Our Mission To enable Indian manufacturing industry invest in energy security without affecting their current cash flows or bottom line. To enable Indian

Embed Size (px)

Citation preview

  • Slide 1

Slide 2 Our Mission To enable Indian manufacturing industry invest in energy security without affecting their current cash flows or bottom line. To enable Indian manufacturing industry replace part of their fossil fuel consumption with Solar thermal energy TODAY! Using commercial finance, without waiting for Government Subsidy or Corporate CSR Funds. We are the proud recipient of CLIMATE SOLVER AWARD 2013 by WWF - India Slide 3 Save the FUTURE, without sacrificing anything TODAY VALUE PROPOSITION Reduce Emissions Enhance your Brand Image Set an example for others Save Fuel Cost Slide 4 Why Solar Thermal? Invest in energy security today and enjoy solar energy at approx. Rs 1 per KWH (maintenance cost) for 20-25 years (asset life) Pay for the investment from tax savings and fuel savings during the first few years without affecting your cash flows or bottom line. Help the country save on foreign exchange. Help the country meet its carbon emission reduction commitments. Protect our future generations from climate change and adverse weather conditions. Save Earth. Slide 5 The Economics 60 to 90 Deg Celsius90-120 Deg Celsius Average costRs 3 - 4 Crores per MWRs 4 - 5 Crores per MW Net Investment (after 100% accelerated depreciation & income tax benefit) Rs 2 - 3 Crores per MW Subsidy is not considered Rs 3 - 4 Crores per MW Subsidy is not considered Fossil fuel savings per year Rs 75 - 100 Lacs per MW Pay back period2 - 3 years3 - 4 years Cost per unit during pay back Rs 4.0 to Rs 5.0 per KWH Rs 5.0 to Rs 6.0 per KWH Cost per unit after pay back (Maintenance cost) Rs 0.8 to Rs 1.2 per KWH Slide 6 Energy Security Slide 7 Success Stories Installation ----->Wheels India Limited Sona Koyo Steering Systems Limited Harita Seating System limited Project size & type630 KWth - Auto Hybrid 210 KWth - Auto Hybrid 360 KWth - Auto Hybrid Solar thermal energy produced 3780 KWh / day1260 KWh / day2160 KWh / day Fossil fuel saved360 liters / day120 liters / day198 Kg / day Fuel replacedFurnace oilDieselLPG Total savings on fuel per year Rs. 48,60,000/-Rs. 16,20,000/-Rs. 53,46,000/- Annual carbon abatement 2,80,800 Kg97,000 Kg160,380 Kg ApplicationPre-treatment process Slide 8 Why Aspiration Energy? *Parabolic dish : 16 sq.m. Requires min. 35 sq.m of space between each dish. *Arun dish : 160 Sq.m. RCC structure required to withstand 15 Ton concentrated load within a 3 sq.m area. AEPL ETC and ETHP CSP (Concentrators) Fitted on factory shed type roof top Cannot be fitted on factory shed type roof top* Up to 120 C without tracking mechanism Requires tracking mechanism Low cost per MW and less maintenance High cost per MW and high maintenance Slide 9 Temperatures All Solar not equal PV (Electricity)CSP ThermalAEPL Thermal Cost per MWRs 8 CroreRs 6 CroreRs 3-4 Crore Cost per unit during pay-back Rs 11 per KWHRs 8 per KWHRs 4.0-5.0 per KWH Cost per unit after pay-back Rs 2.2 per KWHRs 1.6 per KWHRs 0.8-1.2 per KWH How AEPL achieved it? Integrative Concentration TM StayLiquid TM : Pressurized ETC FlexiFlow TM : Forced circulation & flow Engg. HybriHeat TM : Switches from Solar to Fuel & vice versa based on temperature. Slide 10 FOR CFOs : Funding Models Model Name -->OutrightPAYS-COPAYS-TPOOLease Finance Fuel Savings Performance risk and rewardTo CustomerShared with customerAE / TPOTo customer Operations ManagementCustomerAE Customer AMC cost absorbed by AE12 monthsMonthly fee tenure 12 months AMC cost after free period (Per year)6% Monthly Fee to AE / Lease CoNA Fixed fee PM with annual inflation 80% of actual savings X fuel cost Fixed lease rental PM TenureNA60 84 Months60 120 Months60 84 Months Asset Transfer price at the end of Tenure or earlier NA Pre-agreedMarket price Down payment / Security Deposit by customer NA10-15%20-25%10% VAT/Service Tax payment and MODVAT Claimby Customer By TPOBy Lease co VAT4% Service Tax on E & C12.36% Service Tax on Monthly FeeNAPartial12.36% Slide 11 FOR CFOs : Funding Models SAMPLE PROJECT DATAOutrightPAYS-COPAYS-TPOOLease Finance Total Project Value incl E&C465.00 Funded from tax savings162.43 - AE's / TPO InvestmentNA 257.57198.140 Lease Finance Co InvestmentNA 418.50 Net Investment by Customer302.5745.00104.4346.50 Fuel Savings per month10.443 Monthly Payment to AEPL / Lease Rental 0 7.838.359.77 Monthly Payment DurationNA8412060 Net Savings for customerNA3.012.080.67 Payback for Customer Investment 29 months 17 months50 months 69 months Accumulated Savings after Payment Tenure 2204162912531880 Slide 12 Asset Leasing Model through OPC Assest Solutions Pvt. Ltd. Customer Owned Cranche Investment Model through Tata Cleantech Capital Ltd. Financial Leasing Model through Rent Alpha Private Limited Financial Partners Slide 13 Market Focus: Naturally Economical Niche Segments Slide 14 Niche Market Focus Industrial process heat below 150 degrees C is naturally economical Parablic Dish, Trough, Fresnel, etc Scheffler CPC-ETHP ETHP ETC Flat Plate Collectors HIGH TEMPERATURE As temperature increases, cost per KWHr increases. Economics justified only with subsidies. Higher temperatures produced by Tracking and concentration Parabolic dish, scheffler, parabolic trough, etc, Tracking makes heavy equipment, does not lend for Truss Factory rooftops. Hence needs ground area or concrete roof. Players: Clique, Thermax, Gadhia, etc. Temperature Deg C Rs. per KWHr Cannot be on roof tops Can be fitted on factory roof 8 7 6 5 4 3 2 1 0 50 100150200250 LOW TEMPERATURE Low temperatures