Outotec – in brief
May, 2010
2/21 Alumina Business Center
Strong history of groundbreaking technologies
and innovation
3/21 Alumina Business Center
Outotec‘s experience and solutions
4/21 Alumina Business Center
Outotec delivers from equipments to plants and
services
5/21 Alumina Business Center
Outotec – global partner
6/21 Alumina Business Center
Main Technology Portfolio
Outotec GmbH as PROVEN TECHNOLOGY PROVIDER delivered already as example:
600 Sulphuric acid plants!450 Fluidised bed plants! 400 Sinter plants!60 Pelletizing plants!50 Calciners
…
7/21 Alumina Business Center
Fluidization – A Key Technology
Example Rosting
8/21 Alumina Business Center
Victor César Ribeiro da Cruz, Alunorte, Brazil “Our goal is to produce the highest quality alumina in the world. In order to reach that we needed two things: the best available technology and the most qualified professionals. Outokumpu Technology provided us with both. Their technology is reliable and easy to work with. The same is true of their people.”
Ma’aden-Alcoa Refinery Project
26.05.2010
Suggested Agenda
1. Brief Status on our currently
implementend Project with Ma’aden
2. Outotec’s Alumina Refinery Capabilities
3. Current Status of Aluminium Project
Offers to Ma’aden, Suggestions and
Discussion
Ma’aden-Alcoa Refinery Project
Status Sulphuric Acid Plants
Project Development – Convertible EPC approach
Lump Sum
DESIGN BASIS
BIDDING
ANALYSE/NEGOTIATE/
AWARD
MA’ADEN
EPC CONTRACTOR
Contractor Bid
MANAGE AND CONTROL
ENGINEERING
PROCUREMENT
CONSTRUCTION
ENGINEERING
PROCUREMENT
OPEN BOOK ESTIMATE
CONVERT TO LUMP
SUM
ANALYSE/NEGOTIATE/
COMMIT
Reimbursable
- Engineering services
reimbursable rates
- Agreed profit margin
- Agreement on LD’s
and major commercial
terms
Fix price
May 2006 June 2007
Project Development – Why selected?
Outotec Strength:• strong reference basis
• experience in LSTK implementation
• experience in project development worldwide
Step 1: Development of strong concept for local project implementation and
convince customer about Outotec‘s capabilities to implement large projects in
Saudi Arabia
Step 2:
Open Bidding process for phase 1 FEED (Front-End-Engineering) and OBE
(Open-Book-Estimate) phase won
Step 4:
Professional Engineering work, value engineering and global sourcing concept
applied during phase 1 lead to a sucessful team work with Maaden and it‘s
PMC. A optimised implementation concept for phase 2 had been developed
and contracted
Scope of Services and Supplies
• Outotec‘s Import scope:
Design, engineering, delivery and Commissioning
on a Lump-Sum-Turnkey basis .
• Outotec’s Local scope (via direct contract with local subcontractor):
Local supplies and Construction
• Total Price: USD495M
• Some key data:
Project implementation schedule: 31 month to MC
Total tons of structural steel: 3.800 tons
Total tons of equipment: 25.000 tons
Total cubic meters concrete 23.000m3
Total electrical drives installed: 200
Total cables installed: 350 km
Total engineering hours: 150.000
Total construction hours: 3.750.000
Global Sourcing
Supplies from and Fabrication in
• Europe
• Asia (South Korea, Taiwan, China)
• North America (Canada)
• South America (Argentina, Brazil)
0,0
5,0
10,0
15,0
20,0
25,0
30,0
35,0
40,0
45,0
50,0
55,0
60,0
65,0
70,0
75,0
80,0
85,0
90,0
95,0
100,0
%
Early / Month 0 10, 2,3 4,1 1,3 3,7 2,4 2,4 2,4 3,3 3,2 3,1 3,3 4,3 3,5 2,9 4,5 4,8 2,9 2,5 3,5 3,4 4,6 4,3 3,6 2,6 2,1 1,8 1,3 1,1 1,0 0,8 0,4 0,3 0,4 0,3 0,3 0,3 0,3 0,1 0,1 0,0
Target / Month 0 6,7 4,2 3,5 1,8 3,2 2,4 2,3 2,5 2,7 2,8 3,0 3,1 3,7 3,3 2,5 3,7 4,3 3,6 3,4 3,5 4,5 5,0 4,3 3,4 3,1 3,4 2,2 1,6 1,3 1,3 1,0 0,3 0,3 0,4 0,4 0,3 0,3 0,3 0,1 0,1 0,0
Actual / Month 0 0,0 8,0 3,9 2,5 2,3 2,9 2,0 2,0 7,3 2,4 1,8 5,7 1,7 1,6 2,3 2,7 4,7 3,7 3,4 5,0 4,3 6,0 4,6
Late / Month 0 2,9 6,0 2,9 2,2 2,6 2,3 2,2 2,6 2,2 2,5 2,9 3,0 3,0 3,1 2,2 2,8 3,7 4,3 4,4 3,5 5,5 5,3 4,4 3,1 3,5 4,8 2,6 2,0 1,5 1,5 1,3 0,3 0,3 0,4 0,4 0,4 0,3 0,3 0,1 0,1 0,1
Early cum. 0 10, 12, 17, 18, 22, 24, 26, 29, 32, 35, 38, 41, 46, 49, 52, 57, 61, 64, 67, 70, 74, 78, 83, 86, 89, 91, 93, 94, 95, 96, 97, 97, 98, 98, 98, 99, 99, 99, 99, 10 10
Target cum. 0 6,7 10, 14, 16, 19, 21, 24, 26, 29, 32, 35, 38, 41, 45, 47, 51, 55, 59, 62, 66, 70, 75, 80, 83, 86, 89, 92, 93, 94, 96, 97, 97, 97, 98, 98, 98, 99, 99, 99, 99, 10
Actual cum. 0 0,0 8,0 11, 14, 16, 19, 21, 23, 31, 33, 35, 40, 42, 44, 46, 49, 53, 57, 61, 66, 70, 76, 81,
Late cum. 0 2,9 8,9 11, 14, 16, 19, 21, 23, 26, 28, 31, 34, 37, 40, 42, 45, 49, 53, 58, 61, 67, 72, 76, 79, 83, 88, 90, 92, 94, 95, 97, 97, 97, 98, 98, 98, 99, 99, 99, 99, 10
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
early
target
late
Progress Curve - Total Project
Effective Date MC
• Mechanical Completion Certificates for all 3 plants reached
• Plant erected with highest quality standards and in accordance with the
specification
• Remaining Phosphate Project: Delay of other plants e.g. phosphoric acid
• Mode of contracting of phosphoric acid plants: split between technology
provider and project implementation:
• Technology package by Process Provider
• Lump Sum contract with other Contractor
• Commissioning delayed due to delay of phosphoric acid plant: 1 year (?)
• Plan to cope with time in between MC and commissioning: mothballing by
Outotec experts
Current Status
Ma’aden-Alcoa Refinery Project
Outotec’s Alumina Refinery Capabilities
Alumina Production Overview
Alumina
(2t)
Outotec Package
(Mills) (Tube Digestor)
Outotec Package
(Settlers/Washers)
Outotec Package
(Integrated Filtration
& Calcination)
Bauxite
(4t)
DigestionRed Mud
SeparationPrecipitation
Filtration and
CalcinationGrinding
Alumina Refinery
Alumina Production Overview
Alumina
(2t)
Outotec Package
(Mills) (Tube Digestor)
Outotec Package
(Settlers/Washers)
Outotec Package
(Integrated Filtration
& Calcination)
Bauxite
(4t)
DigestionRed Mud
SeparationPrecipitation
Filtration and
CalcinationGrinding
Alumina Refinery
Outotec: Grinding
Outotec is designing
and building variety of
mills for various
minerals
Outotec’s scope
covers the range from
the mill up to the full
grinding circuit
Alumina Production Overview
Alumina
(2t)
Outotec Package
(Mills) (Tube Digestor)
Outotec Package
(Settlers/Washers)
Outotec Package
(Integrated Filtration
& Calcination)
Bauxite
(4t)
DigestionRed Mud
SeparationPrecipitation
Filtration and
CalcinationGrinding
Alumina Refinery
Outotec: Digestion
Outotec employs tube digestion technology concept, which was developed by VAW and constructed by Lurgi in German alumina refineries in the 1970s
This technology is designed to efficiently deal with a wide variety of bauxites and includes:
• single stream (caustic liquor + bauxite) heating in jacketed pipes:
• thermally efficient
• avoids caustic damage to carbon steel heating surfaces
• reduces silica scaling rates
• high digestion temperature
• suitable for mono hydrate bauxites
• high evaporation rate / m3 of slurry flow
• allows wet oxidation technology
• a holding tube for final extraction instead of an autoclave
• reduced descaling maintenance
• allows safe application of wet oxidation technology
Yarwun Alumina Refinery / Gladstone, Australia
End view of heater trains
Alumina Production Overview
Alumina
(2t)
Outotec Package
(Mills) (Tube Digestor)
Outotec Package
(Settlers/Washers)
Outotec Package
(Integrated Filtration
& Calcination)
Bauxite
(4t)
DigestionRed Mud
SeparationPrecipitation
Filtration and
CalcinationGrinding
Alumina Refinery
Principal flow diagram for a Residue Separation and
Washing Plant
Outotec: Red Mud Separation
Alumina Production Overview
Alumina
(2t)
Outotec Package
(Mills) (Tube Digestor)
Outotec Package
(Settlers/Washers)
Outotec Package
(Integrated Filtration
& Calcination)
Bauxite
(4t)
DigestionRed Mud
SeparationPrecipitation
Filtration and
CalcinationGrinding
Alumina Refinery
CFB –Calciner world wide
Calciners smaller 2000 tpd Calciners 2000 –3500 tpd and more
4
3
5
7
2+1
1 2
2
1
5
2
3
3
2
3
Outotec: Integrated Filtration & Calcination
Outotec’s integrated Filtration
and Calcination is developed
to provide:
• Constant and high product
quality
• Low energy consumption
• Fuel
• Electricity
• Steam
• Stable operation
• High degree of automation
Washing
and Filtration
Circulated
Fluid Bed
Calcination
Condensate
Hydrate Slurry
Flash
Hot Condensate
Hot Condensate
Filter Cake
Steam
Filtrate
Alumina
Major advantages of the CFB system
very stable plant operation
high availability and low maintenance
low vulnerability to power failures with quick restart
possible
very uniform product quality
favourable partial load behaviour
high flexibility of plant with respect to product quality
and plant capacity
low combustion temperature leads to low particle
breakage
low combustion temperature gives low NOx emission
Process Flow Diagram of the CFB system
Specific Energy Consumption
Source: CSIRO National Franework for Energy Efficiency, 2007
ALUNORTE 6.3 MTPY Refinery
Alcan Gove – Preassembled Modules Manufactored in Thailand and Vietnam
Vedanta, India, 3 x 3300 tpd
Full Automatic Smooth/Easy Operation trough
Feedforward Control ®– Example Alunorte
Rapid load change in a calciner
from 235 t/h to 60 t/h --- Alunorte plant data
Performance Test Results –
Exceeding Client’s Expectation72 hours average
Test
Unit Performance
Guarantees
Performance
Results
Difference Performed
BET m²/g within 60-80 78 +/- 0
Max. Continuous
Ratingt/d min 3300 3500 200
Particle Breakage % max 5.3 3.6 -1.7
Alpha Alumina % max 10 2.4 -7.6
Pick up for Fe2O3 % max 0.003 0.002 -0.001
Pick up for SiO2 % max 0.002 0.001 -0.001
LOI % max 1.0 0.75 -0.25
SEC at hydrate
moisture of 6%MJ/t max 2900 2800 -100
Product discharge
temperature°C max. 70 50 -20
Stretch-out Flowsheet
Secondary Air
Primary Air Offgas
Hydrate
Alumina
Dedusting
Dust Transport
Preheating
Stage 1Preheating
Stage 2
Hydrate
Feed
CFB
FurnaceMix Pot
Cooling
Stage 2
Cooling
Stage 1
FB Cooler
Alumina
Product
Secondary AirSecondary Air
Primary AirPrimary Air OffgasOffgas
HydrateHydrate
AluminaAlumina
Dedusting
Dust Transport
Preheating
Stage 1Preheating
Stage 2
Hydrate
Feed
CFB
FurnaceMix Pot
Cooling
Stage 2
Cooling
Stage 1
FB Cooler
Alumina
Product
Victor César Ribeiro da Cruz, Alunorte, Brazil “Our goal is to produce the highest quality alumina in the world. In order to reach that we needed two things: the best available technology and the most qualified professionals. Outokumpu Technology provided us with both. Their technology is reliable and easy to work with. The same is true of their people.”
Ma’aden-Alcoa Refinery Project
Current Status of Aluminium Project Offers (All)
Outotec Offers for Ma‘aden Aluminium Project
Smelter:• 2 x 37,5tph stand-alone Paste Plants :
• LSTK Package
• Rodding Shop 60 anodes/hr:
• Full engineering and Supply of all Equipment (except steel structure)
• Casthouse:
• Key Equipment for sow caster and/or ingot casters (still to be offered)
Refinery:• Tube Digestion/Evaporation Unit as HOT JV (together with Hatch):
• License, reimbursable engineering and purchasing services
• Optional: License, Lump sum Engineering and proprietary equipment supply
• Alumina Calciners (2 x 3.500tpd):
• Full engineering and supply of all Equipment
• Full LSTK
Further Options for the Refinery to Support Ma‘aden
Tube Digestion/Evaporation Unit as HOT JV (together with Hatch):
• Increase of current license and reimbursable engineering and supply services packages to a full LSTK provided by Outotec/HOT
Benefits:
• Full set of guarantees with liability related to a percentage of the LSTK package (no excuses due to interface technology provider/implementation)
• Outotec fully considers the overall refinery standards
• Significantly reduced involvement of EPCM contractor and related savings
• Optimised coordination efforts due to a whole solution out of one hand
• Outotec has proven its reliability and easiness to work with during the Ma’aden Sulphuric Acid Plant Project
• Outotec and HOT prepared to show the estimate in a open-book/closed book manner
Alumina Calciners (2 x 3.500tpd):
• Utilize the same project/site management, infrastructure, construction partner as for tube digestion/evaporation giving the entire savings back to Ma’aden as a price reduction for the Alumina Calciners
Ma’aden-Alcoa Refinery Project
Thank you for your attention