16
RIVERSIDE VIEW EXT 13; EXT 15; EXT 16; (RIVERSANDS DEVELOPMENT PHASE 1) Situated On Portion 7, Part of Portion 38 & Portion 121 Of The Farm Diepsloot 388-JR OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ENGINEERING SERVICES AND SERVICE AGREEMENTS. Prepared for Prepared by C-PLAN CIVIL ENGINEERS (Pty) Ltd 459 Ontdekkers Road Florida Hills Roodepoort PO Box 6622 Westgate 1734 Tel (011) 472-2277 Fax (011) 472-2305 Ref: -13516 AUGUST `13

OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

RIVERSIDE VIEW EXT 13; EXT 15; EXT 16; (RIVERSANDS DEVELOPMENT PHASE 1)

Situated On Portion 7, Part of Portion 38 & Portion 121 Of The Farm Diepsloot 388-JR

OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ENGINEERING SERVICES AND SERVICE AGREEMENTS.

Prepared for

Prepared by

C-PLAN CIVIL ENGINEERS (Pty) Ltd 459 Ontdekkers Road Florida Hills Roodepoort PO Box 6622 Westgate 1734 Tel (011) 472-2277 Fax (011) 472-2305 Ref: -13516 AUGUST `13

Page 2: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

2

CONTENTS PAGE 1. Scope of Report 3 2. Description of Township 3

2.1 Locality 3 2.2 Layout 3 2.3 Description 4 2.4 Existing Services 4

3. Design Guidelines 4 4. Water Reticulation 5

4.1 Layout and Design 5 4.2 Materials and Construction 6 4.3 Conclusion 6 4.4 Bulk Contributions 6

5. Sewer Reticulation 7

5.1 Layout and Design 7 5.2 Materials and Construction 7 5.3 Conclusion 7 5.4 Bulk Contributions 7

6. Roads 8

6.1 Layout and Geometrics 8 6.2 Pavement Design 10 6.3 Materials and Construction 10 6.4 Bulk Contributions 10

7. Storm water 10

7.1 Layout and Design 10 7.2 Storm water Attenuation 11 7.3 Material and Construction 11 7.4 Estimate Costs 11

8. Annexure 12 8.1 GLS Consulting Water Reticulation Master Plan Figure BHW 5.2 8.2 GLS Consulting Sewer Reticulation Master Plan Figure SP311_S1 8.3 GLS Consulting Sewer Reticulation Master Plan Figure DSP 6.1 9. Drawings 13 Locality 13516-100-C01 Locality- Orthophoto 13516-100-C02 Water Reticulation 13516-200-P01 Sewer Reticulation 13516-300-P01 Riversands Access Provision (Layout prepared by WSP SA) Figure 3A

Page 3: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

3

1. SCOPE OF REPORT

This Report deals with the provision of water reticulation, sewer reticulation, roads and stormwater drainage for the proposed Riversands development situated on Portion 7, Portion 36, Portion 37, Portion 38 and Portion 121 of the Farm Diepsloot 388-JR, in Randburg, within the City of Johannesburg`s Metropolitan Municipal boundary in the Gauteng Province. Provision of the Electrical Reticulation has not been dealt with in this Report.

2. TOWNSHIP DESCRIPTION

2.1 Locality The proposed development is situated approximately 2.5km north of the Dainfern Township and approximately 1.3km southeast of the Diepsloot Township.

The Riversands Development is bounded by: - William Nicol Drive (Road K46) along the western boundary, Portion 1, 2, 3, 4 and 131 of the Farm Zevenfontein 407-JR along the southern

boundary, Remainder of Portion 205 and Portion 205 of the Farm Diepsloot 388 JR along the

eastern boundary, Portion 111, 112, 113 and 118 of the Farm Diepsloot 388-JR along the northern

boundary.

2.2 Layout It is our client’s intention to establish a mixed land use development referred to as the Riversands development. The development will comprise of 6 townships (refer to table below). The proposed townships will be phased as per the tables below.

Riversands Phase 1

Riverside View Township Zoning

Riverside View Ext 13 “Business”

Riverside View Ext 15 “Educational”

Riverside View Ext 16 “Business”

Future Riversands Townships

Riverside View Township Zoning

Riverside View Ext 14 “Industrial & Residential 3”

Riverside View Ext 17 “Educational”

Riverside View Ext 18 “Industrial”

Page 4: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

4

2.3 Description Some of the stands forming the proposed development boundary are currently zoned agricultural and are equipped with the relevant agricultural buildings. The site is traversed by a river along the northern portion and central portion as shown on layout. A few large trees and veldt grass cover the site generally but a large number of concentrated trees are found along the river that traverses the site in the middle as shown. The sites elevation varies between 1417.000m to 1359.000m and 1419.000m The total extent of the Riversands development measures 221.21ha (including existing and proposed road reserves, open spaces/parks and the floodline areas with the relevant buffers).

2.4 Existing Services Water: There is an existing 600mm-diameter Rand Water pipe 3.5km north of the proposed development, as shown on GLS master plan Figure BHW 5.2. Sewer: There is an existing 1500-diameter sewer outfall across the southern portion of the site as shown on layout, an existing 2500-diameter Dainfern Outfall 1.3km west of the proposed development and the northern sewer treatment works approximately 3.0km in the northwesterly direction from the proposed development. Storm Water: There is no formal stormwater system within the catchment areas of the proposed development, however a river traverses the site as shown on layout.

3. DESIGN GUIDELINES

The Design of the Township’s services will be based on the Design Principles in the “Guidelines for the Provision of Engineering Services and Amenities in Residential Township Development” published by the Department of Community Development and to the City of Johannesburg’s requirements for Engineering Services. A competent contractor through acceptable tender process will install all services. The General Conditions for the Works of Civil Engineering Construction, Standard Specification SABS 1200 and relevant particular Specifications will pertain to the contract.

Page 5: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

5

4. WATER RETICULATION 4.1 Layout and Design

The layout of the existing Council water reticulation system and the proposed tie in for the proposed developments is shown on layout 13516-200-C01 and the master plan layout Figure BHW 5.2 prepared by GLS Consulting. A water reticulation master plan report (JWAT-C-0160-01-001209) was prepared for the Blue Hills and Diepsloot Corridor Developments (where the proposed development is situated) by GLS Consulting Engineers. As per the master plan Report, the Diespsloot Corridor Developments will be supplied from a new bulk water main that needs to be constructed from the existing 600mm-diameter H33 Rand Water bulk water main situated +/-3.5km north of the proposed development to the proposed future Dainfern reservoir, as shown on Figure BHW 5.2 (GLS layout attached). The master plan Report recommends that the proposed new 1000mm-diameter bulk water main be extended further south along Gymkana Road, turning west along the south-western boundary of Portion 26 & Portion 28 of the Farm Diepsloot 388-JR (gravel road), the size will then decrease to a 900mm-diameter bulk water main. The water pipe will be extended further south along Knopieslaagte Road with the change in pipe sizes as per the master plan layout till it passes the northern boundary of the site where a 450mm-diameter connection will be provided for proposed Township forming the Riversands development. The Report further recommends that the bulk main be extended towards the southern direction to supply the future Dainfern reservoir, the reservoir will further supply the future townships between the existing Diepsloot and Dainfern township. Bigen Africa Consulting Engineers on behalf of the Steyn City Development have prepared preliminary Council bulk water layouts and are in the process of designing and subsequently constructing the bulk water main from the existing 600mm-diameter H33 Randwater bulk main to the future Riverglen/Dainfern township (Steyn City Development) as per Johannesburg Water`s master plan prepared by GLS Consulting. A 450mm-diameter bulk water connection will be provided for the proposed Riversands development where a bulk water connection will then be taken. A new Council water reticulation network will be constructed from the 450mm-diameter bulk water connection extending within the proposed development`s road reserve boundaries, ultimately providing water connections to the first phase of the Riversands Development (Riverside View Ext 13, Ext 15 & Ext 16). The proposed new water reticulation system to be constructed within the Riversands development will be designed and constructed to cater for future extensions forming the Riversands development as shown on layout 13516-200-C01.

Water reticulation pipes to be constructed and handed over to Johannesburg Water will be constructed to JW`s standards and will be handed over to Council upon completion. The water reticulation system to be constructed within the boundaries of the individual township`s

Page 6: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

6

forming the Riversands development will remain private and therefore maintained by the Section 21 Company or the Body Cooperate to be registered for the relevant Township.

Design Criteria:-

Riversands Phase 1

Riverside view Township

Zoning Developable Area

Bulk FAR

Average Annual Daily

Demand Riverside View

Ext 13 “Business” 12.64ha

@ 0.6 75 840m² 250 kl/d

Riverside View Ext 15

“Educational” 9.49ha @ 0.5

47 450m²

130 kl/d

Riverside View Ext 16

“Business” 23.52 @0.6

141 120m² 465 kl/d

Total demand 845 kl/day

Future Riversands Townships

Riverside view Township

Zoning Developable Area

Bulk FAR

Average Annual Daily

Demand Riverside View

Ext 14 “Industrial & Residential 3”

28.96ha & (4.1ha Res 3)

179 400m² (107 units-40u/ha)

505 kl/d

Riverside View Ext 17

“Industrial” 15.06ha @0.6

90 360m² 207 kl/d

Riverside View Ext 18

“Industrial” 88.83 @0.6

532 973m² 1 222 kl/d

Total demand 1 934 kl/day

Total Site Area : 232.3 ha (Riversands Development)

F.A.R / Density : As tabled above Hydrant Flow : 1500 l/min/hydrant @ (15m) Annual Daily Demand : 2779 kl/day (32.2 l/sec) Peak Factor : 3.0 Instantaneous Peak Demand : 96.5 l/sec 4.2 Materials and Construction

It is proposed that all materials, construction and testing of the water reticulation comply with Johannesburg Water (Pty) Ltd as well as the SABS Standards. All fire hydrants will meet the standard requirements of the Johannesburg Fire Department. The water reticulation pipelines will consist of Class 16 (SABS 1283), high impact uPVC pipes and steel fittings as per the latest Johannesburg Water Standards for the water main to be handed over to the Council.

Page 7: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

7

4.3 Conclusion. The Council bulk water reticulation system to be constructed under the Steyn City development will be designed and constructed as per Johannesburg Water`s master plan Report supplying proposed developments between the Diepsloot and Dainfern area, including the Riversands development. The bulk water infrastructure design by Bigen Africa under the Steyn City will in-cooperate the peak water demand of 96.5l/s required by the Riversands development, therefore the proposed Riversands development will not negatively affect the proposed bulk infrastructure to be constructed for future Diepsloot corridor developments.

4.4 Bulk Contributions It is our client’s intention to apply for external bulk contributions offset, for construction of the external water reticulation system to service individual townships forming the Riversands Development.

5. SEWER RETICULATION

5.1 Layout and Design The layout of the proposed sewerage reticulation is shown on layout no. 13516-300-P01, Figure DSP 6.1 & Figure SP311_S1.

There is no existing Council sewer reticulation system within the catchment areas of the proposed development; however a bulk infrastructure master plan was prepared for the catchment area by GLS Consulting Engineers. The Northern Waste Water Treatment Works is situated 2.8 km in the north westerly direction of the proposed development.

The master plan prepared by GLS Consulting recommends that a new 600mm-diameter Jukskei sewer outfall (DSP 10.1 – see Figure DSP6.1) be constructed along the river traversing the proposed Riversands development towards the westerly direction as shown on layout, where a new regional Diepsloot sewer pump station (DSP13.1) will be constructed to further pump effluents to the Northern Waste Water Works. The Diepsloot sewer pumpstation is currently under construction under the proposed Steyn City development (designed by Bigen Africa). The 600mm-diameter Jukskei outfall has been designed by Bigen Africa and will be constructed under the Steyn City development from the new Diepsloot pump station towards the easterly direction and will terminate as shown on layout.

As per the master plan, the proposed Riversands development will construct the Jukskei Outfall (DSP 10.1) as shown on layout (13516-300-P01) from the eastern boundary of the Riversands development, along the river to link in to the future Jukskei Outfall to be constructed under the development of Steyn City, as shown on layout.

GLS Consulting further recommends that a secondary 600mm-diameter sewer outfall pipe (Figure SP311_S1) be constructed approximately 250m south of the Jukskei sewer outfall, the recommended secondary outfall will then drain the Diepsloot consolidated basin to the Northern Waste Water treatment plant via the Old Northern Outfall.

Page 8: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

8

Due to secondary 600mm-diameter sewer outfall traversing the proposed development of Jukskei View Ext 15 (forming part of the Riversands development) and the proposed William Nicole/Rose Road interchange, it has been recommended that the secondary sewer outfall be moved +/- 200m further south as shown on layout, the outfall will now be in-cooperated into the proposed developments and protected by servitude.

The 600mm-diameter secondary outfall will be constructed under the first phase of the Riversands development, from the eastern boundary through the Riversands development boundaries to tie into the Old Northern Outfall. Item DSP23-1& 2 will also be constructed under the Riversands development and Township forming the Riversands development within that relevant catchment will tie into the proposed system as per the master plan. Connecting Council sewer pipe will be constructed from the proposed first phase (Jukskei View Ext 13, Ext 15 and Ext 16) of the Riversands development, linking to the sewer outfall pipe to be constructed as per the master plan. The sewer infrastructure to be constructed under the proposed development and handed over to Council will be constructed to Johannesburg Water standards and specification, the sewer reticulation system to be constructed within individual townships forming the proposed development will remain private and therefore maintained by the Section 21 Company or body corporate to register for the development.

Design Criteria:

Total Site Area : 232.3 ha. F.A.R / No of Units : As tabled above Average Sewage Discharge Phase 1 : 676 kl/d (Jukskei View Ext 13, Ext 15 & Ext 16) Future Township : 1238 kl/d Total Sewage Discharge : 22.2 l/s Peak Factor : 2.3 Peak Discharge : 51.06 l/s Design Flow : 67% Max Velocity : 2.500m/s at full flow (0.67D) 5.2 Materials and Construction

It is proposed that all materials, construction and testing of the sewer reticulation comply with Johannesburg Water (Pty) Ltd as well as the SABS Standards. Manholes will be a minimum 1050mm in diameter, pre-cast concrete, constructed of dolomitic type aggregate (SABS 558) Concrete Type manhole covers will be supplied.

Page 9: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

9

5.3 Conclusion The infrastructure for the Steyn City development is currently under construction and the bulk infrastructure including the construction of the proposed new 600mm-diameter Jukskei Outfall to be constructed to link to the Diepsloot pump station has been discussed with Johannesburg Water. The Diepsloot sewer pump station, pump line and the Jukskei outfall has been designed to accommodate sewer flows from the proposed township forming the Riversands development.

5.4 Bulk Contributions It is our client’s intention to apply for bulk contributions offset, for construction of the sewer reticulation infrastructure and bulk infrastructure to service individual townships forming the Riversands Development including the sewer catchment area for bulk infrastructure to be constructed under the development.

6. ROADS AND ACCESS 6.1 Layouts and Geometrics

A Traffic Impact Assessment Report (March 2013) was prepared by WSP SA Civil and Structural Engineers. The traffic report addresses the proposed traffic generated by the first phase of the Riversands development, proposed road upgrading and circulation of traffic.

The traffic report recommends the following:- Access to the proposed development will be provided in 3 phases off the surrounding roads network. As a short term arrangement, regional access to the proposed development will be gained at grade, from Rose Road. The medium term arrangement will be implemented in the event of the William Nicol upgrades not being completed at the time of implementation of Phase I. The proposal entails the construction of the North-South Link up to Erling Road in order to provide regional access to and from the development. The long term access provision plan entails the construction of William Nicol/Rose and the extension of the North-South Link from Mnandi Road to Erling Road. It is our clients intention to implement the medium term arrangement which involves the construction of the North-South Link from Erling Road to Mnandi Road with the development of the first phase (Jukskei View Ext 13, Ext 15 and Ext 16) of Riversands, providing regional access to the Riversands development. A section of Rose Road will also be constructed from the North-South Link providing access to Riverside View Ext 13 and Riverside View Ext16. The North-South Link from Erling Road to Mnandi Road and a section of Rose Road will be constructed as per Johannesburg Roads Agency standards and will be handed over to Council upon completion. It should be noted that the Traffic Impact Study referred to above only covers the first phase of the development, traffic reports will be submitted as and when the townships forming the Riversands development are developed.

Page 10: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

10

The roads to be constructed within the proposed township boundaries forming the first phase of the Riversands development will remain private and therefore maintained by the Section 21 Company/Holding Company to be registered for the development.

6.2 Pavement Design The Council Roads pavement layer design is proposed as follows:-

30mm Type TPA Medium Asphalt, 150mm G1 Quality Crusher run compacted to 88% apparent density, 150mm Imported C4 Subbase Compacted to 95% mod Aashto (G5min), 150mm Imported Subgrade Compacted to 93% mod Aashto (G7min), 150mm In-situ Roadbed compacted to 90% mod Aashto (G7min)

The Road will be designed in accordance with “The Guidelines for the provision of Engineering Services and Amenities in Township Development”.

6.3 Materials and Construction It is proposed that the materials, construction and testing of the roads should comply with the SABS 1200 Specifications, except insofar as the Johannesburg Roads Agency and Gautrans requires these varied. Kerbing will consist of Mountable (fig 8c) and Barrier (fig 3) on the intersections. The kerbing will be in accordance with SABS 927.

6.4 Bulk Contributions It is our client’s intention to apply for external bulk contributions offset, for construction of external Council Roads to service individual townships forming the Riversands Development and improvement of the road network within the area.

7. STORM WATER 7.1 Layout and Design

There is no formal stormwater reticulation system within the catchment areas of the proposed development, however a formal stormwater reticulation system will be constructed within the developments boundaries (within each township forming the Riversands development and within the proposed new road reserves).

Each Township forming the proposed development will be provided with a stormwater connection to the external Council system, the Council stormwater system will gravitate to discharge stormwater within the floodline area with erosion control and protection measures. The stormwater reticulation system within the Council`s road reserve will be constructed to Johannesburg Roads Agency`s standards, it will be designed and constructed to accommodated flows within the relevant catchment areas. The stormwater reticulation system to be constructed within individual townships forming the Riversands development will remain private and therefore maintained by the section 21 Company or holding company to be registered for the relevant development.

Page 11: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

11

7.2 Storm Water Attenuation Each Township forming the first phase of the Riversands development will provide stormwater attenuation system within the development boundaries. The attenuation system will be designed as per the guidelines given by the Johannesburg Roads Agency, where the discharge post development will be equal or less than the discharge pre- development. The design will incorporate the 1:25 and 1:5 year recurrence interval with a 15-minute storage capacity. The attenuation system will be provided within the floodline area, the attenuation Report will be submitted separately to Johannesburg Roads Agency for comment and approval. The Section 21 Company or Body Cooperate will maintain the proposed developments stormwater attenuation system.

7.3 Materials and Construction

It is proposed that the materials, construction and testing of the storm water system would comply with the SABS 1200 Series of Specifications.

7.4 Bulk Contributions It is our client’s intention to apply for external bulk contributions offset, for construction of the external Council stormwater reticulation system providing connection to individual townships forming the Riversands Development and improvement of the road network within the area.

Telkom and Electrical services are not included in this Report.

Page 12: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

12

8 ANNEXURE

Page 13: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

DiepslootReservoir No1 & 225000 kl + 25000klTWL=1515BWL=1510

DainfernReservoir25000 klTWL=1439BWL=1434

Blue HillsReservoir13000 klTWL=1565BWL=1560

Blue HillsTower1200 klTWL=1590BWL=1585

RW Connection B(R33)

FOURWAYS EXT.34

FOURWAYS EXT.33

FOURWAYS EXT.25FOURWAYS EXT.25

DAINFERN EXT.16

RIVERGLEN

DAINFERN EXT.19

FOURWAYS EXT.40

WITKOPPEN

BROADACRES EXT.7

UNSET

STRATFORD

DAINFERN EXT.20

BROADACRES EXT.9

BROADACRES EXT.8

DAINFERN EXT.13

BROADACRES EXT.3

BROADACRES PARK EXT.10

DAINFERN RIDGE

DAINFERN

DAINFERN EXT.2

DAINFERN EXT.5

DAINFERN EXT.6

DAINFERN EXT.7

DAINFERN EXT.8

DAINFERN EXT.9

DAINFERN EXT.10

DAINFERN EXT.11

KENGIES EXT.8

KENGIES EXT.10FOURWAYS EXT.39

KENGIES EXT.17

DAINFERN EXT.14

DAINFERN EXT.15

DAINFERN EXT.17

BROADACRES EXT.1BROADACRES PARK EXT.1

FOURWAYS EXT.15

FOURWAYS EXT.20

FOURWAYS EXT.8

FOURWAYS EXT.10

FOURWAYS EXT.18

WITKOPPEN EXT.3MAROELADAL EXT.8

MAROELADAL EXT.13

NEEDWOOD

NEEDWOOD EXT.4FOURWAYS EXT.30

BEVERLEY EXT.10

BEVERLEY EXT.15

BEVERLEY EXT.39

BEVERLEY EXT.43

BEVERLEY EXT.40

BEVERLEY EXT.1FOURWAYS EXT.27

BEVERLEY EXT.25

BEVERLEY EXT.17

BEVERLEY EXT.48

BEVERLEY EXT.44

BEVERLEY EXT.46

BEVERLEY EXT.22

BEVERLEY EXT.59

FOURWAYS EXT.37

GLENFERNESS A.H. EXT.2

BEVERLEY EXT.27BEVERLEY EXT.31

LONE HILL EXT.23

LONE HILL EXT.21

LONE HILL EXT.12

BEVERLEY EXT.37BEVERLEY EXT.56

BEVERLEY EXT.6

BEVERLEY EXT.13

BEVERLEY EXT.19

BEVERLEY EXT.24

LONE HILL EXT.10

BEVERLEY EXT.3

BEVERLEY EXT.4

BEVERLEY EXT.21

BEVERLEY EXT.7

BEVERLEY EXT.8

EXT. 17

EXT. 15

RIVERSANDS

DIEPSLOOT WES EXT.6

DIEPSLOOT WES EXT.7

TANGANANI

DIEPSLOOT WES EXT.8

DIEPSLOOT WES

EXT 3

EXT 4

EXT 5

EXT 6

EXT 8

EXT 10

EXT 9

EXT

EXT 2

EXT 1

EXT. 16 EXT. 18

EXT. 13

DIEPSLOOT WES EXT.3

DIEPSLOOT WES EXT.1

DIEPSLOOT WES EXT.2

DIEPSLOOT WES EXT.9

DIEPSLOOT WES EXT.9

EXT. 14

MP - BH9.9F

MP - BH5.10160Ø

MP - BH5.10160Ø

MP - BH5.10160Ø

MP - BH5.9200Ø

MP - BH5.8200Ø

MP - BH5.10160Ø

MP - BH5.7250Ø

MP - BH17.5400Ø

FM - BH14.1450Ø

MP - BH10.7650Ø

MP - BH17.4200Ø

MP - BH17.3200Ø

MP - BH17.2200Ø

MP - BH17.1355Ø

MP - BH16.3200Ø

MP - BH16.4A

MP - BH16.4B

MP - BH16.4C

MP - BH16.4D

MP - BH16.2250Ø

MP - BH15.1650Ø

MP - BH10.7650Ø

MP - BH15.2400Ø

MP - BH10.7650Ø

MP - BH15.3355Ø

MP - BH16.1

MP - BH10.9

MP - BH9.4

MP - BH9.4

MP - BH19.2200Ø

MP - BH19.3200Ø

MP - BH18.1355Ø

MP - BH19.1200Ø

MP - BH13.7C

MP - BH13.7A

MP - BH13.7B

FM - BH13.5200Ø

FM - BH13.6200Ø

MP - BH8.4CMP - BH8.4B

MP - BH8.2300Ø

MP - BH8.1500Ø

MP - BH6.1300Ø

MP - BH6.2250Ø

MP - BH6.3200Ø

MP - BH8.3250Ø

MP - BH8.4D

MP - BH6.5

MP - BH6.5450Ø

MP - BH7.2160Ø

MP - BH7.1200Ø

FM - BH12.2400Ø

FM - BH13.3315Ø

MP - BH10.41000Ø

MP - BH1.3250Ø

MP - BH1.5110Ø

MP - BH9.4500Ø

MP - BH9.6315Ø

MP - BH9.9A

MP - BH9.9B

MP - BH9.9C

MP - BH9.5450Ø

MP - BH1.2350Ø

MP - BH1.4200Ø

MP - BH8.4A

MP - BH1.1400Ø

MP - BH9.8200Ø

FM - BH13.9250Ø

FM - BH13.8400Ø

FM - BH13.1600Ø

FM - BH13.2450ØFM - BH13.4

315Ø

MP - BH10.6750Ø

MP - BH10.5900Ø

MP - BH9.9D

MP - BH19.4

FM - BH14.4

FM - BH14.2

MP - BH9.5450Ø

MP - BH9.9E

FM - BH14.3200Ø

MP - BH6.4160Ø

MP - BH4.5450Ø

MP - BH8.4F

MP - BH8.4E

MP - BH4.7A

MP - BH4.7BMP - BH4.6

400Ø

MP - BH2.2500Ø

MP - BH5.12200Ø

MP - BH5.14160Ø

MP - BH4.2250Ø

MP - BH5.11250Ø

MP - BH5.6300Ø

MP - BH5.5300Ø

MP - BH5.5300Ø

MP - BH5.4350Ø

MP - BH5.13250Ø

MP - BH5.11200Ø

MP - BH4.4250Ø

MP - BH2.2500Ø

MP - BH4.3500Ø

MP - BH4.3500Ø

MP - BH3.1

MP - BH2.3

RIVERGLEN 4

RIVERGLEN 1 & 2

DAINFERN 23

DAINFERN 21

RIETVALLEI

PORCUPINE PARK

TANGANANI

RIVERSANDS

DIEPSLOOT SOUTH

FUTURE

REMAINDER OFDIEPSLOOT

DAINFERN & RIVERGLENEXTENSIONS

BRYANSTON RESERVOIR - MULBARTON/FOUNTAIN PRV

OLIVEDALE RESERVOIR - FIRST PRV

Diepsloot Reservoir

Diepsloot Reservoir - Diepsloot PRV

RW33 Direct (Pretoriusrand Reservoir)

Pretoriusrand Reservoir (Outside UDZ)

Diepsloot Reservoir (Outside UDZ)

Diepsloot Reservoir - Saddlebrook PRV (Outside UDZ)

Diepsloot Reservoir - Riversands PRV

Dainfern Reservoir (Outside UDZ)ERAND LL RES

(or Proposed Witpoortjie Res) -PRV 17/18/33

OLIVEDALE RESERVOIR - SIXTH PRV

Dainfern Reservoir

Diepsloot Reservoir - Dainfern PRV

Olivedale Reservoir

ERAND LL RES Proposed Witpoortjie Res) -

PRV 15/16

ERAND LL RES - PRV 14/20/32 (or Proposed Witpoortjie Res)

ERAND LL RES - PRV 13

BRYANSTON RESERVOIR - BUSHWILLOW PRV

OLIVEDALE RESERVOIR - CEDAR PRV

OLIVEDALE RESERVOIR - WINDSOR PRVBryanston Reservoir - Dainfern PRV

ERAND LL RES - PRV 19/34

RW33 (600mmØ)

RW33 (1000mmØ)

Supply to RW33 Direct Feed Sub-District

Sup

ply

from

Oliv

edal

e

Res

ervo

ir cl

osed

off

Investigation into Bulk Water Supplyfor the Diepsloot Corridor Developments

Figure 76_W1 AApril 2009

Detail 2

Detail 1

SeeDetail 2

SeeDetail 1a

Detail 1a

Proposed Water Districts andBulk Water Supply

SeeDetail 1

13

84

\ J

HB

_IM

QS

_W

ork

\SP

_In

vest

iga

tion

s\2

00

9-0

1_

Die

psl

oo

t_D

eve

lop

me

nts

\...

...

PRV

> 600

Proposed Reservoir

Future System :

Future Master Plan Items

Reservoir

Proposed PRV

Proposed RW Connection

Proposed Tower

Proposed Bulk Supply

Tower

Proposed Close Valve

Future Main

Future Schematic Pipes

Bulk Supply

Proposed FCV

Proposed Pump Station

Closed Valve

> 500 <= 600

> 450 <= 500

> 400 <= 450

> 350 <= 400

> 300 <= 350

> 200 <= 250

> 150 <= 200

> 100 <= 150

<= 100

Pipe Diameter Legend

> 250 <= 300

Proposed Developments(Diepsloot Corridor)

Existing System :

Diepsloot Reservoir - Dainfern PRV

Olivedale Reservoir

ERAND LL RES (Proposed Witpoortjie Res) - PRV 15/16

ERAND LL RES - PRV 14/20/32 (or Proposed Witpoortjie Res)

ERAND LL RES - PRV 13

BRYANSTON RESERVOIR - BUSHWILLOW PRV

OLIVEDALE RESERVOIR - CEDAR PRV

OLIVEDALE RESERVOIR - WINDSOR PRV

Bryanston Reservoir - Dainfern PRV

ERAND LL RES - PRV 19/34

COJ Boundary

Proposed Water Districts

Legend :Urban Development Boundary

Diepsloot Reservoir

RW33 Direct (Pretoriusrand Reservoir)

Pretoriusrand Reservoir (Outside UDZ)

Diepsloot Reservoir (Outside UDZ)

Diepsloot Reservoir - Saddlebrook PRV (Outside UDZ)

Diepsloot Reservoir - Riversands PRV

Dainfern Reservoir (Outside UDZ)

ERAND LL RES (or Proposed Witpoortjie Res) - PRV 17/18/33

OLIVEDALE RESERVOIR - SIXTH PRV

Dainfern Reservoir

Diepsloot Reservoir - Diepsloot PRV

> 500 <= 600

> 450 <= 500

> 400 <= 450

> 350 <= 400

> 300 <= 350

> 200 <= 250

> 150 <= 200

> 100 <= 150

<= 100

Pipe Diameter Legend

> 250 <= 300

> 600

Proposed Developments(Diepsloot Corridor)

Future Master Plan Items

Reservoir

Proposed Water Districts

Proposed RW Connection

Legend :Urban Development Boundary Existing System :

Proposed Tower

Proposed Bulk Supply

Tower

Proposed Close Valve

Future Main

Future Schematic Pipes

Bulk Supply

Proposed FCV

Proposed Pump Station

Diepsloot Reservoir

RW33 Direct (Pretoriusrand Reservoir)

Pretoriusrand Reservoir (Outside UDZ)

Diepsloot Reservoir (Outside UDZ)

Diepsloot Reservoir - Saddlebrook PRV (Outside UDZ)

Diepsloot Reservoir - Riversands PRV

Dainfern Reservoir (Outside UDZ)

ERAND LL RES (or Proposed Witpoortjie Res) - PRV 17/18/33

OLIVEDALE RESERVOIR - SIXTH PRV

Dainfern Reservoir

Diepsloot Reservoir - Dainfern PRV

Olivedale Reservoir

ERAND LL RES (Proposed Witpoortjie Res) - PRV 15/16

Diepsloot Reservoir - Diepsloot PRV

ERAND LL RES - PRV 14/20/32 (or Proposed Witpoortjie Res)

ERAND LL RES - PRV 13

BRYANSTON RESERVOIR - BUSHWILLOW PRV

OLIVEDALE RESERVOIR - CEDAR PRV

OLIVEDALE RESERVOIR - WINDSOR PRV

Bryanston Reservoir - Dainfern PRV

ERAND LL RES - PRV 19/34

Closed Valve

COJ Boundary

PRV

Future System :

Proposed PRV

Proposed Reservoir

DiepslootReservoir No1 & 225000 kl + 25000klTWL=1515BWL=1510

DainfernReservoir25000 klTWL=1439BWL=1434

Blue HillsReservoir13000 klTWL=1565BWL=1560

Blue HillsTower1200 klTWL=1590BWL=1585

RW Connection B(R33)

MP - BH9.9F

MP - BH5.10160Ø

MP - BH5.10160Ø

MP - BH5.10160Ø

MP - BH5.9200Ø

MP - BH5.8200Ø

MP - BH5.10160Ø

MP - BH5.7250Ø

MP - BH17.5400Ø

FM - BH14.1450Ø

MP - BH10.7650Ø

MP - BH17.4200Ø

MP - BH17.3200Ø

MP - BH17.2200Ø

MP - BH17.1355Ø

MP - BH16.3200Ø

MP - BH16.4A

MP - BH16.4B

MP - BH16.4C

MP - BH16.4D

MP - BH16.2250Ø

MP - BH15.1650Ø

MP - BH10.7650Ø

MP - BH15.2400Ø

MP - BH10.7650Ø

MP - BH15.3355Ø

MP - BH16.1

MP - BH10.9

MP - BH9.4

MP - BH9.4

RIVERGLEN 4

RIVERGLEN 1 & 2

DAINFERN 23

DAINFERN 21

RIETVALLEI

PORCUPINE PARK

TANGANANI

RIVERSANDS

DIEPSLOOT SOUTH

FUTURE

REMAINDER OFDIEPSLOOT

DAINFERN & RIVERGLENEXTENSIONS

BRYANSTON RESERVOIR - MULBARTON/FOUNTAIN PRV

OLIVEDALE RESERVOIR - FIRST PRV

Blue HillsTower1200 klTWL=1590BWL=1585

RW Connection B(R33)

DainfernReservoir25000 klTWL=1439BWL=1434

DiepslootReservoir No 225000 klTWL=1515BWL=1510

RW Connection(R33)

DiepslootReservoir No 125000 klTWL=1515BWL=1510

Blue HillsTower1200 klTWL=1590BWL=1585

Blue HillsReservoir13000 klTWL=1565BWL=1560

MP - BH10.41000Ø

MP - BH10.2A800Ø

MP - BH10.2A1000Ø

MP - BH10.1

MP - BH10.3B

MP - BH10.3A

MP - BH11.1600Ø

MP - BH11.2

MP - BH10.41000Ø

FM - BH12.2400Ø

FM

- B

H1

3.5

MP - BH10.7650Ø

MP - BH16.2250Ø

MP - BH15.1650Ø

MP - BH15.2400Ø

MP - BH10.7650Ø

MP - BH17.1355Ø

MP - BH16.1

MP - BH10.8

MP - BH2.2 MP - BH3.1

MP - BH2.3

MP - BH10.9

MP - BH5.3450ØMP - BH5.1

500Ø

MP - BH5.2300Ø

MP

- BH

4.1

600Ø

MP - BH2.2500Ø

MP - BH4.3500Ø

MP - BH4.2250Ø

MP - BH5.11250Ø

MP - BH5.4350Ø

MP - BH5.4350Ø

MP - BH5.11200Ø

MP - BH5.13250Ø

To RW33 Direct Feed Sub-District

RW33 (1000mmØ)

Supply to Diepsloot Reservoir -Dainfern PRV Sub-District

DainfernReservoir25000 klTWL=1439BWL=1434

DiepslootReservoir No 225000 klTWL=1515BWL=1510

RW Connection(R33)

DiepslootReservoir No 125000 klTWL=1515BWL=1510

Blue HillsTower1200 klTWL=1590BWL=1585

Blue HillsReservoir13000 klTWL=1565BWL=1560

MP - BH10.41000Ø

MP - BH10.2A800Ø

MP - BH10.2A1000Ø

MP - BH10.1

MP - BH10.3B

MP - BH10.3A

MP - BH11.1600Ø

MP - BH11.2

MP - BH10.41000Ø

FM - BH12.2400Ø

FM

- B

H1

3.5

MP - BH10.7650Ø

MP - BH16.2250Ø

MP - BH15.1650Ø

MP - BH15.2400Ø

MP - BH10.7650Ø

MP - BH17.1355Ø

MP - BH16.1

MP - BH10.8

MP - BH2.2 MP - BH3.1

MP - BH2.3

MP - BH10.9

MP - BH5.3450ØMP - BH5.1

500Ø

MP - BH5.2300Ø

MP

- BH

4.1

600Ø

MP - BH2.2500Ø

MP - BH4.3500Ø

MP - BH4.2250Ø

MP - BH5.11250Ø

MP - BH5.4350Ø

MP - BH5.4350Ø

MP - BH5.11200Ø

MP - BH5.13250Ø

To RW33 Direct Feed Sub-District

RW33 (1000mmØ)

Supply to Diepsloot Reservoir -Dainfern PRV Sub-District

MP - BH10.41000Ø

MP - BH11.2M

P - BH11.1

600Ø

MP - BH10.4

1000Ø

FM - BH12.2

400Ø

MP - BH10.1RW Connection(R33)

MP -

BH10.2A

1000Ø

MP - BH12.1

MP - BH10.2B

RW33 (600mmØ)

RW33 (1000mmØ)

Supply to RW33 Direct Feed Sub-District

Sup

ply

from

Oliv

edal

e

Res

ervo

ir cl

osed

off

Scale 1:12500

0 62.5 125 250 500 1000 meters

Page 14: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under
Page 15: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

125/388 JR

RE/11/388 JR

185/388 JR

127/388 JR

1

2

3CHRISTIAAN ROAD/WEG

WIL

LIA

M N

ICO

L

DO

RO

TH

Y A

VE

NU

E

188/388 JR

113/388 JR

8

11

HIG

HW

AY

RO

AD

RE/15/388 JR

15

16

18

19

20

RIVER ROAD

SCHOOL ROAD

190/388 JR

205/388 JR

REM/154/388 JR

30m ROAD

206/388 JR

RIVER

PR

OP

OS

ED

PR

OV

INC

IAL

RO

AD

K46

FUTURE PROVINCIAL ROUTE PWV 5

FUTURE PROVINCIAL ROUTE PWV 5

PR

OP

OS

ED

PR

OV

INC

IAL

RO

AD

K46

PR

OP

OS

ED

PR

OV

INC

IAL

RO

AD

K46

PRIVATE STREET 11m

PUBLIC STREET 30m

PRIVATE S

TREET 16m

PRIVATE STREET 11m

PRIVATE STREET 11m

PRIVATE STREET 11m

30m P

UB

LIC S

TR

EE

T

PRIVATE STREET 11m

PRIVATE STREET 13m

PR

IVA

TE

ST

RE

ET

11m

PRIVATE STREET 16m

PR

IVA

TE

STREET

ST

RE

ET

ROSE STREET 40m

20m P

RIV

AT

E S

TR

EE

T

30m P

UB

LIC S

TR

EE

T

30m P

UB

LIC S

TRE

ET

20m P

RIV

AT

E

PR

IVA

TE

ST

RE

ET

20m

PRIVATE STREET 11m

PR

IVA

TE

ST

RE

ET

13m

PRIVATE STREET 20m

20m

PRIV

ATE

PRIVATE STREET 13m

STREET 11m

11m

PR

IVA

TE S

TRE

ET

PR

IVA

TE

ST

RE

ET

11m

PRIVATE STREET 11m

PRIVATE STREET 11m

11m

PR

IVA

TE

ST

RE

ET

PRIVATE STREET 11m

PRIVATE STREET 11m

PR

IVA

TE

ST

RE

ET

13m

PRIVATE STREET 13m

PRIV

ATE

STR

EET

13m

PRIV

ATE

STR

EET

11m

PRIV

ATE

STR

EET

11m

PRIVATE STREET 11m

PRIV

ATE

ST11

m

PRIV

ATE

STR

EET

13m

PRIVATE STREET 11m

PR

IVA

TE

ST

RE

ET

11m

11m P

RIV

AT

E S

T

PRIVATE STREET 11m

PR

IVA

TE

ST

RE

ET

11m

ST 13m

PU

BLIC

ST

RE

ET

30m

PRIVATE STREET 16m

PRIVATE STREET 30m

PRIVATE STREET 20m

PR

IVA

TE

ST

RE

ET

30m

PRIVATE STREET 11m

11m PRIVATE STREET

PRIVATE STREET 11m

PR

IVA

TE

ST

RE

ET

11m

PR

IVA

TE

ST

RE

ET

11m

PR

IVA

TE

ST

RE

ET

11mPRIV

ATE STREET 1

1m

PR

IVA

TE

ST

RE

ET

11m

PRIVATE STREET 11m

PRIVATE STREET 11m

13m P

RIV

AT

E S

TR

EE

T

11m PRIVATE STREET

PRIVATE STREET 13m

PRIVATE STREET 11m

PR

IVA

TE

ST

RE

ET

13m

PRIVATE STREET 11m

PU

BLIC

ST

RE

ET

30m

PRIVATE STREET 11m

PRIVATE STREET 13m

PRIVATE STREET 11m

PRIVATE STREET

PRIVATE STREET 13m

PRIVATE STREET 11m

PRIVATE STREET 16m

PRIVATE STREET 16m

PRIVATE STREET 13m

PR

IVA

TE

ST

RE

ET

16m

PRIVATE STREET 13m

PRIVATE STREET 13m

PRIVATE STREET

PRIVATE STREET

PRIVATE STREET 11m

ST 13m13m

PR

IVA

TE

ST

RE

ET

PR

IVA

TE

ST

RE

ET

13m

PRIVATE S

TREET 11m

ROSE STREET 30m

11m

11m

11m

FU

TU

RE

K R

OU

TE

40

41

39

36

37

38

709

710

711

712

713

714

715

716

717

790

791

792 793 794 795

816

817818

819820

917

913

1084

1085

952

953

1065

1066

1067

1068

192 193

229

230

231

232

954955956

547

957

958

959960

961

962

963

964

965

966

967

1083

1368

1367

513

515 516 517518

204 205 206 207

208

209

54 55

132

486

487

488489

490 491492

493494 495

45 46 47

4849

5859

60 61 62

63

4243 44

505152

53

5657

98

99

126

1369

153

203

201

202

129

557

149

214

215

216

217

150

151

144

145

146

147

148

156

157

158

140141

142143

159

160

161162

163164

165166

167

168

169

170

171172

173174 175

176

177184

185

186

187188

189190

191

154

155

179

178

180181

182

183194 195196

197

198

199

200 152

1261

1262

1263

1264

218

1260

1252

1253

1254 1255

1277

1278127912801281

1282

1283

137138 139

219220

221222223

224225

226

227

228

556

12561257 1258 1259

1359

1333

1336

1343

239

240

241

2421332

1352

1353

1354

1355

1337

1338

1344

1345

1346

1364

236

237

2381350

1351

547

213

233234

235

463464465466467

468

469

470

471

472473

482483

484

526

527

537

13471348

13491365

210

211

212

450451

485512

514

547

1009

1040

1041

1055

1056

941

942

943

944

945

946

947

948

949

950

951

1042

1043

1044

1045

10461047

1048

1049

1050

1051

1052

1057

1058

1059

1060

1061

10621063

1064

1069

1076

1082

968

969

970

971

972

973

974

975

976

977

1070

1071

1072

1073

1074

1075

982

983

984

985

986

987

988

989

990

1005

1006

1007

1008 1010

1011

1028

1029

1030

1031

1032

1033

1034

1035

1036

1037

1038

1039

1053

1054978

979

980

981

1077

993

991

992

994

1230

1242

1243

1244

1245

927

928

929930

931

932

933

934

935

936

937

938

939

940

997

998

999

1000

1001

1002

1003

1004

1012

1013

1014

1015

1016

1017

1018

1019

1020

10211022

1023

1024

1025

1026

1027

1081

1227

1228

1229

1265

1266

12671268

1269

1270

12711246

1247

1248

1249

1250

1251

1272

1273

1274

1275

1276

1284

1285

1362

1359

1359

1366

1220

1221

1222

1223

1224

1225

1231

1232

1233

1234

1235

1236

1237

1238

1239

1240

1241

1287

1288

1289

12901291

12921293

1359

1360

1200

1201

1359

1226

1286

1305

1306

1307

1308

1309

1321

1322

1323

1324

1325

13261327

1334

1335

1339

1340

1341

1342

1359

1361

1078

995996

1079

1080

1086

10871087

908

834835836

837

849850 851

860861862

863

874875 876

885886887

888

917

923

924

925

917

917

821 822

838

839840

841

842

843

844845

846

847848

864865

866

867

868

869870

871872

873

889890

891

917

718

719720

721722

723

724725 726 727

728729 730

892893

894895 896 897

909910

911912

914

754

829

605

606607

616

617

618619

631

735

736

737

738

739

740

741

742

755

756

757

758

759

760

830

855

856

880

881

926

852 853 854

857858859

877 878879

882883884

731732

733

734761

762

763

898 899900 901

902

903904

905906907

915

917

917

917

689690691693

771 772 773 774

781782783784785

919

920

921797 798 799

809810811812

823824 825

922

917

694695696697698699700701

702

703

704764

765766 767 768 769 770

786787788789

705

706

707

708

796

813814

815

56

75

8586

87

22232425

130

136

96

97

114

115 116 117 118 119 120

121122123124125

130

26272829303132333435

645

664

647648

665

666 667

681682

683

684686

630632

646

560

561

687688

748 749

775 776 777

778779780

803

916

917

918

917

743

744

745

746

747 750

751

752

753

804

805

800 801 802

806807808

826 827 828

831832833

685

1234

ATTENUATIONPONDS

131

15

77 78 79 80

818283

84

0,15ha

P.O.S.16

1718192021

562 563 564 565

585

586

587

588

589

590

591

592

608609 610

611

612613614615

620 621 622623

624

625626627628

629

639

917

917

593

594

595596

597598

599 600 601

602

603604

128

573 574575 576

577

578

579

580

581

582

583

584

674

675

917566 567 568 569 570

571 572

649650 651 652 653 654 655

656

668 669 670 671672 673

676677678679680

633 634 635636 637

638

640641642643644

657

658659660661662663

917

7 8 910 11

12

13

14

68 69 70 71 72 73 74

76127

66 67

88

89

90

91

134

135

496 497 498 499 500 501

502

503504

505506507508

509 510 511

548

549519

520521522

523524

525555

558

64 65

92

93

94

95

100 101 102 103 104

105 106

107

108109110111112113

130

130

403404

409 410

411412

413

414

427

428

443

444

445

446

447

448

552

452

453

454

455

456457458

459460461462

474475

476 477

478

479480481

528529 530

531 532

533534535536

551

405 406 407449

376377

381

382

419

420

415

416

417

418

421

422

423

424

425

426

429

430

431

378

379

380

433

432

434

435

436

437

438

439 440

441 442

538

539

540

541

542

543

550

283

284

285

286

287288

289

290

291

292

316

317

318319

320

321

358

359

360

361

362363

364

365 366367

368369

370

371

396

397

398

399

400

401402

553

554

547

372408

547

272

273

274

275

276299

300

301

302

303305

307

308

309328

329

330

349

350

351

352

277

278

279

280

281

282293

294

295

296

297

298

310

311

312

313

314

315322

323

324

325

326

327

389

353

354

355

356

357

390

391

392

393

394

395

256

257

258

259

260

261

262

263

264

265

266

267

268

545

546

559

133

245

246

247

248

249

373

374

375

383

384

385

1163

1204

1205

1206

1207

1208

1209

12101211

547

547

243

244

1202

1203

12121213

12941295

1296

12971298

12991300

13011302

1303

1304

13101311

13121313

13141315

131613171318

13191320

13281329

1330

1331

1183

1191

10981099

11001101

1165

11661167

11781179

11801181

1182

11921193

11941195

1363

1359692

10891090

10911092

1093 1094 1095 1096 1097

11681169

11701171

1172

1173

11741175 1176 1177

119611971198

1199

1216

1217

1218

1219

11641214

1215

1119

250

251

252

253

254269270

271304306

331332 333

334335 336 337

338 339

340341342

343344

345346

347

348

11331134

11351136

1137

11381139

1140

1158

386

387

388

11591160

1161

1162 1359

547

547

1118

11051106

1107 1108 11091110

1111

1112

1113

1114

1115

1116

1117

1122 11231124 1125 1126

1127

1128

1129

1130

1131

11321141

1142

1143

1144

1145

114611471148

11491150

1151

11521153

1154

1155

11561157

1359

1102 1103 1104

1120

1121

1184

11851186

1187

1188

1189

1190

1359

1357

1358

1356

255

544

1:100 YEAR FLOODLINE

1:100 YEAR FLOODLINE

1:100 YEAR FLOODLINE

1:100 YEAR FLOODLINE

DO

RO

TH

Y A

VE

NU

E

FUTURE PROVINCIAL ROUTE PWV 5

OLD NORTHERN OUTFALL

DIE

PS

LOO

T T

UN

NE

L

OLD

NO

RT

HE

RN

OU

TF

ALL

DIEPSLOOT CONSOLIDATED BASIN(NORTHERN WWTW)

DIEPSLOOT PUMPED BASIN(FUTURE LANSERIA WWTW)

DIEPSLOOT WEST BASIN(NORTHERN WWTW)

A

D

B

C

E

F

DIE

PS

LOO

T B

RID

GE

July 2013

Riversands Bulk Sewer Outfalls

Figure SP311_S1

1346

_Joh

anne

sbur

g_A

d_H

oc...

.

Legend :

5m Contours

Existing Sewer System :

Manholes

Proposed Sewer System :

Future Schematic

Future Main

Bridge

Tunnel

Proposed Development

Sewer Reticulation( 160 unless otherwise shown)-<

Scale 1:10000

0 62.5 125 250 500 meters

Figure SP311_S1

Riversands Bulk Sewer Outfalls

Page 16: OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL ...nalisustainabilitysolutions.co.za/wp-content/uploads/2015/02/Appen… · The bulk water infrastructure design by Bigen Africa under

13

9. DRAWINGS