUM CORRECTION MANUAL CONTROL: SPLIT MANUAL CONTROL: OFFSET 1 - AUTO 0 - PERMISSIVE - - 1 1 0 - INHIBIT 2 - SHORT WAY 1 - END GREEN 1 OFFSET MODE FORCE MODE MAX DWELL TIME 0 - PLAN ECONOLITE COORD SETTINGS - D 3 7 - A B C YELLOW CHANGE ALL RED CLEARANCE *VOLUME DENSITY CONTROLS RECALL PEDESTRIAN CLEARANCE *(SEC./ACTUATION) WALK MINIMUM GREEN (INITIAL) OVERLAP MAXIMUM GREEN II 2&6, 4&8 INTERSECTION: MAINTAINING AGENCY: Sample Rd. @ Main St. ODOT DUAL ENTRY: REST IN RED: PHASES MAXIMUM GREEN I PHASES: YELLOW/RED FLASH TIME FOR FLASH OR ALL RED: 2&6 GREEN INTERVAL OR FEATURE INTERSECTION MOVEMENT (PHASE) DIRECTION START UP MAXIMUM INITIAL PASSAGE TIME (PRESET GAP) TIME BEFORE REDUCTION MINIMUM GAP TIME TO REDUCE CONTROLLER MOVEMENT NO. 1 OF 10 SAMPLE

OTO - Standard Signal Timing Tables 2 2/ped 3 4 4/ped 5 6 6/ped 7 8 8/ped wb lt eb eb nb lt sb sb eb lt wb wb sb lt nb nb ext. plan no. prop. plan no. 1/1/1 1/1/1 15 765 2 16 42 1

  • Upload
    lamkiet

  • View
    229

  • Download
    5

Embed Size (px)

Citation preview

Local Controller DataSAMPLE ROAD PROJECT

YES

RING 1 - RING 2 -

START IN:

5

FIRST PHASE(S):

COLOR DISPLAYED:

1 2 3 4 5 6 7 8

WB LT EB NB LT SB EB LT WB SB LT NB

(SEC.) 7 20 7 10 7 20 7 10

ADDED INITIAL - - - - - - - -

(SEC.) - - - - - - - -

(SEC.) 3 3 3 3 3 3 3 3

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

(SEC.) 15 60 15 40 15 60 20 40

(SEC.) 15 60 15 40 15 60 20 40

(SEC.) 4 5 4 5 4 5 4 5

(SEC.) 3 2 3 2 3 2 3 2

(SEC.) - 7 - 7 - 7 - 7

(SEC.) - 15 - 20 - 15 - 20

MAXIMUM (ON/OFF) OFF OFF OFF OFF OFF OFF OFF OFF

MINIMUM (ON/OFF) OFF ON OFF OFF OFF ON OFF OFF

PEDESTRIAN (ON/OFF) OFF OFF OFF OFF OFF OFF OFF OFF

MEMORY (ON/OFF) OFF OFF OFF OFF OFF OFF OFF OFF

MANUAL PATTERN AUTO

SYSTEM SOURCE SYS

SPLITS IN SECONDS

TRANSITION SMOOTH

DWELL/ADD TIME 0

OFFSET REFERNECE YELLOW

PED RECALL NO

LOCAL ZERO OVERRIDE NO

RE-SYNC COUNT 0

ECPI COORD YES

SYSTEM FORMAT STD

OFFSET IN SECONDS

MAX SELECT MAXINH

FORCE OFF FLOAT

USE PED TIME YES

PED RESERVICE NO

FO ADD INI GRN NO

MULTISYNC NO

Note: Any deviation from the standard econolite/siemens coord settings above will require OTO approval

SAMPLE ROAD PROJECT

Proposed Local Controller Data

YIELD PERIOD

MANUAL CONTROL: DIAL

SIEMENS COORD SETTINGS

OPERATION

MODE (NORMAL)

MAXIMUM

CORRECTION

MANUAL CONTROL: SPLIT

MANUAL CONTROL: OFFSET

1 - AUTO

0 - PERMISSIVE

-

-

1

1

0 - INHIBIT

2 - SHORT WAY

1 - END GREEN

1

OFFSET MODE

FORCE MODE

MAX DWELL TIME

0 - PLAN

ECONOLITE COORD SETTINGS

-

D

3 7 -

A B C

YELLOW CHANGE

ALL RED CLEARANCE

*VOLUME DENSITY CONTROLS

RECALL

PEDESTRIAN CLEARANCE

*(SEC./ACTUATION)

WALK

MINIMUM GREEN (INITIAL)

OVERLAP

MAXIMUM GREEN II

2&6, 4&8

INTERSECTION:

MAINTAINING AGENCY:

Sample Rd. @ Main St.

ODOT

DUAL ENTRY:

REST IN RED:

PHASES

MAXIMUM GREEN I

PHASES:

YELLOW/RED FLASH

TIME FOR FLASH OR ALL RED:

2&6

GREEN

INTERVAL OR FEATURE

INTERSECTION MOVEMENT (PHASE)

DIRECTION

START UP

MAXIMUM INITIAL

PASSAGE TIME (PRESET GAP)

TIME BEFORE REDUCTION

MINIMUM GAP

TIME TO REDUCE

CONTROLLER MOVEMENT NO.

1 OF 10

SAMPLE

Local Controller DataSAMPLE ROAD PROJECT

YES

RING 1 - RING 2 -

START IN:

5

FIRST PHASE(S):

COLOR DISPLAYED:

1 2 3 4 5 6 7 8

- EB - SB - WB - NB

(SEC.) - 20 - 10 - 20 - 10

ADDED INITIAL - - - - - - - -

(SEC.) - - - - - - - -

(SEC.) - 3 - 3 - 3 - 3

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

(SEC.) - 60 - 40 - 60 - 40

(SEC.) - 60 - 40 - 60 - 40

(SEC.) - 5 - 5 - 5 - 5

(SEC.) - 2 - 2 - 2 - 2

(SEC.) - - - - - - - -

(SEC.) - - - - - - - -

MAXIMUM (ON/OFF) - OFF - OFF - OFF - OFF

MINIMUM (ON/OFF) - ON - OFF - ON - OFF

PEDESTRIAN (ON/OFF) - OFF - OFF - OFF - OFF

MEMORY (ON/OFF) - OFF - OFF - OFF - OFF

MANUAL PATTERN AUTO

SYSTEM SOURCE SYS

SPLITS IN SECONDS

TRANSITION SMOOTH

DWELL/ADD TIME 0

OFFSET REFERNECE YELLOW

PED RECALL NO

LOCAL ZERO OVERRIDE NO

RE-SYNC COUNT 0

ECPI COORD YES

SYSTEM FORMAT STD

OFFSET IN SECONDS

MAX SELECT MAXINH

FORCE OFF FLOAT

USE PED TIME YES

PED RESERVICE NO

FO ADD INI GRN NO

MULTISYNC NO

Note: Any deviation from the standard econolite/siemens coord settings above will require OTO approval

MANUAL CONTROL: SPLIT 1

MANUAL CONTROL: OFFSET 1

MAX DWELL TIME -

YIELD PERIOD -

MANUAL CONTROL: DIAL 1

CORRECTION 2 - SHORT WAY

OFFSET MODE 1 - END GREEN

FORCE MODE 0 - PLAN

OPERATION 1 - AUTO

MODE (NORMAL) 0 - PERMISSIVE

MAXIMUM 0 - INHIBIT

WALK

PEDESTRIAN CLEARANCE

RECALL

*VOLUME DENSITY CONTROLS

ECONOLITE COORD SETTINGS SIEMENS COORD SETTINGS

TIME TO REDUCE

MAXIMUM GREEN I

MAXIMUM GREEN II

YELLOW CHANGE

ALL RED CLEARANCE

*(SEC./ACTUATION)

MAXIMUM INITIAL

PASSAGE TIME (PRESET GAP)

TIME BEFORE REDUCTION

MINIMUM GAP

INTERVAL OR FEATURE CONTROLLER MOVEMENT NO.

INTERSECTION MOVEMENT (PHASE)

DIRECTION

MINIMUM GREEN (INITIAL)

DTIME FOR FLASH OR ALL RED:

2&6

PHASES - - - -GREEN

YELLOW/RED FLASHOVERLAP A B C

START UPDUAL ENTRY: PHASES: 2&6, 4&8

REST IN RED:

SAMPLE ROAD PROJECT

Proposed Local Controller Data

INTERSECTION: SAMPLE RD @ SECOND ST

MAINTAINING AGENCY: ODOT

2 OF 10

SAMPLE

Local Controller Data (2)SAMPLE ROAD PROJECT

YES

RING 1 - RING 2 -

START IN:

5

FIRST PHASE(S):

COLOR DISPLAYED:

1 2 3 4 5 6 7 8

- EB - SB - WB - NB

(SEC.) - 20 - 10 - 20 - 10

ADDED INITIAL - - - - - - - -

(SEC.) - - - - - - - -

(SEC.) - 3 - 3 - 3 - 3

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

(SEC.) - 60 - 35 - 60 - 35

(SEC.) - 60 - 35 - 60 - 35

(SEC.) - 5 - 5 - 5 - 5

(SEC.) - 2 - 2 - 2 - 2

(SEC.) - - - - - - - -

(SEC.) - - - - - - - -

MAXIMUM (ON/OFF) - OFF - OFF - OFF - OFF

MINIMUM (ON/OFF) - ON - OFF - ON - OFF

PEDESTRIAN (ON/OFF) - OFF - OFF - OFF - OFF

MEMORY (ON/OFF) - OFF - OFF - OFF - OFF

MANUAL PATTERN AUTO

SYSTEM SOURCE SYS

SPLITS IN SECONDS

TRANSITION SMOOTH

DWELL/ADD TIME 0

OFFSET REFERNECE YELLOW

PED RECALL NO

LOCAL ZERO OVERRIDE NO

RE-SYNC COUNT 0

ECPI COORD YES

SYSTEM FORMAT STD

OFFSET IN SECONDS

MAX SELECT MAXINH

FORCE OFF FLOAT

USE PED TIME YES

PED RESERVICE NO

FO ADD INI GRN NO

MULTISYNC NO

Note: Any deviation from the standard econolite/siemens coord settings above will require OTO approval

MANUAL CONTROL: DIAL 1

MANUAL CONTROL: SPLIT 1

MANUAL CONTROL: OFFSET 1

FORCE MODE 0 - PLAN

MAX DWELL TIME -

YIELD PERIOD -

MAXIMUM 0 - INHIBIT

CORRECTION 2 - SHORT WAY

OFFSET MODE 1 - END GREEN

*VOLUME DENSITY CONTROLS

ECONOLITE COORD SETTINGS SIEMENS COORD SETTINGS

OPERATION 1 - AUTO

MODE (NORMAL) 0 - PERMISSIVE

MAXIMUM GREEN II

YELLOW CHANGE

ALL RED CLEARANCE

WALK

PEDESTRIAN CLEARANCE

RECALL

MAXIMUM INITIAL

PASSAGE TIME (PRESET GAP)

TIME BEFORE REDUCTION

MINIMUM GAP

TIME TO REDUCE

MAXIMUM GREEN I

INTERVAL OR FEATURE CONTROLLER MOVEMENT NO.

INTERSECTION MOVEMENT (PHASE)

DIRECTION

MINIMUM GREEN (INITIAL)

*(SEC./ACTUATION)

YELLOW/RED FLASHOVERLAP A B C D

TIME FOR FLASH OR ALL RED:

2&6

PHASES - - - -GREEN

SAMPLE ROAD PROJECT

Proposed Local Controller Data

INTERSECTION: SAMPLE RD @ THIRD ST

MAINTAINING AGENCY: ODOT

START UPDUAL ENTRY: PHASES: 2&6, 4&8

REST IN RED:

3 OF 10

SAMPLE

Local Controller Data (2)SAMPLE ROAD PROJECT

YES

RING 1 - RING 2 -

START IN:

5

FIRST PHASE(S):

COLOR DISPLAYED:

1 2 3 4 5 6 7 8

- EB - SB - WB - NB

(SEC.) - 20 - 10 - 20 - 10

ADDED INITIAL - - - - - - - -

(SEC.) - - - - - - - -

(SEC.) - 3 - 3 - 3 - 3

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

*(SEC.) - - - - - - - -

(SEC.) - 60 - 40 - 60 - 40

(SEC.) - 60 - 40 - 60 - 40

(SEC.) - 5 - 5 - 5 - 5

(SEC.) - 2 - 2 - 2 - 2

(SEC.) - - - - - - - -

(SEC.) - - - - - - - -

MAXIMUM (ON/OFF) - OFF - OFF - OFF - OFF

MINIMUM (ON/OFF) - ON - OFF - ON - OFF

PEDESTRIAN (ON/OFF) - OFF - OFF - OFF - OFF

MEMORY (ON/OFF) - OFF - OFF - OFF - OFF

MANUAL PATTERN AUTO

SYSTEM SOURCE SYS

SPLITS IN SECONDS

TRANSITION SMOOTH

DWELL/ADD TIME 0

OFFSET REFERNECE YELLOW

PED RECALL NO

LOCAL ZERO OVERRIDE NO

RE-SYNC COUNT 0

ECPI COORD YES

SYSTEM FORMAT STD

OFFSET IN SECONDS

MAX SELECT MAXINH

FORCE OFF FLOAT

USE PED TIME YES

PED RESERVICE NO

FO ADD INI GRN NO

MULTISYNC NO

Note: Any deviation from the standard econolite/siemens coord settings above will require OTO approval

MANUAL CONTROL: DIAL 1

MANUAL CONTROL: SPLIT 1

MANUAL CONTROL: OFFSET 1

FORCE MODE 0 - PLAN

MAX DWELL TIME -

YIELD PERIOD -

MAXIMUM 0 - INHIBIT

CORRECTION 2 - SHORT WAY

OFFSET MODE 1 - END GREEN

*VOLUME DENSITY CONTROLS

ECONOLITE COORD SETTINGS SIEMENS COORD SETTINGS

OPERATION 1 - AUTO

MODE (NORMAL) 0 - PERMISSIVE

MAXIMUM GREEN II

YELLOW CHANGE

ALL RED CLEARANCE

WALK

PEDESTRIAN CLEARANCE

RECALL

MAXIMUM INITIAL

PASSAGE TIME (PRESET GAP)

TIME BEFORE REDUCTION

MINIMUM GAP

TIME TO REDUCE

MAXIMUM GREEN I

INTERVAL OR FEATURE CONTROLLER MOVEMENT NO.

INTERSECTION MOVEMENT (PHASE)

DIRECTION

MINIMUM GREEN (INITIAL)

*(SEC./ACTUATION)

DTIME FOR FLASH OR ALL RED:

2&6

PHASES - - - -GREEN

START UPDUAL ENTRY: PHASES: 2&6, 4&8

REST IN RED:

YELLOW/RED FLASHOVERLAP A B C

SAMPLE ROAD PROJECT

Proposed Local Controller Data

INTERSECTION: SAMPLE RD @ FOURTH ST

MAINTAINING AGENCY: ODOT

4 OF 10

SAMPLE

Volume DataSAMPLE ROAD PROJECT

General Notes:

1. Volumes are per hour

2. Corresponding Plan No.'s are shown on Timing Summary

Month/Year: Day of Week:

Time Period(s):

Total Number of Hours:

Method of Obtaining Counts1:

Type of Count2:

Video

TMC

13

0700-2000

9/24/2014

SAMPLE ROAD PROJECT

1 Count Board, Video, Tube Counts, etc.

2 Turning Movement Count (TMC), Average Daily Traffic (ADT), etc.

Volume Data

Wednesday

COUNT INFORMATION

INSERT PICTURE OF VISIO SYSTEM LAYOUT HERE

5 OF 10

SAMPLE

Volume DataSAMPLE ROAD PROJECT

1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED

WB LT EB EB NB LT SB SB EB LT WB WB SB LT NB NB

EXT. PLAN NO. PROP. PLAN NO.

1/1/1 1/1/1 15 765 2 16 42 1 16 982 2 27 92 1

- 1/1/2 11 445 3 10 75 1 10 550 2 31 71 2

1/1/1 2/1/1 20 805 2 22 111 2 18 827 3 33 105 1

2/1/1 3/1/1 18 1128 2 19 78 1 20 735 2 40 85 1

- - - - - - - - - - - - - -

1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED

- EB - - SB - - WB - - NB -

EXT. PLAN NO. PROP. PLAN NO.

1/1/1 1/1/1 - 744 - - 76 - - 972 - - 80 -

- 1/1/2 - 458 - - 101 - - 476 - - 115 -

1/1/1 2/1/1 - 811 - - 133 - - 822 - - 135 -

2/1/1 3/1/1 - 1108 - - 105 - - 714 - - 110 -

- - - - - - - - - - - - - -

1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED

- EB - - SB - - WB - - NB -

EXT. PLAN NO. PROP. PLAN NO.

1/1/1 1/1/1 - 743 - - 75 - - 973 - - 81 -

- 1/1/2 - 457 - - 100 - - 477 - - 116 -

1/1/1 2/1/1 - 810 - - 132 - - 823 - - 136 -

2/1/1 3/1/1 - 1107 - - 104 - - 715 - - 111 -

- - - - - - - - - - - - - -

1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED

- EB - - SB - - WB - - NB -

EXT. PLAN NO. PROP. PLAN NO.

1/1/1 1/1/1 - 734 - - 77 - - 982 - - 81 -

- 1/1/2 - 438 - - 105 - - 486 - - 122 -

1/1/1 2/1/1 - 811 - - 152 - - 832 - - 145 -

2/1/1 3/1/1 - 1008 - - 122 - - 724 - - 107 -

- - - - - - - - - - - - - -

PHASE

DIRECTION

DIRECTION

PHASE

SAMPLE RD @ SECOND ST

VEHICULAR/PED PEAK HOURLY VOLUME

SAMPLE RD @ MAIN ST

VEHICULAR/PED PEAK HOURLY VOLUME

SAMPLE RD @ THIRD ST

VEHICULAR/PED PEAK HOURLY VOLUME

SAMPLE RD @ FOURTH ST

VEHICULAR/PED PEAK HOURLY VOLUME

PHASE

DIRECTION

PHASE

DIRECTION

6 OF 10

SAMPLE

Coordination Timing - EXISTINGSAMPLE ROAD PROJECT

General Notes:

φ 2 & φ 6

DAY(S) OF WEEK

MON-FRI

MON-FRI

MON-FRI

MON-FRI

SAT-SUN

SAMPLE ROAD PROJECT

COORDINATION TIMING PLANS

PLAN NAME HOURS CYCLE/SPLIT/OFFSET CYCLE LENGTH (SEC)

- 0000-0800 FREE -

- 0800-1500 1/1/1 100

- 1500-2000 2/1/1 120

- 2000-2400 FREE -

- 0000-2400 FREE -

1. All offsets are measured from the referenced phase END OF GREEN / BEGINNING OF YELLOW

2. All offsets are measured from

Signal Timing Summary - EXISTING

INSERT PICTURE OF VISIO SYSTEM LAYOUT HERE

7 OF 10

SAMPLE

Coordination Timing - EXISTINGSAMPLE ROAD PROJECT

PHASE 1 2 3 4 5 6 7 8

DIRECTION WB LT EB NB LT SB EB LT WB SB LT NB

PLAN NO.

1/1/1 20 30 20 30 20 30 20 30 0 -

2/1/1 20 40 20 40 20 40 20 40 0 -

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -

PHASE 1 2 3 4 5 6 7 8

DIRECTION - EB - SB - WB - NB

PLAN NO.

1/1/1 60 40 60 40 20 -

2/1/1 70 50 70 50 20 -

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -

PHASE 1 2 3 4 5 6 7 8

DIRECTION - EB - SB - WB - NB

PLAN NO.

1/1/1 60 40 60 40 40 -

2/1/1 70 50 70 50 40 -

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -

PHASE 1 2 3 4 5 6 7 8

DIRECTION - - - - - - - -

PLAN NO.

1/1/1 60 40 60 40 60 -

2/1/1 70 50 70 50 60 -

- - - - - - - - - - -

- - - - - - - - - - -

- - - - - - - - - - -

OFFSET 1

(SEC)

OFFSET 2

(SEC)SPLITS (G+Y+AR) IN SECONDS

SAMPLE RD @ SECOND ST

OFFSET 1

(SEC)

OFFSET 2

(SEC)SPLITS (G+Y+AR) IN SECONDS

SAMPLE RD @ THIRD ST

OFFSET 1

(SEC)

OFFSET 2

(SEC)SPLITS (G+Y+AR) IN SECONDS

SAMPLE RD @ MAIN ST

SAMPLE RD @ FOURTH ST

OFFSET 1

(SEC)

OFFSET 2

(SEC)SPLITS (G+Y+AR) IN SECONDS

8 OF 10

SAMPLE

Coordination Timing - PROPOSEDSAMPLE ROAD PROJECT

General Notes:

φ 2 & φ 6

DAY(S) OF WEEK

MON-FRI

MON-FRI

MON-FRI

MON-FRI

MON-FRI

MON-FRI

SAT-SUN

SAT-SUN

SAT-SUN

SAMPLE ROAD PROJECT

COORDINATION TIMING PLANS

PLAN NAME HOURS CYCLE/SPLIT/OFFSET CYCLE LENGTH (SEC)

PLAN 1 0000-0530 FREE -

PLAN 1 0530-0930 1/1/1 100

PLAN 1 0930-1400 2/1/1 110

PLAN 1

PLAN 2 0000-1000 FREE

1400-1900 3/1/1 120

PLAN 1 1900-2200 1/1/2 100

PLAN 1 2200-2400 FREE -

2/1/1 110

FREE -

Signal Timing Summary - Proposed

-

PLAN 2

PLAN 2 1900-2400

1. All offsets are measured from the referenced phase END OF GREEN / BEGINNING OF YELLOW

2. All offsets are measured from

1000-1900

INSERT PICTURE OF VISIO SYSTEM LAYOUT HERE

9 OF 10

SAMPLE

Coordination Timing - PROPOSEDSAMPLE ROAD PROJECT

PHASE 1 2 3 4 5 6 7 8

DIRECTION WB LT EB NB LT SB EB LT WB SB LT NB

PLAN NO.

1/1/1 15 35 20 30 15 35 20 30 0 0

2/1/1 15 45 20 30 15 45 20 30 0 -

3/1/1 20 50 20 30 20 50 20 30 0 -

- - - - - - - - - - -

- - - - - - - - - - -

PHASE 1 2 3 4 5 6 7 8

DIRECTION - EB - SB - WB - NB

PLAN NO.

1/1/1 65 35 65 35 15 21

2/1/1 70 40 70 40 10 -

3/1/1 75 45 75 45 20 -

- - - - - - - - - - -

- - - - - - - - - - -

PHASE 1 2 3 4 5 6 7 8

DIRECTION - EB - SB - WB - NB

PLAN NO.

1/1/1 65 35 65 35 25 33

2/1/1 70 40 70 40 7 -

3/1/1 75 45 75 45 40 -

- - - - - - - - - - -

- - - - - - - - - - -

PHASE 1 2 3 4 5 6 7 8

DIRECTION - EB - SB - WB - NB

PLAN NO.

1/1/1 65 35 65 35 60 40

2/1/1 70 40 70 40 30 -

3/1/1 75 45 75 45 46 -

- - - - - - - - - - -

- - - - - - - - - - -

SAMPLE RD @ MAIN ST

SAMPLE RD @ THIRD ST

OFFSET 1

(SEC)

OFFSET 2

(SEC)

SPLITS (G+Y+AR) IN SECONDS

OFFSET 2

(SEC)SPLITS (G+Y+AR) IN SECONDS

SAMPLE RD @ FOURTH ST

OFFSET 1

(SEC)

SPLITS (G+Y+AR) IN SECONDS

SAMPLE RD @ SECOND ST

OFFSET 1

(SEC)

OFFSET 2

(SEC)SPLITS (G+Y+AR) IN SECONDS

OFFSET 1

(SEC)

OFFSET 2

(SEC)

10 OF 10

SAMPLE