> Ventilation Air Conditioning Refrigeration Heating 22 º C Inside OUTSIDE HUMIDITY PROVIDED BY HEINEN & HOPMAN 35 C 90% Contractor: Lamprell Owner: Single Buoy Moorings CASE REPORT OFFSHORE Flash Gas Compressor Barges (FGCB) 3,4 and 16

OUTSIDE 35 C HUMIDITY 22ºC - static.heinenhopman.com€¦ · AKCO awarded a letter of intent to the consortium of Single Buoy Moorings Inc. (SBM) and Siemens on 29th July 2004, followed

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OUTSIDE 35 C HUMIDITY 22ºC - static.heinenhopman.com€¦ · AKCO awarded a letter of intent to the consortium of Single Buoy Moorings Inc. (SBM) and Siemens on 29th July 2004, followed

>

Ventilation Air Conditioning RefrigerationHeating

22ºCInside

OUTSIDEHUMIDITY

PROVIDED BYHEINEN & HOPMAN

35 C

90%

Contractor: LamprellOwner: Single Buoy MooringsCaSe repOrt OffShOre

Flash Gas Compressor Barges (FGCB) 3,4 and 16

Page 2: OUTSIDE 35 C HUMIDITY 22ºC - static.heinenhopman.com€¦ · AKCO awarded a letter of intent to the consortium of Single Buoy Moorings Inc. (SBM) and Siemens on 29th July 2004, followed

KEY FEATURES

Length: 95.0 mBreadth: 16.0 mHeight: 33.5 mWeight: 3,085tDesign Life: 40 yearsMaximum ambient/ Design Temperature: 35°C / 65%RHMinimum ambient Design Temperature: -23°CH2S Containment: 23%Handle the associated gas relevant to a Plant capacity of 225,000 BOPD

CHALLENGES

SBM needed a well-known HVAC specialist in the field. Heinen & Hopman was invited into the project by Lamprell to re-evaluate the basic engineering and ultimately come up with a fixed design.

The main criteria the HVAC had to meet were:

1. Safety (Zone-1 operation, pressurized rooms, blast resistance and H2S filtering).

2. Reliable and easy use.3. Easy maintenance due to unmanned operation.4. A 40-year lifespan.5. GOSH

SOLUTIONSAs requested, special attention was given to electrical rooms in relation to H2S filtering. The goal was to make sure that no H2S or other toxic sour gas mixtures can enter these spaces, ensuring the safety of maintenance crews and extending the lifespan of the equipment. Heinen & Hopman was also asked to focus on the electrical rooms related to blast-proof 2-bar static. All main intakes and outlets were executed with SS316L blast-proof dampers. Special attention was also given to any components that might fly around during an explosion/blast. Items such as ducting, air handling units, condensing units and filter units required special engineered supports and framework to ensure that components would not spread all over a barge in case of an explosion. The main consideration was that, while deformation and damage could be allowed to occur, equipment had to stay in its mounted position.All components were to be suitable for Zone-1 classification and have been certified as such. All materials have been selected for this harsh environment or have been protected to guarantee the same by means of special coating methods.All electrical rooms are pressurized at a

Contractor: LamprellOwner: Single Buoy Moorings

DESCRIPTION OF THE PROJECT

AKCO awarded a letter of intent to the consortium of Single Buoy Moorings Inc. (SBM) and Siemens on 29th July 2004, followed by a contract award on 30th September 2004 for the Design, Engineering, Procurement and Fabrication (EPF) of three Flash Gas

Compressor Barges (FGCB) 3, 4 and 16 to be used for the Kashagan Field Development in the northern part of the Caspian Sea offshore Kazakhstan.

Page 3: OUTSIDE 35 C HUMIDITY 22ºC - static.heinenhopman.com€¦ · AKCO awarded a letter of intent to the consortium of Single Buoy Moorings Inc. (SBM) and Siemens on 29th July 2004, followed

SCOPE OF WORK

ConsultancyDesign & EngineeringProject managementCustom built productionSupervisionCommissioning

SCOPE OF SUPPLY

Compressor hall & LER

Air intake systems for HVACAir Handling Units 3xRefrigeration equipment 3xH2S filtering units 2xCentrifugal fans 2xAxial fans 6xAir filtersDampers Sound attenuatorsSupply & extract ornamentsHVAC control systemsHVAC instrumentation

All Zone-1 Eexde-IIB-T3

Total air volume approx. 123,000m3/hTotal cooling capacity approx. 325 kW

Dirivent systemTotal air volume approx. 150,000m3/h

Including blast dampers

minimum positive pressure of +50 Pa with respect to the outside atmosphere so as to ensure that no contaminated outside air can enter. Sufficient redundancy is foreseen for all essential HVAC systems, cooling, heating, mechanical ventilation, filtering, control, etc. Normal ventilation ducting would not have fitted in the compressor hall if common practice design criteria for ducting had been used. This is why Heinen & Hopman proposed, delivered and installed a directional flow ventilation system, which allowed for considerably smaller dimensions of the ducting system. This was needed to ensure that cooling air would also reach dead spots inside the compressor hall so that no uncontrolled heat loads would occur.

Page 4: OUTSIDE 35 C HUMIDITY 22ºC - static.heinenhopman.com€¦ · AKCO awarded a letter of intent to the consortium of Single Buoy Moorings Inc. (SBM) and Siemens on 29th July 2004, followed

www.heinenhopman.com

heinen & hopman encourages a more

sustainable world. By providing eco-friendly solutions and serviceswe offer our clients

the option of reducing energy consumption

and thus CO2 emissions. Visit

greenmanifest.info for more information.

BrazilT: +5521 3587 4241/4244E: [email protected]

France - La CiotatT: +334 4204 8685E: [email protected]

France - GrasseT: +336 3090 7786 E: [email protected]

GermanyT:+49 4073 1680E: [email protected]

IndiaT: +9133 6499 1293E: [email protected]

ItalyT: +3901 8745 7970E: [email protected]

The Netherlands (HQ)T: +313 3299 2500E: [email protected]

The Netherlands (Rotterdam)T: +317 8890 8050E: [email protected]

NorwayT: +47 6919 0900E: [email protected]

Peoples Republic of ChinaT: +8621 3253 2896E: [email protected]

Peoples Republic of ChinaT: +86 510 8528 1763E: [email protected]

PolandT: +489 1433 1800E: [email protected]

RomaniaT: +402 3644 8222E: [email protected]

RussiaT: +7 (4012) 308 801E: [email protected]

SingaporeT: +65 6897 7879E: [email protected]

South KoreaT: +8270 4901 0000E: [email protected]

SpainT: +349 3225 9668E: [email protected]

SwedenT: +46 3121 7500E: [email protected]

TurkeyT: +9021 6493 8118E: [email protected]

UAE (Abu Dhabi) T:+971 2550 4147E: [email protected]

UAE (Dubai)T: +971 4263 5453E: [email protected]

USA - Fort Lauderdale, FloridaT: +195 4463 0110E: [email protected]

USA - Houma, Louisiana T: +198 5876 7989E: [email protected]