OVERHEAD CONSTRUCTION MANUAL
REACTORS Go to SECTION INDEX Back to MAIN INDEX
CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG
Ergon Energy Corporation Ltd
ABN 50 087 646 062 FILE: 5 17 1402 1
OVERHEAD DISTRIBUTION REACTORS INDEX
APPROVED
DATE
PASSED
DRAWN M. Kavanagh Index
30.06.05
Sh 1
J. Brooks A ORIGINAL ISSUE
Construction Code Guide – Reactor Structure 1403/1 Construction Code Guide – Reactor Tank 1403/2 (Tank) 12.7/19.1kV 25/50kVAr SWER 1400/1 REAT12/S/25 fused Shunt Reactor construction – material REAT19/S/25 12.7/19.1kV 25/50kVAr SWER 1400/2 REAT19/S/50 fused Shunt Reactor construction (Structure) 12.7/19.1kV 25/50kVAr SWER 1400/3 REAS12/S/25NF fused Shunt Reactor construction – drilling REAS19/S/25NF detail REAS19/S/505NF 12.7/19.1kV 25/50kVAr SWER 1400/4 Fused Shunt Reactor construction – Shunt Reactor and HV bridging
140017 1400 1
23.7.03
2
Connection bushing HV 11/12.7kV
Connection bushing HV 22/19.1kV
3
2
1Guard wildlife to wood pole
Pole Mounted plant to wood pole
MATERIAL - H.V. BRIDGING (Sheet 4)
ASSY DESCRIPTION QTY
61-1
61-2
MATERIAL -
DESCRIPTIONASSY QTY
26-5
64-1
85-2
85-10
88-15
Bracket stand-off to wood pole
1
1
1
1
Clamp live line to mains (5 - 19mm) (LL1)
140-62
2141-14 Lug, compression Cu. 35mm M12
Cable, insulated hard drawn Cu. 35mm
2140-1
21141-9 Lug, compression Cu. 10mm M12
Cable, bare annealed Cu. 10mm
101-10 Pole step to wood pole (screw in) (12.5m pole) 6
REACTOR MOUNTING
NOTES:
3. Earth leads and metalwork to be separated by at least 50mm.
contact with the wood.
be greased for the entire length that may come into
1. All metalwork that passes through or into wood shall
Construction Practices.
2. For wood pole attachments and foundations refer to
Surge arrester to tank (22/12.7kV)1
1
1
Surge arrester to tank (33/19.1kV)
QTYDESCRIPTIONASSY
62-4
62-7
152-6
152-10
89-33
152-12
89-31 Fuse Link 11/22/33kV 3/10A Class K
Fuse Link 11/22/33kV 6/20A Class K
REACTOR CONSTRUCTION:-
MATERIAL - REACTOR (Sheet 4.)
4. Reactor to be fitted under supply.
Shunt Reactor 25kVAr 12.7kV SWER
Shunt Reactor 25kVAr 19.1kV SWER
Shunt Reactor 50kVAr 19.1kV SWER
REACTORS
FUSED CONSTRUCTION - MATERIAL
12.7/19.1kV 25/50kVAr S.W.E.R.
2
B 21.7.06
D
HARD COPYUNCONTROLLED
C 28.02.12
C.Avenell
C.Noel
T.Borg
EDO fuse switch SWER/33kV to stand-off bracket 1
D 10.5.12
(25kVAr)
(50kVAr)
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5
�����������
��B� 1/2 �DISC
����
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�
�
�
�
�
�
�
��
�
�
�
�
�
��
�
����� �
��
���
�
�
�
�
F
F
F
F
F
140017 1400 4
24.7.03
00
XX
X
11
00
33
00
36
80
38
0
Wood
Po
le
H.V
. F
US
E L
INK
S
Assy 8
8-1
5
F
F
F
Assy 8
5-1
0
4
�
�
�
�
�
�
R.L
. to
suit
bra
ck
et
su
pp
lied
F
F
F
Assy 1
41-9
Ass
y 1
40
-1
Ass
y 6
4-1
F
Assy
26
-5
F
25/5
0kV
Ar
REACTORS
FUSE AND H.V. BRIDGING
12.7/19.1kV 25/50kVAr S.W.E.R.
F
Assy S
ele
cti
on
15
2-6
, 1
0 o
r 1
2
Assy S
ele
cti
on
62-4
or
7
Assy 1
40-6
Assy 1
41-1
4
Assy S
ele
cti
on
61-1
or
2
Assy S
ele
cti
on
89
-31
or
33
B 21.7.06
C
HARD COPYUNCONTROLLED
C. Noel
C. Avenell
L. Burton
NO
TE
:
For
copper
main
s u
se
Assy
88
-17
no
t 8
8-1
5
�
C 15.12.11
Assy 8
5-2
���
�
�
��
�
�
�DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation Ltd
A ORIGINAL ISSUE
ABN 50 087 646 062Dwg Sh
OVERHEAD DISTRIBUTION
FILE: 5