Document Number/Version © 1998 Nokia Telecommunications Oy NTC DN 9731494/4.0.0en

OUTDOOR SSS1100

Installation Manual

Page 2: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version (ii) NTC DN 9731494/4.0.0en

The information in this document is subject to change without notice and describes only the product and its version defined in the introduction of this document. This document is intended for the use of Nokia Telecommunications' customers only for the purposes of the agreement under which the document is submitted, and no part of it may be reproduced or transmitted in any form or means without the prior written permission of Nokia Telecommunications. The document has been prepared to be used by professional and properly trained personnel, and the customer assumes full responsibility when using it. Nokia Telecommunications welcomes customer comments as part of the process of continuous development and improvement of the documentation. The information or statements given in this document concerning the suitability, capacity, or performance of the mentioned hardware or software products cannot be considered binding but shall be defined in the agreement made between Nokia Telecommunications and the customer. However, Nokia Telecommunications has made all reasonable efforts to ensure that the instructions contained in the document are adequate and free of material errors and omissions. Nokia Telecommunications will, if necessary, explain issues which may not be covered by the document. Nokia Telecommunications' liability for any errors in the document is limited to the documentary correction of errors. Nokia Telecommunications WILL NOT BE RESPONSIBLE IN ANY EVENT FOR ERRORS IN THIS DOCUMENT OR FOR ANY DAMAGES, INCIDENTAL OR CONSEQUENTIAL (INCLUDING MONETARY LOSSES), that might arise from the use of this document or the information in it. This document and the product it describes are considered protected by copyright according to the applicable laws. NOKIA logo is a registered trademark of Nokia Corporation. Other product names mentioned in this document may be trademarks of their respective companies, and they are mentioned for identification purposes only. Copyright © Nokia Telecommunications Oy1998. All rights reserved.

Page 3: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en (iii)

INTERNAL HISTORY PAGE

Archive Location: \\ncsbsr03ca\SiSo\Les\SSS1100 Customer Manual Filename: Outdoor SSS1100 Installation Manual

History

Date Version Author Change Note No./Notes 11 Sep 98 4.0.0 Leslie Fray For re-issue

Page 4: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version (iv) NTC DN 9731494/4.0.0en

APPROVAL PAGE Edited/Translated by: Leslie Fray Date: 23.11.98 Checked by: Leslie Fray Date: 10 12.98. Approved by: Andreas Weeber Date:

Page 5: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 1 (80)

CONTENTS

1. INTRODUCTION ..................................................................................................... 5 1.1. References ........................................................................................................ 5 1.2. Definitions ........................................................................................................ 5

2. GENERAL................................................................................................................. 7 2.1. Fault reporting .................................................................................................. 7 2.2. Site folders........................................................................................................ 7

3. WARNINGS.............................................................................................................. 8 3.1. Lethal voltages.................................................................................................. 8 3.2. Precautions for lead acid batteries .................................................................... 8 3.3. Electromagnetic fields and power .................................................................... 8 3.4. Dimension of the cabinet.................................................................................. 9 3.5. Cabinet weight.................................................................................................. 9 3.6. Battery weight .................................................................................................. 9

4. CABINET INSTALLATION .................................................................................. 10 4.1. Tools list ......................................................................................................... 10 4.2. Site power requirements ................................................................................. 10

4.2.1. Initial site inspection ........................................................................ 11

4.2.2. Three Phase power requirements ..................................................... 11

4.2.3. Single Phase power requirements .................................................... 11

4.2.4. Disconnect and over-current devices ............................................... 11 4.3. Preparations .................................................................................................... 11 4.4. Unpacking and checking the delivery ............................................................ 12 4.5. Installing the Cabinet to Site .......................................................................... 13

4.5.1. Base requirements ............................................................................ 14

4.5.2. Torque recommendations................................................................. 14

4.5.3. Preparing the base for plinth installation.......................................... 15

4.5.4. Installing the single plinth ................................................................ 15

4.5.5. Installing the double plinth............................................................... 16

4.5.6. Installing the grid plates to the plinth............................................... 17 4.6. Installing the cabinet onto the plinth .............................................................. 17

4.6.1. Cabinet configurations ..................................................................... 18

Page 6: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 2 (80) NTC DN 9731494/4.0.0en

4.6.2. Lifting the cabinet ............................................................................ 18

4.6.3. Installing the cabinet onto a single plinth ........................................ 21

4.6.4. Installing the cabinet onto a double plinth....................................... 22

4.6.5. Installing the Outdoor SSS1100 and BTS cabinets onto a double plinth ................................................................................................ 23

4.6.6. Installing the bridging plate and bracket.......................................... 23 4.7. Cabinet door adjustment ................................................................................ 27 4.8. Installing the Earthing Frame (Option).......................................................... 33

4.8.1. Installing the Earthing Frame to Cabinet ......................................... 34

4.8.2. Installing the Earthing Frame to Plinth............................................ 34

5. INTERFACE CABLING ........................................................................................ 36 5.1. Check of pre-installed cabling and units........................................................ 36 5.2. Cables requiring On Site Installation ............................................................. 37

5.2.1. Earthing cables................................................................................. 37

5.2.2. AC mains input cable....................................................................... 37

5.2.3. Alarm interface cable....................................................................... 41 5.3. Pre installed cables......................................................................................... 42

5.3.1. DC output to BTS basic cabinet ...................................................... 42

5.3.2. AC output to BTS basic cabinet ...................................................... 42 5.4. Assembling the cable entry ............................................................................ 42

5.4.1. Cable Entry Kits............................................................................... 42

5.4.2. Assembly Instructions...................................................................... 44

6. INSTALLATION OF THE UNITS ........................................................................ 49 6.1. Handling of the units...................................................................................... 49 6.2. Installation of PDU Extension and Backplane Extension.............................. 49

6.2.1. Delivery check ................................................................................. 49

6.2.2. Removing Cables PDU Basic .......................................................... 50

6.2.3. Removing Backplane Panel ............................................................. 50 6.3. Installation of the Backplane Extension......................................................... 50

6.3.1. Mechanics ........................................................................................ 50

6.3.2. Cabling............................................................................................. 51 6.4. Installation of the PDU Extension ................................................................. 53

6.4.1. Mechanics ........................................................................................ 53

6.4.2. Cabling............................................................................................. 53 6.5. Calibration backplane extension .................................................................... 56 6.6. Removal and installation of rectifiers ............................................................ 57

Page 7: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 3 (80)

6.7. Battery installation.......................................................................................... 58

6.7.1. Battery Lower tray installation......................................................... 58

6.7.2. Installing and removing Four (4) Battery blocks ............................. 59

6.7.3. Installing and removing Eight (8) Battery blocks ............................ 61 6.8. Installing and removing sixteen (16) battery blocks ...................................... 63 6.9. RLE installation.............................................................................................. 66

7. INSTALLING THE HEAT MANAGEMENT UNIT............................................. 68 7.1. Unpacking and checking delivery .................................................................. 68 7.2. Installing the Heat Exchanger Unit ................................................................ 68 7.3. Installing the Air Conditioning Unit............................................................... 71

7.3.1. ACU condensation hose ................................................................... 73 7.4. Checklist ......................................................................................................... 73

8. INSTALLING THE ROOF ..................................................................................... 74

9. COMPLETING THE INSTALLATION AND CHECKLIST ................................ 76 9.1. Power-ON-test ................................................................................................ 76 9.2. Site leaving conditions ................................................................................... 77

10. INSTALLATION CHECKLIST ............................................................................. 78

Page 8: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 4 (80) NTC DN 9731494/4.0.0en

Page 9: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 5 (80)

1. INTRODUCTION This document describes the installation of the Outdoor SSS1100 cabinet as a part of the NOKIA Citytalk DE 34 / DF 34 Outdoor BTS installation. The Outdoor SSS1100 cabinet is pre assembled with rack units and cables [2]. Other units have to be installed on the site. The installation is to be undertaken considering the given warnings and cautions [6].

1.1. References

[1] Outdoor SSS1100 Commissioning Manual DN 9731501

[2] Outdoor SSS1100 Pre assembling Manual

[3] Outdoor SSS1100 Power Distribution Modules Product Description BAN0784

[4] Man-Machine Interface User’s Guide B6Z 052596AE

[5] DE 34/DF 34 BTS Commissioning B6Z 054211AE

[6] DE 34/DF 34 Warnings and Cautions B6Z 052592AE

[7] Nokia Citytalk DE 34/DF 34 Outdoor GSM/DCS BTS B6Z 056296 AE

[8] Nokia Intratalk DE 34/DF 34 Indoor GSM/DCS BTS B6Z 056496 AE

1.2. Definitions The following abbreviations are used within this document:

AC Alternating Current

ACU Air Conditioning Unit

BBU Battery Back Up Unit

BCF Base Control Function

BS Base Station

BTS Base Transceiver Station

CSM Cabinet System Management

DC Direct Current

EMC Electromagnetic Compatibility

EN European Norm

ETS European Telecommunications Standard

HE Heat Exchanger

LED Light Emitting Diode

Page 10: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 6 (80) NTC DN 9731494/4.0.0en

LV Low Voltage

MMI Man Machine Interface (a PC running the NOKIA MMI software connected to the BCF in the BS cabinet)

NOC Not Connected

PDU Power Distribution Unit

RLE Radio Link Equipment

SSS Site Support System

Page 11: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 7 (80)

2. GENERAL The Outdoor SSS1100 cabinet is designed to be used in conjunction with a NOKIA DE 34/DF 34 BTS [7]. It houses a battery backup system, and provides space and DC-power for up to 9 HU's of radio link units depending on battery configuration The standard configuration is 6 HU's for radio link units.

2.1. Fault reporting All damage, failures and faults should be cleared, wherever possible, during installation of the cabinet, and reported to NOKIA using a Failure Report Form provided by the Customer Service Centre (CSC).

2.2. Site folders Nokia recommends a site-specific folder for every BTS site for recording the Factory Acceptance Tests (FAT), the installation, commissioning, and integration logs, inventory lists and site-specific installation information. The project and/or the customer should determine the exact content of the site folder. Site folders should be archived by the customer.

Page 12: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 8 (80) NTC DN 9731494/4.0.0en

3. WARNINGS For further information refer to [6].

3.1. Lethal voltages Potentially lethal voltages are present within this system. The main voltage connection to the Outdoor SSS1100 cabinet supplies either 400VAC or 230VAC. The Heater, the Base Station, the Air conditioner, and each rectifier are all supplied with 230VAC via their voltage connections. The maximum DC voltage is 60VDC. Care must be taken when handling all of the power cables. There must be no damage of any kind to the insulation of the cables, and points carrying lethal voltages should not be exposed. For safety reasons, make sure that the cables are not connected to the power supply when routing them.

3.2. Precautions for lead acid batteries This equipment uses lead acid batteries. When handling the batteries follow the instructions delivered with the battery set, as the fluids contained within these batteries are known to be a health hazard. Ensure that protective full face shields, rubber gloves and aprons are worn, and insulated tools are used when working with the batteries. Should a lead acid battery suffer damage it must be removed in a well-ventilated area, and any contact with the corrosive fluids present in the battery should be avoided. Neutralise any acid corrosion with copious amounts of baking soda and water. After neutralisation, all traces of soda must be removed. If the lead acid battery is removed from the equipment to which it is fitted, any exposed contacts must be insulated prior to disposal. The disposal of lead acid batteries is subject to the Control of Substances Hazardous to Health Act, therefore disposal locally must be undertaken safely and with due care. Any attempt to burn these batteries may result in an explosion and the generation of toxic fumes.

3.3. Electromagnetic fields and power The Outdoor SSS1100 cabinet does not generate electromagnetic fields which are deemed to be hazardous. For further information of the electromagnetic fields generated by the BTS, refer to [6].

Page 13: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 9 (80)

3.4. Dimension of the cabinet The overall dimension of the cabinet with installed roof, plinth, and HE, are as follows:

Height 1360mm

Width 770mm

Depth 880mm

3.5. Cabinet weight The minimum weight of the empty cabinet is 95kg After pre-installation, when it is equipped with cables, racks, sensors, PDU etc., the weight of the cabinet can exceed 100kg When equipped with batteries, rectifiers and radio relay units, the weight of the cabinet can exceed 300kg.

3.6. Battery weight Care should be taken when handling the batteries. The weight of a battery depends upon the battery type used, and can be up to a maximum of 35kg.

Page 14: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 10 (80) NTC DN 9731494/4.0.0en

4. CABINET INSTALLATION

4.1. Tools list The minimum tool requirement is listed in Table 1.

Table 1 Installation tools Item No. Tool

1. Antistatic hand strap and cable.

2. Screwdrivers, Pozidrive, PZ 1, 2 and 3.

3. Screwdrivers, standard flat blade, small, medium and large size.

4. Side cutters.

5. BTS door key, triangle key, included in the BTS cabinet delivery.

6. Cable wraps.

7. Drill; drill bit (e.g. for drilling cabinet mounting holes).

8. Spanner, 10mm.

9. Allen keys set.

10. Multimeter.

11 Voltmeter

12. Spirit level.

13. Tape measure.

14. Pen.

15. Crimping tool.

16. Insulated torque spanner for battery connections.

17. Socket wrench, 13mm and 19mm with extension bar.

18. 4 off M12 bolts, nuts, washers, and dowels (in case cabinet floor fixing is required).

19. Tamper-proof bit set.

4.2. Site power requirements

WARNING!

THE OPERATIONS DETAILED IN PARAGRAPHS 4.2.1, 4.2.2, 4.2.3 AND 4.2.4 MUST BE UNDERTAKEN TO ENSURE THE SAFE AND SATISFACTORY INSTALLATION OF THE OUTDOOR SSS1100.

Page 15: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 11 (80)

4.2.1. Initial site inspection

A site survey should be conducted prior to installation of the Outdoor SSS1100 to ensure that the local power supply cabling and fuse box fitted to the BBU is adequate. Sections 4.2.2 and 4.2.3 define the power requirements for three phase and single phase respectively. In the event that the present cabling is not adequate, it must be replaced with cabling of the correct rating, either prior to the upgrade commencing or before the power is turned on after the upgrade has been completed.

NOTE For the maximum cable size and types of AC systems the Outdoor SSS1100 can accommodate, refer to [3].

4.2.2. Three Phase power requirements

Voltage 230V +/-15% Phase to Neutral

Current 20A per phase

Frequency 50Hz +/-6%

4.2.3. Single Phase power requirements

Voltage 230V +/-15%

Current 50A

Frequency 50Hz +/-6%

4.2.4. Disconnect and over-current devices

An appropriate disconnect device and appropriate primary circuit over-current protection devices shall be incorporated within the fixed wiring to the BBU. Rating of the disconnect device and the primary circuit over-current protection devices shall be commensurate with the chosen site configuration power requirements detailed on sections 4.2.2 and 4.2.3

4.3. Preparations The installation phase requires that, in addition to the site power requirements, the site itself is properly surveyed and prepared, and that all the required external connections are correctly installed. The surveyor must also identify any special requirements for the installation, such as lifting equipment.

Prepare the site for the cabinet installation as follows:

1. Ensure the site is accessible.

2. Inspect the site visually to ensure the following requirements are fulfilled:

• Site-specific installation instructions are available.

Page 16: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 12 (80) NTC DN 9731494/4.0.0en

• Site survey is completed.

• Site Survey Report is available.

• Site is clean.

3. Check that the base for the plinth is in order:

• The base structure is as specified.

• Fixing points are ready for the plinth, if applicable.

• Bolts are anchored to the base, if applicable.

4. Verify that all external connections for the BTS and the Outdoor SSS1100 are available:

• Earthing point.

• Mains voltage AC (or DC if needed) according to the site.

• A-bis connection point.

5. Ensure that the cabinet can be installed safely by verifying the availability of lifting and other equipment, as defined in the Site Survey Report.

6. Check that the delivery is complete.

4.4. Unpacking and checking the delivery

NOTE Do not discard the M8 screws and washers with which the cabinet is attached to the transportation pallet. These screws are required for fastening the cabinet to the plinth. Do not break the plywood container or misplace the steel clips of the container while opening it. Both the container and the clips are reusable. There are several delivery package types and the unpacking procedure may differ from the one detailed in this section.

Unpack and check the cabinet delivery as follows:

1. Remove the metal clips retaining the top cover of the plywood container and remove the cover.

2. Remove the clips retaining the sides of the plywood container and remove the sides.

3. Lift off the cardboard or plastic cover around the cabinet.

4. Open the cabinet door.

5. Unscrew the four M8 screws fastening the cabinet to the pallet. Retain the screws and washers for the cabinet installation. There are two screws in the front and two screws in the rear of the cabinet as shown in Figure 1. It

Page 17: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 13 (80)

may be necessary to remove the bottom plates of the cabinet to access the screws. These plates have to be reinstalled after the cabinet installation.

6. Unpack the plinth and roof packages.

7. Check the delivery for damage.

8. Check the contents of the delivery against the Packing List.

9. Place the Packing List into the Site Folder.

10. Recycle the packing material.

Figure 1 Pallet mounting screw positions

1923

After unpacking and checking the delivery, tick off the box in the checklist. Unpacking and delivery check failed or passed.

4.5. Installing the Cabinet to Site This chapter details the installation of the cabinet and the cabinet parts at the site.

CAUTION Do not expose the cabinet top and interior to rain. Keep the cabinet and units protected until all site work, such as drilling, is completed.

Page 18: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 14 (80) NTC DN 9731494/4.0.0en

4.5.1. Base requirements

The base to which the Outdoor SSS1100 cabinet is mounted can either be made of concrete or constructed of steel bars. Anchor bolts are used to secure the cabinet to the base. The steel bar construction could feature ready-made holes for these anchor bolts. Into a concrete base, the anchor bolts can be pre-installed, according to the measurements in Figure 3 and Figure 4, or fixed to the base when the plinth is available.

Figure 2 Bolting the plinth to the base

Plinth Fitting toSteel Bar Construction Plinth Fitting to

Concrete Base

2890

The base must be flat within ± 2.5mm over a 1600mm span true to the horizontal plane. There must be no steps in the level of the base. Where two or more plinths are mounted adjacent, the top face of the plinths must be level within ± 0.5mm of each other to a true horizontal plane. Where necessary, the plinths can be adjusted using shims between the base and the plinth. A spirit level is required to verify that the above requirements are met.

NOTE The cabinet delivery does not contain shims or the M12 anchor bolts.

4.5.2. Torque recommendations

The recommended torque and corresponding screw sizes are listed in Table 1.

Table 1 Torque recommendations

Bolt/Screw Type SFS DIN Size Torque

Hexagon socket head and Screw cylinder head

2219 912 M6 8.0Nm

Hexagon socket head and Screw cylinder head

2219 912 M8 16.0Nm

Nut 2067 934 M6 8.0Nm

Page 19: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 15 (80)

4.5.3. Preparing the base for plinth installation

CAUTION Handle the plinth with care! Refer to [5] for weights.

Prepare the concrete base for the plinth installation as follows:

1. Position the plinth on the base according to the site plan.

2. Using the plinth fixing holes as a template, drill one anchor bolt hole in the base. Insert an anchor bolt into the hole to keep the plinth in position.

3. Check the alignment of the plinth with the site and correct, if necessary.

4. Drill a second anchor bolt hole into the base, using another plinth fixing hole as location. Insert an anchor bolt into the hole.

5. Drill the remaining anchor bolt holes into the base. Remove the two anchor bolts fitted, and, if necessary, remove the plinth in order to finish the holes.

4.5.4. Installing the single plinth

NOTE A blanking plate identifies the bottom face of the plinth. The top face is identified by four large holes.

The single plinth is anchored to the base with four M12 anchor bolts and washers, two at the cabinet rear and two at the front. The washers are included in the single plinth delivery and are specified to provide complete cover of the plinth fixing holes.

Secure the plinth to the base as follows:

1. Place the plinth on the base so that the plinth fixing holes (shown in Figure 3) and the anchor bolt holes in the base are in line.

Figure 3 Single plinth-fixing holes

635 575

620

770

30

75

SinglePlinth

2888

Page 20: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 16 (80) NTC DN 9731494/4.0.0en

2. Insert the anchor bolts with washers into the holes and tighten. 3. Ensure that the washers cover the plinth fixing holes. Ensure with a spirit

level that the plinth is level. If it is not, remove the anchor bolts and level the plinth using shims inserted, where necessary, between the base and the plinth. Re-insert the anchor bolts with washers into the holes and tighten.

4.5.5. Installing the double plinth

NOTE A blanking plate identifies the bottom face of the plinth. The top face is identified by eight large holes.

The double plinth is anchored to the base with six M12 anchor bolts.

Secure the plinth to the base as follows:

1. Place the plinth on the base so that the plinth fixing holes (shown in Figure 4) and the anchor bolt holes in the base are in line.

Figure 4 Double plinth fixing holes

1540

75

575

695

635DoublePlinth

6952889

30

2. Insert the anchor bolts into the holes and tighten.

3. Ensure with a spirit level that the plinth is level. If it is not, remove the anchor bolts and level the plinth using shims inserted, where necessary, between the base and the plinth. Re-insert the anchor bolts into the holes and tighten.

After installing the plinth give the required information by ticking the boxes in the checklist. Plinth installation on steel construction or on concrete base.

Single plinth or double plinth.

Page 21: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 17 (80)

4.5.6. Installing the grid plates to the plinth

Grid plates should be fitted to the rear side of the installed plinth, as shown in Figure 5. Each grid is secured with ten M6 x 16 screws with washers.

Figure 5 Installation of the grid plates

M6 x 16 (10 pcs)

M6 x 16 (10 pcs)

M6 x 16 (10 pcs)

DN98914468

4.6. Installing the cabinet onto the plinth This sections details the following:

• installing a single Outdoor SSS1100 cabinet onto the single plinth,

• installing an Outdoor SSS1100 cabinet and a BTS cabinet, onto the double plinth,

• Installing a bridging plate and bracket to join the adjacent Outdoor SSS1100 and BTS cabinets.

Page 22: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 18 (80) NTC DN 9731494/4.0.0en

4.6.1. Cabinet configurations

The cabinet configuration, using an Outdoor SSS1100 cabinet and a BTS basic cabinet, is shown in Figure 6. When mounted adjacently the Outdoor SSS1100 cabinet is always installed to the left side of the BTS cabinet when viewed from the front.

Figure 6 Nokia Outdoor SSS1100 cabinet and BTS basic cabinet

SSS1100 Cabinet BTS basic cabinet

This configuration can be achieved on an existing BTS installation by mounting the Outdoor SSS1100 cabinet onto a single plinth (or the right side of a double plinth, where desired by the customer), positioned adjacent to the existing BTS plinth. For new BTS and Outdoor SSS1100 installations, the cabinets can either be mounted onto two adjacent single plinths, or onto a double plinth.

4.6.2. Lifting the cabinet

CAUTION The cabinet should not be lifted with the ACU, HE or the batteries installed.

This section details two cabinet lifting methods; lifting the cabinet using eyebolts, and lifting the cabinet using the cabinet lifting handles. The lifting eyebolts and the lifting handles are optional fittings and are not included in the cabinet delivery unless requested by the customer. The handles should be used for lifting the cabinet only when no mechanical lifting device is available and the customer project has reserved sufficient personnel to carry out the task.

Page 23: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 19 (80)

4.6.2.1. Lifting the cabinet using the optional eye bolts

CAUTION Care should be taken not to bend or damage the cable entry on the left side of the BTS cabinet when manoeuvring the Outdoor SSS1100 cabinet into position.

There are four lifting points built into the cabinet, which are compatible with M12 lifting eyebolts. These lifting points have been designed to support the weight of the cabinet, without the plug-in units and heat management equipment fitted. All four lifting points must be used when lifting the cabinet.

Lift the cabinet using the lifting eye bolts as follows:

1. Screw the lifting eyebolts into the four lifting points, positioned near the top corners of the cabinet.

2. Attach the lifting lines to the lifting eyebolts according to Figure 7.

Figure 7 Lifting the cabinet using lifting eyebolts

Lifting EyeBolts (4 off)

DIN 580 M12

MinimumDistance800 mm

20465

3. Carefully lift the cabinet directly upward from the Earth.

4. Position the cabinet in the desired location.

5. Remove the lifting ropes and the lifting eye bolts.

Page 24: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 20 (80) NTC DN 9731494/4.0.0en

4.6.2.2. Lifting the cabinet using the optional lifting handles

CAUTION The weight of a pre-installed Outdoor SSS1100 cabinet can exceed 100kg .It is therefore extremely important that sufficient personnel are applied to the task of moving the cabinet.

There are two alternative fixing positions for the handles, as shown in Figure 8. The handle fixing screws are included in the lifting handle delivery package.

Lift the cabinet using the lifting handles as follows:

1. Place the lifting handle against the cabinet side panel as shown in Figure 8

2. Attach the lifting handle to the cabinet side panel, at the desired lifting handle position, with two Allen screws. Place a piece of plastic or cardboard between the handle and the cabinet lifting points to avoid scratching the paint.

3. Lift the lifting handle upwards so that the screws are engaged in the narrow ends of the lifting handle guide holes.

Figure 8 Cabinet lifting handle positions

2901

AlternativeLifting HandlePositions

4. Attach the other lifting handle to the opposite side of the cabinet.

5. Carefully lift and carry the cabinet to the correct position.

6. Remove the screws and the handles from the side panels.

Page 25: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 21 (80)

4.6.3. Installing the cabinet onto a single plinth

The cabinet is bolted to the single plinth using the four M8 fastening screws and washers delivered with the transportation pallet. Two screws are used at the rear of the cabinet and two at the front.

Install the cabinet onto the single plinth as follows:

1. Lift the cabinet onto the plinth as shown in Figure 9

Figure 9. Fixing points between the cabinet and plinth

2027

2. Open the cabinet door.

3. Remove the bottom plates from the cabinet floor.

4. Align the cabinet fixing holes and the mating holes in the plinth.

5. Insert the four fastening screws and washers into the cabinet fixing holes but do not tighten.

6. Working from the front, pull the cabinet forwards as far as required to align the fastening screws with the mating holes in the plinth.

7. Ensure that the sides of cabinet are flush with the sides of the plinth.

8. Tighten the fastening screws with a suitable tool.

Page 26: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 22 (80) NTC DN 9731494/4.0.0en

9. Replace the bottom plates to the cabinet floor.

4.6.4. Installing the cabinet onto a double plinth

The cabinet is bolted to the right side of the double plinth using the four M8 fastening screws and washers delivered with the transportation pallet. Two screws are used at the rear of the cabinet and two at the front.

Install the cabinet onto the double plinth as follows:

1. Lift the cabinet onto the plinth as shown in Figure 10

Figure 10 Fixing points between the cabinet and double plinth

2025

2. Open the cabinet door.

3. Remove the bottom plates from the cabinet floor.

4. Align the cabinet fixing holes and the mating holes in the plinth.

5. Insert the four fastening screws and washers into the cabinet fixing holes but do not tighten.

6. Working from the front, pull the cabinet forwards as far as required to align the fastening screws with the mating holes in the plinth.

7. Ensure that the side of the cabinet is flush with the right side of the plinth.

Page 27: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 23 (80)

8. Tighten the fastening screws with a suitable tool.

9. Replace the bottom plates to the cabinet floor.

4.6.5. Installing the Outdoor SSS1100 and BTS cabinets onto a double plinth

The Outdoor SSS1100 cabinet is bolted to the double plinth using the four M8 fastening screws and washers delivered with the transportation pallet. Two screws are used at the rear of the cabinet and two at the front. The BTS cabinet should be installed in accordance with the applicable BTS Installation Manual, however, the additional requirements described below should also be observed for installation onto a double plinth.

Install the cabinets onto the double plinth as follows:

1. Lift the Outdoor SSS1100 and BTS cabinets onto the plinth. Leave at least 35 cm of working space between them.

2. Open the cabinet doors.

3. Remove the bottom plates from the floor of the Outdoor SSS1100 cabinet.

4. Push the cabinets side by side and align the cabinet fixing holes with the mating holes in the plinth.

5. Insert the fastening screws and washers into the cabinet fixing holes, but do not tighten.

6. Working from the front, pull the cabinets forward as far as required to align the fastening screws with the mating holes in the plinth.

7. Adjust one of the cabinets so that it is exactly flush with the side of the plinth, and then tighten the associated fastening screws with a suitable tool.

10. Push the second cabinet against the first so that no gap remains between them and tighten the cabinet fastening screws with a suitable tool.

11. Replace the bottom plates to the Outdoor SSS1100 cabinet floor.

After mounting the cabinets to the plinth tick off the box in the checklist. Cabinets mounted to plinth no or yes.

4.6.6. Installing the bridging plate and bracket

The Outdoor SSS1100 and BTS cabinets are joined together using a bridging plate secured by the eight M6 fastening screws provided, and by a bridging bracket on top of the bridging plate, which is secured by a further four M6 fastening screws.

Page 28: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 24 (80) NTC DN 9731494/4.0.0en

Install the bridging plate and bracket onto the adjacent cabinets as follows:

1. Starting from the seam at the rear of the cabinets, carefully pull off the top seals lining the cover plates on both cabinets, as shown in Figure 11.

2. Unscrew the cover plate retaining screws and remove the cover plates on both cabinets. There are two screws at each end of the cover plates, as shown in Figure 11.

Figure 11. Removing cabinet top seals and cover plates

Cover Plate

SealCabinet Front

Cabinet Rear

2946

Place the bridging plate across the cabinets as shown in

Page 29: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 25 (80)

3. Figure 12. Note that the underside of the bridging plate has a full-length seal and the topside has seals at both ends.

4. Secure the bridging plate to the cabinets with eight M6 screws and fully tighten with a suitable tool.

Page 30: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 26 (80) NTC DN 9731494/4.0.0en

Figure 12 Positioning the bridging plate

Bridging Plate

2893

Seal

Seal

5. Place the bridging bracket on top of the bridging plate: first fit the bracket's narrow end to the rear of the cabinet, and then fit the bracket's broad end to the front as shown in Figure 13. Be careful not to damage the seals at both ends of the bracket. Lubricate if necessary.

Figure 13 Positioning the bridging bracket

Bridging Bracket

Rear

Front

2952

6. Secure the bridging bracket to the cabinets with the four M6 screws provided.

7. Replace the cabinet top seals tightly along the bridging bracket top edges.

Page 31: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 27 (80)

8. Make sure that all seals are tight and the cabinets are aligned. After installing the bridging bracket tick off the box in the checklist. Bridging plate and bracket installed no or yes.

4.7. Cabinet door adjustment

WARNING!

Do not touch the EMC shields situated around the cabinet door.The sharp edges in the EMC shields may cause personal injury.

CAUTION Care should be taken when adjusting the cabinet door, due to its significant weight.

The cabinet door is installed in the factory with the hinges on the right. If the site so requires, the door opening direction can be changed following the instructions below. Note that after the change, the lock bezel cover is hinged from the bottom instead of the top.

Change the position of the door locking mechanism and Earth cable as follows:

1. Release the Earth cable, which is attached to the door with a M6 nut and washer.

2. Unscrew the two M6 bolts, which secure the door locking mechanism to the upper left frame of the cabinet. See Figure 14.

NOTE Ensure the bond between the earth cable and the cabinet is at an angle of 45 degrees from the top edge of the door as shown in Figure 14.

Page 32: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 28 (80) NTC DN 9731494/4.0.0en

Figure 14 Cabinet door with EMC shields and Earth cable

Ground Cable

3. Unscrew the two blanking screws in the upper right frame of the cabinet.

4. Secure the door locking mechanism to the upper right frame of the cabinet with the two M6 bolts, at the position previously occupied by the blanking screws.

5. Screw the two blanking screws into the empty holes in the upper left frame of the cabinet, the position previously occupied by the door locking mechanism.

6. Unscrew the two M6 bolts, which secure the door locking mechanism to the lower left frame of the cabinet. See Figure 14.

7. Unscrew the two blanking screws in the lower right frame of the cabinet.

8. Secure the door locking mechanism to the lower right frame of the cabinet with the two M6 bolts, at the position previously occupied by the blanking screws.

9. Screw the two blanking screws into the empty holes in the lower left frame of the cabinet, the position previously occupied by the door locking mechanism.

Page 33: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 29 (80)

10. Locate the Earth cable-fixing nut under the front right corner of the cabinet roof by hand.

11. Detach the Earth cable from the cabinet. The Earth cable is secured to the cabinet with a M6 nut and washer. See Figure 14.

12. Secure the Earth cable to the cabinet, under the front left corner of the cabinet roof, with the M6 nut and washer removed in the previous step.

13. Ease off the door arrester, located near the bottom edge of the door, at the right arrester position on the cabinet.

Change the door lock orientation as follows:

1. Remove the four M2 screws which retain the door lock cover plate, as shown in Figure 15

2. Remove the door lock cover plate.

3. Gently cut away the seal behind the cover plate where necessary to give access to the two M6 bolts, which retain the lock fascia panel. Remove as little of the seal as possible, ensuring that the outer edge of the seal is maintained, as shown in Figure 15.

Figure 15 Door lock cover plate removal

DN98912446

4. Using the access hole in the side of the cabinet door, remove the M4 screw, which retains the security lock barrel, as shown in Figure 16. Turn the triangle BTS door key 45 degrees counter-clockwise to the locked position. Turn the security key counter-clockwise until the key and barrel can be removed.

Page 34: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 30 (80) NTC DN 9731494/4.0.0en

Figure 16 Security door lock barrel removal

DN98912625 5. Remove the two bolts and washers, which retain the lock fascia panel

carefully and remove the lock fascia panel, the outer spacer panel and the triangle lock collar, as shown in Figure 17.

Figure 17 Door lock fascia panel removal

DN98912601 6. Remove the M6 screw, which retains the triangle lock barrel, as shown in

Figure 18.

Page 35: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 31 (80)

Figure 18 Triangle lock barrel removal

DN98912637 7. Remove the triangle lock barrel. Ensure that the inner spacer panel does not

drop inside the door.

8. Manipulate the lock, through the lock access panel in the door, to give access to the M4 bolt, which retains the upper door-locking bar.

9. Unscrew the bolt sufficiently to allow removal of the upper latch bar. Thread the upper latch bar out through the top edge of the cabinet door.

10. Manipulate the lock, through the lock access panel in the door, to give access to the M4 bolt, which retains the lower latch bar.

11. Unscrew the bolt sufficiently to allow removal of the lower latch bar. Allow the lower latch bar to rest upright inside the cabinet door. Ensure that the lock and inner spacer panel do not drop inside the door.

12. Rotate the lock and the inner spacer panel through 180°.

13. Fit the lower latch bar to the lock, ensuring that the latch taper is positioned as shown in Figure 19. Tighten the bolt.

14. Thread the upper latch bar through the top edge of the cabinet door. Fit the upper latch bar to the lock, ensuring that the latch taper is positioned as shown in Figure 19. Tighten the bolt.

Page 36: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 32 (80) NTC DN 9731494/4.0.0en

Figure 19 Door lock latch position

DN98912649 15. Refit the security lock barrel with the M4 screw. Use a small amount of

grease between the head of the screw and the screwdriver to aid location of the screw.

16. Refit the triangle lock barrel with the M6 screw.

17. Refit the lock fascia panel, the outer spacer panel and the triangle lock collar, with the two M6 bolts and washers.

18. Refit the door lock cover plate with the four M2 screws.

Change the door opening direction as follows:

WARNING!

Do not touch the EMC shields around the door. The sharp edges in the EMC shields may cause personal injury!

1. Open the door at 90 degrees to the cabinet.

2. Lift the door carefully upwards until the door hinge pins are disengaged from the cabinet hinges on the right of the cabinet. See Figure 20.

Page 37: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 33 (80)

Figure 20 Lifting the Cabinet Door

1962

WARNINGTHE EDGES OFCONTACT STRIPAROUND THE DOORARE SHARP

Lift off

3. Ease the door arrester away from the bottom edge of the door, and refit to the top edge of the door.

4. Turn the door upside down.

5. Guide the door hinge pins into the cabinet hinge location holes on the left of the cabinet, and lower the door in place.

6. Reconnect the Earth cable to the door with the M6 bolt and washer, ensuring that the bond is at an angle of 45 degrees.

7. Guide the door arrester into its left arrester position on the cabinet by turning it until it becomes engaged.

Give information of the door opening direction by ticking off the box in the checklist Door opening direction changed or default.

4.8. Installing the Earthing Frame (Option) The Earthing frame is an option with the Site Support System, and it offers the customer ten M8 Earthing points. The customer provides M8 x 25 screws, washers, and nuts for Earthing connections to the frame . When the cabinet is installed to the single plinth or to the left of the double plinth, the Earthing frame is attached to the side of the cabinet

Page 38: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 34 (80) NTC DN 9731494/4.0.0en

When only one cabinet is installed on the right side of a double plinth, the Earthing frame is attached to the plinth and supported by support parts.

4.8.1. Installing the Earthing Frame to Cabinet

The Earthing bar can be fixed to four alternative levels marked A, B, C, and D in Figure 21.

Install the Earthing frame to the cabinet as follows:

1. Attach the Earthing frame to the cabinet with four M6x40 Allen screws and washers.

2. Attach the Earthing bar to the Earthing frame with two M6x16 Allen screws and washers.

Figure 21. Installing the Earthing Frame to Cabinet

Earthing Frame

Earthing Bar

A

B

C

D2896

M6x40

M6x16

M6x16

M6x40

M6x40

M6x40

4.8.2. Installing the Earthing Frame to Plinth

Install the Earthing frame to the plinth as follows:

1. Attach the Earthing frame to the plinth with M6 x 40 Allen screws and washers. The fixing points are marked with (1) in Figure 22

2. Position the support parts onto the plinth as shown in Figure 22.

Page 39: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 35 (80)

3. Fasten the support parts to the Earthing frame with M6 x 40 Allen screws and washers. Hands tighten the screws. The fixing points are marked with (2) in Figure 22.

Figure 22 Installing the Earthing Frame to Plinth

Earthing Frame

Earthing Bar10 pcs M8Earthing Points

Support Part

1

4

2024

2

2

3

3

3

3

1

4. Fasten the support parts to the plinth with M8x20 Allen screws and washers. Hands tighten the screws. The fixing points are marked (3) in Figure 22.

5. Tighten all support part fastening screws.

6. Attach the Earthing bar to the Earthing frame with the two M6x16 screws and washers.

After installing the Earthing frame tick off the box in the checklist. Earthing frame installed no or yes.

Page 40: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 36 (80) NTC DN 9731494/4.0.0en

5. INTERFACE CABLING

WARNING!

The Earthing cables should be routed before any other cables. Ensure by taking measurements that all cables are not powered during routing and connection.

5.1. Check of pre-installed cabling and units

From the open rear side of the cabinet the pre-installed cabling must be checked to ensure that the connection points and cables are not damaged and are fastened securely. For the correct cabling refer to [1]. Also the pre-installed units have to be checked for correct installation and that they are not damaged. After checking the pre-installed cables and units tick off the box in the checklist. Pre-installed cables and units check failed. Or passed.

This chapter details the installation of interface cabling of the Outdoor SSS1100

WARNING!

For warnings and cautions carefully read reference [5] before commencing the installation. Make sure that all cables are not powered when routing and connecting them

The following interface cables have to be routed in installation to connect the Outdoor SSS1100 cabinet with Mains voltage supply, the main Earth and the BTS:

• Earthing cables.

• AC mains voltage supply input cable.

• AC voltage supply to the BTS cabinet.

• DC (+) and (-) output cables to BTS.cabinet

• Alarm interface cable.

The power cables routed through the entries are connected to the rear side of the PDU. The AC mains input cable must always be prepared and installed on the site. The DC output cables are pre-installed standard length cables. For detailed information of the pre-installed cables refer to [2]. The length fits if the Outdoor SSS1100 cabinet is installed directly near the BTS. If a longer distance between both cabinets is needed, correct length cables have to be made and installed on site. The alarm interface cable is to be ordered from NOKIA to the required length.

Page 41: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 37 (80)

5.2. Cables requiring On Site Installation

5.2.1. Earthing cables

Two Earthing cables have to be prepared and connected to the Outdoor SSS1100 cabinet: Earthing cable between Earthing bar and Outdoor SSS1100 cabinet. Earthing cable between Outdoor SSS1100 cabinet and BTS. Cut off the required lengths of both cables and fit the ends with 6mm ring cable tags for the cabinet connection bolts. The connection points on the Outdoor SSS1100 cabinet top plate is shown in Figure 24. For the connection point on the BTS top plate connector refer to [7]. After connecting the Earthing cables tick off the box in the checklist. Earthing cables connected no Or yes.

5.2.2. AC mains input cable

How to install and connect the AC mains input cable is described below:

• Cut off the required length of the cable and route one end through the corresponding cable entry into the cabinet. See Figure 25.

• Remove about 15 cm of the insulation at this end. Prepare the PE wire bending an eye (6-mm diameter) at its end.

Continue the installation using one of the sections below dependent on whether a single phase or a three-phase connection is used. a) Three-phase connection

• Connect the wires to the rear connectors of the PDU as shown in Figure 26.

b) Single phase connection

Page 42: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 38 (80) NTC DN 9731494/4.0.0en

Figure 23 Bridging of a single-phase connection

L1L1L2L2L3L3NN

N

L1

20426

1. Install the attached phase bridges as shown in Figure 23.

2. Connect the wires to the rear of the PDU as shown in Figure 26.

3. After routing and connecting the AC mains input cable to the Outdoor SSS1100 cabinet tick off one of the boxes in the checklist.

AC mains 3-phase connected no or yes.

or AC mains single phase connected no or yes.

Page 43: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 39 (80)

Figure 24 AC Voltage and earthing cables

Earth cable to grounding frame

Page 44: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 40 (80) NTC DN 9731494/4.0.0en

Figure 25 DC Voltage and Alarm interface cables

Page 45: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 41 (80)

Figure 26 AC mains power connection (connection) to the PDU Phase 1 Phase 2 Phase 3 Neutral

L1 L2 L3 N Earth

A1A2

12

35

A1A2

12

35

AC mains power input cable

Cable clamp

A1A2

12

35

A1A2

12

35

AC mains power input cable

Cable clamp

5.2.3. Alarm interface cable

The alarm interface cable is to be routed between the Outdoor SSS1100 cabinet and the BTS cabinet. The cable has a 37-pin-Sub-D connector on both ends. Connect one end of the alarm interface cable to the Outdoor SSS1100 cabinet top plate connector shown in Figure 25. Route the cable to the BTS cabinet. Connect the other end to the Support Alarms connector on the BTS basic cabinet top plate. See Figure 25. After connecting the alarm interface cable tick off the box in the checklist.

Page 46: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 42 (80) NTC DN 9731494/4.0.0en

Alarm interface cable connected no. Or yes.

5.3. Pre installed cables The DC output to BTS (+) and (-) cables and the AC output to BTS cables are already installed in the Outdoor SSS1100 cabinet and have only to be routed and connected to the BTS cabinet.

5.3.1. DC output to BTS basic cabinet

On the BTS basic cabinet the DC-wires have to be connected to the (+) and (-) connectors on the top plate connector shown in Figure 25. The blue wire is to be connected to the (-), the black wire to the (+) clamp. After routing and connecting the DC output cables to BTS tick off the box in the checklist. DC output cables connected no. Or yes.

5.3.2. AC output to BTS basic cabinet

The AC cable (3*1mm²) has to be connected to the AC-connection block as shown in Figure 25. Connect the blue wire to the N-connector, the black or brown one to the L1 connector. The PE-wire (yellow/green) is already equipped with a ring tag and is to be fitted to the Earthing bolt shown in Figure 25. After routing and connecting the AC output cable to BTS tick off the box in the checklist. AC output cable connected no. or yes

5.4. Assembling the cable entry The cable entry can be installed to the right or left side of the Outdoor SSS1100 cabinet. In a configuration of Outdoor SSS1100 cabinet with BTS cabinet it has to be installed to the left side as the default.

5.4.1. Cable Entry Kits

There are five-cable entry kits available (see Table 2). All kits include cable entry blocks, a cover plate, three assembly parts, and screws. The cable entry kits are detailed in Table 2and Figure 27.

Page 47: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 43 (80)

Table 2. Cable Entry Kits Available Cable Entry Kit Number of Entries Cable Diameter

Cable Entry Kit 1

CEKA 11

6 (3 pcs of 2-entry blocks)

16 (2 pcs of 8-entry blocks)

18...28mm

5...13mm

Cable Entry Kit 2

CEKB 11

9 (3 pcs of 3-entry blocks)

16 (2 pcs of 8-entry blocks)

10...18mm

5...13mm

Cable Entry Kit 3

CEKC 11

8 (4 pcs of 2-entry blocks)

8 (1 pcs 8-entry blocks)

18...28mm

5...13mm

Cable Entry Kit 4

CEKD 11

10 (5 pcs 2-entry blocks)

8 (1 pcs 8-entry blocks)

18...28mm

5...13mm

Cable Entry Kit 5

CEKE 11

6 (3 pcs 2-entry blocks)

6 (2 pcs 3-entry blocks)

18...28mm

10...18mm

Page 48: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 44 (80) NTC DN 9731494/4.0.0en

Figure 27 Cable Entry Kits

CEKA 11 Cable Entry Kit 1 (466292_)

CEKB 11 Cable Entry Kit 2 (466293_)

CEKC 11 Cable Entry Kit 3 (466785_)

CEKD 11 Cable Entry Kit 4 (467050_)

CEKE 11 Cable Entry Kit 5 (467192_)

3227

5.4.2. Assembly Instructions

Assemble the cable entry as follows:

NOTE Do not discard the cover plate retaining screws.

NOTE New cable entry blocks are talcum powdered to make the installation easier. If the set to be used is not talcum powdered, moisten all rubber blocks and cables with water before use (or use some suitable lubricant on the cables). The moisture between the rubber blocks and cables guarantees the tightness of the structure.

Page 49: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 45 (80)

1. Remove the seal lining of the cover plate as shown in Figure 28.

2. Unscrew the cover plate retaining screws and remove the cover plate by inclining it outwards. Screw two of the cover plate screws back in to the holes from inside as shown in Figure 28.

Figure 28 Removing the Cover Plate

CabinetDoor

CabinetDoor

CabinetDoor

2854

RECOMMENDATION Cut the V-shaped entries according to the cable size so that the maximum depth of the entry is half of the cable cross-section and the maximum width equal to the cable cross-section.

3. Design the arrangement for the cable entry blocks. Use side-cutters to cut suitable V-shaped entries in the front and the back of all the rubber blocks used. See Figure 29. Ensure that the cutting lines do not reach the metal structure inside the rubber block.

Figure 29 Cutting the Entry

Cutting Line

Holes for M6x75 Screws

3228

Page 50: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 46 (80) NTC DN 9731494/4.0.0en

4. Place the bottom rubber blocks on the cabinet top so that the rubber guides on the bottom of the blocks settle between the cabinet wall and the cabinet inner body as shown in the cross-section in Figure 30.

5. Place the feeders and other cables on the bottom rubber blocks.

6. Place the top rubber blocks on the bottom rubber blocks and carefully align the blocks.

7. Place the part marked with (1) in Figure 30 on the rubber blocks with the wider side towards the cabinet door as shown in Figure 30 and align the fixing holes.

8. Lubricate the six fixing screws with petroleum jelly and fit washers before insert them in the holes. Fasten the screws but do not tighten them yet.

Figure 30 Cable Entry

2

1

3

A

A

Cross-SectionA-A

2 1

Top Rubber BlockBottom Rubber Block

Cabinet Door

Cabinet Inner BodyCabinetWall

1851

9. Place part (3) to its place shown in Figure 30. 10. Secure the part marked with (3) in Figure 30 with the two remaining cover

plate fixing screws. Insert the lower fixing screw from inside and the upper one from outside as shown in Figure 30

Page 51: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 47 (80)

11. Place the part marked with (2) on the rubber blocks and align the fixing holes. The rubber guides on the top rubber blocks remain between parts (1) and (2) as shown by the cross-section in Figure 30

12. Lubricate the six fixing screws with petroleum jelly and fit washers before insert them into the holes. Fasten the screws but do not tighten them yet.

13. Tighten the fixing screws of parts (1) and (2) in turn. Tighten one at a time and just a little at a time, until the front edge of part (1) sits flush with the side plates, and the lower parts of part (2) reach the cabinet wall top level, as shown by the dashed lines in Figure 31.

14. Ensure that the metal parts keep their original shape while tightening. Equal tightness of all screws makes the cable entry waterproof.

Figure 31 Tightening of Assembly Parts

2 1

Top Rubber BlockBottom Rubber Block

Cabinet Inner BodyCabinetWall

2855

15. Tighten the seal lining along part (1) back to its place.

16. Install the cover plate (included in the cable entry kit) on the opposite side with the two M6x16 screws as shown in Figure 32.

Page 52: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 48 (80) NTC DN 9731494/4.0.0en

Figure 32 Installing the Cover Plate

2030

After installing the cable entry tick off the box in the checklist. Cable entry installed no or yes.

Page 53: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 49 (80)

6. INSTALLATION OF THE UNITS This chapter details the handling and installation of plug-in-units and other units which are to be installed in the Outdoor SSS1100 cabinet.

6.1. Handling of the units

WARNING!

Units carrying this sign are sensitive against electrostatic discharging. Always use the antistatic hand strap when handling units that are marked with the ESD-sign.

Make sure that no humidity reaches the units. The units have to be protected against humidity.

6.2. Installation of PDU Extension and Backplane Extension The PDU Extension and Backplane Extension are to be installed when 4 or more rectifiers are required.

6.2.1. Delivery check

Check the contents of the delivery against the Packing List. Unpack the Backplane Extension and check the delivery. With the Upgrade Kit the following equipment is delivered:

One PDU Extension CS71919.xx

One (1) Backplane Extension

Two (2) rails made of copper

One (1) splint made of steel

One (1) screw for fixing the splint

One (3) DC cables from rectifier Backplane to PDU Extension

Three (3) AC cables from rectifier Backplane to PDU Extension

One (1) AC Cable from PDU Basic to PDU Extension

One (1) Connection cable between PDU Basic and PDU Extension

One (1) Rectifier Control cable from Backplane Extension to PDU Basic

One (1) Earthing cable with screw

Two (2) DC Cables from PDU Basic to PDU Extension

Page 54: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 50 (80) NTC DN 9731494/4.0.0en

After unpacking and checking the delivery, tick off the box in the checklist Unpacking and delivery check. correct incorrect.

1. Switch off all AC and DC breakers on the PDU Basic.

2. Switch off the AC voltage in the external wall distribution box.

3. Removing roof, HE or ACU refer to [2].

4. Position the HE or ACU near to the cabinet and being careful with the cabling.

5. Measure the voltage on the AC terminals L1, L2, L3 and N (rear side) on the PDU Basic see Figure 26and check that the AC Power is switched off.

6. Remove all rectifiers.

7. Disconnect the following cables.

• Earthing cable

• Control cable

• AC power cable

• DC power cable

6.2.2. Removing Cables PDU Basic

Remove the battery cables from the battery before removing the battery cables from the PDU Basic. The terminals are on the rear side of the PDU Basic.

6.2.3. Removing Backplane Panel

Loosen the temperature sensor, which is tied on the rectifier frame, also the Earthing cable on the rectifier frame, and on the PDU Basic. Unplug the Rectifier Control Cable from Backplane Basic. Bend the fixings points of the rectifier frame on the rear side so that you can lift out the rectifier frame. Be careful with the cabling when lifting out.

6.3. Installation of the Backplane Extension

6.3.1. Mechanics

Install the Backplane Extension into the rectifier frame and fix it with the splint and the screw. Lay the rectifier frame down on a clean area and loosen the DC Cables for rectifier 3 from the conductor rail. Connect the conductor rails from the backplanes with the two rails made of copper as shown in Figure 33.

Page 55: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 51 (80)

Figure 33 Connecting conductor rail

Backplane Basic Backplane Extension

conductor rail

6.3.2. Cabling

1. Loosen the nuts on the conductor rails and install the ring terminals from the DC

2. Power cables for the rectifiers (see label on the cables)

3. Put the black DC Power cable on the upper and the blue DC Power cables on the lower one.

4. Put the AC cables for the rectifiers (see labels on the cables) on the connection points for AC as shown in Figure 34.

Page 56: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 52 (80) NTC DN 9731494/4.0.0en

Figure 34 Front view Backplane Extension

POWEC

black DC+

blueDC-

blue AC

green yellowAC

brown AC

rectifier4rectifier5rectifier6

5. Fix the new cables on the rear side of the frame with cable binders.

6. Put the rectifier frame back into the 19” frame and fix it on the rear side. Backplane extension installed no or yes.

Page 57: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 53 (80)

6.4. Installation of the PDU Extension

6.4.1. Mechanics

To fix the PDU four (4) holes are provided in the front panel. The positions of the holes are in accordance with standard 19“ technology. The unit is fixed to the vertical 19“ support frame on the left-hand side of the cabinet with four (4) M6 screws. The screws have plastic washer to protect the front panel from scratches. The unit has the following (maximum) dimensions:

Height : 19“ (Front plate)

Width : 3 HU (Front plate)

Depth : 350 mm (Unit body)

6.4.2. Cabling

Install the DC Cables from extension backplane to the PDU Extension. The terminals are shown in Figure 35.

Figure 35 Location of the DC Outlets

Page 58: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 54 (80) NTC DN 9731494/4.0.0en

Plug in the AC Cables for rectifiers 4,5 and 6.see Figure 36 All plugs, terminals and the cables are labelled

Figure 36 Location of the AC Outlets

For the Battery cables and the AC supply see Figure 37 Install a new Earthing cable on the rear side of the rectifier frame between the PDU Basic and the rectifier frame with a supplied screw M5.

Page 59: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 55 (80)

Figure 37 Rear view PDU

100mm longer

AC Supply

AC Supply

PDU Control Cable

Battery

Cable binder

Page 60: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 56 (80) NTC DN 9731494/4.0.0en

Table 2 PDU & PDU Extension Cables Cable Terminal Name

PDU PDU Extension

Three Phase AC Power Supply L1, L2, L3, N, Earth L1, L2, L3, N, Earth

Single Phase AC Power Supply L3, N,

Earth

L3, N,

Earth

48V DC Black + PDU Extension - Basic PDU -

48V DC Blue - PDU Extension - Basic PDU -

Connection Cable Sub-D Extension Basic PDU Control

PDU extension installed. no or yes

6.5. Calibration backplane extension The new backplane must be calibrated at 53V. Switch off the DC and AC breaker of all rectifiers. Switch on the AC Power at the wall distribution box. Using a volt meter measure the voltage on the AC terminals At the PDU basic measure the voltage between N and L1, L2, L3?

1. Insert the fourth rectifier in the position fourth from the left on the Backplane Extension.

2. Switch on the DC and then the AC breaker for rectifier 4 on the PDU extension.

3. Adjust the voltage to 53V with the sealed screw at position P1 (see Figure 38). You can measure the voltage at the screws SKR11, SKR12.

4. Switch off the AC and the DC breaker for rectifier 4 and remove rectifier 4.

5. Insert the fifth rectifier into the middle position on the Backplane Extension.

6. Switch on the DC and then the AC breaker for rectifier 5.

7. Adjust the voltage to 53V with the sealed screw at position P11 (see Figure 38). You can measure the voltage at the screws SKR1, SKR2.

8. Switch off the AC and the DC breaker for rectifier 5 and remove rectifier 5.

9. Insert the sixth rectifier into the right position on the Backplane Extension.

Page 61: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 57 (80)

10. Switch on the DC and then the AC breaker for rectifier 6.

11. Adjust the voltage to 53V with the sealed screw at position P21 (see Figure 38). You can measure the voltage at the screws SKR1, SKR2

12. Switch off the AC and the DC breaker for rectifier 6 and remove rectifier 6.

13. Plug in the Rectifier Control Cables in the backplane (the plugs are under rectifier plug 1 and rectifier plug 4) and in the PDU Basic Connection points are on the rear of the PDU Basic).

The backplane is now calibrated.

Figure 38 Backplane front view

Rectifier control cable

Backplane calibrated no or yes

6.6. Removal and installation of rectifiers Three rectifiers are pre-fitted to the SSS1100. The SSS1100 cabinet provides space for an additional three rectifiers if required, which can only be used in conjunction with a PDU extension and a backplane extension. Start the rectifier removal from the right to the left according to the positions shown in Figure 43

Page 62: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 58 (80) NTC DN 9731494/4.0.0en

Remove each rectifier as follows:

1. Remove the two fixing screws at the front panel of the rectifier.

2. Secure the rectifiers against dropping down until it is removed.

3. Carefully pull the rectifier out of its designated slot.

4. Repeat points 1, 2 and 3 for each rectifier to be removed. Start the rectifier installation from the left to the right according to the positions shown in Figure 43

Install each rectifier as follows:

1. If the rectifier is new, unpack the rectifier from its protective package and check for damage. Check the contents of the delivery against the Packing List, and place the list into the site folder. Recycle the packing material.

2. Carefully place the rectifier into the designated slot and shift it in till you feel the rear connector snapping into the backplane connector.

3. Secure the rectifiers against dropping down until the fixing screws are fastened.

4. Fasten the two fixing screws at the front panel of the rectifier.

5. Repeat points 1, 2, 3 and 4 for each rectifier to be installed. After installing the rectifiers tick off the box and enter the number of rectifiers. Rectifiers installed no or yes, number of rectifiers ___.

6.7. Battery installation

6.7.1. Battery Lower tray installation

Always position the battery lower tray so the holes in the tray are facing to the back and front of the cabinet.

WARNING!

Never disconnect the battery lead from the PDU rear connector when the other end is connected to the batteries.

CAUTION Care should be taken when handling the batteries. The weight of one battery can be 34 kg depending on the type used

Page 63: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 59 (80)

NOTE . If a battery type is used other than the one described here, proceed according to the instructions delivered with the batteries

The standard Battery Backup Unit (BBU) consists of four 12V-battery blocks. An alternative configuration may consist of 8 battery blocks configured as 2*4 12 volt units. Or 16 battery blocks configured as 2*2*4 using additional battery shelf. Before installing the batteries perform the following voltage measurements as follows and fill in the results into the checklist: Battery voltages (without load):

Battery 1 ____V Battery 2 ____V

Battery 3 ____V Battery 4 ____V

Battery 5 ____V Battery 6 ____V

Battery 7 ____V Battery 8 ____V

Battery 9 ____V Battery 10 ____V

Battery 11 ____V Battery 12 ____V

Battery 13 ____V Battery 14 ____V

Battery 15 ____V Battery 16 ____V

Check the batteries visually for damage and fill in the result to the checklist: Visual check for external damages failed. Or passed.

6.7.2. Installing and removing Four (4) Battery blocks

Installing the four battery blocks into the Outdoor SSS1100 cabinet as follows:

1. Place the lower tray in the bottom of the Outdoor SSS1100 cabinet

2. Place the batteries on the lower battery plate in the battery compartment as shown in Figure 39.

Page 64: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 60 (80) NTC DN 9731494/4.0.0en

Figure 39 Four (4) Battery block installation Position

+-

+-

+-

+-

DN98914105

To PDU

Battery temperature sensor

To HMU

3. Connect the cable bridges and the Battery ventilation tubes as shown in Figure 39. Use an insulated torque wrench and tighten the battery contact screws to 6.78 Nm.

4. Position the battery temperature sensor as shown in Figure 39 and secure sensor into position using a cable binder

Remove the four battery blocks from the SSS1100 cabinet as follows:

1. Loosen the cable binder, which secures the battery temperature sensor in position, and remove the sensor.

2. Disconnect the cables, cable bridges and the battery ventilation tubes.

3. Remove the batteries from the battery compartment.

4. Remove the lower tray from the bottom of the battery compartment.

Page 65: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 61 (80)

6.7.3. Installing and removing Eight (8) Battery blocks

: Installing the battery blocks into the Outdoor SSS1100 cabinet as follows

1. Place the lower tray in the bottom of the Outdoor SSS1100 cabinet.

2. Place the batteries on the lower battery plate in the battery compartment as shown in Figure 40.

Page 66: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 62 (80) NTC DN 9731494/4.0.0en

Figure 40 Eight (8) Battery block installation Position

+ -

+-

+- +-

+-

+ -

+ - + -

To PDU

To HMU

Battery temperature sensor

DN98914086

3. Connect the cable bridges and the Battery ventilation tubes as shown in Figure 40. Use an insulated torque wrench and tighten the battery contact screws to 6.78 Nm.

4. Position the Battery temperature sensor as shown in Figure 40 secure the sensor into position using a cable binder

Remove the eight battery blocks from the SSS1100 cabinet as follows:

1. Loosen the cable binder, which secures the battery temperature sensor in position, and remove the sensor.

2. Disconnect the cables, cable bridges and the battery ventilation tubes.

3. Remove the batteries from the battery compartment.

Remove the lower tray from the bottom of the battery compartment.

Page 67: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 63 (80)

6.8. Installing and removing sixteen (16) battery blocks

: Installing the battery blocks into the Outdoor SSS1100 cabinet as follows

1. Place the lower tray in the bottom of the Outdoor SSS1100 cabinet. Place the batteries on the lower battery plate in the battery compartment as shown in Figure 41.

Figure 41 Sixteen (16) Battery block installation Position Bottom Shelf

+ -

+-

+- +-

+-

+ -

+ - + -

To PDU

To HMU

To upper battery tray

Battery temperature sensor

DN98914074

2. Connect the cable bridges and the Battery ventilation tubes as shown in Figure 41. Use an insulated torque wrench and tighten the battery contact screws to 6.78 Nm.

3. Position the Battery temperature sensor as shown in Figure 41 Secure the sensor into position using a cable binder

Page 68: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 64 (80) NTC DN 9731494/4.0.0en

Install the upper battery tray as follows:

1. Unpack the upper battery tray kit from its protective packaging and check for damage. Check the contents of the delivery against the Packing List and place the list into the site folder. Recycle the packing material.

2. Position one of the tray bars against the rear of the support frame, at 7U up from the bottom of the frame.

3. Secure the bar to the frame with four M6 screws.

4. Position the other tray bar against the front of the support frame, at 7U up from the bottom of the frame.

5. Secure the bar to the frame with four M6 screws.

6. Position the upper tray on top of the bars

7. Secure the upper tray to the bars using four M6 screws, ensuring that the tray position allows the cabinet door to be closed.

Install eight battery blocks on to the upper tray as follows

:

Place the second block of batteries onto the upper battery tray in the battery compartment as shown in Figure 42.

Page 69: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 65 (80)

Figure 42 Sixteen- (16) Battery block installation Position top shelf

+ -

+-

+- +-

+-

+ -

+ - + -

To PDU / PDU extension

To lower tray

DN98914098

4. Connect the cable bridges and the Battery ventilation tubes as shown in Figure 41. Use an insulated torque wrench and tighten the battery contact screws to 6.78 Nm.

Remove the sixteen battery blocks from the cabinet as follows:

1. Disconnect the cables, cable bridges and the battery ventilation tubes from the batteries on the upper tray.

2. Remove the batteries from the upper tray.

3. Remove the four M6 screws that secure the upper tray to the tray bars.

4. Remove the upper tray.

5. Remove the four M6 screws that secure the front bar to the support frame.

6. Remove the front bar.

7. Remove the four M6 screws that secure the rear bar to the support frame.

8. Remove the rear bar.

9. Loosen the cable binder that secures the battery temperature sensor in position, and remove the sensor.

Page 70: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 66 (80) NTC DN 9731494/4.0.0en

10. Disconnect the cables, cable bridges and the battery ventilation tubes from the batteries on the lower tray.

11. Remove the batteries from the battery compartment.

12. Remove the lower tray from the bottom of the battery compartment. After installing and connecting the batteries tick off the box in the checklist. Batteries installed and connected no or yes.

Torque correct (6,78Nm)

6.9. RLE installation

NOTE Customer equipment other than RLEs can be fitted to the SSS1100 cabinets provided that it meets the requirements described in this section.

In order to fit into the 19” equipment support frame of the cabinets, the physical dimensions for each customer chosen and supplied RLE should be:

Table 3 RLE physical dimensions

Width 19”

Depth 400 mm (15.7in) from front panel to rear

70 mm (2.8in) from front panel to front (for cabling)

Height Multiples of 1HU

The DC power supply to the RLEs is provided by six specialist two pin connectors.

RECOMMENDATION Nokia recommends the RLE configuration detailed in Table 4, dependent upon the BTS configuration supported.

Table 4 Recommended RLE configuration

Height of RLE 1HU

RLE heat dissipation 25W per HU

RLE DC power consumption 75W

Number of RLEs in SSS1100. 6

It is recommended that 1HU of space is provided below the SSS1100 rectifiers, before any RLE is installed. RLEs that do not meet the above recommendations can be installed at the discretion of Nokia and the customer.

Page 71: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 67 (80)

The quantity of customer chosen and supplied RLEs is dependent upon the RLE physical dimensions, the RLE heat dissipation, the RLE DC power consumption, the total DC consumption of the site configuration, and the available space in the cabinets. The quantity of RLEs should be decided at the discretion of Nokia and the customer. After installing and connecting the RLEs complete the information in the checklist. Total power consumption for all RLEs ____W

Figure 43 Rectifier Positions

UpperBattery Tray

PDU

PDUExtension

Page 72: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 68 (80) NTC DN 9731494/4.0.0en

7. INSTALLING THE HEAT MANAGEMENT UNIT This chapter details the installation of the Heat management unit to the Outdoor SSS1100 cabinet.

7.1. Unpacking and checking delivery The Heat management unit is delivered on a transportation pallet. All necessary fastenings are included. The Heat management unit lifting handles are optional. Unpack the HMU as follows:

1. Unpack the delivery and check for any damage.

2. Check the delivery against the packing list.

3. Place the packing list into the site folder.

4. Recycle the packing material.

7.2. Installing the Heat Exchanger Unit

WARNING!

Handle the Heat exchanger with care. The weight is about 30 kg!

WARNING!

Do not damage the seals on the air guide when placing the heat exchanger on it.

RECOMMENDATION Moisten the air guide seal before placing the HE.

WARNING!

Make sure that all power to the HE is switched off before starting the installation!

Page 73: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 69 (80)

Install the Heat Exchanger as follows: The HE can be lifted and carried using one or more optional lifting handles. The triangle BTS door key is used to lock the HE in place.

NOTE The function check laid down in section 9.1 is to be undertaken before the HE is lifted into position.

Install the HE to the rear of the cabinet as follows:

1. Attach the lifting handle or handles at the positions shown in Figure 44. Place a piece of plastic or cardboard between the handle and the HE lifting points to avoid scratching the HE.

Figure 44 Heat management unit lifting handle positions

B

C

A

DN98918285 2. Using the triangle BTS door key, unlock the locking mechanism as shown in

Figure 45.

Page 74: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 70 (80) NTC DN 9731494/4.0.0en

Figure 45 Locking bar opening direction

LockLock

DN98918273 3. Take the ends of the HE cables out of the rear side of the cabinet.

4. Position the HE near to the cabinet, so that the cables reach the relevant connectors on the HE.

5. Connect the grounding cable, control cable, AC power cable, and DC power cable as shown in Figure 46.

Figure 46 HE cable connections

DN98912976 6. Direct the cabinet guide pins into the guide holes of the HE.

Page 75: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 71 (80)

7. Support the HE and lock both sides using the triangle BTS door key, as shown in Figure 47. Ensure that there is no gap between the HE and the cabinet.

Figure 47 Locking the Heat management unit into position

DN98913075

7.3. Installing the Air Conditioning Unit

WARNING!

Handle the Air Conditioner with care. The weight is about 65kg!

WARNING!

Do not damage the seals on the air guide when placing the air conditioner on it!

RECOMMENDATION Moisten the air guide seal before positioning the air conditioner unit.

WARNING!

Make sure that all power to the air conditioner is switched off before starting the installation!

The ACU can be lifted and carried using one or more optional lifting handles. The triangle BTS door key is used to lock the HE in place.

Page 76: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 72 (80) NTC DN 9731494/4.0.0en

NOTE The function check laid down in section 9.1 is to be undertaken before the ACU is lifted into position.

Install the ACU to the rear of the cabinet as follows:

1. Attach the lifting handle or handles at the positions shown in Figure 44. Place a piece of plastic or cardboard between the handle and the ACU lifting points to avoid scratching the ACU.

2. Using the triangle BTS door key, unlock the locking mechanism as shown in Figure 45.

3. Take the ends of the ACU cables out of the rear side of the cabinet.

4. Position the ACU near to the cabinet, so that the cables reach the relevant connectors on the ACU.

5. Connect the grounding cable, control cable, AC power cable, AC compressor cable, and DC power cable as shown in Figure 48.

Figure 48 ACU cable connections

DN98914035

6. Direct the cabinet guide pins into the guide holes of the ACU.

Page 77: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 73 (80)

7. Support the ACU and lock both sides using the triangle BTS door key, as shown in Figure 47. Ensure that there is no gap between the ACU and the cabinet.

8. Ensure that the air inlet and outlet are unimpeded for the required drawing and blowing of air.

9. Ensure that the gasket seals on the intake and return air apertures are properly fitted, so that no air can be drawn into the internal airflow circuit from the atmosphere.

7.3.1. ACU condensation hose

The ACU produces condensation during operation, due to the relative humidity of its environment. In order to drain the condensation from the ACU, a tube in the bottom panel of the ACU is fitted. This tube is connected to a plastic hose to remove the condensation from the ACU. Check the installed ACU to ensure that the plastic hose is in position.

7.4. Checklist After installing and locking the Heat management unit tick off the box in the checklist. Heat management unit installed no or yes.

Page 78: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 74 (80) NTC DN 9731494/4.0.0en

8. INSTALLING THE ROOF

CAUTION Handle the roof with care. The weight of a single roof is about 15kg, the double roof weighs about 25kg.

NOTE The Heat management unit should be installed before installing the roof. If guide pins are also fitted at the rear they will need to be removed.

RECOMMENDATION If possible, connect all interface cabling on the cabinet top before installing the roof.

This section details the installation of the single and double roof panels.

Install the roof as follows:

1. Lift the roof on top of the cabinet with the roof locking plate at the rear as shown in Figure 49.

Figure 49 Installing the Cabinet Roof

Locking Hooks

2924

Locking Hooks

2. Direct the roof guide pins to the cabinet guide slots shown in Figure 50.

Page 79: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 75 (80)

3. Slide the roof backwards so that the roof guide pins are engaged in the cabinet guide slots shown in Figure 50.

4. Release the roof spring pins shown in Figure 50.

Figure 50 Securing the Roof to Cabinet Top

Roof GuidePin

Cabinet Guide Slot

Roof Spring Pin

2895

5. Using the door key handle, press the locking hook down on both sides to release the roof locking mechanism. If required, adjust the roof to match the roof guide holes with the cabinet guide pins.

6. Lock the roof by closing the hooks with the door key handle at both sides as shown in Figure 51.

Figure 51 Locking the Roof

1965 After installing and locking the roof tick off the box in the checklist. Roof installed no or yes.

Page 80: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 76 (80) NTC DN 9731494/4.0.0en

9. COMPLETING THE INSTALLATION AND CHECKLIST

9.1. Power-ON-test After finishing the installation a first function check is to be undertaken with the power-ON-test as follows.

NOTE The power up sequence is to be carried out with Heat management unit removed from the cabinet.

Perform the Power On Test as follows::

Check that all circuit breakers at the PDU are switched off.

Check that the connected BTS or other power consumers are all switched to “off”.

Make sure that the Input voltage to the cabinet is correct by measuring the voltages at the external mains power distribution box.

Switch on the AC voltage in the external mains power distribution box.

Measure the voltages at the AC input connector of the PDU, using a voltmeter between N and L1, L2, L3.

Switch on DC POWER to all rectifiers

Switch on the AC POWER circuit breakers on the PDU and verify that the green “Power” LED on the rectifiers are illuminated

Switch on the Earth leakage breaker if fitted and check its function by pressing the T button. The switch must trigger now. After the test switch it on again.

Switch on the DC POWER circuit breakers now except the BATTERY.

Also the circuit breakers CSM UNIT and HEAT MANAGEMENT are to be switched on now. Verify that the cooling unit (air conditioner or heat exchanger) fans start running at high speed and slow down after the CSM unit is running (approx. 15 seconds start-up time)

Switch on the BATTERY circuit breakers.

After the power-on-test is performed, tick off the box in the checklist. Power-ON-test failed. Or passed.

Page 81: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 77 (80)

9.2. Site leaving conditions After finishing all the installation tasks described in the previous sections, mount the roof, the back panel and install the door. Tick off the following boxes in the checklist. Heat management unit locked no or yes.

Roof locked no or yes.

Door locked, Earthing cable connected no or yes.

The other conditions, e.g. if power is to be switched off after leaving the site, are to be cleared with NOKIA or the customer.

RECOMMENDATION Before the site is integrated to the network, no alarms are transmitted to the BSC/OMC. . To avoid false alarms due to un-commisioned systems the cabinet is to be powered down.

This is undertaken by switching off all circuit breakers at the PDU and switching off the AC mains input at the external power distribution box. Supply this information by ticking off the box in the checklist. Outdoor SSS1100 powered down no or yes.

Page 82: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 78 (80) NTC DN 9731494/4.0.0en

10. INSTALLATION CHECKLIST Serial Number Date

Section with Instructions

Outdoor Site Support Cabinet Installation Checklist

4.4 Unpacking and delivery check

Correct In-correct

4.5.1 Plinth installed on steel construction

Or concrete base yes

yes

4.5.4

4.5.5

Single plinth or Double plinth Single Double

4.5.6 Grid plates fixed to plinth no yes

4.6 Cabinets mounted to plinth no yes

4.6.6 Bridging bracket installed no yes

4.7 Door opening direction Default Changes

4.8 Earthing frame installed no yes

5.1 Pre-installed cables and units check Failed Passed

5.2.1 Earthing cables connected no yes

5.2.2 AC mains 3-phase connected no yes

5.2.2 AC mains single phase connected no yes

5.2.3 Alarm interface cable connected no yes

5.3.1 DC output cable connected no yes

5.3.2 AC output cable connected no yes

5.4 Cable entry installed no yes

6.2.1 Unpacking and delivery check upgrade kit Correct In-correct

6.3 Backplane extension Installed no yes

6.4 PDU extension installed no yes

6.5 Backplane calibrated no yes

6.6 Rectifiers installed, number of rectifiers____ no yes

Page 83: Outdoor SSS1100

Installation Manual

Document Number/Version © 1998 Nokia Telecommunications Oy Page NTC DN 9731494/4.0.0en 79 (80)

6.7 Battery checks: Battery voltages (without

load):

Battery 1 ____V Battery 2 ____V

Battery 3 ____V Battery 4 ____V

Battery 5 ____V Battery 6 ____V

Battery 7 ____V Battery 8 ____V

Battery 9 ____V Battery 10 ____V

Battery 11 ____V Battery 12 ____V

Battery 13 ____V Battery 14 ____V

Battery 15 ____V Battery 16 ____V

Number of Batteries blocks____

Failed

Passed

6.7 Visual check for external damage failed passed

6.7 Batteries installed and connected no yes

6.7

with the correct torque (6.78Nm) no yes

RLE installation6.9

Total power consumption for all RLEs ____W

7 Heat management unit installed no yes

8 Roof installed Single Double

9.1 Power On test failed passed

9.2 Heat management unit locked no yes

9.2 Roof locked no yes

9.2 Door locked and Earthing cable connected no yes

Outdoor SSS1100 powered down no yes

Page 84: Outdoor SSS1100

Installation Manual

Page © 1998 Nokia Telecommunications Oy Document Number/Version 80 (80) NTC DN 9731494/4.0.0en

For every check results failed or no give remarks into this field.

Remarks :

Name: __________________ Company: ________________ Sign. : ______________