Overview of ETSI Testing Methodology
ICT-OSA/Parlay WorkshopBrazil, March 2006
Anthony Wiles
Manager
ETSI Protocol and Testing Competence Centre
Testing Methodology - ICT Workshop, Brazil March 2006 2
Interoperability is …
The ultimate aim of ICT standardisation The red thread running through the entire standards
development process, it’s not an isolated issue Not something to be somehow fixed at the end
The ability of systems and products to interwork is fundamental
ETSI approach ETSI produces with the required degree of parallelism
• Base Standards and • Test Specifications
Base standards should be designed with interoperability in mind Profiles designed to reduce potential non-interoperability Protocol conformance and Interoperability statements Two complementary forms of testing
• Conformance testing• Interoperability testing (formal IOT)
Testing provides vital feedback into the standardization work
Testing Methodology - ICT Workshop, Brazil March 2006 3
Technical Committee MTS (Methods for Testing and Specification)
Development of methodologies, techniques and languages (including TTCN3) http://portal.etsi.org
ETSI’s Protocol and Testing Competence Centre (PTCC)Supports ETSI committees on the application of formal techniques in standards on a daily basisDevelopment of test specifications (conformance and interop)
http://www.etsi.org/ptcc
ETSI Plugtests™ ServiceValidation of standards and prototypes through interoperability events http://www.etsi.org/plugtests
These resources are highly complementary
ETSI Resources for Interoperability
Testing Methodology - ICT Workshop, Brazil March 2006 4
Typical Standards Development Process in ETSI
(Unit) Conformance Testing
Interoperability Testing
Products mature from prototypes to commercial products
ETSI: Development of base standards
Certification
Industry
time
Conformance Test Specifications
Interoperability Test SpecificationsIterative feedback
Testing Methodology - ICT Workshop, Brazil March 2006 5
Different Kinds of ETSI Test Specifications
Conformance Robustness
PerformanceInteroperability
Network Integration
RF/EMC
Testing Methodology - ICT Workshop, Brazil March 2006 6
Progressive Testing
All engineering disciplines accept that testing should be applied to progressively complex units From individual components to entire systems
This demands a number of different testing solutions There is no silver bullet
In the two extremes Just testing the components is not enough Just testing the system is not enough
Limitations are economic, not technical What can I afford to test? What can I afford not to test?
What should be covered by standardised test specifications What is the right kind of testing for the job
What kind of ‘thing’ is being tested? Device? System? Service? What is the most economic method(s)? What resources are (or must be made) available?
• Tools, test scripts, testbeds etc.
Testing Methodology - ICT Workshop, Brazil March 2006 7
Conformance and Interoperability Testing are Complementary
ETSI experience As you move up a system stack the emphasis should change
from conformance to IOT
Lower layer protocols, infrastructure Emphasis on conformance
Middleware, enablers Combination of Conformance + IOT
Services, applications, systems Emphasis on IOT
Conformance testing as a pre-requisite to IOT
Interop Testing
Conformance Testing
Interoperability
Testing Methodology - ICT Workshop, Brazil March 2006 8
Conformance Testing
Tester
Is Black-Box testing Stimulation and Response
Device
Point of Control and Observation (PCO)
Reqs.
Testing Methodology - ICT Workshop, Brazil March 2006 9
Conformance Testing Tests is Usually Layer-byLayer
lat
ii
1 2 3
4 5 67 8 9
* 8 #
latigid
TestSystem
SUT API
MMI
L3
L2
PHY
SUT = System Under Test
IUT = Implementation Under Test
L3
Upper Tester
Lower Tester
Testing Methodology - ICT Workshop, Brazil March 2006 10
Characteristics of Conformance Testing (1)
Is unit testing Tests a single ‘part’ of a device (e.g., a protocol layer)
• Often incrementally – layer-by-layer
Tests against well-specified requirements For conformance to the requirements in a base
specification or profile (standard) Usually limited to one requirement per test
Tests at a 'low' level At the protocol (message/behaviour) level (bits)
• Or service primitive, API, Interface
Tests over standardised interfaces May not be available to ‘normal’ user
Requires a test system (and executable test cases) Can be expensive (e.g., radio-based test system) Tests under ideal conditions
Testing Methodology - ICT Workshop, Brazil March 2006 11
Characteristics of Conformance Testing (2)
High control and observability Means we can explicitly test error behaviour Can provoke and test non-normal (but legitimate)
scenarios Can be extended to include robustness tests
It is usually automated and tests are repeatable Conformance Testing is DEEP and NARROW
Thorough and accurate but limited in scope Gives a high-level of confidence that key components of
a device or system are working as they were specified and designed to do
Testing Methodology - ICT Workshop, Brazil March 2006 12
Limitations of Conformance Testing
Does not prove end-to-end functionality (interoperability) between communicating systems Conformance tested implementations may still not interoperate
• This is often a specification problem rather than a testing problem! Need minimum requirements or profiles
Does not test a complete system Tests individual system components, not the whole
• A system is often greater than the sum of its parts!• Does not test functionality
– Does not test the user’s ‘perception’ of the system
Standardised conformance tests do not include proprietary ‘aspects’ Though this may well be done by a manufacturer with own
conformance tests for proprietary requirements
Testing Methodology - ICT Workshop, Brazil March 2006 13
Conformance Testing Documentation and Process: ISO 9646 Methodology
Test Suite (Test Cases)
ATS
Req. checklist
ICS
Test Purposes
TSS & TP
testingTest
Report
logging and
analysis
Test System
Base Standard
(or Profile)
implementation
Product
Implementation Under Test
compilation
Executable Test Suite
(e.g., C++)
Industry
validation
Testing Methodology - ICT Workshop, Brazil March 2006 14
Implementation Conformance Statement (ICS)
The ICS is a checklist of the capabilities supported by the Implementation Under Test (IUT)
Provides an overview of the features and options that are implemented in any given product
The ICS can be used to select and parameterise test cases and can be used as an indicator of basic interoperability between different products.
Conditional support e.g., Qn must be supported if Q1 supported then otherwise not.
Q# ICS Question Ref Status Support
Q1 Support of Feature F1 [x] Clause a OPTIONAL
Q2 Support of Feature F2 [x] Clause b MANDATORY
: : : :
Qn Support of Message M1 [y] Clause c CONDITIONAL
: : : :
Qk Support of message Parameter P1 [y] Clause d OPTIONAL
Testing Methodology - ICT Workshop, Brazil March 2006 15
Profile ICS
Q# ICS Question Ref Status Profile Status Support
Q1 Support of feature F1 [x] Clause a OPTIONAL MANDATORY
Q2 Support of feature F2 [x] Clause b MANDATORY MANDATORY
: : : : :
Qn Support of Message M1 [y] Clause c CONDITIONAL MANDATORY
: : : : :
Qk Support of parameter P1 [y] Clause d OPTIONAL N/A
A profile ICS reflects how a (protocol) profile restricts the scope of a base standard by making certain options mandatory or excluding certain options.
Testing Methodology - ICT Workshop, Brazil March 2006 16
Selecting Tests with the ICS
Q# ICS Question Ref Status Support
Q1 Support of Feature F1 [x] Clause a OPTIONAL
Q2 Support of Feature F2 [x] Clause b MANDATORY
: : : :
Qn Support of Message M1 [y] Clause c CONDITIONAL
: : : :
Qk Support of message Parameter P1 [y] Clause d OPTIONAL
A filled-in ICS can be used to select tests. For example, a test for an OPTIONAL feature which is not supported in a given product will be deselected from the test suite.
Testing Methodology - ICT Workshop, Brazil March 2006 17
Parameterizing Tests with eXtra Information for Testing (IXIT)
Q# IXIT Question Ref Allowed Values Value
Q1 Network address [x] Clause a Valid IP address 12.34.56.76
Q2 Value of Timer T1 [x] Clause b 1 .. 7 s 5s
: : : : :
A filled-in IXIT can be used to parameterize tests. The Value column is used to specify explicit IUT or test system dependent values.
Testing Methodology - ICT Workshop, Brazil March 2006 18
Test Purposes (TP)
Test Purposes (TP) are natural language, precise descriptions of the purpose of the test in relation to a particular (base standard) requirement
They are very focussed. They are not code.
A TP is WHAT to test not HOW to test
TPId: SIP_SS _PR_CE _V_012Selection: Mandatory [Q2]Precondition: Registration of both simulated UA to the IUT and an initiated sessionRef: 5.1.1 [1], 17.3.6 [1], 17.4 [1] , 10.46.6 [1]Purpose: Ensure that the IUT on receipt of a Server Internal Error (500 Server Internal Error) server failure response, sends an ACK request, with the same field Via and Branch parameter as in the previous INVITE, to the UAS and forwards it to the UAC.
Testing Methodology - ICT Workshop, Brazil March 2006 19
Test Suite Structure (TSS)
RegistrationRegistrant
ValidInvalid
Registrar:
SessionOriginating Endpoint
Call EstablishmentTP_S_OE_CE_01TP_S_OE_CE_02TP_S_OE_CE_03:
Call Release :
Terminating EndpointProxyRedirect Server
:
Test Purposes are grouped into a logical Test Suite Structure (TSS) according to suitable criteria
e.g., basic interconnection, error handling, functionality etc.).
The complete document is usually called the Test Suite Structure and Test Purposes (TSS&TP)
Testing Methodology - ICT Workshop, Brazil March 2006 20
Abstract Test Suite
A Test Case is the ‘implementation’ of the test purpose Is the HOW to test not WHAT to test
The Test Suite (ATS) is the collection of all Test Cases Most ETSI Test Suites are written in TTCN
Predominantly in TTCN-2 Progression to TTCN-3 for new work Not RF testing (generally not physical layer)
TTCN-3 Testing and Test Control Notation Allows tests to be specified in detail (test code) that is
independent of the (eventual) real test system on which it may be run
• i.e., TTCN-3 will run on any test system that supports a standardised TTCN-3 execution environment
Testing Methodology - ICT Workshop, Brazil March 2006 21
Executable Test Suites
Executable test suites are compiled from the abstract Either direct to binary, or More commonly to some intermediate programming
language (C++, Java, etc.)
ETSI does not deliver executables, but We try to ensure all code can be compiled And validated by executing the tests against a real
implementation on at least one test system• 5 test systems in the case of UMTS, for example
Testing Methodology - ICT Workshop, Brazil March 2006 22
Interoperability Testing End-to-End Interoperability of devices
What is being tested? Assignment of verdicts?
Need to distinguish between Formal interoperability testing And informal interoperability events used to validate/develop
technologies
Device1 Devicen
Device2
Testing Methodology - ICT Workshop, Brazil March 2006 23
SUT
API
MMI
L3
L2
PHY
API
MMI
L3
L2
PHY
QE = Qualified
Equipment
EUT = Equipment Under Test
Interoperability Testing Tests Functionality Between Devices
Conformance Monitoring
Interoperability Testing(of terminals)
1 2 3
4 5 67 8 9
* 8 #
QE EUT
1 2 3
4 5 67 8 9
* 8 #
Means of Communication (MoC)
Testing Methodology - ICT Workshop, Brazil March 2006 24
Characteristics of Interoperability Testing
Is system testing Tests a complete device or a collection of devices
Shows that (two) devices interoperate Albeit within a limited scenario
Tests at a ‘high’ level (as perceived by users) Tests the ‘whole’, not the parts
• e.g, protocol stacks + applications Tests functionality
• Shows function is accomplished (but not how)
Does not necessarily require a test system Uses existing interfaces (standard/proprietary)
Interoperability Testing is BROAD and SHALLOW Less thorough but wide in scope Gives a high-level of confidence that devices (or components in
a system) will interoperate with other devices (components)
Testing Methodology - ICT Workshop, Brazil March 2006 25
Limitations of Interoperability Testing
Does not prove interoperability with other implementations with which no testing has been done A may interoperate with B and B may interoperate with C. But it
doesn’t necessarily follow that A will interoperate with C. Combinatorial explosion
Does not prove that a device is conformant Interoperable devices may still interoperate even though they
are non-conformant
Cannot explicitly test error behaviour or unusual scenarios Or other conditions that may need to be forced (lack of
controllability) Has limited coverage (does not fully exercise the device)
Not usually automated and may not be repeatable
Testing Methodology - ICT Workshop, Brazil March 2006 26
Interoperability Test Methodology
ETSI TS 102 237-1
Uses best principles of ISO 9646 and adapts them for interoperability testing
Definitions
EUT – Equipemt Under Test
QE – Qualified Equipment
Concepts
IFS (like the PICS)
• Interoperable Functions Statement
Generic testing architecture
Test Descriptions (in prose, tabular format)
If suitable interfaces (API/MMI) are exposed then can automate the tests by running TTCN-3 scripts
Processes
Basic test specification development process
Testing Methodology - ICT Workshop, Brazil March 2006 27
Interoperability Testing Documentation and Process: TS 102 237 Methodology
Interop Test Cases
Test Report
logging and
analysis
Base Standard (or Profile)
implementation
Product 1
Qualified Equipment
Product 2
Equipment Under Test
implementation
IFS (functional checklist)
Interop Test Purposes
testing
Testing Methodology - ICT Workshop, Brazil March 2006 28
Test Purpose Language (TPLan)
ETSI language, not necessarily restricted to IOP testing Keywords and syntax provide clear and consistent
structure Keywords chosen for communications applications (sends,
receives etc.) Text between keywords not part of syntax so free
expression possible A TP’s basic structure (corresponding keyword):
Header (TP id) Pre-conditions (with) Stimulus (when) Expected response (then)
Testing Methodology - ICT Workshop, Brazil March 2006 29
TP id : TP_COR_1719_02Summary : 'EUT sends packet to All-RT LL M/cast address'RQ ref : RQ_COR_1719Config : CF_021_ITD ref : TD_COR_1719_02
with { QE1 'configured as a router' and QE2 'configured as a router'}
ensure that { when { EUT is requested to 'send packet to All-Routers Link-Local M/cast addr' } then { QE1 indicates 'receipt of the packet' and QE2 indicates 'receipt of the packet' } }
TPLan Example for Interoperability
Testing Methodology - ICT Workshop, Brazil March 2006 30
Interoperability Test Descriptions
Specify detailed steps to be followed to achieve stated test purpose
Steps are specified clearly and unambiguously without unreasonable restrictions on actual method: Example:
• Answer incoming call
NOT• Pick up telephone handset
Written in a structured and tabulated natural language so tests can be performed manually
Can be automated using TTCN‑3 when EUT has software interfaces
Testing Methodology - ICT Workshop, Brazil March 2006 31
Example Test Description
Test: COR_001_02 Selection Criteria: Mandatory Selected: Yes
Title: Auto configure QE using a unique address in a simple network
Test Purpose: ensure that {when { etc……….
Pre‑test conditions: Configure the equipment to ensure that QE1 will not intend to use the same link-local address than the one used by EUT (EUT and QE1 interfaces carry different Interface identifiers and both run stateless autoconfig, or EUT Link-Local address configured manually).
EUT interface is up and carries a link-local address QE1 interface is down
Step Test description Verdict
Pass Fail
1 Turn on QE1 interface and wait a few seconds
2 EUT sends an echo request to the Link-Local address of QE1
3 Check: does EUT receive an echo reply from QE1? Yes No
4 QE1 sends an echo request to the Link-Local address of EUT
5 Check: does QE1 receive an echo reply from EUT? Yes No
Observations:
Testing Methodology - ICT Workshop, Brazil March 2006 32
Automated IOP Testing Using TTCN-3
TestDriver
(TTCN-3)
TestDriver
(TTCN-3)
TestController(TTCN-3)
AT Command
s
AT Command
s
Testing Methodology - ICT Workshop, Brazil March 2006 33
Network Integration Testing (NIT)
End-to-end testing of the system Components in the network must interoperate
Test Driver2
SUT
SIP
RADIUS
DIAMETER
PoC
Test Driver1
Testing Methodology - ICT Workshop, Brazil March 2006 34
Example NIT for IMS
End-to-End Methodology
Mw Mw
UE1
Um Um
UE2
P-CSCF1
S-CSCF1 S-CSCF2
Cx
Mw
Access Network
HSS
I-CSCF P-CSCF2 Access Network
Testing Methodology - ICT Workshop, Brazil March 2006 35
Testing Methodology - ICT Workshop, Brazil March 2006 36
TTCN-3 can be used for Conformance and Interoperability Testing
A
TTCN-3
latigid
Conformance testing(of a network element)
1 2 3
4 5 6
7 8 9
* 8 #
Conformance testing(of terminal equipment)
latigid
TTCN-3
B
Interoperability testing(of terninal equipment)
1 2 3
4 5 6
7 8 9
* 8 #
1 2 3
4 5 6
7 8 9
* 8 #
TTCN-3TTCN-3
Testing Methodology - ICT Workshop, Brazil March 2006 37
Benefits of TTCN-3
Specifically designed for testing
Concentrates on the test not the test system
Commonly understood syntax and operational semantics
Constantly maintained and developed
Off-the-shelf tools and TTCN-based test systems are readily available
Single language for many (all?) testing activities
Education and training costs can be rationalized
Maintenance of test suites (and products) is easier
Allows the application of a common methodology and style, both on a corporate level and within standardization
Testing Methodology - ICT Workshop, Brazil March 2006 38
Main Capabilities of TTCN-3
Dynamic concurrent testing configurations
Various communication mechanisms (synch and asynch)
Data and signature templates with powerful matching mechanisms (including regular expressions)
Specification of encoding information
Display and user-defined attributes
Test suite parameterization
Control of Test Case execution and selection mechanisms
Control of complex test configurations
Assignment and handling of test verdicts
Harmonized with ASN.1 (XML and IDL coming)
Different presentation formats
Well-defined syntax, static - and operational semantics
Testing Methodology - ICT Workshop, Brazil March 2006 39
The Core Languageand Other Presentation Formats
TTCN-3 Core Language
Text format
PresentationFormat3
PresentationFormatn
Graphical Format
Tabular Format
Core format is text based (most popular)
TTCN-3 can be edited or viewed in other formats
Tabular format (for TTCN-2 people)
Graphical format (good for visual overview)
Other standardized formats in the future?
Proprietary formats possible
Testing Methodology - ICT Workshop, Brazil March 2006 40
Example Core (Text) Format
function PO49901(integer FL) runs on MyMTC {
L0.send(A_RL3(FL,CREF1,16))TAC.startalt {
[] L0.receive(A_RC1((FL+1) mod 2)) { TAC.cancel
verdict.set(pass)
}
[] TAC.timeout { verdict.set(inconc)
}
[] any.receive { verdict.set(fail) }
}}
Testing Methodology - ICT Workshop, Brazil March 2006 41
Example Graphical Format
Testing Methodology - ICT Workshop, Brazil March 2006 42
Example Tabular Format
Test Case Definition
Name : MyTestcase
Group :
Purpose : Example Testcase
System I/f :
MTC Type : MyComponentType
Comments :
Name Type Initial Value Comments
MyVar INTEGER 0
Behaviour Definition Comments alt { [ ] MyPort.receive(Msg); [ ] : }
DetailedComments:
Testing Methodology - ICT Workshop, Brazil March 2006 43
Use of TTCN-3 With Other Languages
TTCN can be integrated with other languages
Fully harmonized with ASN.1 (1997)
Harmonized with other languages
IDL, XML, C/C++
TTCN-3 Core Language
IDL Types & Values
Other types & Valuesn
XML Types & Values
ASN.1 Types & Values
Testing Methodology - ICT Workshop, Brazil March 2006 44
Test Suite
Major Elements of a TTCN-3 Test Suite
Test Behaviour
Test System Architecture
Actual Test Data
Test Data Types
Definition of data types for• Protocol Messages and• Information elements (fields, parameters)• Internal data (e.g., for computation)• Test coordination messages etc.Predefined simple types Integer, boolean, float bitstring, hexstring, octetstring charstring, universal charstring... and complex types record, record of, set, set of union, enumerated
... and special types such asverdict, address
Actual test data (values) used during testing
• Message templates• (Remote) signature templates
• Matching mechanisms
• values, lists, wildcards, • regular expressions etc.
• Encoding information
Test components
Test ports
Connections
• between test components
• to System Under Test
Configurations
• static
• dynamic
test cases
test steps
default behaviour
management of test components
sending/receiving messages
verdict assignment
computation (e.g., checksums)
timers and timeouts
test execution and control
etc.
Testing Methodology - ICT Workshop, Brazil March 2006 45
Simple TTCN-3 Architecture
IUTTest Systemstimulus
response
Point of Control and Observation
(PCO)
Test port Test port
Implementation Under TestBlack-Box
TTCN-3 based Test
System
Testing Methodology - ICT Workshop, Brazil March 2006 46
TTCN-3 Architecture – Test Components
Test System
Parallel Test Component
(PTC)
Parallel Test Component
(PTC)
Main Test Component
(MTC)
Communication to IUT
Internal Communication
IUT
Testing Methodology - ICT Workshop, Brazil March 2006 47
TTCN-3 Module
module Example{
// Definitions part
control{
// Control part}
} with {encode "BER"}
Attributes
Module (…)
Module Control
Module Definitions
Testing Methodology - ICT Workshop, Brazil March 2006 48
module Example{
group TestArchitecture{
// Port and Test Component definitions }group MessageTypes{
// Defintions of message types }group ActualMessages{
// Templates for instances of actual messages}group TestCases{
// Test Case definitions}
}
Definitions Partmodule Example{
// Port and Test Component definitions // Defintions of message types // Templates for instances of actual messages// Test Case definitions
}
Testing Methodology - ICT Workshop, Brazil March 2006 49
Specifying Test Messages
type record MsgType{ integer msgId charstring msgName, charstring msgInfo}
template MsgType INVITE{ msgId 0 msgName "INVITE", msgInfo "For a good Brazilian Dinner"}
template MsgType ACCEPT{ msgId 1 msgName "ACCEPT", msgInfo *}
Testing Methodology - ICT Workshop, Brazil March 2006 50
TTCN-3 Behaviour
INVITE ACCEPT or DECLINE
P
testcase TC1() runs on PTC1{
P.send(INVITE)T1.start(30E3)alt{
[] PCO.receive(ACCEPT){verdict.set(pass)}
[] PCO.receive(DECLINE){verdict.set(inconc)} [] PCO.receive{verdict.set(fail)}
[] T1.timeout{verdict.set(fail)}
}}
Testing Methodology - ICT Workshop, Brazil March 2006 51
Attributes
The Control Part
Module (…)
Module Control
Module Definitions
module Example{
// Definitions part
params { boolean Q1;:
}
control{
if Q1 then execute (TC1()):
}} with {encode "BER"}
Testing Methodology - ICT Workshop, Brazil March 2006 52
TTCN-3 Test System
ENCODER
DECODER
(N-protocol specific)
Adaptation Layers
TRITTCN-3 Runtime Interface
TCI TTCN-3 Control Interface
The Industry
Test Suite in TTCN-3
(source)
TTCN-3 Test Suite
(object)
Compilation
PICS etc
(reqs. catalogu
e)
Parameterisation
Selection
Underlying Protocol Stack
(N-1)
Connection to the SUT
Control / Logging
User
Testing Methodology - ICT Workshop, Brazil March 2006 53
TTCN-3 Standardshttp://www.ttcn-3.org
ES 201 873-1 (Z.140) TTCN-3 Core Language
ES 201 873-2 (Z.141) TTCN-3 Tabular Presentation Format (TFT)
TR 101 873-3 (will eventually be ES 201 873-3) (Z.142) TTCN-3 Graphical Presentation Format (GFT)
ES 201 873-4 (Z.143) TTCN-3 Operational Semantics
ES 201 873-5 TTCN-3 Runtime Interface (TRI)
ES 201 873-6 TTCN-3 Control Interfaces (TCI)
ES 201 873-7 and upwards Using ASN.1, XML, IDL, C/C++, with TTCN-3
Testing Methodology - ICT Workshop, Brazil March 2006 54
Concluding Thoughts (1)
Bad publicity in trade magazines Embarrassment for the manufacturer Annoyance of the end customer
In the past, interoperability failures meant:
Today, interoperability failures in the field means:
Front page headlines in the Financial Times Fall in manufacturers stock price Loss of investor confidence Unrecoverable damage to brand name Irretrievable loss of customers
We can no longer afford to get it wrong! Testing We can no longer afford to get it wrong! Testing is part of ETSI’s strategy to get it right!is part of ETSI’s strategy to get it right!
Testing Methodology - ICT Workshop, Brazil March 2006 55
Concluding Thoughts (2)
ETSI membership believes in methodical testing A good example
GSM/UMTS is growing by 1 Million users per day! Can you imagine what would happen if users were
experiencing interoperability problems ? More than 1 Million Euros invested per year for writing
formal test specifications and test suites We have experienced what it means to get it right!
A bad example We have not always got it right! For GPRS we did not take a formal approach to testing First market products did not interoperate
We have learnt that testing is not cheap, but it pays in the long run
Thank You!
Anthony Wiles
ETSI Protocol and Testing Competence Centre
Phone +33 (0)4 92 94 43 26
e-mail [email protected]
Website www.etsi.org/ptcc