Our Production
Engineering, starting up and adjustment of automation
systems for industrial production, software
development, production of boards and commissioning of
“turn key” projects.
Seversky Pipe WorksPump station Automation
(February, 2008)
Flow diagram of Pump Station industrial control
Symbolic circuit of Pumps of chemically treated waterThe project was carried out on the basis
of “Siemens” S7-300 controllers
JSC “Aluminum of Kazakhstan”
Oxygen Plant on the basis of KA-5 (year 2006)
Symbolic circuit of regenerators
Control board of Oxygen Plant. Front panel
Control board of Oxygen Plant. Inner part
Upper level of Automation was carried out on the basis of SCADA system ‘In touch’ by “Wonderware”
Designing, manufacture, supply,
erection or head-erection and
commissioning of mechanical equipment
JSC “Solikamsky Magnesium Works”. Ejection unit of low pressure
JSC “Solikamsky Magnesium Works”. Metallurgical shop. Equipment of sample preparing laboratory
JSC “Chepetsky Mechanical Plant”. Crushing chamber of 500 m3 for zirconium sponge in the environment of argon