39
The business of sustainability © Copyright 2019 by ERM Worldwide Group Limited and/or its affiliates (‘ERM’). All Rights Reserved. No part of this work may be reproduced or transmitted in any form or by any means, without prior written permission of ERM. Overview of Fenceline Monitoring Reporting Process In CEDRI Presented by: Toby Hanna Pat Sorensen Hedrick Strickland Andy Woerner April 25, 2019

Overview of Fenceline Monitoring Reporting Process In CEDRI · 2019. 4. 25. · Overview of Fenceline Monitoring Reporting Process In CEDRI Presented by: Toby Hanna. Pat Sorensen

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

  • The business of sustainability

    © Copyright 2019 by ERM Worldwide Group Limited and/or its affiliates (‘ERM’). All Rights Reserved. No part of this work may be reproduced or transmitted in any form or by any means, without prior written permission of ERM.

    Overview of FencelineMonitoring Reporting Process In CEDRIPresented by:

    Toby HannaPat SorensenHedrick StricklandAndy Woerner

    April 25, 2019

  • www.erm.com

    Today’s Webinar

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 2

    Andy WoernerPartner

    Toby HannaPartner, Regional Lead, Air Quality & Climate Change

    Hedrick StricklandProject Manager

    Pat SorensenPrincipal Consultant

    Populate & Review Reporting Template01

    02

    03

    04

    Package & Upload Data to CEDRI

    Review WebFIRE

    Q&A

  • www.erm.com

    https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri

    Finding the Template

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 3

    https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri

  • www.erm.com

    Register for CEDRI

    https://cdx.epa.gov/Register

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 4

    Accept Terms and ConditionsAdd CEDRI to your active program service list

    https://cdx.epa.gov/

  • www.erm.com

    Submitting Package

    There are four criteria which must be met before you may submit a CEDRI package: One registered Certifier for the CEDRI program

    service has access to the submittal

    User submitting package is registered as a Certifier or a Delegated Certifier

    A facility has been selected and set for the submission package

    All reports within the submission package have the status of ‘Pending Signature’

    When criteria are met, the ‘Submit’ button will be activated

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 5

  • www.erm.com

    Certify Package

    Accept certification statement Launches CDX Cross-Media Electronic

    Reporting Regulation (CROMERR) eSignature Widget

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 6

  • www.erm.com

    Certify Package

    Completing eSignature Widget is a three-step process: Log in to CDX

    Answer your secret question

    Click ‘Sign’ to sign the file

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 7

  • www.erm.com

    Certify Package

    Submission Home tab shows report status ‘Processing’CEDRI will send a confirmation emailAfter processing, package will appear in the ‘CEDRI History’ list

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 8

  • www.erm.com

    WebFIRE

    https://cfpub.epa.gov/webfire/Search for reports

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 9

    https://cfpub.epa.gov/webfire/

  • Details

  • www.erm.com

    https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri

    Finding the Template

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 11

    https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri

  • www.erm.com

    Finding the Template

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 12

    https://www.epa.gov/electronic-reporting-air-emissions/compliance-and-emissions-data-reporting-interface-cedri#63

  • www.erm.com

    Review

    Facility Information File name of any supporting documentation (optional)

    Period Identifications Clear annual average ∆C prior to first year of data (Column F) (optional)

    Row 49 is the 26th sample period – may want to clear first 25 values (rows 24 – 48)

    Only first reporting period will be affected

    Comments about exceedances or residual exceedances (optional)

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 13

  • www.erm.com

    Review (continued)

    Sampler Information Check locations that may have moved

    Check that Regular/Extra monitors are identified correctly

    Sources of interference

    Method 325A Section 4.1: Passive tube samplers should be sited at a distance beyond the influence of possible obstructions such as trees, walls, or buildings at the monitoring site … You must document and report siting interference with the results of this method.

    Sample Results Comments on data flags or any other caveats (optional)

    Data flag explanations may be added in automatically

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 14

  • www.erm.com

    Missing Samples

    Add any missing samples (damaged, animal knocked down, lab error, etc.) Enter at bottom of sample results tab

    with an explanation

    Separate document identifying missing samples with explanation

    Create a Pivot Chart in new tab of workbook to identify missing samples Must create new worksheet

    Delete worksheet when you’re done

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 15

    0

    2

    4

    6

    8

    10

    12

    14

    16

    Count of Samples in Each Sample Period

  • www.erm.com

    Package Data for Upload

    Instructions on the Welcome tabMultiple facilities may use the same templateEach facility only gets one supporting document Supporting documentation can be in any digital file

    format

    Zip template and supporting documentation into a single zip file that is uploaded to CEDRI Excel files, except the main reporting template,

    should be zipped separately inside master zip file

    Do not submit confidential business information (CBI) through CEDRI More information on submitting CBI in welcome tab

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 16

    *Zip file shown here would be for a reporting template with 2 facilities since there should be only 1 supporting documentation file per facility

    Master zip file

    Zipped Excel fileUnzipped word fileUnzipped reporting template]

  • www.erm.com

    Register for CEDRI

    https://cdx.epa.gov/Register

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 17

    Accept Terms and ConditionsAdd CEDRI to your active program service list

    https://cdx.epa.gov/

  • www.erm.com

    Register for CEDRI

    Select Role (below role descriptions) Preparer

    Certifier

    Delegated Certifier

    Request role accessAdd facilities (now or later)Complete personal information

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 18

  • www.erm.com

    Set Up CEDRI Profile

    https://cdx.epa.gov/Log In

    From homepage If CEDRI is not added, click “Add Program Service”

    If CEDRI is added, click your RoleERM Webinar: Overview of the FLM Reporting Process in CEDRI 19

    https://cdx.epa.gov/

  • www.erm.com

    Add Facility

    If there are no facilities added, click “here” at bottom of page to add one

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 20

    If there is at least one facility added,you’ll see option to “Create New Submission Package”

  • www.erm.com

    Add Facility

    Input search criteria in the field of choice and click “Search Facilities”

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 21

  • www.erm.com

    Add Facility

    Choose map or list view

    Choose the appropriate facility and click “Proceed with Selection”

    Click “Save Selected Facility”

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 22

  • www.erm.com

    CEDRI Upload

    Click “Create New Submission Package”Step 1: Create Package NameStep 2: Select Facility You can also add a facility here

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 23

  • www.erm.com

    CEDRI Upload

    Step 3: Select CC – Petroleum Refineries from the Part 63 subparts list Click “X” to close menu once you’ve made the selection

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 24

  • www.erm.com

    CEDRI Upload

    Click “Use Selected Report(s)”

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 25

    Select 63.655(h)(8) Fenceline Monitoring Report (Spreadsheet Template)Click “X” to close menu once you’ve made the selection

  • www.erm.com

    CEDRI Upload

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 26

    Click “Fenceline Monitoring Report Spreadsheet Template”

    Another place to download blank template

  • www.erm.com

    CEDRI Upload

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 27

    Click “Choose File”Select Master Zip File that you want to uploadClick “Upload”

  • www.erm.com

    CEDRI Upload

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 28

    Can “Save and Complete Later” at any point in the processRestart or remove “under development” submission packages from Submission Home tab

  • www.erm.com

    CEDRI Upload

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 29

    Click “Notify Certifier(s)”

  • www.erm.com

    Notify Certifiers

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 30

    Select from a dropdown list of existing certifiers associated with the facility

    Can also add a new certifier if the appropriate one isn’t listed

    Click “Send Notification”

  • www.erm.com

    Submitting Package

    There are four criteria which must be met before you may submit a CEDRI package: One registered Certifier for the CEDRI program

    service has access to the submittal

    User submitting package is registered as a Certifier or a Delegated Certifier

    A facility has been selected and set for the submission package

    All reports within the submission package have the status of ‘Pending Signature’

    When criteria are met, the ‘Submit’ button will be activated

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 31

  • www.erm.com

    Certify Package

    Accept certification statement Launches CDX Cross-Media Electronic

    Reporting Regulation (CROMERR) eSignature Widget

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 32

  • www.erm.com

    Certify Package

    Completing eSignature Widget is a three-step process: Log in to CDX

    Answer your secret question

    Click ‘Sign’ to sign the file

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 33

  • www.erm.com

    Certify Package

    Submission Home tab shows report status “Processing”CEDRI will send a confirmation emailAfter processing, package will appear in the “CEDRI History” list

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 34

  • www.erm.com

    WebFIRE

    https://cfpub.epa.gov/webfire/Search for reports

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 35

    https://cfpub.epa.gov/webfire/

  • www.erm.com

    WebFIRE

    Select Air Emissions ReportsSubmit Search

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 36

  • www.erm.com

    WebFIRE

    Search by Regulatory Part and Subpart Part 63 – NESHAP

    NESHAP – CC: Petroleum Refineries

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 37

  • www.erm.com

    WebFIRE

    Currently no search results for NESHAP CC Example shown is for NSPS Ja

    Download by selecting document and/or related attachments

    Can download in bulk

    ERM Webinar: Overview of the FLM Reporting Process in CEDRI 38

    Data available ~1 month after upload to CEDRI (?)Spreadsheet downloads just as it uploads

  • The business of sustainability

    Thank you Hedrick StricklandProject [email protected]+1 (919) 855-2290Raleigh, North Carolina

    Toby HannaPartnerRegional Lead, Air Quality & Climate [email protected]+1 (609) 403-7518Ewing, New Jersey

    Pat SorensenPrincipal [email protected]+1 (317) 706-2007Indianapolis, Indiana

    Andy [email protected]+1 (484) 913-0455Philadelphia, Pennsylvania

    mailto:[email protected]:[email protected]:[email protected]:[email protected]

    Overview of Fenceline Monitoring Reporting Process In CEDRIToday’s WebinarFinding the TemplateRegister for CEDRISubmitting PackageCertify PackageCertify PackageCertify PackageWebFIREDetailsFinding the TemplateFinding the TemplateReviewReview (continued)Missing SamplesPackage Data for UploadRegister for CEDRIRegister for CEDRISet Up CEDRI ProfileAdd FacilityAdd FacilityAdd FacilityCEDRI UploadCEDRI UploadCEDRI UploadCEDRI UploadCEDRI UploadCEDRI UploadCEDRI UploadNotify CertifiersSubmitting PackageCertify PackageCertify PackageCertify PackageWebFIREWebFIREWebFIREWebFIREThank you