1.0 Project Management
multi‐disciplinary approach over a diversified area of
activities from the state of preconstruction till start up and
precommissioning state.
Project management functions involve executing a STPP
durin various hases of construction activities i.e. from
taking a green site till handing over of erected and tested
.
PMI Revision 01 3
8/9/2019 Over View of Erection
4/19
1.1 Project Management is multi disciplines :
. .
2. Mechanical equipment erection. 3. Electrical erection. . . As per NTPC Corporate philosophy construction has been
organized into two major groups :- i Construction : This includes civil construction and structural fabrication. ii) Equipment Erection : This includes erection of
mechanical, electrical and C&I equipments.
Equipment erection involves erection of all plant and systems such asboiler, turbo-generator, auxiliary systems like Coal handling system,Electrical and C&I system.
PMI Revision 01 4
8/9/2019 Over View of Erection
5/19
.execution supervision group are :-
. ‐
a) Scope of work and terminal points. b) Location, lay outs, technical specification and
. c) Quality plan.
d) Contractor’s resource commitment. ’ .
f) Scope of supply and erection.
2. Land allotment and infrastructure services.
3. Erection planning – implementation of detailed
construction planning system. 4. Monitoring of equipment despatch, transportation,
rece pts an expe t ng.
PMI Revision 01 5
8/9/2019 Over View of Erection
6/19
8/9/2019 Over View of Erection
7/19
.contractor to work efficiently in terms of quality and
parameters.
a) Inspection of works and field quality control.
easuremen o wor or ecson o ma ng
payment.
commissioning.
.
PMI Revision 01 7
8/9/2019 Over View of Erection
8/19
. a ety ssu ance PEP talk
Demonstrations
Use of
PPEs
Reward
Warning & Penalty
8PMI Revis ion 01
8/9/2019 Over View of Erection
9/19
8/9/2019 Over View of Erection
10/19
How
to
ensure
quality
?
gas, welding
consumables
etc
Deployment of qualified, experienced and sincere
supervisors
Higher frequency of inspection
PMI Revision 01 10
8/9/2019 Over View of Erection
11/19
8/9/2019 Over View of Erection
12/19
8/9/2019 Over View of Erection
13/19
STRATEGIES:
SAR
NCR
PMI Revision 01 13
8/9/2019 Over View of Erection
14/19
8/9/2019 Over View of Erection
15/19
Ma or T&Ps
Re uired
for
boiler
erection
Chain Pulley
Block
‐ 05
MT
‐100
Nos
‐ ‐
Radiography Source‐02 sources of minimum ‐15 Currie
Li ht Fittin s
‐60
Nos
Power Cable ‐3Cx180 ‐400 Meter
15PMI Revis ion 01
8/9/2019 Over View of Erection
16/19
Erection High
Pressure
Welders
‐12
Nos
Millwri ht Fitters ‐06 Nos
Piping/ Pressure Parts fitter Gangs – 16 Gangs
Structural fitter
gangs
‐10
Gangs
Average Manpower ‐300 / PM
16PMI Revis ion 01
8/9/2019 Over View of Erection
17/19
8/9/2019 Over View of Erection
18/19
, ELECTRIC/HAND/PNEUMETIC WINCHES/SLINGS/PULLEY BLOCKS
DERRICKS
WELDING GENERATORS/TRANSFORMER, HEAT TREATMENT EQUIP.
TIG/ARC WELDING EPUIPMENTS, DRYING OVEN
JACKS/PIPE BENDING M/C CHAMFERING M/C
SMALL T&P---CHISELS, SRAPPERS, SPANNERS,HAMMER
FILES, SCREW DRIVERS, WIRE ROPES .
ELECTRICAL TOOL, ULTRSONIC TESTING M/C
REDIOGRAPHY SOURCE
SPACE CLIMBER
PMI Revision 01 18
8/9/2019 Over View of Erection
19/19