RIVERSIDE VIEW EXT 13; EXT 15; EXT 16; (RIVERSANDS DEVELOPMENT PHASE 1)
Situated On Portion 7, Part of Portion 38 & Portion 121 Of The Farm Diepsloot 388-JR
OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ENGINEERING SERVICES AND SERVICE AGREEMENTS.
Prepared for
Prepared by
C-PLAN CIVIL ENGINEERS (Pty) Ltd 459 Ontdekkers Road Florida Hills Roodepoort PO Box 6622 Westgate 1734 Tel (011) 472-2277 Fax (011) 472-2305 Ref: -13516 AUGUST `13
2
CONTENTS PAGE 1. Scope of Report 3 2. Description of Township 3
2.1 Locality 3 2.2 Layout 3 2.3 Description 4 2.4 Existing Services 4
3. Design Guidelines 4 4. Water Reticulation 5
4.1 Layout and Design 5 4.2 Materials and Construction 6 4.3 Conclusion 6 4.4 Bulk Contributions 6
5. Sewer Reticulation 7
5.1 Layout and Design 7 5.2 Materials and Construction 7 5.3 Conclusion 7 5.4 Bulk Contributions 7
6. Roads 8
6.1 Layout and Geometrics 8 6.2 Pavement Design 10 6.3 Materials and Construction 10 6.4 Bulk Contributions 10
7. Storm water 10
7.1 Layout and Design 10 7.2 Storm water Attenuation 11 7.3 Material and Construction 11 7.4 Estimate Costs 11
8. Annexure 12 8.1 GLS Consulting Water Reticulation Master Plan Figure BHW 5.2 8.2 GLS Consulting Sewer Reticulation Master Plan Figure SP311_S1 8.3 GLS Consulting Sewer Reticulation Master Plan Figure DSP 6.1 9. Drawings 13 Locality 13516-100-C01 Locality- Orthophoto 13516-100-C02 Water Reticulation 13516-200-P01 Sewer Reticulation 13516-300-P01 Riversands Access Provision (Layout prepared by WSP SA) Figure 3A
3
1. SCOPE OF REPORT
This Report deals with the provision of water reticulation, sewer reticulation, roads and stormwater drainage for the proposed Riversands development situated on Portion 7, Portion 36, Portion 37, Portion 38 and Portion 121 of the Farm Diepsloot 388-JR, in Randburg, within the City of Johannesburg`s Metropolitan Municipal boundary in the Gauteng Province. Provision of the Electrical Reticulation has not been dealt with in this Report.
2. TOWNSHIP DESCRIPTION
2.1 Locality The proposed development is situated approximately 2.5km north of the Dainfern Township and approximately 1.3km southeast of the Diepsloot Township.
The Riversands Development is bounded by: - William Nicol Drive (Road K46) along the western boundary, Portion 1, 2, 3, 4 and 131 of the Farm Zevenfontein 407-JR along the southern
boundary, Remainder of Portion 205 and Portion 205 of the Farm Diepsloot 388 JR along the
eastern boundary, Portion 111, 112, 113 and 118 of the Farm Diepsloot 388-JR along the northern
boundary.
2.2 Layout It is our client’s intention to establish a mixed land use development referred to as the Riversands development. The development will comprise of 6 townships (refer to table below). The proposed townships will be phased as per the tables below.
Riversands Phase 1
Riverside View Township Zoning
Riverside View Ext 13 “Business”
Riverside View Ext 15 “Educational”
Riverside View Ext 16 “Business”
Future Riversands Townships
Riverside View Township Zoning
Riverside View Ext 14 “Industrial & Residential 3”
Riverside View Ext 17 “Educational”
Riverside View Ext 18 “Industrial”
4
2.3 Description Some of the stands forming the proposed development boundary are currently zoned agricultural and are equipped with the relevant agricultural buildings. The site is traversed by a river along the northern portion and central portion as shown on layout. A few large trees and veldt grass cover the site generally but a large number of concentrated trees are found along the river that traverses the site in the middle as shown. The sites elevation varies between 1417.000m to 1359.000m and 1419.000m The total extent of the Riversands development measures 221.21ha (including existing and proposed road reserves, open spaces/parks and the floodline areas with the relevant buffers).
2.4 Existing Services Water: There is an existing 600mm-diameter Rand Water pipe 3.5km north of the proposed development, as shown on GLS master plan Figure BHW 5.2. Sewer: There is an existing 1500-diameter sewer outfall across the southern portion of the site as shown on layout, an existing 2500-diameter Dainfern Outfall 1.3km west of the proposed development and the northern sewer treatment works approximately 3.0km in the northwesterly direction from the proposed development. Storm Water: There is no formal stormwater system within the catchment areas of the proposed development, however a river traverses the site as shown on layout.
3. DESIGN GUIDELINES
The Design of the Township’s services will be based on the Design Principles in the “Guidelines for the Provision of Engineering Services and Amenities in Residential Township Development” published by the Department of Community Development and to the City of Johannesburg’s requirements for Engineering Services. A competent contractor through acceptable tender process will install all services. The General Conditions for the Works of Civil Engineering Construction, Standard Specification SABS 1200 and relevant particular Specifications will pertain to the contract.
5
4. WATER RETICULATION 4.1 Layout and Design
The layout of the existing Council water reticulation system and the proposed tie in for the proposed developments is shown on layout 13516-200-C01 and the master plan layout Figure BHW 5.2 prepared by GLS Consulting. A water reticulation master plan report (JWAT-C-0160-01-001209) was prepared for the Blue Hills and Diepsloot Corridor Developments (where the proposed development is situated) by GLS Consulting Engineers. As per the master plan Report, the Diespsloot Corridor Developments will be supplied from a new bulk water main that needs to be constructed from the existing 600mm-diameter H33 Rand Water bulk water main situated +/-3.5km north of the proposed development to the proposed future Dainfern reservoir, as shown on Figure BHW 5.2 (GLS layout attached). The master plan Report recommends that the proposed new 1000mm-diameter bulk water main be extended further south along Gymkana Road, turning west along the south-western boundary of Portion 26 & Portion 28 of the Farm Diepsloot 388-JR (gravel road), the size will then decrease to a 900mm-diameter bulk water main. The water pipe will be extended further south along Knopieslaagte Road with the change in pipe sizes as per the master plan layout till it passes the northern boundary of the site where a 450mm-diameter connection will be provided for proposed Township forming the Riversands development. The Report further recommends that the bulk main be extended towards the southern direction to supply the future Dainfern reservoir, the reservoir will further supply the future townships between the existing Diepsloot and Dainfern township. Bigen Africa Consulting Engineers on behalf of the Steyn City Development have prepared preliminary Council bulk water layouts and are in the process of designing and subsequently constructing the bulk water main from the existing 600mm-diameter H33 Randwater bulk main to the future Riverglen/Dainfern township (Steyn City Development) as per Johannesburg Water`s master plan prepared by GLS Consulting. A 450mm-diameter bulk water connection will be provided for the proposed Riversands development where a bulk water connection will then be taken. A new Council water reticulation network will be constructed from the 450mm-diameter bulk water connection extending within the proposed development`s road reserve boundaries, ultimately providing water connections to the first phase of the Riversands Development (Riverside View Ext 13, Ext 15 & Ext 16). The proposed new water reticulation system to be constructed within the Riversands development will be designed and constructed to cater for future extensions forming the Riversands development as shown on layout 13516-200-C01.
Water reticulation pipes to be constructed and handed over to Johannesburg Water will be constructed to JW`s standards and will be handed over to Council upon completion. The water reticulation system to be constructed within the boundaries of the individual township`s
6
forming the Riversands development will remain private and therefore maintained by the Section 21 Company or the Body Cooperate to be registered for the relevant Township.
Design Criteria:-
Riversands Phase 1
Riverside view Township
Zoning Developable Area
Bulk FAR
Average Annual Daily
Demand Riverside View
Ext 13 “Business” 12.64ha
@ 0.6 75 840m² 250 kl/d
Riverside View Ext 15
“Educational” 9.49ha @ 0.5
47 450m²
130 kl/d
Riverside View Ext 16
“Business” 23.52 @0.6
141 120m² 465 kl/d
Total demand 845 kl/day
Future Riversands Townships
Riverside view Township
Zoning Developable Area
Bulk FAR
Average Annual Daily
Demand Riverside View
Ext 14 “Industrial & Residential 3”
28.96ha & (4.1ha Res 3)
179 400m² (107 units-40u/ha)
505 kl/d
Riverside View Ext 17
“Industrial” 15.06ha @0.6
90 360m² 207 kl/d
Riverside View Ext 18
“Industrial” 88.83 @0.6
532 973m² 1 222 kl/d
Total demand 1 934 kl/day
Total Site Area : 232.3 ha (Riversands Development)
F.A.R / Density : As tabled above Hydrant Flow : 1500 l/min/hydrant @ (15m) Annual Daily Demand : 2779 kl/day (32.2 l/sec) Peak Factor : 3.0 Instantaneous Peak Demand : 96.5 l/sec 4.2 Materials and Construction
It is proposed that all materials, construction and testing of the water reticulation comply with Johannesburg Water (Pty) Ltd as well as the SABS Standards. All fire hydrants will meet the standard requirements of the Johannesburg Fire Department. The water reticulation pipelines will consist of Class 16 (SABS 1283), high impact uPVC pipes and steel fittings as per the latest Johannesburg Water Standards for the water main to be handed over to the Council.
7
4.3 Conclusion. The Council bulk water reticulation system to be constructed under the Steyn City development will be designed and constructed as per Johannesburg Water`s master plan Report supplying proposed developments between the Diepsloot and Dainfern area, including the Riversands development. The bulk water infrastructure design by Bigen Africa under the Steyn City will in-cooperate the peak water demand of 96.5l/s required by the Riversands development, therefore the proposed Riversands development will not negatively affect the proposed bulk infrastructure to be constructed for future Diepsloot corridor developments.
4.4 Bulk Contributions It is our client’s intention to apply for external bulk contributions offset, for construction of the external water reticulation system to service individual townships forming the Riversands Development.
5. SEWER RETICULATION
5.1 Layout and Design The layout of the proposed sewerage reticulation is shown on layout no. 13516-300-P01, Figure DSP 6.1 & Figure SP311_S1.
There is no existing Council sewer reticulation system within the catchment areas of the proposed development; however a bulk infrastructure master plan was prepared for the catchment area by GLS Consulting Engineers. The Northern Waste Water Treatment Works is situated 2.8 km in the north westerly direction of the proposed development.
The master plan prepared by GLS Consulting recommends that a new 600mm-diameter Jukskei sewer outfall (DSP 10.1 – see Figure DSP6.1) be constructed along the river traversing the proposed Riversands development towards the westerly direction as shown on layout, where a new regional Diepsloot sewer pump station (DSP13.1) will be constructed to further pump effluents to the Northern Waste Water Works. The Diepsloot sewer pumpstation is currently under construction under the proposed Steyn City development (designed by Bigen Africa). The 600mm-diameter Jukskei outfall has been designed by Bigen Africa and will be constructed under the Steyn City development from the new Diepsloot pump station towards the easterly direction and will terminate as shown on layout.
As per the master plan, the proposed Riversands development will construct the Jukskei Outfall (DSP 10.1) as shown on layout (13516-300-P01) from the eastern boundary of the Riversands development, along the river to link in to the future Jukskei Outfall to be constructed under the development of Steyn City, as shown on layout.
GLS Consulting further recommends that a secondary 600mm-diameter sewer outfall pipe (Figure SP311_S1) be constructed approximately 250m south of the Jukskei sewer outfall, the recommended secondary outfall will then drain the Diepsloot consolidated basin to the Northern Waste Water treatment plant via the Old Northern Outfall.
8
Due to secondary 600mm-diameter sewer outfall traversing the proposed development of Jukskei View Ext 15 (forming part of the Riversands development) and the proposed William Nicole/Rose Road interchange, it has been recommended that the secondary sewer outfall be moved +/- 200m further south as shown on layout, the outfall will now be in-cooperated into the proposed developments and protected by servitude.
The 600mm-diameter secondary outfall will be constructed under the first phase of the Riversands development, from the eastern boundary through the Riversands development boundaries to tie into the Old Northern Outfall. Item DSP23-1& 2 will also be constructed under the Riversands development and Township forming the Riversands development within that relevant catchment will tie into the proposed system as per the master plan. Connecting Council sewer pipe will be constructed from the proposed first phase (Jukskei View Ext 13, Ext 15 and Ext 16) of the Riversands development, linking to the sewer outfall pipe to be constructed as per the master plan. The sewer infrastructure to be constructed under the proposed development and handed over to Council will be constructed to Johannesburg Water standards and specification, the sewer reticulation system to be constructed within individual townships forming the proposed development will remain private and therefore maintained by the Section 21 Company or body corporate to register for the development.
Design Criteria:
Total Site Area : 232.3 ha. F.A.R / No of Units : As tabled above Average Sewage Discharge Phase 1 : 676 kl/d (Jukskei View Ext 13, Ext 15 & Ext 16) Future Township : 1238 kl/d Total Sewage Discharge : 22.2 l/s Peak Factor : 2.3 Peak Discharge : 51.06 l/s Design Flow : 67% Max Velocity : 2.500m/s at full flow (0.67D) 5.2 Materials and Construction
It is proposed that all materials, construction and testing of the sewer reticulation comply with Johannesburg Water (Pty) Ltd as well as the SABS Standards. Manholes will be a minimum 1050mm in diameter, pre-cast concrete, constructed of dolomitic type aggregate (SABS 558) Concrete Type manhole covers will be supplied.
9
5.3 Conclusion The infrastructure for the Steyn City development is currently under construction and the bulk infrastructure including the construction of the proposed new 600mm-diameter Jukskei Outfall to be constructed to link to the Diepsloot pump station has been discussed with Johannesburg Water. The Diepsloot sewer pump station, pump line and the Jukskei outfall has been designed to accommodate sewer flows from the proposed township forming the Riversands development.
5.4 Bulk Contributions It is our client’s intention to apply for bulk contributions offset, for construction of the sewer reticulation infrastructure and bulk infrastructure to service individual townships forming the Riversands Development including the sewer catchment area for bulk infrastructure to be constructed under the development.
6. ROADS AND ACCESS 6.1 Layouts and Geometrics
A Traffic Impact Assessment Report (March 2013) was prepared by WSP SA Civil and Structural Engineers. The traffic report addresses the proposed traffic generated by the first phase of the Riversands development, proposed road upgrading and circulation of traffic.
The traffic report recommends the following:- Access to the proposed development will be provided in 3 phases off the surrounding roads network. As a short term arrangement, regional access to the proposed development will be gained at grade, from Rose Road. The medium term arrangement will be implemented in the event of the William Nicol upgrades not being completed at the time of implementation of Phase I. The proposal entails the construction of the North-South Link up to Erling Road in order to provide regional access to and from the development. The long term access provision plan entails the construction of William Nicol/Rose and the extension of the North-South Link from Mnandi Road to Erling Road. It is our clients intention to implement the medium term arrangement which involves the construction of the North-South Link from Erling Road to Mnandi Road with the development of the first phase (Jukskei View Ext 13, Ext 15 and Ext 16) of Riversands, providing regional access to the Riversands development. A section of Rose Road will also be constructed from the North-South Link providing access to Riverside View Ext 13 and Riverside View Ext16. The North-South Link from Erling Road to Mnandi Road and a section of Rose Road will be constructed as per Johannesburg Roads Agency standards and will be handed over to Council upon completion. It should be noted that the Traffic Impact Study referred to above only covers the first phase of the development, traffic reports will be submitted as and when the townships forming the Riversands development are developed.
10
The roads to be constructed within the proposed township boundaries forming the first phase of the Riversands development will remain private and therefore maintained by the Section 21 Company/Holding Company to be registered for the development.
6.2 Pavement Design The Council Roads pavement layer design is proposed as follows:-
30mm Type TPA Medium Asphalt, 150mm G1 Quality Crusher run compacted to 88% apparent density, 150mm Imported C4 Subbase Compacted to 95% mod Aashto (G5min), 150mm Imported Subgrade Compacted to 93% mod Aashto (G7min), 150mm In-situ Roadbed compacted to 90% mod Aashto (G7min)
The Road will be designed in accordance with “The Guidelines for the provision of Engineering Services and Amenities in Township Development”.
6.3 Materials and Construction It is proposed that the materials, construction and testing of the roads should comply with the SABS 1200 Specifications, except insofar as the Johannesburg Roads Agency and Gautrans requires these varied. Kerbing will consist of Mountable (fig 8c) and Barrier (fig 3) on the intersections. The kerbing will be in accordance with SABS 927.
6.4 Bulk Contributions It is our client’s intention to apply for external bulk contributions offset, for construction of external Council Roads to service individual townships forming the Riversands Development and improvement of the road network within the area.
7. STORM WATER 7.1 Layout and Design
There is no formal stormwater reticulation system within the catchment areas of the proposed development, however a formal stormwater reticulation system will be constructed within the developments boundaries (within each township forming the Riversands development and within the proposed new road reserves).
Each Township forming the proposed development will be provided with a stormwater connection to the external Council system, the Council stormwater system will gravitate to discharge stormwater within the floodline area with erosion control and protection measures. The stormwater reticulation system within the Council`s road reserve will be constructed to Johannesburg Roads Agency`s standards, it will be designed and constructed to accommodated flows within the relevant catchment areas. The stormwater reticulation system to be constructed within individual townships forming the Riversands development will remain private and therefore maintained by the section 21 Company or holding company to be registered for the relevant development.
11
7.2 Storm Water Attenuation Each Township forming the first phase of the Riversands development will provide stormwater attenuation system within the development boundaries. The attenuation system will be designed as per the guidelines given by the Johannesburg Roads Agency, where the discharge post development will be equal or less than the discharge pre- development. The design will incorporate the 1:25 and 1:5 year recurrence interval with a 15-minute storage capacity. The attenuation system will be provided within the floodline area, the attenuation Report will be submitted separately to Johannesburg Roads Agency for comment and approval. The Section 21 Company or Body Cooperate will maintain the proposed developments stormwater attenuation system.
7.3 Materials and Construction
It is proposed that the materials, construction and testing of the storm water system would comply with the SABS 1200 Series of Specifications.
7.4 Bulk Contributions It is our client’s intention to apply for external bulk contributions offset, for construction of the external Council stormwater reticulation system providing connection to individual townships forming the Riversands Development and improvement of the road network within the area.
Telkom and Electrical services are not included in this Report.
12
8 ANNEXURE
DiepslootReservoir No1 & 225000 kl + 25000klTWL=1515BWL=1510
DainfernReservoir25000 klTWL=1439BWL=1434
Blue HillsReservoir13000 klTWL=1565BWL=1560
Blue HillsTower1200 klTWL=1590BWL=1585
RW Connection B(R33)
FOURWAYS EXT.34
FOURWAYS EXT.33
FOURWAYS EXT.25FOURWAYS EXT.25
DAINFERN EXT.16
RIVERGLEN
DAINFERN EXT.19
FOURWAYS EXT.40
WITKOPPEN
BROADACRES EXT.7
UNSET
STRATFORD
DAINFERN EXT.20
BROADACRES EXT.9
BROADACRES EXT.8
DAINFERN EXT.13
BROADACRES EXT.3
BROADACRES PARK EXT.10
DAINFERN RIDGE
DAINFERN
DAINFERN EXT.2
DAINFERN EXT.5
DAINFERN EXT.6
DAINFERN EXT.7
DAINFERN EXT.8
DAINFERN EXT.9
DAINFERN EXT.10
DAINFERN EXT.11
KENGIES EXT.8
KENGIES EXT.10FOURWAYS EXT.39
KENGIES EXT.17
DAINFERN EXT.14
DAINFERN EXT.15
DAINFERN EXT.17
BROADACRES EXT.1BROADACRES PARK EXT.1
FOURWAYS EXT.15
FOURWAYS EXT.20
FOURWAYS EXT.8
FOURWAYS EXT.10
FOURWAYS EXT.18
WITKOPPEN EXT.3MAROELADAL EXT.8
MAROELADAL EXT.13
NEEDWOOD
NEEDWOOD EXT.4FOURWAYS EXT.30
BEVERLEY EXT.10
BEVERLEY EXT.15
BEVERLEY EXT.39
BEVERLEY EXT.43
BEVERLEY EXT.40
BEVERLEY EXT.1FOURWAYS EXT.27
BEVERLEY EXT.25
BEVERLEY EXT.17
BEVERLEY EXT.48
BEVERLEY EXT.44
BEVERLEY EXT.46
BEVERLEY EXT.22
BEVERLEY EXT.59
FOURWAYS EXT.37
GLENFERNESS A.H. EXT.2
BEVERLEY EXT.27BEVERLEY EXT.31
LONE HILL EXT.23
LONE HILL EXT.21
LONE HILL EXT.12
BEVERLEY EXT.37BEVERLEY EXT.56
BEVERLEY EXT.6
BEVERLEY EXT.13
BEVERLEY EXT.19
BEVERLEY EXT.24
LONE HILL EXT.10
BEVERLEY EXT.3
BEVERLEY EXT.4
BEVERLEY EXT.21
BEVERLEY EXT.7
BEVERLEY EXT.8
EXT. 17
EXT. 15
RIVERSANDS
DIEPSLOOT WES EXT.6
DIEPSLOOT WES EXT.7
TANGANANI
DIEPSLOOT WES EXT.8
DIEPSLOOT WES
EXT 3
EXT 4
EXT 5
EXT 6
EXT 8
EXT 10
EXT 9
EXT
EXT 2
EXT 1
EXT. 16 EXT. 18
EXT. 13
DIEPSLOOT WES EXT.3
DIEPSLOOT WES EXT.1
DIEPSLOOT WES EXT.2
DIEPSLOOT WES EXT.9
DIEPSLOOT WES EXT.9
EXT. 14
MP - BH9.9F
MP - BH5.10160Ø
MP - BH5.10160Ø
MP - BH5.10160Ø
MP - BH5.9200Ø
MP - BH5.8200Ø
MP - BH5.10160Ø
MP - BH5.7250Ø
MP - BH17.5400Ø
FM - BH14.1450Ø
MP - BH10.7650Ø
MP - BH17.4200Ø
MP - BH17.3200Ø
MP - BH17.2200Ø
MP - BH17.1355Ø
MP - BH16.3200Ø
MP - BH16.4A
MP - BH16.4B
MP - BH16.4C
MP - BH16.4D
MP - BH16.2250Ø
MP - BH15.1650Ø
MP - BH10.7650Ø
MP - BH15.2400Ø
MP - BH10.7650Ø
MP - BH15.3355Ø
MP - BH16.1
MP - BH10.9
MP - BH9.4
MP - BH9.4
MP - BH19.2200Ø
MP - BH19.3200Ø
MP - BH18.1355Ø
MP - BH19.1200Ø
MP - BH13.7C
MP - BH13.7A
MP - BH13.7B
FM - BH13.5200Ø
FM - BH13.6200Ø
MP - BH8.4CMP - BH8.4B
MP - BH8.2300Ø
MP - BH8.1500Ø
MP - BH6.1300Ø
MP - BH6.2250Ø
MP - BH6.3200Ø
MP - BH8.3250Ø
MP - BH8.4D
MP - BH6.5
MP - BH6.5450Ø
MP - BH7.2160Ø
MP - BH7.1200Ø
FM - BH12.2400Ø
FM - BH13.3315Ø
MP - BH10.41000Ø
MP - BH1.3250Ø
MP - BH1.5110Ø
MP - BH9.4500Ø
MP - BH9.6315Ø
MP - BH9.9A
MP - BH9.9B
MP - BH9.9C
MP - BH9.5450Ø
MP - BH1.2350Ø
MP - BH1.4200Ø
MP - BH8.4A
MP - BH1.1400Ø
MP - BH9.8200Ø
FM - BH13.9250Ø
FM - BH13.8400Ø
FM - BH13.1600Ø
FM - BH13.2450ØFM - BH13.4
315Ø
MP - BH10.6750Ø
MP - BH10.5900Ø
MP - BH9.9D
MP - BH19.4
FM - BH14.4
FM - BH14.2
MP - BH9.5450Ø
MP - BH9.9E
FM - BH14.3200Ø
MP - BH6.4160Ø
MP - BH4.5450Ø
MP - BH8.4F
MP - BH8.4E
MP - BH4.7A
MP - BH4.7BMP - BH4.6
400Ø
MP - BH2.2500Ø
MP - BH5.12200Ø
MP - BH5.14160Ø
MP - BH4.2250Ø
MP - BH5.11250Ø
MP - BH5.6300Ø
MP - BH5.5300Ø
MP - BH5.5300Ø
MP - BH5.4350Ø
MP - BH5.13250Ø
MP - BH5.11200Ø
MP - BH4.4250Ø
MP - BH2.2500Ø
MP - BH4.3500Ø
MP - BH4.3500Ø
MP - BH3.1
MP - BH2.3
RIVERGLEN 4
RIVERGLEN 1 & 2
DAINFERN 23
DAINFERN 21
RIETVALLEI
PORCUPINE PARK
TANGANANI
RIVERSANDS
DIEPSLOOT SOUTH
FUTURE
REMAINDER OFDIEPSLOOT
DAINFERN & RIVERGLENEXTENSIONS
BRYANSTON RESERVOIR - MULBARTON/FOUNTAIN PRV
OLIVEDALE RESERVOIR - FIRST PRV
Diepsloot Reservoir
Diepsloot Reservoir - Diepsloot PRV
RW33 Direct (Pretoriusrand Reservoir)
Pretoriusrand Reservoir (Outside UDZ)
Diepsloot Reservoir (Outside UDZ)
Diepsloot Reservoir - Saddlebrook PRV (Outside UDZ)
Diepsloot Reservoir - Riversands PRV
Dainfern Reservoir (Outside UDZ)ERAND LL RES
(or Proposed Witpoortjie Res) -PRV 17/18/33
OLIVEDALE RESERVOIR - SIXTH PRV
Dainfern Reservoir
Diepsloot Reservoir - Dainfern PRV
Olivedale Reservoir
ERAND LL RES Proposed Witpoortjie Res) -
PRV 15/16
ERAND LL RES - PRV 14/20/32 (or Proposed Witpoortjie Res)
ERAND LL RES - PRV 13
BRYANSTON RESERVOIR - BUSHWILLOW PRV
OLIVEDALE RESERVOIR - CEDAR PRV
OLIVEDALE RESERVOIR - WINDSOR PRVBryanston Reservoir - Dainfern PRV
ERAND LL RES - PRV 19/34
RW33 (600mmØ)
RW33 (1000mmØ)
Supply to RW33 Direct Feed Sub-District
Sup
ply
from
Oliv
edal
e
Res
ervo
ir cl
osed
off
Investigation into Bulk Water Supplyfor the Diepsloot Corridor Developments
Figure 76_W1 AApril 2009
Detail 2
Detail 1
SeeDetail 2
SeeDetail 1a
Detail 1a
Proposed Water Districts andBulk Water Supply
SeeDetail 1
13
84
\ J
HB
_IM
QS
_W
ork
\SP
_In
vest
iga
tion
s\2
00
9-0
1_
Die
psl
oo
t_D
eve
lop
me
nts
\...
...
PRV
> 600
Proposed Reservoir
Future System :
Future Master Plan Items
Reservoir
Proposed PRV
Proposed RW Connection
Proposed Tower
Proposed Bulk Supply
Tower
Proposed Close Valve
Future Main
Future Schematic Pipes
Bulk Supply
Proposed FCV
Proposed Pump Station
Closed Valve
> 500 <= 600
> 450 <= 500
> 400 <= 450
> 350 <= 400
> 300 <= 350
> 200 <= 250
> 150 <= 200
> 100 <= 150
<= 100
Pipe Diameter Legend
> 250 <= 300
Proposed Developments(Diepsloot Corridor)
Existing System :
Diepsloot Reservoir - Dainfern PRV
Olivedale Reservoir
ERAND LL RES (Proposed Witpoortjie Res) - PRV 15/16
ERAND LL RES - PRV 14/20/32 (or Proposed Witpoortjie Res)
ERAND LL RES - PRV 13
BRYANSTON RESERVOIR - BUSHWILLOW PRV
OLIVEDALE RESERVOIR - CEDAR PRV
OLIVEDALE RESERVOIR - WINDSOR PRV
Bryanston Reservoir - Dainfern PRV
ERAND LL RES - PRV 19/34
COJ Boundary
Proposed Water Districts
Legend :Urban Development Boundary
Diepsloot Reservoir
RW33 Direct (Pretoriusrand Reservoir)
Pretoriusrand Reservoir (Outside UDZ)
Diepsloot Reservoir (Outside UDZ)
Diepsloot Reservoir - Saddlebrook PRV (Outside UDZ)
Diepsloot Reservoir - Riversands PRV
Dainfern Reservoir (Outside UDZ)
ERAND LL RES (or Proposed Witpoortjie Res) - PRV 17/18/33
OLIVEDALE RESERVOIR - SIXTH PRV
Dainfern Reservoir
Diepsloot Reservoir - Diepsloot PRV
> 500 <= 600
> 450 <= 500
> 400 <= 450
> 350 <= 400
> 300 <= 350
> 200 <= 250
> 150 <= 200
> 100 <= 150
<= 100
Pipe Diameter Legend
> 250 <= 300
> 600
Proposed Developments(Diepsloot Corridor)
Future Master Plan Items
Reservoir
Proposed Water Districts
Proposed RW Connection
Legend :Urban Development Boundary Existing System :
Proposed Tower
Proposed Bulk Supply
Tower
Proposed Close Valve
Future Main
Future Schematic Pipes
Bulk Supply
Proposed FCV
Proposed Pump Station
Diepsloot Reservoir
RW33 Direct (Pretoriusrand Reservoir)
Pretoriusrand Reservoir (Outside UDZ)
Diepsloot Reservoir (Outside UDZ)
Diepsloot Reservoir - Saddlebrook PRV (Outside UDZ)
Diepsloot Reservoir - Riversands PRV
Dainfern Reservoir (Outside UDZ)
ERAND LL RES (or Proposed Witpoortjie Res) - PRV 17/18/33
OLIVEDALE RESERVOIR - SIXTH PRV
Dainfern Reservoir
Diepsloot Reservoir - Dainfern PRV
Olivedale Reservoir
ERAND LL RES (Proposed Witpoortjie Res) - PRV 15/16
Diepsloot Reservoir - Diepsloot PRV
ERAND LL RES - PRV 14/20/32 (or Proposed Witpoortjie Res)
ERAND LL RES - PRV 13
BRYANSTON RESERVOIR - BUSHWILLOW PRV
OLIVEDALE RESERVOIR - CEDAR PRV
OLIVEDALE RESERVOIR - WINDSOR PRV
Bryanston Reservoir - Dainfern PRV
ERAND LL RES - PRV 19/34
Closed Valve
COJ Boundary
PRV
Future System :
Proposed PRV
Proposed Reservoir
DiepslootReservoir No1 & 225000 kl + 25000klTWL=1515BWL=1510
DainfernReservoir25000 klTWL=1439BWL=1434
Blue HillsReservoir13000 klTWL=1565BWL=1560
Blue HillsTower1200 klTWL=1590BWL=1585
RW Connection B(R33)
MP - BH9.9F
MP - BH5.10160Ø
MP - BH5.10160Ø
MP - BH5.10160Ø
MP - BH5.9200Ø
MP - BH5.8200Ø
MP - BH5.10160Ø
MP - BH5.7250Ø
MP - BH17.5400Ø
FM - BH14.1450Ø
MP - BH10.7650Ø
MP - BH17.4200Ø
MP - BH17.3200Ø
MP - BH17.2200Ø
MP - BH17.1355Ø
MP - BH16.3200Ø
MP - BH16.4A
MP - BH16.4B
MP - BH16.4C
MP - BH16.4D
MP - BH16.2250Ø
MP - BH15.1650Ø
MP - BH10.7650Ø
MP - BH15.2400Ø
MP - BH10.7650Ø
MP - BH15.3355Ø
MP - BH16.1
MP - BH10.9
MP - BH9.4
MP - BH9.4
RIVERGLEN 4
RIVERGLEN 1 & 2
DAINFERN 23
DAINFERN 21
RIETVALLEI
PORCUPINE PARK
TANGANANI
RIVERSANDS
DIEPSLOOT SOUTH
FUTURE
REMAINDER OFDIEPSLOOT
DAINFERN & RIVERGLENEXTENSIONS
BRYANSTON RESERVOIR - MULBARTON/FOUNTAIN PRV
OLIVEDALE RESERVOIR - FIRST PRV
Blue HillsTower1200 klTWL=1590BWL=1585
RW Connection B(R33)
DainfernReservoir25000 klTWL=1439BWL=1434
DiepslootReservoir No 225000 klTWL=1515BWL=1510
RW Connection(R33)
DiepslootReservoir No 125000 klTWL=1515BWL=1510
Blue HillsTower1200 klTWL=1590BWL=1585
Blue HillsReservoir13000 klTWL=1565BWL=1560
MP - BH10.41000Ø
MP - BH10.2A800Ø
MP - BH10.2A1000Ø
MP - BH10.1
MP - BH10.3B
MP - BH10.3A
MP - BH11.1600Ø
MP - BH11.2
MP - BH10.41000Ø
FM - BH12.2400Ø
FM
- B
H1
3.5
MP - BH10.7650Ø
MP - BH16.2250Ø
MP - BH15.1650Ø
MP - BH15.2400Ø
MP - BH10.7650Ø
MP - BH17.1355Ø
MP - BH16.1
MP - BH10.8
MP - BH2.2 MP - BH3.1
MP - BH2.3
MP - BH10.9
MP - BH5.3450ØMP - BH5.1
500Ø
MP - BH5.2300Ø
MP
- BH
4.1
600Ø
MP - BH2.2500Ø
MP - BH4.3500Ø
MP - BH4.2250Ø
MP - BH5.11250Ø
MP - BH5.4350Ø
MP - BH5.4350Ø
MP - BH5.11200Ø
MP - BH5.13250Ø
To RW33 Direct Feed Sub-District
RW33 (1000mmØ)
Supply to Diepsloot Reservoir -Dainfern PRV Sub-District
DainfernReservoir25000 klTWL=1439BWL=1434
DiepslootReservoir No 225000 klTWL=1515BWL=1510
RW Connection(R33)
DiepslootReservoir No 125000 klTWL=1515BWL=1510
Blue HillsTower1200 klTWL=1590BWL=1585
Blue HillsReservoir13000 klTWL=1565BWL=1560
MP - BH10.41000Ø
MP - BH10.2A800Ø
MP - BH10.2A1000Ø
MP - BH10.1
MP - BH10.3B
MP - BH10.3A
MP - BH11.1600Ø
MP - BH11.2
MP - BH10.41000Ø
FM - BH12.2400Ø
FM
- B
H1
3.5
MP - BH10.7650Ø
MP - BH16.2250Ø
MP - BH15.1650Ø
MP - BH15.2400Ø
MP - BH10.7650Ø
MP - BH17.1355Ø
MP - BH16.1
MP - BH10.8
MP - BH2.2 MP - BH3.1
MP - BH2.3
MP - BH10.9
MP - BH5.3450ØMP - BH5.1
500Ø
MP - BH5.2300Ø
MP
- BH
4.1
600Ø
MP - BH2.2500Ø
MP - BH4.3500Ø
MP - BH4.2250Ø
MP - BH5.11250Ø
MP - BH5.4350Ø
MP - BH5.4350Ø
MP - BH5.11200Ø
MP - BH5.13250Ø
To RW33 Direct Feed Sub-District
RW33 (1000mmØ)
Supply to Diepsloot Reservoir -Dainfern PRV Sub-District
MP - BH10.41000Ø
MP - BH11.2M
P - BH11.1
600Ø
MP - BH10.4
1000Ø
FM - BH12.2
400Ø
MP - BH10.1RW Connection(R33)
MP -
BH10.2A
1000Ø
MP - BH12.1
MP - BH10.2B
RW33 (600mmØ)
RW33 (1000mmØ)
Supply to RW33 Direct Feed Sub-District
Sup
ply
from
Oliv
edal
e
Res
ervo
ir cl
osed
off
Scale 1:12500
0 62.5 125 250 500 1000 meters
125/388 JR
RE/11/388 JR
185/388 JR
127/388 JR
1
2
3CHRISTIAAN ROAD/WEG
WIL
LIA
M N
ICO
L
DO
RO
TH
Y A
VE
NU
E
188/388 JR
113/388 JR
8
11
HIG
HW
AY
RO
AD
RE/15/388 JR
15
16
18
19
20
RIVER ROAD
SCHOOL ROAD
190/388 JR
205/388 JR
REM/154/388 JR
30m ROAD
206/388 JR
RIVER
PR
OP
OS
ED
PR
OV
INC
IAL
RO
AD
K46
FUTURE PROVINCIAL ROUTE PWV 5
FUTURE PROVINCIAL ROUTE PWV 5
PR
OP
OS
ED
PR
OV
INC
IAL
RO
AD
K46
PR
OP
OS
ED
PR
OV
INC
IAL
RO
AD
K46
PRIVATE STREET 11m
PUBLIC STREET 30m
PRIVATE S
TREET 16m
PRIVATE STREET 11m
PRIVATE STREET 11m
PRIVATE STREET 11m
30m P
UB
LIC S
TR
EE
T
PRIVATE STREET 11m
PRIVATE STREET 13m
PR
IVA
TE
ST
RE
ET
11m
PRIVATE STREET 16m
PR
IVA
TE
STREET
ST
RE
ET
ROSE STREET 40m
20m P
RIV
AT
E S
TR
EE
T
30m P
UB
LIC S
TR
EE
T
30m P
UB
LIC S
TRE
ET
20m P
RIV
AT
E
PR
IVA
TE
ST
RE
ET
20m
PRIVATE STREET 11m
PR
IVA
TE
ST
RE
ET
13m
PRIVATE STREET 20m
20m
PRIV
ATE
PRIVATE STREET 13m
STREET 11m
11m
PR
IVA
TE S
TRE
ET
PR
IVA
TE
ST
RE
ET
11m
PRIVATE STREET 11m
PRIVATE STREET 11m
11m
PR
IVA
TE
ST
RE
ET
PRIVATE STREET 11m
PRIVATE STREET 11m
PR
IVA
TE
ST
RE
ET
13m
PRIVATE STREET 13m
PRIV
ATE
STR
EET
13m
PRIV
ATE
STR
EET
11m
PRIV
ATE
STR
EET
11m
PRIVATE STREET 11m
PRIV
ATE
ST11
m
PRIV
ATE
STR
EET
13m
PRIVATE STREET 11m
PR
IVA
TE
ST
RE
ET
11m
11m P
RIV
AT
E S
T
PRIVATE STREET 11m
PR
IVA
TE
ST
RE
ET
11m
ST 13m
PU
BLIC
ST
RE
ET
30m
PRIVATE STREET 16m
PRIVATE STREET 30m
PRIVATE STREET 20m
PR
IVA
TE
ST
RE
ET
30m
PRIVATE STREET 11m
11m PRIVATE STREET
PRIVATE STREET 11m
PR
IVA
TE
ST
RE
ET
11m
PR
IVA
TE
ST
RE
ET
11m
PR
IVA
TE
ST
RE
ET
11mPRIV
ATE STREET 1
1m
PR
IVA
TE
ST
RE
ET
11m
PRIVATE STREET 11m
PRIVATE STREET 11m
13m P
RIV
AT
E S
TR
EE
T
11m PRIVATE STREET
PRIVATE STREET 13m
PRIVATE STREET 11m
PR
IVA
TE
ST
RE
ET
13m
PRIVATE STREET 11m
PU
BLIC
ST
RE
ET
30m
PRIVATE STREET 11m
PRIVATE STREET 13m
PRIVATE STREET 11m
PRIVATE STREET
PRIVATE STREET 13m
PRIVATE STREET 11m
PRIVATE STREET 16m
PRIVATE STREET 16m
PRIVATE STREET 13m
PR
IVA
TE
ST
RE
ET
16m
PRIVATE STREET 13m
PRIVATE STREET 13m
PRIVATE STREET
PRIVATE STREET
PRIVATE STREET 11m
ST 13m13m
PR
IVA
TE
ST
RE
ET
PR
IVA
TE
ST
RE
ET
13m
PRIVATE S
TREET 11m
ROSE STREET 30m
11m
11m
11m
FU
TU
RE
K R
OU
TE
40
41
39
36
37
38
709
710
711
712
713
714
715
716
717
790
791
792 793 794 795
816
817818
819820
917
913
1084
1085
952
953
1065
1066
1067
1068
192 193
229
230
231
232
954955956
547
957
958
959960
961
962
963
964
965
966
967
1083
1368
1367
513
515 516 517518
204 205 206 207
208
209
54 55
132
486
487
488489
490 491492
493494 495
45 46 47
4849
5859
60 61 62
63
4243 44
505152
53
5657
98
99
126
1369
153
203
201
202
129
557
149
214
215
216
217
150
151
144
145
146
147
148
156
157
158
140141
142143
159
160
161162
163164
165166
167
168
169
170
171172
173174 175
176
177184
185
186
187188
189190
191
154
155
179
178
180181
182
183194 195196
197
198
199
200 152
1261
1262
1263
1264
218
1260
1252
1253
1254 1255
1277
1278127912801281
1282
1283
137138 139
219220
221222223
224225
226
227
228
556
12561257 1258 1259
1359
1333
1336
1343
239
240
241
2421332
1352
1353
1354
1355
1337
1338
1344
1345
1346
1364
236
237
2381350
1351
547
213
233234
235
463464465466467
468
469
470
471
472473
482483
484
526
527
537
13471348
13491365
210
211
212
450451
485512
514
547
1009
1040
1041
1055
1056
941
942
943
944
945
946
947
948
949
950
951
1042
1043
1044
1045
10461047
1048
1049
1050
1051
1052
1057
1058
1059
1060
1061
10621063
1064
1069
1076
1082
968
969
970
971
972
973
974
975
976
977
1070
1071
1072
1073
1074
1075
982
983
984
985
986
987
988
989
990
1005
1006
1007
1008 1010
1011
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1053
1054978
979
980
981
1077
993
991
992
994
1230
1242
1243
1244
1245
927
928
929930
931
932
933
934
935
936
937
938
939
940
997
998
999
1000
1001
1002
1003
1004
1012
1013
1014
1015
1016
1017
1018
1019
1020
10211022
1023
1024
1025
1026
1027
1081
1227
1228
1229
1265
1266
12671268
1269
1270
12711246
1247
1248
1249
1250
1251
1272
1273
1274
1275
1276
1284
1285
1362
1359
1359
1366
1220
1221
1222
1223
1224
1225
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1287
1288
1289
12901291
12921293
1359
1360
1200
1201
1359
1226
1286
1305
1306
1307
1308
1309
1321
1322
1323
1324
1325
13261327
1334
1335
1339
1340
1341
1342
1359
1361
1078
995996
1079
1080
1086
10871087
908
834835836
837
849850 851
860861862
863
874875 876
885886887
888
917
923
924
925
917
917
821 822
838
839840
841
842
843
844845
846
847848
864865
866
867
868
869870
871872
873
889890
891
917
718
719720
721722
723
724725 726 727
728729 730
892893
894895 896 897
909910
911912
914
754
829
605
606607
616
617
618619
631
735
736
737
738
739
740
741
742
755
756
757
758
759
760
830
855
856
880
881
926
852 853 854
857858859
877 878879
882883884
731732
733
734761
762
763
898 899900 901
902
903904
905906907
915
917
917
917
689690691693
771 772 773 774
781782783784785
919
920
921797 798 799
809810811812
823824 825
922
917
694695696697698699700701
702
703
704764
765766 767 768 769 770
786787788789
705
706
707
708
796
813814
815
56
75
8586
87
22232425
130
136
96
97
114
115 116 117 118 119 120
121122123124125
130
26272829303132333435
645
664
647648
665
666 667
681682
683
684686
630632
646
560
561
687688
748 749
775 776 777
778779780
803
916
917
918
917
743
744
745
746
747 750
751
752
753
804
805
800 801 802
806807808
826 827 828
831832833
685
1234
ATTENUATIONPONDS
131
15
77 78 79 80
818283
84
0,15ha
P.O.S.16
1718192021
562 563 564 565
585
586
587
588
589
590
591
592
608609 610
611
612613614615
620 621 622623
624
625626627628
629
639
917
917
593
594
595596
597598
599 600 601
602
603604
128
573 574575 576
577
578
579
580
581
582
583
584
674
675
917566 567 568 569 570
571 572
649650 651 652 653 654 655
656
668 669 670 671672 673
676677678679680
633 634 635636 637
638
640641642643644
657
658659660661662663
917
7 8 910 11
12
13
14
68 69 70 71 72 73 74
76127
66 67
88
89
90
91
134
135
496 497 498 499 500 501
502
503504
505506507508
509 510 511
548
549519
520521522
523524
525555
558
64 65
92
93
94
95
100 101 102 103 104
105 106
107
108109110111112113
130
130
403404
409 410
411412
413
414
427
428
443
444
445
446
447
448
552
452
453
454
455
456457458
459460461462
474475
476 477
478
479480481
528529 530
531 532
533534535536
551
405 406 407449
376377
381
382
419
420
415
416
417
418
421
422
423
424
425
426
429
430
431
378
379
380
433
432
434
435
436
437
438
439 440
441 442
538
539
540
541
542
543
550
283
284
285
286
287288
289
290
291
292
316
317
318319
320
321
358
359
360
361
362363
364
365 366367
368369
370
371
396
397
398
399
400
401402
553
554
547
372408
547
272
273
274
275
276299
300
301
302
303305
307
308
309328
329
330
349
350
351
352
277
278
279
280
281
282293
294
295
296
297
298
310
311
312
313
314
315322
323
324
325
326
327
389
353
354
355
356
357
390
391
392
393
394
395
256
257
258
259
260
261
262
263
264
265
266
267
268
545
546
559
133
245
246
247
248
249
373
374
375
383
384
385
1163
1204
1205
1206
1207
1208
1209
12101211
547
547
243
244
1202
1203
12121213
12941295
1296
12971298
12991300
13011302
1303
1304
13101311
13121313
13141315
131613171318
13191320
13281329
1330
1331
1183
1191
10981099
11001101
1165
11661167
11781179
11801181
1182
11921193
11941195
1363
1359692
10891090
10911092
1093 1094 1095 1096 1097
11681169
11701171
1172
1173
11741175 1176 1177
119611971198
1199
1216
1217
1218
1219
11641214
1215
1119
250
251
252
253
254269270
271304306
331332 333
334335 336 337
338 339
340341342
343344
345346
347
348
11331134
11351136
1137
11381139
1140
1158
386
387
388
11591160
1161
1162 1359
547
547
1118
11051106
1107 1108 11091110
1111
1112
1113
1114
1115
1116
1117
1122 11231124 1125 1126
1127
1128
1129
1130
1131
11321141
1142
1143
1144
1145
114611471148
11491150
1151
11521153
1154
1155
11561157
1359
1102 1103 1104
1120
1121
1184
11851186
1187
1188
1189
1190
1359
1357
1358
1356
255
544
1:100 YEAR FLOODLINE
1:100 YEAR FLOODLINE
1:100 YEAR FLOODLINE
1:100 YEAR FLOODLINE
DO
RO
TH
Y A
VE
NU
E
FUTURE PROVINCIAL ROUTE PWV 5
OLD NORTHERN OUTFALL
DIE
PS
LOO
T T
UN
NE
L
OLD
NO
RT
HE
RN
OU
TF
ALL
DIEPSLOOT CONSOLIDATED BASIN(NORTHERN WWTW)
DIEPSLOOT PUMPED BASIN(FUTURE LANSERIA WWTW)
DIEPSLOOT WEST BASIN(NORTHERN WWTW)
A
D
B
C
E
F
DIE
PS
LOO
T B
RID
GE
July 2013
Riversands Bulk Sewer Outfalls
Figure SP311_S1
1346
_Joh
anne
sbur
g_A
d_H
oc...
.
Legend :
5m Contours
Existing Sewer System :
Manholes
Proposed Sewer System :
Future Schematic
Future Main
Bridge
Tunnel
Proposed Development
Sewer Reticulation( 160 unless otherwise shown)-<
Scale 1:10000
0 62.5 125 250 500 meters
Figure SP311_S1
Riversands Bulk Sewer Outfalls
13
9. DRAWINGS