CONNEXION MONTHLY REPORT MAY 2021 FIBER AREAS UPDATE Monthly info / highlights Over 42.18 miles of fiber were installed in April, along with 495 vaults and 755 flowerpots (smaller vaults). Project to date: 489.7miles of fiber have been installed along with 7,602 vaults and over 13,562 flowerpots. Downtown construction has paused due to a supply issue and will resume by the beginning of June. Irrigation season has started in Fort Collins and our crews will be utilizing the Spring Checklist to repair irrigation systems and landscape damaged during the winter season. For questions about landscape repairs or to report construction damage, please call our Help Line at 970-674-7800 or email [email protected]. OVERALL FIBER CONSTRUCTION THROUGH APRIL ‘21 2018 2019 2020 2021 2022 2023 Design Construction Available Atlantic Engineering Group (AEG) work Connexion Service Available ongoing 0 50 100 150 200 250 Y 2019 Jan-20 Feb-20 Ma r-20 Apr-20 Ma y-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Ma r-21 Apr-21 Ma y-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 #of Areas Actual Forecasted *Includes fibers areas that have construction completed and turned over for QC Total Fiber Areas Complete* 0 Ft 500,000 Ft 1,000,000 Ft 1,500,000 Ft 2,000,000 Ft 2,500,000 Ft 3,000,000 Ft 3,500,000 Ft Y 2019 Jan-20 Feb-20 Ma r-20 Apr-20 Ma y-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Ma r-21 Apr-21 Ma y-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Fiiber Pulled in Feet Actual Forecasted Total Fiber Pulled

OVERALL FIBER CONSTRUCTION THROUGH APRIL ‘21...CONNEXION MONTHLY REPORT MAY 2021 FIBER AREAS UPDATE Monthly info / highlights • Over 42.18 miles of fiber were installed in April,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OVERALL FIBER CONSTRUCTION THROUGH APRIL ‘21...CONNEXION MONTHLY REPORT MAY 2021 FIBER AREAS UPDATE Monthly info / highlights • Over 42.18 miles of fiber were installed in April,

CONNEXION MONTHLY REPORT MAY 2021

FIBER AREAS UPDATE

Monthly info / highlights

• Over 42.18 miles of fiber were installed in April, along with 495 vaults and 755 flowerpots (smaller vaults).

• Project to date: 489.7miles of fiber have been installed along with 7,602 vaults and over 13,562 flowerpots.

• Downtown construction has paused due to a supply issue and will resume by the beginning of June.

• Irrigation season has started in Fort Collins and our crews will be utilizing the Spring Checklist to repair irrigation systems and landscape damaged during the winter season. For questions about landscape repairs or to report construction damage, please call our Help Line at 970-674-7800 or email [email protected].

OVERALL FIBER CONSTRUCTION THROUGH APRIL ‘21

2018 2019 2020 2021 2022 2023

Design

Construction

Available

Atlantic Engineering Group

(AEG) work

Connexion Service Availableongoing

0

50

100

150

200

250

Y 20

19

Jan-

20

Feb-

20

Mar

-20

Apr-2

0

May

-20

Jun-

20

Jul-2

0

Aug-

20

Sep-

20

Oct

-20

Nov

-20

Dec

-20

Jan-

21

Feb-

21

Mar

-21

Apr-2

1

May

-21

Jun-

21

Jul-2

1

Aug-

21

Sep-

21

Oct

-21

Nov

-21

Dec

-21

#of A

reas

Fiber Areas Complete

Actual Forecasted

*Includes fibers areas that have construction completed and turned over for QC

Total Fiber Areas Complete*

0 Ft

500,000 Ft

1,000,000 Ft

1,500,000 Ft

2,000,000 Ft

2,500,000 Ft

3,000,000 Ft

3,500,000 Ft

Y 20

19

Jan-

20

Feb-

20

Mar

-20

Apr-2

0

May

-20

Jun-

20

Jul-2

0

Aug-

20

Sep-

20

Oct

-20

Nov

-20

Dec

-20

Jan-

21

Feb-

21

Mar

-21

Apr-2

1

May

-21

Jun-

21

Jul-2

1

Aug-

21

Sep-

21

Oct

-21

Nov

-21

Dec

-21

Fiib

er P

ulle

d in

Fee

t

Fiber Pulled

Actual Forecasted

Total Fiber Pulled

Page 2: OVERALL FIBER CONSTRUCTION THROUGH APRIL ‘21...CONNEXION MONTHLY REPORT MAY 2021 FIBER AREAS UPDATE Monthly info / highlights • Over 42.18 miles of fiber were installed in April,

FINANCES

Connexion YTD Budget to Actual as of April ‘21

BUDGET ACTUAL BETTER / (WORSE)

Operating Revenues* $2,762,372 $1,242,995 ($1,519,377)

Operating Expense** $4,231,346 $1,712,137 $2,519,209

Net Operations ($1,468,974) ($469,142) $999,832

Investment Income $190,104 $382,334 $192,230

Net Total ($1,278,870) ($86,808) $1,192,062

BUDGET PROJECT TO DATE REMAINING

Construction Budget $109,217,775 $83,284,433 $25,933,342

* Excludes investment earnings on bond proceeds** Excludes Depreciation

CONNEXION MONTHLY REPORT

Auxiliary aids and services are available for persons with disabilities. V/TDD: 711MAY 2021

21-23252

In to the third year of Connexion’s rollout, our deployment is on track for construction completion in Q4 2022.

• Operating revenues are less than budgeted, as are the operating expenses for April. Resulting in a positive net effect of $1.0 M.

• Net total (operating cashflow) was $1.2 M positive compared to budget, driven primarily by lower operating expenses and positive investment income.

• We are approximately 76% spent on Construction Budget, reflecting the increase in boring and operating crews in 2021.

Completed Bore Length2,340,157 ft

86.5%

Total Bore Length2,704,557 ft*

Completed Fiber Pulled through Conduit2,585,494 ft

52.2%

Total Fiber Pulled through Conduit4,952,640 ft

Total Fiber Area Construction Completed140

*A Fiber Area on average serves 225 homes

39.2%

Total Fiber Area*357

Spent to Date$83,284,433

76.3%

Total Construction Budget$109,217,775

* Bore Length may be updated through the course of the project as design is completed.