    Grid Point BS IS FS HI RL Remarks

    PBM 170.370PBM-1 (Westernmost point on

    floor infront of site office)

    TBM On plinth Protection of site office

    A0

    A1

    A2

    A3

    A4

    A5

    A6

    A7

    A8

    A9

    A10

    A11

    A12

    A13

    A14

    A15

    A16

    Name of Work: Construction of of PG Hostel for Girls for Central University of Kerala at Periye, Kasaragod.

    SH: Building portion including internal water supply, sanitary instllations , drainage,development, bulk

    services, Internal electrical installations, Lift and Fire fighting arrangements.

    Over area Excavation Final level

    Date of Measurement :

  • 8/10/2019 Over Area Excavation Final Level PDF

    2/12

    Page 2 of 12

    Grid Point BS IS FS HI RL Remarks

    A17

    A18

    A19

    A20

    A21

    A22

    A23

    A24

    A25

    A'19 top0.5 m from A line

    A'20 top1.4 m from A line

    A'21 top2.52 m from A line

    A'22 top 3.7 m from A line

    A'23 top4.8 m from A line

    A'19 bottom0.5 m from A line

    A'20 bottom1.4 m from A line

    A'21 bottom2.52 m from A line

    A'22 bottom3.7 m from A line

    A'23 bottom4.8 m from A line

    B0

    B1

    B2

    B3

    B4

  • 8/10/2019 Over Area Excavation Final Level PDF

    3/12

    Page 3 of 12

    Grid Point BS IS FS HI RL Remarks

    B5

    B6

    B7

    B8

    B9

    B10

    B11

    B12

    B13

    B14

    B15

    B16

    B17

    B18

    B19

    B20

    B21

    B22

    B23

    B24

    B25

    B'24 top1.45 m from B line

    B'25 top

    2.60 m from B line

    B'24 bottom1.45 m from B line

  • 8/10/2019 Over Area Excavation Final Level PDF

    4/12

    Page 4 of 12

    Grid Point BS IS FS HI RL Remarks

    B'25 bottom2.60 m from B line

    C0

    C1

    C2

    C3

    C4

    C5

    C6

    C7

    C8

    C9

    C10

    C11

    C12

    C13

    C14

    C15

    C16

    C17

    C18

    C19

    C20

    C21

    C22

  • 8/10/2019 Over Area Excavation Final Level PDF

    5/12

    Page 5 of 12

    Grid Point BS IS FS HI RL Remarks

    C23

    C24

    C25

    D0

    D1

    D2

    D3

    D4

    D5

    D6

    D7

    D8

    D9

    D10

    D11

    D12

    D13

    D14

    D15

    D16

    D17

    D18

    D19

    D20

  • 8/10/2019 Over Area Excavation Final Level PDF

    6/12

    Page 6 of 12

    Grid Point BS IS FS HI RL Remarks

    D21

    D22

    D23

    D24

    D25

    E0

    E1

    E2

    E3

    E4

    E5

    E6

    E7

    E8

    E9

    E10

    E11

    E12

    E13

    E14

    E15

    E16

    E17

    E18

  • 8/10/2019 Over Area Excavation Final Level PDF

    7/12

    Page 7 of 12

    Grid Point BS IS FS HI RL Remarks

    E19

    E20

    E21

    E22

    E23

    E24

    E25

    F0

    F1

    F2

    F3

    F4

    F5

    F6

    F7

    F8

    F9

    F10

    F11

    F12

    F13

    F14

    F15

    F16

  • 8/10/2019 Over Area Excavation Final Level PDF

    8/12

    Page 8 of 12

    Grid Point BS IS FS HI RL Remarks

    F17

    F18

    F19

    F20

    F21

    F22

    F23

    F24

    F25

    F'11 top2.57 m from F line

    F'12 top2.5 m from F line

    F'13 top2.53 m from F line

    F'14 top 2.47 m from F line

    F'15 top2.33 m from F line

    F'16 top2.3 m from F line

    F'17 top2.15 m from F line

    F'18 top2.30 m from F line

    F'19 top2.35 m from F line

    F'20 top2.30 m from F line

    F'21 top2.30 m from F line

    F'22 top2.25 m from F line

    F'23 top2.30 m from F line

    F'24 top

    2.63 m from F line

    F'25 top3.00 m from F line

  • 8/10/2019 Over Area Excavation Final Level PDF

    9/12

    Page 9 of 12

    Grid Point BS IS FS HI RL Remarks

    F'11 bottom2.57 m from F line

    F'12 bottom2.5 m from F line

    F'13 bottom2.53 m from F line

    F'14 bottom2.47 m from F line

    F'15 bottom2.33 m from F line

    F'16 bottom2.3 m from F line

    F'17 bottom2.15 m from F line

    F'18 bottom2.30 m from F line

    F'19 bottom2.35 m from F line

    F'20 bottom2.30 m from F line

    F'21 bottom2.30 m from F line

    F'22 bottom2.25 m from F line

    F'23 bottom 2.30 m from F line

    F'24 bottom2.63 m from F line

    F'25 bottom3.00 m from F line

    G0

    G1

    G2

    G3

    G4

    G5

    G6

    G7

    G8

  • 8/10/2019 Over Area Excavation Final Level PDF

    10/12

    Page 10 of 12

    Grid Point BS IS FS HI RL Remarks

    G9

    G10

    G11

    G12

    G13

    G14

    G15

    G16

    G17

    G18

    G19

    G20

    G21

    G22

    G23

    G24

    G25

    H0

    H1

    H2

    H3

    H4

    H5

    H6

  • 8/10/2019 Over Area Excavation Final Level PDF

    11/12

    Page 11 of 12

    Grid Point BS IS FS HI RL Remarks

    H7

    H8

    H9

    H10

    H11

    H12

    H13

    H14

    H15

    H16

    H17

    H18

    H19

    H20

    H21

    H22

    H23

    H24

    H25

  • 8/10/2019 Over Area Excavation Final Level PDF

    12/12

    Page 12 of 12

    Grid Point BS IS FS HI RL Remarks

    Sum

    Last RL - First RL =

    BS - FS = Check is